Beruflich Dokumente
Kultur Dokumente
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Design Basis
-------------------------------------------------------------------------------------------------------------------------------
1 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1.0 Detailed design of 1x30.0m c/c span integral bridge at ch. 153+347 km for Northern
Carriageway of Ramban- Banihal section of NH-1A
1.1 Basis
Basic design criteria have been prepared with a view to satisfy all the relevant technical
requirements specified in the contract.
1.3 Material :
a) Grades of concrete are as follows:
i) Foundation :M40
ii) Substructure :M40
iii) Superstructure :M40
iv) crash barrier :M40
v) Retaining wall :M35
b) Grade of Reinforcement :Fe-500
c) Prestressing steel :12.7mm dia low relaxation strand of
UTS 1862 Mpa confirming to IS:14268
1.4 LOADS :
a) Unit Weight of Materials :
i) Unit weight of PSC super structure = 25.0 KN/m3
ii) Unit weight of RCC substructure & foundation = 25.0 KN/m3
iii) Unit weight of Structural steel = 78.5 KN/m3
iv) Unit weight of Wearing course = 22.0 KN/m3
v) Unit weight of Earth = 19.0 KN/m3
f) Impact (IL)
Impact factor of live load has been calculated as per IRC: 6-2014
Impact Factor for class-A = 4.5/(6+L)
i) Snow load
Snow load shall be calculated as per clause no. 221 of IRC:6-2014.
a) 0.25m ht of snow load to be added over 70R wheeled loading
b) 0.5m ht of snow load to be added over 70R tracked loading
r) Buoyancy (Gb)
Buoyancy as per clause no. 213 of IRC:6-2014 for water at HFL shall not be applicable for the above bridge
as the proposed integral bridge is away from the stream.
-------------------------------------------------------------------------------------------------------------------------------
3 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
4 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1.5 Arrangement
PSC superstructure of span 30.0m c/c over RCC abutments on RCC open foundation have been proposed.
For two lane bridge with footpath, total width of carriageway is 9.0m and total width of deck slab
(incl. two nos. crash barrier & one railing) is 12.0m. 4nos. PSC girders are integrated with abutment.
1.6 Analysis
The longitudinal & transverse analysis of integral bridge has been done by Staad pro for Seismic load, DL,
SIDL, live load, secondary effect of prestress, support settlement, temperature earth pressure creep &
shrinkage etc.
Dead load analyses, prestressing forces & loss and stress calculation have been done by excel spreadsheet
prepared in-house. Design of abutment & its foundations have been done by excel spreadsheet.
1.7 Construction Methodology
Foundation
Before casting of RCC open foundation for abutment A1 & A2, foundation trench shall be excavated with
proper shoring to avoid collapse or slip circle failure. Open foundation with sliding key shall be placed on firm
rock bed. If any unsuitable material on foundation level or any loose pockets are observed on foundation
level, the same shall be removed /replaced by the PCC M15. RCC cast-in-situ foundation for both abutments
shall be laid over 100thk PCC M15 levelling course.
Substructure
RCC cast-in-situ abutment shall be cast over open foundation. The precast PSC 4nos. girders shall be placed
on PCC levelled plinth over abutment wall. Backfilling behind abutment shall be done after complete integration
of substructure & superstructure.
Superstructure
Stage-1 :- All 4 nos. Precast girders shall be cast over abutment with proper staging or casting yard.
Stage-2 :- After 5 days casting of Girder, first stage cables shall be stressed as per given force & elongation.
Stage-3 :- Second stage cables shall be stressed after 28 days of casting of precast girder.
Stage-4 :- All Precast girders shall be placed/erected on PCC levelled plinth over abutment wall.
Stage-5 :- Deck slab & X-Girder shall be monolithically cast after erecting necessary shuttering from precast
girder at 60 days except at top of abutment portion.
Stage-6 :- After 30 days casting of Deck Slab i.e. after 90 days casting of Precast Girder, top of abutment
cap shall be cast for jointing of superstructure & substructure after removing of all shuttering.
Stage-7 :- After 28/30 days jointing of superstructure & substructure i.e. after 120 days casting of
Precast Girder, SIDL shall be laid.
-------------------------------------------------------------------------------------------------------------------------------
5 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Design Data
-------------------------------------------------------------------------------------------------------------------------------
6 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
2.0 Design Data for Simply Supported Prestressed I-Girder of span 30.0m - Curved span
2.1 Geometric details
C/C distance of abutments = 30.00 m Effective girder span = 28.50 m
Deck slab overhang over pier = 0.75 m Girder overhang at either end = 0.25 m
Note - Overhangs are measured from the centreline of bearing. Angle for span, θ = 0.27 radian
Average Radius of curvature R = 110.00 m Design velocity of vehicle = 60 kmph
Actual length of girder, LG4 = 30.356 m Actual length of girder, LG3 = 29.711 m
Actual length of girder, LG2 = 29.049 m Actual length of girder, LG1 = 28.414 m
Elevation
-------------------------------------------------------------------------------------------------------------------------------
8 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
12.550
0.5 1.500 0.50 9.000 0.50
65 thk w/c
0.225 1.250
0.2
0.1
0.2
0.75 0.25
1.050 3.000 3.000 3.000 2.350 to 1.5
to 2.3 Section X-X
Center of Symmetry
0.225
0.2
0.10 0.30
1.75 1.75
2.00 1.775 1.525
0.20
0.25
0.75 28.50
30.00
0.250
Section Y-Y
X
3.00
13.100 Girder-LG2
3.00
Girder-LG3
3.00
Cross Girder
Girder-LG4
1.50 2.350
X
0.750 28.50
30.00
Plan
-------------------------------------------------------------------------------------------------------------------------------
9 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
10 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.2 1 1
0.1 2 2
0.475
D= 1.775 3
0.2 4 4
0.25 5 5
0.225 0.3
0.75
0.2 1 1
0.053 2 2
0.25
D= 1.775 3
0.75
-------------------------------------------------------------------------------------------------------------------------------
11 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Calculation of Sectional properties of main girder & cross girder for STAAD Analysis
2.8.3 Sectional properties of Composite Precast Girder & Deck Slab : At Mid Span
As per cl. No. 7.6.1.2 of IRC 112-2011, the width of compression flange of beams with solid webs
beff = ∑ beff,i +bw for T-Beam beff,i = 0.2bi+0.1l0
bw = Width of web = 0.3 m lo = effetive span = 28.50 m
bi = Spacing of girder = 3 m
be = 3.000 m for T-Beam 3.000 m for L-Beam
3.000
1.25
Y
1 0.225
0.2 2 2
0.1 3 3
0.475
D= 1.775 Z 4 Z
0.2 5 5
0.25 6 6
0.225 0.3
0.75
Y
Flexural Stiffness about major axis X-X:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I xx(i) Ixx(i)+A(d'i)2
Bottom (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 3.000 0.225 1 0.6750 1.888 1.27406 2.40479 0.002848 2.40764
2 0.475 0.200 2 0.1900 1.675 0.31825 0.53307 0.000633 0.53370
3 0.475 0.100 2 0.0475 1.542 0.07323 0.11289 0.000026 0.11292
4 0.300 1.775 1 0.5325 0.888 0.47259 0.41943 0.139809 0.55924
5 0.225 0.200 2 0.0450 0.317 0.01425 0.00451 0.000100 0.00461
6 0.225 0.250 2 0.1125 0.125 0.01406 0.00176 0.000586 0.00234
Total A = 1.6025 Total Axd'i = 2.1664 Total ICG(i)+ A ( d'i )2 = 3.6205
Total A = 1.603 m2
Total CG from bottom CG = =A/Axd'i = 1.352 m
Total Moment of Inertia about CG =ICG(i) + A ( d'i )2 -Ax CG^2 = 0.692 m4
3
Z Top of slab =I/(D+d-CG) = 1.067 m
3
Z bot of slab = 1.635 m
Zbottom of beam =I/CG = 0.512 m3
Perimeter in contact with air u = = 10.473 m
Flexural Stiffness about major axis Y-Y:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Centre (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.225 3.000 1 0.6750 0.000 0.00000 0.00000 0.506250 0.50625
2 0.200 0.475 2 0.1900 0.388 0.00000 0.02853 0.003572 0.03210
3 0.100 0.475 2 0.0475 0.308 0.00000 0.00452 0.000595 0.00511
4 1.775 0.300 1 0.5325 0.000 0.00000 0.00000 0.003994 0.00399
5 0.200 0.225 2 0.0450 0.225 0.00000 0.00228 0.000127 0.00240
6 0.250 0.225 2 0.1125 0.263 0.00000 0.00775 0.000475 0.00823
Total Area = 1.6025 Total Axd'i = 0.00000 Total I = 0.55809
Total Moment of Inertia about CG = 0.558 m4
Torsional Stiffness : 3.000
Id. No. d b d/b k J0 = kb3d 1 0.225
(m) (m) (m4) 1.0917 2 0.300
1 3.0000 0.2250 13.333 0.333 0.01138
2 1.0917 0.3000 3.639 0.275 0.00809
3 1.025
3 1.0250 0.3000 3.417 0.271 0.00749 0.3
4 0.6500 0.4500 1.444 0.190 0.01128
Total torsional stiffness 0.03824 4 0.450
0.6500
-------------------------------------------------------------------------------------------------------------------------------
12 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
2.8.4 Sectional properties of Composite Precast Girder & Deck Slab : At Support
3.000
1.25
Y
1 0.225
0.2 2 2
0.053 3 3
0.25
D= 1.775 X 4 X
0.75
Y
Flexural Stiffness about major axis X-X:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Bottom (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 3.0000 0.225 1 0.6750 1.8875 1.27406 2.40479 0.002848 2.40764
2 0.2500 0.200 2 0.1000 1.675 0.16750 0.28056 0.000333 0.28090
3 0.2500 0.053 2 0.0132 1.557 0.02049 0.03192 0.000002 0.03192
4 0.750 1.775 1 1.3313 0.888 1.18148 1.04857 0.349522 1.39809
Total A = 2.1194 Total Axd'i = 2.6435 Total ICG(i)+ A ( d'i )2 = 4.1185
Total A = 2.119 m2
Total CG from bottom CG = =A/Axd'i = 1.247 m
Total Moment of Inertia about CG =ICG(i) + A ( d'i )2 -Ax CG^2 = 0.821 m4
Z Top of slab =I/(D+d-CG) = 1.091 m3
Z Top of girder 1.556 m3
Zbottom of girder =I/CG = 0.658 m3
Flexural Stiffness about major axis Y-Y:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Centre (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.225 3.000 1 0.6750 0.000 0.00000 0.00000 0.506250 0.50625
2 0.200 0.250 2 0.1000 0.500 0.00000 0.02500 0.000521 0.02552
3 0.053 0.250 2 0.0132 0.833 0.00000 0.00914 0.000046 0.00918
4 1.775 0.750 1 1.3313 0.000 0.00000 0.00000 0.062402 0.06240
Total Area = 2.1194 Total Axd'i = 0.00000 Total I = 0.60336
Total Moment of Inertia about CG = 0.603 m4
Torsional Stiffness : 3.000
Id. No. d b d/b k J0 = kb3d 1 0.225
(m) (m) (m4) 1.1979 2 0.253
1 3.0000 0.2250 13.333 0.333 0.01138
2 1.1979 0.2526 4.742 0.288 0.00557 3
1.522
3 1.5224 0.7500 2.030 0.230 0.14792 0.75
Total torsional stiffness 0.16487
2.8.5.
2.8.5 Sectional properties of Composite Precast Girder & Deck Slab : At flared Portion
3.000
1.25
Y
1 0.225
0.2 2 2
0.076 3 3
0.3625
D= 1.775 X 4 X
0.100 5 5
0.25 6 6
0.1125 0.525
0.75
Y
-------------------------------------------------------------------------------------------------------------------------------
13 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
2.8.6.
2.8.6 Sectional Properties of intermeaiate Cross Girder Member
3.563
1 0.225
2 1.525
0.30
-------------------------------------------------------------------------------------------------------------------------------
14 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
15 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Load Calculation
-------------------------------------------------------------------------------------------------------------------------------
16 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Avg. Dist. from LG4 = 1.585 m 0.650 m at support Moment= 4.88 kN-m at support
1.155 m 1.080 m at span Moment= 8.10 kN-m at span
Outer girder LG1, support 1.761 m Width = 2.761 m =2.761x0.1x22 = 6.07 kN/m
CG from girder = -0.120 m Moment = -= 0.73 kN-m
Outer girder LG1, support 2.122 m Width = 3.122 m =3.122x0.1x22 = 6.87 kN/m
CG from girder = 0.061 m Moment = = 0.42 kN-m
Inner girder LG2 = 3.0 m = 6.600 kN/m 0 m
Inner girder LG3 = 3.0 m = 6.600 kN/m 0 m
Outer girder LG4 = 2.500 m = 5.500 kN/m 0.25 m
Outer girder LG4, support 1.585 m Width = 0.585 m =0.585x0.1x22 = 1.29 kN/m
CG from girder = 1.208 m Moment = = 1.55 kN-m
Outer girder LG4, support 1.155 m Width = 0.155 m =0.155x0.1x22 = 0.34 kN/m
CG from girder = 1.423 m Moment = = 0.49 kN-m
-------------------------------------------------------------------------------------------------------------------------------
17 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
(For slab bridge, CD =1.1, For Single beam/Box girder, CD =1.5 for b/d<=2.0, CD =1.3 for b/d>=6.0 and inbetween interpolated CD to be considered)
G = Gust Factor (If Span<=150, G=2, Otherwise Wind tunnel testing required) = 2.0
CL = Lift coefficient = 0.75
-------------------------------------------------------------------------------------------------------------------------------
18 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.84
2.06 2.9
0.84
0.914 0.914 0.914 0.914 0.914
4.57
3.656
Live Load Position in Plan
12.55
0.5 1.500 0.50 9.00 0.50
2.9
0.84 0.84 1.2
-------------------------------------------------------------------------------------------------------------------------------
19 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
13.4
-------------------------------------------------------------------------------------------------------------------------------
20 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
18.80
12.55
0.5 1.500 0.50 9.00 0.50
-------------------------------------------------------------------------------------------------------------------------------
21 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
F
1025 300 h= 2000 mm
200 G 525
100 H
150 I h3 =0.3h<0.15m = 150mm
2.1
750
Equivalent Beam Section Temperature Rise
E= Elastic Modulus of Concrete at service Condition = 3.3E+04 N/mm2
α = Coefficient of thermal coefficient of concrete = 1.2E-05 /0C
CG = 1352 mm A= 1.603
Temperature Stress : = EαT = x xT Zt = 1.067 Ztb = 1.635
Zbb = 0.512
Force
Block Area Stress (σ) y (mm) Moment
(A x σ)
1 450000 4.26 1917.71 557.47 1069.07
2 225000 1.36 306.11 458.38 140.32
3 218750 0.56 122.55 306.42 37.55
4 112500 0.42 47.27 -1251.92 -59.18
2394 1188
Axial Tension = 2394 kN
Strain =F/(E*A) = 0.000045
Hogging Moment = 1188 kN-m
+ + =
Temperature Stresses :
Top of Slab : 6.92 - 1.494 = 5.43 - 1.11 = 4.32 N/mm2
Top of Beam : 1.12 - 1.49 -= 0.37 - 0.73 -= 1.10 N/mm2
Bottom of Beam: 0.84 - 1.49 -= 0.65 + 2.32 = 1.67 N/mm2
-------------------------------------------------------------------------------------------------------------------------------
22 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
b) Temperature Fall
3000
10.6
225 A h1 =0.2h<0.25m = 250mm
25 B 1.69
175 C 1250 0.7 h2 =0.25h<0.25m = 250mm
75 D 775 0.210
25 E
F
975 300 h= 2000 mm
E= = 3.3E+04 N/mm2
α= = 1.2E-05 /0C
CG = 1352 mm A= 1.603
Temperature Stress : = EαT = x xT Zt = 1.067 Ztb = 1.635
Zbb = 0.512
Forcein top Slab as per cl. 218.5 to control
Hence sufficient amount Longitudinal reiforcement needs to provide
Block Area Stress (σ) y (mm) Moment
the thermal cracking. (A x σ)
1 675000.0 -2.46 -1659.77 508.40 -843.82
2 31250.0 -0.48 -14.94 408.86 -6.11
3 218750.0 -0.18 -39.83 519.88 -20.71
4 58125.0 -0.08 -4.88 423.08 -2.07
5 15000.0 -0.06 -0.96 -1318.58 1.27
105000.0 -0.19 -20.17 -1229.70 24.80
4 187500 -1.48 -277.60 -1194.26 331.53
-2018 -515
Axial compression = -2018 kN
Strain =F/(E*A) = -0.000038
Sagging Moment = -515 kN-m
-4.24 + 1.26 + 0.48 -2.50
-0.68 + 1.26 + 0.32 0.90
-0.28
-0.08
+ + =
-0.06
-0.32
-2.64 1.26 -1.01 -2.39
-------------------------------------------------------------------------------------------------------------------------------
23 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
+ + =
-------------------------------------------------------------------------------------------------------------------------------
24 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
25 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
3.10.2 Active earth Pressure on vertical wall at seismic case 0.000 kN/m2
-------------------------------------------------------------------------------------------------------------------------------
26 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
3.10.3 Active earth Pressure on tranverse side wall at normal case 0.000 kN/m2
(As per clause no. 214 of ammendment no. 2 of IRC:6-2014, August 2014)
Active earth pressure coefficient at Normal case Ka
= Cos2(φ-α)
Cos α*Cos(α+δ)*[1+{Sin(φ+δ)*Sin(φ-β)/(Cos(α-δ)*Cos(δ+α))}1/2]2
2
-------------------------------------------------------------------------------------------------------------------------------
27 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
28 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
29 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
30 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.475 0.2
0.1 0.053
0.2
0.25
0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN
= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 22.44 1.75 1.75 0.250
4.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 3.445 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008
-------------------------------------------------------------------------------------------------------------------------------
31 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
19.376
-------------------------------------------------------------------------------------------------------------------------------
32 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
33 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
34 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
35 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
36 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
4.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 4 36 26 27 28 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.680 7.360 11.039 14.719
Precast girder only -1.1 1160.0 1961.1 2448.1 2621.2
Construction load -0.2 318.4 545.9 682.5 728.0
Deck slab & X-girder -0.6 936.1 1610.4 2022.3 2171.9
Total wt of deck slab = -1.7 2096.1 3571.5 4470.5 4793.1
SIDL (DL) from staad output -354.9 -105.1 118.3 195.2 128.5
SIDL (WC) from staad output -409.0 -167.5 86.2 247.9 311.1
Removal of shutter 392.1 152.4 -89.8 -236.1 -286.5
Active Earth pressure -211.6 -211.6 -257.6 -284.2 -284.2
Earth pressure at rest -344.8 -231.0 -388.9 -433.5 -310.6
Earth pressure at K* -451.4 -510.0 -590.1 -670.1 -749.9
Live load surcharge 456.2 340.4 225.1 110.5 -3.8
Wind load (unloaded structure) -416.8 -148.5 145.9 160.0 174.1
Wind load (loaded structure) -204.2 -67.4 68.4 146.5 167.0
Differential settlement -900.0 -728.4 492.9 255.4 17.0
Temperature rise -326.1 -387.2 -468.2 -547.8 -626.8
Temperature fall 152.2 180.6 218.4 255.4 292.1
Creep & shrinkage -72.8 -90.8 114.4 137.3 159.9
Footpath live load 38.8 23.4 2.6 -18.2 -40.0
Snow load -238.9 -92.4 55.0 143.1 171.7
Braking load 110.1 89.1 60.6 31.9 3.3
Live Load -2274.3 -961.0 899.3 1591.9 1566.7
Seismic in X- direction -1444.5 -1206.7 -863.7 -485.1 -78.7
Seismic in Z- direction -1196.2 -555.2 -245.8 -761.8 -913.0
Seismic in Y- direction -183.3 -86.8 -38.9 -112.6 -138.0
Dynamic increment of Earth pr. -121.5 -131.8 -145.9 -160.0 -174.1
Dynamic increment of LL Surcharge 159.7 127.7 84.5 41.5 -1.4
Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 139.114 142.084 145.631 142.928 142.397
Moment -1070.6 -1067.5 -1062.4 -1056.5 -1050.1
The hyperstatic action is only considered for calculation of negative moment at support.
-------------------------------------------------------------------------------------------------------------------------------
37 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
38 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.300
4
0.350
X X X 3
1.775 0.400
2
4 0.400
1 3 2 0.170 1 0.325
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support
-------------------------------------------------------------------------------------------------------------------------------
39 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.25 14.719
Y
4.50
1 2 X 0.17
0.17
0.15 14.969
0.15
0.30 4
0.350 3
0.400 Z
2
0.400
1 0.170
0.125
0.33 0.25 3.000 4.50 3.00 4.219
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.325-0.125)/(0.25+3-0.15)} = 3.691
o
Vertical bending of Cable 2 =Tan-1{(0.325+0.4-0.125-0.17)/(0.25+3+4.5-0.15)} = 4.514
o
Vertical bending of Cable 3 =Tan-1{(0.325+0.4+0.4-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 5.389
o
Vertical bending of Cable 4 =Tan-1{(0.325+0.4+0.4+0.35-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 6.352
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.325 3.100 0.000 0.125
2 0.000 0.000 0.725 7.600 -0.170 0.125
3 0.000 0.000 1.13 10.600 0.000 0.125
4 0.000 0.000 1.48 10.600 0.000 0.295
-------------------------------------------------------------------------------------------------------------------------------
40 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2447.56
1-2 3.106 0.00 0.000 1.0062
2 2715.98 2464.49
2-3 4.503 4.622 0.081 1.0230
3 2654.97 2525.50
3-4 7.219 2.781 0.049 1.0229
4 2595.41 2585.06
Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2440.90
1-2 3.110 0.00 0.000 1.0062
2 2715.96 2457.84
2-3 4.517 5.302 0.093 1.0251
3 2649.53 2524.28
3-4 7.219 2.781 0.049 1.0229
4 2590.09 2590.09
3.110 4.517 7.219
2732.90 2715.96
1 2 2649.53 2590.09
= 3
= 2583.71 4
2457.84 2524.28
2440.90 7.219
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2583.71 kN
Point of Zero Slip from node 3 = 7.219 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 29.692 m
Extension of cable = 113.92 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2492.94
1-2 10.647 0.00 0.000 1.0215
2 2675.33 2550.52
2-3 4.219 5.389 0.094 1.0247
3 2610.76 2610.76
10.647 4.219
2732.90 2675.33
1 2 2610.76
= 3
= 2612.92
2550.52 4.078
2492.94
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2612.923 kN
Point of Zero Slip from node 1 = 4.078 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.647+4.219)x2 = 29.732 m
Extension of cable at each side = 115.11 mm
-------------------------------------------------------------------------------------------------------------------------------
41 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Cable 4 6 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 863.02 786.70
1-2 10.665 0.00 0.000 1.0216
2 844.81 804.91
2-3 4.219 6.352 0.111 1.0277
3 822.07 822.07
10.665 4.219
863.02 844.81
1 2 822.07
= 3
= 824.86
804.91 3.701
786.70 Force Diagram before & after Slip Loss
Assume Force of zero slip = 824.8614 kN
Point of Zero Slip from node 1 = 3.701 m
Area of Shaded Portion = ExAx∆L = 693.576 kN-m
Area of Shaded Portion = 693.576 kN-m
Diferance of these two forces = 693.58-693.58 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.665+4.219)x2 = 29.769 m
Extension of cable at each side = 115.21 mm
4.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.680 7.360 11.039 14.719
Cable 1 2450.29 2467.61 2522.11 2553.79 2585.06
Vert. angle 3.691 3.691 3.691 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.293 0.125 0.125 0.125 0.125
Cable 2 2443.62 2460.95 2520.34 2555.39 2590.09
Vert. angle 4.514 4.514 4.514 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.686 0.434 0.144 0.125 0.125
Total cable
forces Normal 4881.24 4915.81 5023.48 5106.17 5175.14
at first stage
CG of Cable 0.489 0.279 0.135 0.125 0.125
Total cable
forces Per.
350.07 352.55 360.31 0.00 0.00
Cable 3 2495.65 2512.84 2532.74 2552.64 2610.76
Vert. angle 5.389 5.389 5.389 5.389 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.078 0.778 0.431 0.125 0.125
Cable 4 787.55 792.98 799.27 822.07 822.07
Vert. angle 6.352 6.352 6.352 6.352 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.419 1.065 0.656 0.295 0.295
Total cable
forces Normal 3267.33 3289.85 3315.91 3358.38 3432.83
CG of Cable 1.160 0.847 0.485 0.166 0.166
Total cable
321.53 323.75 326.31 330.70 0.00
forces CG
Overall Per.of
Cable 0.758 0.507 0.274 0.141 0.141
% loss 9.8 % 9.1 % 7.6 % 6.4 % 5.0 %
4.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 29.657 113.93
Cable 2 29.692 113.92
Cable 3 29.732 115.11
Cable 4 29.769 115.21
-------------------------------------------------------------------------------------------------------------------------------
42 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
43 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
4.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4770+2x(4805+4913+4995)+5064)/8 = 4907.51 kN
Percentage of Initial force = 0.703 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.56 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4907.51/2x2.56/100 = 62.83 kN/Cable
Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 23.25 kN/Cable
5 - 28 days Loss = 26.39 kN/Cable
28 - 60 days Loss = 13.19 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 125.65 kN/Cable
Total = 188.48 kN/Cable
188.479 6.90 %
-------------------------------------------------------------------------------------------------------------------------------
44 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
4.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 13.19 kN/Cable Relaxation = 39.58 kN/Cable
Creep = 41.23 kN/Cable Creep = 41.23 kN/Cable
Total = 70.44 kN/Cable Total = 96.83 kN/Cable
actual time dependent losses = 70.44 kN/Cable actual time dependent losses = 96.83 kN/Cable
Total Loss of 4 Cables = 268.29 kN Actual Loss of third Cables = 127.41 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
+ + =
< 20.00
Mpa
19.05 Mpa -0.89 Mpa -7.88 Mpa 10.29 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder
Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
Losses:- Shrinkage = 11.19 kN/Cable
Relaxation = 0.00 kN/Cable
Creep = 16.27 kN/Cable
Total = 27.46 kN/Cable
Total Loss = 91.06 kN/Cable
actual time dependent losses = 91.06 kN
-------------------------------------------------------------------------------------------------------------------------------
46 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Total Stress
Stress due Loss of CG of Cables Stress due Moment due due to Total Stress at
Section
at 60 days Cables from soffit to loss to SIDL SIDL Stress cable CG
(Mpa) (kN) (m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab 0.00 0.00 -0.34 -0.34
Top of girder 2.46 -0.01 -371.86 -0.24 2.20
End -91.06 0.758 5.71
Bottom 7.87 -0.11 0.56 8.32
Top of slab 0.00 0.02 -0.11 -0.10
Top of girder 6.00 -0.01 -120.20 -0.07 5.92
L/8 -91.06 0.507 8.82
Bottom 9.95 -0.21 0.23 9.98
Top of slab 0.00 0.04 0.11 0.14
Top of girder 5.88 0.00 114.72 0.07 5.96
L/4 -91.06 0.274 9.33
Bottom 10.41 -0.25 -0.22 9.94
Top of slab 0.00 0.05 0.19 0.24
Top of girder 5.80 0.01 206.98 0.13 5.93
3L/8 -91.06 0.141 9.80
Bottom 10.81 -0.27 -0.40 10.13
Top of slab 0.00 0.05 0.14 0.19
Top of girder 6.52 0.01 153.10 0.09 6.63
L/2 -91.06 0.141 9.47
Bottom 10.29 -0.27 -0.30 9.71
Average stress at 90 days = (5.71+2x(8.82+9.33+9.8)+9.47)/8 = 8.88 Mpa
0.00 Mpa 0.05 0.14 Mpa 0.19 Mpa
6.52 0.01 Mpa 0.09 6.63 Mpa
Mpa Mpa
+ + =
-------------------------------------------------------------------------------------------------------------------------------
47 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)
+ =
Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.42 -1.57 -0.11 -3.09
Top of girder 1.27 -1707.96 -122.50 -1.10 -0.08 0.10
End
Bottom 8.51 2.59 0.19 11.30
Top of slab -0.95 -0.50 -0.04 -1.49
Top of girder 5.18 -531.52 -40.44 -0.33 -0.02 4.83
L/8
Bottom 10.19 1.04 0.08 11.30
Top of slab -0.47 1.11 0.04 0.68
Top of girder 5.39 1184.96 41.02 0.72 0.03 6.14
L/4
Bottom 9.73 -2.32 -0.08 7.34
Top of slab -0.23 1.63 0.08 1.48
Top of girder 5.47 1734.38 87.91 1.06 0.05 6.58
3L/8
Bottom 9.69 -3.39 -0.17 6.13
Top of slab -0.27 1.47 0.09 1.29
Top of girder 6.16 1569.97 100.21 0.96 0.06 7.19
L/2
Bottom 9.26 -3.07 -0.20 5.99
-------------------------------------------------------------------------------------------------------------------------------
48 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 7.2 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -3.1 Mpa
Tension reinforcement at top of support are provided
4.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Axial Force Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder & Moment (Mpa)
Top of slab snow (kN-m) 0.13 F=139.11 -1.08
Top of girder 0.08 1.31
End -1.73 136.8 8148.58 0.758 -690.89 -1611.14 -1070.58
Bottom -0.20 8.03
Top of slab -1.25 F=142.08 -0.82
Top of girder 4.00 -0.66
L/8 2096.11 -1329.2 8205.66 0.507 -690.89 -1611.14 -1067.53
Bottom -3.10 15.73
Top of slab 0.09 F=145.63 -0.46
Top of girder 8.26 -4.52
L/4 3571.45 97.3 8339.39 0.274 -690.89 -1611.14 -1062.43
Bottom -9.89 20.13
Top of slab 0.02 F=142.93 -0.26
Top of girder 10.27 -6.81
3L/8 4470.46 25.8 8464.55 0.141 -690.89 -1611.14 -1056.51
Bottom -12.19 22.87
Top of slab -0.15 F=142.40 -0.25
Top of girder 10.90 -6.92
L/2 4793.13 -161.4 8607.98 0.141 -690.89 -1611.14 -1050.13
Bottom -12.70 23.33
Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.70 -1.57 -0.11 4.32 -2.50
Top of girder -0.49 -1.10 -0.08 -1.10 0.90
End -763.92 -1707.96 -122.50
Bottom 1.16 2.59 0.19 1.67 -2.39
Top of slab -0.26 -0.50 -0.04 4.32 -2.50
Top of girder -0.17 -0.33 -0.02 -1.10 0.90
L/8 -272.61 -531.52 -40.44
Bottom 0.53 1.04 0.08 1.67 -2.39
Top of slab 0.19 1.11 0.04 4.32 -2.50
Top of girder 0.13 0.72 0.03 -1.10 0.90
L/4 204.55 1184.96 41.02
Bottom -0.40 -2.32 -0.08 1.67 -2.39
Top of slab 0.42 1.63 0.08 4.32 -2.50
Top of girder 0.27 1.06 0.05 -1.10 0.90
3L/8 443.13 1734.38 87.91
Bottom -0.87 -3.39 -0.17 1.67 -2.39
Top of slab 0.41 1.47 0.09 4.32 -2.50
Top of girder 0.27 0.96 0.06 -1.10 0.90
L/2 439.58 1569.97 100.21
Bottom -0.86 -3.07 -0.20 1.67 -2.39
4.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
-------------------------------------------------------------------------------------------------------------------------------
49 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
50 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab -0.53 -4.76 -4.62 1.45 1.59 -5.36 -5.22 1.59 -5.36
Top of girder -0.98 0.12 0.21 -1.25 -1.15 0.75 0.85 0.85 -1.25
End
Bottom 11.78 9.58 9.34 12.03 11.80 7.97 7.74 12.03 7.74
Top of slab -0.15 -4.29 -4.24 1.65 1.70 -5.16 -5.11 1.70 -5.16
Top of girder 2.25 3.41 3.45 1.86 1.89 3.85 3.89 3.89 1.86
L/8
Bottom 13.63 11.30 11.20 14.15 14.04 10.09 9.98 14.15 9.98
Top of slab 3.57 -0.49 -0.52 5.05 5.01 -1.76 -1.80 5.05 -1.80
Top of girder 4.38 5.60 5.58 3.78 3.76 5.78 5.76 5.78 3.76
L/4
Bottom 6.51 4.00 4.08 7.68 7.76 3.62 3.70 7.83 3.62
Top of slab 4.42 0.42 0.33 5.83 5.74 -0.99 -1.07 5.83 -1.07
Top of girder 4.82 6.07 6.02 4.17 4.12 6.17 6.11 6.17 4.12
3L/8
Bottom 5.13 2.53 2.70 6.47 6.65 2.42 2.59 7.52 2.42
Top of slab 4.10 0.09 0.01 5.54 5.45 -1.28 -1.36 5.54 -1.36
Top of girder 5.24 6.49 6.44 4.61 4.56 6.61 6.56 6.61 4.56
L/2
Bottom 5.37 2.76 2.94 6.63 6.81 2.58 2.75 7.44 2.58
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.91 -1.77 -1.97 -1.83 -3.54 -3.40 -3.19 -3.05 -0.88
Top of girder 0.94 1.03 0.89 0.99 -0.21 -0.11 0.03 0.13 -0.82
End
Bottom 10.02 9.79 10.13 9.90 12.73 12.49 12.15 11.92 13.62
Top of slab -2.45 -2.40 -2.48 -2.42 -2.97 -2.92 -2.86 -2.81 -0.36
Top of girder 3.07 3.10 3.05 3.09 2.73 2.76 2.80 2.83 2.08
L/8
Bottom 14.84 14.74 14.89 14.78 15.93 15.82 15.70 15.59 16.88
Top of slab -0.19 -0.23 -0.17 -0.20 0.94 0.91 0.68 0.64 3.51
Top of girder 3.43 3.41 3.45 3.42 4.17 4.15 4.00 3.98 3.50
L/4
Bottom 11.77 11.85 11.73 11.81 9.41 9.49 9.96 10.04 10.46
Top of slab 0.24 0.16 0.29 0.21 1.91 1.83 1.54 1.46 4.45
Top of girder 3.11 3.06 3.14 3.09 4.21 4.15 3.96 3.91 3.51
3L/8
Bottom 11.92 12.10 11.82 11.99 8.43 8.60 9.21 9.38 9.53
Top of slab 0.07 -0.01 0.12 0.04 1.60 1.51 1.26 1.18 4.13
Top of girder 3.61 3.56 3.65 3.59 4.61 4.55 4.39 4.34 3.91
L/2
Bottom 11.93 12.11 11.82 11.99 8.75 8.92 9.44 9.61 9.87
-------------------------------------------------------------------------------------------------------------------------------
51 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab -0.74 -4.97 -4.83 1.23 1.37 -5.58 -5.44 1.37 -5.58
Top of girder -0.72 0.38 0.48 -0.99 -0.89 1.01 1.11 1.11 -0.99
End
Bottom 13.38 11.18 10.95 13.63 13.40 9.58 9.34 13.63 9.34
Top of slab -0.31 -4.45 -4.40 1.49 1.54 -5.33 -5.27 1.54 -5.33
Top of girder 2.12 3.28 3.31 1.72 1.76 3.72 3.76 3.76 1.72
L/8
Bottom 16.78 14.45 14.34 17.29 17.18 13.23 13.13 17.29 13.13
Top of slab 3.47 -0.58 -0.62 4.96 4.92 -1.86 -1.89 4.96 -1.89
Top of girder 3.47 4.70 4.67 2.88 2.85 4.88 4.85 4.88 2.85
L/4
Bottom 10.54 8.02 8.10 11.71 11.79 7.65 7.73 11.85 7.65
Top of slab 4.37 0.37 0.28 5.77 5.69 -1.04 -1.12 5.77 -1.12
Top of girder 3.46 4.71 4.66 2.81 2.75 4.81 4.75 4.81 2.75
3L/8
Bottom 9.71 7.10 7.27 11.05 11.22 6.99 7.16 12.10 6.99
Top of slab 4.05 0.04 -0.04 5.49 5.40 -1.33 -1.41 5.49 -1.41
Top of girder 3.86 5.11 5.05 3.23 3.18 5.23 5.17 5.23 3.18
L/2
Bottom 10.04 7.43 7.60 11.30 11.47 7.24 7.42 12.11 7.24
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 17.3 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 2.42 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 1.72 Mpa Hence O.K.
except at support
4.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
52 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.91 -1.77 -1.97 -1.83 -3.14 -3.00 -2.29 -2.15 -0.92
Top of girder 0.94 1.03 0.89 0.99 0.07 0.17 0.67 0.77 -0.44
End
Bottom 10.02 9.79 10.13 9.90 12.06 11.83 10.65 10.42 12.80
Top of slab -2.45 -2.40 -2.48 -2.42 -2.85 -2.79 -2.57 -2.52 -0.67
Top of girder 3.07 3.10 3.05 3.09 2.81 2.84 2.99 3.02 2.27
L/8
Bottom 14.84 14.74 14.89 14.78 15.66 15.56 15.10 14.99 16.46
Top of slab -0.19 -0.23 -0.17 -0.20 0.66 0.62 0.06 0.02 2.80
Top of girder 3.43 3.41 3.45 3.42 3.99 3.97 3.59 3.57 3.43
L/4
Bottom 11.77 11.85 11.73 11.81 10.00 10.08 11.26 11.34 10.87
Top of slab 0.24 0.16 0.29 0.21 1.50 1.42 0.61 0.53 3.62
Top of girder 3.11 3.06 3.14 3.09 3.94 3.88 3.36 3.30 3.36
3L/8
Bottom 11.92 12.10 11.82 11.99 9.29 9.47 11.14 11.31 10.21
Top of slab 0.07 -0.01 0.12 0.04 1.22 1.14 0.42 0.34 3.33
Top of girder 3.61 3.56 3.65 3.59 4.36 4.31 3.84 3.78 3.78
L/2
Bottom 11.93 12.11 11.82 11.99 9.53 9.71 11.20 11.37 10.47
-------------------------------------------------------------------------------------------------------------------------------
53 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab -0.78 -4.33 -4.19 0.37 0.51 -3.72 -3.58 0.51 -4.33
Top of girder -0.34 0.56 0.66 0.06 0.16 1.26 1.35 1.35 -0.44
End
Bottom 12.57 10.77 10.54 11.54 11.31 9.11 8.87 12.80 8.87
Top of slab -0.62 -4.08 -4.02 0.04 0.09 -4.05 -4.00 0.09 -4.08
Top of girder 2.31 3.27 3.31 2.34 2.38 3.54 3.58 3.58 2.27
L/8
Bottom 16.35 14.43 14.32 16.05 15.95 13.62 13.51 16.46 13.51
Top of slab 2.76 -0.61 -0.64 2.62 2.58 -1.47 -1.51 2.80 -1.51
Top of girder 3.40 4.43 4.40 2.92 2.89 4.12 4.09 4.43 2.89
L/4
Bottom 10.95 8.84 8.92 12.31 12.39 9.88 9.96 12.39 8.84
Top of slab 3.53 0.21 0.13 3.15 3.07 -0.93 -1.02 3.62 -1.02
Top of girder 3.30 4.36 4.30 2.66 2.61 3.86 3.81 4.36 2.61
3L/8
Bottom 10.39 8.19 8.36 12.25 12.42 9.81 9.98 12.42 8.19
Top of slab 3.25 -0.08 -0.16 2.95 2.87 -1.14 -1.22 3.33 -1.22
Top of girder 3.73 4.78 4.72 3.14 3.09 4.34 4.29 4.78 3.09
L/2
Bottom 10.64 8.44 8.61 12.32 12.49 9.89 10.06 12.49 8.44
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 16.5 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 3.61 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 2.27 Mpa Hence O.K.
except at support
4.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 8754 kN
202.64
NA NA
2000 300
-------------------------------------------------------------------------------------------------------------------------------
54 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.853 MPa Negative Design Moment = 8464 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 10973.4 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 8464 kNm Hence O.K.
Factor of safety = 17,616/8,464 = 2.08
-------------------------------------------------------------------------------------------------------------------------------
55 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
vi) As per clause no 6.3.2 of IS-13920 :1993, Shear force due to ductile detailing shall be
Vua = Va D+L - 1.4(MuAh+MuBs)/L
D+L
Va = 1.2(D+L)/2 = 1756.01 kN
MuAh = -8464.06 kN
MuBs = -4173.31 kN
L = 28.36 m
Vua = 2380 kN
Maximum design shear at support > 2378 kN
-------------------------------------------------------------------------------------------------------------------------------
56 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5927.5 5984.5 6118.3 6243.4 6386.9
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1242 1493 1726 1859 1859
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7
iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.68 7.36 11.04 14.72
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 2380.0 1976.3 1395.3 832.3 391.0
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 493.8 498.5 509.2 260.4 0.0
Total Shear force for the Beam (kN) 1886.2 1477.8 886.1 571.9 391.0
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 2.4367 0.2408 -4.0888 -6.6411 -6.7607
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 435.13 466.16 466.21
Maximum shear capacity of the Section (kN) 4349 2091 2418 2603 2603
Not
Whether shear reinforcement required or not Required Required Required Required
Required
-------------------------------------------------------------------------------------------------------------------------------
57 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
58 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
59 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
A -0.00018
B 4 3.680 1.840 -0.00020 -0.00019 -0.001271035
C 3 3.680 5.520 -0.00020 -0.00020 -0.004023914
D 2 3.680 9.199 -0.00016 -0.00018 -0.006092231
E 1 3.680 12.879 -0.00015 -0.00016 -0.007449376
Total -0.018836556
So, Midspan deflection due to Prestress + wt of precast Girder = = -19 mm
= - L/ 1563
(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.680 7.360 11.039 14.719
CG of all cables from bot.(m) 0.758 0.507 0.274 0.141 0.141
Loss 268.291 268.291 268.291 268.291 268.291
Moment due to prestressing losses 51.071 122.139 184.675 220.183 220.241
Moment due to Wt of Deck Slab -0.606 936.075 1610.393 2022.350 2171.944
Total moment due to prestress+DL 50.465 1058.214 1795.069 2242.532 2392.185
M/EI (1/m) 0.0000037 0.0000896 0.0001520 0.0001899 0.00020
3.7 3.680 3.680 3.680
A B C D E
0.000004 0.0000896 0.0001899
4 0.0001520
0.0002025
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000037
B 4 3.680 1.840 0.0000896 0.0000466 0.000315699 0.00197
C 3 3.680 5.520 0.0001520 0.0001208 0.002453209
D 2 3.680 9.199 0.0001899 0.0001709 0.005785781
E 1 3.680 12.879 0.0002025 0.0001962 0.009298006
Total 0.017852696
-------------------------------------------------------------------------------------------------------------------------------
60 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
33 1 SPECTRUM IN X6.519
DIRECTION 0.19 0.037 6.522 0 0 0
2 SPECTRUM IN Z0.072
DIRECTION 1.939 1.12 2.241 0 0 0
3 SPECTRUM IN Y0.016
DIRECTION 0.403 0.089 0.413 0 0 0
4 DEAD LOAD 0.174 -5.575 0.021 5.578 0 0 0
5 SIDL (DL) 0.022 -0.646 0.002 0.647 0 0 0
6 SIDL(WC) 0.024 -0.885 0.004 0.886 0 0 0
7 REMOVAL OF SHUTTER
-0.027 0.85 -0.004 0.851 0 0 0
8 EARTH PR ON ABUTMENT
-0.279 1.84 0.199 1.872 0 0 0
9 LIVE LOAD SURCHARGE
1.222 0.048 0.015 1.223 0 0 0
10 DYNAMIC INCREMENT
-0.178 OF EARTH
1.161 PR. 0.125 1.182 0 0 0
11 DYNAMIC INCREMENT
0.772 OF LL 0.03
SURCGARGE 0.01 0.773 0 0 0
12 UNLADEN WIND 0.15
LOAD -0.955 -0.114 0.974 0 0 0
13 LADEN WIND LOAD
0.126 -0.494 -0.105 0.521 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.339 -6.245 -0.002 6.669 0 0 0.001
15 TEMPERATURE0.625
RISE 2.965 -0.5 3.072 0 0 0
16 TEMPERATURE -0.287
FALL -1.385 0.235 1.433 0 0 0
17 CREEP SHRINKAGE
-0.221 DIFF SHRINKAGE
-0.714 0.236 0.784 0 0 0
18 FOOTPATH LIVE0.005
LOAD 0.058 -0.002 0.058 0 0 0
19 SNOW LOAD FOR0.031
70R LL TRACK
-1.027 0.005 1.027 0 0 0
20 SNOW LOAD FOR0.016
LL 70R WHEEL
-0.514 0.002 0.514 0 0 0
21 BRAKING 0.463 -0.01 0 0.463 0 0 0
504 COMBINATION0.082
LOAD CASE-1.232
504 0.014 1.235 0 0 0
-------------------------------------------------------------------------------------------------------------------------------
61 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
62 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.475 0.2
0.1 0.053
0.2
0.25
0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN
= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 21.78 1.75 1.75 0.250
5.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 3.000 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008
-------------------------------------------------------------------------------------------------------------------------------
63 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
16.875
-------------------------------------------------------------------------------------------------------------------------------
64 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
65 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
66 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
67 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
68 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
5.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 3 35 19 20 21 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.598 7.195 10.793 14.390
Precast girder only -1.1 1111.1 1877.1 2342.9 2508.7
Construction load -0.2 294.2 504.5 630.7 672.8
Deck slab & X-girder -0.5 781.9 1345.9 1691.4 1818.6
Total wt of deck slab = -1.7 1893.0 3222.9 4034.4 4327.4
SIDL (DL) from staad output -134.6 -94.0 -11.2 116.0 283.0
SIDL (WC) from staad output -363.9 -139.9 86.6 221.6 266.3
Removal of shutter 364.5 141.0 -87.1 -225.2 -273.5
Active Earth pressure -214.1 -214.1 -261.2 -288.6 -288.6
Earth pressure at rest -348.3 -233.9 -393.7 -439.6 -316.1
Earth pressure at K* -458.3 -517.5 -599.0 -680.9 -774.6
Live load surcharge 406.1 325.9 215.8 105.3 -5.5
Wind load (unloaded structure) -367.3 -131.7 -147.8 -162.4 -177.0
Wind load (loaded structure) -179.1 -59.2 62.4 134.7 157.8
Differential settlement -955.2 -771.4 519.6 267.6 15.5
Temperature rise -381.0 -424.5 -486.3 -549.7 -613.6
Temperature fall 178.1 198.3 227.0 256.4 286.1
Creep & shrinkage 92.3 104.9 122.7 141.0 159.4
Footpath live load -14.3 -6.9 3.7 15.0 26.7
Snow load -215.6 -84.1 50.8 133.6 164.4
Braking load 109.8 88.9 60.4 31.8 3.2
Live Load -1362.0 -592.2 842.0 1010.7 972.3
Seismic in X- direction -1448.9 -1200.9 -845.5 -467.5 -75.6
Seismic in Z- direction -737.6 -364.8 -111.6 -481.4 -698.0
Seismic in Y- direction -104.3 -52.2 -22.6 -67.2 -99.6
Dynamic increment of Earth pr. -122.8 -133.3 -147.8 -162.4 -177.0
Dynamic increment of LL Surcharge 152.3 122.3 81.0 39.5 -2.0
Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 158.876 163.11 179.097 188.679 192.648
Moment -1076.0 -1079.4 -1083.9 -1088.1 -1092.4
The hyperstatic action is only considered for calculation of negative moment at support.
-------------------------------------------------------------------------------------------------------------------------------
69 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
70 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.300
4
0.350
X X X 3
1.775 0.400
2
4 0.400
1 3 2 0.170 1 0.325
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support
-------------------------------------------------------------------------------------------------------------------------------
71 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.25 14.390
Y
4.50
1 2 X 0.17
0.17
0.15 14.640
0.15
0.30 4
0.350 3
0.400 Z
2
0.400
1 0.170
0.125
0.33 0.25 3.000 4.50 3.00 3.890
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.325-0.125)/(0.25+3-0.15)} = 3.691
o
Vertical bending of Cable 2 =Tan-1{(0.325+0.4-0.125-0.17)/(0.25+3+4.5-0.15)} = 4.514
o
Vertical bending of Cable 3 =Tan-1{(0.325+0.4+0.4-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 5.389
o
Vertical bending of Cable 4 =Tan-1{(0.325+0.4+0.4+0.35-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 6.352
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.325 3.100 0.000 0.125
2 0.000 0.000 0.725 7.600 -0.170 0.125
3 0.000 0.000 1.13 10.600 0.000 0.125
4 0.000 0.000 1.48 10.600 0.000 0.295
-------------------------------------------------------------------------------------------------------------------------------
72 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2446.79
1-2 3.106 0.00 0.000 1.0062
2 2715.98 2463.71
2-3 4.503 4.622 0.081 1.0230
3 2654.97 2524.72
3-4 6.890 2.781 0.049 1.0223
4 2597.12 2582.57
Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2440.22
1-2 3.110 0.00 0.000 1.0062
2 2715.96 2457.16
2-3 4.517 5.302 0.093 1.0251
3 2649.53 2523.59
3-4 6.890 2.781 0.049 1.0223
4 2591.79 2591.79
3.110 4.517 6.890
2732.90 2715.96
1 2 2649.53 2591.79
= 3
= 2581.33 4
2457.16 2523.59
2440.22 6.890
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2581.33 kN
Point of Zero Slip from node 3 = 6.890 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 29.034 m
Extension of cable = 111.58 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2492.01
1-2 10.647 0.00 0.000 1.0215
2 2675.33 2549.59
2-3 3.890 5.389 0.094 1.0241
3 2612.48 2612.48
10.647 3.890
2732.90 2675.33
1 2 2612.48
= 3
= 2612.46
2549.59 3.890
2492.01
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2612.458 kN
Point of Zero Slip from node 1 = 3.890 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.647+3.89)x2 = 29.074 m
Extension of cable at each side = 112.75 mm
-------------------------------------------------------------------------------------------------------------------------------
73 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Cable 4 6 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 863.02 786.41
1-2 10.665 0.00 0.000 1.0216
2 844.81 804.63
2-3 3.890 6.352 0.111 1.0270
3 822.61 822.61
10.665 3.890
863.02 844.81
1 2 822.61
= 3
= 824.72
804.63 3.521
786.41 Force Diagram before & after Slip Loss
Assume Force of zero slip = 824.7169 kN
Point of Zero Slip from node 1 = 3.521 m
Area of Shaded Portion = ExAx∆L = 693.576 kN-m
Area of Shaded Portion = 693.576 kN-m
Diferance of these two forces = 693.58-693.58 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.665+3.89)x2 = 29.111 m
Extension of cable at each side = 112.84 mm
5.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.598 7.195 10.793 14.390
Cable 1 2449.51 2466.39 2519.10 2551.45 2582.57
Vert. angle 3.691 3.691 3.691 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.293 0.125 0.125 0.125 0.125
Cable 2 2442.94 2459.82 2517.24 2554.93 2591.79
Vert. angle 4.514 4.514 4.514 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.686 0.441 0.157 0.125 0.125
Total cable
forces Normal 4879.79 4913.46 5017.40 5103.37 5174.37
at first stage
CG of Cable 0.489 0.283 0.141 0.125 0.125
Total cable
forces Per.
349.97 352.39 359.87 0.00 0.00
Cable 3 2494.71 2511.47 2530.92 2550.38 2612.48
Vert. angle 5.389 5.389 5.389 5.389 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.078 0.786 0.446 0.125 0.125
Cable 4 787.27 792.55 798.70 822.61 822.61
Vert. angle 6.352 6.352 6.352 6.352 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.419 1.075 0.674 0.295 0.295
Total cable
forces Normal 3266.12 3288.05 3313.53 3356.66 3435.09
CG of Cable 1.160 0.855 0.501 0.166 0.166
Total cable
321.41 323.57 326.08 330.55 0.00
forces CG
Overall Per.of
Cable 0.758 0.512 0.284 0.141 0.141
% loss 9.8 % 9.2 % 7.7 % 6.4 % 5.0 %
5.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 28.999 111.59
Cable 2 29.034 111.58
Cable 3 29.074 112.75
Cable 4 29.111 112.84
-------------------------------------------------------------------------------------------------------------------------------
74 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
75 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
5.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4767+2x(4801+4905+4991)+5062)/8 = 4903.03 kN
Percentage of Initial force = 0.702 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.55 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4903.03/2x2.55/100 = 62.45 kN/Cable
Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 23.11 kN/Cable
5 - 28 days Loss = 26.23 kN/Cable
28 - 60 days Loss = 13.12 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 124.91 kN/Cable
Total = 187.36 kN/Cable
187.362 6.86 %
-------------------------------------------------------------------------------------------------------------------------------
76 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
77 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
5.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 13.12 kN/Cable Relaxation = 39.35 kN/Cable
Creep = 41.42 kN/Cable Creep = 41.42 kN/Cable
Total = 70.55 kN/Cable Total = 96.78 kN/Cable
actual time dependent losses = 70.55 kN/Cable actual time dependent losses = 96.78 kN/Cable
Total Loss of 4 Cables = 268.45 kN Actual Loss of third Cables = 127.35 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
+ + =
< 20.00
Mpa
19.36 Mpa -0.89 Mpa -6.77 Mpa 11.70 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder
Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
-------------------------------------------------------------------------------------------------------------------------------
78 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
79 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Total Stress
Stress due Loss of CG of Cables Stress due Moment due due to Total Stress at
Section
at 60 days Cables from soffit to loss to SIDL SIDL Stress cable CG
(Mpa) (kN) (m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab 0.00 0.00 -0.12 -0.13
Top of girder 2.46 -0.01 -134.00 -0.09 2.36
End -94.70 0.758 5.56
Bottom 7.86 -0.12 0.20 7.95
Top of slab 0.00 0.02 -0.09 -0.07
Top of girder 5.57 -0.01 -92.91 -0.06 5.50
L/8 -94.70 0.512 9.00
Bottom 10.45 -0.21 0.18 10.42
Top of slab 0.00 0.04 -0.01 0.02
Top of girder 5.17 0.00 -11.66 -0.01 5.17
L/4 -94.70 0.284 10.06
Bottom 11.23 -0.26 0.02 11.00
Top of slab 0.00 0.05 0.11 0.15
Top of girder 4.68 0.01 112.38 0.07 4.76
3L/8 -94.70 0.141 11.06
Bottom 12.11 -0.28 -0.22 11.61
Top of slab 0.00 0.05 0.26 0.31
Top of girder 5.33 0.01 275.88 0.17 5.51
L/2 -94.70 0.141 10.45
Bottom 11.70 -0.28 -0.54 10.88
Average stress at 90 days = (5.56+2x(9+10.06+11.06)+10.45)/8 = 9.53 Mpa
0.00 Mpa 0.05 0.26 Mpa 0.31 Mpa
5.33 0.01 Mpa 0.17 5.51 Mpa
Mpa Mpa
+ + =
-------------------------------------------------------------------------------------------------------------------------------
80 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)
+ =
Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.21 -0.78 -0.10 -2.09
Top of girder 1.41 -846.16 -107.46 -0.54 -0.07 0.80
End
Bottom 8.11 1.29 0.16 9.55
Top of slab -0.95 -0.17 -0.03 -1.15
Top of girder 4.74 -177.36 -35.50 -0.11 -0.02 4.61
L/8
Bottom 10.60 0.35 0.07 11.01
Top of slab -0.63 1.05 0.04 0.45
Top of girder 4.56 1118.15 37.46 0.68 0.02 5.27
L/4
Bottom 10.77 -2.19 -0.07 8.51
Top of slab -0.36 1.08 0.08 0.79
Top of girder 4.26 1147.74 80.84 0.70 0.05 5.01
3L/8
Bottom 11.14 -2.24 -0.16 8.74
Top of slab -0.21 0.91 0.09 0.79
Top of girder 4.99 975.55 94.65 0.60 0.06 5.65
L/2
Bottom 10.41 -1.91 -0.19 8.32
-------------------------------------------------------------------------------------------------------------------------------
81 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 5.6 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -2.1 Mpa
Tension reinforcement at top of support are provided
5.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Moment due Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder to (Mpa)
Top of slab snow (kN-m) 0.34 F=158.88 -1.10
Top of girder 0.24 1.29
End -1.66 373.7 8145.91 0.758 -692.33 -1643.67 -1075.95
Bottom -0.56 7.98
Top of slab -1.11 F=163.11 -0.85
Top of girder 3.62 -0.60
L/8 1892.96 -1183.9 8201.51 0.512 -692.33 -1643.67 -1079.43
Bottom -2.83 15.56
Top of slab 0.12 F=179.10 -0.51
Top of girder 7.47 -4.38
L/4 3222.92 124.8 8330.92 0.284 -692.33 -1643.67 -1083.86
Bottom -9.00 19.85
Top of slab 0.02 F=188.68 -0.30
Top of girder 9.27 -6.85
3L/8 4034.39 24.7 8460.03 0.141 -692.33 -1643.67 -1088.09
Bottom -11.01 22.78
Top of slab -0.17 F=192.65 -0.30
Top of girder 9.82 -6.98
L/2 4327.37 -178.2 8609.46 0.141 -692.33 -1643.67 -1092.38
Bottom -11.41 23.29
Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.46 -0.78 -0.10 4.32 -2.50
Top of girder -0.32 -0.54 -0.07 -1.10 0.90
End -498.46 -846.16 -107.46
Bottom 0.76 1.29 0.16 1.67 -2.39
Top of slab -0.22 -0.17 -0.03 4.32 -2.50
Top of girder -0.14 -0.11 -0.02 -1.10 0.90
L/8 -233.91 -177.36 -35.50
Bottom 0.46 0.35 0.07 1.67 -2.39
Top of slab 0.07 1.05 0.04 4.32 -2.50
Top of girder 0.05 0.68 0.02 -1.10 0.90
L/4 75.41 1118.15 37.46
Bottom -0.15 -2.19 -0.07 1.67 -2.39
Top of slab 0.32 1.08 0.08 4.32 -2.50
Top of girder 0.21 0.70 0.05 -1.10 0.90
3L/8 337.61 1147.74 80.84
Bottom -0.66 -2.24 -0.16 1.67 -2.39
Top of slab 0.51 0.91 0.09 4.32 -2.50
Top of girder 0.34 0.60 0.06 -1.10 0.90
L/2 549.34 975.55 94.65
Bottom -1.07 -1.91 -0.19 1.67 -2.39
5.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
-------------------------------------------------------------------------------------------------------------------------------
82 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
83 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.71 -3.47 -3.38 2.54 2.63 -4.28 -4.18 2.63 -4.28
Top of girder -0.13 1.01 1.07 -0.49 -0.43 1.50 1.57 1.57 -0.49
End
Bottom 9.66 7.38 7.23 10.16 10.01 6.11 5.95 10.16 5.95
Top of slab 0.33 -3.80 -3.76 2.06 2.10 -4.76 -4.71 2.10 -4.76
Top of girder 2.17 3.34 3.36 1.72 1.75 3.72 3.75 3.75 1.72
L/8
Bottom 12.98 10.64 10.55 13.65 13.56 9.60 9.51 13.65 9.51
Top of slab 3.37 -0.71 -0.72 4.85 4.83 -1.97 -1.98 4.85 -1.98
Top of girder 3.60 4.81 4.80 3.00 2.99 5.00 4.99 5.00 2.99
L/4
Bottom 7.54 5.07 5.10 8.72 8.75 4.66 4.69 8.75 4.66
Top of slab 3.74 -0.29 -0.35 5.26 5.19 -1.56 -1.62 5.26 -1.62
Top of girder 3.36 4.60 4.56 2.79 2.75 4.78 4.74 4.78 2.75
3L/8
Bottom 7.60 5.03 5.16 8.69 8.83 4.64 4.77 8.84 4.64
Top of slab 3.58 -0.41 -0.51 5.18 5.07 -1.64 -1.74 5.18 -1.74
Top of girder 3.82 5.08 5.02 3.29 3.23 5.29 5.23 5.29 3.23
L/2
Bottom 7.57 4.93 5.14 8.50 8.72 4.45 4.66 8.72 4.45
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.41 -1.32 -1.47 -1.38 -2.25 -2.16 -2.09 -2.00 0.40
Top of girder 1.27 1.34 1.23 1.30 0.69 0.75 0.80 0.86 0.07
End
Bottom 9.13 8.98 9.22 9.07 10.51 10.36 10.25 10.10 11.41
Top of slab -2.30 -2.26 -2.32 -2.28 -2.49 -2.44 -2.46 -2.42 0.12
Top of girder 2.78 2.81 2.77 2.80 2.66 2.69 2.68 2.71 2.02
L/8
Bottom 14.84 14.75 14.88 14.79 15.23 15.13 15.17 15.08 16.19
Top of slab -0.36 -0.37 -0.34 -0.35 0.71 0.70 0.46 0.45 3.28
Top of girder 2.72 2.71 2.73 2.72 3.41 3.40 3.25 3.24 2.74
L/4
Bottom 12.66 12.69 12.62 12.65 10.43 10.46 10.95 10.98 11.48
Top of slab 0.07 0.01 0.12 0.06 1.20 1.13 0.96 0.89 3.74
Top of girder 1.99 1.95 2.02 1.98 2.72 2.68 2.57 2.53 2.03
3L/8
Bottom 13.26 13.40 13.17 13.30 10.93 11.06 11.42 11.56 12.02
Top of slab 0.12 0.01 0.17 0.07 1.08 0.98 0.89 0.79 3.62
Top of girder 2.55 2.48 2.59 2.52 3.18 3.12 3.06 2.99 2.49
L/2
Bottom 12.92 13.14 12.81 13.03 10.91 11.12 11.31 11.52 12.02
-------------------------------------------------------------------------------------------------------------------------------
84 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.49 -3.69 -3.60 2.32 2.41 -4.50 -4.40 2.41 -4.50
Top of girder 0.13 1.27 1.33 -0.24 -0.17 1.76 1.83 1.83 -0.24
End
Bottom 11.26 8.98 8.83 11.76 11.61 7.70 7.55 11.76 7.55
Top of slab 0.16 -3.97 -3.92 1.89 1.93 -4.93 -4.88 1.93 -4.93
Top of girder 2.05 3.22 3.24 1.60 1.63 3.60 3.63 3.63 1.60
L/8
Bottom 16.09 13.75 13.66 16.77 16.67 12.71 12.62 16.77 12.62
Top of slab 3.27 -0.81 -0.82 4.74 4.73 -2.07 -2.09 4.74 -2.09
Top of girder 2.73 3.94 3.93 2.13 2.12 4.13 4.12 4.13 2.12
L/4
Bottom 11.51 9.04 9.07 12.69 12.72 8.64 8.66 12.72 8.64
Top of slab 3.68 -0.35 -0.41 5.20 5.13 -1.62 -1.68 5.20 -1.68
Top of girder 1.99 3.23 3.19 1.42 1.38 3.42 3.37 3.42 1.38
3L/8
Bottom 12.15 9.59 9.72 13.25 13.38 9.19 9.33 13.40 9.19
Top of slab 3.52 -0.47 -0.57 5.12 5.01 -1.70 -1.80 5.12 -1.80
Top of girder 2.42 3.69 3.62 1.90 1.83 3.90 3.83 3.90 1.83
L/2
Bottom 12.23 9.58 9.80 13.16 13.38 9.10 9.32 13.38 9.10
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 16.8 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 4.45 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 1.38 Mpa Hence O.K.
except at support
5.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
85 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.41 -1.32 -1.47 -1.38 -2.05 -1.95 -1.63 -1.54 0.16
Top of girder 1.27 1.34 1.23 1.30 0.83 0.89 1.12 1.19 0.31
End
Bottom 9.13 8.98 9.22 9.07 10.17 10.02 9.48 9.33 10.92
Top of slab -2.30 -2.26 -2.32 -2.28 -2.44 -2.40 -2.36 -2.31 -0.27
Top of girder 2.78 2.81 2.77 2.80 2.69 2.72 2.75 2.78 2.15
L/8
Bottom 14.84 14.75 14.88 14.79 15.13 15.04 14.95 14.86 15.93
Top of slab -0.36 -0.37 -0.34 -0.35 0.45 0.43 -0.13 -0.14 2.59
Top of girder 2.72 2.71 2.73 2.72 3.24 3.23 2.87 2.86 2.68
L/4
Bottom 12.66 12.69 12.62 12.65 10.99 11.02 12.18 12.21 11.86
Top of slab 0.07 0.01 0.12 0.06 0.92 0.86 0.33 0.27 3.04
Top of girder 1.99 1.95 2.02 1.98 2.54 2.50 2.16 2.12 1.97
3L/8
Bottom 13.26 13.40 13.17 13.30 11.50 11.63 12.72 12.85 12.42
Top of slab 0.12 0.01 0.17 0.07 0.85 0.74 0.35 0.25 2.96
Top of girder 2.55 2.48 2.59 2.52 3.03 2.96 2.71 2.64 2.45
L/2
Bottom 12.92 13.14 12.81 13.03 11.40 11.62 12.43 12.65 12.33
-------------------------------------------------------------------------------------------------------------------------------
86 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.25 -3.25 -3.15 1.02 1.11 -3.07 -2.98 1.11 -3.25
Top of girder 0.38 1.31 1.38 0.50 0.57 1.70 1.77 1.77 0.31
End
Bottom 10.77 8.90 8.74 10.38 10.23 7.95 7.80 10.92 7.80
Top of slab -0.23 -3.68 -3.63 0.25 0.30 -3.84 -3.79 0.30 -3.84
Top of girder 2.18 3.15 3.18 2.10 2.13 3.30 3.33 3.33 2.10
L/8
Bottom 15.84 13.90 13.81 15.91 15.82 13.47 13.38 15.93 13.38
Top of slab 2.57 -0.82 -0.84 2.44 2.43 -1.65 -1.66 2.59 -1.66
Top of girder 2.67 3.68 3.67 2.19 2.18 3.39 3.38 3.68 2.18
L/4
Bottom 11.89 9.83 9.86 13.23 13.26 10.79 10.82 13.26 9.83
Top of slab 2.98 -0.37 -0.43 2.88 2.82 -1.21 -1.27 3.04 -1.27
Top of girder 1.93 2.97 2.93 1.47 1.43 2.67 2.63 2.97 1.43
3L/8
Bottom 12.55 10.39 10.52 13.82 13.95 11.38 11.51 13.95 10.39
Top of slab 2.86 -0.45 -0.55 2.89 2.78 -1.20 -1.30 2.96 -1.30
Top of girder 2.38 3.45 3.38 2.01 1.94 3.21 3.14 3.45 1.94
L/2
Bottom 12.54 10.30 10.51 13.54 13.76 11.11 11.32 13.76 10.30
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 15.9 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 5.64 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 1.43 Mpa Hence O.K.
except at support
5.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 8754 kN
202.64
NA NA
2000 300
-------------------------------------------------------------------------------------------------------------------------------
87 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.672 MPa Negative Design Moment = 6669 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 8598.7 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 6669 kNm Hence O.K.
Factor of safety = 17,616/6,669 = 2.64
MuAh = -6669.41 kN
MuBs = -3676.53 kN
L = 27.71 m
Vua = 2080 kN
Maximum design shear at support < 2156 kN
-------------------------------------------------------------------------------------------------------------------------------
89 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5891.0 5946.6 6076.1 6205.2 6354.6
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1242 1488 1716 1859 1859
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7
iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.60 7.20 10.79 14.39
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 2155.9 1676.9 1176.6 720.3 407.4
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 490.8 495.4 505.8 259.1 0.0
Total Shear force for the Beam (kN) 1665.1 1181.5 670.8 461.2 407.4
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 2.4370 0.3368 -3.8905 -6.6365 -6.7612
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 432.69 466.15 466.21
Maximum shear capacity of the Section (kN) 4349 2084 2403 2603 2603
Not Not
Whether shear reinforcement required or not Required Required Required
Required Required
-------------------------------------------------------------------------------------------------------------------------------
90 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
92 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
A -0.00018
B 4 3.598 1.799 -0.00020 -0.00019 -0.001223854
C 3 3.598 5.396 -0.00020 -0.00020 -0.003915921
D 2 3.598 8.994 -0.00017 -0.00019 -0.006046906
E 1 3.598 12.591 -0.00016 -0.00017 -0.007571111
Total -0.018757792
So, Midspan deflection due to Prestress + wt of precast Girder = = -19 mm
= - L/ 1534
(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.598 7.195 10.793 14.390
CG of all cables from bot.(m) 0.758 0.512 0.284 0.141 0.141
Loss 268.453 268.453 268.453 268.453 268.453
Moment due to prestressing losses 51.104 120.823 181.997 220.310 220.372
Moment due to Wt of Deck Slab -0.527 781.861 1345.854 1691.450 1818.650
Total moment due to prestress+DL 50.577 902.684 1527.851 1911.760 2039.022
M/EI (1/m) 0.0000037 0.0000764 0.0001294 0.0001619 0.00017
3.6 3.598 3.598 3.598
A B C D E
0.000004 0.0000764 0.0001619
4 0.0001294
0.0001726
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000037
B 4 3.598 1.799 0.0000764 0.0000401 0.000259166 0.00164
C 3 3.598 5.396 0.0001294 0.0001029 0.001997362
D 2 3.598 8.994 0.0001619 0.0001456 0.004710998
E 1 3.598 12.591 0.0001726 0.0001672 0.007575559
Total 0.014543085
-------------------------------------------------------------------------------------------------------------------------------
93 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
26 1 SPECTRUM IN X6.388
DIRECTION 0.187 0.037 6.391 0 0 0
2 SPECTRUM IN Z0.011
DIRECTION 1.386 1.118 1.781 0 0 0
3 SPECTRUM IN Y0.014
DIRECTION 0.257 0.089 0.272 0 0 0
4 DEAD LOAD 0.171 -5.134 0.02 5.137 0 0 0
5 SIDL (DL) 0.022 -0.486 0.002 0.487 0 0 0
6 SIDL(WC) 0.024 -0.77 0.004 0.77 0 0 0
7 REMOVAL OF SHUTTER
-0.026 0.787 -0.004 0.787 0 0 0
8 EARTH PR ON ABUTMENT
-0.269 1.811 0.199 1.842 0 0 0
9 LIVE LOAD SURCHARGE
1.204 0.058 0.015 1.206 0 0 0
10 DYNAMIC INCREMENT
-0.172 OF EARTH
1.143 PR. 0.125 1.162 0 0 0
11 DYNAMIC INCREMENT
0.761 OF LL0.036
SURCGARGE 0.01 0.762 0 0 0
12 UNLADEN WIND 0.147
LOAD -0.858 -0.113 0.878 0 0 0
13 LADEN WIND LOAD
0.122 -0.445 -0.103 0.473 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.296 -6.247 -0.002 6.655 0 0 0.001
15 TEMPERATURE0.615
RISE 2.861 -0.497 2.968 0 0 0
16 TEMPERATURE -0.282
FALL -1.337 0.233 1.386 0 0 0
17 CREEP SHRINKAGE
-0.218 DIFF SHRINKAGE
-0.702 0.235 0.772 0 0 0
18 FOOTPATH LIVE0.005
LOAD -0.063 -0.002 0.063 0 0 0
19 SNOW LOAD FOR0.031
70R LL TRACK
-0.934 0.005 0.935 0 0 0
20 SNOW LOAD FOR0.016
LL 70R WHEEL
-0.467 0.002 0.468 0 0 0
21 BRAKING 0.454 -0.01 0 0.454 0 0 0
504 COMBINATION0.081
LOAD CASE-1.185
504 0.014 1.188 0 0 0
-------------------------------------------------------------------------------------------------------------------------------
94 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
95 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.475 0.2
0.1 0.053
0.2
0.25
0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN
= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 21.12 1.75 1.75 0.250
6.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 3.000 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008
-------------------------------------------------------------------------------------------------------------------------------
96 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
16.875
-------------------------------------------------------------------------------------------------------------------------------
97 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
98 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
99 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
100 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
101 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
6.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 2 34 12 13 14 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.515 7.031 10.546 14.061
Precast girder only -1.1 1063.3 1795.0 2240.1 2398.8
Construction load -0.2 280.9 481.7 602.2 642.4
Deck slab & X-girder -0.5 746.9 1285.8 1616.2 1738.0
Total wt of deck slab = -1.7 1810.2 3080.8 3856.3 4136.8
SIDL (DL) from staad output -207.1 -108.4 28.6 156.0 267.9
SIDL (WC) from staad output -311.0 -113.8 82.9 192.1 213.7
Removal of shutter 342.6 132.3 -84.1 -215.1 -260.6
Active Earth pressure -215.1 -215.1 -265.4 -294.3 -294.3
Earth pressure at rest -348.5 -236.3 -397.7 -446.5 -323.2
Earth pressure at K* -460.6 -523.2 -609.1 -694.7 -792.1
Live load surcharge 396.3 318.1 209.7 101.0 -7.9
Wind load (unloaded structure) -333.1 -117.0 -150.1 -165.6 -181.0
Wind load (loaded structure) -161.8 -51.9 59.6 124.8 143.4
Differential settlement -1019.9 825.5 556.5 286.5 15.9
Temperature rise -383.0 -427.2 -489.6 -553.3 -617.6
Temperature fall 179.3 199.8 228.7 258.3 288.0
Creep & shrinkage 98.4 110.3 127.3 144.7 162.2
Footpath live load -87.6 -46.4 9.3 61.4 110.1
Snow load -199.7 -77.4 48.8 125.8 153.5
Braking load 110.0 89.3 60.7 32.0 3.2
Live Load -1240.5 -517.4 823.1 964.0 711.0
Seismic in X- direction -1449.7 -1203.7 -847.5 -467.9 -72.8
Seismic in Z- direction -460.0 -226.0 -73.8 -293.6 -405.6
Seismic in Y- direction -93.9 -45.6 -21.6 -62.0 -84.2
Dynamic increment of Earth pr. -123.3 -134.6 -150.1 -165.6 -181.0
Dynamic increment of LL Surcharge 148.7 119.4 78.7 37.9 -2.9
Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 35.66 35.483 39.118 42.865 44.653
Moment -889.3 -885.8 -881.0 -876.0 -870.8
The hyperstatic action is only considered for calculation of negative moment at support.
-------------------------------------------------------------------------------------------------------------------------------
102 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
103 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.375
3
0.000
X X X
1.775 0.500
2
0.500
1 3 2 0.170 1 0.400
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support
-------------------------------------------------------------------------------------------------------------------------------
104 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.25 14.061
Y
4.50
1 2 X 0.17
0.17
0.15 14.311
0.15
0.38 4
0.000 3
0.500 Z
2
0.500
1 0.170
0.125
0.40 0.25 3.000 4.50 3.00 3.561
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.4-0.125)/(0.25+3-0.15)} = 5.069
o
Vertical bending of Cable 2 =Tan-1{(0.4+0.5-0.125-0.17)/(0.25+3+4.5-0.15)} = 5.823
o
Vertical bending of Cable 3 =Tan-1{(0.4+0.5+0.5-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 6.859
o
Vertical bending of Cable 4 =Tan-1{(0.4+0.5+0.5+0-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 5.951
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.400 3.100 0.000 0.125
2 0.000 0.000 0.900 7.600 -0.170 0.125
3 0.000 0.000 1.40 10.600 0.000 0.125
-------------------------------------------------------------------------------------------------------------------------------
105 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2434.70
1-2 3.112 0.00 0.000 1.0062
2 2715.95 2451.65
2-3 4.503 5.782 0.101 1.0265
3 2645.81 2521.79
3-4 6.561 2.781 0.049 1.0216
4 2589.87 2577.73
Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2428.42
1-2 3.116 0.00 0.000 1.0063
2 2715.93 2445.40
2-3 4.527 6.452 0.113 1.0286
3 2640.41 2520.91
3-4 6.561 2.781 0.049 1.0216
4 2584.58 2584.58
3.116 4.527 6.561
2732.90 2715.93
1 2 2640.41 2584.58
= 3
= 2576.75 4
2445.40 2520.91
2428.42 6.561
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2576.75 kN
Point of Zero Slip from node 3 = 6.561 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 28.407 m
Extension of cable = 109.13 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2488.56
1-2 10.676 0.00 0.000 1.0216
2 2675.17 2546.29
2-3 3.561 6.859 0.120 1.0279
3 2602.68 2602.68
10.676 3.561
2732.90 2675.17
1 2 2602.68
= 3
= 2610.73
2546.29 3.165
2488.56
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2610.73 kN
Point of Zero Slip from node 1 = 3.165 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.676+3.561)x2 = 28.475 m
Extension of cable at each side = 110.54 mm
-------------------------------------------------------------------------------------------------------------------------------
106 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
6.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.515 7.031 10.546 14.061
Cable 1 2437.42 2453.85 2512.68 2546.77 2577.73
Vert. angle 5.069 5.069 5.069 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.356 0.125 0.125 0.125 0.125
Cable 2 2431.15 2447.57 2510.70 2549.08 2584.58
Vert. angle 5.823 5.823 5.823 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.849 0.542 0.183 0.125 0.125
Total cable
forces Normal 4846.49 4879.20 4994.71 5092.86 5162.31
at first stage
CG of Cable 0.602 0.333 0.154 0.125 0.125
Total cable
forces Per.
