Average Flow 10 m3/d Designflow 50 m3/d 0.0005787 m3/s Flow to be percolated in 8 24 hours Storage 2 days ( 1 day percolation 1 day emergency storage) Vol reqd 100 m3 Central column 3 m Type of Material Test Depth Permeability Soakaway Dimesions-TOP H perm Dimensions- Bottom Hbackfill (below EGS) m/s Area L B Depth Poorly Graded Sand 5.95-6.2 8.68056E-06 66.67 8 8 1.5 6 6 2.56 Poorly graded Sand 5.9 to 6 6.94444E-06 83.33 9 9 1.2 5.4 5.4 2.56 Poorly Graded Sand 5.9 to6.5 5.78704E-06 100.00 10 10 1 5 5 2.56 Poorly Graded Sand 6 to 6.5 4.34028E-06 133.33 12 12 0.75 4.5 4.5 2.56 Poorly Graded Sand 6 to 6.5 3.47222E-06 166.67 13 13 0.6 4.2 4.2 2.56 Poorly Graded Sand 6.5 to 7.5 2.89352E-06 200.00 14 14 0.5 4 4 2.56 Poorly Graded Sand 8to 8.5 1.44676E-06 400.00 20 20 0.25 3.5 3.5 2.56 Poorly Graded Sand 8to 8.5 8.68056E-07 666.67 26 26 0.15 3.3 3.3 2.56
Septic Tank Design
Average flow 10 m3/d Ground Level 25 HRT 2D IL of incoming pipe 23.31 Effective Vol 20 m3 Head loss 0.1 m Volume for sludge Depth of Tank 2m Period of accumulation 180 days Free board 0.5 m Solids accumulated 540 kgs Water Level 22.71 Sludge digested 237.6 kgs Tank bottom 20.71 Sludge digested,volume 23.07 m3 Head loss Total volume of tank 43.07 m3 Across the Septic Tan 0.07 m depth 2 m Septic Tank to Soak 0.1 m Area 21.5 m Diameter of pipe 0.1 m Width 2.8 m IL of pipe to soak pit 22.44 Length 7.7 m First Compartment 5.13 m Second Compartment 2.57 m
TABLE FOR PROPOSED GABION SOAK AWAY
Type of Material Permeability SOAK AWAY DIMESNIONS (m) Top of m/s b B Hperm Hbackfill Htotal Slab Level Poorly Graded Sand 8.6805556E-06 6 8 1.5 2.56 4.06 25.2 Poorly graded Sand 6.9444444E-06 5.4 9 1.2 2.56 3.76 25.2 Poorly Graded Sand 0.000005787 5 10 1 2.56 3.56 25.2 Poorly Graded Sand 4.3402778E-06 4.5 12 0.75 2.56 3.31 25.2 Poorly Graded Sand 3.4722222E-06 4.2 13 0.6 2.56 3.16 25.2 Poorly Graded Sand 2.8935185E-06 4 14 0.5 2.56 3.06 25.2 Poorly Graded Sand 1.4467593E-06 3.5 20 0.25 2.56 2.81 25.2 Poorly Graded Sand 8.6805556E-07 3.3 26 0.15 2.56 2.71 25.2 Flow 50 m3/d HRT 1 D Vol 50 m3 depth 2 m Area 25 m Width 3 Length 8.3 First Compartmen 5.533333 Second Compartment 2.766667