Beruflich Dokumente
Kultur Dokumente
PROFILE
Dedicated and having 6+ years of experience in Civil Engineer. Capable of working
independently with maximum best supervision, and best drawing design committed to providing high
quality service to every project, with a focus on health, safety and environmental issues
EMPLOYMENT HISTORY
May 2013 to May 2014 - Site Engineer, R.S.R Enterprises , Thiruthuraipoondi
Zonal Work at Thiruthuraipoondi
Improvement of technical basic building plans provide in
field
Extension of labour productivity in building work in best
supervision.
Jun 2014 to Mar 2016 - CIVIL ENGINEER, Prompt Conmtracting llc, DUBAI
Zonal Work at GLOBAL VILLAGE{near Arabian ranches}
Improvement of better knowledge and workmanship.
According to work for Warehouses, Planting, Interlocking
Extension of labour heavy workmanship combined that any
project duration of complete
Very Exciting of places and good communication for
learning the work and language.
SKILLS
Technical - Operating System, Windows OS
Software - Auto CADD, REVIT Architecture,3D’sMAX, MSOffice.
ADOBE PHOTOSHOP, Primaveera
Personal - Creativity Thinker, Imagination, Team leader, Communication Skill
TRAINING PROGRAMME
Attended In-plant training at studying that fishery harbor area surrounding that learn for case
study in that place in Cochin & Kerala from 28th March, 2016 to 28th March, 2017.
Attended Ten day training program on “BEST PRACTICES FOR CIVIL CONSTRUCTION
SUPERVISOR” {MSME DEVELOPMENT INSTITUTE}, Chennai.
Attended Surveying and Levelling Camp in Vallam, Thanjore for Seven days.
PROJECT DETAILS
Title - Study of Green house building including that solar panel system and building use
of water recycling the garden purpose and ground water.
Specialization - Global Engineering
Duration - July 2017-April 2018
Description - The determine building that inside nobody current for observed the solar panel
board observed the heat of sun evaporate consolidation, So green house in some place in building cool
and non A/C solution but building use of water wastage of runoff fluent water recycling purpose of the
garden purpose using the water again the continuous process. This project in main concept awareness of
the building construct in field.
REFERENCE
DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge.
Place: