SCOPE OF WORK

Document No : FORM-ENG-001 Responsibility : Engineering


REV. 01 Date : February 26, 2016 Page : 1 of 1
No. : 1 of 1 Customer : HUB SURABAYA Part Name :

Date : September 7, 2019 Job No. : Model/Unit :

SSC ID : SSC SA-3786 Quote No. : Part No. :


PLANNED PROCESS
Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign
10 Striping ID Bearing Seat 1 Ö CNCVL 2.0
20 Striping ID Bearing Seat 2 Ö CNCVL 2.0
30 Striping ID Bearing Seat 3 Ö CNCVL 1.0
40 Masking Ö SPRAY 1.0
50 Blasting Ö SPRAY 1.0
60 Final Machining Ö SPRAY 8.0
70 Check Concentricity Ö CNCVL 1.0
80 Handressing & Cleaning Ö HD 1.0
90 Post Inspection Ö QC 1.0
100 Packing Ö HD 1.0
110 Final Inspection Ö QC 1.0
Ö

REMARKS

UN-PLANNED PROCESS / REWORK


Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign

Issued by: (Engineering) Reviewed by: (Engineering Spv.) Received by: (Production Spv.)
For

RFS Date: ASR Date: Date:


Prcs. No : 70
Process Definition : Final Machining

Ø 4 4 7 .6 1 ± 0 .0 3 8

Ø 3 5 8 .7 2 ± 0 .0 3 3
Ø 5 9 0 .0 0 ± 0 .0 5

44.00

52.94

Dimension Record (Critical Dim.) X: X' :


Y: Y' :
Inspection Requirement: Rev:00