462.01 465.13 476.17 0.00 0.00
Cable 3 2491.26 2507.57 2526.58 2545.59 2602.68
Vert. angle 6.859 6.859 6.859 6.859 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.340 0.977 0.554 0.125 0.125
Total cable
forces Normal 2473.43 2489.62 2508.49 2527.37 2602.68
CG of Cable 1.340 0.977 0.554 0.125 0.125
Total cable
297.51 299.46 301.73 304.00 0.00
forces CG
Overall Per.of
Cable 0.851 0.551 0.288 0.125 0.125
% loss 10.2 % 9.6 % 7.9 % 6.8 % 5.3 %
6.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 28.353 109.06
Cable 2 28.407 109.13
Cable 3 28.475 110.54
-------------------------------------------------------------------------------------------------------------------------------
107 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
108 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
6.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4737+2x(4770+4885+4984)+5053)/8 = 4883.58 kN
Percentage of Initial force = 0.700 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.49 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4883.58/2x2.49/100 = 60.92 kN/Cable
Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 22.54 kN/Cable
5 - 28 days Loss = 25.59 kN/Cable
28 - 60 days Loss = 12.79 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 121.84 kN/Cable
Total = 182.76 kN/Cable
182.762 6.69 %
-------------------------------------------------------------------------------------------------------------------------------
109 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
110 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
6.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 12.79 kN/Cable Relaxation = 38.38 kN/Cable
Creep = 36.14 kN/Cable Creep = 36.14 kN/Cable
Total = 64.95 kN/Cable Total = 90.54 kN/Cable
actual time dependent losses = 64.95 kN/Cable actual time dependent losses = 90.54 kN/Cable
Total Loss of 4 Cables = 220.45 kN Actual Loss of third Cables = 90.54 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
+ + =
< 20.00
Mpa
17.49 Mpa -0.74 Mpa -6.47 Mpa 10.29 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder
Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
-------------------------------------------------------------------------------------------------------------------------------
111 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
+ + =
-------------------------------------------------------------------------------------------------------------------------------
112 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)
+ =
Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.11 -0.67 -0.09 -1.87
Top of girder 2.51 -734.25 -97.08 -0.47 -0.06 1.97
End
Bottom 6.18 1.12 0.15 7.44
Top of slab -0.76 -0.10 -0.03 -0.90
Top of girder 5.23 -110.05 -31.14 -0.07 -0.02 5.14
L/8
Bottom 8.67 0.22 0.06 8.94
Top of slab -0.40 1.02 0.03 0.66
Top of girder 4.77 1093.50 35.78 0.67 0.02 5.46
L/4
Bottom 9.15 -2.14 -0.07 6.94
Top of slab -0.14 1.03 0.07 0.96
Top of girder 4.28 1096.95 74.87 0.67 0.05 4.99
3L/8
Bottom 9.73 -2.14 -0.15 7.44
Top of slab -0.05 0.67 0.08 0.70
Top of girder 4.94 714.28 86.06 0.44 0.05 5.43
L/2
Bottom 9.16 -1.40 -0.17 7.60
-------------------------------------------------------------------------------------------------------------------------------
113 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 5.4 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -1.9 Mpa
Tension reinforcement at top of support are provided
6.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Moment due Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder to (Mpa)
Top of slab snow (kN-m) 0.42 F=35.66 -0.98
Top of girder 0.29 2.46
End -1.66 457.9 7319.92 0.851 -602.84 -1368.13 -889.32
Bottom -0.69 6.01
Top of slab 0.39 F=35.48 -0.68
Top of girder 4.41 0.16
L/8 1810.16 412.7 7368.82 0.551 -602.84 -1368.13 -885.82
Bottom -5.72 13.57
Top of slab 0.15 F=39.12 -0.34
Top of girder 7.17 -3.76
L/4 3080.75 160.6 7503.20 0.288 -602.84 -1368.13 -881.04
Bottom -8.68 18.07
Top of slab 0.03 F=42.87 -0.13
Top of girder 8.87 -6.30
3L/8 3856.29 33.8 7620.23 0.125 -602.84 -1368.13 -876.03
Bottom -10.54 21.07
Top of slab -0.18 F=44.65 -0.12
Top of girder 9.38 -6.42
L/2 4136.78 -191.6 7764.99 0.125 -602.84 -1368.13 -870.81
Bottom -10.86 21.55
Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.47 -0.67 -0.09 4.32 -2.50
Top of girder -0.33 -0.47 -0.06 -1.10 0.90
End -518.11 -734.25 -97.08
Bottom 0.79 1.12 0.15 1.67 -2.39
Top of slab -0.21 -0.10 -0.03 4.32 -2.50
Top of girder -0.14 -0.07 -0.02 -1.10 0.90
L/8 -222.25 -110.05 -31.14
Bottom 0.43 0.22 0.06 1.67 -2.39
Top of slab 0.10 1.02 0.03 4.32 -2.50
Top of girder 0.07 0.67 0.02 -1.10 0.90
L/4 111.50 1093.50 35.78
Bottom -0.22 -2.14 -0.07 1.67 -2.39
Top of slab 0.33 1.03 0.07 4.32 -2.50
Top of girder 0.21 0.67 0.05 -1.10 0.90
3L/8 348.12 1096.95 74.87
Bottom -0.68 -2.14 -0.15 1.67 -2.39
Top of slab 0.45 0.67 0.08 4.32 -2.50
Top of girder 0.29 0.44 0.05 -1.10 0.90
L/2 481.55 714.28 86.06
Bottom -0.94 -1.40 -0.17 1.67 -2.39
6.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
-------------------------------------------------------------------------------------------------------------------------------
114 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
115 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.98 -3.21 -3.11 2.78 2.87 -4.04 -3.94 2.87 -4.04
Top of girder 1.04 2.17 2.24 0.65 0.72 2.65 2.72 2.72 0.65
End
Bottom 7.62 5.35 5.19 8.17 8.01 4.11 3.95 8.17 3.95
Top of slab 2.05 -2.08 -2.04 3.76 3.81 -3.05 -3.01 3.81 -3.05
Top of girder 3.68 4.86 4.88 3.23 3.26 5.23 5.26 5.26 3.23
L/8
Bottom 8.14 5.79 5.71 8.84 8.76 4.78 4.70 8.84 4.70
Top of slab 3.56 -0.50 -0.53 5.05 5.03 -1.76 -1.78 5.05 -1.78
Top of girder 3.86 5.07 5.06 3.27 3.25 5.26 5.25 5.26 3.25
L/4
Bottom 6.23 3.75 3.80 7.39 7.43 3.33 3.38 7.43 3.33
Top of slab 3.86 -0.16 -0.23 5.39 5.33 -1.42 -1.49 5.39 -1.49
Top of girder 3.42 4.66 4.62 2.86 2.81 4.85 4.81 4.85 2.81
3L/8
Bottom 6.60 4.03 4.17 7.67 7.80 3.61 3.75 7.80 3.61
Top of slab 3.42 -0.58 -0.67 5.07 4.98 -1.75 -1.84 5.07 -1.84
Top of girder 3.67 4.92 4.86 3.18 3.12 5.17 5.11 5.17 3.12
L/2
Bottom 7.19 4.57 4.76 8.02 8.21 3.97 4.15 8.21 3.97
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.23 -1.13 -1.28 -1.19 -1.96 -1.86 -1.82 -1.73 0.69
Top of girder 2.60 2.66 2.56 2.63 2.09 2.15 2.18 2.25 1.47
End
Bottom 6.87 6.71 6.95 6.80 8.07 7.91 7.85 7.69 8.98
Top of slab -0.61 -0.57 -0.63 -0.59 -0.73 -0.69 -0.72 -0.67 1.88
Top of girder 4.42 4.44 4.40 4.43 4.34 4.36 4.35 4.37 3.69
L/8
Bottom 9.73 9.64 9.76 9.68 9.98 9.89 9.95 9.86 10.94
Top of slab -0.10 -0.12 -0.08 -0.10 0.95 0.93 0.70 0.68 3.52
Top of girder 3.11 3.10 3.12 3.11 3.79 3.78 3.63 3.62 3.12
L/4
Bottom 10.94 10.98 10.90 10.94 8.76 8.80 9.27 9.31 9.80
Top of slab 0.28 0.22 0.32 0.26 1.35 1.29 1.12 1.06 3.90
Top of girder 2.19 2.15 2.22 2.18 2.89 2.85 2.74 2.70 2.20
3L/8
Bottom 11.82 11.96 11.73 11.87 9.59 9.73 10.07 10.20 10.68
Top of slab 0.22 0.13 0.27 0.18 0.94 0.85 0.81 0.72 3.48
Top of girder 2.66 2.60 2.69 2.64 3.13 3.07 3.04 2.98 2.44
L/2
Bottom 11.71 11.90 11.61 11.80 10.21 10.40 10.49 10.68 11.32
-------------------------------------------------------------------------------------------------------------------------------
116 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.78 -3.40 -3.31 2.58 2.68 -4.23 -4.14 2.68 -4.23
Top of girder 1.53 2.66 2.73 1.14 1.21 3.14 3.21 3.21 1.14
End
Bottom 8.82 6.55 6.39 9.37 9.21 5.31 5.16 9.37 5.16
Top of slab 1.92 -2.21 -2.17 3.63 3.67 -3.19 -3.14 3.67 -3.19
Top of girder 3.72 4.89 4.92 3.27 3.29 5.26 5.29 5.29 3.27
L/8
Bottom 10.86 8.51 8.42 11.56 11.47 7.50 7.41 11.56 7.41
Top of slab 3.50 -0.57 -0.59 4.99 4.97 -1.83 -1.85 4.99 -1.85
Top of girder 3.11 4.32 4.31 2.51 2.50 4.51 4.50 4.51 2.50
L/4
Bottom 9.85 7.37 7.41 11.00 11.05 6.95 6.99 11.05 6.95
Top of slab 3.83 -0.19 -0.26 5.37 5.30 -1.45 -1.51 5.37 -1.51
Top of girder 2.16 3.40 3.36 1.59 1.55 3.59 3.55 3.59 1.55
3L/8
Bottom 10.82 8.25 8.38 11.88 12.02 7.83 7.96 12.02 7.83
Top of slab 3.39 -0.61 -0.70 5.04 4.95 -1.77 -1.86 5.04 -1.86
Top of girder 2.38 3.64 3.58 1.89 1.83 3.89 3.83 3.89 1.83
L/2
Bottom 11.50 8.88 9.07 12.33 12.52 8.27 8.46 12.52 8.27
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 12.5 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 3.33 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 1.55 Mpa Hence O.K.
except at support
6.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
117 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.23 -1.13 -1.28 -1.19 -1.78 -1.68 -1.42 -1.32 0.42
Top of girder 2.60 2.66 2.56 2.63 2.21 2.28 2.47 2.53 1.69
End
Bottom 6.87 6.71 6.95 6.80 7.78 7.62 7.18 7.02 8.54
Top of slab -0.61 -0.57 -0.63 -0.59 -0.70 -0.66 -0.65 -0.61 1.47
Top of girder 4.42 4.44 4.40 4.43 4.36 4.38 4.39 4.42 3.82
L/8
Bottom 9.73 9.64 9.76 9.68 9.92 9.83 9.81 9.72 10.72
Top of slab -0.10 -0.12 -0.08 -0.10 0.69 0.67 0.13 0.11 2.83
Top of girder 3.11 3.10 3.12 3.11 3.62 3.61 3.26 3.24 3.06
L/4
Bottom 10.94 10.98 10.90 10.94 9.30 9.34 10.47 10.51 10.17
Top of slab 0.28 0.22 0.32 0.26 1.09 1.02 0.53 0.46 3.21
Top of girder 2.19 2.15 2.22 2.18 2.72 2.68 2.35 2.31 2.14
3L/8
Bottom 11.82 11.96 11.73 11.87 10.14 10.28 11.31 11.44 11.05
Top of slab 0.22 0.13 0.27 0.18 0.77 0.68 0.41 0.32 2.88
Top of girder 2.66 2.60 2.69 2.64 3.02 2.96 2.78 2.72 2.44
L/2
Bottom 11.71 11.90 11.61 11.80 10.58 10.77 11.33 11.52 11.50
-------------------------------------------------------------------------------------------------------------------------------
118 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.52 -2.98 -2.89 1.23 1.32 -2.86 -2.77 1.32 -2.98
Top of girder 1.76 2.69 2.76 1.84 1.91 3.04 3.11 3.11 1.69
End
Bottom 8.38 6.51 6.35 8.09 7.93 5.66 5.50 8.54 5.50
Top of slab 1.51 -1.94 -1.90 1.96 2.00 -2.13 -2.09 2.00 -2.13
Top of girder 3.84 4.81 4.84 3.74 3.77 4.94 4.97 4.97 3.74
L/8
Bottom 10.64 8.69 8.61 10.77 10.68 8.34 8.25 10.77 8.25
Top of slab 2.81 -0.58 -0.60 2.70 2.68 -1.39 -1.41 2.83 -1.41
Top of girder 3.05 4.06 4.05 2.59 2.57 3.78 3.77 4.06 2.57
L/4
Bottom 10.21 8.14 8.18 11.51 11.56 9.08 9.12 11.56 8.14
Top of slab 3.15 -0.20 -0.26 3.08 3.01 -1.01 -1.08 3.21 -1.08
Top of girder 2.10 3.14 3.10 1.67 1.62 2.86 2.82 3.14 1.62
3L/8
Bottom 11.18 9.02 9.16 12.39 12.53 9.96 10.10 12.53 9.02
Top of slab 2.79 -0.52 -0.61 2.95 2.86 -1.14 -1.23 2.95 -1.23
Top of girder 2.38 3.44 3.38 2.09 2.03 3.29 3.23 3.44 2.03
L/2
Bottom 11.69 9.47 9.66 12.43 12.62 10.00 10.19 12.62 9.47
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 12.6 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 4.30 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 1.62 Mpa Hence O.K.
except at support
6.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 7920 kN
183.34
NA NA
2000 300
-------------------------------------------------------------------------------------------------------------------------------
119 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.642 MPa Negative Design Moment = 6370 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 8205.4 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 6370 kNm Hence O.K.
Factor of safety = 17,616/6,370 = 2.77
-------------------------------------------------------------------------------------------------------------------------------
120 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
vi) As per clause no 6.3.2 of IS-13920 :1993, Shear force due to ductile detailing shall be
Vua = Va D+L - 1.4(MuAh+MuBs)/L
D+L
Va = 1.2(D+L)/2 = 1519.63 kN
MuAh = -6370.18 kN
MuBs = -3511.54 kN
L = 27.05 m
Vua = 2031 kN
Maximum design shear at support < 2130 kN
-------------------------------------------------------------------------------------------------------------------------------
121 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5394.4 5443.3 5577.7 5694.7 5839.5
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1149 1449 1712 1875 1875
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7
iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.52 7.03 10.55 14.06
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 2130.3 1653.2 1176.4 696.7 364.2
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 540.1 545.2 559.0 219.3 0.0
Total Shear force for the Beam (kN) 1590.1 1108.0 617.3 477.4 364.2
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 3.5523 0.9542 -3.4427 -6.2768 -6.3997
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 431.81 470.00 470.01
Maximum shear capacity of the Section (kN) 4022 2030 2398 2626 2626
Not
Whether shear reinforcement required or not Required Required Required Required
Required
-------------------------------------------------------------------------------------------------------------------------------
122 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
124 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
A -0.00013
B 4 3.515 1.758 -0.00018 -0.00016 -0.000970146
C 3 3.515 5.273 -0.00020 -0.00019 -0.003556017
D 2 3.515 8.788 -0.00018 -0.00019 -0.005916817
E 1 3.515 12.303 -0.00017 -0.00018 -0.007632652
Total -0.018075632
So, Midspan deflection due to Prestress + wt of precast Girder = = -18 mm
= - L/ 1556
(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.515 7.031 10.546 14.061
CG of all cables from bot.(m) 0.851 0.551 0.288 0.125 0.125
Loss 220.450 220.450 220.450 220.450 220.450
Moment due to prestressing losses 21.360 90.734 148.620 184.537 184.548
Moment due to Wt of Deck Slab -0.527 746.897 1285.797 1616.173 1738.025
Total moment due to prestress+DL 20.833 837.631 1434.418 1800.710 1922.573
M/EI (1/m) 0.0000015 0.0000709 0.0001214 0.0001525 0.00016
3.5 3.515 3.515 3.515
A B C D E
0.000002 0.0000709 0.0001525
4 0.0001214
0.0001628
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000015
B 4 3.515 1.758 0.0000709 0.0000362 0.000223756 0.00150
C 3 3.515 5.273 0.0001214 0.0000962 0.00178272
D 2 3.515 8.788 0.0001525 0.0001369 0.004230637
E 1 3.515 12.303 0.0001628 0.0001576 0.00681661
Total 0.013053723
-------------------------------------------------------------------------------------------------------------------------------
125 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
19 1 SPECTRUM IN X DIRECTION
6.26 0.176 0.037 6.263 0 0 0
2 SPECTRUM IN Z0.068
DIRECTION 1.028 1.119 1.521 0 0 0
3 SPECTRUM IN Y0.014
DIRECTION 0.197 0.089 0.216 0 0 0
4 DEAD LOAD 0.169 -4.773 0.02 4.776 0 0 0
5 SIDL (DL) 0.021 -0.553 0.002 0.553 0 0 0
6 SIDL(WC) 0.024 -0.64 0.004 0.64 0 0 0
7 REMOVAL OF SHUTTER
-0.026 0.723 -0.004 0.723 0 0 0
8 EARTH PR ON ABUTMENT
-0.259 1.782 0.199 1.812 0 0 0
9 LIVE LOAD SURCHARGE
1.187 0.068 0.015 1.189 0 0 0
10 DYNAMIC INCREMENT
-0.165 OF EARTH
1.125 PR. 0.125 1.144 0 0 0
11 DYNAMIC INCREMENT
0.75 OF LL0.042
SURCGARGE 0.01 0.751 0 0 0
12 UNLADEN WIND 0.143
LOAD -0.767 -0.112 0.788 0 0 0
13 LADEN WIND LOAD
0.119 -0.398 -0.102 0.428 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.254 -6.248 -0.002 6.642 0 0 0.001
15 TEMPERATURE0.605
RISE 2.748 -0.495 2.857 0 0 0
16 TEMPERATURE -0.278
FALL -1.285 0.232 1.335 0 0 0
17 CREEP SHRINKAGE
-0.215 DIFF SHRINKAGE
-0.687 0.235 0.758 0 0 0
18 FOOTPATH LIVE0.005
LOAD -0.215 -0.002 0.215 0 0 0
19 SNOW LOAD FOR0.031
70R LL TRACK
-0.847 0.005 0.847 0 0 0
20 SNOW LOAD FOR0.015
LL 70R WHEEL
-0.423 0.002 0.424 0 0 0
21 BRAKING 0.446 -0.01 0 0.446 0 0 0
504 COMBINATION 0.08
LOAD CASE-1.134
504 0.015 1.137 0 0 0
-------------------------------------------------------------------------------------------------------------------------------
126 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
127 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.475 0.2
0.1 0.053
0.2
0.25
0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN
= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 20.46 1.75 1.75 0.250
7.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 2.870 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008
-------------------------------------------------------------------------------------------------------------------------------
128 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
16.143
-------------------------------------------------------------------------------------------------------------------------------
129 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
130 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
131 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
132 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
133 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
7.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 1 33 5 6 7 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.433 6.866 10.299 13.732
Precast girder only -1.1 1016.5 1714.7 2139.7 2291.3
Construction load -0.2 265.2 454.8 568.6 606.5
Deck slab & X-girder -0.5 682.5 1175.3 1477.9 1590.2
Total wt of deck slab = -1.6 1699.1 2890.1 3617.6 3881.5
SIDL (DL) from staad output -482.7 -153.8 144.5 264.3 211.3
SIDL (WC) from staad output -220.3 -83.4 57.2 146.0 188.6
Removal of shutter 322.5 124.9 -80.3 -204.6 -248.3
Active Earth pressure -218.0 -218.0 -269.6 -299.6 -299.6
Earth pressure at rest -352.7 -239.7 -403.4 -453.6 -329.8
Earth pressure at K* -467.0 -530.8 -619.1 -707.5 -808.5
Live load surcharge 0.0 0.0 0.0 0.0 0.0
Wind load (unloaded structure) -300.1 -103.8 -152.5 -168.6 -184.8
Wind load (loaded structure) -144.9 -45.2 56.2 114.6 130.0
Differential settlement -1101.0 -888.5 595.9 306.2 17.9
Temperature rise -341.0 -399.2 -478.6 -556.6 -634.0
Temperature fall 159.8 186.8 223.8 260.0 296.1
Creep & shrinkage 89.0 104.8 126.7 148.4 170.1
Footpath live load -245.9 -91.1 59.0 135.0 137.8
Snow load -186.6 -71.7 47.2 118.6 142.5
Braking load 111.4 90.4 61.3 32.4 3.5
Live Load -832.6 -473.8 216.8 560.3 1009.0
Seismic in X- direction -1461.9 -1216.9 -860.8 -477.6 -74.5
Seismic in Z- direction -370.7 -187.1 -62.8 -207.7 -263.8
Seismic in Y- direction -156.4 -75.3 -31.6 -98.8 -125.7
Dynamic increment of Earth pr. -124.8 -136.4 -152.5 -168.6 -184.8
Dynamic increment of LL Surcharge 149.1 119.3 78.0 36.8 -4.4
Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 109.101 112.083 114.002 111.452 107.715
Moment -894.0 -890.0 -886.1 -883.0 -880.3
The hyperstatic action is only considered for calculation of negative moment at support.
-------------------------------------------------------------------------------------------------------------------------------
134 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
135 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.375
3
0.000
X X X
1.775 0.500
2
0.500
1 3 2 0.170 1 0.400
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support
-------------------------------------------------------------------------------------------------------------------------------
136 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.25 13.732
Y
4.50
1 2 X 0.17
0.17
0.15 13.982
0.15
0.38 4
0.000 3
0.500 Z
2
0.500
1 0.170
0.125
0.40 0.25 3.000 4.50 3.00 3.232
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.4-0.125)/(0.25+3-0.15)} = 5.069
o
Vertical bending of Cable 2 =Tan-1{(0.4+0.5-0.125-0.17)/(0.25+3+4.5-0.15)} = 5.823
o
Vertical bending of Cable 3 =Tan-1{(0.4+0.5+0.5-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 6.859
o
Vertical bending of Cable 4 =Tan-1{(0.4+0.5+0.5+0-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 5.951
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.400 3.100 0.000 0.125
2 0.000 0.000 0.900 7.600 -0.170 0.125
3 0.000 0.000 1.40 10.600 0.000 0.125
-------------------------------------------------------------------------------------------------------------------------------
137 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2433.84
1-2 3.112 0.00 0.000 1.0062
2 2715.95 2450.80
2-3 4.503 5.782 0.101 1.0265
3 2645.81 2520.94
3-4 6.232 2.781 0.049 1.0209
4 2591.57 2575.18
Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2427.68
1-2 3.116 0.00 0.000 1.0063
2 2715.93 2444.65
2-3 4.527 6.452 0.113 1.0286
3 2640.41 2520.17
3-4 6.232 2.781 0.049 1.0209
4 2586.28 2586.28
3.116 4.527 6.232
2732.90 2715.93
1 2 2640.41 2586.28
= 3
= 2574.30 4
2444.65 2520.17
2427.68 6.232
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2574.30 kN
Point of Zero Slip from node 3 = 6.232 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 27.749 m
Extension of cable = 106.80 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2487.50
1-2 10.676 0.00 0.000 1.0216
2 2675.17 2545.24
2-3 3.232 6.859 0.120 1.0272
3 2604.39 2604.39
10.676 3.232
2732.90 2675.17
1 2 2604.39
= 3
= 2610.20
2545.24 2.966
2487.50
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2610.203 kN
Point of Zero Slip from node 1 = 2.966 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.676+3.232)x2 = 27.817 m
Extension of cable at each side = 108.17 mm
-------------------------------------------------------------------------------------------------------------------------------
138 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
7.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.433 6.866 10.299 13.732
Cable 1 2436.57 2452.55 2509.26 2544.29 2575.18
Vert. angle 5.069 5.069 5.069 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.356 0.125 0.125 0.125 0.125
Cable 2 2430.40 2446.38 2507.21 2548.35 2586.28
Vert. angle 5.823 5.823 5.823 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.849 0.550 0.200 0.125 0.125
Total cable
forces Normal 4844.90 4876.72 4987.85 5089.64 5161.46
at first stage
CG of Cable 0.602 0.337 0.163 0.125 0.125
Total cable
forces Per.
461.86 464.89 475.52 0.00 0.00
Cable 3 2490.21 2506.07 2524.63 2543.20 2604.39
Vert. angle 6.859 6.859 6.859 6.859 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.340 0.987 0.574 0.125 0.125
Total cable
forces Normal 2472.38 2488.13 2506.56 2525.00 2604.39
CG of Cable 1.340 0.987 0.574 0.125 0.125
Total cable
297.39 299.28 301.50 303.71 0.00
forces CG
Overall Per.of
Cable 0.851 0.557 0.300 0.125 0.125
% loss 10.3 % 9.7 % 8.0 % 6.9 % 5.3 %
7.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 27.695 106.73
Cable 2 27.749 106.80
Cable 3 27.817 108.17
-------------------------------------------------------------------------------------------------------------------------------
139 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
140 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
7.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4735+2x(4766+4877+4979)+5051)/8 = 4878.99 kN
Percentage of Initial force = 0.699 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.49 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4878.99/2x2.49/100 = 60.66 kN/Cable
Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 22.45 kN/Cable
5 - 28 days Loss = 25.48 kN/Cable
28 - 60 days Loss = 12.74 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 121.33 kN/Cable
Total = 181.99 kN/Cable
181.988 6.66 %
-------------------------------------------------------------------------------------------------------------------------------
141 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
142 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
7.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 12.74 kN/Cable Relaxation = 38.22 kN/Cable
Creep = 36.29 kN/Cable Creep = 36.29 kN/Cable
Total = 65.05 kN/Cable Total = 90.53 kN/Cable
actual time dependent losses = 65.05 kN/Cable actual time dependent losses = 90.53 kN/Cable
Total Loss of 4 Cables = 220.63 kN Actual Loss of third Cables = 90.53 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
+ + =
< 20.00
Mpa
17.78 Mpa -0.74 Mpa -5.97 Mpa 11.08 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder
Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
-------------------------------------------------------------------------------------------------------------------------------
143 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
+ + =
-------------------------------------------------------------------------------------------------------------------------------
144 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)
+ =
Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.34 -0.66 -0.08 -2.08
Top of girder 2.34 -721.24 -86.95 -0.46 -0.06 1.82
End
Bottom 6.44 1.10 0.13 7.67
Top of slab -0.82 -0.36 -0.03 -1.21
Top of girder 4.98 -383.48 -27.15 -0.23 -0.02 4.73
L/8
Bottom 8.90 0.75 0.05 9.70
Top of slab -0.35 0.26 0.03 -0.06
Top of girder 4.48 278.11 33.74 0.17 0.02 4.67
L/4
Bottom 9.28 -0.54 -0.07 8.67
Top of slab -0.09 0.56 0.06 0.53
Top of girder 3.67 592.71 68.78 0.36 0.04 4.08
3L/8
Bottom 10.26 -1.16 -0.13 8.97
Top of slab -0.14 0.95 0.07 0.88
Top of girder 4.21 1012.46 77.98 0.62 0.05 4.88
L/2
Bottom 10.05 -1.98 -0.15 7.92
-------------------------------------------------------------------------------------------------------------------------------
145 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 4.9 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -2.1 Mpa
Tension reinforcement at top of support are provided
7.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Moment due Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder to (Mpa)
Top of slab snow (kN-m) 0.49 F=109.10 -1.02
Top of girder 0.34 2.42
End -1.63 536.4 7317.28 0.851 -604.24 -1380.27 -894.01
Bottom -0.81 5.97
Top of slab -1.23 F=112.08 -0.74
Top of girder 3.09 0.19
L/8 1699.07 -1314.5 7364.85 0.557 -604.24 -1380.27 -890.04
Bottom -2.05 13.40
Top of slab 0.18 F=114.00 -0.40
Top of girder 6.75 -3.62
L/4 2890.08 191.9 7494.41 0.300 -604.24 -1380.27 -886.11
Bottom -8.23 17.78
Top of slab 0.04 F=111.45 -0.17
Top of girder 8.33 -6.34
3L/8 3617.56 42.4 7614.64 0.125 -604.24 -1380.27 -883.00
Bottom -9.91 20.98
Top of slab -0.19 F=107.72 -0.17
Top of girder 8.78 -6.47
L/2 3881.51 -200.3 7765.85 0.125 -604.24 -1380.27 -880.27
Bottom -10.15 21.49
Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.64 -0.66 -0.08 4.32 -2.50
Top of girder -0.45 -0.46 -0.06 -1.10 0.90
End -703.05 -721.24 -86.95
Bottom 1.07 1.10 0.13 1.67 -2.39
Top of slab -0.22 -0.36 -0.03 4.32 -2.50
Top of girder -0.15 -0.23 -0.02 -1.10 0.90
L/8 -237.23 -383.48 -27.15
Bottom 0.46 0.75 0.05 1.67 -2.39
Top of slab 0.19 0.26 0.03 4.32 -2.50
Top of girder 0.12 0.17 0.02 -1.10 0.90
L/4 201.72 278.11 33.74
Bottom -0.39 -0.54 -0.07 1.67 -2.39
Top of slab 0.38 0.56 0.06 4.32 -2.50
Top of girder 0.25 0.36 0.04 -1.10 0.90
3L/8 410.27 592.71 68.78
Bottom -0.80 -1.16 -0.13 1.67 -2.39
Top of slab 0.37 0.95 0.07 4.32 -2.50
Top of girder 0.24 0.62 0.05 -1.10 0.90
L/2 399.95 1012.46 77.98
Bottom -0.78 -1.98 -0.15 1.67 -2.39
7.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
-------------------------------------------------------------------------------------------------------------------------------
146 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
147 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.86 -3.36 -3.23 2.62 2.75 -4.20 -4.07 2.75 -4.20
Top of girder 0.94 2.05 2.14 0.53 0.62 2.53 2.62 2.62 0.53
End
Bottom 7.72 5.50 5.29 8.33 8.12 4.27 4.06 8.33 4.06
Top of slab 0.11 -4.02 -3.98 1.88 1.93 -4.93 -4.89 1.93 -4.93
Top of girder 2.23 3.40 3.43 1.82 1.85 3.82 3.85 3.85 1.82
L/8
Bottom 12.23 9.89 9.79 12.80 12.71 8.74 8.65 12.80 8.65
Top of slab 2.86 -1.19 -1.23 4.56 4.52 -2.26 -2.30 4.56 -2.30
Top of girder 3.12 4.35 4.32 2.66 2.64 4.66 4.64 4.66 2.64
L/4
Bottom 7.84 5.33 5.40 8.56 8.64 4.51 4.59 8.64 4.51
Top of slab 3.41 -0.60 -0.67 5.08 5.00 -1.74 -1.81 5.08 -1.81
Top of girder 2.57 3.82 3.77 2.09 2.04 4.09 4.04 4.09 2.04
3L/8
Bottom 8.02 5.42 5.58 8.81 8.97 4.76 4.92 8.97 4.76
Top of slab 3.58 -0.44 -0.51 5.14 5.06 -1.68 -1.75 5.14 -1.75
Top of girder 3.17 4.42 4.37 2.62 2.57 4.62 4.57 4.62 2.57
L/2
Bottom 7.43 4.84 4.99 8.43 8.59 4.38 4.53 8.59 4.38
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.40 -1.28 -1.45 -1.32 -2.11 -1.98 -1.98 -1.85 0.52
Top of girder 2.46 2.55 2.43 2.52 1.96 2.05 2.06 2.15 1.34
End
Bottom 7.03 6.82 7.11 6.90 8.21 8.00 7.99 7.77 9.13
Top of slab -2.31 -2.26 -2.32 -2.28 -2.68 -2.64 -2.60 -2.56 -0.08
Top of girder 3.13 3.16 3.12 3.15 2.89 2.92 2.94 2.97 2.24
L/8
Bottom 13.25 13.16 13.28 13.19 14.03 13.94 13.86 13.77 15.00
Top of slab -0.04 -0.07 -0.02 -0.05 0.24 0.21 0.19 0.15 2.81
Top of girder 2.91 2.89 2.92 2.90 3.09 3.07 3.06 3.04 2.42
L/4
Bottom 10.86 10.94 10.82 10.90 10.28 10.35 10.38 10.46 11.32
Top of slab 0.31 0.24 0.35 0.27 0.91 0.83 0.79 0.72 3.46
Top of girder 1.65 1.60 1.68 1.63 2.04 1.99 1.96 1.91 1.35
3L/8
Bottom 12.21 12.37 12.13 12.29 10.97 11.13 11.21 11.37 12.05
Top of slab 0.08 0.00 0.12 0.05 1.07 1.00 0.86 0.79 3.62
Top of girder 1.96 1.92 1.99 1.94 2.61 2.56 2.48 2.43 1.92
L/2
Bottom 12.55 12.70 12.46 12.61 10.48 10.63 10.91 11.07 11.57
-------------------------------------------------------------------------------------------------------------------------------
148 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.65 -3.57 -3.44 2.42 2.54 -4.40 -4.27 2.54 -4.40
Top of girder 1.43 2.53 2.62 1.01 1.10 3.01 3.10 3.10 1.01
End
Bottom 8.92 6.70 6.48 9.52 9.31 5.47 5.25 9.52 5.25
Top of slab -0.03 -4.17 -4.12 1.74 1.78 -5.08 -5.03 1.78 -5.08
Top of girder 2.27 3.44 3.47 1.86 1.89 3.86 3.89 3.89 1.86
L/8
Bottom 14.91 12.57 12.47 15.48 15.39 11.42 11.33 15.48 11.33
Top of slab 2.78 -1.28 -1.31 4.48 4.44 -2.34 -2.38 4.48 -2.38
Top of girder 2.40 3.62 3.60 1.94 1.91 3.94 3.91 3.94 1.91
L/4
Bottom 11.39 8.88 8.96 12.12 12.20 8.06 8.14 12.20 8.06
Top of slab 3.38 -0.63 -0.71 5.04 4.97 -1.77 -1.85 5.04 -1.85
Top of girder 1.30 2.55 2.50 0.82 0.77 2.82 2.77 2.82 0.77
3L/8
Bottom 12.21 9.62 9.78 13.01 13.17 8.95 9.11 13.17 8.95
Top of slab 3.54 -0.47 -0.55 5.11 5.03 -1.71 -1.78 5.11 -1.78
Top of girder 1.87 3.12 3.07 1.33 1.28 3.33 3.28 3.33 1.28
L/2
Bottom 11.73 9.13 9.29 12.73 12.89 8.67 8.83 12.89 8.67
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 15.5 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 4.06 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 0.77 Mpa Hence O.K.
