Ramban Banihal Project HCC MNB-03 - 30m Integral bridge

---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design Basis

-------------------------------------------------------------------------------------------------------------------------------
1 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

1.0 Detailed design of 1x30.0m c/c span integral bridge at ch. 153+347 km for Northern
Carriageway of Ramban- Banihal section of NH-1A
1.1 Basis
Basic design criteria have been prepared with a view to satisfy all the relevant technical
requirements specified in the contract.

1.2 Structure Description


The Bridge consists of single span simply supported PSC superstructure of span 30.0m c/c
integrated with both sides RCC abutments.

1.3 Material :
a) Grades of concrete are as follows:
i) Foundation :M40
ii) Substructure :M40
iii) Superstructure :M40
iv) crash barrier :M40
v) Retaining wall :M35
b) Grade of Reinforcement :Fe-500
c) Prestressing steel :12.7mm dia low relaxation strand of
UTS 1862 Mpa confirming to IS:14268

1.4 LOADS :
a) Unit Weight of Materials :
i) Unit weight of PSC super structure = 25.0 KN/m3
ii) Unit weight of RCC substructure & foundation = 25.0 KN/m3
iii) Unit weight of Structural steel = 78.5 KN/m3
iv) Unit weight of Wearing course = 22.0 KN/m3
v) Unit weight of Earth = 19.0 KN/m3

b) Dead Load (DL) :


Self weight of PSC I-girder, RCC deck, abutment & foundation have been considered for analysis &
design of PSC girder & abutment of the proposed integral bridge.

c)Super Imposed Dead Load (SIDL) : p = p' _ (40L ~ 300)


Weight of wearing course, crash barriers have been calculated separately.

d) Live Load (LL) :


As per IRC : 6 :2014, Live loads on two lane carriageway superstructure are as follows:
i) Single lane of 70R tracked
or ii) Single lane of 70R wheeled
or iii)Two lane class-A , whichever governs

e) Footpath Live Load (FLL) :


As per Cl. no. 206.3 of IRC : 6 :2014, Live loads on two lane carriageway superstructure are as follows:
P = P' - (40L-300)/9

f) Impact (IL)
Impact factor of live load has been calculated as per IRC: 6-2014
Impact Factor for class-A = 4.5/(6+L)

g) Braking Force (BF)


Braking has been calculated as per IRC: 6-2014
Braking force = 0.20 x First vehicle + 0.1 x Succeeding Vehicles for Two lane Carriageway
+ 0.05 x Vehicles on each excess lane Carriageway

h) Centrifugal Force (CF)


The centrifugal forces shall be determined from the following equation:
C = WV2/(127R) C = Centrifugal force acting normal to the traffic.
W= Live Load V = Design Speed (km/hr) R = Radius of Curvature (meters)

i) Snow load
Snow load shall be calculated as per clause no. 221 of IRC:6-2014.
a) 0.25m ht of snow load to be added over 70R wheeled loading
b) 0.5m ht of snow load to be added over 70R tracked loading

j) Force due to Support Settlement (SS)


For simply support span, forces due to differential settlement of supports need not be considered.

k) Temperature Load (TL)


For simply support span, force due to temperature rise & fall need not be considered.

l) Temperature Gradient (TG)


Stress due to temperature gradient along depth of superstructure shall be calculated as per IRC: 6-2014.
-------------------------------------------------------------------------------------------------------------------------------
2 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

m) Creep & Shrinkage (CS)


Strain due to creep & shrinkage shall be taken as per IRC: 112-2011.

n) Seismic Load (EQ)


Earthquake Loads has been calculated as per IS:1893 and IRC: 6-2014. Project is located in earthquake
zone IV. Horizontal seismic forces has been computed as per clause no. 219.2 of IRC : 6-2014 for zone IV .
z = zone factor = For Zone IV = 0.24 I = Importance factor = 1.20
R = Response Reduction factor = 2.00 For integral bridge with ductile detailing Sa/g = = 2.50

o) Wind Load (WL)


Wind Loads shall be calculated as per clause 209 of IRC: 6-2014.

p) Earth Pressure (EP) :


Value of φ for backfill = 30 deg
Value of δ of backfill = 20 deg
Active earth pressure Co-efficient shall be calculated as per Coulomb’s formula.
q) Water current force (Fwc)
Water current force as per clause no. 210 of IRC:6-2014 based on design hydrology shall not be applicable
for the above bridge as the proposed integral bridge is away from the stream.

r) Buoyancy (Gb)
Buoyancy as per clause no. 213 of IRC:6-2014 for water at HFL shall not be applicable for the above bridge
as the proposed integral bridge is away from the stream.

s) Secondary effect of Prestress (Gb)


Buoyancy as per clause no. 213 of IRC:6-2014 for water at HFL shall not be applicable for the above bridge
as the proposed integral bridge is away from the stream.

t) Load Combination (LC)


As per Annex B of IRC:6-2014, the following load combination shall be considered for design
Load Combination - Ultimate limit state
1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+Live load(leading) + Temp load(accompany)
6) Dead load +SIDL+Live load(accompany) + Temp load(lead)
7) Dead load +SIDL+Live load(accompany) +seismic load(leading)

-------------------------------------------------------------------------------------------------------------------------------
3 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

DL, Support Secondary


Load Temp Long. Transverse Vertical Creep &
settle, snow SIDL(DL) SIDL(WC) Earth pr. Live load Wind load effect of
Case load Seismic Seismic Seismic Shrinkage
load Prestress
1 1.35 1.35 1.75 1.35 1.5 1.35 1.35
2 (a) 1.35 1.35 1.75 1.35 1.5 1.35 1.35
2 (b) 1 1 1 1 1.5 1 1
3 (a) 1.35 1.35 1.75 1.35 1.5 0.9 1.35 1.35
3 (b) 1 1 1 1 1.5 0.9 1 1
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5 1.35 1.35
4 (b) 1 1 1 1 1.15 1.5 1 1
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9 1.35 1.35
5 (b) 1 1 1 1 1.5 0.9 1 1
6 (a) 1.35 1.35 1.75 1.35 1.15 1.5 1.35 1.35
6 (b) 1 1 1 1 1.15 1.5 1 1
7 (a) 1.35 1.35 1.75 1.35 0.2 1.5 0.45 0.45 1.35 1.35
7 (b) 1.35 1.35 1.75 1.35 0.2 0.45 1.5 0.45 1.35 1.35
7 (c) 1.35 1.35 1.75 1.35 0.2 0.45 0.45 1.5 1.35 1.35
7 (d) 1 1 1 1 0.2 1.5 0.45 0.45 1 1
7 (e) 1 1 1 1 0.2 0.45 1.5 0.45 1 1
7 (f) 1 1 1 1 0.2 0.45 0.45 1.5 1 1

Load Combination for Rare Combination (SL1)


1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
DL, Support Secondary
Creep &
Load Case settle, snow SIDL(DL) SIDL(WC) Earth pr. Prestress Live load Wind load Temperature effect of
Shrinkage
load Prestress
1(a) 1 1 1.2 1 1.1 or 0.9 1 1
1(b) 1 1 1 1 1.1 or 0.9 1 1
2 (a) 1 1 1.2 1 1.1 or 0.9 1 1 1
2 (b) 1 1 1 1 1.1 or 0.9 1 1 1
3 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
3 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
4 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
4 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
5 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
5 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
6 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
6 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1

Load Combination for frequent Combination (SL2) - for prestressing member


1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
DL, Support Secondary
Creep &
Load Case settle, snow SIDL(DL) SIDL(WC) Earth pr. Prestress Live load Wind load Temperature effect of
Shrinkage
load Prestress
1(a) 1 1 1.2 1 1.1 or 0.9 1 1
1(b) 1 1 1 1 1.1 or 0.9 1 1
2 (a) 1 1 1.2 1 1.1 or 0.9 0.6 1 1
2 (b) 1 1 1 1 1.1 or 0.9 0.6 1 1
3 (a) 1 1 1.2 1 1.1 or 0.9 0.75 0.5 1 1
3 (b) 1 1 1 1 1.1 or 0.9 0.75 0.5 1 1
4 (a) 1 1 1.2 1 1.1 or 0.9 0.2 0.6 1 1
4 (b) 1 1 1 1 1.1 or 0.9 0.2 0.6 1 1
5 (a) 1 1 1.2 1 1.1 or 0.9 0.75 0.5 1 1
5 (b) 1 1 1 1 1.1 or 0.9 0.75 0.5 1 1
6 (a) 1 1 1.2 1 1.1 or 0.9 0.2 0.6 1 1
6 (b) 1 1 1 1 1.1 or 0.9 0.2 0.6 1 1

-------------------------------------------------------------------------------------------------------------------------------
4 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Load Combination for Quasi-permanent (SL3) - for RCC structure


1) Dead load +SIDL
2) Dead load +SIDL+Temperature(lead)
Secondary
DL, Support Temperatu Creep &
Load Case SIDL(WC) Earth pr. Earth pr. Live load Wind load effect of
settle re Shrinkage
Prestress
1 1 1.2 1 1 1 1
2 (a) 1 1.2 1 1 0.5 1 1
2 (b) 1 1 1 1 0.5 1 1

1.5 Arrangement
PSC superstructure of span 30.0m c/c over RCC abutments on RCC open foundation have been proposed.
For two lane bridge with footpath, total width of carriageway is 9.0m and total width of deck slab
(incl. two nos. crash barrier & one railing) is 12.0m. 4nos. PSC girders are integrated with abutment.

1.6 Analysis
The longitudinal & transverse analysis of integral bridge has been done by Staad pro for Seismic load, DL,
SIDL, live load, secondary effect of prestress, support settlement, temperature earth pressure creep &
shrinkage etc.
Dead load analyses, prestressing forces & loss and stress calculation have been done by excel spreadsheet
prepared in-house. Design of abutment & its foundations have been done by excel spreadsheet.
1.7 Construction Methodology
Foundation
Before casting of RCC open foundation for abutment A1 & A2, foundation trench shall be excavated with
proper shoring to avoid collapse or slip circle failure. Open foundation with sliding key shall be placed on firm
rock bed. If any unsuitable material on foundation level or any loose pockets are observed on foundation
level, the same shall be removed /replaced by the PCC M15. RCC cast-in-situ foundation for both abutments
shall be laid over 100thk PCC M15 levelling course.

Substructure
RCC cast-in-situ abutment shall be cast over open foundation. The precast PSC 4nos. girders shall be placed
on PCC levelled plinth over abutment wall. Backfilling behind abutment shall be done after complete integration
of substructure & superstructure.

Superstructure
Stage-1 :- All 4 nos. Precast girders shall be cast over abutment with proper staging or casting yard.
Stage-2 :- After 5 days casting of Girder, first stage cables shall be stressed as per given force & elongation.
Stage-3 :- Second stage cables shall be stressed after 28 days of casting of precast girder.
Stage-4 :- All Precast girders shall be placed/erected on PCC levelled plinth over abutment wall.
Stage-5 :- Deck slab & X-Girder shall be monolithically cast after erecting necessary shuttering from precast
girder at 60 days except at top of abutment portion.
Stage-6 :- After 30 days casting of Deck Slab i.e. after 90 days casting of Precast Girder, top of abutment
cap shall be cast for jointing of superstructure & substructure after removing of all shuttering.
Stage-7 :- After 28/30 days jointing of superstructure & substructure i.e. after 120 days casting of
Precast Girder, SIDL shall be laid.

1.8 Reference codes & books


1) IRC: 5-1998
2) IRC: 6-2014
3) IRC: 22-2008
4) IRC: 78-2014
5) IRC: 112-2012

-------------------------------------------------------------------------------------------------------------------------------
5 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design Data

-------------------------------------------------------------------------------------------------------------------------------
6 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

2.0 Design Data for Simply Supported Prestressed I-Girder of span 30.0m - Curved span
2.1 Geometric details
C/C distance of abutments = 30.00 m Effective girder span = 28.50 m
Deck slab overhang over pier = 0.75 m Girder overhang at either end = 0.25 m
Note - Overhangs are measured from the centreline of bearing. Angle for span, θ = 0.27 radian
Average Radius of curvature R = 110.00 m Design velocity of vehicle = 60 kmph

2.2 Cross-sectional details of superstructure


Width of carriage way = 9.00 m Width of crash barrier = 0.50 m
Width of footpath = 1.50 m Nos. of footpath =1 Nos.
Width of railing = 0.50 m Average Deck Width 12.550 m
Depth of Precast Girder = 1.775 m Thickness of deck slab = 0.225 m
Overall depth of girder = 2.000 m Thickness of wearing coat 0.065 m
Number of PSC longitudinal girder = 4 Nos. Spacing of longitudinal girder = 3.00 m
Width of deck at A1 = 13.1 m Width of deck at A2 = 12.0 m

Actual length of girder, LG4 = 30.356 m Actual length of girder, LG3 = 29.711 m
Actual length of girder, LG2 = 29.049 m Actual length of girder, LG1 = 28.414 m

2.3 Cross sectional details of girders


Top width of precast girder = 1.25 m Width of web of PSC girder(support) = 0.75 m
Thickness of End cross girder = 2.00 m Width of web of PSC girder(san) = 0.30 m
Thickness of Inner cross girder = 0.30 m

2.4 Details of substructure & foundation


Height of abutment at A1 = 19.000 m Height of abutment at A2 = 20.000 m
Length of ]wall A1 = 13.1 m Length of ]wall A2 = 12.0 m
Thickness of abutment wall = 2.000 m Thickness of abutment wall = 2.000 m
Width of Foundation A1 = 10.000 m Width of Foundation A2 = 10.000 m
Depth of Foundation at abutment = 2.400 m Depth of Foundation at abutment = 2.400 m
Depth of Foundation at edge = 1.250 m Depth of Foundation at edge = 1.250 m

2.5 Material details


2.5.1 Concrete details [ IRC:112-2011 ]
Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
Modulus of elasticity Ecm = 33346 MPa Mean tensile strength fctm = 3.03 MPa
Lower fractile tensile fctm = 2.12 MPa Upper fractile tensile fctm95 = 3.94 MPa
Material safety factor γm = 1.50 Design concrete strength fcd = 17.87 MPa
Unit weight of concrete = 25.00 kN/m3 Coeff of thermal expansion = 12 E-06 /0C
Permissible Compressive stress at rare combination of loads = 19.20 MPa
Permissible Compressive stress at frequent combination of loads = 14.40 MPa
Permissible tensile stress = 1.41 MPa Modular ratio m = E p /E c

2.5.2 Reinforcing details [ IRC:112-2011 ]


Grade of reinforcement Fe 500 Modulus of elasticity = 200000 MPa
Material safety factor gs = 1.15 Design yield strength fyd = 434.78 MPa
Design yield strain eyd = 0.0022 Permissible working stress = 240.00 MPa
Density of Steel = 78.50 kN/m3

2.5.3 Prestressing strand details [ IRC:112-2011 & IS:14268-1995 ]


Type of prestressing strand Low Relaxation Ultimate tensile strength fpk = 1860.00 MPa
Modulus of elasticity = 195.00 Gpa 0.1% proof stress (0.87 UTS) = 1617.39 MPa
Design yield strength fpd = 1406.43 MPa Design yield strain epd = 0.0072
Applied jack pressure = 1455.65 MPa Expected slip at girder end = 6.00 mm
Type of sheathing material Corrugated HDPE Area of single strand of 12.7mm = 98.80 mm2
Coefficient of friction (m) = 0.17 per radian Wobble coefficient (k) = 0.0020 per metre
Typical cable identification 19T/13 Duct dia including sheathing = 85.00 mm
Width of anchorage plate = 220.00 mm Depth of anchorage plate = 250.00 mm
Minimum clear cover = 75.00 mm Clear distance between cables = 85.00 mm
Effective cover for cables = 117.50 mm Effective cover for anchorage = 210.00 mm
Eff dist between cables = 170.00 mm Eff dist between anchorages = 290.00 mm
Cross Sectional area of Tendon ( area of each stand = 98.80mm2) = 1877 mm2
Braking load (Breaking load each strand = 183.7 kN) = 3490 kN
Applied Force (90% of 0.1% proof load = =0.9*0.87*183.7) = 2733 kN

2.6 Sequence of construction


Foundation & shear key of both foundation shall be cast after excavation of trench & proper protection of
foundation trench to avoid any collapse. Afterthat, the abutment walls shall be cast upto bottom of girder.
Precast Psc Girders shall be cast & stressed over abutment wall. RCC deck, cross girder & abutment caps shall
be cast over PSC girders to integrate the superstructure with abutment. Backfilling shall be done after setting
of deck.
-------------------------------------------------------------------------------------------------------------------------------
7 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Casting of Precast girders = 0 days


Prestressing First stage = 5 days
Second stage = 28 days
Erection of girder = 50 days
Casting of deck slab, cross girder = 60 days
Casting of abutment caps = 90 days
Removal of Shuttering, Laying of wearing course and crash barrier = 120 days
After 5 days casting of Precast Girder, first stage Cables shall be stressed as per given force & elongation.
Second stage Cables shall be stressed after 28 days of casting of precast girder. After that all Precast
Girders shall be erected over abutment and Deck slab & X-Girder shall be cast erecting necessary
shuttering from precast girder at 60 days. After 30 days casting of Deck Slab i.e. after 90 days casting
of Precast Girder, all shuttering material shall be removed and abutment cap shall be cast and SIDL shall be laid.
at 120 days.
2.7 Sketch

Elevation

Plan at Deck level

-------------------------------------------------------------------------------------------------------------------------------
8 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

12.550
0.5 1.500 0.50 9.000 0.50

65 thk w/c

0.225 1.250
0.2
0.1

1.775 LG1 LG2 1.025 LG3 LG4

0.2
0.75 0.25
1.050 3.000 3.000 3.000 2.350 to 1.5
to 2.3 Section X-X

Center of Symmetry
0.225
0.2
0.10 0.30
1.75 1.75
2.00 1.775 1.525
0.20
0.25
0.75 28.50
30.00
0.250
Section Y-Y
X

2.300 Footpath 1.050


Y Y
Girder-LG1 Longitudinal girder

3.00

13.100 Girder-LG2
3.00

Girder-LG3
3.00
Cross Girder

Girder-LG4
1.50 2.350

X
0.750 28.50
30.00
Plan

-------------------------------------------------------------------------------------------------------------------------------
9 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Sectional Properties of Girder

-------------------------------------------------------------------------------------------------------------------------------
10 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

2.8 Sectional properties of Girder


2.8.1 Sectional properties of Precast Longitudinal Girder : At Mid Span
(Precast Girder only)
1.250

0.2 1 1
0.1 2 2
0.475

D= 1.775 3

0.2 4 4
0.25 5 5
0.225 0.3
0.75

Flexural Stiffness about major axis:


CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Bottom (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.475 0.200 2 0.1900 1.675 0.31825 0.53307 0.000633 0.53370
2 0.475 0.100 2 0.0475 1.542 0.07323 0.11289 0.000026 0.11292
3 0.300 1.775 1 0.5325 0.888 0.47259 0.41943 0.139809 0.55924
4 0.225 0.200 2 0.0450 0.317 0.01425 0.00451 0.000100 0.00461
5 0.225 0.250 2 0.1125 0.125 0.01406 0.00176 0.000586 0.00234
Total A = 0.9275 Total Axd'i = 0.89239 Total ICG(i)+ A ( d'i )2 = 1.21282
Total A = 0.928 m2
Total CG from bottom CG = =A/Axd'i = m
0.962
Total Moment of Inertia about CG =ICG(i) + A ( d'i )2 -Ax CG^2 = m4
0.354
Z Top =I/(D-CG) = 0.436
m3
ZBottom =I/CG = 0.368
m3
Perimeter in contact with air u = = 6.523 m

2.8.2 Sectional properties of Precast Longitudinal Girder : At Support


(Precast Girder only)
1.250

0.2 1 1
0.053 2 2
0.25

D= 1.775 3

0.75

Flexural Stiffness about major axis:


CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Bottom (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.2500 0.200 2 0.1000 1.675 0.16750 0.28056 0.000333 0.28090
2 0.2500 0.053 2 0.0132 1.557 0.02049 0.03192 0.000002 0.03192
3 0.750 1.775 1 1.3313 0.888 1.18148 1.04857 0.349522 1.39809
Total A = 1.4444 Total Axd'i = 1.36948 Total ICG(i)+ A ( d'i )2 = 1.71090
Total A = 1.444 m2
Total CG from bottom CG = =A/Axd'i = 0.948 m
Total Moment of Inertia about CG =ICG(i) + A ( d'i )2 -Ax CG^2 = 0.412 m4
Z Top =I/(D-CG) = 0.499 m3
ZBottom =I/CG = 0.435 m3

-------------------------------------------------------------------------------------------------------------------------------
11 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Calculation of Sectional properties of main girder & cross girder for STAAD Analysis
2.8.3 Sectional properties of Composite Precast Girder & Deck Slab : At Mid Span
As per cl. No. 7.6.1.2 of IRC 112-2011, the width of compression flange of beams with solid webs
beff = ∑ beff,i +bw for T-Beam beff,i = 0.2bi+0.1l0
bw = Width of web = 0.3 m lo = effetive span = 28.50 m
bi = Spacing of girder = 3 m
be = 3.000 m for T-Beam 3.000 m for L-Beam
3.000
1.25
Y
1 0.225
0.2 2 2
0.1 3 3
0.475

D= 1.775 Z 4 Z

0.2 5 5
0.25 6 6
0.225 0.3
0.75
Y
Flexural Stiffness about major axis X-X:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I xx(i) Ixx(i)+A(d'i)2
Bottom (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 3.000 0.225 1 0.6750 1.888 1.27406 2.40479 0.002848 2.40764
2 0.475 0.200 2 0.1900 1.675 0.31825 0.53307 0.000633 0.53370
3 0.475 0.100 2 0.0475 1.542 0.07323 0.11289 0.000026 0.11292
4 0.300 1.775 1 0.5325 0.888 0.47259 0.41943 0.139809 0.55924
5 0.225 0.200 2 0.0450 0.317 0.01425 0.00451 0.000100 0.00461
6 0.225 0.250 2 0.1125 0.125 0.01406 0.00176 0.000586 0.00234
Total A = 1.6025 Total Axd'i = 2.1664 Total ICG(i)+ A ( d'i )2 = 3.6205
Total A = 1.603 m2
Total CG from bottom CG = =A/Axd'i = 1.352 m
Total Moment of Inertia about CG =ICG(i) + A ( d'i )2 -Ax CG^2 = 0.692 m4
3
Z Top of slab =I/(D+d-CG) = 1.067 m
3
Z bot of slab = 1.635 m
Zbottom of beam =I/CG = 0.512 m3
Perimeter in contact with air u = = 10.473 m
Flexural Stiffness about major axis Y-Y:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Centre (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.225 3.000 1 0.6750 0.000 0.00000 0.00000 0.506250 0.50625
2 0.200 0.475 2 0.1900 0.388 0.00000 0.02853 0.003572 0.03210
3 0.100 0.475 2 0.0475 0.308 0.00000 0.00452 0.000595 0.00511
4 1.775 0.300 1 0.5325 0.000 0.00000 0.00000 0.003994 0.00399
5 0.200 0.225 2 0.0450 0.225 0.00000 0.00228 0.000127 0.00240
6 0.250 0.225 2 0.1125 0.263 0.00000 0.00775 0.000475 0.00823
Total Area = 1.6025 Total Axd'i = 0.00000 Total I = 0.55809
Total Moment of Inertia about CG = 0.558 m4
Torsional Stiffness : 3.000
Id. No. d b d/b k J0 = kb3d 1 0.225
(m) (m) (m4) 1.0917 2 0.300
1 3.0000 0.2250 13.333 0.333 0.01138
2 1.0917 0.3000 3.639 0.275 0.00809
3 1.025
3 1.0250 0.3000 3.417 0.271 0.00749 0.3
4 0.6500 0.4500 1.444 0.190 0.01128
Total torsional stiffness 0.03824 4 0.450
0.6500

-------------------------------------------------------------------------------------------------------------------------------
12 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

2.8.4 Sectional properties of Composite Precast Girder & Deck Slab : At Support
3.000
1.25
Y
1 0.225
0.2 2 2
0.053 3 3
0.25

D= 1.775 X 4 X

0.75
Y
Flexural Stiffness about major axis X-X:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Bottom (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 3.0000 0.225 1 0.6750 1.8875 1.27406 2.40479 0.002848 2.40764
2 0.2500 0.200 2 0.1000 1.675 0.16750 0.28056 0.000333 0.28090
3 0.2500 0.053 2 0.0132 1.557 0.02049 0.03192 0.000002 0.03192
4 0.750 1.775 1 1.3313 0.888 1.18148 1.04857 0.349522 1.39809
Total A = 2.1194 Total Axd'i = 2.6435 Total ICG(i)+ A ( d'i )2 = 4.1185
Total A = 2.119 m2
Total CG from bottom CG = =A/Axd'i = 1.247 m
Total Moment of Inertia about CG =ICG(i) + A ( d'i )2 -Ax CG^2 = 0.821 m4
Z Top of slab =I/(D+d-CG) = 1.091 m3
Z Top of girder 1.556 m3
Zbottom of girder =I/CG = 0.658 m3
Flexural Stiffness about major axis Y-Y:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Centre (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.225 3.000 1 0.6750 0.000 0.00000 0.00000 0.506250 0.50625
2 0.200 0.250 2 0.1000 0.500 0.00000 0.02500 0.000521 0.02552
3 0.053 0.250 2 0.0132 0.833 0.00000 0.00914 0.000046 0.00918
4 1.775 0.750 1 1.3313 0.000 0.00000 0.00000 0.062402 0.06240
Total Area = 2.1194 Total Axd'i = 0.00000 Total I = 0.60336
Total Moment of Inertia about CG = 0.603 m4
Torsional Stiffness : 3.000
Id. No. d b d/b k J0 = kb3d 1 0.225
(m) (m) (m4) 1.1979 2 0.253
1 3.0000 0.2250 13.333 0.333 0.01138
2 1.1979 0.2526 4.742 0.288 0.00557 3
1.522
3 1.5224 0.7500 2.030 0.230 0.14792 0.75
Total torsional stiffness 0.16487

2.8.5.
2.8.5 Sectional properties of Composite Precast Girder & Deck Slab : At flared Portion
3.000
1.25
Y
1 0.225
0.2 2 2
0.076 3 3
0.3625

D= 1.775 X 4 X

0.100 5 5
0.25 6 6
0.1125 0.525
0.75
Y

-------------------------------------------------------------------------------------------------------------------------------
13 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Flexural Stiffness about major axis X-X:


CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Bottom (d'i)
2 3 4 4
(m) (m) (Nos.) (m ) (m) (m ) (m ) (m ) (m4)
1 3.000 0.225 1 0.6750 1.888 1.27406 2.40479 0.002848 2.40764
2 0.363 0.200 2 0.1450 1.675 0.24288 0.40682 0.000483 0.40730
3 0.363 0.076 2 0.0277 1.550 0.04287 0.06643 0.000009 0.06644
4 0.525 1.775 1 0.9319 0.888 0.82704 0.73400 0.244666 0.97866
5 0.113 0.100 2 0.0113 0.283 0.00319 0.00090 0.000006 0.00091
6 0.113 0.250 2 0.0563 0.125 0.00703 0.00088 0.000293 0.00117
Total Area = 1.8470 Total Axd'i = 2.39706 Total I = 3.86212
Total CG from bottom = 1.2978 m
Total Moment of Inertia about CG = 0.7512 m4
Flexural Stiffness about major axis Y-Y:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Centre (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.225 3.000 1 0.6750 0.000 0.00000 0.00000 0.506250 0.50625
2 0.200 0.363 2 0.1450 0.444 0.00000 0.02855 0.001588 0.03014
3 0.076 0.363 2 0.0277 0.383 0.00000 0.00407 0.000202 0.00427
4 1.775 0.525 1 0.9319 0.000 0.00000 0.00000 0.021404 0.02140
5 0.100 0.113 2 0.0113 0.300 0.00000 0.00101 0.000008 0.00102
6 0.250 0.113 2 0.0563 0.319 0.00000 0.00572 0.000059 0.00577
Total Area = 1.8470 Total Axd'i = 0.00000 Total I = 0.56886
Total Moment of Inertia about CG = 0.569 m4
Torsional Stiffness : 3.000
Id. No. d b d/b k J0 = kb3d 1 0.225
(m) (m) (m4) 1.1499 2 0.276
1 3.0000 0.2250 13.333 0.333 0.01138
2 1.1499 0.2763 4.161 0.283 0.00686
3 1.149
3 1.1487 0.5250 2.188 0.237 0.03944 0.525
4 0.7179 0.3500 2.051 0.231 0.00712
Total torsional stiffness 0.06479 4 0.350
0.7179

2.8.6.
2.8.6 Sectional Properties of intermeaiate Cross Girder Member
3.563
1 0.225

2 1.525
0.30

Flexural Stiffness about major axis X-X:


CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Bottom (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 3.5625 0.225 1 0.8016 1.638 1.31256 2.14931 0.003382 2.15270
2 0.3000 1.525 1 0.4575 0.763 0.34884 0.26599 0.088664 0.35466
Total Area = 1.2591 Total Axd'i = 1.66140 Total I = 2.50735
Total CG from bottom = 1.3196 m
Total Moment of Inertia about CG = 0.3150 m4
Flexural Stiffness about major axis Y-Y:
CG from
Id. No. bi di N A A x d'i A x ( d'i )2 I CG(i) ICG(i)+A(d'i)2
Centre (d'i)
(m) (m) (Nos.) (m2) (m) (m3) (m4) (m4) (m4)
1 0.225 3.563 1 0.8016 0.000 0.00000 0.00000 0.847746 0.84775
2 1.525 0.300 1 0.4575 0.000 0.00000 0.00000 0.003431 0.00343
Total Area = 1.2591 Total Axd'i = 0.00000 Total I = 0.85118
Total Moment of Inertia about CG = 0.85118 m4
Torsional Stiffness :
Id. No. d b d/b k J0 = kb3d
(m) (m) (m4)
1 3.5625 0.2250 15.833 0.333 0.01351
2 1.5250 0.3000 5.083 0.293 0.01205
Total torsional stiffness 0.02557

-------------------------------------------------------------------------------------------------------------------------------
14 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

2.8.7 Summary of sectional properties of Girders

Composite Girder Longitudinal girder Central


Desription Unit At span At support At Flared Cross Girder
Cross-sectional area m2 1.6025 2.1194 1.8470 1.2591
Moment of inertia about major axis X-X m4 0.6916 0.8213 0.7512 0.3150
Moment of inertia about major axis Y-Y m4 0.5581 0.6034 0.5689 0.8512
Torsional stiffness m4 0.0382 0.1649 0.0648 0.0256
Torsional Moment of Inertia J0 = 3xb3xd3/{10x(b2+d2)}
(if b>5d<10d) 3/{10x(1+(b/d)2)}
Where, k = b = Shoter Side d = Longer Side
3
J0 = kb d
According to Timoshenko and Goodier"s Table k=
d/b k d/b k
1.00 0.141 3.00 0.263
1.20 0.166 4.00 0.281
1.50 0.196 5.00 0.291
2.00 0.229 10.00 0.312
2.25 0.240 >10.00 0.333
2.50 0.249

-------------------------------------------------------------------------------------------------------------------------------
15 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Load Calculation

-------------------------------------------------------------------------------------------------------------------------------
16 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.0 Load Calculation other than dead load


3.1 SIDL - Crash Barrier - per m 150 50 200
Unit weight of concrete = 25.00 kN/m3 50
Load 2 Weight Lever Moment g mm
Sl No Area(m ) 200
Calculation (KN) arm(m) (KN-m)
a 0.45x0.165 0.074 1.856 0.225 0.418
b 1/2x(0.5+0.25)x0.05 0.019 0.469 0.033 0.016 500 f
c (0.5+0.25)x0.2 0.150 3.750 0.150 0.563 c
d 0.25x0.05 0.013 0.313 0.275 0.086 d
e 1/2x0.25x0.15 0.019 0.469 0.350 0.164 250 b
f 1/2x0.5x0.05 0.013 0.313 0.267 0.083 e 450
g 0.100 0.150 0.015 mm
Total 0.287 7.269 1.344 165 a
Total load of crash barrier = 7.269 kN/m
Say, = 7.5 kN/m 450
Lever arm = 0.185 m from outer face 0.235 m
Avg. Dist. from LG1 = 1.761 m 1.526 m at support Moment= 11.44 kN-m at support
2.122 m 1.887 m at span Moment= 14.15 kN-m at span

Avg. Dist. from LG4 = 1.585 m 0.650 m at support Moment= 4.88 kN-m at support
1.155 m 1.080 m at span Moment= 8.10 kN-m at span

Weight of Railing - per m


Dead Load of 3 nos.railing at each side = 0.175x0.2x3x25 = 2.625 kN/m
kerb = 0.25x0.5x25 = 3.125 kN/m
Dead Load of post = 0.25x0.25x1.15x25/1.5 = 1.198 kN/m
Total 6.948 kN/m
Say, = 7.0 kN/m
Avg. Dist. from LG4 = 1.585 m -1.335 m at support Moment = -9.34 kN-m at support
1.155 m -0.905 m at span Moment = -6.34 kN-m at span

Dead load of Footpath - per m


Thickness of footpath finish = 100 mm Unit weight = 22 kN/m3
Dead Load of footpath at each side = 1.5x20/1000x22 = 3.3 kN/m
Avg. Dist. from LG4 = 1.585 m -0.335 m at support Moment = -1.10 kN-m at support
1.155 m 0.095 m at span Moment = 0.31 kN-m at span

Weight of wearing course- per m


Unit weight of wearing course = 22 kN/m3
Thickness of wearing course including overlay = 0.1 m

Outer girder LG1, support 1.761 m Width = 2.761 m =2.761x0.1x22 = 6.07 kN/m
CG from girder = -0.120 m Moment = -= 0.73 kN-m
Outer girder LG1, support 2.122 m Width = 3.122 m =3.122x0.1x22 = 6.87 kN/m
CG from girder = 0.061 m Moment = = 0.42 kN-m
Inner girder LG2 = 3.0 m = 6.600 kN/m 0 m
Inner girder LG3 = 3.0 m = 6.600 kN/m 0 m
Outer girder LG4 = 2.500 m = 5.500 kN/m 0.25 m
Outer girder LG4, support 1.585 m Width = 0.585 m =0.585x0.1x22 = 1.29 kN/m
CG from girder = 1.208 m Moment = = 1.55 kN-m
Outer girder LG4, support 1.155 m Width = 0.155 m =0.155x0.1x22 = 0.34 kN/m
CG from girder = 1.423 m Moment = = 0.49 kN-m

3.2 Wind Loads on Structure


Wind Load as per Clause 209 of IRC:6-2014
As per clause 209.3.7 the bridges shall not be considered to be carrying any live load
when the wind speed at deck level exceeds 36m/s.
Vb = design wind speed at any height = 50 m/s
Tranverse wind Force FT = PZxA1xGxCD
Longitudinal wind Force FL = 25% of FT
Vertical wind Force FV = PZxA3xGxCL
Span (c/c of exp gap) = 30.00 m
Overall width = 12.55 m
Depth of superstructure = 2.00 m
where, Pz = The design wind pressure at the location of the bridge.
A1 = Solid area as seen in elevation. =30x(2+0.065+1.05) = 93.450 sqm
A3 = Plan area of the Superstructure =30x12.55 = 376.500 sqm
Type of Superstructure : Single beam/Box girder
b/d ratio for the Superstructure : =12.55/2 = 6.3
CD = Drag coefficient for the Superstructure = 1.30

-------------------------------------------------------------------------------------------------------------------------------
17 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

(For slab bridge, CD =1.1, For Single beam/Box girder, CD =1.5 for b/d<=2.0, CD =1.3 for b/d>=6.0 and inbetween interpolated CD to be considered)
G = Gust Factor (If Span<=150, G=2, Otherwise Wind tunnel testing required) = 2.0
CL = Lift coefficient = 0.75

3.2.1 Wind load on Unloaded structure


a) Wind load on Superstructure
Vb = design wind speed at any height = 50 m/s
Bridge situated in : = Plain Terrain
As per note no. 5 of cl no. 209 of IRC :6-2014, wind pressure shall be increased by 20 %
Wind Speed & design wind pressure for Basic wind speed of 33Wind
m/s speed & design wind pr. for Basic wind speed of 50m/s
H Plain Terrain Terrain with Obstructions H Plain Terrain Terrain with Obstructions
2 2
(m) Vz (m/s) Pz (N/m ) Vz (m/s) Pz (N/m ) (m) Vz (m/s) Pz (N/m2) Vz (m/s) Pz (N/m2)
10 27.8 463.7 17.8 190.5 < 10 63.8 1064.5 40.9 437.3
15 29.2 512.5 19.6 230.5 15 67.0 1176.5 45.0 529.2
20 30.3 550.6 21 265.3 20 69.6 1264.0 48.2 609.0
30 31.4 590.2 22.8 312.2 30 72.1 1354.9 52.3 716.7
50 33.1 659.2 24.9 370.4 50 76.0 1513.3 57.2 850.3
60 33.6 676.3 25.6 392.9 60 77.1 1552.6 58.8 902.0
70 34.0 693.6 26.2 412.8 70 78.1 1592.3 60.1 947.7
80 34.4 711.2 26.9 433.3 80 79.0 1632.7 61.8 994.7
90 34.9 729.0 27.5 454.2 90 80.1 1673.6 63.1 1042.7
100 35.3 747.0 28.2 475.6 100 81.0 1714.9 64.7 1091.8
Average Height of superstructure = 20 m
Lower bound Height = 20 m Pz = = 1264.0 N/m2
Upper Bound Height = 30 m Pz = = 1354.9 N/m2
2
Pz = The design wind pressure at the bridge location for h= 20.000 m 1516.8 N/m
A1 = Solid area as seen in elevation. = 93.5 sqm
A3 = Plan area of the Superstructure = 376.5 sqm
Summary of wind Force on superstructure
Tranverse wind Force FT = 212.6 kN udl = 7.09 kN/m at edge girder
Longitudinal wind Force FL = 53.2 kN udl = 0.44 kN/m per gider
Vertical wind Force FV = 856.6 kN udl = 2.275 kN/m2
UDL on girder Girder G1 udl = 7.83 kN/m
Girder G2 & G3 udl = 6.83 kN/m
Girder G4 udl = 6.53 kN/m

3.2.2 Wind load on loaded structure


a) Wind load on Superstructure
Vb = design wind speed at any height = 36 m/s
Bridge situated in : = Plain Terrain
Wind Speed & design wind pressure for Basic wind speed of 33Wind
m/s speed & design wind pr. for Basic wind speed of 36m/s
H Plain Terrain Terrain with Obstructions H Plain Terrain Terrain with Obstructions
2 2
(m) Vz (m/s) Pz (N/m ) Vz (m/s) Pz (N/m ) (m) Vz (m/s) Pz (N/m2) Vz (m/s) Pz (N/m2)
10 27.8 463.7 17.8 190.5 < 10 33.08 551.84 21.18 226.71
15 29.2 512.5 19.6 230.5 15 34.75 609.92 23.33 274.31
20 30.3 550.6 21 265.3 20 36.06 655.26 24.99 315.73
30 31.4 590.2 22.8 312.2 30 37.37 702.39 27.13 371.54
50 33.1 659.2 24.9 370.4 50 39.39 784.50 29.63 440.81
60 33.6 676.3 25.6 392.9 60 39.99 804.85 30.47 467.58
70 34.0 693.6 26.2 412.8 70 40.46 825.44 31.18 491.27
80 34.4 711.2 26.9 433.3 80 40.94 846.39 32.01 515.66
90 34.9 729 27.5 454.2 90 41.53 867.57 32.73 540.54
100 35.3 747 28.2 475.6 100 42.01 888.99 33.56 566.00
Average Height of superstructure = 20 m
2
Lower bound Height = 20 m Pz = = 655.3 N/m
2
Upper Bound Height = 30 m Pz = = 702.4 N/m
2
Pz = The design wind pressure at the bridge location for h= 20.000 m 786.3 N/m
A1 = Solid area as seen in elevation. = 93.45 sqm

-------------------------------------------------------------------------------------------------------------------------------
18 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

A3 = Plan area of the Superstructure = 376.50 sqm


Summary of wind Force on superstructure
Tranverse wind Force FT = 191.1 kN udl = 6.37 kN/m at edge girder
Longitudinal wind Force FL = 47.8 kN udl = 0.40 kN/m per gider
Vertical wind Force FV = 444.1 kN udl = 1.179 kN/m2
UDL on girder Girder G1 udl = 4.06 kN/m
Girder G2 & G3 udl = 3.54 kN/m
Girder G4 udl = 3.38 kN/m

b) Wind load on live load :


Wind load on the exposed frontal area of the Live load has been calculated as per Cl. No. 209.3.6
of IRC 6: 2010. As per clause 209.3.7 the bridges shall not be considered to be carrying any
live load when the wind speed at deck level exceeds 36m/s.
Average Height of superstructure 20+0.065+1.5 21.565 m
2
Lower bound Height = 20 m Pz = 655.3 N/m
2
Upper Bound Height = 30 m Pz = 702.4 N/m
2
Design Wind Pressure for height = 21.57 m Pz = 662.6 N/m
Drag coefficient for the Superstructure, Cd : = 1.2
A1 = Solid area as seen in elevation. =30x3 = 90.000 sqm
Summary of wind Force for loaded structure
Tranverse wind Force FT = 143.1 kN cg from super = 2.21 m
Moment at cg from super = = 316.76 kN-m
Force per m of each girder = 1.2 kN/m
Moment per m of each girder = 2.6 kN-m/m
Longitudinal wind Force FL = 0.3 kN/m
Moment at piercap top level = = 0.66 kN-m/m

3.3 Footpath Live Load- per m


As per Cl. No. 206.3(b) of IRC:6-2014, 7.5m> L (Span length)<30m
Where, P= P/- (40L-300)/9 P/ = 500 Kg/m
2
L= 28.50 m
2
W= 1.5 m P= 406.7 Kg/m
U.D.L. due to footpath live load at each side = 406.7x1.5/100 = 6.10 kN/m
Avg. Dist. from LG4 = 1.585 m -0.335 m at support Moment = -2.04 kN-m at support
1.155 m 0.095 m at span Moment = 0.58 kN-m at span

3.4 Snow load


As per clause no. 221 of IRC:6-2014, a) 0.25m ht of snow load to be added over 70R wheeled loading
b) 0.5m ht of snow load to be added over 70R tracked loading
Unit weight of snow = 500 kg/m3 = 5.00 kN/m3
LG1 LG2 & LG3 LG4
Case-1 For 70R Wheeled loading, udl on Girder = 4.31 3.75 3.75 kN/m
Case-2 For 70R Tracked loading, udl on Girder = 8.61 7.50 7.50 kN/m

3.5 Differential settlement


Maximum settlement of foundation = 25 mm
Differential settlement = 1/2 of total settlement = 12.5 mm

3.6 Live Load


i) Single Lane 70-R Track Loading

0.84

2.06 2.9

0.84
0.914 0.914 0.914 0.914 0.914
4.57
3.656
Live Load Position in Plan

12.55
0.5 1.500 0.50 9.00 0.50
2.9
0.84 0.84 1.2

10.43 10.580 7.58 6.180

Live Load Position along Transverse Direction

-------------------------------------------------------------------------------------------------------------------------------
19 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

70R Track loading have been divided by five concentrated loading


Total Vertical Load = 700 kN
Load at each units = 70 kN
Impact Factor For L = 28.50 m = 10 %
Load at each units including impact = 77 kN

ii) Single Lane 70-R Wheel Loading


170 170 170 170 120 120 80
1.37 3.05 1.37 2.13 1.52 3.96

13.4

Live Load Position


12.55
0.5 1.500 0.50 9.00 0.50
2.79
0.86 0.86 1.2

10.42 10.515 7.515 6.060

Live Load Position along Transverse Direction

As per Cl. No. 211.3 b(i) of IRC:6-2000, For L = 28.50 m = 13.04 %


One wheel load including impact for 8t = 45.22 kN
One wheel load including impact for 12 t = 67.83 kN
One wheel load including impact for 17 t = 96.09 kN

-------------------------------------------------------------------------------------------------------------------------------
20 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

iii) Two Lane Class-A Loading


27 27 114 114 68 68 68 68
1.1 3.2 1.2 4.3 3.0 3.0 3.0

18.80

Live Load Position

12.55
0.5 1.500 0.50 9.00 0.50

1.8 1.7 1.8 0.4

11.65 10.450 7.45 8.200


8.15 6.950 3.95 4.700
Live Load Position along Transverse Direction

As per Cl. No. 211.3 b(i) of IRC:6-2000, For L = 28.50 m = 13.04 %


One wheel load including impact for 2.7 t = 15.26 kN
One wheel load including impact for 11.4 t = 64.43 kN
One wheel load including impact for 6.8 t = 38.43 kN

3.6.1 .Live load braking force


Class 70R
Length of 70R from nose to tail = 14.92 m
Distance between two cars = 30 m
Total length of bridge = 30 m
No of cars in 30m span = 1
First two lane loaded 0.2x1000 = 200 kN
UDL per girder = 1.67 kN/m
CG of girder = 1.913 m
Moment per girder = 3.19 kN-m/m

2Lane Class A Loading


Length of 70R from nose to tail = 18.8 m
Distance between two cars = 20 m
Total length of bridge = 30 m
First two lane loaded 0.2x554 = 110.8 kN
UDL per girder = 0.92 kN/m
CG of girder = 1.913 m
Moment per girder = 1.77 kN-m/m

3.7 Temperature stress


3.7.1 Temperature Rise & fall
As per cl. No. 215 of IRC-6
o
The maximum air shade temperature in Ramban banihal area = 45 C
o
The minimum air shade temperature in Ramban banihal area = -7.5 C
o
Difference between maximum & minimum air shade temperature = 52.5 C
Bridge temperature = Mean of maximum 7 minimum air shade temperature + 10 oC
o
Temperature rise in superstructure = (52.5/2 + 10) = 36.25 C
o
Temperature fall in superstructure = -(52.5/2 - 10) = -16.25 C
Thermal coefficient for RCC & PSC & steel structure = 12.0E-06/oC

-------------------------------------------------------------------------------------------------------------------------------
21 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.7.2 Temperature Gradient on superstructure


a) Temperature Rise
3000
17.3
150 A h1 =0.3h<0.15m = 150mm
75 B 4
175 C 1250 2.8 h2 =0.3h>0.1m = 250mm
25 D <0.25m
100 E 775

F
1025 300 h= 2000 mm

200 G 525
100 H
150 I h3 =0.3h<0.15m = 150mm
2.1
750
Equivalent Beam Section Temperature Rise
E= Elastic Modulus of Concrete at service Condition = 3.3E+04 N/mm2
α = Coefficient of thermal coefficient of concrete = 1.2E-05 /0C
CG = 1352 mm A= 1.603
Temperature Stress : = EαT = x xT Zt = 1.067 Ztb = 1.635
Zbb = 0.512
Force
Block Area Stress (σ) y (mm) Moment
(A x σ)
1 450000 4.26 1917.71 557.47 1069.07
2 225000 1.36 306.11 458.38 140.32
3 218750 0.56 122.55 306.42 37.55
4 112500 0.42 47.27 -1251.92 -59.18
2394 1188
Axial Tension = 2394 kN
Strain =F/(E*A) = 0.000045
Hogging Moment = 1188 kN-m

6.92 -1.49 -1.11 4.32

1.60 -1.49 -0.73


1.12 -0.62

+ + =

0.84 -1.49 2.32 1.67

+Eαt - F/A - M/Z σt(+ve) = + E α t - F/A - M/Z

Temperature Stresses :
Top of Slab : 6.92 - 1.494 = 5.43 - 1.11 = 4.32 N/mm2
Top of Beam : 1.12 - 1.49 -= 0.37 - 0.73 -= 1.10 N/mm2
Bottom of Beam: 0.84 - 1.49 -= 0.65 + 2.32 = 1.67 N/mm2

-------------------------------------------------------------------------------------------------------------------------------
22 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

b) Temperature Fall
3000
10.6
225 A h1 =0.2h<0.25m = 250mm
25 B 1.69
175 C 1250 0.7 h2 =0.25h<0.25m = 250mm
75 D 775 0.210
25 E

F
975 300 h= 2000 mm

50 G 0.16 h3 =0.25h<0.25m = 250mm


200 H 525 0.8
250 I h4 =0.2h<0.25m = 250mm
6.6
750
Equivalent Beam Section Temperature Fall

E= = 3.3E+04 N/mm2
α= = 1.2E-05 /0C
CG = 1352 mm A= 1.603
Temperature Stress : = EαT = x xT Zt = 1.067 Ztb = 1.635
Zbb = 0.512
Forcein top Slab as per cl. 218.5 to control
Hence sufficient amount Longitudinal reiforcement needs to provide
Block Area Stress (σ) y (mm) Moment
the thermal cracking. (A x σ)
1 675000.0 -2.46 -1659.77 508.40 -843.82
2 31250.0 -0.48 -14.94 408.86 -6.11
3 218750.0 -0.18 -39.83 519.88 -20.71
4 58125.0 -0.08 -4.88 423.08 -2.07
5 15000.0 -0.06 -0.96 -1318.58 1.27
105000.0 -0.19 -20.17 -1229.70 24.80
4 187500 -1.48 -277.60 -1194.26 331.53
-2018 -515
Axial compression = -2018 kN
Strain =F/(E*A) = -0.000038
Sagging Moment = -515 kN-m
-4.24 + 1.26 + 0.48 -2.50
-0.68 + 1.26 + 0.32 0.90
-0.28
-0.08

+ + =
-0.06
-0.32
-2.64 1.26 -1.01 -2.39

-Eαt +F/A + M/Z σt(-ve) = - E α t + F/A + M/Z


Temperature Stresses :
Top of Slab : -4.24 + 1.26 -= 2.98 + 0.48 -= 2.50 N/mm2
Top of Beam : -0.68 + 1.26 = 0.58 + 0.32 = 0.90 N/mm2
Bottom of Beam: -2.64 + 1.26 -= 1.38 - 1.01 -= 2.39 N/mm2

-------------------------------------------------------------------------------------------------------------------------------
23 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.8 Calculation for Differential Shrinkage Stresses :


As the precast beams & the deck slab over the beams are casted at different times, it is likely that the composite section will be
experiencing a differential shrinkage as the beam has already undergone a amount of shrinkage & will continue shinking in a slower
A) Determination of Shrinkage Strain for Deck Slab :
The Shrinkage Strain in the Concrete can be classified as Drying shrinkage strain & Autogeneous shrinkage strain.
εcs = εcs + εca where, εcs = Total Shrinkage Strain εcd = Drying Shrinkage Strain
εca = Autogenous Shrinkage Strain
Hence, Drying Shrinkage Strain at the age of 36500 days = 0.000342
Drying Shrinkage strain at t= 36500 & ∞, 0.00034398 (at t= ∞, β ds tends to 1.)
Autogenous Shrinkage strain at t= ∞, 0.000055 (at t= ∞, β as tends to 1.)
Total Shrinkage Strain at End of Service life for deck Slab = 0.000399
B) Determination of Differential Shrinkage stresses in the Beam :
The residual shrinkage strain in Beams from setting of the Deck slab & the End of Service life of the Structure :
0.000399
The calculation for the Differential shrinkage-0.000152 = calculated
stresses has been 0.000247
as per Annex K (K4.2) of the Thomas Telford publication
by Hendy and Smith:C.R. Hendy and D.A. Smith. (2007) Designers' Guide to EN 1992-2. Eurocode 2: Design of Concrete
εdiff = εsh,slab(∞) - εsh,beam(∞) - εsh,beam(t1)
= 0.000399 - 0.000247 = 0.000152
The fully restrained force in the slab due to differential shrinkage modified by creep is given by Equation DK.5 as follows:
Fsh = εdiff E Aslab (1-e-φ)/φ or, εdiff E Aslab φ
where, E = Modulus of Elasticity of the Deck concrete 33346 MPa
2
Aslab = Area of the Slab 675000 mm
φ = Creep coefficient (taken as recommended in the book) 2.00

Hence, Fsh Axial compression = 1482.7 kN


Eccentricity of the force from the CG of the Beam : 535.58 mm
Sagging Moment generated due to the restrained force (Msh) : 794.12 kNm
m = Modular ratio for Deck Concrete w.t. girder concrete = 1.00
Restrained stress in the Slab = -Fsh / Aslab -= 2.20 MPa
Axial Release in the Slab = m x Fsh / Acomp. = 0.93 MPa
Axial Release in the Beam = Fsh / Acomp. = 0.93 MPa
Stresses at various location of the cross-section of the beam generated due to restrained moment :
Stress at Top of slab : m x Msh / Zts = 0.74 MPa
Stress at Bottom of slab : m x Msh / Zbs = 0.49 MPa
Stress at Top of beam : Msh / Ztb = 0.49 MPa
Stress at Bottom of beam : - Msh / Zbb -= 1.55 MPa
-2.20 0.93 0.74 -0.53
0.49 -0.79
1.41

