Sie sind auf Seite 1von 1

SHDC 2300

FINISH GRADE ELEVATION : 281.19

1650
PIPE, 2 - PVC 6" diameter
Orange with Clean-out

1650

125
CHARCOAL
BASKET
1650

RC DIVERSION PIPE
FROM DRAINAGE
2125
1 CHARCOAL
BASKET
Breather
INFLOW 2
365
1650

Gravel
FGL Charcoal Basket
CHARCOAL
150 Gravel BASKET D=8", W=6" and L=24"
450 anchored to masonry wall.
365
FGL 3
150 1650
200
450
Gravel
CHARCOAL
BASKET
200
Sand 365
PERIMETER REBARS
FGL 4
150
2-12mm dia. longitudinal with 1650
450
10mm dia. transverse @ 200mm O.C.

Gravel Gravel
600
200
Sand
FGL

TYPICAL SECTION 450


150

SLAB REBARS
NOT TO SCALE 10mm dia. deformed bars @
200 200
300 mm O.C. B.W.

TO RIVER

Das könnte Ihnen auch gefallen