except at support
7.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)
-------------------------------------------------------------------------------------------------------------------------------
149 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.40 -1.28 -1.45 -1.32 -1.94 -1.81 -1.58 -1.46 0.26
Top of girder 2.46 2.55 2.43 2.52 2.08 2.17 2.33 2.42 1.56
End
Bottom 7.03 6.82 7.11 6.90 7.92 7.71 7.33 7.12 8.69
Top of slab -2.31 -2.26 -2.32 -2.28 -2.59 -2.55 -2.40 -2.35 -0.42
Top of girder 3.13 3.16 3.12 3.15 2.95 2.98 3.08 3.11 2.41
L/8
Bottom 13.25 13.16 13.28 13.19 13.84 13.74 13.43 13.34 14.65
Top of slab -0.04 -0.07 -0.02 -0.05 0.18 0.14 0.03 0.00 2.32
Top of girder 2.91 2.89 2.92 2.90 3.05 3.02 2.96 2.93 2.49
L/4
Bottom 10.86 10.94 10.82 10.90 10.42 10.50 10.71 10.79 11.28
Top of slab 0.31 0.24 0.35 0.27 0.76 0.68 0.46 0.39 2.89
Top of girder 1.65 1.60 1.68 1.63 1.94 1.89 1.75 1.70 1.37
3L/8
Bottom 12.21 12.37 12.13 12.29 11.27 11.43 11.90 12.06 12.18
Top of slab 0.08 0.00 0.12 0.05 0.83 0.75 0.31 0.24 2.95
Top of girder 1.96 1.92 1.99 1.94 2.45 2.40 2.12 2.07 1.88
L/2
Bottom 12.55 12.70 12.46 12.61 10.99 11.14 12.06 12.22 11.90
-------------------------------------------------------------------------------------------------------------------------------
150 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.39 -3.15 -3.02 1.05 1.18 -3.04 -2.91 1.18 -3.15
Top of girder 1.65 2.56 2.65 1.71 1.80 2.90 3.00 3.00 1.56
End
Bottom 8.48 6.66 6.45 8.26 8.04 5.82 5.61 8.69 5.61
Top of slab -0.38 -3.83 -3.78 0.21 0.25 -3.88 -3.84 0.25 -3.88
Top of girder 2.44 3.41 3.44 2.43 2.46 3.63 3.66 3.66 2.41
L/8
Bottom 14.55 12.62 12.52 14.40 14.31 11.97 11.87 14.65 11.87
Top of slab 2.28 -1.09 -1.13 2.61 2.57 -1.48 -1.52 2.61 -1.52
Top of girder 2.46 3.49 3.46 2.29 2.26 3.48 3.46 3.49 2.26
L/4
Bottom 11.36 9.26 9.34 11.75 11.83 9.32 9.40 11.83 9.26
Top of slab 2.81 -0.52 -0.60 3.01 2.94 -1.08 -1.15 3.01 -1.15
Top of girder 1.32 2.37 2.32 1.06 1.01 2.26 2.21 2.37 1.01
3L/8
Bottom 12.34 10.15 10.31 12.98 13.14 10.55 10.71 13.14 10.15
Top of slab 2.87 -0.46 -0.53 2.86 2.78 -1.23 -1.31 2.95 -1.31
Top of girder 1.83 2.88 2.83 1.43 1.38 2.63 2.58 2.88 1.38
L/2
Bottom 12.05 9.87 10.02 13.15 13.31 10.72 10.87 13.31 9.87
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 14.6 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 4.41 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 1.01 Mpa Hence O.K.
except at support
7.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 7920 kN
183.34
NA NA
2000 300
-------------------------------------------------------------------------------------------------------------------------------
151 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.665 MPa Negative Design Moment = 6605 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 8513.4 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 6605 kNm Hence O.K.
Factor of safety = 17,616/6,605 = 2.67
-------------------------------------------------------------------------------------------------------------------------------
152 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
vi) As per clause no 6.3.2 of IS-13920 :1993, Shear force due to ductile detailing shall be
Vua = Va D+L - 1.4(MuAh+MuBs)/L
D+L
Va = 1.2(D+L)/2 = 1122.87 kN
MuAh = -6604.56 kN
MuBs = -3277.76 kN
L = 26.41 m
Vua = 1647 kN
Maximum design shear at support < 1708 kN
-------------------------------------------------------------------------------------------------------------------------------
153 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5378.4 5426.0 5555.5 5675.8 5827.0
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1149 1443 1700 1875 1875
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7
iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.43 6.87 10.30 13.73
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 1707.9 1362.6 1018.1 635.1 332.5
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 538.3 543.2 556.6 218.4 0.0
Total Shear force for the Beam (kN) 1169.6 819.4 461.4 416.7 332.5
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 3.5516 1.0553 -3.2319 -6.2716 -6.3999
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 428.93 470.00 470.01
Maximum shear capacity of the Section (kN) 4022 2021 2381 2626 2626
Not Not
Whether shear reinforcement required or not Required Required Required
Required Required
-------------------------------------------------------------------------------------------------------------------------------
154 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
156 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
A -0.00013
B 4 3.433 1.717 -0.00018 -0.00016 -0.000931814
C 3 3.433 5.150 -0.00020 -0.00019 -0.003439088
D 2 3.433 8.583 -0.00019 -0.00020 -0.005822337
E 1 3.433 12.016 -0.00018 -0.00019 -0.007671573
Total -0.017864812
So, Midspan deflection due to Prestress + wt of precast Girder = = -18 mm
= - L/ 1537
(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.433 6.866 10.299 13.732
CG of all cables from bot.(m) 0.851 0.557 0.300 0.125 0.125
Loss 220.630 220.630 220.630 220.630 220.630
Moment due to prestressing losses 21.380 89.462 146.038 184.688 184.699
Moment due to Wt of Deck Slab -0.504 682.547 1175.350 1477.902 1590.206
Total moment due to prestress+DL 20.876 772.009 1321.388 1662.590 1774.904
M/EI (1/m) 0.0000015 0.0000654 0.0001119 0.0001408 0.00015
3.4 3.433 3.433 3.433
A B C D E
0.000002 0.0000654 0.0001408
4 0.0001119
0.0001503
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000015
B 4 3.433 1.717 0.0000654 0.0000334 0.000197048 0.00135
C 3 3.433 5.150 0.0001119 0.0000886 0.001566579
D 2 3.433 8.583 0.0001408 0.0001263 0.003721733
E 1 3.433 12.016 0.0001503 0.0001455 0.006002326
Total 0.011487686
-------------------------------------------------------------------------------------------------------------------------------
157 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
12 1 SPECTRUM IN X6.131
DIRECTION 0.173 0.037 6.134 0 0 0
2 SPECTRUM IN Z0.136
DIRECTION 0.94 1.12 1.468 0 0 0
3 SPECTRUM IN Y0.016
DIRECTION 0.257 0.089 0.272 0 0 0
4 DEAD LOAD 0.167 -4.482 0.02 4.486 0 0 0
5 SIDL (DL) 0.021 -0.797 0.002 0.797 0 0 0
6 SIDL(WC) 0.023 -0.488 0.004 0.489 0 0 0
7 REMOVAL OF SHUTTER
-0.025 0.659 -0.004 0.66 0 0 0
8 EARTH PR ON ABUTMENT
-0.249 1.754 0.199 1.783 0 0 0
9 LIVE LOAD SURCHARGE
1.169 0.076 0.015 1.171 0 0 0
10 DYNAMIC INCREMENT
-0.159 OF EARTH
1.107 PR. 0.126 1.125 0 0 0
11 DYNAMIC INCREMENT
0.738 OF LL0.048
SURCGARGE 0.01 0.74 0 0 0
12 UNLADEN WIND 0.139
LOAD -0.68 -0.111 0.702 0 0 0
13 LADEN WIND LOAD
0.115 -0.354 -0.102 0.386 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.21 -6.248 -0.002 6.628 0 0 0
15 TEMPERATURE0.597
RISE 2.626 -0.497 2.739 0 0 0
16 TEMPERATURE -0.274
FALL -1.229 0.233 1.281 0 0 0
17 CREEP SHRINKAGE
-0.212 DIFF SHRINKAGE
-0.67 0.236 0.742 0 0 0
18 FOOTPATH LIVE0.005
LOAD -0.406 -0.002 0.406 0 0 0
19 SNOW LOAD FOR 0.03
70R LL TRACK
-0.764 0.005 0.765 0 0 0
20 SNOW LOAD FOR0.015
LL 70R WHEEL
-0.382 0.002 0.382 0 0 0
21 BRAKING 0.437 -0.009 0 0.437 0 0 0
504 COMBINATION0.078
LOAD CASE-1.082
504 0.015 1.085 0 0 0
-------------------------------------------------------------------------------------------------------------------------------
158 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
159 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
160 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
8.1.2 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) Moment Shear
Staad Node no 19 26 19 26
Dead load = 92.9 -100.4 -2.5 2.5
SIDL (DL) from staad output 235.6 -304.0 -22.8 22.8
SIDL (WC) from staad output -30.7 19.1 -3.9 3.9
Removal of shutter -0.2 -0.4 -0.2 0.2
Earth pressure -1.7 3.2 0.5 -0.5
Live load surcharge 0.0 0.0 0.2 -0.2
Wind load (unloaded structure) 5.5 -7.4 -0.6 0.6
Wind load (loaded structure) 2.9 -3.8 -0.3 0.3
Differential settlement -0.3 0.3 0.0 0.0
Temperature rise 11.8 -12.2 -0.1 0.1
Temperature fall -5.6 5.7 0.0 0.0
Creep & shrinkage -3.5 2.9 -0.2 0.2
Footpath live load 56.8 -40.1 5.6 -5.6
Snow load 3.3 -3.6 -0.1 0.1
Braking load 0.0 0.0 0.0 0.0
Live Load 334.3 -686.6 131.4 -102.4
Seismic in X- direction 68.5 -88.8 7.5 -7.5
Seismic in Y- direction 94.0 -134.6 14.1 -14.1
Seismic in Z- direction 24.9 -29.7 9.8 -9.8
Dynamic increment of Earth pr. -0.4 0.7 0.1 -0.1
Dynamic increment of LL Surcharge 0.6 -0.3 0.1 -0.1
-------------------------------------------------------------------------------------------------------------------------------
161 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Moment Shear
1 972.0 -1590.1 164.4 -120.9
2 (a) 393.7 -511.0 -42.0 42.0
2 (b) 302.7 -386.9 -30.2 30.2
3 (a) 976.9 -1596.7 163.8 -120.3
3 (b) 886.0 -1472.5 175.6 -132.1
4 (a) 843.4 -1346.8 115.5 -82.2
4 (b) 752.4 -1222.6 127.3 -93.9
5 (a) 982.6 -1601.0 164.3 -120.8
5 (b) 891.7 -1476.8 176.0 -132.5
6 (a) 852.8 -1354.0 116.3 -82.9
6 (b) 761.9 -1229.8 128.0 -94.7
7 (a) 620.4 -853.6 8.2 -2.4
7 (b) 574.7 -791.6 10.7 -4.9 (+)ve
7 (c) 647.2 -901.7 15.2 -9.4 value of
7 (d) 528.9 -728.3 20.2 -14.4 seismic
7 (e) 483.1 -666.3 22.6 -16.8 force
7 (f) 555.7 -776.4 27.1 -21.3
7 (a) 308.0 -439.3 -35.9 41.7
7 (b) 353.7 -501.4 -38.3 44.1 (-)ve
7 (c) 281.2 -391.2 -42.8 48.6 value of
7 (d) 216.4 -314.0 -24.0 29.8 seismic
7 (e) 262.2 -376.1 -26.4 32.2 force
7 (f) 189.6 -266.0 -30.9 36.7
Maximum 982.6 -266.0 176.0 48.6
Minimum 189.6 -1601.0 -42.8 -132.5
1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1
2 (b) 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.6
3 (b) 1 1 1 1 1 0.6
4 (a) 1 1 1.2 1 0.75 1
4 (b) 1 1 1 1 0.75 1
5 (a) 1 1 1.2 1 1 0.6
5 (b) 1 1 1 1 1 0.6
6 (a) 1 1 1.2 1 0.75 1
6 (b) 1 1 1 1 0.75 1
Quasi-permanent (SL3)
1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5
-------------------------------------------------------------------------------------------------------------------------------
162 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
163 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
164 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
729.78
0.00124
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 729.78 kN Total tensile force = 729.78 kN
Compressive force CG = 128.64 mm Moment of resistance = 1110.63 kNm
-------------------------------------------------------------------------------------------------------------------------------
165 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
8.5.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 123.35 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]=
248.8 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.039
fct,eff = = 2.12 Mpa εsm-εcm = 0.000451
>= 0.6σsc/Es= 0.00037
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 25.0 mm k2 = 0.5
Sr,max = 277.7 mm Crack width, Wk = = 0.125 mm
< 0.3 mm OK
Inner Cross girder
Description At support Span
Stress in steel, σs 98.1 123.4
As 2945.2 2945.2
Actual NA 386 386
hc,eff 248.8 248.8
ρp,eff 0.039 0.039
εsm-εcm 0.00032 0.00045
φeq 25.0 25.0
Crack spacing Sr,max 277.7 277.7
Crack width, Wk 0.090 0.125
Check <0.3 O.K. <0.3 O.K.
7.6. Side face reinforcement
Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 643.70 mm2
Side face reinf. 0.1% bd = 495.15 mm2
Hence provide 7 Nos. 16 dia on each span Ast = 2814.9 mm2
-------------------------------------------------------------------------------------------------------------------------------
166 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
167 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
300 2202 mm
2352 mm
-------------------------------------------------------------------------------------------------------------------------------
168 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
2.352 3 3 3 1.198
4.57
0.84 0.840
2.9
2.06
2.06
1.5
2.35 3 3 3 1.20
70R- Track Loading position over Deck for maximum moment
Centre to centre distance between X-gider b = 2.355 m
Span L = 3 m
Total Load = 700 kN
Impact Factor = 25 %
Dispersion of load along direction of movement
As per Annexure B-3 of IRC 112:2011 bef = α a(1-a/L)+b1
b/L = 0.79 α = 2.6
a1 = 1.5 m
Thickness of W/C = 65 mm Thick. of Deck slab = 225 mm
b1 =4.57+0.065x2 = 4.70 m
bef 1 = 6.650 m
=10/((0.86-0.05)x5.273x10) 1.22
0.234
0.86 0.86
2.79
1.93
Position of 70R Wheel bogie load
-------------------------------------------------------------------------------------------------------------------------------
169 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1.93
1.5
2.35 3 3 3 2.35
70R- Track Loading position over Deck for maximum moment
Total Load = 400 kN
Impact Factor = 25 %
Dispersion of load along direction of movement
As per Annexure B-3 of IRC 112:2011 bef = α a(1-a/L)+b1
α = 2.6 a = 1.5 m
Thickness of W/C = 65 mm Thick. of Deck slab = 225 mm
b1 =0.234+0.065x2 = 0.364 m
bef = 2.314 m
> 1.220 m Overlaps.
Modified bef =2.314+1.22 = 3.534 m
1.2
0.250
0.5 0.50
2.3
1.8
Position of Class-A loading
2.35 3 3 3 2.35
70R- Track Loading position over Deck for maximum moment
Each Axle load = 114 kN
Impact Factor = 50 %
Dispersion of load along direction of movement
As per Annexure B-3 of IRC 112:2011 bef = α a(1-a/L)+b1
α = 2.6 For Ist Wheel a = 1.500 m
Thickness of W/C = 65 mm Thick. of Deck slab = 225 mm
b1 =0.250+0.065x2 = 0.380 m bef = 2.030 m
> 1.200 m Overlaps.
Modified bef1 = 3.230 m
-------------------------------------------------------------------------------------------------------------------------------
171 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
48 0.0069 854 kN
1000 Strain Diagram Stress Diagram
-------------------------------------------------------------------------------------------------------------------------------
172 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
419.00
0.00107
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 419.00 kN Total tensile force = 419.00 kN
Compressive force CG = 17.95 mm Moment of resistance = 66.64 kNm
-------------------------------------------------------------------------------------------------------------------------------
173 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
9.5.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 213.40 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 112.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.017
fct,eff = = 2.12 Mpa εsm-εcm = 0.000731
>= 0.6σsc/Es= 0.00064
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 40 mm
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 14.3 mm k2 = 0.5
Sr,max = 275.1 mm Crack width, Wk = = 0.201 mm
< 0.3 mm OK
Tranverse section of slab
Description End Inner
Span
support support
Stress in steel, σs 213.4 70.3 140.7
As 1963.5 1413.7 1413.7
Actual NA 54 47 47
hc,eff 112.5 112.5 112.5
ρp,eff 0.017 0.013 0.013
εsm-εcm 0.00073 0.00021 0.00042
φeq 14.3 12.0 12.0
Crack spacing Sr,max 275.1 298.3 298.3
Crack width, Wk 0.201 0.063 0.126
Check <0.3 O.K. <0.3 O.K. <0.3 O.K.
-------------------------------------------------------------------------------------------------------------------------------
174 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Design of Column
-------------------------------------------------------------------------------------------------------------------------------
175 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
176 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
178 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Stress
-------------------------------------------------------------------------------------------------------------------------------
179 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Stress
-------------------------------------------------------------------------------------------------------------------------------
180 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 11.931 11.931 11.931
Area of shear reinforcement provided (mm) 5926.30 5926.30 5926.30
Spacing of stirrups provided (mm) 100.000 150.000 100.000
Area of shear reinf provided Asw/s (mm2/mm) 59.263 39.509 59.263
Angle of compression strut θ (degrees) 22.55 18.24 22.55
Shear resistance provided by reinf V RD,s (kN) 84533 70976 84533
Coeff accounting stress in comp chord αcw 1.000 1.000 1.000
Shear capacity of compression strut V RD,max (kN) 84533 70976 84533
Difference in shear resistance (kN) 0.0 0.0 0.0
Shear capacity of the Section (kN) 84533 70976 84533
Factor of Safety associated with failure 2.71 14.45 3.41
Longitudinal tensile force ∆Ftd (kN) 37554 7452 29879
Area of steel required for shear due stut & tie model 86374 17140 68722
-------------------------------------------------------------------------------------------------------------------------------
181 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1
2 (b) 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.8 0.6
3 (b) 1 1 1 1 1 0.8 0.6
4 (a) 1 1 1.2 1 0.75 0.8 1
4 (b) 1 1 1 1 0.75 0.8 1
5 (a) 1 1 1.2 1 1 0.8 0.6
5 (b) 1 1 1 1 1 0.8 0.6
6 (a) 1 1 1.2 1 0.75 0.8 1
6 (b) 1 1 1 1 0.75 0.8 1
9.1.3.2 Load Combination for Quasi-permanent (SL3) - for RCC structure
1) Dead load +SIDL
2) Dead load +SIDL+Temperature(lead)
Wind on
DL, Support Wind on loaded
Load Case SIDL(WC) Earth pr. Earth pr. Live load unloaded Temperature
settle structure
structure
1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5
Rare Combination
Bottom support section Midspan section Top support section
Load Case V (kN) M (kN-m) V (kN) M (kN-m) V (kN) M (kN-m)
1(a) -14125.24 -24830.64 -9514.04 23690.23 -4732.54 7193.82
1(b) -14054.55 -24904.47 -9443.34 23794.00 -4661.84 7487.54
2 (a) -14532.79 -24747.27 -9106.49 22930.46 -4324.99 5546.63
2 (b) -14462.10 -24821.11 -9035.79 23034.23 -4254.29 5840.35
3 (a) -15701.60 -17742.95 -10921.76 22481.86 -6327.75 7602.20
3 (b) -15630.90 -17816.79 -10851.06 22585.62 -6257.06 7895.92
4 (a) -15397.73 -17744.56 -10479.60 22436.38 -5838.72 7436.65
4 (b) -15327.04 -17818.40 -10408.91 22540.15 -5768.03 7730.37
5 (a) -15558.49 -32847.98 -11064.86 34845.74 -6470.86 11964.82
5 (b) -15487.79 -32921.81 -10994.17 34949.51 -6400.16 12258.54
6 (a) -15185.83 -36372.50 -10691.50 36451.22 -6050.62 12815.87
6 (b) -15115.14 -36446.33 -10620.80 36554.99 -5979.92 13109.59
MaxV -15701.60 -17743.0 -11064.86 34845.7 -6470.86 11964.8
MinV -14054.55 -24904.5 -9035.79 23034.2 -4254.29 5840.3
MaxM -15701.60 -17743.0 -10620.80 36555.0 -5979.92 13109.6
MinM -15115.14 -36446.3 -10479.60 22436.4 -4324.99 5546.6
Quasi-permanent
1 -14119.04 -24836.85 -9507.83 23700.21 -4726.33 7220.96
2 (a) -14040.33 -25192.13 -9529.74 29651.54 -4748.24 8076.91
2 (b) -14032.64 -25259.75 -9465.25 29745.33 -4683.75 8343.49
-------------------------------------------------------------------------------------------------------------------------------
182 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Reinforcement at bottom
Bar Diameter (φ) = T 32 mm Number of bars = 107 Nos.
Bar Diameter (φ) = T 32 mm Number of bars = 54 Nos.
= T 25 mm = 53 Nos.
2 2
Reinforcement area (Ast) 86054.51 mm Reinforcement area (Ast) 69445.69 mm
2
Total Reinforcement area (A = 155500 mm Reinforcement % = 0.626
Min reinforcement % = 0.300 (Ok)
2
Cross-sectional area of uncracked section = 27909807 mm
4
Moment of inertia of uncracked section = 1.011E+13 mm
15702 17743 2.32 -1.19 Uncracked section 861.9 13087184 472.53 657.48
14055 24904 2.84 -1.83 Cracked section 675.7 10647487 527.83 1244.15
Bottom 15702 17743 2.23 -1.10 Uncracked section 861.9 13087184 472.53 657.48
support 15115 36446 3.96 -2.88 Cracked section 603.1 9695943 544.24 1867.00
section 14119 24837 2.84 -1.82 Cracked section 677.8 10675343 527.30 1231.80
14040 25192 2.87 -1.86 Cracked section 672.1 10600455 528.73 1265.54
14033 25260 2.87 -1.87 Cracked section 671.2 10588441 528.96 1271.11
11065 34846 3.67 -2.87 Cracked section 511.1 8292473 593.59 2555.64
9036 23034 2.48 -1.84 Cracked section 542.4 8702629 587.92 1961.31
10621 36555 3.81 -3.05 Cracked section 500.3 8150279 595.32 2846.51
Midspan
10480 22436 2.48 -1.73 Cracked section 575.8 9139578 580.89 1560.07
section
9508 23700 2.56 -1.88 Cracked section 546.3 8753142 587.15 1905.55
9530 29652 3.12 -2.44 Cracked section 512.7 8313013 593.33 2518.15
9465 29745 3.13 -2.45 Cracked section 511.4 8296045 593.54 2549.04
6471 11965 1.35 -0.89 Uncracked section 610.9 9598993 572.55 1276.48
4254 5840 0.70 -0.40 Uncracked section 711.3 10914263 544.39 828.42
Top support 5980 13110 1.44 -1.02 Uncracked section 570.8 9073962 582.00 1610.27
section 4726 7221 0.85 -0.51 Uncracked section 669.7 10369445 556.73 971.08
4748 8077 0.93 -0.59 Uncracked section 634.5 9908273 566.45 1134.58
4684 8343 0.95 -0.62 Uncracked section 621.1 9732407 569.96 1211.41
-------------------------------------------------------------------------------------------------------------------------------
183 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Compressive
Eff. M.I. of Stress at stress in Tensile stress
Calculated NA ycal-yassum
Load Case cracked
(mm)
Ycal (mm) neutral axis concrete in steel (σsbt)
section (mm4) (mm) (Mpa)
(σcbc)
Maximum compressive stress = 6.82 Mpa < 19.20 Mpa Hence O.K.
Maximum tensile stress = 228.38 Mpa < 400.00 Mpa Hence O.K.
9.1.3.4 Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 97.36 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 257.5 mm
Ac,eff = 3373250 mm2 As/Ac,eff = 0.0255
fct,eff = = 3.03 Mpa εsm-εcm = 0.00029
>= 0.6σsc/Es= 0.0002921
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 75.00 mm 50 mm
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 32.0 mm k2 = 0.5
Sr,max = 468.2 mm Crack width, Wk = = 0.137 mm
< 0.3 mm OK
Bottom support section Midspan section Top support section
Description 1 2 3 1 2 3 1 2 3
Stress in steel, σs 94.3 96.9 97.4 131.9 179.5 180.7 29.6 36.1 38.6
As 86054.5 86054.5 86054.5 69445.7 69445.7 69445.7 69445.7 69445.7 69445.7
Diameter 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Actual NA 678 672 671 546 513 511 670 634 621
hc,eff 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5
Ac,eff 3373250 3373250 3373250 3373250 3373250 3373250 3373250 3373250 3373250
ρp,eff 0.026 0.026 0.026 0.021 0.021 0.021 0.021 0.021 0.021
εsm-εcm 0.00028 0.00029 0.00029 0.00040 0.00054 0.00054 0.00009 0.00011 0.00012
φeq 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Crack spacing Sr,max 468.2 468.2 468.2 434.2 434.2 434.2 519.2 519.2 519.2
Crack width, Wk 0.132 0.136 0.137 0.172 0.234 0.235 0.046 0.056 0.060
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.