+ + =

0.93 -1.55 -0.63


- Fsh/Aslab + Fsh/Acomp + Msh/Zcomp σds = - Fsh/Aslab + Fsh/Acomp + Msh/Zcomp
The final stresses at various location of the cross section are as follows :
Stress at Top of slab : -2.2 + 0.93 + 0.74 -= 0.53 MPa
Stress at Bottom of slab : -2.2 + 0.93 + 0.49 -= 0.79 MPa
Stress at Top of beam : 0.93 + 0.49 = 1.41 MPa
Stress at Bottom of beam : 0.93 + -1.55 -= 0.63 MPa

C) Determination of Creep & Shrinkage stresses in the Beam :


The residual shrinkage strain of Beams : 0.000399 -0.000178 = 0.000221
Creep strain (assumed) = 0.000200
Total strain = 0.000421
E = Modulus of Elasticity of the Deck concrete 33346 MPa
2
Acomp beam = Area of the composite beam 1602500 mm
φ = Creep coefficient (taken as recommended in the book) 2.00
Axial compression = 9731 kN
Fsh = Total compression = 11214 kN
Total strain = 0.000421
Msh = Moment = 794.1 kN

-------------------------------------------------------------------------------------------------------------------------------
24 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.9 Seismic Force


Earthquake Loads has been calculated as per IS:1893 and IRC: 6-2014. Project is located in earthquake
zone IV. Horizontal seismic forces has been computed as per clause no. 219.2 of IRC : 6-2014 for zone IV .
z = zone factor = For Zone IV = 0.24 I = Importance factor = 1.20
R = Response Reduction factor = 2.00 For integral bridge with ductile detailing Sa/g = = 2.50

3.10 Earth pressure calculation


3.10.1 Active earth Pressure on vertical wall at normal case 0.000 kN/m2
(As per clause no. 214 of ammendment no. 2 of IRC:6-2014, August 2014)
Active earth pressure coefficient at Normal case Ka
= Cos2(φ-α)
Cos2α*Cos(α+δ)*[1+{Sin(φ+δ)*Sin(φ-β)/(Cos(α-δ)*Cos(δ+α))}1/2]2

Note :- 100.857 kN/m2


α = Angle subtended by the earth side wall with the
o
vertical on the earth side = 0 = 0.00 radians
o
φ = Angle of internal friction of the earth fill = 30 = 0.52 radians
o
δ = Angle of friction of the earth side wall with the earth=2φ/3 20 = 0.35 radians
o
β = Inclination of the earth fill surface with horizontal 0 = 0.00 radians
Hence, dry unit wt of soil shall be considered.
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Active earth pressure coefficient at Normal case = Ka = 0.297
Earth pressure = γs * height of wall * Ka
Height abutment wall at A1 = 19.000 m
Horz. earth pr. at top = 0.297*19*0*COS(0.35) = 0.000 kN/m2
Horz. earth pr. at foundation level = 0.297*19*19*COS(0.35) = 100.86 kN/m2
Earth pr. due to LL surcharge at top 0.297x1.2x19xcos(0.35) = 6.370 kN/m2
Earth pressure distribution of abutment A1
Width of edge wall = 0.500 m
Width of middle wall = 3.020 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 3.3 1.0 1.7 0.52 0.14 10.0 3.13 0.82
1.375 2.000 10.6 10.6 5.3 32.1
0.5 2.500 13.3 16.6 6.6 40.1
7.25 9.750 51.8 252.3 25.9 156.3
7.25 17.000 90.2 767.0 45.1 272.5
2 19.000 100.9 958.1 50.4 304.6

Earth pressure due to live load at abutment A1


Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 6.4 0.0 3.2 0 0 19.2 0 0
0.625 0.625 6.4 4.0 3.2 2.0 0.62 19.2 12.02 3.76
1.375 2.000 6.4 12.7 3.2 19.2
0.5 2.500 6.4 15.9 3.2 19.2
7.25 9.750 6.4 62.1 3.2 19.2
7.25 17.000 6.4 108.3 3.2 19.2
2 19.000 6.4 121.0 3.2 19.2
Earth pressure distribution of abutment A2
Width of edge wall = 0.500 m
Width of middle wall = 2.770 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 3.3 1.0 1.7 0.52 0.14 9.2 2.87 0.75
1.375 2.000 10.6 10.6 5.3 29.4
0.5 2.500 13.3 16.6 6.6 36.8
7.75 10.250 54.4 278.9 27.2 150.7
7.75 18.000 95.5 859.9 47.8 264.7
2 20.000 106.2 1061.7 53.1 294.1

-------------------------------------------------------------------------------------------------------------------------------
25 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.10.2 Active earth Pressure on vertical wall at seismic case 0.000 kN/m2

Active earth pressure coefficient at Normal case Ka


= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2

Note :- 63.655 kN/m2


α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.00 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
 z  S a 
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014.    
Where, Ah = Horizontal Seismic Coefficient  2  g 
Ah =
 R 
 
z = zone factor = For Zone IV = 0.24  I 
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.00
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
So, Sa/g = = 2.50
Horizontal coefficient - Ah 0.24/2x2.5/(2/1.2) = 0.18
Vertical coefficient - Av = 0.12
λ = Ah/(1+Av) = 0.16
Active earth pressure coefficient at seismic case = Ka = 0.485
Dynamic increment of static earth pressure coefficient = 0.188
Horz. earth pr. at top = = 0.000 kN/m2
Horz. earth pr. at bottom of abutment A1= = 19.000 m = 63.66 kN/m2
Earth pr. due to LL surcharge at top = 4.02 kN/m2

Earth pressure distribution of abutment A1


Width of edge wall = 0.500 m
Width of middle wall = 3.020 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 2.1 0.7 1.0 0.33 0.102 6.3 1.98 0.62
1.375 2.000 6.7 6.7 3.4 20.2
0.5 2.500 8.4 10.5 4.2 25.3
7.25 9.750 32.7 159.2 16.3 98.6
7.25 17.000 57.0 484.1 28.5 172.0
2 19.000 63.7 604.7 31.8 192.2

Earth pressure due to live load at abutment A1


Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 4.02 0.0 2.0 0 0 12.1 0 0
0.625 0.625 4.02 2.5 2.0 1.26 0.52 12.1 7.59 3.16
1.375 2.000 4.02 8.0 2.0 12.1
0.5 2.500 4.02 10.1 2.0 12.1
7.25 9.750 4.02 39.2 2.0 12.1
7.25 17.000 4.02 68.3 2.0 12.1
2 19.000 4.02 76.4 2.0 12.1

-------------------------------------------------------------------------------------------------------------------------------
26 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Earth pressure distribution of abutment A2


Width of edge wall = 0.500 m
Width of middle wall = 2.770 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 2.1 0.7 1.0 0.33 0.10 5.8 1.81 0.57
1.375 2.000 6.7 6.7 3.4 18.6
0.5 2.500 8.4 10.5 4.2 23.2
7.75 10.250 34.3 176.0 17.2 95.1
7.75 18.000 60.3 542.7 30.2 167.0
2 20.000 67.0 670.1 33.5 185.6

3.10.3 Active earth Pressure on tranverse side wall at normal case 0.000 kN/m2
(As per clause no. 214 of ammendment no. 2 of IRC:6-2014, August 2014)
Active earth pressure coefficient at Normal case Ka
= Cos2(φ-α)
Cos α*Cos(α+δ)*[1+{Sin(φ+δ)*Sin(φ-β)/(Cos(α-δ)*Cos(δ+α))}1/2]2
2

Note :- 100.857 kN/m2


α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.00 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal 0 degree = 0.00 radians
Hence, dry unit wt of soil shall be considered.
2
γs = Unit weight of Soil at normal case = 19.00 kN/m
Surcharge = 0 xγsoil = 0.00 kN/m2
Average height of hill side is 3.0m.
Active earth pressure coefficient at Normal case = Ka = 0.297
Earth pressure = γs * height of wall * Ka
Height abutment wall = 19.000 m
Horz. earth pr. at top = 0.297*19*0*COS(0.35) = 0.000 kN/m2
Horz. earth pr. at foundation level = 0.297*19*19*COS(0.35) = 100.86 kN/m2
Earth pr. due to LL surcharge at top 0.297x0x19xcos(0.35) = 0.000 kN/m2
Both side earth slope are same & propoerly pitched.
Hence, percentage of active force at tranverse direction is considered = 0%

Earth pressure distribution of abutment A1


Width of edge wall = 6.000 m
Earth pr. at
Height Cumulative Earth pr. Force Force at side Moment at side
side wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m) wall (kN/m)
(kN/m)
0 0 0.0 0 0.0 0 0
0.625 0.625 0.0 0.0 0.0 0.00 0.00
1.375 2.000 0.0 0.0 0.0
0.5 2.500 0.0 0.0 0.0
7.25 9.750 0.0 0.0 0.0
7.25 17.000 0.0 0.0 0.0
2 19.000 0.0 0.0 0.0

Earth pressure distribution of abutment A2


Width of edge wall = 6.000 m
Earth pr. at
Height Cumulative Earth pr. Force Force at side Moment at side
side wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m) wall (kN/m)
(kN/m)
0 0 0.0 0 0.0 0 0
0.625 0.625 0.0 0.0 0.0 0.00 0.00
1.375 2.000 0.0 0.0 0.0
0.5 2.500 0.0 0.0 0.0
7.75 10.250 0.0 0.0 0.0
7.75 18.000 0.0 0.0 0.0
2 20.000 0.0 0.0 0.0

-------------------------------------------------------------------------------------------------------------------------------
27 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.9 Seismic Force


Earthquake Loads has been calculated as per IS:1893 and IRC: 6-2014. Project is located in earthquake
zone IV. Horizontal seismic forces has been computed as per clause no. 219.2 of IRC : 6-2014 for zone IV .
z = zone factor = For Zone IV = 0.24 I = Importance factor = 1.20
R = Response Reduction factor = 2.00 For integral bridge with ductile detailing Sa/g = = 2.50

3.10 Earth pressure calculation


3.10.1 At Rest Earth Pressure on vertical wall at normal case 0.000 kN/m2
(As per clause no. 214 of ammendment no. 2 of IRC:6-2014, August 2014)
earth pressure coefficient at At rest K0
= 1-Sin(φ)
Passive earth pressure coefficient at Normal case Kp
= Cos2(φ+α)
Cos2α*Cos(α-δ)*[1-{Sin(φ+δ)*Sin(φ+β)/(Cos(α-δ)*Cos(δ-α))}1/2]2 169.615 kN/m2
α = Angle subtended by the earth side wall with the
o
vertical on the earth side = 0 = 0.00 radians
o
φ = Angle of internal friction of the earth fill = 30 = 0.52 radians
o
δ = Angle of friction of the earth side wall with the earth=2φ/3 20 = 0.35 radians
o
β = Inclination of the earth fill surface with horizontal 0 = 0.00 radians
Hence, dry unit wt of soil shall be considered.
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
At rest earth pressure coefficient at Normal case = K0 = 0.500
Passive earth pressure coefficient at Normal case = Kp = 6.105
K*= (d/0.05H)0.4xKp
Dispalcement (d)=Lαt = 0.0065
K*= (d/0.05H)0.4xKp = 0.8326 0.816

Earth pressure = γs * height of wall * Kp


Height abutment wall at A1 = 19.000 m 20
Horz. earth pr. at top = 0.500*19*0*COS(0.35) = 0.000 kN/m2
Horz. earth pr. at foundation level = 0.500*19*19*COS(0.35) = 169.61 kN/m2
Earth pr. due to LL surcharge at top 0.500x1.2x19xcos(0.35) = 10.712 kN/m2
At Rest Earth Pressure on vertical wall
Earth pressure distribution of abutment A1
Width of edge wall = 0.500 m
Width of middle wall = 3.020 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 5.6 1.7 2.8 0.87 0.18 16.8 5.27 1.09
1.375 2.000 17.9 17.9 8.9 53.9
0.5 2.500 22.3 27.9 11.2 67.4
7.25 9.750 87.0 424.3 43.5 262.9
7.25 17.000 151.8 1290.0 75.9 458.3
2 19.000 169.6 1611.3 84.8 512.2

Earth pressure due to live load at abutment A1


Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 10.7 0.0 5.4 0 0 32.4 0 0
0.625 0.625 10.7 6.7 5.4 3.3 1.05 32.4 20.22 6.32
1.375 2.000 10.7 21.4 5.4 32.4
0.5 2.500 10.7 26.8 5.4 32.4
7.25 9.750 10.7 104.4 5.4 32.4
7.25 17.000 10.7 182.1 5.4 32.4
2 19.000 10.7 203.5 5.4 32.4

Earth pressure distribution of abutment A2


Width of edge wall = 0.500 m
Width of middle wall = 2.770 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 5.6 1.7 2.8 0.87 0.18 15.5 4.83 1.00
1.375 2.000 17.9 17.9 8.9 49.5
0.5 2.500 22.3 27.9 11.2 61.8
7.75 10.250 91.5 469.0 45.8 253.5
7.75 18.000 160.7 1446.2 80.3 445.1
2 20.000 178.5 1785.4 89.3 494.6

-------------------------------------------------------------------------------------------------------------------------------
28 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Earth Pressure on vertical wall for Thermal Expansion


Earth pressure distribution of abutment A1
Width of edge wall = 0.500 m
Width of middle wall = 3.020 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 9.3 2.9 4.6 1.45 0.30 28.1 8.77 1.81
1.375 2.000 29.7 29.7 14.9 89.8
0.5 2.500 37.2 46.5 18.6 112.2
7 9.500 141.2 670.8 70.6 426.5
3.75 13.250 141.2 935.6 70.6 426.5
3.75 17.000 151.8 1290.0 75.9 458.3
2 19.000 169.6 1611.3 84.8 512.2

Earth pressure distribution of abutment A2


Width of edge wall = 0.500 m
Width of middle wall = 2.770 m
Earth pr. of Moment of Earth pr. of Force of Moment of
Height Cumulative Earth pr. Force Force of Edge
Edge wall Edge wall middle wall middle wall middle wall
(m) ht (m) (kN/m2) (kN/m) wall (kN/m)
(kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
0 0 0.0 0 0.0 0 0 0.0 0 0
0.625 0.625 9.1 2.8 4.6 1.42 0.29 25.2 7.88 1.63
1.375 2.000 29.1 29.1 14.6 80.7
0.5 2.500 36.4 45.5 18.2 100.9
7.5 10.000 145.6 728.2 72.8 403.4
4 14.000 145.6 1019.5 72.8 403.4
4 18.000 160.7 1446.2 80.3 445.1
2 20.000 178.5 1785.4 89.3 494.6

-------------------------------------------------------------------------------------------------------------------------------
29 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of PSC Girder LG4

-------------------------------------------------------------------------------------------------------------------------------
30 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.0 Calculation of Stresses for Girder LG4


C/C span = 30.356 m Width of abutment wall = 2.00 m
Length of girder = 29.938 m Width of bearing area = 0.50 m

4.1. Load calculation


4.1.1 Dead Load Moment & Shear for Precast girder only
Unit weight of concrete = 25.00 kN/m3
Cross-sectional area at span = 0.928 m2
Cross-sectional area at support = 1.444 m2
Unit Weight at span = 23.19 kN/m
Unit Weight at support = 36.11 kN/m
Thickness of intermediate Cross Girder = 0.30 m
Thickness of end Cross Girder = 2.00 m
1.250 1.750 1.250

0.475 0.2
0.1 0.053

1.775 1.325 1.025

0.2
0.25

0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN

= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 22.44 1.75 1.75 0.250

0.250 29.438 0.250


29.938
Support Reaction = 388.62 kN
Table : Maximum BM & SF at critical sections
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Dist. for prop. Section(m) 0.000 3.680 7.360 11.039 14.719
Bending Moment (kNm) -1.1 1160.0 1961.1 2448.1 2621.2
Shear Force (kN) 379.6 264.5 175.0 58.1 4.4
4.1.2 Construction load and weight of shuttering & proping.
Assume, Construction Live load = 0.500 kN/m2
Assume, UDL for weight of shuttering = 5.000 kN/m
Effective width of deck slab for end girder = 3.445 m
Weight of shuttering & Conc. Live load = 6.72 kN/m
6.722

0.250 29.44 0.250


Support Reaction = 100.63 kN
Table : Maximum BM & SF at critical sections of outer girders
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.680 7.360 11.039 14.719
Bending Moment (kNm) -0.2 318.4 545.9 682.5 728.0
Shear Force (kN) 98.9 74.2 49.5 24.7 0.0

4.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 3.445 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008

-------------------------------------------------------------------------------------------------------------------------------
31 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

19.376

0.250 29.44 0.250


Support Reaction = 295.04 kN

Table : Maximum BM & SF at critical sections


Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.680 7.360 11.039 14.719
Bending Moment (kNm) -0.6 936.1 1610.4 2022.3 2171.9
Shear Force (kN) 290.2 218.9 147.6 76.3 5.0

4.1.4 Staad output


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
4 1 SPECTRUM IN X DIRECTION
7 280.933 87.88 17.486 8.487 58.736 1529.01
40 -280.933 -87.88 -17.486 -8.487 -42.066 -1444.488
2 SPECTRUM IN Z DIRECTION
7 111.611 232.198 119.262 30.303 262.121 1427.751
40 -111.611 -232.198 -119.262 -30.303 -143.859 -1196.165
3 SPECTRUM IN Y DIRECTION
7 15.822 36.422 9.103 4.879 20.332 219.026
40 -15.822 -36.422 -9.103 -4.879 -11.34 -183.311
4 DEAD LOAD 7 218.889 677.91 -2.451 -30.807 3.318 3170.016
40 -218.889 -624.925 2.451 30.807 -0.866 -2518.598
5 SIDL (DL) 7 28.539 106.68 -1.023 -66 2.997 457.828
40 -28.539 -99.179 1.023 54.56 -1.974 -354.899
6 SIDL(WC) 7 34.733 100.958 0.036 0.629 -0.79 506.94
40 -34.733 -94.888 -0.036 0.101 0.754 -409.016
7 REMOVAL OF SHUTTER
7 -33.973 -101.815 0.279 1.558 -0.276 -490.508
40 33.973 95.095 -0.279 -1.558 -0.003 392.054
8 EP ON ABUTMENT 7 701.326 -6.857 -19.933 -0.015 48.9 204.771
40 -701.326 6.857 19.933 0.015 -28.967 -211.628
9 AT REST EP ON ABUTMENT
7 1179.553 -11.51 -33.555 -0.025 82.316 344.785
40 -1179.553 11.51 33.555 0.025 -48.762 -356.295
10 AT K* EP ON ABUTMENT
7 1776.754 -20.705 -49.562 0.138 120.813 430.74
40 -1776.754 20.705 49.562 -0.138 -71.251 -451.445
11 LIVE LOAD SURCHARGE
7 -21.652
AT REST -30.558 15.751 -0.027 -50.418 -456.221
40 21.652 30.558 -15.751 0.027 34.667 425.663
12 DYNAMIC INCREMENT
7 OF416.458
EARTH PR. -3.632 -11.843 0.005 29.07 117.828
40 -416.458 3.632 11.843 -0.005 -17.226 -121.46
13 DYNAMIC INCREMENT
7 OF -8.029
LL SURCGARGE
-11.457 5.913 -0.009 -18.905 -171.11
40 8.029 11.457 -5.913 0.009 12.993 159.653
14 UNLADEN WIND LOAD
7 41.26 114.67 30.304 -2.598 -54.014 527.555
40 -41.7 -106.84 -30.304 2.598 23.71 -416.8
15 LADEN WIND LOAD 7 22.387 58.6 27.324 -1.444 -48.548 260.73
40 -22.787 -54.54 -27.324 1.444 21.224 -204.16
16 DIFFERNTIAL SETTLEMENT
7 54.222 -61.311 -9.022 1.129 25.576 -961.277
40 -54.222 61.311 9.022 -1.129 -16.554 899.966
17 TEMPERATURE RISE7 1723.318 -21.782 -328.677 -0.867 804.639 304.359
40 -1723.318 21.782 328.677 0.867 -475.961 -326.141
18 TEMPERATURE FALL7 -805.453 10.145 149.273 0.435 -377.134 -142.046
40 805.453 -10.145 -149.273 -0.435 227.861 152.191
19 CREEP SHRINKAGE 7 DIFF
-857.796
SHRINKAGE 6.448 45.866 0.705 -389.038 -66.37
40 857.796 -6.448 -45.866 -0.705 343.172 72.818
20 FOOTPATH LIVE LOAD
7 -2.057 -5.51 -1.047 1.855 3.164 -44.342
40 2.057 5.51 1.047 -1.855 -2.117 38.832
21 SNOW LOAD FOR 770R LL TRACK
41.141 124.66 -0.316 -2.251 0.214 597.854
40 -41.141 -116.33 0.316 2.251 0.102 -477.359
22 SNOW LOAD FOR 7LL 70R WHEEL
20.588 62.394 -0.158 -1.13 0.106 299.213
40 -20.588 -58.224 0.158 1.13 0.052 -238.904
23 BRAKING 7 -33.757 -7.506 1.978 0.197 -5.467 -117.624
40 32.087 7.506 -1.978 -0.197 3.489 110.118
604 COMBINATION LOAD
7 CASE
139.114
504 1.029 -23.024 -1.388 43.948 1071.606
40 -139.114 -1.029 23.024 1.388 -20.924 -1070.577

4 7 +ve 154.982 599.487 4.748 88.616 7.211 2758.724


210 LOAD GENERATION,
199 LOAD GENERATION,
LOAD
257 LOAD
#210,GENERATION,
(26
27
LOAD
LOAD
of 26)
#199,
GENERATION,
340
(15
LOAD
LOAD
of 26)
#257,
GENERATION,
210
LOAD
(21
LOAD
of#27,
56)GENERATION,
(3 LOAD
of 26) #340, LOAD
(22 of #210,
26) (26 of 26)
-ve -6.716 -4.317 -2.51 -101.342 -16.226 -40.984
136 LOAD GENERATION,
133 LOAD GENERATION,
LOAD
340 LOAD
#136,GENERATION,
(4
356
LOAD
of LOAD
26)#133,
GENERATION,
210
(1LOAD
ofLOAD
26)#340,
GENERATION,
133
LOAD
(22
LOAD
of #356,
26)GENERATION,
LOAD
(12 of 26)
#210, LOAD
(26 of #133,
26) (1 of 26)
4 40 +ve 154.982 599.487 4.748 88.616 4.701 2274.295
210 LOAD GENERATION,
199 LOAD GENERATION,
LOAD
257 LOAD
#210,GENERATION,
(26
27
LOAD
LOAD
of 26)
#199,
GENERATION,
340
(15
LOAD
LOAD
of 26)
#257,
GENERATION,
210
LOAD
(21
LOAD
of#27,
56)GENERATION,
(3 LOAD
of 26) #340, LOAD
(22 of #210,
26) (26 of 26)
-ve -6.716 -4.317 -2.51 -101.342 -13.348 -39.827
136 LOAD GENERATION,
133 LOAD GENERATION,
LOAD
340 LOAD
#136,GENERATION,
(4
356
LOAD
of LOAD
26)#133,
GENERATION,
210
(1LOAD
ofLOAD
26)#340,
GENERATION,
136
LOAD
(22
LOAD
of #356,
26)GENERATION,
LOAD
(12 of 26)
#210, LOAD
(26 of #136,
26) (4 of 26)

-------------------------------------------------------------------------------------------------------------------------------
32 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


36 1 SPECTRUM IN X DIRECTION
40 258.269 88.937 14.962 8.332 42.457 1444.491
30 -258.269 -88.937 -14.962 -8.332 -12.067 -1206.72
2 SPECTRUM IN Z DIRECTION
40 121.118 230.617 107.655 29.421 187.396 1195.754
30 -121.118 -230.617 -107.655 -29.421 -114.686 -555.16
3 SPECTRUM IN Y DIRECTION
40 17.004 35.78 8.264 4.799 14.722 183.251
30 -17.004 -35.78 -8.264 -4.799 -8.707 -86.779
4 DEAD LOAD 40 217.458 623.431 -0.059 -27.003 0.051 2515.827
30 -217.458 -494.395 0.059 27.003 0.114 -953.946
5 SIDL (DL) 40 27.918 99.343 -1.359 -56.21 2.765 353.47
30 -27.918 -78.385 1.359 24.241 1.033 -105.139
6 SIDL(WC) 40 34.433 94.954 0.384 0.164 -0.871 409.116
30 -34.433 -77.992 -0.384 1.876 -0.203 -167.468
7 REMOVAL OF SHUTTER
40 -33.773 -95.156 -0.088 1.393 0.184 -392.087
30 33.773 76.377 0.088 -1.393 0.062 152.412
8 EP ON ABUTMENT40 700.383 -6.955 -14.886 -0.175 33.714 211.61
30 -700.383 6.955 14.886 0.175 7.886 -231.045
9 AT REST EP ON ABUTMENT
40 1177.965 -11.674 -25.06 -0.295 56.751 356.265
30 -1177.965 11.674 25.06 0.295 13.279 -388.888
10 AT K* EP ON ABUTMENT
40 1774.335 -20.956 -36.967 -0.291 83.267 451.404
30 -1774.335 20.956 36.967 0.291 20.036 -509.967
11 LIVE LOAD SURCHARGE
40 -20.589
AT REST -30.487 14.09 -0.013 -37.998 -425.565
30 20.589 30.487 -14.09 0.013 -1.375 340.369
12 DYNAMIC INCREMENT
40 OF415.898
EARTH PR. -3.691 -8.851 -0.092 20.051 121.449
30 -415.898 3.691 8.851 0.092 4.684 -131.762
13 DYNAMIC INCREMENT
40 OF -7.633
LL SURCGARGE
-11.43 5.286 -0.004 -14.243 -159.617
30 7.633 11.43 -5.286 0.004 -0.53 127.675
14 UNLADEN WIND LOAD
40 42.631 106.97 20.205 -2.317 -32.094 416.865
30 -43.861 -85.089 -20.205 2.317 -24.367 -148.51
15 LADEN WIND LOAD40 23.739 54.626 18.105 -1.265 -28.719 204.199
30 -24.857 -43.28 -18.105 1.265 -21.877 -67.4
16 DIFFERNTIAL SETTLEMENT
40 54.043 -61.428 -7.947 0.701 19.364 -900.026
30 -54.043 61.428 7.947 -0.701 2.844 728.365
17 TEMPERATURE RISE
40 1738.907 -21.804 -308.483 -0.672 580.003 326.232
30 -1738.907 21.804 308.483 0.672 282.052 -387.162
18 TEMPERATURE FALL
40 -805.913 10.156 139.595 0.339 -266.631 -152.235
30 805.913 -10.156 -139.595 -0.339 -123.468 180.617
19 CREEP SHRINKAGE40 DIFF
-703.427
SHRINKAGE 6.424 30.658 0.578 -156.527 -72.884
30 703.427 -6.424 -30.658 -0.578 70.855 90.836
20 FOOTPATH LIVE 40
LOAD -1.794 -5.531 -0.951 1.838 1.999 -38.863
30 1.794 5.531 0.951 -1.838 0.659 23.405
21 SNOW LOAD FOR4070R LL TRACK
40.849 116.412 0.107 -2.046 -0.254 477.409
30 -40.849 -93.134 -0.107 2.046 -0.044 -184.619
22 SNOW LOAD FOR40LL 70R WHEEL
20.441 58.265 0.053 -1.027 -0.127 238.929
30 -20.441 -46.612 -0.053 1.027 -0.022 -92.39
23 BRAKING 40 -32.144 -7.506 1.566 0.175 -3.792 -110.114
30 27.477 7.506 -1.566 -0.175 -0.584 89.138
604 COMBINATION LOAD
40 CASE
142.084
504 1.1 -20.363 -1.211 30.406 1070.606
30 -142.084 -1.1 20.363 1.211 26.499 -1067.532

36 40 +ve 149.638 555.067 5.244 30.175 4.552 2274.549


210 LOAD GENERATION,
205 LOAD GENERATION,
LOAD
256 LOAD
#210,GENERATION,
(26
29
LOAD
LOAD
of 26)
#205,
GENERATION,
341
(21
LOAD
LOAD
of 26)
#256,
GENERATION,
210
LOAD
(20
LOAD
of#29,
56)GENERATION,
(5 LOAD
of 26) #341, LOAD
(23 of #210,
26) (26 of 26)
-ve -5.377 -3.799 -1.966 -99.665 -11.31 -40.113
136 LOAD GENERATION,
133 LOAD GENERATION,
LOAD
342 LOAD
#136,GENERATION,
(4
357
LOAD
of LOAD
26)#133,
GENERATION,
256
(1LOAD
ofLOAD
26)#342,
GENERATION,
136LOAD
(24
LOAD
of #357,
26)GENERATION,
LOAD
(13 of 26)
#256, LOAD
(20 of #136,
56) (4 of 26)
36 30 +ve 149.638 555.067 5.244 30.175 4.227 961.029
210 LOAD GENERATION,
205 LOAD GENERATION,
LOAD
256 LOAD
#210,GENERATION,
(26
29
LOAD
LOAD
of 26)
#205,
GENERATION,
313
(21
LOAD
LOAD
of 26)
#256,
GENERATION,
370
LOAD
(20
LOAD
of#29,
56)GENERATION,
(5 LOAD
of 26) #313, LOAD
(21 of #370,
26) (26 of 26)
-ve -5.377 -3.799 -1.966 -99.665 -3.365 -229.646
136 LOAD GENERATION,
133 LOAD GENERATION,
LOAD
342 LOAD
#136,GENERATION,
(4
357
LOAD
of LOAD
26)#133,
GENERATION,
199
(1LOAD
ofLOAD
26)#342,
GENERATION,
28LOAD
(24
LOAD
of #357,
26)
GENERATION,
LOAD
(13 of 26)
#199,
LOAD
(15 of#28,
26) (4 of 26)

-------------------------------------------------------------------------------------------------------------------------------
33 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


26 1 SPECTRUM IN X DIRECTION
30 216.36 93.284 12.049 6.229 30.411 1206.591
31 -216.36 -93.284 -12.049 -6.229 -18.333 -863.713
2 SPECTRUM IN Z DIRECTION
30 207.921 207.687 88.479 23.71 148.973 556.634
31 -207.921 -207.687 -88.479 -23.71 -187.358 -245.846
3 SPECTRUM IN Y DIRECTION
30 18.798 31.372 7.124 4.048 13.05 87.076
31 -18.798 -31.372 -7.124 -4.048 -14.373 -38.879
4 DEAD LOAD 30 214.836 483.797 0.75 -13.673 -1.774 953.226
31 -214.836 -331.78 -0.75 13.673 -1.074 594.128
5 SIDL (DL) 30 25.666 72.735 -0.954 -40.121 1.953 103.7
31 -25.666 -44.277 0.954 -3.288 1.665 118.3
6 SIDL(WC) 30 34.074 78.48 0.309 -0.63 -0.52 167.848
31 -34.074 -55.447 -0.309 3.4 -0.653 86.245
7 REMOVAL OF SHUTTER
30 -33.476 -76.642 -0.182 0.914 0.411 -152.612
31 33.476 51.143 0.182 -0.914 0.281 -89.827
8 EP ON ABUTMENT30 686.833 -7.011 -6.223 -0.257 13.019 231.032
31 -686.833 7.011 6.223 0.257 10.592 -257.634
9 AT REST EP ON ABUTMENT
30 1155.164 -11.768 -10.475 -0.432 21.917 388.865
31 -1155.164 11.768 10.475 0.432 17.831 -433.519
10 AT K* EP ON ABUTMENT
30 1740.537 -21.117 -15.142 -0.544 31.328 509.944
31 -1740.537 21.117 15.142 0.544 26.128 -590.072
11 LIVE LOAD SURCHARGE
30 AT
-7.409
REST -30.325 10.697 0.12 -29.461 -340.206
31 7.409 30.325 -10.697 -0.12 -11.128 225.137
12 DYNAMIC INCREMENT
30 OF407.842
EARTH PR. -3.726 -3.704 -0.144 7.756 131.755
31 -407.842 3.726 3.704 0.144 6.301 -145.892
13 DYNAMIC INCREMENT
30 OF -2.699
LL SURCGARGE
-11.37 4.005 0.046 -11.024 -127.614
31 2.699 11.37 -4.005 -0.046 -4.172 84.472
14 UNLADEN WIND LOAD
30 61.177 85.527 13.981 -1.569 -20.82 148.878
31 -62.846 -55.816 -13.981 1.569 -32.23 119.287
15 LADEN WIND LOAD30 40.609 43.533 12.492 -0.837 -18.577 67.597
31 -42.127 -28.128 -12.492 0.837 -28.824 68.363
16 DIFFERNTIAL SETTLEMENT
30 47.061 -62.013 -5.923 -0.365 14.665 -728.178
31 -47.061 62.013 5.923 0.365 7.809 492.868
17 TEMPERATURE RISE
30 1644.7 -21.373 -69.248 -0.108 109.716 387.136
31 -1644.7 21.373 69.248 0.108 153.045 -468.234
18 TEMPERATURE FALL
30 -753.47 9.95 29.983 0.066 -46.014 -180.61
31 753.47 -9.95 -29.983 -0.066 -67.755 218.364
19 CREEP SHRINKAGE30 DIFF
-462.054
SHRINKAGE 6.2 -25.374 0.257 75.731 -90.904
31 462.054 -6.2 25.374 -0.257 20.551 114.429
20 FOOTPATH LIVE 30
LOAD -1.696 -5.568 -0.433 1.7 0.293 -23.771
31 1.696 5.568 0.433 -1.7 1.351 2.643
21 SNOW LOAD FOR3070R LL TRACK
40.372 93.507 0.198 -1.398 -0.412 184.941
31 -40.372 -61.899 -0.198 1.398 -0.34 109.902
22 SNOW LOAD FOR30LL 70R WHEEL
20.202 46.799 0.099 -0.702 -0.205 92.552
31 -20.202 -30.976 -0.099 0.702 -0.17 55.005
23 BRAKING 30 -26.753 -7.529 1.012 0.116 -2.398 -89.127
31 20.416 7.529 -1.012 -0.116 -1.441 60.558
604 COMBINATION LOAD
30 CASE
145.631
504 1.424 -6.116 -0.576 7.311 1067.83
31 -145.631 -1.424 6.116 0.576 15.895 -1062.425

26 30 +ve 138.435 557.666 3.828 11.098 5.435 959.725


210 LOAD GENERATION,
205 LOAD GENERATION,
LOAD
310 LOAD
#210,GENERATION,
(26
320
LOAD
ofLOAD
26)
#205,
GENERATION,
205
(21
LOAD
LOAD
of 26)
#310,
GENERATION,
370LOAD
(18
LOAD
of #320,
26)GENERATION,
LOAD
(2 of 26)
#205, LOAD
(21 of #370,
26) (26 of 26)
-ve -1.412 -11.879 -1.385 -67.68 -9.124 -232.216
133 LOAD GENERATION,
25 LOAD GENERATION,
LOAD
203 LOAD
#133,GENERATION,
LOAD
(1
363of LOAD
26)
#25, GENERATION,
(1310
ofLOAD
26)
LOAD #203,
GENERATION,
27LOAD
(19
LOAD
of #363,
26)
GENERATION,
LOAD
(19 of 26)
#310,
LOAD
(18 of#27,
26) (3 of 26)
26 31 +ve 138.435 392.33 3.828 11.098 5.478 130.706
210 LOAD GENERATION,
213 LOAD GENERATION,
LOAD
310 LOAD
#210,GENERATION,
(26
320
LOAD
ofLOAD
26)
#213,
GENERATION,
313
(3LOAD
ofLOAD
26)#310,
GENERATION,
64LOAD
(18
LOAD
of #320,
26)
GENERATION,
LOAD
(2 of 26)
#313,
LOAD
(21 of#64,
26) (14 of 26)
-ve -1.412 -49.316 -1.385 -67.68 -2.712 -899.262
133 LOAD GENERATION,
32 LOAD GENERATION,
LOAD
203 LOAD
#133,GENERATION,
LOAD
(1
363of LOAD
26)
#32, GENERATION,
(8342
ofLOAD
26)
LOAD #203,
GENERATION,
203LOAD
(19
LOAD
of #363,
26)GENERATION,
LOAD
(19 of 26)
#342, LOAD
(24 of #203,
26) (19 of 26)

-------------------------------------------------------------------------------------------------------------------------------
34 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


27 1 SPECTRUM IN X DIRECTION
31 168.37 100.531 11.506 2.111 24.124 863.677
32 -168.37 -100.531 -11.506 -2.111 -21.67 -485.064
2 SPECTRUM IN Z DIRECTION
31 304.432 140.325 59.641 11.837 57.846 244.041
32 -304.432 -140.325 -59.641 -11.837 -170.587 -761.818
3 SPECTRUM IN Y DIRECTION
31 22.76 22.174 5.531 2.475 7.7 38.575
32 -22.76 -22.174 -5.531 -2.475 -14.085 -112.576
4 DEAD LOAD 31 214.787 317.489 0.585 -2.65 -0.526 -592.919
32 -214.787 -165.472 -0.585 2.65 -1.696 1509.216
5 SIDL (DL) 31 24.455 34.33 -0.401 -25.598 0.563 -118.926
32 -24.455 -5.871 0.401 -28.094 0.958 195.197
6 SIDL(WC) 31 34.176 55.739 0.163 -2.797 0.029 -85.882
32 -34.176 -29.671 -0.163 1.203 -0.648 247.928
7 REMOVAL OF SHUTTER
31 -33.548 -51.362 -0.127 0.614 0.133 89.626
32 33.548 25.863 0.127 -0.614 0.349 -236.142
8 EP ON ABUTMENT31 678.98 -6.998 -2.852 -0.238 5.493 257.637
32 -678.98 6.998 2.852 0.238 5.329 -284.192
9 AT REST EP ON ABUTMENT
31 1141.945 -11.747 -4.801 -0.401 9.247 433.524
32 -1141.945 11.747 4.801 0.401 8.97 -478.099
10 AT K* EP ON ABUTMENT
31 1721.521 -21.095 -6.564 -0.522 12.515 590.08
32 -1721.521 21.095 6.564 0.522 12.392 -670.125
11 LIVE LOAD SURCHARGE
31 AT7.747
REST -30.203 9.811 0.24 -23.058 -225.12
32 -7.747 30.203 -9.811 -0.24 -14.171 110.516
12 DYNAMIC INCREMENT
31 OF403.168
EARTH PR. -3.72 -1.7 -0.136 3.276 145.894
32 -403.168 3.72 1.7 0.136 3.174 -160.01
13 DYNAMIC INCREMENT
31 OF LL2.972
SURCGARGE
-11.324 3.67 0.09 -8.621 -84.465
32 -2.972 11.324 -3.67 -0.09 -5.303 41.497
14 UNLADEN WIND LOAD
31 78.707 56.22 8.379 -1.046 -5.29 -118.946
32 -80.377 -26.509 -8.379 1.046 -26.504 275.904
15 LADEN WIND LOAD31 56.378 28.348 7.484 -0.549 -4.75 -68.185
32 -57.896 -12.942 -7.484 0.549 -23.646 146.521
16 DIFFERNTIAL SETTLEMENT
31 38.845 -62.473 -5.383 -1.191 11.117 -492.48
32 -38.845 62.473 5.383 1.191 9.309 255.426
17 TEMPERATURE RISE
31 1574.3 -21.021 -9.272 0.292 -14.247 468.028
32 -1574.3 21.021 9.272 -0.292 49.43 -547.794
18 TEMPERATURE FALL
31 -719.656 9.782 3.635 -0.126 7.413 -218.27
32 719.656 -9.782 -3.635 0.126 -21.207 255.389
19 CREEP SHRINKAGE31 DIFF
-409.081
SHRINKAGE 6.038 -12.581 0.048 24.779 -114.407
32 409.081 -6.038 12.581 -0.048 22.961 137.32
20 FOOTPATH LIVE 31
LOAD -1.731 -5.627 0.064 1.531 -0.907 -3.124
32 1.731 5.627 -0.064 -1.531 0.664 -18.226
21 SNOW LOAD FOR3170R LL TRACK
40.402 62.259 0.137 -0.935 -0.084 -109.593
32 -40.402 -30.651 -0.137 0.935 -0.436 285.866
22 SNOW LOAD FOR31LL 70R WHEEL
20.216 31.157 0.068 -0.47 -0.041 -54.849
32 -20.216 -15.334 -0.068 0.47 -0.218 143.053
23 BRAKING 31 -19.644 -7.541 0.923 0.086 -1.898 -60.558
32 13.307 7.541 -0.923 -0.086 -1.604 31.943
604 COMBINATION LOAD
31 CASE
142.928
504 1.618 -1.57 -0.242 -3.339 1062.652
32 -142.928 -1.618 1.57 0.242 9.296 -1056.514

27 31 +ve 135.063 396.437 2.651 8.874 7.639 133.26


370 LOAD GENERATION,
213 LOAD GENERATION,
LOAD
310 LOAD
#370,GENERATION,
(26
328
LOAD
of
LOAD
26)
#213,
GENERATION,
206
(3LOAD
ofLOAD
26)#310,
GENERATION,
64LOAD
(18
LOAD
of #328,
26)
GENERATION,
LOAD
(10 of 26)
#206,
LOAD
(22 of#64,
26) (14 of 26)
-ve 0 -47.991 -1.979 -42.541 -5.627 -899.593
- 32 LOAD GENERATION,
203 LOAD GENERATION,
LOAD
370 LOAD
#32, GENERATION,
(8310
ofLOAD
26)
LOAD #203,
GENERATION,
203LOAD
(19
LOAD
of #370,
26)GENERATION,
LOAD
(26 of 26)
#310, LOAD
(18 of #203,
26) (19 of 26)
27 32 +ve 135.063 274.136 2.651 8.874 5.116 0
370 LOAD GENERATION,
48 LOAD GENERATION,
LOAD
310 LOAD
#370,GENERATION,
LOAD
(26
328ofLOAD
#48,
26) GENERATION,
(24
227LOAD
of LOAD
26) #310,
GENERATION,
- LOAD
(18 of #328,
26) LOAD
(10 of 26)
#227, (17 of 26)
-ve 0 -131.563 -1.979 -42.541 -3.301 -1591.921
- 40 LOAD GENERATION,
203 LOAD GENERATION,
LOAD
370 LOAD
#40, GENERATION,
(16
342LOAD
of LOAD
26) #203,
GENERATION,
210LOAD
(19
LOAD
of #370,
26)GENERATION,
LOAD
(26 of 26)
#342, LOAD
(24 of #210,
26) (26 of 26)

-------------------------------------------------------------------------------------------------------------------------------
35 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


28 1 SPECTRUM IN X DIRECTION
32 122.458 108.767 9.386 8.611 15.216 484.978
33 -122.458 -108.767 -9.386 -8.611 -22.692 -78.742
2 SPECTRUM IN Z DIRECTION
32 364.798 47.767 27.437 14.37 31.963 759.507
33 -364.798 -47.767 -27.437 -14.37 -126.619 -913.016
3 SPECTRUM IN Y DIRECTION
32 25.92 8.348 2.884 1.059 2.91 112.138
33 -25.92 -8.348 -2.884 -1.059 -11.072 -138.013
4 DEAD LOAD 32 215.017 151.672 0.54 9.968 -0.105 -1507.844
33 -215.017 0.345 -0.54 -9.968 -1.945 1794.948
5 SIDL (DL) 32 23.957 -3.066 -0.069 0.445 -0.108 -194.082
33 -23.957 31.525 0.069 -54.137 0.371 128.455
6 SIDL(WC) 32 34.258 29.758 0.096 -1.328 0.225 -247.666
33 -34.258 -3.69 -0.096 -0.266 -0.588 311.126
7 REMOVAL OF SHUTTER
32 -33.627 -26.046 -0.102 0.4 0.023 236.024
33 33.627 0.547 0.102 -0.4 0.366 -286.477
8 EP ON ABUTMENT32 674.271 -6.968 -1.041 -0.188 1.543 284.19
33 -674.271 6.968 1.041 0.188 2.408 -310.631
9 AT REST EP ON ABUTMENT
32 1134.02 -11.697 -1.753 -0.316 2.598 478.096
33 -1134.02 11.697 1.753 0.316 4.053 -522.48
10 AT K* EP ON ABUTMENT
32 1710.466 -21.026 -2.04 -0.41 3.018 670.116
33 -1710.466 21.026 2.04 0.41 4.721 -749.898
11 LIVE LOAD SURCHARGE
32 AT
21.156
REST -30.132 8.718 0.313 -15.582 -110.573
33 -21.156 30.132 -8.718 -0.313 -17.5 -3.763
12 DYNAMIC INCREMENT
32 OF400.364
EARTH PR. -3.704 -0.622 -0.109 0.924 160.01
33 -400.364 3.704 0.622 0.109 1.438 -174.064
13 DYNAMIC INCREMENT
32 OF LL7.987
SURCGARGE
-11.298 3.26 0.117 -5.825 -41.518
33 -7.987 11.298 -3.26 -0.117 -6.546 -1.351
14 UNLADEN WIND LOAD
32 88.644 26.858 1.889 -0.643 7.696 -275.737
33 -90.313 2.853 -1.889 0.643 -14.865 321.28
15 LADEN WIND LOAD32 65.306 13.128 1.662 -0.332 6.876 -146.436
33 -66.824 2.278 -1.662 0.332 -13.182 167.021
16 DIFFERNTIAL SETTLEMENT
32 31.513 -62.709 -4.764 -1.617 6.968 -254.923
33 -31.513 62.709 4.764 1.617 11.108 16.974
17 TEMPERATURE RISE
32 1569.045 -20.879 -13.083 0.428 17.705 547.557
33 -1569.045 20.879 13.083 -0.428 31.939 -626.783
18 TEMPERATURE FALL
32 -717.059 9.714 5.848 -0.193 -8.399 -255.28
33 717.059 -9.714 -5.848 0.193 -13.791 292.14
19 CREEP SHRINKAGE32 DIFF
-403.634
SHRINKAGE 5.957 -0.659 -0.055 -10.532 -137.264
33 403.634 -5.957 0.659 0.055 13.033 159.869
20 FOOTPATH LIVE 32
LOAD -1.536 -5.818 0.278 1.114 -1.088 17.874
33 1.536 5.818 -0.278 -1.114 0.035 -39.952
21 SNOW LOAD FOR3270R LL TRACK
40.468 30.962 0.114 -0.587 0.034 -285.709
33 -40.468 0.646 -0.114 0.587 -0.465 343.225
22 SNOW LOAD FOR32LL 70R WHEEL
20.249 15.49 0.057 -0.295 0.018 -142.974
33 -20.249 0.333 -0.057 0.295 -0.233 171.73
23 BRAKING 32 -12.674 -7.546 0.872 0.073 -1.384 -31.949
33 6.337 7.546 -0.872 -0.073 -1.924 3.316
604 COMBINATION LOAD
32 CASE
142.397
504 1.709 -1.011 -0.104 -3.625 1056.615
33 -142.397 -1.709 1.011 0.104 7.462 -1050.129

28 32 +ve 134.276 273.475 2.071 50.608 6.681 0


370 LOAD GENERATION,
48 LOAD GENERATION,
LOAD
310 LOAD
#370,GENERATION,
LOAD
(26
370of
LOAD
#48,
26) GENERATION,
(24
208
LOAD
of LOAD
26) #310,
GENERATION,
- LOAD
(18 of #370,
26) LOAD
(26 of 26)
#208, (24 of 26)
-ve 0 -127.617 -1.849 -11.924 -3.503 -1595.09
- 40 LOAD GENERATION,
203 LOAD GENERATION,
LOAD
254 LOAD
#40, GENERATION,
(16
142
LOAD
of LOAD
26) #203,
GENERATION,
210LOAD
(19
LOAD
of #254,
26)GENERATION,
LOAD
(18 of 56)
#142, LOAD
(10 of #210,
26) (26 of 26)
28 33 +ve 134.276 178.403 2.071 50.608 4.847 0
370 LOAD GENERATION,
56 LOAD GENERATION,
LOAD
310 LOAD
#370,GENERATION,
LOAD
(26
370of
LOAD
#56,
26) GENERATION,
(6370
ofLOAD
26)
LOAD #310,
GENERATION,
- LOAD
(18 of #370,
26) LOAD
(26 of 26)
#370, (26 of 26)
-ve 0 -217.498 -1.849 -11.924 -4.451 -1566.652
- 47 LOAD GENERATION,
203 LOAD GENERATION,
LOAD
254 LOAD
#47, GENERATION,
(23
342
LOAD
of LOAD
26) #203,
GENERATION,
218LOAD
(19
LOAD
of #254,
26)GENERATION,
LOAD
(18 of 56)
#342, LOAD
(24 of #218,
26) (8 of 26)

-------------------------------------------------------------------------------------------------------------------------------
36 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 4 36 26 27 28 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.680 7.360 11.039 14.719
Precast girder only -1.1 1160.0 1961.1 2448.1 2621.2
Construction load -0.2 318.4 545.9 682.5 728.0
Deck slab & X-girder -0.6 936.1 1610.4 2022.3 2171.9
Total wt of deck slab = -1.7 2096.1 3571.5 4470.5 4793.1
SIDL (DL) from staad output -354.9 -105.1 118.3 195.2 128.5
SIDL (WC) from staad output -409.0 -167.5 86.2 247.9 311.1
Removal of shutter 392.1 152.4 -89.8 -236.1 -286.5
Active Earth pressure -211.6 -211.6 -257.6 -284.2 -284.2
Earth pressure at rest -344.8 -231.0 -388.9 -433.5 -310.6
Earth pressure at K* -451.4 -510.0 -590.1 -670.1 -749.9
Live load surcharge 456.2 340.4 225.1 110.5 -3.8
Wind load (unloaded structure) -416.8 -148.5 145.9 160.0 174.1
Wind load (loaded structure) -204.2 -67.4 68.4 146.5 167.0
Differential settlement -900.0 -728.4 492.9 255.4 17.0
Temperature rise -326.1 -387.2 -468.2 -547.8 -626.8
Temperature fall 152.2 180.6 218.4 255.4 292.1
Creep & shrinkage -72.8 -90.8 114.4 137.3 159.9
Footpath live load 38.8 23.4 2.6 -18.2 -40.0
Snow load -238.9 -92.4 55.0 143.1 171.7
Braking load 110.1 89.1 60.6 31.9 3.3
Live Load -2274.3 -961.0 899.3 1591.9 1566.7
Seismic in X- direction -1444.5 -1206.7 -863.7 -485.1 -78.7
Seismic in Z- direction -1196.2 -555.2 -245.8 -761.8 -913.0
Seismic in Y- direction -183.3 -86.8 -38.9 -112.6 -138.0
Dynamic increment of Earth pr. -121.5 -131.8 -145.9 -160.0 -174.1
Dynamic increment of LL Surcharge 159.7 127.7 84.5 41.5 -1.4

Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 139.114 142.084 145.631 142.928 142.397
Moment -1070.6 -1067.5 -1062.4 -1056.5 -1050.1
The hyperstatic action is only considered for calculation of negative moment at support.

b) Shear force (kN)


Desription At support Near L/8 Near L/4 Near 3L/8 At L/2
Precast girder only 379.6 264.5 175.0 58.1 4.4
Deck slab & X-girder 290.2 218.9 147.6 76.3 5.0
Total DL 669.8 483.4 322.6 134.4 9.4
SIDL (DL) from staad output 99.2 78.4 44.3 5.9 -31.5
SIDL (WC) from staad output 94.9 78.0 55.4 29.7 3.7
Active Earth pressure 6.9 7.0 7.0 7.0 7.0
Earth pressure at Rest 11.5 11.7 11.8 11.7 11.7
Earth pressure at K* -20.7 -21.0 -21.1 -21.1 -21.0
Live load surcharge 30.6 30.5 30.3 30.2 30.1
Wind load (unloaded structure) 106.8 85.1 55.8 26.5 -2.9
Wind load (loaded structure) 54.5 43.3 28.1 12.9 -2.3
Differential settlement 61.3 61.4 62.0 62.5 62.7
Temperature rise -21.8 -21.8 -21.4 -21.0 -20.9
Temperature fall 10.1 10.2 10.0 9.8 9.7
Creep & shrinkage 6.4 6.4 6.2 6.0 6.0
Footpath live load -5.5 -5.5 -5.6 -5.6 -5.8
Snow load 58.2 46.6 31.0 15.3 -0.3
Hyperstatic action 1.0 1.1 1.4 1.6 1.7
Braking load 7.5 7.5 7.5 7.5 7.5
Live Load 599.5 555.1 392.3 274.1 178.4
Seismic in X- direction 87.9 88.9 93.3 100.5 108.8
Seismic in Z- direction 232.2 230.6 207.7 140.3 47.8
Seismic in Y- direction 36.4 35.8 31.4 22.2 8.3
Dynamic increment of Earth pr. -3.6 -3.7 -3.7 -3.7 -3.7
Dynamic increment of LL Surcharge 11.5 11.4 11.4 11.3 11.3

-------------------------------------------------------------------------------------------------------------------------------
37 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.1.6 Load Combination - Ultimate limit state


1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+construction Live load(leading) + wind load(accompany)
DL, Support settle, snow
Transverse
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load Wind load Temp load Long. Seismic Vertical Seismic
prestress loss Seismic

1 1.35 1.35 1.75 1.35 1.5


2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
3 (a) 1.35 1.35 1.75 1.35 1.5 0.9
3 (b) 1 1 1 1 1.5 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5
4 (b) 1 1 1 1 1.15 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9
5 (b) 1 1 1 1 1.5 0.9
6 (a) 1.35 1.35 1.75 1.35 1.15 1.5
6 (b) 1 1 1 1 1.15 1.5
7 (a) 1.35 1.35 1.75 1 0.2 1.5 0.45 0.45
7 (b) 1.35 1.35 1.75 1 0.2 0.45 1.5 0.45
7 (c) 1.35 1.35 1.75 1 0.2 0.45 0.45 1.5
7 (d) 1 1 1 1 0.2 1.5 0.45 0.45
7 (e) 1 1 1 1 0.2 0.45 1.5 0.45
7 (f) 1 1 1 1 0.2 0.45 0.45 1.5
a) Moment At support Near L/8 Near L/4 Near 3L/8 At L/2
1 -8280.3 -1247.5 5659.6 7666.6 7725.9
2 (a) -5387.1 -197.5 4434.7 5498.1 5692.0
2 (b) -4173.3 -48.6 3386.2 4095.8 4190.6
3 (a) -8464.1 -1308.2 5721.1 7798.4 7876.2
3 (b) -7250.2 -1159.2 4672.6 6396.1 6374.9
4 (a) -7765.6 -1051.6 5425.2 7324.4 7441.0
4 (b) -6551.8 -902.7 4376.7 5922.1 5939.6
5 (a) -8170.4 -1875.6 6033.2 8098.0 8024.5
5 (b) -6919.2 -1733.4 4938.8 6643.5 6513.9
6 (a) -7545.1 -1470.3 5827.4 7689.3 7664.3
6 (b) -6293.9 -1328.1 4733.0 6234.7 6153.7
7 (a) -7595.0 -2268.8 2991.8 4458.2 5080.2
7 (b) -7334.3 -1584.7 3640.5 4167.6 4204.2 (+)ve
7 (c) -6270.8 -1092.9 3857.8 4849.3 5018.0 value of
7 (d) -6501.9 -2200.7 1807.1 2904.2 3470.1 seismic
7 (e) -6241.2 -1516.5 2455.9 2613.6 2594.1 force
7 (f) -5177.7 -1024.7 2673.2 3295.3 3407.9
7 (a) -1729.7 1537.7 5580.2 6573.2 6266.7
7 (b) -1990.4 853.5 4931.5 6863.8 7142.7 (-)ve value
7 (c) -3053.9 361.7 4714.2 6182.1 6328.9
of seismic
7 (d) -636.5 1605.8 4395.6 5019.2 4656.6
force
7 (e) -897.2 921.6 3746.9 5309.8 5532.6
7 (f) -1960.7 429.8 3529.5 4628.1 4718.8
Maximum -8464.1 1605.8 6033.2 8098.0 8024.5
Minimum -636.5 -2268.8 1807.1 2613.6 2594.1

b) Shear At support Near L/8 Near L/4 Near 3L/8 At L/2


1 2328.7 1937.3 1370.0 820.7 391.0
2 (a) 1586.7 1229.4 862.3 446.4 116.5
2 (b) 1198.3 930.1 653.4 341.5 93.5
3 (a) 2377.8 1976.3 1395.3 832.3 388.9
3 (b) 1989.3 1677.0 1186.4 727.5 365.9
4 (a) 2200.0 1807.3 1274.2 743.5 324.5
4 (b) 1811.5 1508.0 1065.3 638.7 301.5
5 (a) 2228.9 1865.9 1298.1 748.9 319.4
5 (b) 1851.8 1578.0 1100.8 655.6 307.8
6 (a) 2005.3 1677.0 1166.1 658.1 262.1
6 (b) 1628.2 1389.1 968.8 564.8 250.6
7 (a) 1763.5 1430.5 1069.0 649.9 309.5
7 (b) 1915.1 1579.3 1189.1 691.7 245.5
7 (c) 1709.5 1374.7 1004.0 567.7 204.1
7 (d) 1379.1 1135.3 864.3 549.3 290.6
7 (e) 1530.7 1284.1 984.4 591.0 226.5
7 (f) 1325.1 1079.5 799.3 467.0 185.1
Maximum 2377.8 1976.3 1395.3 832.3 391.0

-------------------------------------------------------------------------------------------------------------------------------
38 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.1.7 Load Combination for Rare Combination (SL1)


1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
DL, Support settle, snow Secondary
Creep &
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Prestress Live load Wind load Temperature effect of
prestress loss Shrinkage
Prestress
1(a) 1 1 1.2 1 1.1 or 0.9 1 1
1(b) 1 1 1 1 1.1 or 0.9 1 1
2 (a) 1 1 1.2 1 1.1 or 0.9 1 1 1
2 (b) 1 1 1 1 1.1 or 0.9 1 1 1
3 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
3 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
4 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
4 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
5 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
5 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
6 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
6 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
4.2 Cable Details
Maximum midspan Moment for outer girder =
Precast Girder Only = 2621.19 kN-m
Deck Slab & Cross Girder = 2171.94 kN-m
SIDL = 439.58 kN-m
Wind load = 100.21 kN-m
Live Load = 1566.65 kN-m
Total Moment = 6899.6 kN-m
Sectional Properties Inner Composite Girder at Midspan :-
Area - A = 1.603 m2
Moment of Inertia - I = 0.692 m4
CG from bottom = 1.352 m
Z Bottom = 0.512 m3
Assume Nos. of Cable = N
Ultimate Force of each 19T13 strands P = 3490 kN
Applied Force = 2733 kN
CG From bottom = 0.141 m
"e" from CG of Girder = 1.211 m
Assum overall Loss = 30 %
Stress at bottom of Girder = NP/A+NP*e/ZBottom-M/Zbottom = 0
N = (M/ZBottom)/(P/A+P*e/ZBottom) = 2.36
Say, No of Cables Provided = 3.32

4.2.1 Calculation of Friction & Slip loss

0.300
4

0.350
X X X 3
1.775 0.400

2
4 0.400

1 3 2 0.170 1 0.325
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support

-------------------------------------------------------------------------------------------------------------------------------
39 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

0.25 14.719
Y
4.50
1 2 X 0.17
0.17

0.15 14.969

Cable profile in Plan

0.15
0.30 4
0.350 3

0.400 Z
2
0.400
1 0.170
0.125
0.33 0.25 3.000 4.50 3.00 4.219
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.325-0.125)/(0.25+3-0.15)} = 3.691
o
Vertical bending of Cable 2 =Tan-1{(0.325+0.4-0.125-0.17)/(0.25+3+4.5-0.15)} = 4.514
o
Vertical bending of Cable 3 =Tan-1{(0.325+0.4+0.4-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 5.389
o
Vertical bending of Cable 4 =Tan-1{(0.325+0.4+0.4+0.35-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 6.352
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.325 3.100 0.000 0.125
2 0.000 0.000 0.725 7.600 -0.170 0.125
3 0.000 0.000 1.13 10.600 0.000 0.125
4 0.000 0.000 1.48 10.600 0.000 0.295

Cable Start of Horizontal Bending End of Horizontal Bending Midspan


No. X Y Z X Y Z X Y Z
1 3.100 0.000 0.125 7.600 0.170 0.125 14.819 0.170 0.125
2 3.100 0.000 0.480 7.600 -0.170 0.125 14.819 -0.170 0.125
3 0.000 0.000 0.000 0.000 0.000 0.000 14.819 0.000 0.125
4 0.000 0.000 0.000 0.000 0.000 0.000 14.819 0.000 0.295
C.G. of Cables from Bottom of girder at different Locations
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.680 7.360 11.039 14.719 Distance from
Cable 1 0.293 0.125 0.125 0.125 0.125 Anchorage End
Cable 2 0.686 0.434 0.144 0.125 0.125
Cable 3 1.078 0.778 0.431 0.125 0.125
Cable 4 1.419 1.065 0.656 0.295 0.295

Friction & Slip Loss


Type of Tendon = 19T/13
2
Modulous of Elasticity (E) = 195 Gpa = 1.95E+08 kN/m
Refer figure 6.3, clause no.7.9.2, table no. 18.4 of IRC 112-2011
Cross Sectional Area(A) = 1877 mm2
Ultimate Force of each 19T13 strands (Breaking load each strand =183.7 kN) = 3490.30 kN
Applied Force -P(je) = (90% of 0.1% proof load = =0.9*0.87*183.7) = 2733 kN
Cofficient of Friction (µ) = 0.17 per radian
Wobble factor (k) = 0.002 per meter
Slip (∆L) = 6 mm.
P(je)=P(x)e (µφ+kl) or P(x)=P(je)/e (µφ+kl)

-------------------------------------------------------------------------------------------------------------------------------
40 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2447.56
1-2 3.106 0.00 0.000 1.0062
2 2715.98 2464.49
2-3 4.503 4.622 0.081 1.0230
3 2654.97 2525.50
3-4 7.219 2.781 0.049 1.0229
4 2595.41 2585.06

3.106 4.503 7.219


2732.90 2715.98 2654.97
1 2 3 2595.41
= 4
= 2525.50 2585.06
7.219
2447.56 2464.49
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2585.055 kN
Point of Zero Slip from node 3 = 7.219 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 29.657 m
Extension of cable at each side = 113.93 mm

Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2440.90
1-2 3.110 0.00 0.000 1.0062
2 2715.96 2457.84
2-3 4.517 5.302 0.093 1.0251
3 2649.53 2524.28
3-4 7.219 2.781 0.049 1.0229
4 2590.09 2590.09
3.110 4.517 7.219
2732.90 2715.96
1 2 2649.53 2590.09
= 3
= 2583.71 4
2457.84 2524.28
2440.90 7.219
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2583.71 kN
Point of Zero Slip from node 3 = 7.219 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 29.692 m
Extension of cable = 113.92 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2492.94
1-2 10.647 0.00 0.000 1.0215
2 2675.33 2550.52
2-3 4.219 5.389 0.094 1.0247
3 2610.76 2610.76
10.647 4.219
2732.90 2675.33
1 2 2610.76
= 3
= 2612.92
2550.52 4.078
2492.94
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2612.923 kN
Point of Zero Slip from node 1 = 4.078 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.647+4.219)x2 = 29.732 m
Extension of cable at each side = 115.11 mm

-------------------------------------------------------------------------------------------------------------------------------
41 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Cable 4 6 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 863.02 786.70
1-2 10.665 0.00 0.000 1.0216
2 844.81 804.91
2-3 4.219 6.352 0.111 1.0277
3 822.07 822.07
10.665 4.219
863.02 844.81
1 2 822.07
= 3
= 824.86
804.91 3.701
786.70 Force Diagram before & after Slip Loss
Assume Force of zero slip = 824.8614 kN
Point of Zero Slip from node 1 = 3.701 m
Area of Shaded Portion = ExAx∆L = 693.576 kN-m
Area of Shaded Portion = 693.576 kN-m
Diferance of these two forces = 693.58-693.58 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.665+4.219)x2 = 29.769 m
Extension of cable at each side = 115.21 mm
4.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.680 7.360 11.039 14.719
Cable 1 2450.29 2467.61 2522.11 2553.79 2585.06
Vert. angle 3.691 3.691 3.691 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.293 0.125 0.125 0.125 0.125
Cable 2 2443.62 2460.95 2520.34 2555.39 2590.09
Vert. angle 4.514 4.514 4.514 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.686 0.434 0.144 0.125 0.125
Total cable
forces Normal 4881.24 4915.81 5023.48 5106.17 5175.14
at first stage
CG of Cable 0.489 0.279 0.135 0.125 0.125
Total cable
forces Per.
350.07 352.55 360.31 0.00 0.00
Cable 3 2495.65 2512.84 2532.74 2552.64 2610.76
Vert. angle 5.389 5.389 5.389 5.389 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.078 0.778 0.431 0.125 0.125
Cable 4 787.55 792.98 799.27 822.07 822.07
Vert. angle 6.352 6.352 6.352 6.352 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.419 1.065 0.656 0.295 0.295
Total cable
forces Normal 3267.33 3289.85 3315.91 3358.38 3432.83
CG of Cable 1.160 0.847 0.485 0.166 0.166
Total cable
321.53 323.75 326.31 330.70 0.00
forces CG
Overall Per.of
Cable 0.758 0.507 0.274 0.141 0.141
% loss 9.8 % 9.1 % 7.6 % 6.4 % 5.0 %
4.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 29.657 113.93
Cable 2 29.692 113.92
Cable 3 29.732 115.11
Cable 4 29.769 115.21

-------------------------------------------------------------------------------------------------------------------------------
42 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.3 Construction sequence of precast girder & deck slab


All 4 nos. Precast girders shall be cast over abutment with proper staging or casting yard. After 5 days casting of Girder, first
stage cables shall be stressed as per given force & elongation. Second stage cables shall be stressed after 28 days of casting of
precast girder. All Precast girders shall be placed/erected on PCC levelled plinth over abutment wall. Deck slab & X-Girder shall
be monolithically cast after erecting necessary shuttering from precast girder at 60 days except at top of abutment portion. After
30 days casting of Deck Slab i.e. after 90 days casting of Precast Girder, top of abutment cap shall be cast for jointing of
superstructure & substructure after removing of all shuttering. After 28/30 days jointing of superstructure & substructure i.e.
after 120 days casting of Precast Girder, SIDL shall be laid.
4.3.1 Loss calculation
4.3.1.1 Loss due to Elastic Shortening
Refer clause no.6.4.2.2, Annexure A-2 of IRC 112-2011 Average loss in Cable Stress = 1/2 m f c
f cm (t) = βcc(t)f cm βcc(t) = exp{S[1-(28/(t/t1)0^0.5]}
f ck = Grade of concrete = M 40
f cm (t) = mean concrete compressive strength at age 't' days
f cm = mean concrete compressive strength at age '28' days = 50 Mpa
t = Age of concrete in days = 5 days
t1 = 1 day S = 0.25
βcc(t) = 0.71 f cm (t) = 35.53 Mpa
f ck (t) = 25.53 Mpa
corresponding Ecm = 22x(f cm/12.5)^0.3 = 30.10 Gpa
Ep = 195.00 Gpa m =Modular Ratio = Ec/Ecj = 6.48
To calculate average stress fc at CG of Cables due to Prestress and
Depth of Girder = 1.775 m Assume, Elastic Shortening = 55.45 kN/Cable
2.03 %
2
Area of each Cable = 1877.20 mm Number of cables (cable 1 to 4) = 2.00 Nos
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Sustained Stress of precast girder only at 5 days :-
Dead Load Dead Load Stress at
Cable Force (kN)
Section After fr. & After fr., slip & Cable CG from Stress Moment (kN- Stress Total Stress cable CG
slip loss ES loss soffit (m) (Mpa) m) (kN/m2) (Mpa) (Mpa)
T -1.09 0.00 -1.09
End 4881.24 4770.34 0.489 -1.13 5.74
B 8.34 0.00 8.34
T -2.35 2.66 0.32
L/8 4915.81 4804.90 0.279 1160.04 9.27
B 14.09 -3.15 10.94
T -4.03 4.50 0.47
L/4 5023.48 4912.57 0.135 1961.06 10.21
B 16.34 -5.33 11.01
T -4.21 5.62 1.41
3L/8 5106.17 4995.26 0.125 2448.11 9.48
B 16.74 -6.65 10.09
T -4.27 6.02 1.75
L/2 5175.14 5064.24 0.125 2621.19 9.28
B 16.98 -7.12 9.86
Average stress fc = (5.74+2x(9.27+10.21+9.48)+9.28)/8 = 9.12 Mpa
Average Loss of cable stress = 1/2 m fc = 29.54 Mpa
Loss of each cable due to Elastic shortening = 1/2 m fc As = 55.45 kN
-4.27 Mpa 6.02 Mpa 1.75 Mpa
> -1.57
Mpa
X X + = < 12.26
Mpa
Hence O.K.

16.98 Mpa -7.12 Mpa 9.86 Mpa


Precast Stress due to 1st stage Stress due to DL of Girder Resultant Stress at 7
Girder stressing after loss days
Stress Diagram at Midspan of Precast Girder at 5 days of Casting of Girder
Permissible Compressive stress 0.48xfcm(t) = 12.26 MPa
Permissible tensile stress 0.7xftmj = 1.57 MPa

-------------------------------------------------------------------------------------------------------------------------------
43 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4770+2x(4805+4913+4995)+5064)/8 = 4907.51 kN
Percentage of Initial force = 0.703 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.56 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4907.51/2x2.56/100 = 62.83 kN/Cable

Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 23.25 kN/Cable
5 - 28 days Loss = 26.39 kN/Cable
28 - 60 days Loss = 13.19 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 125.65 kN/Cable
Total = 188.48 kN/Cable
188.479 6.90 %

4.3.1.3 Computation of shrinkage strain (clause no. 6.4.2.6, IRC:112 - 2011)


Total shrinkage strain, εcs = εcd + εc a
Where, εcd is drying shrinkage strain and εca is autogenous shrinkage strain
Maximum Autogenous shrinkage strain εca = 0.00006 (refer table 6.6 of IRC:112 - 2011)
The development of autogenous shrinkage with time εc a(t) = β as(t) x εc a
Where, β as(t) = 1-esp{-0.2sqrt(t)} where t is in days.
The development of dying shrinkage strain in time εcd(t) = β ds(t,ts) * kh x εcd
Where, β ds(t,ts) = (t-ts)/[(t-ts)+0.04sqrt(ho^3) End of curing of concrete t s = 5.00 day
kh is a coefficient depending on notional size ho
Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
Precast Girder only
C/S area of girder at span A c = 0.928 m2 Perimeter in contact with air u = 6.523 m
Nominal size of precast member h 0=2Ac/u = 284.38 mm
Composite Girder
C/S area of comp. girder at span A c = 1.603 m2 Perimeter in contact with air u = 10.473 m
Nominal size of member h0=2Ac/u = 306.03 mm
The drying shrinkage strain ε cd,0 =0.85*((220+110*αds1)*EXP(-αds2*fcm/fcm,o))*β RH/10^6 = 0.0004
Coefficient αds1 (normal cement) = 4.0 Coefficient α ds2 (normal cement) = 0.12
The coefficient β RH = 1.55 x [1-RH/Rho]^3 = 1.02 fcmo = 12.50
Relative humidity of enviroment RH = 70.0 % RHo = 100 %
These are expected mean values, with a coefficient of variation of about 30 percent.
Loss of Prestress due to creep, shrinkage and relaxation as per Euro code
∆Pc+s+r = AP + ∆σPc+s+r = Ap * (εcs*EP+0.8*∆Pr+EP/Ecm*φ(t,to)*σcQP)
1+EP/Ecm*AP/Ac*(1+Ac/Ic*Zcp^2)*(1+0.8*φ(t,to))
Development of shrinkage of concrete
Autogenous Nominal size of Drying
Shrinkage Loss due to
Days shrinkage factor member h0 shrinkage kh strain shrinkage
β as(t) (mm) factor β as(t)

5 0.000 0 0.000 0.000 0.000000 0.00


28 0.653 284 0.107 0.766 0.000074 25.42
60 0.788 306 0.223 0.748 0.000120 16.02
90 0.850 306 0.307 0.748 0.000152 11.19
36500 1.000 306 0.995 0.748 0.000397 84.56
Total 137.192 5.02 %

120 0.888 306 0.375 0.748 0.000178

-------------------------------------------------------------------------------------------------------------------------------
44 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.3.1.4 Computation of creep coefficients (clause no. 6.4.2.7, IRC:112 - 2011)


Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
The creep coefficient φ(t,to) = φo x βc(t,to) as per A2-14of IRC:112 - 2011
Where, φo = φRH x β(fcm) x β(to)
φRH = 1+(1-RH/100)/{0.1*(ho)^1/3} for fcm <= 45MPa
φRH = [1+(1-RH/100)/{0.1*(ho)^1/3} x α1] x α2 for fcm > 45MPa
The coefficient α 1 =(43.75/fcm)^0.7 = 0.91
The coefficient α 2 =(43.75/fcm)^0.2 = 0.97
The coefficient β(fcm) = 18.78/sqrt(fcm) = 2.66
The coefficient β (t0) = 1/(0.1+to^0.2) = 0.68
Where, age of concrete at first loading t 0 =5 day
βc(t,to) =[(t-to)/(β H +t-to)]^0.3
βH = = 1.5 x [1+(0.012RH)^18] x ho + 250 <= 1500 for fcm <= 35MPa
= 1.5 x [1+(0.012RH)^18] x ho + 250α3 <= 1500α3 for fcm <= 35MPa
The coefficient α 3 =(43.75/fcm)^0.5 = 0.94
For temperature greater than 40oC theby 10% in absence of accurate data coefficient may be increased by 10%
in absence of accurate data. This is valid for concrete using normal cement.
Development of creep
Loss due to
Creep
Days h0 (mm) φRH φo βH β c(t,to) creep of
coeff. φo concrete

5 0 0.00 0.000 0.00 0.000 0.000 0.00


28 284 1.38 2.474 678.92 0.359 0.976 102.12
60 306 1.37 2.456 712.80 0.453 1.225 41.23
90 306 1.37 2.456 712.80 0.511 1.380 16.27
36500 306 1.37 2.456 712.80 0.994 2.686 128.88
Total 288.50 10.56 %
4.3.2 Sustained Stress of precast girder at 28 days after stressing of cable
Losses:- Shrinkage = 25.42 kN/Cable
Relaxation = 49.63 kN/Cable
Creep = 102.12 kN/Cable
Total = 177.17 kN/Cable Total Loss for 2 Cables = 354.34 kN
f ck for 28 days strength = M 40 Modulus of elasticity E 33346 MPa
m =Modular Ratio = Ecm/Ecj = 5.85
Stressing of cable no. 4
Elastic Shortening = 58.83 kN/Cable Nomber of cables 1.316 Nos
Relaxation = 23.25 kN/Cable Depth of Girder 1.775 m
Total = 82.08 kN/Cable
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Cable Force (kN)
Stress at 5 loss bet. 5 Cable CG Stress due After fr., Cable CG Total Stress at
Section days - 28 days from soffit to loss After fr. & slip & ES from soffit Stress Stress cable CG
(kN/m2) (Tons) (m) (Mpa) slip loss loss (m) (Mpa) (Mpa) (Mpa)
T -1.09 0.11 3.53 2.54
End -471.99 0.489 3267.33 3159.34 1.160 6.62
B 8.34 -0.83 0.65 8.17
T 0.32 0.23 2.59 3.13
L/8 -471.99 0.279 3289.85 3181.86 0.847 12.28
B 10.94 -1.38 4.43 13.98
T 0.47 0.39 -0.06 0.80
L/4 -471.99 0.135 3315.91 3207.91 0.485 15.83
B 11.01 -1.57 7.62 17.06
T 1.41 0.40 -2.43 -0.63
3L/8 -471.99 0.125 3358.38 3250.39 0.166 17.66
B 10.09 -1.58 10.53 19.04
T 1.75 0.40 -2.49 -0.35
L/2 -471.99 0.125 3432.83 3324.84 0.166 17.68
B 9.86 -1.58 10.78 19.05
Average stress σs at CG of cables for 28 days = (6.62+2x(12.28+15.83+17.66)+17.68)/8 = 14.48 Mpa
Loss of cable stress = m (fc-fc') = 31.34 Mpa
Loss of each cable due to Elastic shortening = m f c As = 58.83 kN
1.75 Mpa 0.40 Mpa -2.49 Mpa -0.63 Mpa
> -2.12
Mpa
+ + =
< 20.00
Mpa
9.86 Mpa -1.58 Mpa 10.78 Mpa 19.05 Mpa Hence O.K.
-------------------------------------------------------------------------------------------------------------------------------
45 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Stress due to loss between 5 Stress due to stressing of Resultant Stress at 28


Resultant Stress at 5 days to28 days cables 3 days
Stress Diagram at Midspan of Precast Girder at 28 days of Casting of Girder

Permissible Compressive stress 0.5xfcm = 20.00 MPa


Permissible tensile stress 0.7xftmj = 2.12 MPa

4.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 13.19 kN/Cable Relaxation = 39.58 kN/Cable
Creep = 41.23 kN/Cable Creep = 41.23 kN/Cable
Total = 70.44 kN/Cable Total = 96.83 kN/Cable
actual time dependent losses = 70.44 kN/Cable actual time dependent losses = 96.83 kN/Cable
Total Loss of 4 Cables = 268.29 kN Actual Loss of third Cables = 127.41 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m

Stress at Cable CG Stress due Total Moment Stress Total Stress at


Section 28 days Stress
loss bet. 28 - from soffit to loss due to slab due to slab Stress cable CG
(kN/m2) 60 days (kN) (m) (Mpa) (kN/m2) (kN-m) (Mpa) (Mpa) (Mpa)
Top of girder 2.54 -0.08 2.46 0.00 2.46
End -268.29 0.758 -0.82 5.56
Bottom 8.17 -0.30 7.87 0.00 7.87
Top of girder 3.13 -0.01 3.12 2.88 6.00
L/8 -268.29 0.507 1254.45 8.83
Bottom 13.98 -0.62 13.36 -3.41 9.95
Top of girder 0.80 0.13 0.93 4.95 5.88
L/4 -268.29 0.274 2156.33 9.71
Bottom 17.06 -0.79 16.27 -5.86 10.41
Top of girder -0.63 0.22 -0.41 6.21 5.80
3L/8 -268.29 0.141 2704.82 10.41
Bottom 19.04 -0.89 18.15 -7.35 10.81
Top of girder -0.35 0.22 -0.13 6.65 6.52
L/2 -268.29 0.141 2899.92 9.99
Bottom 19.05 -0.89 18.16 -7.88 10.29
Average stress σs at CG of cables for 60 days = (5.56+2x(8.83+9.71+10.41)+9.99)/8 = 9.18 Mpa

-0.35 Mpa 0.22 Mpa 6.65 Mpa 6.52 Mpa


> -2.12
Mpa

+ + =
< 20.00
Mpa
19.05 Mpa -0.89 Mpa -7.88 Mpa 10.29 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder

4.3.4 Sustained stress of composite girder at 90 days


After 30 days casting of Deck Slab i.e.after 90 days casting of Precast Girder, Shuttering to be removed and
Apply of SIDL shall be done.
fck for precast girder at 90 days of Concrete I.e. 100% of fc = 40 Mpa
Ecj = 33.3 Gpa Es = 195 Gpa
m =Modular Ratio = Ec/Ecj = 5.85
Area of each Cable = 1877.20 mm2
Depth of Composite Girder = 2.000 m
Depth of Precast Girder = 1.775 m
Thickness of deck slab = 225 mm

Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
Losses:- Shrinkage = 11.19 kN/Cable
Relaxation = 0.00 kN/Cable
Creep = 16.27 kN/Cable
Total = 27.46 kN/Cable
Total Loss = 91.06 kN/Cable
actual time dependent losses = 91.06 kN

-------------------------------------------------------------------------------------------------------------------------------
46 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Total Stress
Stress due Loss of CG of Cables Stress due Moment due due to Total Stress at
Section
at 60 days Cables from soffit to loss to SIDL SIDL Stress cable CG
(Mpa) (kN) (m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab 0.00 0.00 -0.34 -0.34
Top of girder 2.46 -0.01 -371.86 -0.24 2.20
End -91.06 0.758 5.71
Bottom 7.87 -0.11 0.56 8.32
Top of slab 0.00 0.02 -0.11 -0.10
Top of girder 6.00 -0.01 -120.20 -0.07 5.92
L/8 -91.06 0.507 8.82
Bottom 9.95 -0.21 0.23 9.98
Top of slab 0.00 0.04 0.11 0.14
Top of girder 5.88 0.00 114.72 0.07 5.96
L/4 -91.06 0.274 9.33
Bottom 10.41 -0.25 -0.22 9.94
Top of slab 0.00 0.05 0.19 0.24
Top of girder 5.80 0.01 206.98 0.13 5.93
3L/8 -91.06 0.141 9.80
Bottom 10.81 -0.27 -0.40 10.13
Top of slab 0.00 0.05 0.14 0.19
Top of girder 6.52 0.01 153.10 0.09 6.63
L/2 -91.06 0.141 9.47
Bottom 10.29 -0.27 -0.30 9.71
Average stress at 90 days = (5.71+2x(8.82+9.33+9.8)+9.47)/8 = 8.88 Mpa
0.00 Mpa 0.05 0.14 Mpa 0.19 Mpa
6.52 0.01 Mpa 0.09 6.63 Mpa
Mpa Mpa

+ + =

10.29 -0.27 Mpa -0.30 Mpa 9.71 Mpa


Resultant Stress at 60 Loss of Cables between 60 to Resultant Stress at 90
Stress due to SIDL
days 90 days days
Stress Diagram at Midspan of Composite Girder at 90 days

4.3.5 Sustained Stress of composite girder at α days :-


Losses:- Shrinkage = 84.56 kN/Cable
Relaxation = 125.65 kN/Cable
Creep = 128.88 kN/Cable
Total = 339.10 kN/Cable
Total Loss = 1124.38 kN/Cable
actual time dependent losses = 1124.38 kN

-------------------------------------------------------------------------------------------------------------------------------
47 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)

Top of slab -0.34 -0.03 -1.05 -1.42


Top of girder 2.20 -0.18 139.11 -1070.58 -0.75 1.27
End -1124.38 0.758 5.42
Bottom 8.32 -1.37 1.56 8.51
Top of slab -0.10 0.23 -1.09 -0.95
Top of girder 5.92 0.00 142.08 -1067.53 -0.74 5.18
L/8 -1124.38 0.507 8.76
Bottom 9.98 -1.79 2.00 10.19
Top of slab 0.14 0.47 -1.09 -0.47
Top of girder 5.96 0.17 145.63 -1062.43 -0.74 5.39
L/4 -1124.38 0.274 9.06
Bottom 9.94 -2.19 1.99 9.73
Top of slab 0.24 0.61 -1.08 -0.23
Top of girder 5.93 0.27 142.93 -1056.51 -0.74 5.47
3L/8 -1124.38 0.141 9.35
Bottom 10.13 -2.42 1.98 9.69
Top of slab 0.19 0.61 -1.07 -0.27
Top of girder 6.63 0.27 142.40 -1050.13 -0.73 6.16
L/2 -1124.38 0.141 9.01
Bottom 9.71 -2.42 1.96 9.26
Average stress at α days = (5.42+2x(8.76+9.06+9.35)+9.01)/8 = 8.60 Mpa
0.19 Mpa 0.61 -0.27 Mpa
6.63 Mpa 0.27 Mpa 6.16 Mpa < 19.2 Mpa
Mpa Hence O.K.

