Sie sind auf Seite 1von 3

SRA - GEN

Document Type: Risk evaluation and risk assessment


Fact-finding
No: 021 Revision: 1
Energy Sector Activity: (include El-Cid-test)
Location: Site Date: 01/2013
Document reviewed:

Work area: Generator (all types) Issued by: HSE- Department


Document released:
Document Handling: For Siemens internal use only
Persons Affected (e.g. operators, maintenance, visitors, public etc): Preliminary
Status: Review: Following any significant legislation or
Those performing the task and others in the work area Final procedure changes but no later than: - 12 Months

The Risk Assessment Severity (S) Likelihood of harm (L) Risk Rating (R) = S x L
1. Identify and record for each hazard/risk 1 = No Injury 1= Very Unlikely 1 to 6 = Low Risk (L) (Acceptable, Monitor & Review) Likelihood of harm
identified the appropriate rating for 1 2 3 4 5
severity and likelihood without controls. 2 = Minor Injury 2 = Unlikely 8 to 12 = Medium Risk (M) (Acceptable with controls)
1 1 2 3 4 5

Severity
3 = Lost time Injury 3 = Likely >12 = High Risk (H) Unacceptable
2. Identify and record the control 4 = Major Injury 4 = Very Likely
2 2 4 6 8 10
measures to be used then repeat the
5 = Death or Permanent Disability 5 = Certain
3 3 6 9 12 15
assessment with the controls in place
4 4 8 12 16 20
NOTE: If after risk evaluation and with all the necessary controls in place; the risk rating (R) is HIGH,
the HS&E department are to be contacted for guidance on the task/process. 5 5 10 15 20 25
Assessment Assessment
(No Controls) (With Controls)
Hazard/Risk Controls
S L R S L R

• Try to route lines overhead


• Materials and tools which are not required shall be removed
SLIPPING, STUMBLING AND FALLING ON SAME LEVEL 3 3 M from the work area 3 1 L
• Traffic routes shall be kept free
• ensure area is tidy and clean
• Installation of scaffolding or handrails or barriers
• only access scaffolding that has been inspected and approved
• Scaffolding shall only be installed or modified by a specialist
company
WORKING IN ELEVATED WORK AREAS 5 3 H • Each employee shall check scaffolding for obvious deficiencies 5 1 L
before accessing
• All scaffolding shall be inspected weekly by a trained and
qualified scaffolding inspector
• use PPE to prevent falling
• Obtain permit to work
• Perform visual inspection of Tag out and lockout for correct
implementation before entering confined spaces
• Only use electrical equipment with safety extra-low voltage
(SELV) or protected extra-low voltage (PELV)
WORKING IN CONFINED SPACES • Assign manhole watch
(inadequate evacuation and rescue possibilities, poor communication to • Maintain constant contact with manhole watch
the outside, risk of panic attacks, poor ventilation conditions, insufficient 5 3 H • Check atmosphere (oxygen concentration) before start of work, 5 1 L
room to move)
keep rescue equipment ready if necessary
• Ensure tidiness and cleanliness during maintenance work in
confined spaces
• Working alone is prohibited; 2 employees as a minimum
• Suitable persons
• Use respirator equipment if necessary
• Install continuous ambient air monitoring if necessary
• Use scaffolding access point if access is necessary
• Ensure tidiness and cleanliness during maintenance work in
ENTRANCE, EXIT, EMERGENCY EXITS 3 4 M 3 2 L
confined spaces
• Clearly define access and exit points
HAZARD DUE TO IMPACTS TO HEAD 2 4 M • Wear hardhat or protective cap 2 3 L

• Only use tools which are appropriate or intended for the activity
• Visual inspection before use
WORKING WITH HAND TOOLS/MEASURING EQUIPMENT 3 3 M • Safety instructions in the instruction manual shall be observed 3 1 L
• Wear appropriate personal protective equipment

Supervisors must review the work activity & complete the following sections, before commencing work to ensure that all risks are identified and controlled.

Assessment Assessment
(No Controls) (With Controls)
Additional Hazard/Risk Additional Controls
S L R S L R
• CORRECT PPE AT ALL TIMES
• TOOLBOX TALK TO BE GIVEN BEFORE
COMMENCEMENT OF WORK
• ALL PERSONNEL TO BE SUITABLY QUALIFIED AND
EXPERIENCED(SQEP)
UNAUTHORIZED PERSONS/ OTHER SUBCONTRACTORS IN
• Mark areas and barricade off if necessary
WORK AREA 5 4 H 5 2 M
• Inform subcontractors of risks
POOR LIGHTING 3 4 M 2 1 L
• Lighting that is appropriate to the situation shall be provided
• Select low-noise work procedures
• Observe all noise protection and hearing protection
NOISE / AMBIENT SOUNDS 4 4 H 4 1 L
instructions
• Wear appropriate personal protective equipment if necessary
• Try to route lines overhead
• Materials and tools which are not required shall be removed
SLIPPING, STUMBLING AND FALLING ON SAME LEVEL 3 3 M from the work area 3 1 L
• Traffic routes shall be kept free
• ensure area is tidy and clean

Primary Legislation: Associated Documentation:


ArbSchG: GV 02 Risk Assessment(s):-
Method Statement(s)
BGV: A3,C16, Lifting Plan if Required
COSHH Assessment(s)
BGR: 189, 191,192,193,194,195,197.198,500 Process Specification Sheet:-
Site Procedure:-
BGI: 515, 593, Local Management Instruction(s)

TRBS:2131,2111-1/2/3/4,2210

Assessed by Supervisor: Name: Date:

“This document contains proprietary information. It is submitted in confidence and is to be used solely for the purpose for which it is furnished and returned upon request.
This document and such information are not to be reproduced, transmitted, disclosed, or used otherwise in whole or in part without written authorization.”

Das könnte Ihnen auch gefallen