-------------------------------------------------------------------------------------------------------------------------------
184 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
9.2 Abutment A2
Formation Level = 890.548 m
Foundation bottom level = 870.548 m
Length of wall = 12.000 m
Width of wall = 2.000 m
Depth of superstructure = 2.000 m
Depth of Foundation at abutment base = 2.400 m
Height of wall = 15.600 m
Output of Midas file Bottom support section Mid section Top support section
Description Vertical load Shear Moment Vertical load Shear Moment Vertical load Shear Moment
Seismic in X- direction -482.2 -1350.2 13569.4 482.2 1350.2 3219.9 417.2 658.3 5155.5
Seismic in Z- direction -5395.2 -375.9 1503.2 5395.2 375.9 1424.9 1414.9 277.0 2571.0
Seismic in Y- direction -498.5 -48.7 191.5 498.5 48.7 194.7 175.9 56.4 446.9
Dead load = -13093.0 -860.0 -1899.8 -8413.0 -860.0 1899.8 -3733.0 860.0 1899.8
SIDL (DL) from staad output -317.2 -111.2 -524.1 -317.2 -111.2 337.4 -317.2 111.2 1256.0
SIDL (WC) from staad output-347.7 -122.4 -576.9 -347.7 -122.4 372.1 -347.7 122.4 1383.2
Earth pressure k* 91.7 15994.4 36262.9 -91.7 -2008.4 -32588.2 91.7 6711.5 -5108.0
Earth pressure at rest -51.7 12792.9 26338.1 51.7 -987.3 -22878.7 51.7 4463.0 -3420.3
Live load surcharge -120.9 -324.3 3855.7 120.9 324.3 -1342.1 120.9 324.3 1343.6
Dynamic increment of Earth pr. 16.5 2689.3 -8444.1 16.5 -474.4 7714.4 16.5 1570.7 1272.6
Dynamic increment of LL Surcharge
-45.3 -121.5 1444.5 45.3 121.5 502.6 45.3 121.5 503.7
Wind load (unloaded structure)
-417.0 -166.1 930.9 417.0 166.1 -356.7 417.0 166.1 1715.3
Wind load (loaded structure) -219.3 -94.8 581.3 219.3 94.8 -153.6 219.3 94.8 -924.6
Differential settlement 286.5 -85.7 1310.4 -286.5 85.7 -1642.5 286.5 85.7 -1994.4
Temperature rise 77.6 -1524.4 -18180.1 -77.6 1524.4 6366.2 77.6 1524.4 6227.1
Temperature fall 36.0 694.5 8350.4 -36.0 -694.5 -2967.9 -36.0 -694.5 -2769.6
Creep & shrinkage 21.8 600.8 6327.0 -21.8 -600.8 -1670.5 -21.8 -600.8 -3293.3
Footpath live load -86.1 -29.1 -137.8 86.1 29.1 87.7 86.1 29.1 328.3
Snow load -224.7 -79.0 -372.2 224.7 79.0 239.8 224.7 79.0 891.9
Braking load -31.3 -77.1 -898.4 31.3 77.1 -300.7 31.3 77.1 336.8
Hyperstatic action 2.8 -341.6 -2113.2 -2.8 341.6 534.2 -2.8 341.6 3355.8
Live Load Max -1277.4 338.1 25.1 -1277.4 338.1 1293.0 -1418.5 619.0 4595.8
Min 45.6 0.0 -1663.2 45.6 0.0 -113.0 40.0 -118.5 0.0
9.2.2 Ultimate limit state
9.2.2.1 Load Combination As per Clause 706 of IRC:78-2014
1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+Live load(leading) + Temp load(accompany)
6) Dead load +SIDL+Live load(accompany) + Temp load(lead)
7) Dead load +SIDL+Live load(accompany) +seismic load(leading)
-------------------------------------------------------------------------------------------------------------------------------
185 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
2. Geometric details
[a] Dimension detail of column
Actual column length = 15.60 m Effective length multiplier = 1.50
Width of section = 12000 mm
Depth of section = 2000 mm Radius of gyration, i = 577.4 mm
Effective length of col l e = 23.40 m Slenderness ratio λ = 40.53
Reinforcement provided
Tension face At bottom 97 Nos. T 32 48.5 = 78012 mm2
At Top & middle 49 Nos. T 32 = 62970 mm2
48 Nos. T 25
Compression face 49 Nos. T 32 = 62970 mm2
48 Nos. T 25
Side side 12 Nos. T 25 = 5890 mm2
12 Nos. T 25 = 5890 mm2
Stiruups 16 T @ 100 c/c Total = 152763 mm2
12 T @ 100 c/c or = 137721 mm2
Ductile detailing for Seismic case, (although, this is applicable for seismic zone III, IV, V)
For rectangular Column
As per Clause No. 7.4 of IS 13920:1993, Ash = 0.18ShSDkxfck/fy[Ag/Ak-1.0)
Ash Area of tranverse Reinforcement = 201.1 mm2
D Larger Dimensionr of Column = 2000 mm
h Larger dimension of Core measured to the outside of the spiral = 308.3333 mm
fck = M40
fy = M500
-------------------------------------------------------------------------------------------------------------------------------
186 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
187 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Stress
-------------------------------------------------------------------------------------------------------------------------------
188 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Stress Stress
-------------------------------------------------------------------------------------------------------------------------------
189 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
190 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1
2 (b) 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.8 0.6
3 (b) 1 1 1 1 1 0.8 0.6
4 (a) 1 1 1.2 1 0.75 0.8 1
4 (b) 1 1 1 1 0.75 0.8 1
5 (a) 1 1 1.2 1 1 0.8 0.6
5 (b) 1 1 1 1 1 0.8 0.6
6 (a) 1 1 1.2 1 0.75 0.8 1
6 (b) 1 1 1 1 0.75 0.8 1
1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5
Rare Combination
Bottom support section Midspan section Top support section
Load Case V (kN) M (kN-m) V (kN) M (kN-m) V (kN) M (kN-m)
1(a) -14365.79 25753.07 -8609.09 -19449.11 -4502.16 4344.21
1(b) -14296.26 25868.45 -8539.55 -19523.53 -4432.63 4067.56
2 (a) -14782.80 26683.97 -8192.08 -19805.83 -4085.15 6059.56
2 (b) -14713.27 26799.35 -8122.55 -19880.25 -4015.62 5782.91
3 (a) -14409.78 22114.65 -8473.86 -18192.25 -4372.52 2706.07
3 (b) -14340.25 22230.03 -8404.33 -18266.66 -4302.99 2429.42
4 (a) -14495.21 22572.81 -8411.25 -18322.55 -4308.51 2338.35
4 (b) -14425.68 22688.19 -8341.71 -18396.96 -4238.97 2061.70
5 (a) -14113.20 36700.95 -8770.45 -29590.34 -4485.79 -88.57
5 (b) -14043.67 36816.33 -8700.91 -29664.75 -4416.26 -365.22
6 (a) -14096.50 40266.75 -8809.96 -30846.36 -4523.90 -1194.29
6 (b) -14026.96 40382.13 -8740.43 -30920.77 -4454.37 -1470.94
MaxV -14782.80 26684.0 -8809.96 -30846.4 -4523.90 -1194.3
MinV -14026.96 40382.1 -8122.55 -19880.2 -4015.62 5782.9
MaxM -14026.96 40382.1 -8473.86 -18192.2 -4085.15 6059.6
MinM -14409.78 22114.7 -8740.43 -30920.8 -4454.37 -1470.9
Quasi-permanent
1 -13786.63 28373.89 -9176.07 -22740.97 -3923.00 330.00
2 (a) -13625.22 29208.65 -9337.49 -29267.40 -3901.10 1755.91
2 (b) -13561.77 29324.03 -9274.04 -29334.89 -3837.65 1504.70
14783 26684 3.46 -2.31 Cracked section 668.1 9644962 530.91 1274.16
14027 40382 4.69 -3.59 Cracked section 570.8 8477294 551.61 2327.28
Bottom 14027 40382 4.69 -3.59 Cracked section 570.8 8477294 551.61 2327.28
support 14410 22115 2.83 -1.70 Cracked section 719.6 10263936 517.35 1017.34
section 13787 28374 3.45 -2.37 Cracked section 634.3 9239841 538.89 1519.18
13625 29209 3.53 -2.46 Cracked section 625.0 9128178 540.95 1602.77
13562 29324 3.54 -2.48 Cracked section 623.1 9105379 541.37 1620.89
8810 30846 3.51 -2.82 Cracked section 496.5 7405149 597.17 2904.13
8123 19880 2.36 -1.72 Cracked section 547.5 8018063 588.06 1859.48
8474 18192 2.20 -1.53 Cracked section 573.1 8325463 582.58 1564.28
Midspan
8740 30921 3.51 -2.83 Cracked section 495.3 7391240 597.35 2940.33
section
9176 22741 2.69 -1.97 Cracked section 545.3 7991542 588.51 1889.78
9337 29267 3.37 -2.64 Cracked section 509.8 7565800 595.04 2539.36
9274 29335 3.37 -2.65 Cracked section 508.7 7551712 595.24 2567.88
4524 -1194 0.05 0.30 Uncracked section 3861.8 47789263 -903.88 639.88
4016 5783 0.75 -0.44 Uncracked section 689.5 9721952 551.86 888.25
Top support 4085 6060 0.78 -0.46 Uncracked section 678.2 9586403 555.19 928.12
section 3923 -330 0.12 0.19 Uncracked section 3312.1 41193166 -634.37 550.25
3901 -1756 -0.03 0.33 Uncracked section 4431.3 54623704 -1184.48 734.37
3838 -1505 0.00 0.30 Uncracked section 4253.8 52493368 -1096.90 704.81
-------------------------------------------------------------------------------------------------------------------------------
192 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Compressive
Eff. M.I. of Stress at stress in Tensile stress
Calculated NA ycal-yassum
Load Case cracked
(mm)
Ycal (mm) neutral axis concrete in steel (σsbt)
section (mm4) (mm) (Mpa)
(σcbc)
Maximum compressive stress = 7.72 Mpa < 19.20 Mpa Hence O.K.
Maximum tensile stress = 215.11 Mpa < 400.00 Mpa Hence O.K.
9.2.3.4 Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 138.39 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 257.5 mm
Ac,eff = 3090000 mm2 As/Ac,eff = 0.0252
fct,eff = = 3.03 Mpa εsm-εcm = 0.00042
>= 0.6σsc/Es= 0.0004152
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 75.00 mm 50
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 32.0 mm k2 = 0.5
Sr,max = 470.5 mm Crack width, Wk = = 0.195 mm
< 0.3 mm OK
Bottom support section Midspan section Top support section
Description 1 2 3 1 2 3 1 2 3
Stress in steel, σs 130.5 137.2 138.4 139.1 195.8 196.8 -1.0 1.0 1.0
As 78012.0 78012.0 78012.0 62970.1 62970.1 62970.1 62970.1 62970.1 62970.1
Diameter 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Actual NA 634 625 623 545 510 509 3312 4431 4254
hc,eff 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5
Ac,eff 3090000 3090000 3090000 3090000 3090000 3090000 3090000 3090000 3090000
ρp,eff 0.025 0.025 0.025 0.020 0.020 0.020 0.020 0.020 0.020
εsm-εcm 0.00039 0.00041 0.00042 0.00042 0.00059 0.00059 0.00000 0.00000 0.00000
φeq 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Crack spacing Sr,max 470.5 470.5 470.5 436.9 436.9 436.9 521.9 521.9 521.9
Crack width, Wk 0.184 0.194 0.195 0.182 0.257 0.258 -0.002 0.002 0.002
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.
-------------------------------------------------------------------------------------------------------------------------------
193 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
194 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
10.1.1 Summary
Load caseof loads & Fx
moments
kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 SPECTRUM IN X DIRECTION 1914.7 706.5 195.9 2188.5 323.2 24859.8
2 SPECTRUM IN Z DIRECTION 410.2 4200.5 1439.0 4488.2 436.1 2237.9
3 SPECTRUM IN Y DIRECTION 63.8 367.1 90.8 290.3 49.6 336.0
4 DEAD LOAD 866.7 13463.8 2.2 222.7 22.9 1943.1
5 SIDL (DL) 112.1 322.4 0.6 39.6 -16.5 -560.6
6 SIDL(WC) 123.4 353.5 0.2 20.1 16.2 -616.7
7 REMOVAL OF SHUTTER -134.6 -386.5 -0.4 -29.8 -4.6 672.5
8 EARTH PR ON AT REST -16207.6 -51.7 -2576.6 -7331.1 59.3 48275.1
9 EARTH PR ON k* -19595.9 -91.7 -3287.4 -10108.2 70.6 64760.8
9 LIVE LOAD SURCHARGE -1739.2 -120.9 49.2 -614.0 220.8 11839.0
-4076.9
10 DYNAMIC INCREMENT OF EARTH PR. -16.5 -707.6 -2120.4 21.1 12952.5
11 DYNAMIC INCREMENT OF LL -649.5
SURCGARGE -45.3 18.4 -229.8 82.3 4427.2
12 UNLADEN WIND LOAD 103.4 407.6 112.4 362.4 -28.5 -269.0
13 LADEN WIND LOAD 37.4 208.0 100.9 314.2 -29.2 38.4
14 DIFFERNTIAL SETTLEMENT 41.6 -143.3 -26.1 212.6 129.0 2847.0
15 TEMPERATURE RISE 1536.3 -77.6 3.8 1715.2 238.0 -21941.7
16 TEMPERATURE FALL -700.0 36.0 -1.9 -790.0 -105.7 10084.5
-605.9
17 CREEP SHRINKAGE DIFF SHRINKAGE 21.8 -4.6 -584.2 27.6 7570.9
18 FOOTPATH LIVE LOAD 29.5 87.5 1.2 29.6 -28.8 -147.8
159.1
19 SNOW LOAD FOR 70R LL TRACK 456.8 0.4 33.8 7.6 -795.3
79.6
20 SNOW LOAD FOR LL 70R WHEEL 228.5 0.2 16.9 3.8 -397.8
21 BRAKING -118.2 -31.3 3.3 -119.3 -20.5 1678.6
22 HYPERSTATIC ACTION 344.1 2.8 -0.4 142.3 63.1 -2372.8
Max 360.0 1491.5 15.0 129.7 238.1 356.7
Live load
Min -7.4 -80.9 -16.9 -236.2 -57.4 -2061.5
10.1.2 Load Combination As per Clause 706 of IRC:78-2014
1) Dead load +SIDL+Live load incl. braking & centrifugal force
2) Dead load +SIDL+Wind load - unloaded strructure
3) Dead load +SIDL+Live load incl. braking & centrifugal force + wind load - loaded structure
4) Dead load +SIDL+Live load incl. braking & centrifugal force + Longitudinal seismic
5) Dead load +SIDL+Live load incl. braking & centrifugal force + Tranverse seismic
6) Construction stage - Dead load +SIDL+construction live load
7) Construction stage - Dead load +SIDL+construction live load+ wind load
8) Construction stage - Dead load +SIDL+construction live load+ Longitudinal seismic
9) Construction stage - Dead load +SIDL+construction live load+Tranverse seismic
DL, Support
Wind on
settle, snow Wind on loaded Tranverse Vertical
Load Case SIDL SIDL(WC) Earth pr. LL unloaded
structure
Temp load Long. Seismic
Seismic Seismic
load,Creep &
structure
shrinkage,
Normal 1 (a) 1 1 1 1 1
Case 1 (b) 1 1 1 1 1
Wind 2 1 1 1 1 1
Case 3 (a) 1 1 1 1 1 1
3 (b) 1 1 1 1 1 1
Temp 4 (a) 1 1 1 1 1 1
Case 4 (b) 1 1 1 1 1 1
5 (a) 1 1 1 1 0.2 1 0.3 0.3
Seismic 5 (b) 1 1 1 1 0.2 -1 -0.3 -0.3
case 6 (a) 1 1 1 1 0.2 0.3 1 0.3
6 (b) 1 1 1 1 0.2 -0.3 -1 -0.3
-------------------------------------------------------------------------------------------------------------------------------
195 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Counterweght
2.00
4.00 4.00
2.40
1.250
10.00
-------------------------------------------------------------------------------------------------------------------------------
196 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Normal Case
1 47478 18075 0 715 0 0.381 0.015 448 282 443 277 OK.
2 46497 -17073 0 -239 0 -0.367 -0.005 276 432 278 434 OK.
Wind case
5 46459 4079 0 277 0 0.088 0.006 374 337 372 335 OK.
6 47686 18113 0 686 0 0.380 0.014 449 283 445 279 OK.
7 46705 -17034 0 -268 0 -0.365 -0.006 278 434 279 435 OK.
Temp case
8 47482 780 0 744 0 0.016 0.016 369 361 363 356 OK.
9 46259 -10690 0 231 0 -0.231 0.005 305 403 303 401 OK.
Seismic case
10 48352 50105 0 960 0 1.036 0.020 602 143 595 136 OK.
11 44355 -47503 0 -582 0 -1.071 -0.013 119 554 123 558 OK.
12 50841 22104 0 966 0 0.435 0.019 493 290 486 283 OK.
13 41866 -19502 0 -589 0 -0.466 -0.014 228 407 232 411 OK.
-------------------------------------------------------------------------------------------------------------------------------
197 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
199 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Counterweght
2.00
4.00 4.0
2.40
1.250
10.00
-------------------------------------------------------------------------------------------------------------------------------
200 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Normal Case
1 44494.57 -15254.87 -2623.92 15478.89 0 0.70 2.0 > 1.50 OK.
2 42283.97 -15883.52 -2599.04 16094.76 0 0.70 1.8 > 1.50 OK.
Wind case
5 43393.48 -15539.04 -2481.96 15736.00 0 0.70 1.9 > 1.25 OK.
6 44713.85 -15170.98 -2529.03 15380.33 0 0.70 2.0 > 1.25 OK.
42503.25 -15799.63 -2504.14
Temp case
7 44491.15 -17193.83 -3256.01 17499.41 0 0.70 1.8 > 1.25 OK.
8 42522.38 -17156.83 -3329.51 17476.91 0 0.70 1.7 > 1.25 OK.
Seismic case
9 46115.42 -21148.37 -2493.27 21294.84 0 0.70 1.5 > 1.25 OK.
10 39544.18 -10321.87 -2733.07 10677.58 0 0.70 2.6 > 1.25 OK.
11 50483.67 -17582.00 -577.92 17591.50 0 0.70 2.0 > 1.25 OK.
12 35175.93 -13888.24 -4648.42 14645.51 0 0.70 1.7 > 1.25 OK.
However, 1000x750mm shear key has been provided for full length of abutment.
-------------------------------------------------------------------------------------------------------------------------------
202 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Design of Footing
-------------------------------------------------------------------------------------------------------------------------------
203 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
204 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Counterweght
2.00
4.00 4.0
2.40
1.250
10.00
Dead/Earth load calculation over foundation
Width of footing = 10.000 m Unit wt of concrete = 25 kN/m2
Length of footing = 13.100 m Unit wt of soil = 19 kN/m2
Depth of footing = 2.400 m Depth of footing at edge = 1.250 m
Thickness of wall = 2.000 m
Height of fill at back side = 16.600 m
Height of fill at front side = 5 m
A 10.00 X D
T
Y Y
Heel side Toe side
13.10
L
2.0
B C
2.40 AB CD 2.40
1.25
4.000 4.000
10.000
Wt.of base slab*1.35 81.0 kN/m2 123.2 kN/m2 Effective depth = 2.4*1000-75-25/2
Wt.of fill*1.5 425.8 kN/m2 128.3 kN/m2 = 2312.5 mm
Total downward load 506.8 kN/m2 251.4 kN/m2
11.1.1.4 Moment & Shear at X-X i.e. long direction
Avg design Avg design Avg design Avg design Moment
Moment Shear at dist Shear at dist
base pr. along base pr. base pr. at base pr. at along Long -
Load Case along Long - d along Long- d along Long-
long-AB along long- face wall-AB face wall- CD AB (kN-
CD (kN-m/m) AB (kN/m) CD (kN/m)
(kN/m2) CD (kN/m2) (kN/m2) (kN/m2) m/m)
1 -269 423 8 146 -18544.4 34645.7 -4660.8 8057.1
1 (a) -2 53 20 31 527.6 4812.1 50.9 1075.4
2 (a) -185 315 15 115 -12377.9 26032.9 -3151.9 6032.2
2 (b) -106 162 2 55 -7335.7 13272.2 -1837.6 3089.8
3 (a) -268 424 9 147 -18406.8 34807.7 -4632.1 8091.6
3 (b) -1 55 21 33 665.2 4974.0 79.6 1109.9
4 (a) -249 400 11 140 -17023.5 32825.0 -4292.9 7626.0
4 (b) -26 81 17 38 -1225.1 6975.0 -373.9 1586.8
5 (a) -330 486 -4 160 -23194.3 39551.4 -5776.2 9226.5
5 (b) -71 118 4 42 -4808.2 9682.0 -1218.3 2246.4
6 (a) -359 507 -13 161 -25507.7 41032.7 -6317.6 9592.4
6 (b) -17 63 15 31 -700.9 5479.0 -234.9 1242.8
7 (a) -474 646 -26 198 -34039.2 52008.7 -8391.9 12182.3
7 (b) 113 -113 22 -23 8673.9 -8718.4 2074.6 -2084.0
7 (c) -253 482 41 188 -16267.8 40211.0 -4226.8 9277.4
7 (d) -65 9 -35 -21 -5748.8 -117.2 -1291.9 54.6
7 (e) -275 442 12 155 -18784.9 36287.9 -4738.0 8430.1
7 (f) -43 49 -6 12 -3231.6 3805.9 -780.8 901.9
+ve means Upward pressure Maximum 8673.9 52008.7 2074.6 12182.3
Minimum -34039.2 -8718.4 -8391.9 -2084.0
0.0382 36646 kN
Strain Diagram Stress Diagram
a) Support moment
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 13100.0 mm Depth of the section = 2400 mm
Clear Cover = 75 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 0 mm Effective depth, d 2312.5 = 2313 mm
R = Mu/bd2 = 0.742 MPa Design Moment = 52009 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 52857.9 mm2
Lower fractile tensile fctm = 1.94 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
-------------------------------------------------------------------------------------------------------------------------------
206 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 39381.9 mm2
Hence provide 32 dia @ 125 c/c Ast = 84285.2 mm2
0 dia @ 125 c/c > Hence O.K.
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 32308 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 1054.6 mm Actual neutral axis depth = 194.26 mm
Strain in steel = 0.03816394 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 36646 kN Total ultimate tensile force = 36646 kN
Compressive force CG 80.81 mm Moment of resistance = 81782 kNm
> 52009 kNm Hence O.K.
Flexure Design
Heel side Toe side
Description
Maximum Minimum Maximum Minimum
Moment 8673.9 -34039.2 52008.7 -8718.4
Width 13100 13100 13100 13100
Depth 2313 2313 2313 2313
R = Mu/bd2 0.12 -0.49 0.74 -0.12
pt 0.0000 0.0000 0.0000 0.0000
Ast required for bending 82.4 -323.2 493.8 -82.8
Ast required for shear 0.0 0.0 0.0 0.0
Total Ast required 82.4 323.2 493.8 82.8
1st layers 32 dia 25 dia 32 dia 25 dia
Reinf provided 125 c/c 125 c/c 125 c/c 125 c/c
2nd layers 0 dia 0 dia 0 dia 0 dia
125 c/c 125 c/c 125 c/c 125 c/c
Ast provided 84285.2 51443.6 84285.2 51443.6
Actual NA 194 119 194 119
Strain in steel 0.0382 0.0648 0.0382 0.0648
Stress in steel 434.8 434.8 434.8 434.8
Total tension = 36646 22367 36646 22367
Total compression 36646 22367 36646 22367
Difference of force 0 0 0 0
Compressive force CG 80.8 49.3 80.8 49.3
Moment of resistance 81782 50620 81782 50620
Factor of Safety 9.4 1.5 1.6 5.8
Pt 0.0028 0.00170 0.0028 0.0017
-------------------------------------------------------------------------------------------------------------------------------
207 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
208 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
T
Y
2.0
B C
X
2.40 AB CD 2.40
1.25
4.000 4.000
10.000
Wt.of base slab 60.0 kN/m2 45.6 kN/m2 Effective depth = 2.4*1000-75-32/2
Wt.of fill 315.4 kN/m2 95.0 kN/m2 = 2309 mm
Total downward load 375.4 kN/m2 140.6 kN/m2
Rare Combination
1(a) -218 352 10 10 -14881.9 13001.8
1(b) -191 328 17 17 -12748.3 12639.6
2 (a) -212 356 15 15 -14308.2 13472.1
2 (b) -185 332 22 22 -12174.6 13110.0
3 (a) -269 427 9 9 -18480.4 15563.1
3 (b) -116 282 43 43 -6586.9 12849.1
4 (a) -256 409 10 10 -17496.6 15016.3
4 (b) -134 294 37 37 -8043.1 12890.3
5 (a) -298 454 3 3 -20684.6 16059.2
5 (b) -144 308 37 37 -8791.2 13345.2
6 (a) -303 454 0 0 -21170.4 15843.1
6 (b) -181 339 27 27 -11716.9 13717.1
Maximum -6586.9 16059.2
Minimum -21170.4 12639.6
Quasi-permanent Combination
1 -218 352 10 10 -14890.8 12997.9
2 (a) -241 375 5 5 -16651.2 13496.3
2 (b) -240 378 7 7 -16513.0 13684.7
+ve means upward pressure Maximum -14890.8 13684.7
Minimum -16651.2 12997.9
-------------------------------------------------------------------------------------------------------------------------------
209 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.00013 2.16
533 7521.88
NA NA
89.24
0.00045
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 7521.9 kN Total tensile force = 7521.9 kN
Compressive force CG = 177.5 mm Moment of resistance = 16059.2 kNm
Rare Combination Quasi-permanent Combination
Heel side Toe side Heel side Toe side
Description Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum
h or D 2400 2400 2400 2400 2400 2400 2400 2400
b 13100 13100 13100 13100 13100 13100 13100 13100
d 2313 2313 2313 2313 2313 2313 2313 2313
Moment 6586.88 -21170.44 16059.17 0.00 14890.77 -16651.22 13684.75 0.10
Reinf provided 32 dia 25 dia 32 dia 25 dia 32 dia 25 dia 32 dia 25 dia
125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c
0 dia 0 dia 0 dia 0 dia 0 dia 0 dia 0 dia 0 dia
125 c/c 125 c/c 125 c/c 0 c/c 125 c/c 125 c/c 125 c/c 0 c/c
Ast provided 84285.2 84285.2 51443.6 0.0 84285.2 84285.2 51443.6 0.0
Stress in concrete 0.9 2.8 2.6 2.0 2.2 2.2
Actual NA 533 533 428 533 533 428
Stress in steel 36.6 117.6 143.9 82.8 92.5 122.6
Total ultimate tensile force = 3085 9916 7401 6975 7799 6307
Total ultimate compressive force3085 9916 7401 6975 7799 6307
Difference of force 0 0 0 0 0 0
Compressive force CG 177.5 177.5 142.7 177.5 177.5 142.7
Moment of resistance 6587 -21170 16059 14891 -16651 13685
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0
Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 82.75 Mpa αe =Es/Ecm = 6.190
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 218.8 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.029
fct,eff = = 3.03 Mpa εsm-εcm = 0.00025
>= 0.6σsc/Es= 0.00025
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 75 mm 107
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 32.000 mm k2 = 0.5
Sr,max = 440.0 mm Crack width, Wk = = 0.109 mm
Heel side Toe side < 0.3 mm OK
Description Maximum Minimum Maximum
Stress in steel, σs 82.8 92.5 122.6
As 84285.2 84285.2 51443.6
Actual NA 533 533 428
hc,eff 218.8 218.8 218.8
ρp,eff 0.029 0.029 0.018
εsm-εcm 0.00025 0.00028 0.00037
φeq 32.0 25.0 32.0
Crack spacing Sr,max 440.0 399.5 558.0
Crack width, Wk 0.109 0.111 0.205
Check <0.3 O.K. <0.3 O.K. <0.3 O.K.
