Action statement
Prepared by Name
Title Job title
Branch/District Branch/District
Division/Region Division/Region
Location Floor, street, city
Version no. 1.0
Version date 07 October 2004
Status Draft/Final review/Sign off (delete 2 of)
DMS ref. no. DMS reference number
File/Doc no. File number/document number
Version history
Customer
Name
Position
Signature Date
Sponsor
Name
Position
Signature Date
Name
Position
Signature Date
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 2 of 14
Project name Business Process Analysis
Contents
1 Introduction ............................................................................................................5
1.1 Purpose of this document..........................................................................................5
1.2 References ................................................................................................................5
1.3 Definitions................................................................................................................5
3 Stakeholders............................................................................................................6
4 Background.............................................................................................................7
7 Scope of project.......................................................................................................8
7.1 In scope ....................................................................................................................8
7.2 Out of scope .............................................................................................................8
7.3 Related projects ........................................................................................................8
7.4 Constraints................................................................................................................9
7.5 Urgency....................................................................................................................9
7.6 Assumptions .............................................................................................................9
8 Impacts ....................................................................................................................9
8.1 Internal ...................................................................................................................10
8.2 External ..................................................................................................................10
11 Business processes.................................................................................................11
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 3 of 14
Project name Business Process Analysis
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 4 of 14
Project name Business Process Analysis
1 Introduction
Text in this document which has been copied forward from the previous document
has been shown bold and italics “words copied from previous documents”.
1.2 References
This item lists any documents to which this document refers and could include
reports on any previous investigations carried out. Include all previous documents
prepared as part of this project.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
1.3 Definitions
In the table below define any term which this document’s audience may not
understand, including specific terms, abbreviations and acronyms.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 5 of 14
Project name Business Process Analysis
3 Stakeholders
This section should illustrate the consultation undertaken with stakeholders in
developing this document and the key findings of that consultation. List all
stakeholders with an interest in this document including internal stakeholders (from
regions/districts/divisions/branches with the department) and external stakeholders.
Stakeholders may be listed in tabular form (as below) if considered appropriate.
Stakeholders may be categorised (internal, external and so on) if appropriate.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 6 of 14
Project name Business Process Analysis
4 Background
Provide a brief history to bring the reader up to date on the subject matter and
associated business issues.
This section should describe the history of the project. It should include details of:
- Who initiated the project and how it was initiated
- Describe the products and/or services
- Describe any other initiatives carried out previously to address related issues.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
5 Current situation
Describe here the current situation and the problems, needs and/or opportunities
along with their associated impacts on internal and external stakeholders.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
6.1 Purpose/objectives
A statement of what the project is expected to achieve including potential benefits
based upon the current state of knowledge and understanding.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 7 of 14
Project name Business Process Analysis
7 Scope of project
7.1 In scope
This defines the project boundaries to facilitate effective management of deliverables
on time and to agreed/approved cost. The scope outlined in any previous document
should be confirmed here or updated as necessary. List all items that are included in
the scope of this project.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 8 of 14
Project name Business Process Analysis
7.4 Constraints
Restrictions which will limit the way the objective is to be achieved (describe
anything that might impact on the successful development and/or implementation of
the project). This may include restrictions on budget / funding, political issues,
limited resources to work on the project, timing constraints or constraints on the
implementation of the outcomes of the project.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
7.5 Urgency
Identify the urgency of the project stating reasons.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
7.6 Assumptions
List all assumptions made in producing this document.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
8 Impacts
This can be completed in narrative or table format.
Identify areas of potential impact, the nature of impact and who will be impacted
(internal and external). Include both the impacts envisaged during the life of the
project (that is, costs, disruptions, temporary arrangements, and so on) and ongoing
impacts resulting from the project’s product/deliverables.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 9 of 14
Project name Business Process Analysis
8.1 Internal
This item describes when, where and how the project will impact on areas within the
department and should include an outline of both positive and negative influences.
Consider here the culture change and change management aspects that will be
needed to introduce the proposed changes the project will bring. Impacts on staff
and likely staff attitudes need to be considered as well as the impacts on the business.
To delete this guidance text box, double click mouse in the left margin then press
delete.
8.2 External
This item describes the impact that the project will have outside the department and
includes both positive and negative impacts on external stakeholders.
To delete this guidance text box, double click mouse in the left margin then press
delete.
9 Method to date
In this section describe the steps taken in developing this document. Describe any
investigations carried out, research methodology used and consultation carried out
to date.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 10 of 14
Project name Business Process Analysis
10 Outstanding issues
List here any requirements that have been broadly identified but are as yet
unresolved at the appropriate level of detail.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
11 Business processes
In this section, document all of the existing business processes that this project will
affect. Identify the areas that are impacted by these changes. Also, list any new
processes required to support this project. Indicate the areas affected by these new
processes. This information may best be illustrated in tabular form similar to that
shown below.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 11 of 14
Project name Business Process Analysis
12 Process maps
The following process maps show the business processes affected by the project.
These maps will be at a high level for the PBPA document but refined to a detail
level in the FBPA document since the selected option is then known and the level of
detailed information will be further advanced.
To delete this guidance text box, double click mouse in the left margin then press
delete.
Type here
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 12 of 14
Project name Business Process Analysis
When all information has been put into this document and the guidance text boxes
have been deleted, it will be necessary to reformat the document taking out any blank
lines. Once this is done, right click mouse in the table of content, click Update Fields,
Update entire table, then click OK. This will update the table of contents to show the
new page numbers.
To delete this guidance text box, double click mouse in the left margin then press
delete.
----- ooooo-----
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 13 of 14
Project name Business Process Analysis
Queensland Transport and Main Roads Version 1.0 18 July 2006 Page 14 of 14