+ =

9.71 Mpa -2.42 Mpa 9.26 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at 90 Loss of Cables inbet. 90 to
Resultant Stress at α days
days α days
Stress Diagram at Midspan of Composite Girder with SIDL without Live Load at α days

4.3.6 Stress of composite girder due to live load

Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.42 -1.57 -0.11 -3.09
Top of girder 1.27 -1707.96 -122.50 -1.10 -0.08 0.10
End
Bottom 8.51 2.59 0.19 11.30
Top of slab -0.95 -0.50 -0.04 -1.49
Top of girder 5.18 -531.52 -40.44 -0.33 -0.02 4.83
L/8
Bottom 10.19 1.04 0.08 11.30
Top of slab -0.47 1.11 0.04 0.68
Top of girder 5.39 1184.96 41.02 0.72 0.03 6.14
L/4
Bottom 9.73 -2.32 -0.08 7.34
Top of slab -0.23 1.63 0.08 1.48
Top of girder 5.47 1734.38 87.91 1.06 0.05 6.58
3L/8
Bottom 9.69 -3.39 -0.17 6.13
Top of slab -0.27 1.47 0.09 1.29
Top of girder 6.16 1569.97 100.21 0.96 0.06 7.19
L/2
Bottom 9.26 -3.07 -0.20 5.99

-------------------------------------------------------------------------------------------------------------------------------
48 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

-0.27 Mpa 1.47 Mpa 1.29 Mpa


6.16 Mpa 0.96 7.19 Mpa < 19.20 Mpa
Mpa Hence O.K.
+ =

9.26 Mpa -3.07 Mpa 5.99 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at α days Stress due to Live Load Resultant Stress at α days

Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 7.2 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -3.1 Mpa
Tension reinforcement at top of support are provided
4.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Axial Force Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder & Moment (Mpa)
Top of slab snow (kN-m) 0.13 F=139.11 -1.08
Top of girder 0.08 1.31
End -1.73 136.8 8148.58 0.758 -690.89 -1611.14 -1070.58
Bottom -0.20 8.03
Top of slab -1.25 F=142.08 -0.82
Top of girder 4.00 -0.66
L/8 2096.11 -1329.2 8205.66 0.507 -690.89 -1611.14 -1067.53
Bottom -3.10 15.73
Top of slab 0.09 F=145.63 -0.46
Top of girder 8.26 -4.52
L/4 3571.45 97.3 8339.39 0.274 -690.89 -1611.14 -1062.43
Bottom -9.89 20.13
Top of slab 0.02 F=142.93 -0.26
Top of girder 10.27 -6.81
3L/8 4470.46 25.8 8464.55 0.141 -690.89 -1611.14 -1056.51
Bottom -12.19 22.87
Top of slab -0.15 F=142.40 -0.25
Top of girder 10.90 -6.92
L/2 4793.13 -161.4 8607.98 0.141 -690.89 -1611.14 -1050.13
Bottom -12.70 23.33

Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.70 -1.57 -0.11 4.32 -2.50
Top of girder -0.49 -1.10 -0.08 -1.10 0.90
End -763.92 -1707.96 -122.50
Bottom 1.16 2.59 0.19 1.67 -2.39
Top of slab -0.26 -0.50 -0.04 4.32 -2.50
Top of girder -0.17 -0.33 -0.02 -1.10 0.90
L/8 -272.61 -531.52 -40.44
Bottom 0.53 1.04 0.08 1.67 -2.39
Top of slab 0.19 1.11 0.04 4.32 -2.50
Top of girder 0.13 0.72 0.03 -1.10 0.90
L/4 204.55 1184.96 41.02
Bottom -0.40 -2.32 -0.08 1.67 -2.39
Top of slab 0.42 1.63 0.08 4.32 -2.50
Top of girder 0.27 1.06 0.05 -1.10 0.90
3L/8 443.13 1734.38 87.91
Bottom -0.87 -3.39 -0.17 1.67 -2.39
Top of slab 0.41 1.47 0.09 4.32 -2.50
Top of girder 0.27 0.96 0.06 -1.10 0.90
L/2 439.58 1569.97 100.21
Bottom -0.86 -3.07 -0.20 1.67 -2.39
4.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)

-------------------------------------------------------------------------------------------------------------------------------
49 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

b) Stresses of girder at different load casees


Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.69 -1.55 -1.76 -1.62 -3.32 -3.18 -2.98 -2.84 -0.67
Top of girder 0.67 0.77 0.63 0.73 -0.47 -0.37 -0.23 -0.13 -1.08
End
Bottom 8.41 8.18 8.53 8.29 11.12 10.89 10.55 10.31 12.01
Top of slab -2.29 -2.24 -2.31 -2.26 -2.81 -2.76 -2.70 -2.65 -0.20
Top of girder 3.20 3.23 3.19 3.22 2.86 2.89 2.93 2.97 2.22
L/8
Bottom 11.70 11.59 11.75 11.64 12.78 12.68 12.56 12.45 13.74
Top of slab -0.10 -0.13 -0.07 -0.11 1.04 1.00 0.77 0.74 3.60
Top of girder 4.34 4.31 4.35 4.33 5.08 5.05 4.91 4.88 4.40
L/4
Bottom 7.75 7.83 7.70 7.78 5.38 5.46 5.93 6.01 6.43
Top of slab 0.29 0.21 0.34 0.26 1.97 1.88 1.59 1.51 4.51
Top of girder 4.47 4.42 4.51 4.45 5.57 5.51 5.32 5.27 4.87
3L/8
Bottom 7.35 7.52 7.25 7.42 3.86 4.03 4.63 4.81 4.96
Top of slab 0.12 0.04 0.17 0.09 1.65 1.56 1.31 1.23 4.18
Top of girder 4.99 4.94 5.03 4.98 5.99 5.94 5.78 5.72 5.29
L/2
Bottom 7.27 7.44 7.15 7.32 4.08 4.25 4.77 4.94 5.20

-------------------------------------------------------------------------------------------------------------------------------
50 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab -0.53 -4.76 -4.62 1.45 1.59 -5.36 -5.22 1.59 -5.36
Top of girder -0.98 0.12 0.21 -1.25 -1.15 0.75 0.85 0.85 -1.25
End
Bottom 11.78 9.58 9.34 12.03 11.80 7.97 7.74 12.03 7.74
Top of slab -0.15 -4.29 -4.24 1.65 1.70 -5.16 -5.11 1.70 -5.16
Top of girder 2.25 3.41 3.45 1.86 1.89 3.85 3.89 3.89 1.86
L/8
Bottom 13.63 11.30 11.20 14.15 14.04 10.09 9.98 14.15 9.98
Top of slab 3.57 -0.49 -0.52 5.05 5.01 -1.76 -1.80 5.05 -1.80
Top of girder 4.38 5.60 5.58 3.78 3.76 5.78 5.76 5.78 3.76
L/4
Bottom 6.51 4.00 4.08 7.68 7.76 3.62 3.70 7.83 3.62
Top of slab 4.42 0.42 0.33 5.83 5.74 -0.99 -1.07 5.83 -1.07
Top of girder 4.82 6.07 6.02 4.17 4.12 6.17 6.11 6.17 4.12
3L/8
Bottom 5.13 2.53 2.70 6.47 6.65 2.42 2.59 7.52 2.42
Top of slab 4.10 0.09 0.01 5.54 5.45 -1.28 -1.36 5.54 -1.36
Top of girder 5.24 6.49 6.44 4.61 4.56 6.61 6.56 6.61 4.56
L/2
Bottom 5.37 2.76 2.94 6.63 6.81 2.58 2.75 7.44 2.58

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.91 -1.77 -1.97 -1.83 -3.54 -3.40 -3.19 -3.05 -0.88
Top of girder 0.94 1.03 0.89 0.99 -0.21 -0.11 0.03 0.13 -0.82
End
Bottom 10.02 9.79 10.13 9.90 12.73 12.49 12.15 11.92 13.62
Top of slab -2.45 -2.40 -2.48 -2.42 -2.97 -2.92 -2.86 -2.81 -0.36
Top of girder 3.07 3.10 3.05 3.09 2.73 2.76 2.80 2.83 2.08
L/8
Bottom 14.84 14.74 14.89 14.78 15.93 15.82 15.70 15.59 16.88
Top of slab -0.19 -0.23 -0.17 -0.20 0.94 0.91 0.68 0.64 3.51
Top of girder 3.43 3.41 3.45 3.42 4.17 4.15 4.00 3.98 3.50
L/4
Bottom 11.77 11.85 11.73 11.81 9.41 9.49 9.96 10.04 10.46
Top of slab 0.24 0.16 0.29 0.21 1.91 1.83 1.54 1.46 4.45
Top of girder 3.11 3.06 3.14 3.09 4.21 4.15 3.96 3.91 3.51
3L/8
Bottom 11.92 12.10 11.82 11.99 8.43 8.60 9.21 9.38 9.53
Top of slab 0.07 -0.01 0.12 0.04 1.60 1.51 1.26 1.18 4.13
Top of girder 3.61 3.56 3.65 3.59 4.61 4.55 4.39 4.34 3.91
L/2
Bottom 11.93 12.11 11.82 11.99 8.75 8.92 9.44 9.61 9.87

-------------------------------------------------------------------------------------------------------------------------------
51 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab -0.74 -4.97 -4.83 1.23 1.37 -5.58 -5.44 1.37 -5.58
Top of girder -0.72 0.38 0.48 -0.99 -0.89 1.01 1.11 1.11 -0.99
End
Bottom 13.38 11.18 10.95 13.63 13.40 9.58 9.34 13.63 9.34
Top of slab -0.31 -4.45 -4.40 1.49 1.54 -5.33 -5.27 1.54 -5.33
Top of girder 2.12 3.28 3.31 1.72 1.76 3.72 3.76 3.76 1.72
L/8
Bottom 16.78 14.45 14.34 17.29 17.18 13.23 13.13 17.29 13.13
Top of slab 3.47 -0.58 -0.62 4.96 4.92 -1.86 -1.89 4.96 -1.89
Top of girder 3.47 4.70 4.67 2.88 2.85 4.88 4.85 4.88 2.85
L/4
Bottom 10.54 8.02 8.10 11.71 11.79 7.65 7.73 11.85 7.65
Top of slab 4.37 0.37 0.28 5.77 5.69 -1.04 -1.12 5.77 -1.12
Top of girder 3.46 4.71 4.66 2.81 2.75 4.81 4.75 4.81 2.75
3L/8
Bottom 9.71 7.10 7.27 11.05 11.22 6.99 7.16 12.10 6.99
Top of slab 4.05 0.04 -0.04 5.49 5.40 -1.33 -1.41 5.49 -1.41
Top of girder 3.86 5.11 5.05 3.23 3.18 5.23 5.17 5.23 3.18
L/2
Bottom 10.04 7.43 7.60 11.30 11.47 7.24 7.42 12.11 7.24
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 17.3 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 2.42 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 1.72 Mpa Hence O.K.
except at support

4.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

-------------------------------------------------------------------------------------------------------------------------------
52 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6
b) Stresses of girder at different load casees
Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.69 -1.55 -1.76 -1.62 -2.92 -2.78 -2.07 -1.93 -0.71
Top of girder 0.67 0.77 0.63 0.73 -0.19 -0.09 0.41 0.51 -0.70
End
Bottom 8.41 8.18 8.53 8.29 10.45 10.22 9.04 8.81 11.19
Top of slab -2.29 -2.24 -2.31 -2.26 -2.68 -2.63 -2.41 -2.36 -0.50
Top of girder 3.20 3.23 3.19 3.22 2.94 2.98 3.12 3.15 2.41
L/8
Bottom 11.70 11.59 11.75 11.64 12.52 12.41 11.95 11.85 13.31
Top of slab -0.10 -0.13 -0.07 -0.11 0.76 0.72 0.15 0.11 2.89
Top of girder 4.34 4.31 4.35 4.33 4.89 4.87 4.50 4.47 4.33
L/4
Bottom 7.75 7.83 7.70 7.78 5.97 6.05 7.24 7.32 6.84
Top of slab 0.29 0.21 0.34 0.26 1.55 1.47 0.67 0.58 3.67
Top of girder 4.47 4.42 4.51 4.45 5.30 5.24 4.72 4.66 4.72
3L/8
Bottom 7.35 7.52 7.25 7.42 4.72 4.89 6.57 6.74 5.64
Top of slab 0.12 0.04 0.17 0.09 1.27 1.19 0.47 0.39 3.38
Top of girder 4.99 4.94 5.03 4.98 5.74 5.69 5.22 5.17 5.16
L/2
Bottom 7.27 7.44 7.15 7.32 4.87 5.04 6.54 6.71 5.80
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab -0.57 -4.11 -3.97 0.59 0.73 -3.50 -3.36 0.73 -4.11
Top of girder -0.60 0.30 0.40 -0.20 -0.11 0.99 1.09 1.09 -0.70
End
Bottom 10.96 9.17 8.93 9.93 9.70 7.50 7.27 11.19 7.27
Top of slab -0.45 -3.91 -3.86 0.20 0.25 -3.89 -3.84 0.25 -3.91
Top of girder 2.44 3.41 3.44 2.48 2.51 3.67 3.71 3.71 2.41
L/8
Bottom 13.20 11.28 11.18 12.91 12.80 10.47 10.37 13.31 10.37
Top of slab 2.86 -0.51 -0.55 2.72 2.68 -1.37 -1.41 2.89 -1.41
Top of girder 4.31 5.33 5.31 3.82 3.80 5.02 5.00 5.33 3.80
L/4
Bottom 6.92 4.82 4.90 8.29 8.37 5.85 5.93 8.37 4.82
Top of slab 3.58 0.26 0.18 3.21 3.12 -0.88 -0.97 3.67 -0.97
Top of girder 4.67 5.72 5.66 4.03 3.97 5.22 5.17 5.72 3.97
3L/8
Bottom 5.81 3.61 3.79 7.67 7.85 5.24 5.41 7.85 3.61
Top of slab 3.30 -0.03 -0.11 3.00 2.92 -1.09 -1.17 3.38 -1.17
Top of girder 5.11 6.16 6.11 4.53 4.47 5.72 5.67 6.16 4.47
L/2
Bottom 5.97 3.77 3.94 7.65 7.83 5.22 5.39 7.83 3.77

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.91 -1.77 -1.97 -1.83 -3.14 -3.00 -2.29 -2.15 -0.92
Top of girder 0.94 1.03 0.89 0.99 0.07 0.17 0.67 0.77 -0.44
End
Bottom 10.02 9.79 10.13 9.90 12.06 11.83 10.65 10.42 12.80
Top of slab -2.45 -2.40 -2.48 -2.42 -2.85 -2.79 -2.57 -2.52 -0.67
Top of girder 3.07 3.10 3.05 3.09 2.81 2.84 2.99 3.02 2.27
L/8
Bottom 14.84 14.74 14.89 14.78 15.66 15.56 15.10 14.99 16.46
Top of slab -0.19 -0.23 -0.17 -0.20 0.66 0.62 0.06 0.02 2.80
Top of girder 3.43 3.41 3.45 3.42 3.99 3.97 3.59 3.57 3.43
L/4
Bottom 11.77 11.85 11.73 11.81 10.00 10.08 11.26 11.34 10.87
Top of slab 0.24 0.16 0.29 0.21 1.50 1.42 0.61 0.53 3.62
Top of girder 3.11 3.06 3.14 3.09 3.94 3.88 3.36 3.30 3.36
3L/8
Bottom 11.92 12.10 11.82 11.99 9.29 9.47 11.14 11.31 10.21
Top of slab 0.07 -0.01 0.12 0.04 1.22 1.14 0.42 0.34 3.33
Top of girder 3.61 3.56 3.65 3.59 4.36 4.31 3.84 3.78 3.78
L/2
Bottom 11.93 12.11 11.82 11.99 9.53 9.71 11.20 11.37 10.47

-------------------------------------------------------------------------------------------------------------------------------
53 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab -0.78 -4.33 -4.19 0.37 0.51 -3.72 -3.58 0.51 -4.33
Top of girder -0.34 0.56 0.66 0.06 0.16 1.26 1.35 1.35 -0.44
End
Bottom 12.57 10.77 10.54 11.54 11.31 9.11 8.87 12.80 8.87
Top of slab -0.62 -4.08 -4.02 0.04 0.09 -4.05 -4.00 0.09 -4.08
Top of girder 2.31 3.27 3.31 2.34 2.38 3.54 3.58 3.58 2.27
L/8
Bottom 16.35 14.43 14.32 16.05 15.95 13.62 13.51 16.46 13.51
Top of slab 2.76 -0.61 -0.64 2.62 2.58 -1.47 -1.51 2.80 -1.51
Top of girder 3.40 4.43 4.40 2.92 2.89 4.12 4.09 4.43 2.89
L/4
Bottom 10.95 8.84 8.92 12.31 12.39 9.88 9.96 12.39 8.84
Top of slab 3.53 0.21 0.13 3.15 3.07 -0.93 -1.02 3.62 -1.02
Top of girder 3.30 4.36 4.30 2.66 2.61 3.86 3.81 4.36 2.61
3L/8
Bottom 10.39 8.19 8.36 12.25 12.42 9.81 9.98 12.42 8.19
Top of slab 3.25 -0.08 -0.16 2.95 2.87 -1.14 -1.22 3.33 -1.22
Top of girder 3.73 4.78 4.72 3.14 3.09 4.34 4.29 4.78 3.09
L/2
Bottom 10.64 8.44 8.61 12.32 12.49 9.89 10.06 12.49 8.44

Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 16.5 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 3.61 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 2.27 Mpa Hence O.K.
except at support
4.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 8754 kN
202.64
NA NA
2000 300

141 250 0.0286 8754 kN


Strain Diagram Stress Diagram
750
Top width of girder = 3000 mm Thickness of compression flange = 225 mm
Width of web = 300 mm Distance of prestress CG from bottom = 141 mm
Depth of girder = 2000 mm
Balanced neutral axis depth = 1252 mm Actual neutral axis depth 202.64 mm
Total strain at the prestress CG = 0.02860 The Section is under reinforced
Total ultimate compressive force = 8754 kN Total ultimate tensile force = 8754 kN
Compressive force CG 84.30 mm Moment of resistance = 15534 kNm
> 8025 kNm Hence O.K.
At support Near L/8 Near L/4 Near 3L/8 At L/2
Ultimate moment -637 1606 6033 8098 8025
Horizontal prestress after all losses (kN) 5927 5985 6118 6243 6387
Pre-strain in the cables after all losses 0.00488 0.00493 0.00504 0.00514 0.00526
Distance of prestress CG from bottom (mm) 758 507 274 141 141
Total width of web (mm) 750 300 300 300 300
Assumed neutral axis from top (mm) 203 203 203 203 203
Total strain at the prestress CG 0.0228 0.0272 0.0314 0.0337 0.0339
Average prestress at failure (MPa) 1406 1406 1406 1406 1406
Total compressive force by concrete (kN) 8754 8754 8754 8754 8754
Total tensile force by prestressing steel (kN) 8754 8754 8754 8754 8754
Difference in forces 0 0 0 0 0
Moment of resistance (kNm) 10130 12326 14366 15525 15527
Effective lever arm between forces (m) 1.157 1.408 1.641 1.773 1.774
Factor of Safety associated with failure -15.91 7.68 2.38 1.92 1.93

-------------------------------------------------------------------------------------------------------------------------------
54 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.4.1 Flexural design at support of girder:-


Negative design moment
3000 0.0248
68.5 225 10244 kN

NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.853 MPa Negative Design Moment = 8464 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 10973.4 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 8464 kNm Hence O.K.
Factor of safety = 17,616/8,464 = 2.08

Positive design moment


Positive Design Moment = 637 kN-m
Hence provide 7 Nos. 20 dia Bottom reinf. Ast = 4398.2 mm2
7 Nos. 20 dia
0 Nos. 20 dia
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 20 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1894 mm
Strain in steel = 0.1393 Actual neutral axis depth = 44.60 mm
Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 1912 kN Total ultimate tensile force = 1912 kN
Compressive force CG 18.55 mm Moment of resistance = 3586 kNm
> 637 kNm Hence O.K.
Factor of safety = 3,586/637 = 5.63

4.4.2 Ductile detailing of PSC Girder:-


As per clause no 6.0 of IS-13920 :1993, ductile detailing of PSC girder (support section) has been done.
i) As per clause no 6.1.1 of IS-13920 :1993, maximum factored axial stress shall be not more than 0.1fck.
Prestressing force after friction & slip at support = 8168.10 kN
Loss = 2221.12 kN
Total force = 5946.98 kN
Factored PSC force = 5946.98 kN
Cross sectional area at support = 2.12 m2
Stress = 2.81 Mpa
< 4.0 kNm Hence O.K.
ii) As per clause no 6.1.2 of IS-13920 :1993, Width to depth ratio shall be more than 0.3
Width of beam at support = 3000 mm
Depth of Beam = 2000 mm
Width to depth ratio = 1.50 Mpa
> 0.3 kNm Hence O.K.
iii) As per clause no 6.1.4 of IS-13920 :1993, Depth shall not be more thal L/4
Span = 28500 mm
Depth of Beam = 2000 mm
< L/4 = 7125.00 mm Hence O.K.
iv) As per clause no 6.2.1(b) of IS-13920 :1993, minimum tension reinforcement shall not be less than 0.24sqrt(fck)/fy
Ast provided Ast = 23562 mm2
Area of girder Ac = 2.12 m2
Tension reinforcement provided Ast/Ac = 0.01112
> 0.24sqrt(fck)/fy= 0.00304 Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
55 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

vi) As per clause no 6.3.2 of IS-13920 :1993, Shear force due to ductile detailing shall be
Vua = Va D+L - 1.4(MuAh+MuBs)/L
D+L
Va = 1.2(D+L)/2 = 1756.01 kN
MuAh = -8464.06 kN
MuBs = -4173.31 kN
L = 28.36 m
Vua = 2380 kN
Maximum design shear at support > 2378 kN