-------------------------------------------------------------------------------------------------------------------------------
210 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
211 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Counterweght
2.00
4.00 4.0
2.00
1.250
10.00
-------------------------------------------------------------------------------------------------------------------------------
212 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Load W RaL OaL RaT OaT eL eT Max Base pr. at Min Base pr. at Max Base pr. at Min Base pr. At
Case heal side heal side toe side (kN/m2) toe side (kN/m2)
(kN/m2) (kN/m2)
5 (b)
51791 7815 0 -507 0 0.151 -0.010 375 379 450 454
6 (a) 58988 -35426 0 290 0 -0.601 0.005 643 641 303 301
6 (b) 51837 20828 0 -592 0 0.402 -0.011 312 317 512 517
7 (a) 62045 -39911 0 490 0 -0.643 0.008 690 686 307 303
7 (b) 47618 -27173 0 -552 0 -0.571 -0.012 509 513 248 253
7 (c) 68598 -40916 0 485 0 -0.596 0.007 747 743 354 351
7 (d) 40971 -29720 0 -509 0 -0.725 -0.012 468 472 183 187
7 (e) 62069 -42497 0 310 0 -0.685 0.005 702 699 294 291
7 (f) 47500 -28139 0 -334 0 -0.592 -0.007 514 516 244 246
A 10.00 X D
T
Y Y
Heel side
12.50
L
2.0
B C
2.40 AB CD 2.40
1.25
4.000 4.000
10.000
Wt.of base slab*1.35 81.0 kN/m2 123.2 kN/m2 Effective depth = 2.4*1000-75-25/2
Wt.of fill*1.5 451.4 kN/m2 128.3 kN/m2 = 2312.5 mm
Total downward load 532.4 kN/m2 251.4 kN/m2
11.2.1.4 Moment & Shear at X-X i.e. long direction
Avg design base Avg design base Avg design base Avg design base Moment along Moment along Shear at dist d Shear at dist d
Load Case pr. along long-AB pr. along long- pr. at face wall-AB pr. at face wall- Long - AB (kN- Long - CD (kN- along Long-AB along Long-CD
(kN/m2) CD (kN/m2) (kN/m2) CD (kN/m2) m/m) m/m) (kN/m) (kN/m)
-------------------------------------------------------------------------------------------------------------------------------
213 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.0382 34967 kN
Strain Diagram Stress Diagram
a) Support moment
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 12500.0 mm Depth of the section = 2400 mm
Clear Cover = 75 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 0 mm Effective depth, d 2312.5 = 2313 mm
R = Mu/bd2 = 0.298 MPa Design Moment = 19911 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 19967.0 mm2
Lower fractile tensile fctm = 1.94 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 37578.1 mm2
Hence provide @32 dia 125 c/c Ast = 80424.8 mm2
@ 0 dia 125 c/c > Hence O.K.
E of reinforcement =
200000 MPa Max strain in concrete = 0.0035
E of concrete =
32308 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 1054.6 mm Actual neutral axis depth = 194.26 mm
Strain in steel = 0.03816394 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 34967 kN Total ultimate tensile force = 34967 kN
Compressive force CG 80.81 mm Moment of resistance = 78036 kNm
> 19911 kNm
Flexure Design Hence O.K.
Heel side Toe side
Description
Maximum Minimum Maximum Minimum
Moment 19783.5 -15359.0 19910.9 -6575.4
Width 12500 12500 12500 12500
Depth 2313 2313 2313 2313
R = Mu/bd2 0.30 -0.23 0.30 -0.10
pt 0.0000 0.0000 0.0000 0.0000
Ast required for bending -240.3 186.6 -241.9 79.9
Ast required for shear 0.0 0.0 0.0 0.0
Total Ast required 0.0 186.6 0.0 79.9
1st layers 32 dia 25 dia 32 dia 25 dia
Reinf provided 125 c/c 125 c/c 125 c/c 125 c/c
2nd layers 0 dia 0 dia 0 dia 0 dia
125 c/c 125 c/c 125 c/c 125 c/c
Ast provided 80424.8 49087.4 80424.8 49087.4
Actual NA 194 119 194 119
Strain in steel 0.0382 0.0648 0.0382 0.0648
Stress in steel 434.8 434.8 434.8 434.8
Total tension = 34967 21342 34967 21342
Total compression 34967 21342 34967 21342
Difference of force 0 0 0 0
Compressive force CG 80.8 49.3 80.8 49.3
Moment of resistance 78036 48301 78036 48301
Factor of Safety 3.9 3.1 3.9 7.3
Pt 0.0028 0.00170 0.0028 0.0017
11.2.1.6 Shear design
VRD= Design Shear Force of the concrete section = 4696.6 kN
Vccd= Design component of Shear Force in the compression area due to inclined compression chord
Vtd= Design component of Shear Force in tensile reinforcement due to inclined tensile chord
VRd.s= Design value of Shear Force for yielding of vertical shear reinforcement
VRD= VRd.s + Vccd + Vtd Here, Vccd= Vtd = 0.0 kN
Hence, VRD= VRd.s
Along Long Direction (X-X)
Design the section without shear reinforcement Design shear = = 4696.6 kN
VRD,C= Design Shear Resistance of the concrete section = [0.12K(80p1fck)^0.33+0.15σCP]bwd
Grade Concrete = M40 Grade of steel = Fe 500
Width of beam = 12500 mm Effective depth, d = 2313 mm
K= 1+sqrt(200/d)<=2.0 = 1.29 z = 2232 mm
vmin = 0.29 MPa p1 = Asl/bwd <=0.02 = 0.0028
σCP = = 0.00 MPa δ = 0.280 rad
Reduction of shear force as per cl. No. 10.3.2 (5) of IRC:112-2011 Mtanδ/d = 208.5 kN
αV = d= 2313 mm β = αV /2d = 0.5
VRD,C = 9236.1 kN > V-Mtand/d = 4488.2 kN
Hence shear reinforcement not required or 4,696.64x0.5= 2348.3 kN
-------------------------------------------------------------------------------------------------------------------------------
214 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5
Rare Combination
Load Case HL (kN) V (kN) HT (kN) Mx (kN-m) MT (kN-m) ML (kN-m)
1(a) 18811.24 42550.88 -3264.95 -10432.16 69.67 -34600.17
1(b) 19002.17 41908.28 -3317.18 -10101.66 -85.18 -39660.46
2 (a) 18572.91 43187.17 -3064.56 -9721.27 72.31 -32646.35
2 (b) 18763.84 42544.57 -3116.79 -9390.76 -82.53 -37706.64
3 (a) 18322.30 44200.55 -3244.48 -9764.68 85.78 -26163.58
3 (b) 19335.10 43253.52 -3191.65 -10020.45 49.25 -42357.91
4 (a) 18398.40 43908.74 -3197.40 -9752.66 83.53 -27869.72
4 (b) 19205.73 43037.82 -3170.84 -9861.86 17.42 -41280.55
5 (a) 18792.61 44047.36 -3300.30 -10425.31 143.57 -32435.48
5 (b) 19805.41 43100.33 -3247.47 -10681.08 107.05 -48629.81
6 (a) 19182.24 43653.42 -3290.44 -10853.71 179.85 -38322.89
6 (b) 19989.57 42782.50 -3263.88 -10962.91 113.74 -51733.71
Quasi-permanent
1 18813.50 42544.79 -3265.04 -10429.99 74.71 -34615.62
2 (a) 19163.48 42526.78 -3264.11 -10817.89 124.49 -39475.84
2 (b) 19352.15 41890.26 -3316.25 -10489.55 -35.40 -39624.98
T
Y
12.50
L
2.0
B C
X
2.40 AB CD 2.40
1.25
4.000 4.000
10.000
Wt.of base slab 60.0 kN/m2 45.6 kN/m2 Effective depth = 2.4*1000-75-32/2
Wt.of fill 334.4 kN/m2 95.0 kN/m2 = 2309 mm
Total downward load 394.4 kN/m2 140.6 kN/m2
Moment & Shear at X-X i.e. long direction
Avg design Avg design Avg design Avg design Moment
Moment
base pr. along base pr. base pr. at base pr. at along Long -
Load Case along Long -
long-AB along long- face-AB side face-CD side AB (kN-
CD (kN-m/m)
(kN/m2) CD (kN/m2) (kN/m2) (kN/m2) m/m)
Rare Combination
1(a) 112 34 81 81 10163.6 6505.6
1(b) 131 4 80 80 11430.8 5505.7
2 (a) 108 48 84 84 9984.9 7202.2
2 (b) 127 19 84 84 11252.1 6202.3
3 (a) 85 87 86 86 8513.7 8635.2
3 (b) 155 2 94 94 13456.5 6323.0
4 (a) 91 77 85 85 8880.8 8238.0
4 (b) 148 6 91 91 12904.7 6253.8
5 (a) 114 56 91 91 10598.8 7910.6
5 (b) 184 -29 99 99 15541.6 5598.3
6 (a) 139 25 93 93 12356.1 7030.2
6 (b) 196 -47 99 99 16379.9 5046.1
Maximum 16379.9 8635.2
Minimum 8513.7 5046.1
Quasi-permanent Combination
1 112 34 81 81 10164.2 6499.2
2 (a) 135 10 85 85 11860.6 6018.2
2 (b) 131 4 80 80 11403.9 5494.7
+ve means upward pressure Maximum 11860.6 6499.2
Minimum 10164.2 5494.7
0.00014 2.31
533 7672.12
NA NA
95.40
0.00048
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 7672.1 kN Total tensile force = 7672.1 kN
Compressive force CG = 177.5 mm Moment of resistance = 16379.9 kNm
-------------------------------------------------------------------------------------------------------------------------------
216 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
217 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Staad Inputs
-------------------------------------------------------------------------------------------------------------------------------
218 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Member No
-------------------------------------------------------------------------------------------------------------------------------
219 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
POISSON 0.17
DENSITY 25
ALPHA 1.2e-005
DAMP 0.05
ISOTROPIC CONCRETE1
E 3.3346e+007
POISSON 0.17
DENSITY 0
ALPHA 1.2e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
5 TO 10 12 TO 17 19 TO 24 26 TO 31 PRIS AX 1.6025 IX 0.0382 IY 0.5581 IZ 0.6916
11 18 25 32 TO 36 PRIS AX 1.847 IX 0.0648 IY 0.5689 IZ 0.7512
1 TO 4 37 TO 40 PRIS AX 2.1194 IX 0.1649 IY 0.6034 IZ 0.8213
41 TO 60 PRIS YD 0.225 ZD 0.5
66 TO 70 106 TO 110 PRIS YD 0.225 ZD 1.5
71 TO 86 90 TO 105 PRIS YD 0.225 ZD 3.5
117 TO 120 142 TO 145 147 TO 150 172 TO 176 181 182 187 PRIS YD 2.3 ZD 0.5
122 TO 125 127 TO 130 132 TO 135 137 TO 140 177 TO 180 PRIS YD 2.3 ZD 3.02
198 TO 202 213 TO 217 228 TO 232 243 TO 247 PRIS YD 2 ZD 1
208 TO 212 238 TO 242 PRIS YD 2 ZD 3.5
203 TO 207 PRIS YD 2 ZD 7.25
193 TO 197 223 TO 227 PRIS YD 0.5 ZD 2
61 TO 65 111 TO 115 PRIS YD 2.3 ZD 2
233 TO 237 PRIS YD 2 ZD 7.75
MEMBER PROPERTY AMERICAN
152 TO 155 157 TO 160 162 TO 165 167 TO 170 183 TO 186 PRIS YD 2 ZD 2.77
MEMBER PROPERTY AMERICAN
87 TO 89 PRIS AX 1.2563 IX 0.0255 IY 0.8423 IZ 0.3147
CONSTANTS
BETA 90 MEMB 193 TO 217 223 TO 247
BETA 353 MEMB 147 TO 150 152 TO 155 157 TO 160 162 TO 165 167 TO 170 -
172 TO 175 182 TO 187
BETA 7 MEMB 117 TO 120 122 TO 125 127 TO 130 132 TO 135 137 TO 140 -
142 TO 145 176 TO 181
MATERIAL CONCRETE MEMB 1 TO 65 87 TO 89 111 TO 115 117 TO 120 122 TO 125 127 -
128 TO 130 132 TO 135 137 TO 140 142 TO 145 147 TO 150 152 TO 155 157 TO 160 -
162 TO 165 167 TO 170 172 TO 187
MATERIAL CONCRETE1 MEMB 66 TO 86 90 TO 110 193 TO 217 223 TO 247
SUPPORTS
115 TO 126 FIXED
*115 TO 125 -
*126 FIXED BUT MY KFX 4.89898e+006 KFY 7.34847e+006 KFZ 4.89898e+006 -
*KMX 4.8e+007 KMZ 1.8e+007
CUT OFF MODE SHAPE 50
DEFINE 1893 LOAD
ZONE 0.24 RF 2 I 1.2 SS 1 ST 1 DM 0.05 DT 2
*********************************************************************
JOINT WEIGHT
1 WEIGHT 403.926
2 WEIGHT 353.574
3 WEIGHT 416.838
4 WEIGHT 410.673
5 WEIGHT 414.644
6 WEIGHT 406.47
7 WEIGHT 343.95
8 WEIGHT 330.224
9 WEIGHT 197.432
10 WEIGHT 211.226
11 WEIGHT 206.904
12 WEIGHT 199.886
13 WEIGHT 207.118
14 WEIGHT 211.221
15 WEIGHT 196.008
16 WEIGHT 161.095
17 WEIGHT 173.895
18 WEIGHT 171.124
19 WEIGHT 189.974
20 WEIGHT 171.048
21 WEIGHT 173.826
22 WEIGHT 161.147
23 WEIGHT 160.19
24 WEIGHT 166.765
25 WEIGHT 163.054
26 WEIGHT 123.966
27 WEIGHT 163.444
28 WEIGHT 167.332
29 WEIGHT 160.49
-------------------------------------------------------------------------------------------------------------------------------
221 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
30 WEIGHT 191.056
31 WEIGHT 207.163
32 WEIGHT 205.12
33 WEIGHT 244.207
34 WEIGHT 203.251
35 WEIGHT 203.758
36 WEIGHT 188.962
37 WEIGHT 127.067
38 WEIGHT 109.8
39 WEIGHT 113.335
40 WEIGHT 135.253
41 WEIGHT 126.993
42 WEIGHT 109.884
43 WEIGHT 113.296
44 WEIGHT 135.095
45 WEIGHT 113.322
46 WEIGHT 5.519
47 WEIGHT 10.598
48 WEIGHT 11.129
49 WEIGHT 7.163
50 WEIGHT 10.081
51 WEIGHT 7.081
52 WEIGHT 11.058
53 WEIGHT 11.769
54 WEIGHT 5.702
55 WEIGHT 80.706
56 WEIGHT 83.112
57 WEIGHT 6.868
58 WEIGHT 16.481
59 WEIGHT 20.648
60 WEIGHT 19.606
61 WEIGHT 10.817
62 WEIGHT 21.174
63 WEIGHT 23.304
64 WEIGHT 18.384
65 WEIGHT 7.09
66 WEIGHT 78.477
79 WEIGHT 141.383
80 WEIGHT 129.986
81 WEIGHT 141.713
82 WEIGHT 130.177
83 WEIGHT 141.688
84 WEIGHT 129.981
85 WEIGHT 141.547
86 WEIGHT 129.874
87 WEIGHT 23.484
88 WEIGHT 22.986
89 WEIGHT 23.31
90 WEIGHT 23.246
91 WEIGHT 585.126
92 WEIGHT 571.502
93 WEIGHT 585.222
94 WEIGHT 571.521
95 WEIGHT 585.205
96 WEIGHT 571.397
97 WEIGHT 585.188
98 WEIGHT 571.408
99 WEIGHT 96.789
100 WEIGHT 102.742
101 WEIGHT 96.721
102 WEIGHT 102.929
115 WEIGHT 151
116 WEIGHT 151
117 WEIGHT 151
118 WEIGHT 151
119 WEIGHT 25
120 WEIGHT 25
121 WEIGHT 138.5
122 WEIGHT 138.5
123 WEIGHT 138.5
124 WEIGHT 138.5
125 WEIGHT 25
126 WEIGHT 25
127 WEIGHT 698.375
128 WEIGHT 698.376
129 WEIGHT 698.376
130 WEIGHT 698.376
131 WEIGHT 115.624
132 WEIGHT 115.623
-------------------------------------------------------------------------------------------------------------------------------
222 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
6 TO 9 UMOM GY 0.58
LOAD 20 SNOW LOAD FOR 70R LL TRACK
MEMBER LOAD
4 26 TO 32 36 40 UNI GY -8.33
2 3 12 TO 25 34 35 38 39 UNI GY -7.5
1 5 TO 11 33 37 UNI GY -7.48
LOAD 21 SNOW LOAD FOR LL 70R WHEEL
MEMBER LOAD
4 26 TO 32 36 40 UNI GY -4.17
2 3 12 TO 25 34 35 38 39 UNI GY -3.75
1 5 TO 11 33 37 UNI GY -3.74
LOAD 22 BRAKING
MEMBER LOAD
1 TO 40 UNI X 1.67
LOAD 23 PRESTRESS LOSS
MEMBER PRESTRESS LOAD
4 40 FORCE -1215 ES -0.451 EM -0.451 EE -0.451
32 36 FORCE -1215 ES -0.49 EM -0.49 EE -0.49
26 31 FORCE -1215 ES -0.845 EM -0.845 EE -0.845
27 30 FORCE -1215 ES -1.078 EM -1.078 EE -1.078
28 29 FORCE -1215 ES -1.21 EM -1.21 EE -1.21
3 39 FORCE -1247 ES -0.451 EM -0.451 EE -0.451
25 35 FORCE -1247 ES -0.49 EM -0.49 EE -0.49
19 24 FORCE -1247 ES -0.84 EM -0.84 EE -0.84
20 23 FORCE -1247 ES -1.068 EM -1.068 EE -1.068
21 22 FORCE -1247 ES -1.21 EM -1.21 EE -1.21
2 38 FORCE -1056 ES -0.347 EM -0.347 EE -0.347
18 34 FORCE -1056 ES -0.396 EM -0.396 EE -0.396
12 17 FORCE -1056 ES -0.801 EM -0.801 EE -0.801
13 16 FORCE -1056 ES -1.064 EM -1.064 EE -1.064
14 15 FORCE -1056 ES -1.227 EM -1.227 EE -1.227
1 37 FORCE -1068 ES -0.347 EM -0.347 EE -0.347
11 33 FORCE -1068 ES -0.396 EM -0.396 EE -0.396
5 10 FORCE -1068 ES -0.795 EM -0.795 EE -0.795
6 9 FORCE -1068 ES -1.052 EM -1.052 EE -1.052
7 8 FORCE -1068 ES -1.227 EM -1.227 EE -1.227
LOAD 24 POSTSTRESS LOSS
MEMBER POSTSTRESS LOAD
4 40 FORCE -1215 ES -0.451 EM -0.451 EE -0.451
32 36 FORCE -1215 ES -0.49 EM -0.49 EE -0.49
26 31 FORCE -1215 ES -0.845 EM -0.845 EE -0.845
27 30 FORCE -1215 ES -1.078 EM -1.078 EE -1.078
28 29 FORCE -1215 ES -1.21 EM -1.21 EE -1.21
3 39 FORCE -1247 ES -0.451 EM -0.451 EE -0.451
25 35 FORCE -1247 ES -0.49 EM -0.49 EE -0.49
19 24 FORCE -1247 ES -0.84 EM -0.84 EE -0.84
20 23 FORCE -1247 ES -1.068 EM -1.068 EE -1.068
21 22 FORCE -1247 ES -1.21 EM -1.21 EE -1.21
2 38 FORCE -1056 ES -0.347 EM -0.347 EE -0.347
18 34 FORCE -1056 ES -0.396 EM -0.396 EE -0.396
12 17 FORCE -1056 ES -0.801 EM -0.801 EE -0.801
13 16 FORCE -1056 ES -1.064 EM -1.064 EE -1.064
14 15 FORCE -1056 ES -1.227 EM -1.227 EE -1.227
1 37 FORCE -1068 ES -0.347 EM -0.347 EE -0.347
11 33 FORCE -1068 ES -0.396 EM -0.396 EE -0.396
5 10 FORCE -1068 ES -0.795 EM -0.795 EE -0.795
6 9 FORCE -1068 ES -1.052 EM -1.052 EE -1.052
7 8 FORCE -1068 ES -1.227 EM -1.227 EE -1.227
*********70R Track loading************
LOAD GENERATION 26
TYPE 1 -1 0 8.4 XINC 0.5 ZINC 0.0262
LOAD GENERATION 26
TYPE 1 12 0 9.08 XINC 0.5 ZINC -0.0296
LOAD GENERATION 56
TYPE 1 -1 0 7.03 XINC 0.5
LOAD GENERATION 26
TYPE 1 -0.5 0 3.88 XINC 0.5 ZINC 0.0481
LOAD GENERATION 26
TYPE 1 12.5 0 5.13 XINC 0.5 ZINC -0.0204
**********70R Wheel loading************
LOAD GENERATION 26
TYPE 2 -7 0 8.39 XINC 0.5 ZINC 0.0262
LOAD GENERATION 26
TYPE 2 6 0 9.07 XINC 0.5 ZINC -0.0296
LOAD GENERATION 56
TYPE 2 -7 0 6.965 XINC 0.5
LOAD GENERATION 26
TYPE 2 -7 0 3.76 XINC 0.5 ZINC 0.0481
LOAD GENERATION 26
-------------------------------------------------------------------------------------------------------------------------------
229 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
PERFORM ANALYSIS
LOAD LIST ALL
PRINT MEMBER FORCES LIST 1 TO 5
FINISH
-------------------------------------------------------------------------------------------------------------------------------
231 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
232 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
12.0 Design Data for RCC cantilever Retaining wall over foundation Ht = 17.60 m
1.1 Geometric details
Max. Finished road level = 890.55 m
Minimum ground level = 882.23 m
RL at founding level = 870.55 m
Thickness of abutment foundation = 2.400 m
Thickness of retaining wall at base = 2.400 m
Thickness of retaining wall at top = 0.500 m
1.2 Details of wearing coat and backfill matterial
Angle of internal friction (φ) = 30.00 degrees Angle of wall friction (δ) = 20.00 degrees
Slope of backfill soil (β) = 0.00 degrees Angle of earthside wall (α) = 6.16 degrees
Unit weight of soil = 19.0 kN/m3 Surcharge 1.2xγsoil
1.6 Sketch
890.548 m
500
7500 7
1438
o 12500
= 6.16
17600
2063
α
2400 870.5 m
2400
-------------------------------------------------------------------------------------------------------------------------------
233 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
12.1.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 52.91 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.11 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014. z S a
Where, Ah = Horizontal Seismic Coefficient 2 g
Ah =
R
z = zone factor = For Zone IV = 0.24 I
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
So, Sa/g = = 2.50
Horizontal coefficient - Ah 0.24/2x2.5/(2.5/1.2) = 0.14
Vertical coefficient - Av =2/3Ah = 0.10
λ = Ah/(1+Av) = 0.13
Active earth pressure coefficient at seismic case = Ka = 0.502
Active earth pressure coefficient at normal case = Ka = 0.344
-------------------------------------------------------------------------------------------------------------------------------
234 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Summary of Moment
DL Earth fill EP Live load LL Surcharge Seismic Dy. Incr. of Dynamic inc. of LL
earth pr. surcharge
Wall above base slab 0 0 6720.71 0.0 1091.02 1616.95 3677.27 661.91
12.5m below top of wall 0 0 2407.73 0.0 550.34 720.70 1317.40 333.88
7.5m below top of wall 0 0 520.07 0.0 198.12 196.17 284.56 120.20
Summary of Shear
DL Earth fill EP Live load LL Surcharge Seismic Dy. Incr. of Dynamic inc. of LL
earth pr. surcharge
Wall above base slab 0 0 909.19 0.0 123.98 183.7 417.9 57.0
12.5m below top of wall 0 0 458.61 0.0 88.05 115.3 210.8 40.5
7.5m below top of wall 0 0 165.10 0.0 52.83 52.3 75.9 24.3
-------------------------------------------------------------------------------------------------------------------------------
235 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
236 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.01179 7508 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 7508 kN Total ultimate tensile force = 7508 kN
Compressive force CG 216.90 mm Moment of resistance = 15467 kNm
< 13174 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 12.5m below 7.5m
top of
below
wall top of wall
Moment 13174.00 4983.03 1162.55
D 2400.00 2062.50 1437.50
b 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00
d 2277.00 1939.50 1362.5
R = Mu/bd2 2.54 1.32 0.63
pt 0.00634 0.00317 0.00147
Ast required 14447.1 6150.5 1998.2
32 dia + 32 dia + 0 dia +
32 dia + 32 dia + 0 dia +
Reinf provided 25 dia + 0 dia + 0 dia
25 dia + 25 dia 25 dia
150 c/c 150 c/c 150 c/c
Ast provided 17268.3 13995.8 3272.5
Actual NA 521 423 99
Strain in steel 0.0118 0.0126 0.0448
Stress in steel 434.8 434.8 434.8
Total ultimate tensile force =7508 6085 1423
7508
Total ultimate compressive force 6085 1423
Difference of force 0 0 0
Compressive force CG 216.9 175.8 41.1
Moment of resistance 15467 10732 1880
Factor of Safety 1.174 2.154 1.617
Check Safe Safe Safe
12.3.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 40 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
-------------------------------------------------------------------------------------------------------------------------------
237 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Balanced neutral axis depth = = 832.01 mm Actual neutral axis depth = 722.47 mm
Strain in steel = 0.00133 Stress in steel = 266.5 MPa
Strain in concrete = 0.00062 Comp. stress of concrete = 10.32 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00062 10.32
3729.31
722.47
NA NA
266.46
0.00133
Strain Diagram Stress Diagram
=
Total compressive force = 3729.31 kN Total tensile force = 3729.31 kN
Compressive force CG = 240.82 mm Moment of resistance = 7593.53 kNm
-------------------------------------------------------------------------------------------------------------------------------
238 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
12.4.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 193.15 Mpa αe =Es/Ecm = 11.996
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 307.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.046
fct,eff = = 2.12 Mpa εsm-εcm = 0.000786
>= 0.6σsc/Es= 0.000579
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 28.9 mm k2 = 0.5
Sr,max = 278.1 mm Crack width, Wk = = 0.218 mm
< 0.3 mm OK
Total for Quasi-permanent (SL3)
Wall 12.5m
Description above below top
base slab of wall
Stress in steel, σs 193.1 100.0
As 17268.3 13995.8
Actual NA 786 656
hc,eff 307.5 307.5
ρp,eff 0.056 0.046
εsm-εcm 0.00081 0.00032
φeq 30.0 32.0
effective cover, c 75.0 75.0
Crack spacing Sr,max 345.9 374.5
Crack width, Wk 0.279 0.120
Check <0.3 O.K. <0.3 O.K.
-------------------------------------------------------------------------------------------------------------------------------
239 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
110.36 7.04
kN/m2 kN/m2
A 15.2 m B
8 7 6 5 4 3 2 1
5826.52 0.00
kN-m/m kN-m/m
15.2 m
E= = 33346 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.500 0.01042 0.00 0
2 2.171 2.171 0.771 0.03826 31.22 0.00002 0.00003
3 2.171 4.343 1.043 0.09451 183.35 0.00006 0.00029
4 2.171 6.514 1.314 0.18919 544.06 0.00009 0.00085
5 2.171 8.686 1.586 0.33227 1201.04 0.00011 0.00161
6 2.171 10.857 1.857 0.53377 2241.99 0.00013 0.00249
7 2.171 13.029 2.129 0.80368 3754.59 0.00014 0.00345
8 2.171 15.200 2.400 1.15200 5826.52 0.00015 0.00447
Total 0.01319 m
So, Total deflection = = 13.186 mm = L/ 1153
32 dia
@ 150 c/c
20 dia @ 125 c/c
32 dia
@ 150 c/c
25 dia
@ 150 c/c
4000
-------------------------------------------------------------------------------------------------------------------------------
240 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
241 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
13.0 Design Data for RCC cantilever Retaining wall - RW-01 Ht = 7.40 m
1.1 Geometric details
Max. Finished road level = 887.90 m
Minimum ground level = 882.50 m
Minimum Depth of Foundation as per cl. 205.2.1 of IRC: 78-2014 = 2.000 m
RL at founding level = 880.50 m
Width of foundation Width of toe = 1.800 m
Width of heel = 3.200 m
Thickness of Stem at base = 0.900 m
Thickness of Toe = 0.800 m
Total width of foundation = 5.900 m
Friction coefficient bet. soil and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.50
Friction coefficient bet. Rock and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.70
-------------------------------------------------------------------------------------------------------------------------------
242 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1.6 Sketch
12
887.900 m
13
300
3000 7
573
o
= 5.19
5400
8
1 882.500 m
2
11
2000
500 9 4 3 10
5
800 880.5 m
300 6
3200 900 1800
5900
Section of Retaining Wall
-------------------------------------------------------------------------------------------------------------------------------
243 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
13.2.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 21.95 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.09 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014. z S a
Where, Ah = Horizontal Seismic Coefficient 2 g
Ah =
R
z = zone factor = For Zone IV = 0.24 I
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
So, Sa/g = = 2.50
Horizontal coefficient - Ah 0.24/2x2.5/(2.5/1.2) = 0.14
Vertical coefficient - Av =2/3Ah = 0.10
λ = Ah/(1+Av) = 0.13
Active earth pressure coefficient at seismic case = Ka = 0.493
Active earth pressure coefficient at normal case = Ka = 0.336
Dynamic increment of static earth pressure coefficient = 0.156
-------------------------------------------------------------------------------------------------------------------------------
244 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Dynamic increment of Horz. earth pr. at top of base slab = 0.156*(5.40+2-0.8)*19 = 19.58 kN/m2
Dynamic increment of Horz. earth pr. at bottom slab = 0.156*(5.40+2)*19 = 21.95 kN/m2
Dynamic increment of Earth pr. due to LL surcharge = 0.156*22.8 = 3.56 kN/m2
1 1
2 1 1 1
3 1 1 1 1 1
4 1 1 1 0.2 0.2 1 0.33
Load combination at bottom of base slab for verification of equilibrium
Load Case Restoring Forces Overturning Forces
Vertical load Lateral Moment (kN- Vertical load Lateral force Moment
(kN) force (kN) m) (kN) (kN) (kN-m)
1 195.75 0.00 475.64 0.00 0.00 0.00
2 699.44 0.00 2410.73 0.00 158.38 492.23
3 786.08 0.00 2757.29 0.00 209.74 682.28
4 722.97 0.00 2480.04 0.00 275.09 890.99
5 710.57 0.00 2480.04 0.00 275.09 890.99
-------------------------------------------------------------------------------------------------------------------------------
246 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
247 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
248 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
249 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.02027 1493 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 1493 kN Total ultimate tensile force = 1493 kN
Compressive force CG 49.31 mm Moment of resistance = 1129 kNm
< 780 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 3m below top of wall
At heel slab At toe slab
Moment 779.78 102.09 502.10 301.98
D 900.00 572.73 800.00 800.00
b 1000.00 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00 75.00
d 817.00 497.7 715.0 715.0
R = Mu/bd2 1.17 0.41 0.98 0.59
pt 0.00280 0.00096 0.00234 0.00139
Ast required 2285.6 478.1 1670.2 990.6
20 dia + 0 dia + 20 dia + 20 dia +
Reinf provided 16 dia + 16 dia +
150 c/c 150 c/c 125 c/c 150 c/c
Ast provided 3434.8 1340.4 2513.3 2094.4
Actual NA 119 46 87 72
Strain in steel 0.0206 0.0342 0.0254 0.0311
Stress in steel 434.8 434.8 434.8 434.8
Total ultimate tensile force =1493 583 1093 911
1493
Total ultimate compressive force 583 1093 911
Difference of force 0 0 0 0
Compressive force CG 49.3 19.2 36.1 30.1
Moment of resistance 1146 279 742 624
Factor of Safety 1.470 2.732 1.478 2.065
Check Safe Safe Safe Safe
13.6.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 35 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Wall above base slab 3m below top of wall
At heel slab At toe slab
Prestress Force after all losses (kN)
0.0 0.0 0.0 0.0
Effective width in mm 1000 1000 1000 1000
Effective Depth (d) in mm 817 498 715 715
K 1.495 1.634 1.529 1.529
Stress due to Prestress ( 0 0 0 0
Shear Resistance minimum (V273.8 190.6 247.9 247.9
Ast provided 3434.8 1340.4 2513.3 2094.4
Reinforcement ratio, ρ1 0.004 0.003 0.004 0.003
Shear resistance ( VRd,c) (kN) 330.6 190.1 279.0 262.7
Design Shear resistance ( V 330.6 190.6 279.0 262.7
243.95
Max.shear at 1d dist.from face (kN) 72.36 246.24 223.39
M tanδ/d 86.77 18.65 109.73 117.32
Effective shear 157.18 53.71 136.51 106.07
Factor of Safety 2.10 3.55 2.04 2.48
Check Safe Safe Safe Safe
-------------------------------------------------------------------------------------------------------------------------------
250 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Balanced neutral axis depth = = 275.39 mm Actual neutral axis depth = 222.57 mm
Strain in steel = 0.00094 Stress in steel = 187.3 MPa
Strain in concrete = 0.00036 Comp. stress of concrete = 5.78 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00036 5.78
643.35
222.57
NA NA
187.30
0.00094
Strain Diagram Stress Diagram
=
Total compressive force = 643.35 kN Total tensile force = 643.35 kN
Compressive force CG = 74.19 mm Moment of resistance = 470.17 kNm
Rare Combination (SL1) Quasi-permanent (SL3)
Wall Wall
Description above 3m below At heel above 3m below At heel
base slab top of wall slab At toe slab base slab top of wall slab At toe slab
h or D 900 573 800 800 900 573 800 800
b 1000 1000 1000 1000 1000 1000 1000 1000
d 817 498 715 715 817 498 715 715
Moment 470.17 59.02 284.78 195.55 349.23 0.00 208.85 158.17
Reinf provided 20 dia + 0 dia + 20 dia + 20 dia + 20 dia + 0 dia + 20 dia + 20 dia +
16 dia + 16 dia + 0 dia 0 dia 16 dia + 16 dia + 0 dia 0 dia
150 c/c 150 c/c 125 c/c 150 c/c 150 c/c 150 c/c 125 c/c 150 c/c
Ast provided 3434.8 1340.4 2513.3 2094.4 3434.8 1340.4 2513.3 2094.4
Stress in concrete 5.6 2.3 4.8 3.5 4.2 0.0 3.5 2.9
Actual NA 224 113 182 168 224 113 182 168
Stress in steel 184.4 95.7 173.2 141.7 137.0 0.0 127.0 114.6
Total ultimate tensile force = 634 128 435 297 471 0 319 240
Total ultimate compressive force634 128 435 297 471 0 319 240
Difference of force 0 0 0 0 0 0 0 0
Compressive force CG 74.8 37.7 60.7 56.1 74.8 37.7 60.7 56.1
Moment of resistance 470 59 285 196 349 0 209 158
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Maximum compressive stress of concrete= 5.6 Mpa < 16.8 Mpa Hence O.K.
Maximum tensile stress of steel= 184.4 Mpa < 400.0 Mpa Hence O.K.
13.6.2.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 136.99 Mpa αe =Es/Ecm = 12.381
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 237.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.014
fct,eff = = 1.94 Mpa εsm-εcm = 0.000411
>= 0.6σsc/Es= 0.000411
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 20.0 mm k2 = 0.5
Sr,max = 405.1 mm Crack width, Wk = = 0.166 mm
< 0.3 mm OK
-------------------------------------------------------------------------------------------------------------------------------
251 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
45.12 6.94
kN/m2 kN/m2
A 6.6 m B
8 7 6 5 4 3 2 1
500.41 0.00
kN-m/m kN-m/m
6.6 m
E= = 32308 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.300 0.00225 0.00 0
2 0.943 0.943 0.386 0.00478 4.10 0.00003 0.00001
3 0.943 1.886 0.471 0.00873 20.49 0.00007 0.00007
4 0.943 2.829 0.557 0.01441 55.26 0.00012 0.00021
5 0.943 3.771 0.643 0.02214 114.53 0.00016 0.00043
6 0.943 4.714 0.729 0.03223 204.40 0.00020 0.00071
7 0.943 5.657 0.814 0.04499 330.99 0.00023 0.00104
8 0.943 6.600 0.900 0.06075 500.41 0.00025 0.00139
Total 0.00386 m
So, Total deflection = = 3.862 mm = L/ 1709
-------------------------------------------------------------------------------------------------------------------------------
252 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
20 dia
@ 150 c/c
12 dia @ 150 c/c
16 dia
@ 150 c/c
-------------------------------------------------------------------------------------------------------------------------------
253 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
254 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
14.0 Design Data for RCC cantilever Retaining wall - RW-01 Ht = 11.80 m
1.1 Geometric details
Max. Finished road level = 888.10 m
Minimum ground level = 878.30 m
Minimum Depth of Foundation as per cl. 205.2.1 of IRC: 78-2014 = 2.000 m
RL at founding level = 876.30 m
Width of foundation Width of toe = 2.500 m
Width of heel = 5.500 m
Thickness of Stem at base = 1.400 m
Thickness of Toe = 1.200 m
Total width of foundation = 9.400 m
Friction coefficient bet. soil and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.50
Friction coefficient bet. Rock and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.70
-------------------------------------------------------------------------------------------------------------------------------
255 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1.6 Sketch
12
888.100 m
13
300
6000 7
923
o 9000
= 5.92
9800
8
1234
α
1 878.300 m
2
11
2000
900 9 4 3 10
5
1200 876.3 m
300 6
5500 1400 2500
9400
Section of Retaining Wall
-------------------------------------------------------------------------------------------------------------------------------
256 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
14.2.3.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 35.35 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.10 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014. z S a
Where, Ah = Horizontal Seismic Coefficient 2 g
Ah =
R
z = zone factor = For Zone IV = 0.24 I
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
-------------------------------------------------------------------------------------------------------------------------------
257 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
So, Sa/g = = 2.50
Horizontal coefficient - Ah 0.24/2x2.5/(2.5/1.2) = 0.14
Vertical coefficient - Av =2/3Ah = 0.10
λ = Ah/(1+Av) = 0.13
Active earth pressure coefficient at seismic case = Ka = 0.500
Active earth pressure coefficient at normal case = Ka = 0.342
Dynamic increment of static earth pressure coefficient = 0.158
Dynamic increment of Horz. earth pr. at top of base slab = 0.158*(9.80+2-1.2)*19 = 31.76 kN/m2
Dynamic increment of Horz. earth pr. at bottom slab = 0.158*(9.80+2)*19 = 35.35 kN/m2
Dynamic increment of Earth pr. due to LL surcharge = 0.158*22.8 = 3.60 kN/m2
-------------------------------------------------------------------------------------------------------------------------------
258 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1 1
2 1 1 1
3 1 1 1 1 1
4 1 1 1 0.2 0.2 1 0.33
Load combination at bottom of base slab for verification of equilibrium
Load Case Restoring Forces Overturning Forces
Vertical load Lateral Moment (kN- Vertical load Lateral force Moment
(kN) force (kN) m) (kN) (kN) (kN-m)
1 427.25 0.00 1533.58 0.00 0.00 0.00
2 1752.12 0.00 9712.30 0.00 407.23 2018.23
3 1902.60 0.00 10630.23 0.00 490.06 2506.90
4 1795.75 0.00 9895.89 0.00 680.55 3486.03
5 1768.68 0.00 9895.89 0.00 680.55 3486.03
-------------------------------------------------------------------------------------------------------------------------------
259 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
260 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
261 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
Summary of Moment
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 1462.99 0.0 394.34 993.44 239.79
9m below top of wall 0 0 895.47 0.0 284.28 586.65 172.86
6m below top of wall 0 0 265.32 0.0 126.35 209.21 76.83
At heel slab -163.3 -135.9 1264.3 -29.2 305.5 753.66 185.78
At toe slab -178.0 -16.6 -352.3 -7.7 -85.3 -223.00 -37.03
Summary of Shear
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 253.63 0.0 65.37 178.4 30.1
9m below top of wall 0 0 236.90 0.0 63.17 139.9 29.1
6m below top of wall 0 0 105.29 0.0 42.12 79.3 19.4
At heel slab -73.3 77.1 312.7 4.7 75.7 179.1 46.0
At toe slab -77.8 1.5 -153.5 -2.2 -37.2 -152.6 -37.0
-------------------------------------------------------------------------------------------------------------------------------
262 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.01400 3244 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 3244 kN Total ultimate tensile force = 3244 kN
Compressive force CG 107.10 mm Moment of resistance = 3829 kNm
< 3080 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 9m below top 6mofbelow At heel slab
wall top of wall At toe slab
Moment 3079.97 1866.87 619.78 2187.96 969.73
D 1400.00 1233.96 922.64 1200.00 1200.00
b 1000.00 1000.00 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00 75.00 75.00
d 1295.00 1146.5 835.1 1112.5 1112.5
R = Mu/bd2 1.84 1.42 0.89 1.77 0.78
pt 0.00451 0.00343 0.00211 0.00433 0.00185
Ast required 5844.7 3936.7 1759.1 4819.8 2058.4
25 dia + 25 dia + 25 dia + 25 dia + 16 dia +
20 dia + 20 dia + 0 dia +
Reinf provided
20 dia + 0 dia 0 dia 25 dia 25 dia
150 c/c 150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 7461.3 5366.9 3272.5 6545.0 4612.9
Actual NA 257 185 113 226 159
Strain in steel 0.0141 0.0182 0.0224 0.0137 0.0210
Stress in steel 434.8 434.8 434.8 434.8 434.8
Total ultimate tensile force =3244 2333 1423 2846 2006
3244
Total ultimate compressive force 2333 1423 2846 2006
Difference of force 0 0 0 0 0
Compressive force CG 107.1 77.0 47.0 94.0 66.2
Moment of resistance 3854 2495 1121 2898 2098
Factor of Safety 1.251 1.337 1.809 1.325 2.164
Check Safe Safe Safe Safe Safe
-------------------------------------------------------------------------------------------------------------------------------
263 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
14.6.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 35 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Wall above base slab 9m below top
6mofbelow
wall top of wall
At heel slab At toe slab
Prestress Force after all losses (kN)
0.0 0.0 0.0 0.0 0.0
Effective width in mm 1000 1000 1000 1000 1000
Effective Depth (d) in mm 1181 1146 835 916 681
K 1.412 1.418 1.489 1.467 1.542
Stress due to Prestress ( 0 0 0 0 0
Shear Resistance minimum (V363.1 354.9 278.4 298.6 239.0
Ast provided 7461.3 5366.9 3272.5 6545.0 4612.9
Reinforcement ratio, ρ1 0.006 0.005 0.004 0.007 0.007
Shear resistance ( VRd,c) (kN) 516.2 455.9 329.0 433.5 332.6
Design Shear resistance ( V 516.2 455.9 329.0 433.5 332.6
540.28
Max.shear at 1d dist.from face (kN) 465.19 236.49 610.41 501.30
M tanδ/d 270.72 168.98 56.10 390.80 381.06
Effective shear 269.55 296.21 180.39 219.60 120.24
Factor of Safety 1.91 1.54 1.82 1.97 2.77
Check Safe Safe Safe Safe Safe
Balanced neutral axis depth = = 440.46 mm Actual neutral axis depth = 404.01 mm
Strain in steel = 0.00103 Stress in steel = 206.8 MPa
Strain in concrete = 0.00047 Comp. stress of concrete = 7.64 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00047 7.64
1542.69
404.01
NA NA
206.76
0.00103
Strain Diagram Stress Diagram
=
Total compressive force = 1542.69 kN Total tensile force = 1542.69 kN
Compressive force CG = 134.67 mm Moment of resistance = 1778.46 kNm
-------------------------------------------------------------------------------------------------------------------------------
264 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
14.6.2.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 169.05 Mpa αe =Es/Ecm = 12.381
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 281.3 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.027
fct,eff = = 1.94 Mpa εsm-εcm = 0.000602
>= 0.6σsc/Es= 0.000507
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 22.8 mm k2 = 0.5
Sr,max = 316.0 mm Crack width, Wk = = 0.190 mm
< 0.3 mm OK
Total for Quasi-permanent (SL3)
Wall
Description above 9m below At heel
base slab top of wall slab At toe slab
Stress in steel, σs 169.1 161.0 148.1 117.2
As 7461.3 5366.9 6545.0 4612.9
Actual NA 405 329 351 304
hc,eff 262.5 218.8 281.3 281.3
ρp,eff 0.028 0.025 0.023 0.016
εsm-εcm 0.00061 0.00055 0.00047 0.00035
φeq 21.9 22.8 25.0 21.5
effective cover, c 75.0 75.0 75.0 75.0
Crack spacing Sr,max 386.1 412.8 437.6 477.7
Crack width, Wk 0.237 0.226 0.207 0.168
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.
-------------------------------------------------------------------------------------------------------------------------------
265 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
69.02 7.02
kN/m2 kN/m2
A 10.6 m B
8 7 6 5 4 3 2 1
1857.33 0.00
kN-m/m kN-m/m
10.6 m
E= = 32308 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.300 0.00225 0.00 0
2 1.514 1.514 0.457 0.00796 12.31 0.00005 0.00003
3 1.514 3.029 0.614 0.01932 66.31 0.00011 0.00027
4 1.514 4.543 0.771 0.03826 187.59 0.00015 0.00074
5 1.514 6.057 0.929 0.06672 401.74 0.00019 0.00136
6 1.514 7.571 1.086 0.10665 734.35 0.00021 0.00206
7 1.514 9.086 1.243 0.15999 1211.02 0.00023 0.00282
8 1.514 10.600 1.400 0.22867 1857.33 0.00025 0.00362
Total 0.01089 m
So, Total deflection = = 10.891 mm = L/ 973
25 dia
@ 150 c/c
16 dia @ 150 c/c
20 dia
@ 150 c/c
20 dia
@ 150 c/c
3000
1250
25 dia @ 150 c/c 25 dia @ 150 c/c
-------------------------------------------------------------------------------------------------------------------------------
266 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
267 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
15.0 Design Data for RCC cantilever Retaining wall - RW-01 Ht = 4.45 m
1.1 Geometric details
Max. Finished road level = 890.75 m
Minimum ground level = 888.30 m
Minimum Depth of Foundation as per cl. 205.2.1 of IRC: 78-2014 = 2.000 m
RL at founding level = 886.30 m
Width of foundation Width of toe = 1.000 m
Width of heel = 2.200 m
Thickness of Stem at base = 0.500 m
Thickness of Toe = 0.400 m
Total width of foundation = 3.700 m
Friction coefficient bet. soil and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.50
Friction coefficient bet. Rock and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.70
-------------------------------------------------------------------------------------------------------------------------------
268 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1.6 Sketch
12
890.750 m
13
300
2000 7
399
o
= 2.83
2450
8
1 888.300 m
2
11
2000
100 9 4 3 10
5
400 886.3 m
300 6
2200 500 1000
3700
Section of Retaining Wall
-------------------------------------------------------------------------------------------------------------------------------
269 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
15.2.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 12.79 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.05 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014. z S a
Where, Ah = Horizontal Seismic Coefficient 2 g
Ah =
R
z = zone factor = For Zone IV = 0.24 I
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
-------------------------------------------------------------------------------------------------------------------------------
270 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
271 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
1 1
2 1 1 1
3 1 1 1 1 1
4 1 1 1 0.2 0.2 1 0.33
Load combination at bottom of base slab for verification of equilibrium
Load Case Restoring Forces Overturning Forces
Vertical load Lateral Moment (kN- Vertical load Lateral force Moment
(kN) force (kN) m) (kN) (kN) (kN-m)
1 83.50 0.00 121.23 0.00 0.00 0.00
2 293.93 0.00 594.13 0.00 55.15 103.08
3 348.65 0.00 730.93 0.00 84.90 169.26
4 307.51 0.00 621.49 0.00 102.18 203.76
5 302.22 0.00 621.49 0.00 102.18 203.76
-------------------------------------------------------------------------------------------------------------------------------
272 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
273 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------
274 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
At top of
Type of loads 2m below At heel At toe slab At top of At heel At toe slab
base slab top of wall slab base slab slab
1 0.00 0.00 -13.16 -13.09 0.00 -13.16 -13.09
2 77.71 10.27 50.96 -29.19 77.71 50.96 -29.19
3 121.56 20.96 81.38 -39.71
Maximum 121.56 20.96 81.38 -39.71 77.71 50.96 -29.19
-------------------------------------------------------------------------------------------------------------------------------
275 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
0.01631 911 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 911 kN Total ultimate tensile force = 911 kN
Compressive force CG 30.06 mm Moment of resistance = 345 kNm
< 191 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 2m below top of wall
At heel slab At toe slab
Moment 191.42 32.53 132.01 59.19
D 500.00 398.77 400.00 400.00
b 1000.00 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00 75.00
d 419.00 323.8 315.0 317.0
R = Mu/bd2 1.09 0.31 1.33 0.59
pt 0.00260 0.00072 0.00321 0.00138
Ast required 1090.9 233.4 1009.7 437.9
16 dia + 0 dia + 20 dia + 16 dia +
Reinf provided 12 dia + 12 dia +
150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 2094.4 754.0 2094.4 1340.4
Actual NA 72 26 72 46
Strain in steel 0.0168 0.0401 0.0118 0.0205
Stress in steel 434.8 434.8 434.8 434.8
Total ultimate tensile force = 911 328 911 583
Total ultimate compressive force911 328 911 583
Difference of force 0 0 0 0
Compressive force CG 30.1 10.8 30.1 19.2
Moment of resistance 354 103 259 174
Factor of Safety 1.850 3.154 1.965 2.932
Check Safe Safe Safe Safe
-------------------------------------------------------------------------------------------------------------------------------
276 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
15.6.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 35 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Wall above base slab 2m below top of wall
At heel slab At toe slab
Prestress Force after all losses (kN)
0.0 0.0 0.0 0.0
Effective width in mm 1000 1000 1000 1000
Effective Depth (d) in mm 419 324 315 317
K 1.691 1.786 1.797 1.794
Stress due to Prestress ( 0 0 0 0
Shear Resistance minimum (V169.0 141.7 139.1 139.7
Ast provided 2094.4 754.0 2094.4 1340.4
Reinforcement ratio, ρ1 0.005 0.002 0.007 0.004
Shear resistance ( VRd,c) (kN) 203.1 128.8 178.3 154.3
Design Shear resistance ( V 203.1 141.7 178.3 154.3
101.01
Max.shear at 1d dist.from face (kN) 34.38 93.94 80.06
M tanδ/d 22.56 4.96 19.05 18.79
Effective shear 78.45 29.42 74.89 61.27
Factor of Safety 2.59 4.82 2.38 2.52
Check Safe Safe Safe Safe
Balanced neutral axis depth = = 139.92 mm Actual neutral axis depth = 122.00 mm
Strain in steel = 0.00079 Stress in steel = 157.6 MPa
Strain in concrete = 0.00033 Comp. stress of concrete = 5.41 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00033 5.41
330.04
122.00
NA NA
157.58
0.00079
Strain Diagram Stress Diagram
=
Total compressive force = 330.04 kN Total tensile force = 330.04 kN
Compressive force CG = 40.67 mm Moment of resistance = 121.56 kNm
-------------------------------------------------------------------------------------------------------------------------------
277 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 2094.4 754.0 2094.4 1340.4 2094.4 754.0 2094.4 1340.4
Stress in concrete 5.2 2.0 5.6 3.2 3.3 2.0 3.5 2.3
Actual NA 124 69 104 87 124 69 104 87
Stress in steel 153.7 92.4 138.7 102.9 98.2 92.4 86.8 75.6
Total ultimate tensile force = 322 70 290 138 206 70 182 101
Total ultimate compressive force322 70 290 138 206 70 182 101
Difference of force 0 0 0 0 0 0 0 0
Compressive force CG 41.2 23.0 34.8 29.1 41.2 23.0 34.8 29.1
Moment of resistance 122 21 81 40 78 21 51 29
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Maximum compressive stress of concrete= 5.6 Mpa < 16.8 Mpa Hence O.K.
Maximum tensile stress of steel= 153.7 Mpa < 400.0 Mpa Hence O.K.
15.6.2.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 98.22 Mpa αe =Es/Ecm = 12.381
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 227.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.009
fct,eff = = 1.94 Mpa εsm-εcm = 0.000295
>= 0.6σsc/Es= 0.000295
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 16.0 mm k2 = 0.5
Sr,max = 465.5 mm Crack width, Wk = = 0.137 mm
< 0.3 mm OK
Total for Quasi-permanent (SL3)
Wall
Description above 2m below At heel
base slab top of wall slab At toe slab
Stress in steel, σs 98.2 92.4 86.8 75.6
As 2094.4 754.0 2094.4 1340.4
Actual NA 124 69 104 87
hc,eff 202.5 187.5 227.5 227.5
ρp,eff 0.010 0.004 0.009 0.006
εsm-εcm 0.00029 0.00028 0.00026 0.00023
φeq 14.3 12.0 20.0 16.0
effective cover, c 75.0 0.0 75.0 75.0
Crack spacing Sr,max 489.8 507.3 624.3 716.6
Crack width, Wk 0.144 0.141 0.163 0.163
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.
-------------------------------------------------------------------------------------------------------------------------------
278 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------
29.24 6.68
kN/m2 kN/m2
A 4.1 m B
8 7 6 5 4 3 2 1
132.53 0.00
kN-m/m kN-m/m
4.05 m
E= = 32308 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.300 0.00225 0.00 0
2 0.579 0.579 0.329 0.00296 1.35 0.00001 0.00000
3 0.579 1.157 0.357 0.00380 6.29 0.00005 0.00002
4 0.579 1.736 0.386 0.00478 16.19 0.00010 0.00007
5 0.579 2.314 0.414 0.00593 32.40 0.00017 0.00016
6 0.579 2.893 0.443 0.00724 56.29 0.00024 0.00031
7 0.579 3.471 0.471 0.00873 89.21 0.00032 0.00051
8 0.579 4.050 0.500 0.01042 132.53 0.00039 0.00077
Total 0.00184 m
So, Total deflection = = 1.837 mm = L/ 2204
16 dia
@ 150 c/c
12 dia @ 150 c/c
12 dia
@ 150 c/c
-------------------------------------------------------------------------------------------------------------------------------
279 of 279