4.5 Design of Shear


Total loss after friction & Slip Loss
Description 1st stage stressing % Loss 2nd stage stressing % Loss
At 5 days
Elastic shortening 55.45 kN 2.0 %
Relaxation 23.25 kN 0.9 %
At 28 days
Elastic shortening 58.83 kN 2.2 % 58.83 kN 2.2 %
Shrinkage 25.42 kN 0.9 %
Relaxation 49.63 kN 1.8 % 23.25 kN 0.9 %
Creep 102.12 kN 3.7 %
At 60 days
Shrinkage 16.02 kN 0.6 % 16.02 kN 0.6 %
Relaxation 13.19 kN 0.5 % 39.58 kN 1.4 %
Creep 41.23 kN 1.5 % 41.23 kN 1.5 %
At 90 days
Shrinkage 11.19 kN 0.4 % 11.19 kN 0.4 %
Relaxation 0.00 kN 0.0 % 0.00 kN 0.0 %
Creep 16.27 kN 0.6 % 16.27 kN 0.6 %
At α days
Shrinkage 84.56 kN 3.1 % 84.56 kN 3.1 %
Relaxation 125.65 kN 4.6 % 125.65 kN 4.6 %
Creep 128.88 kN 4.7 % 128.88 kN 4.7 %
Total 751.70 kN/cable 27.5 % 545.47 kN 20.0 %
Total loss 2221.12 kN
Total long term loss after integration with abutment & deck to be applied in staad for calculation of hyperstatic action
1st stage prestress = 366.56 kN/cable from 90days to α days
2nd stage prestress = 366.56 kN/cable
Total Loss = 1215 kN
CG of cables
At support At dist 1.0m L/8 L/4 3L/8 L/2
CG of cables from bottom 0.796 0.758 0.507 0.274 0.141 0.141
CG of girder from bottom 1.247 1.247 1.352 1.352 1.352 1.352
CG of cable from CG 0.451 0.490 0.845 1.078 1.210 1.211
Vertical Component of Cable Force (kN)
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.680 7.360 11.039 14.719
Cable 1 2450.29 2467.61 2522.11 2553.79 2585.06
Vert. angle 3.69 3.69 3.69 0.00 0.00
Cable 2 2443.62 2460.95 2520.34 2555.39 2590.09
Vert. angle 4.51 4.51 4.51 0.00 0.00
Cable 3 2495.65 2512.84 2532.74 2552.64 2610.76
Vert. angle 5.39 5.39 5.39 5.39 0.00
Cable4 787.55 792.98 799.27 822.07 822.07
Vert. angle 6.35 6.35 6.35 6.35 0.00
Total Ver. 493.76 498.45 509.20 260.41 0.00
Comp. of cable
Ultimate Shear at Sections :-
Shear 2380 1976 1395 832 391
Ultimate Load
Moment -637 1606 6033 8098 8025

-------------------------------------------------------------------------------------------------------------------------------
56 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

4.5.1 Section not requiring design shear reinforcement


i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 40 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5927.5 5984.5 6118.3 6243.4 6386.9
Effective width of the web in mm 750 300 300 300 300
Effective Depth of precast Section (d) in mm 1017 1268 1501 1634 1634
Effective Depth of composite Section (d) in mm 1242 1493 1726 1859 1859
K 1.401 1.366 1.340 1.328 1.328
Stress due to Prestress (σcp) (Mpa) 3.573 3.573 3.573 3.573 3.573
Shear Resistance minimum (VRd,cmin) (kN) 802.4 380.3 435.1 466.2 466.2
Reinforcement ratio considering Tendons, ρ1 0.007 0.014 0.012 0.011 0.011
Shear resistance ( VRd,c) (kN) 929.8 496.9 555.3 588.0 588.1
Design Shear resistance ( VRd,c) (kN) 802.4 380.3 435.1 466.2 466.2

ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5927.5 5984.5 6118.3 6243.4 6386.9
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1242 1493 1726 1859 1859
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7

iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.68 7.36 11.04 14.72
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 2380.0 1976.3 1395.3 832.3 391.0
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 493.8 498.5 509.2 260.4 0.0
Total Shear force for the Beam (kN) 1886.2 1477.8 886.1 571.9 391.0
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 2.4367 0.2408 -4.0888 -6.6411 -6.7607
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 435.13 466.16 466.21
Maximum shear capacity of the Section (kN) 4349 2091 2418 2603 2603
Not
Whether shear reinforcement required or not Required Required Required Required
Required

-------------------------------------------------------------------------------------------------------------------------------
57 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

iv) Calculation of Shear Resistance when Shear Reinforcement is Required ::


The design for the Vertical stirrups for resisting shear is calculated in the table below as per Cl. No. 10.3.3.2 of IRC:112-2011.
The shear resistance with vertical stirrups is given by,
VRd,s = Asw / s. z. fywd cot θ by Crushing of Compression strut
VRd,max = acw bw z v1 fcd / (cot θ + tan θ) by yielding of the Vertical reinforcement
Grade of reinforcement = Fe 500 Grade of concrete = M40
Design Tensile stress in stirrups (fywd= 0.8fyk/γm) = 347.8 Mpa Concrete Strength (fcd) : = 17.9 Mpa
Minimum Shear reinf. ratio = 0.072sqrt(fck)/fyk = 0.00091 Coeff accounting stress in compression chord ν1
o
Design of Vertical Transverse reinforcement (α = 90 ) = 0.60

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam (kN) 1886.2 1477.8 886.1 571.9 391.0
Lever arm taken from flexural analysis z (m) 1.16 1.41 1.64 1.77 1.77
Angle of compression strut θ (degrees) 28.42 37.01 23.82 23.82 23.82
Dia of shear reinforcement provided (mm) 12+16 16 12 12 12
Number of legs provided 2 2 2 2 2
Spacing of stirrups provided (mm) 100 100 125 125 125
Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 0.68 0.27 0.27 0.27 0.27
Area of shear reinf provided Asw/s (mm2/mm) 6.283 4.021 1.810 1.810 1.810
Check O.K. O.K. O.K. O.K. O.K.
Shear resistance provided by reinf V RD,s (kN) 4673 2612 2340 2529 2529
Coeff accounting stress in comp chord αcw 1.200 1.200 1.200 1.200 1.200
Shear capacity of compression strut V RD,max (kN) 4673 2612 2340 2529 2529
Difference in shear resistance (kN) 0.00 0.00 0.00 0.00 0.00
Shear capacity of the Section (kN) 4672.98 2612.01 2339.84 2528.54 2528.85
Factor of Safety associated with failure 2.48 1.77 2.64 4.42 6.47
Increase in longitudinal tensile force ∆Ftd (kN) 1742.72 980.06 1003.61 647.75 442.81
Total longitudinal tensile force (kN) 1192.65 2120.53 4679.97 5214.04 4967.11
Permissible longitudinal tensile force (kN) 8754.17 8754.17 8754.17 8754.17 8754.17
Check Hence O.K. Hence O.K. Hence O.K. Hence O.K. Hence O.K.

4.6. Anchor Block


Check Bearing pressure
According to Manufacture's Catalog Size of anchor flange = 225 mm Dia of Hole = 85 mm
fb = 0.48xfcjxSQRT(A2/A1) or 0.8xfcj Whichever is smaller
2
fcj = = 25.53 N/mm
2
A2 = 96829.0309649565^2- 3.14/4x85^2
= 9.38E+09 mm
2
A1 = 225x225- 3.14/4x85^2 = 44950.5 mm
2
fb = min (0.48fcjsqrt(A2/A1),0.8fcj) 20.43 N/mm
Now, Maximum Cable Force after immediate Losses = 2437.49 T
As per Manufacture's recommendation = 35% of above force to be taken by End Bearing
= 65% of above force to be taken by Anchorage
Cone and Concrete by friction
2 2
Bearing stress = N/A1 = 18.98 N/mm < 20.43 N/mm Hence O.K.
Busting reinforcement in end block
2Yo = 250 mm 2Ypo = 225 mm
Ypo/Yo = 0.90 As per Table 13.1 of IRC 112-2011 Fbst/Pk = 0.120
Fbst = 0.12x1.3x2437.49 = 380.25 kN
2
Area of Steel Required = Fbst/(0.87xfy) = 1005.25 mm
2
Hence Provide 12T- 4L -4Nos along Web and Normal to Web Ast = 1809.56 mm

4.7. Interface Shear Design for Composite section


The shear stress that arises between the interfaces of concrete placed at different times is reffered to as interface
shear. The interface shear is resisted by friction at the interface and by reinforcement placed across the shear plane.
The interface shear stress, Vedi <= the resisting capacity at the section, VRdi
Vedi = β Ved/zbi
Where, β = The ratio of longitudinal force in the new concrete and total longitudinal force
Ved = The tranverse shear force
z = Lever arm
bi = the width of interface
VRdi = µσn + ρfyd[µsinα+cosα] <=0.5vfcd fck = M40
µ = friction for rough surface = 0.7 fyd = 500 Mpa
σn = the minimum co existing normal stress < 0.6fcd = 0.00 Mpa
ρ = As/Aj where As is the area of reinforcement, Aj is the interface area of the joint

-------------------------------------------------------------------------------------------------------------------------------
58 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

ν1 = Coeff accounting stress in compression chord = 0.60


α = the angle of the reinforcement to the interface = 90.00 degree
fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5 = 17.87 Mpa

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam,VEd (kN) 1886.19 1477.85 886.08 571.90 390.95
Ratio of Longitudinal forces (β) 0.99 0.99 0.99 0.99 0.99
Lever arm taken from flexural analysis z (m) 1.157 1.408 1.641 1.773 1.774
Interface Width bi ( mm) 1250 1250 1250 1250 1250
Design value of Shear Stress vEdi ( MPa) 1.29 0.83 0.43 0.26 0.18
Roughness Co-efficient, µ 0.70 0.70 0.70 0.70 0.70
Stress caused by minimum external normal force 0.0 0.0 0.0 0.0 0.0
Dia of shear reinforcement provided (mm) 10 10 10 10 10
Number of legs provided 4 4 4 4 4
Spacing of stirrups provided (mm) 125 125 125 125 125
Minimum reinf.=0.15% of area of interface 1875 1875 1875 1875 1875
Area of Reinforcement at interface, As (mm2/m) 2513.27 2513.27 2513.27 2513.27 2513.27
Area of the joint, Ai (mm2) 281250 281250 281250 281250 281250
Strength reduction factor (ν) 0.60 0.60 0.60 0.60 0.60
Design shear resistance at the Interface (vRdi) 3.13 3.13 3.13 3.13 3.13
Status with respect to the Interface Shear Ok Ok Ok Ok Ok

4.8. Untensioned Reinforcement of Precast Girder


Vertical reiforcement = 0.18 % of web
=0.18%x300x1775 = 958.5 mm2 per meter
Hence provide 2L-12T @ 125 c/c Ast provide= 1808 mm2 per meter

Longitudinal reinforcement = 0.15 % of web


Total Area of Precast Girder at midspan = 0.9275 m2
=0.15%x0.93x1000000 = 1391.25 mm2 per meter
Hence provide 7-12T at Bottomt top & 8-12T at Top Ast provide= 1695 mm2 per meter
Side Face Reinforcement
Side Face Reinforcement = 0.1 % of web Area
2
Area of steel required = 532.5 mm
2
Minimum Reinf. at earth face (0.12%) = 648 mm
Hence Provide 8 Nos. 12 φ on Each Face
2 2
Ast provided = 1809.56 mm /m > 648 mm /m Hence O.K.
Bottom reinforcement of girder at support
Total Area of Precast Girder at midspan = 2.119 m2
=0.15%x2.12x1000000 = 3179.11 mm2 per meter
Hence provide 14 Nos. 20 dia Ast = 4398.2 mm2

4.9 Calculation for Deflection of Longitudinal girders


(i) Precast Girder - Prestress of cables 1, 2, 3 + wt of precast Girder at 5 days
Young Modulus = 3.01E+07 kN/m2
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.680 7.360 11.039 14.719
CG of Precast girder from bottom , m 0.948 0.962 0.962 0.962 0.962
Moment of Inertia for Precast 0.412 0.354 0.354 0.354 0.354
CG of cables 1 to 3 from bot.(m) 0.489 0.279 0.135 0.125 0.125
Moment due to stressing after -2191.29 -3280.22 -4065.14 -4181.37 -4239.48
Moment due to Wt of Precast -1.13 1160.04 1961.06 2448.11 2621.19
Total moment due to prestress+wt
of precast Girder (kN-m) -2192.4 -2120.2 -2104.1 -1733.3 -1618.3
M/EI (1/m) -0.00018 -0.00020 -0.00020 -0.00016 -0.00015

-------------------------------------------------------------------------------------------------------------------------------
59 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.68 3.680 3.680 3.680


A B C D E
-0.00020 2 -0.00016
-0.000177 4 3 -0.000197 -0.000152
1

M/EI Diagram for Ist Stage Prestress after losses at 5 days


At Midspan
Section Marked Distance CG from A M/EI Average M/EI Moment of M/EI about A

A -0.00018
B 4 3.680 1.840 -0.00020 -0.00019 -0.001271035
C 3 3.680 5.520 -0.00020 -0.00020 -0.004023914
D 2 3.680 9.199 -0.00016 -0.00018 -0.006092231
E 1 3.680 12.879 -0.00015 -0.00016 -0.007449376
Total -0.018836556
So, Midspan deflection due to Prestress + wt of precast Girder = = -19 mm
= - L/ 1563

(ii) Precast Girder - Prestress of cables 4,5 + loss of Cables 1 to 3 at 28 days


Young Modulus = 3.33E+07 Mpa
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.680 7.360 11.039 14.719
CG of cables 3 from bot.(m) 1.160 0.847 0.485 0.166 0.166
Moment due to stressing after 668.26 -367.22 -1531.86 -2586.60 -2648.00
Moment due to loss of prestress (kN- 216.81 322.22 390.57 395.09 395.13
Total moment due to prestress+wt 885.1 -45.0 -1141.3 -2191.5 -2252.9
M/EI (1/m) 0.0000643 -0.0000038 -0.0000966 -0.0001855 -0.00019

3.7 3.680 3.680 3.680


A B C D E
2
-0.0000038 -0.0001855
0.0000643 4 3 -0.000097 -0.0001907
1

M/EI Diagram for Ist Stage Prestress after losses at 28 days


At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A
M/EI
A 0.0000643
B 4 3.680 1.840 -0.0000038 0.0000303 0.000204936
C 3 3.680 5.520 -0.000097 -0.0000502 -0.001019947
D 2 3.680 9.199 -0.000186 -0.0001411 -0.004775815
E 1 3.680 12.879 -0.000191 -0.0001881 -0.008916175
Total -0.014507
So, Midspan deflection due to Prestress +loss = = -14.507 mm
So, Total Midspan deflection at 28 days = = -33.344 mm = - L/ 883

(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.680 7.360 11.039 14.719
CG of all cables from bot.(m) 0.758 0.507 0.274 0.141 0.141
Loss 268.291 268.291 268.291 268.291 268.291
Moment due to prestressing losses 51.071 122.139 184.675 220.183 220.241
Moment due to Wt of Deck Slab -0.606 936.075 1610.393 2022.350 2171.944
Total moment due to prestress+DL 50.465 1058.214 1795.069 2242.532 2392.185
M/EI (1/m) 0.0000037 0.0000896 0.0001520 0.0001899 0.00020
3.7 3.680 3.680 3.680
A B C D E
0.000004 0.0000896 0.0001899
4 0.0001520
0.0002025
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000037
B 4 3.680 1.840 0.0000896 0.0000466 0.000315699 0.00197
C 3 3.680 5.520 0.0001520 0.0001208 0.002453209
D 2 3.680 9.199 0.0001899 0.0001709 0.005785781
E 1 3.680 12.879 0.0002025 0.0001962 0.009298006
Total 0.017852696

-------------------------------------------------------------------------------------------------------------------------------
60 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

So, Midspan deflection due to Prestress losses + DL = = 17.853 mm


Total Deflection at 60 days =-33.344+17.853 = -15.491 mm

(iv) Composite Girder - long term losses + SIDL+ Live load


Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.680 7.360 11.039 14.719
CG of Composite girder from bottom , m 1.247 1.352 1.352 1.352 1.352
CG of cables from bot.(m) 0.758 0.507 0.274 0.141 0.141
Moment of Inertia for Composite 0.821 0.692 0.692 0.692 0.692
Loss 1215.442 1215.442 1215.442 1215.442 1215.44
Moment due to prestressing losses 595.000 1027.080 1310.390 1471.248 1471.5
Total moment due to prestress 595.000 1027.080 1310.390 1471.248 1471.5
M/EI (1/m) 0.0000217 0.0000445 0.0000568 0.0000638 0.00006
3.680 3.680 3.680 3.680
A B C D E
0.00002 0.0000445 0.0000638
4 0.0000568 0.0000638
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at α days
At Midspan
Average Moment of M/EI about
Section Marked Distance CG from A M/EI Rotation
M/EI A
A 0.0000217
B 4 3.680 1.840 0.0000445
0.0000331 0.000224309 0.00077
C 3 3.680 5.520 0.0000568
0.0000507 0.001029319
D 2 3.680 9.199 0.0000638
0.0000603 0.002041519
E 1 3.680 12.879 0.0000638
0.0000638 0.003023681
Total 0.006318827
So, Midspan deflection due to Prestress losses = = 6.319 mm
So, Midspan deflection due SIDL = = 1.531 mm 0.00000
So, Midspan deflection due Footpath Live load = = 0.000 mm 0.00000
So, Midspan deflection due Wind load = = 0.494 mm 0.00000
So, Midspan deflection due to earth pr. = = -1.840 mm
So, Midspan deflection due to Live load surcharge = = -0.048 mm
So, Midspan deflection due to Live load surcharge = = 1.385 mm
So, Midspan deflection due Live load snow load braking = = 4.517 mm 0.00000
Total Deflection at mid span 1xDL+1.2xSIDL+1xLL+0.6xWL = -3.024 mm L/ -9733

33 1 SPECTRUM IN X6.519
DIRECTION 0.19 0.037 6.522 0 0 0
2 SPECTRUM IN Z0.072
DIRECTION 1.939 1.12 2.241 0 0 0
3 SPECTRUM IN Y0.016
DIRECTION 0.403 0.089 0.413 0 0 0
4 DEAD LOAD 0.174 -5.575 0.021 5.578 0 0 0
5 SIDL (DL) 0.022 -0.646 0.002 0.647 0 0 0
6 SIDL(WC) 0.024 -0.885 0.004 0.886 0 0 0
7 REMOVAL OF SHUTTER
-0.027 0.85 -0.004 0.851 0 0 0
8 EARTH PR ON ABUTMENT
-0.279 1.84 0.199 1.872 0 0 0
9 LIVE LOAD SURCHARGE
1.222 0.048 0.015 1.223 0 0 0
10 DYNAMIC INCREMENT
-0.178 OF EARTH
1.161 PR. 0.125 1.182 0 0 0
11 DYNAMIC INCREMENT
0.772 OF LL 0.03
SURCGARGE 0.01 0.773 0 0 0
12 UNLADEN WIND 0.15
LOAD -0.955 -0.114 0.974 0 0 0
13 LADEN WIND LOAD
0.126 -0.494 -0.105 0.521 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.339 -6.245 -0.002 6.669 0 0 0.001
15 TEMPERATURE0.625
RISE 2.965 -0.5 3.072 0 0 0
16 TEMPERATURE -0.287
FALL -1.385 0.235 1.433 0 0 0
17 CREEP SHRINKAGE
-0.221 DIFF SHRINKAGE
-0.714 0.236 0.784 0 0 0
18 FOOTPATH LIVE0.005
LOAD 0.058 -0.002 0.058 0 0 0
19 SNOW LOAD FOR0.031
70R LL TRACK
-1.027 0.005 1.027 0 0 0
20 SNOW LOAD FOR0.016
LL 70R WHEEL
-0.514 0.002 0.514 0 0 0
21 BRAKING 0.463 -0.01 0 0.463 0 0 0
504 COMBINATION0.082
LOAD CASE-1.232
504 0.014 1.235 0 0 0

209 LOAD GENERATION,


0.285 LOAD-3.993
#209, (26 of0.015
26) 4.004 0.001 0 0

-------------------------------------------------------------------------------------------------------------------------------
61 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of PSC Girder LG3

-------------------------------------------------------------------------------------------------------------------------------
62 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.0 Calculation of Stresses for Girder LG3


C/C span = 29.711 m Width of abutment wall = 2.00 m
Length of girder = 29.280 m Width of bearing area = 0.50 m

5.1. Load calculation


5.1.1 Dead Load Moment & Shear for Precast girder only
Unit weight of concrete = 25.00 kN/m3
Cross-sectional area at span = 0.928 m2
Cross-sectional area at support = 1.444 m2
Unit Weight at span = 23.19 kN/m
Unit Weight at support = 36.11 kN/m
Thickness of intermediate Cross Girder = 0.30 m
Thickness of end Cross Girder = 2.00 m
1.250 1.750 1.250

0.475 0.2
0.1 0.053

1.775 1.325 1.025

0.2
0.25

0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN

= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 21.78 1.75 1.75 0.250

0.250 28.780 0.250


29.280
Support Reaction = 380.99 kN
Table : Maximum BM & SF at critical sections
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Dist. for prop. Section(m) 0.000 3.598 7.195 10.793 14.390
Bending Moment (kNm) -1.1 1111.1 1877.1 2342.9 2508.7
Shear Force (kN) 372.0 256.9 171.2 56.2 4.4
5.1.2 Construction load and weight of shuttering & proping.
Assume, Construction Live load = 0.500 kN/m2
Assume, UDL for weight of shuttering = 5.000 kN/m
Effective width of deck slab for end girder = 3.000 m
Weight of shuttering & Conc. Live load = 6.50 kN/m
6.500

0.250 28.78 0.250


Support Reaction = 95.16 kN
Table : Maximum BM & SF at critical sections of outer girders
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.598 7.195 10.793 14.390
Bending Moment (kNm) -0.2 294.2 504.5 630.7 672.8
Shear Force (kN) 93.5 70.2 46.8 23.4 0.0

5.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 3.000 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008

-------------------------------------------------------------------------------------------------------------------------------
63 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

16.875

0.250 28.78 0.250


Support Reaction = 252.05 kN

Table : Maximum BM & SF at critical sections


Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.598 7.195 10.793 14.390
Bending Moment (kNm) -0.5 781.9 1345.9 1691.4 1818.6
Shear Force (kN) 247.8 187.1 126.4 65.7 5.0

5.1.4 Staad output


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
3 1 SPECTRUM IN X DIRECTION
5 208.51 91.255 15.245 3.213 42.033 1539.379
39 -208.51 -91.255 -15.245 -3.213 -31.536 -1448.933
2 SPECTRUM IN Z DIRECTION
5 70.382 138.981 168.329 16.495 326.035 876.487
39 -70.382 -138.981 -168.329 -16.495 -158.732 -737.618
3 SPECTRUM IN Y DIRECTION
5 9.005 21.324 12.923 3.093 25.328 124.663
39 -9.005 -21.324 -12.923 -3.093 -12.521 -104.264
4 DEAD LOAD 5 215.054 629.715 -0.794 -9.631 0.683 2879.921
39 -215.054 -576.73 0.794 9.631 0.112 -2276.698
5 SIDL (DL) 5 16.77 14.225 -1.17 3.775 2.582 148.803
39 -16.77 -14.225 1.17 -3.775 -1.412 -134.578
6 SIDL(WC) 5 33.748 98.136 -0.235 -3.034 -0.343 458.717
39 -33.748 -91.536 0.235 3.034 0.578 -363.881
7 REMOVAL OF SHUTTER
5 -33.996 -97.665 0.099 1.948 0.025 -458.874
39 33.996 91.165 -0.099 -1.948 -0.123 364.46
8 EP ON ABUTMENT 5 656.257 -7.275 -11.687 0.143 26.962 206.865
39 -656.257 7.275 11.687 -0.143 -15.275 -214.139
9 AT REST EP ON ABUTMENT
5 1103.68 -12.214 -19.668 0.239 45.38 348.288
39 -1103.68 12.214 19.668 -0.239 -25.711 -360.502
10 AT K* EP ON ABUTMENT
5 1665.283 -21.766 -29.143 0.569 66.093 436.529
39 -1665.283 21.766 29.143 -0.569 -36.95 -458.295
11 LIVE LOAD SURCHARGE
5 AT65.68
REST -29.508 15.542 -0.149 -46.63 -435.588
39 -65.68 29.508 -15.542 0.149 31.088 406.08
12 DYNAMIC INCREMENT
5 OF389.622
EARTH PR. -3.861 -6.947 0.102 16.033 118.986
39 -389.622 3.861 6.947 -0.102 -9.086 -122.847
13 DYNAMIC INCREMENT
5 OF24.653
LL SURCGARGE
-11.064 5.818 -0.054 -17.451 -163.394
39 -24.653 11.064 -5.818 0.054 11.633 152.329
14 UNLADEN WIND LOAD
5 33.267 102.897 28.955 -3.048 -56.828 466.738
39 -33.707 -96.067 -28.955 3.048 27.872 -367.256
15 LADEN WIND LOAD 5 15.705 52.544 26.11 -1.715 -51.064 229.881
39 -16.105 -49.004 -26.11 1.715 24.954 -179.106
16 DIFFERNTIAL SETTLEMENT
5 22.2 -67.753 -7.203 2.245 20.206 -1022.988
39 -22.2 67.753 7.203 -2.245 -13.003 955.235
17 TEMPERATURE RISE5 640.014 -16.023 -57.412 -0.611 135.74 364.942
39 -640.014 16.023 57.412 0.611 -78.329 -380.965
18 TEMPERATURE FALL5 -290.64 7.429 26.791 0.319 -64.039 -170.692
39 290.64 -7.429 -26.791 -0.319 37.248 178.121
19 CREEP SHRINKAGE 5 DIFF
-171.569
SHRINKAGE 4.618 24.512 0.821 -75.052 -87.726
39 171.569 -4.618 -24.512 -0.821 50.54 92.343
20 FOOTPATH LIVE LOAD
5 1.476 2.702 0.049 2.184 1.407 17.018
39 -1.476 -2.702 -0.049 -2.184 -1.456 -14.316
21 SNOW LOAD FOR 570R LL TRACK
40.323 114.525 -0.202 -2.645 0.015 541.726
39 -40.323 -107.025 0.202 2.645 0.187 -430.95
22 SNOW LOAD FOR 5LL 70R WHEEL
20.171 57.278 -0.102 -1.326 0.008 270.966
39 -20.171 -53.528 0.102 1.326 0.094 -215.563
23 BRAKING 5 -29.153 -7.685 0.854 0.235 -3.166 -117.448
39 27.483 7.685 -0.854 -0.235 2.312 109.763
604 COMBINATION LOAD
5 CASE
158.876
504 -1.29 1.428 -2.105 -4.074 1074.66
39 -158.876 1.29 -1.428 2.105 2.646 -1075.95

3 5 +ve 101.389 572.163 6.44 68.081 6.218 1780.52


369 LOAD GENERATION,
252 LOAD GENERATION,
LOAD
143 LOAD
#369,GENERATION,
(25
308
LOAD
of
LOAD
26)
#252,
GENERATION,
205
(16
LOAD
LOAD
of 56)
#143,
GENERATION,
257LOAD
(11
LOAD
of #308,
26)GENERATION,
LOAD
(16 of 26)
#205, LOAD
(21 of #257,
26) (21 of 56)
-ve 0 0 -11.012 -91.18 -10.399 0
- - 205 LOAD GENERATION,
200 LOAD GENERATION,
313
LOAD
LOAD #205,
GENERATION,
- LOAD
(21 of #200,
26) LOAD
(16 of 26)
#313, (21 of 26)
3 39 +ve 101.389 572.163 6.44 68.081 3.497 1362.004
369 LOAD GENERATION,
252 LOAD GENERATION,
LOAD
143 LOAD
#369,GENERATION,
(25
308
LOAD
of
LOAD
26)
#252,
GENERATION,
341
(16
LOAD
LOAD
of 56)
#143,
GENERATION,
260LOAD
(11
LOAD
of #308,
26)GENERATION,
LOAD
(16 of 26)
#341, LOAD
(23 of #260,
26) (24 of 56)
-ve 0 0 -11.012 -91.18 -5.987 0
- - 205 LOAD GENERATION,
200 LOAD GENERATION,
368
LOAD
LOAD #205,
GENERATION,
- LOAD
(21 of #200,
26) LOAD
(16 of 26)
#368, (24 of 26)

-------------------------------------------------------------------------------------------------------------------------------
64 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


35 1 SPECTRUM IN X DIRECTION
39 189.85 92.287 15.193 2.837 33.089 1449.031
23 -189.85 -92.287 -15.193 -2.837 -18.041 -1200.949
2 SPECTRUM IN Z DIRECTION
39 73.461 137.652 150.433 15.218 225.437 737.664
23 -73.461 -137.652 -150.433 -15.218 -183.462 -364.756
3 SPECTRUM IN Y DIRECTION
39 9.185 20.577 11.749 3.024 17.97 104.26
23 -9.185 -20.577 -11.749 -3.024 -14.075 -52.216
4 DEAD LOAD 39 214.674 576.967 -1.069 -8.157 1.366 2276.792
23 -214.674 -451.653 1.069 8.157 1.536 -881.016
5 SIDL (DL) 39 17.682 14.752 -1.096 3.607 1.894 134.048
23 -17.682 -14.752 1.096 -3.607 1.081 -94.014
6 SIDL(WC) 39 33.503 91.516 -0.185 -2.761 0.022 363.959
23 -33.503 -73.605 0.185 2.761 0.479 -139.899
7 REMOVAL OF SHUTTER
39 -33.879 -91.172 0.114 1.703 -0.099 -364.503
23 33.879 73.532 -0.114 -1.703 -0.21 141.008
8 EP ON ABUTMENT39 657.356 -7.303 -10.987 -0.171 20.198 214.103
23 -657.356 7.303 10.987 0.171 9.619 -233.922
9 AT REST EP ON ABUTMENT
39 1105.53 -12.261 -18.492 -0.289 33.995 360.441
23 -1105.53 12.261 18.492 0.289 16.189 -393.717
10 AT K* EP ON ABUTMENT
39 1668.055 -21.839 -27.212 -0.256 49.44 458.198
23 -1668.055 21.839 27.212 0.256 24.409 -517.467
11 LIVE LOAD SURCHARGE
39 AT64.66
REST -29.536 14.781 -0.067 -34.559 -406.105
23 -64.66 29.536 -14.781 0.067 -5.554 325.949
12 DYNAMIC INCREMENT
39 OF390.276
EARTH PR. -3.878 -6.533 -0.087 12.014 122.825
23 -390.276 3.878 6.533 0.087 5.717 -133.349
13 DYNAMIC INCREMENT
39 OF LL24.27
SURCGARGE
-11.075 5.534 -0.024 -12.933 -152.339
23 -24.27 11.075 -5.534 0.024 -2.085 122.283
14 UNLADEN WIND LOAD
39 34.18 96.071 27.1 -2.615 -39.793 367.306
23 -35.374 -77.535 -27.1 2.615 -33.755 -131.734
15 LADEN WIND LOAD39 16.577 49.007 24.442 -1.432 -35.839 179.138
23 -17.663 -39.4 -24.442 1.432 -30.493 -59.173
16 DIFFERNTIAL SETTLEMENT
39 22.652 -67.795 -7.454 1.593 15.708 -955.34
23 -22.652 67.795 7.454 -1.593 4.521 771.352
17 TEMPERATURE RISE
39 682.443 -16.126 -71.5 -0.522 92.02 380.785
23 -682.443 16.126 71.5 0.522 102.023 -424.549
18 TEMPERATURE FALL
39 -310.291 7.477 33.374 0.274 -43.985 -178.038
23 310.291 -7.477 -33.374 -0.274 -46.588 198.33
19 CREEP SHRINKAGE39 DIFF
-186.246
SHRINKAGE 4.644 31.05 0.678 -64.492 -92.311
23 186.246 -4.644 -31.05 -0.678 -19.774 104.913
20 FOOTPATH LIVE 39
LOAD 1.732 2.709 -0.135 2.162 0.623 14.268
23 -1.732 -2.709 0.135 -2.162 -0.257 -6.916
21 SNOW LOAD FOR3970R LL TRACK
40.197 107.027 -0.211 -2.346 0.199 430.991
23 -40.197 -86.673 0.211 2.346 0.374 -168.151
22 SNOW LOAD FOR39LL 70R WHEEL
20.108 53.529 -0.106 -1.177 0.1 215.583
23 -20.108 -43.352 0.106 1.177 0.188 -84.121
23 BRAKING 39 -27.583 -7.687 0.991 0.211 -2.434 -109.769
23 23.051 7.687 -0.991 -0.211 -0.257 88.908
604 COMBINATION LOAD
39 CASE
163.11
504 -1.251 -0.806 -1.784 -3.654 1076.032
23 -163.11 1.251 0.806 1.784 5.842 -1079.427

35 39 +ve 100.185 446.28 6.151 32.289 9.352 1363.795


369 LOAD GENERATION,
256 LOAD GENERATION,
LOAD
142 LOAD
#369,GENERATION,
(25
310
LOAD
of
LOAD
26)
#256,
GENERATION,
205
(20
LOAD
LOAD
of 56)
#142,
GENERATION,
260LOAD
(10
LOAD
of #310,
26)GENERATION,
LOAD
(18 of 26)
#205, LOAD
(21 of #260,
26) (24 of 56)
-ve 0 0 -9.452 -57.808 -9.574 0
- - 205 LOAD GENERATION,
202 LOAD GENERATION,
310
LOAD
LOAD #205,
GENERATION,
- LOAD
(21 of #202,
26) LOAD
(18 of 26)
#310, (18 of 26)
35 23 +ve 100.185 446.28 6.151 32.289 7.619 592.215
369 LOAD GENERATION,
256 LOAD GENERATION,
LOAD
142 LOAD
#369,GENERATION,
(25
310
LOAD
of
LOAD
26)
#256,
GENERATION,
142
(20
LOAD
LOAD
of 56)
#142,
GENERATION,
219LOAD
(10
LOAD
of #310,
26)GENERATION,
LOAD
(18 of 26)
#142, LOAD
(10 of #219,
26) (9 of 26)
-ve 0 0 -9.452 -57.808 -16.3 -353.237
- - 205 LOAD GENERATION,
202 LOAD GENERATION,
205
LOAD
LOAD #205,
GENERATION,
81LOAD
(21
LOAD
of #202,
26)
GENERATION,
LOAD
(18 of 26)
#205,
LOAD
(21 of#81,
26) (5 of 56)

-------------------------------------------------------------------------------------------------------------------------------
65 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


19 1 SPECTRUM IN X DIRECTION
23 163.376 96.367 17.92 1.708 40.698 1201.199
24 -163.376 -96.367 -17.92 -1.708 -27.88 -845.503
2 SPECTRUM IN Z DIRECTION
23 84.99 127.279 124.87 12.242 210.26 363.983
24 -84.99 -127.279 -124.87 -12.242 -253.902 -111.649
3 SPECTRUM IN Y DIRECTION
23 8.962 17.977 10.252 2.664 18.394 52.078
24 -8.962 -17.977 -10.252 -2.664 -19.957 -22.581
4 DEAD LOAD 23 213.757 454.577 -0.119 -4.889 0.589 880.268
24 -213.757 -305.79 0.119 4.889 -0.147 531.682
5 SIDL (DL) 23 20.581 21.484 -0.563 1.597 0.952 90.954
24 -20.581 -21.484 0.563 -1.597 1.139 -11.164
6 SIDL(WC) 23 32.763 73.295 0.011 -1.833 0.209 140.12
24 -32.763 -48.783 -0.011 1.833 -0.248 86.57
7 REMOVAL OF SHUTTER
23 -33.572 -73.5 -0.028 0.981 -0.007 -141.079
24 33.572 49.36 0.028 -0.981 0.11 -87.064
8 EP ON ABUTMENT23 664.326 -7.349 -7.034 -0.331 14.668 233.914
24 -664.326 7.349 7.034 0.331 11.456 -261.208
9 AT REST EP ON ABUTMENT
23 1117.263 -12.339 -11.839 -0.557 24.687 393.703
24 -1117.263 12.339 11.839 0.557 19.281 -439.529
10 AT K* EP ON ABUTMENT
23 1685.764 -21.96 -16.89 -0.73 34.951 517.44
24 -1685.764 21.96 16.89 0.73 27.777 -598.996
11 LIVE LOAD SURCHARGE
23 AT
60.895
REST -29.658 14.417 0.113 -35.406 -325.957
24 -60.895 29.658 -14.417 -0.113 -18.135 215.809
12 DYNAMIC INCREMENT
23 OF394.421
EARTH PR. -3.905 -4.186 -0.187 8.732 133.344
24 -394.421 3.905 4.186 0.187 6.816 -147.848
13 DYNAMIC INCREMENT
23 OF22.853
LL SURCGARGE
-11.121 5.393 0.043 -13.242 -122.286
24 -22.853 11.121 -5.393 -0.043 -6.788 80.985
14 UNLADEN WIND LOAD
23 37.768 77.395 20.409 -1.576 -33.028 131.767
24 -39.402 -52.03 -20.409 1.576 -42.769 108.566
15 LADEN WIND LOAD23 19.944 39.325 18.349 -0.832 -29.751 59.195
24 -21.43 -26.178 -18.349 0.832 -38.393 62.439
16 DIFFERNTIAL SETTLEMENT
23 24.179 -67.846 -8.01 -0.209 18.1 -771.546
24 -24.179 67.846 8.01 0.209 11.648 519.575
17 TEMPERATURE RISE
23 901.313 -16.651 -10.692 -0.084 -10.634 424.432
24 -901.313 16.651 10.692 0.084 50.345 -486.27
18 TEMPERATURE FALL
23 -412.114 7.723 4.836 0.056 4.681 -198.277
24 412.114 -7.723 -4.836 -0.056 -22.64 226.96
19 CREEP SHRINKAGE23 DIFF
-273.335
SHRINKAGE 4.79 0.827 0.274 -1.668 -104.911
24 273.335 -4.79 -0.827 -0.274 -1.405 122.698
20 FOOTPATH LIVE 23
LOAD 2.569 2.806 -0.186 2.051 -0.277 6.732
24 -2.569 -2.806 0.186 -2.051 0.968 3.689
21 SNOW LOAD FOR2370R LL TRACK
39.861 86.567 -0.005 -1.429 0.117 168.187
24 -39.861 -58.713 0.005 1.429 -0.1 101.59
22 SNOW LOAD FOR23LL 70R WHEEL
19.94 43.298 -0.003 -0.717 0.06 84.139
24 -19.94 -29.371 0.003 0.717 -0.05 50.804
23 BRAKING 23 -23.514 -7.69 1.096 0.122 -2.556 -88.918
24 17.311 7.69 -1.096 -0.122 -1.515 60.357
604 COMBINATION LOAD
23 CASE
179.097
504 -1.153 -0.308 -0.663 -5.4 1079.578
24 -179.097 1.153 0.308 0.663 6.544 -1083.862

19 23 +ve 96.229 429.518 4.199 11.077 13.228 592.693


370 LOAD GENERATION,
258 LOAD GENERATION,
LOAD
140 LOAD
#370,GENERATION,
(26
319
LOAD
of
LOAD
26)
#258,
GENERATION,
205
(22
LOAD
LOAD
of 56)
#140,
GENERATION,
219LOAD
(8LOAD
of 26)
#319,
GENERATION,
LOAD
(1 of 26)
#205, LOAD
(21 of #219,
26) (9 of 26)
-ve 0 -23.831 -5.351 -27.878 -9.21 -347.991
- 77 LOAD GENERATION,
204 LOAD GENERATION,
LOAD
210 LOAD
#77, GENERATION,
(1140
ofLOAD
56)
LOAD #204,
GENERATION,
81LOAD
(20
LOAD
of #210,
26)
GENERATION,
LOAD
(26 of 26)
#140,
LOAD
(8 of #81,
26) (5 of 56)
19 24 +ve 96.229 287.431 4.199 11.077 6.465 142.245
370 LOAD GENERATION,
265 LOAD GENERATION,
LOAD
140 LOAD
#370,GENERATION,
(26
319
LOAD
of
LOAD
26)
#265,
GENERATION,
310
(29
LOAD
LOAD
of 56)
#140,
GENERATION,
285LOAD
(8LOAD
of 26)
#319,
GENERATION,
LOAD
(1 of 26)
#310, LOAD
(18 of #285,
26) (49 of 56)
-ve 0 -108.757 -5.351 -27.878 -6.811 -841.98
- 85 LOAD GENERATION,
204 LOAD GENERATION,
LOAD
210 LOAD
#85, GENERATION,
(9203
ofLOAD
56)
LOAD #204,
GENERATION,
89LOAD
(20
LOAD
of #210,
26)
GENERATION,
LOAD
(26 of 26)
#203,
LOAD
(19 of#89,
26) (13 of 56)

-------------------------------------------------------------------------------------------------------------------------------
66 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


20 1 SPECTRUM IN X DIRECTION
24 131.143 101.998 18.63 1.118 37.316 845.565
25 -131.143 -101.998 -18.63 -1.118 -33.2 -467.484
2 SPECTRUM IN Z DIRECTION
24 98.454 100.207 88.516 10.45 110.916 112.304
25 -98.454 -100.207 -88.516 -10.45 -218.844 -481.36
3 SPECTRUM IN Y DIRECTION
24 8.92 14.704 8.094 2.334 12.145 22.63
25 -8.92 -14.704 -8.094 -2.334 -18.382 -67.228
4 DEAD LOAD 24 212.994 310.8 0.357 -4.063 0.009 -532.628
25 -212.994 -162.014 -0.357 4.063 -1.334 1410.608
5 SIDL (DL) 24 22.274 33.599 -0.204 -1.199 0.113 8.743
25 -22.274 -33.599 0.204 1.199 0.643 116.038
6 SIDL(WC) 24 32.297 48.635 0.058 -1.32 0.258 -86.459
25 -32.297 -24.124 -0.058 1.32 -0.475 221.568
7 REMOVAL OF SHUTTER
24 -33.358 -49.278 -0.084 0.572 0.031 87.044
25 33.358 25.138 0.084 -0.572 0.282 -225.229
8 EP ON ABUTMENT24 667.737 -7.38 -4.119 -0.299 7.989 261.221
25 -667.737 7.38 4.119 0.299 7.31 -288.63
9 AT REST EP ON ABUTMENT
24 1123.006 -12.391 -6.934 -0.504 13.448 439.551
25 -1123.006 12.391 6.934 0.504 12.305 -485.57
10 AT K* EP ON ABUTMENT
24 1694.631 -22.039 -9.404 -0.683 18.146 599.029
25 -1694.631 22.039 9.404 0.683 16.78 -680.879
11 LIVE LOAD SURCHARGE
24 AT
60.792
REST -29.757 14.613 0.23 -32.044 -215.777
25 -60.792 29.757 -14.613 -0.23 -22.226 105.262
12 DYNAMIC INCREMENT
24 OF396.451
EARTH PR. -3.923 -2.454 -0.172 4.761 147.855
25 -396.451 3.923 2.454 0.172 4.353 -162.425
13 DYNAMIC INCREMENT
24 OF22.808
LL SURCGARGE
-11.158 5.464 0.086 -11.98 -80.973
25 -22.808 11.158 -5.464 -0.086 -8.313 39.534
14 UNLADEN WIND LOAD
24 42.545 51.771 12.921 -0.966 -14.511 -108.559
25 -44.179 -26.405 -12.921 0.966 -33.477 253.726
15 LADEN WIND LOAD24 24.344 26.039 11.589 -0.498 -13.09 -62.435
25 -25.83 -12.892 -11.589 0.498 -29.951 134.728
16 DIFFERNTIAL SETTLEMENT
24 24.057 -67.851 -7.985 -1.472 15.977 -519.606
25 -24.057 67.851 7.985 1.472 13.677 267.619
17 TEMPERATURE RISE
24 1038.736 -17.036 13.346 0.211 -47.771 486.385
25 -1038.736 17.036 -13.346 -0.211 -1.796 -549.654
18 TEMPERATURE FALL
24 -475.223 7.904 -6.311 -0.09 21.801 -227.015
25 475.223 -7.904 6.311 0.09 1.635 256.369
19 CREEP SHRINKAGE24 DIFF
-308.553
SHRINKAGE 4.904 -7.995 0.051 9.621 -122.739
25 308.553 -4.904 7.995 -0.051 20.072 140.95
20 FOOTPATH LIVE 24
LOAD 3.085 3.002 0.285 1.902 -1.364 -3.876
25 -3.085 -3.002 -0.285 -1.902 0.304 15.024
21 SNOW LOAD FOR2470R LL TRACK
39.626 58.505 0.079 -0.862 0.049 -101.585
25 -39.626 -30.651 -0.079 0.862 -0.343 267.139
22 SNOW LOAD FOR24LL 70R WHEEL
19.822 29.266 0.039 -0.433 0.025 -50.802
25 -19.822 -15.339 -0.039 0.433 -0.172 133.63
23 BRAKING 24 -17.477 -7.693 1.062 0.077 -2.165 -60.358
25 11.275 7.693 -1.062 -0.077 -1.779 31.788
604 COMBINATION LOAD
24 CASE
188.679
504 -1.136 0.358 -0.153 -6.798 1083.873
25 -188.679 1.136 -0.358 0.153 5.469 -1088.092

20 24 +ve 94.113 300.935 3.148 7.244 11.482 141.882


370 LOAD GENERATION,
265 LOAD GENERATION,
LOAD
140 LOAD
#370,GENERATION,
(26
329
LOAD
of
LOAD
26)
#265,
GENERATION,
205
(29
LOADLOAD
of 56)
#140,
GENERATION,
285LOAD
(8LOAD
of 26)
#329,
GENERATION,
LOAD
(11 of 26)
#205, LOAD
(21 of #285,
26) (49 of 56)
-ve 0 -93.417 -3.988 -19.832 -6.735 -839.885
- 85 LOAD GENERATION,
204 LOAD GENERATION,
LOAD
365 LOAD
#85, GENERATION,
(9142
ofLOAD
56)
LOAD #204,
GENERATION,
89LOAD
(20
LOAD
of #365,
26)
GENERATION,
LOAD
(21 of 26)
#142,
LOAD
(10 of#89,
26) (13 of 56)
20 25 +ve 94.113 179.426 3.148 7.244 5.337 35.241
370 LOAD GENERATION,
100 LOAD GENERATION,
LOAD
140 LOAD
#370,GENERATION,
(26
329
LOAD
of
LOAD
26)
#100,
GENERATION,
232
(24
LOADLOAD
of 56)
#140,
GENERATION,
125LOAD
(8LOAD
of 26)
#329,
GENERATION,
LOAD
(11 of 26)
#232, LOAD
(22 of #125,
26) (49 of 56)
-ve 0 -198.836 -3.988 -19.832 -4.146 -1010.691
- 92 LOAD GENERATION,
204 LOAD GENERATION,
LOAD
365 LOAD
#92, GENERATION,
(16
342
LOAD
of LOAD
56) #204,
GENERATION,
96LOAD
(20
LOAD
of #365,
26)
GENERATION,
LOAD
(21 of 26)
#342,
LOAD
(24 of#96,
26) (20 of 56)

-------------------------------------------------------------------------------------------------------------------------------
67 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


21 1 SPECTRUM IN X DIRECTION
25 97.614 106.709 19.611 1.14 29.22 467.36
26 -97.614 -106.709 -19.611 -1.14 -44.531 -75.55
2 SPECTRUM IN Z DIRECTION
25 108.383 59.451 43.197 7.53 22.934 481.372
26 -108.383 -59.451 -43.197 -7.53 -153.617 -697.962
3 SPECTRUM IN Y DIRECTION
25 8.95 10.117 4.402 1.592 3.864 67.228
26 -8.95 -10.117 -4.402 -1.592 -13.732 -99.566
4 DEAD LOAD 25 212.695 166.435 0.696 -3.944 -0.117 -1410.821
26 -212.695 -17.647 -0.696 3.944 -2.467 1752.652
5 SIDL (DL) 25 23.057 44.88 0.067 -4.653 -0.336 -116.369
26 -23.057 -44.88 -0.067 4.653 0.086 283.047
6 SIDL(WC) 25 32.087 24.314 0.077 -0.798 0.301 -221.514
26 -32.087 0.198 -0.077 0.798 -0.587 266.297
7 REMOVAL OF SHUTTER
25 -33.268 -25.06 -0.127 0.259 0.021 225.219
26 33.268 0.92 0.127 -0.259 0.449 -273.463
8 EP ON ABUTMENT25 668.582 -7.393 -2.367 -0.212 3.933 288.64
26 -668.582 7.393 2.367 0.212 4.856 -316.097
9 AT REST EP ON ABUTMENT
25 1124.427 -12.413 -3.985 -0.356 6.621 485.587
26 -1124.427 12.413 3.985 0.356 8.177 -531.687
10 AT K* EP ON ABUTMENT
25 1697.06 -22.071 -4.849 -0.482 8.298 680.909
26 -1697.06 22.071 4.849 0.482 9.71 -762.878
11 LIVE LOAD SURCHARGE
25 AT
62.897
REST -29.81 15.994 0.301 -25.904 -105.215
26 -62.897 29.81 -15.994 -0.301 -33.495 -5.495
12 DYNAMIC INCREMENT
25 OF396.954
EARTH PR. -3.93 -1.413 -0.124 2.347 162.431
26 -396.954 3.93 1.413 0.124 2.899 -177.025
13 DYNAMIC INCREMENT
25 OF23.592
LL SURCGARGE
-11.177 5.98 0.113 -9.684 -39.517
26 -23.592 11.177 -5.98 -0.113 -12.525 -1.995
14 UNLADEN WIND LOAD
25 46.631 26.192 5.276 -0.436 1.504 -253.682
26 -48.265 -0.826 -5.276 0.436 -21.097 303.853
15 LADEN WIND LOAD25 28.072 12.779 4.7 -0.217 1.303 -134.706
26 -29.557 0.368 -4.7 0.217 -18.759 157.751
16 DIFFERNTIAL SETTLEMENT
25 22.96 -67.86 -8.65 -2.105 12.514 -267.525
26 -22.96 67.86 8.65 2.105 19.61 15.5
17 TEMPERATURE RISE
25 1095.596 -17.183 -1.474 0.303 -13.525 549.817
26 -1095.596 17.183 1.474 -0.303 19.001 -613.632
18 TEMPERATURE FALL
25 -501.184 7.973 0.597 -0.137 5.802 -256.444
26 501.184 -7.973 -0.597 0.137 -8.021 286.054
19 CREEP SHRINKAGE25 DIFF
-319.572
SHRINKAGE 4.956 -1.867 -0.057 -5.696 -140.998
26 319.572 -4.956 1.867 0.057 12.63 159.403
20 FOOTPATH LIVE 25
LOAD 3.42 3.1 0.525 1.198 -1.447 -15.156
26 -3.42 -3.1 -0.525 -1.198 -0.501 26.669
21 SNOW LOAD FOR2570R LL TRACK
39.526 30.471 0.136 -0.392 0.045 -267.108
26 -39.526 -2.617 -0.136 0.392 -0.552 328.552
22 SNOW LOAD FOR25LL 70R WHEEL
19.772 15.249 0.068 -0.197 0.023 -133.614
26 -19.772 -1.321 -0.068 0.197 -0.276 164.384
23 BRAKING 25 -11.289 -7.695 1.152 0.057 -1.703 -31.783
26 5.087 7.695 -1.152 -0.057 -2.576 3.204
604 COMBINATION LOAD
25 CASE
192.648
504 -1.15 -0.324 0.018 -5.521 1088.11
26 -192.648 1.15 0.324 -0.018 6.726 -1092.38

21 25 +ve 93.129 188.443 3.047 7.53 9.687 35.984


370 LOAD GENERATION,
100 LOAD GENERATION,
LOAD
141 LOAD
#370,GENERATION,
(26
336
LOAD
of
LOAD
26)
#100,
GENERATION,
206
(24
LOADLOAD
of 56)
#141,
GENERATION,
125LOAD
(9LOAD
of 26)
#336,
GENERATION,
LOAD
(18 of 26)
#206, LOAD
(22 of #125,
26) (49 of 56)
-ve 0 -184.155 -3.862 -20.379 -5.055 -1014.124
- 92 LOAD GENERATION,
203 LOAD GENERATION,
LOAD
370 LOAD
#92, GENERATION,
(16
142
LOAD
of LOAD
56) #203,
GENERATION,
96LOAD
(19
LOAD
of #370,
26)
GENERATION,
LOAD
(26 of 26)
#142,LOAD
(10 of#96,
26) (20 of 56)
21 26 +ve 93.129 110.471 3.047 7.53 6.847 10.638
370 LOAD GENERATION,
56 LOAD GENERATION,
LOAD
141 LOAD
#370,GENERATION,
LOAD
(26
336ofLOAD
#56,
26) GENERATION,
(665
ofLOAD
LOAD
26) #141,
GENERATION,
77LOAD
(9
LOAD
of 26)
#336,
GENERATION,
LOAD
(18 of#65,
26) (15
LOAD
of 26)
#77, (1 of 56)
-ve 0 -317.191 -3.862 -20.379 -6.397 -972.344
- 100 LOAD GENERATION,
203 LOAD GENERATION,
370
LOADLOAD
#100,
GENERATION,
342
(24
LOADLOAD
of 56)
#203,
GENERATION,
210LOAD
(19
LOAD
of #370,
26)GENERATION,
LOAD
(26 of 26)
#342, LOAD
(24 of #210,
26) (26 of 26)

-------------------------------------------------------------------------------------------------------------------------------
68 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 3 35 19 20 21 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.598 7.195 10.793 14.390
Precast girder only -1.1 1111.1 1877.1 2342.9 2508.7
Construction load -0.2 294.2 504.5 630.7 672.8
Deck slab & X-girder -0.5 781.9 1345.9 1691.4 1818.6
Total wt of deck slab = -1.7 1893.0 3222.9 4034.4 4327.4
SIDL (DL) from staad output -134.6 -94.0 -11.2 116.0 283.0
SIDL (WC) from staad output -363.9 -139.9 86.6 221.6 266.3
Removal of shutter 364.5 141.0 -87.1 -225.2 -273.5
Active Earth pressure -214.1 -214.1 -261.2 -288.6 -288.6
Earth pressure at rest -348.3 -233.9 -393.7 -439.6 -316.1
Earth pressure at K* -458.3 -517.5 -599.0 -680.9 -774.6
Live load surcharge 406.1 325.9 215.8 105.3 -5.5
Wind load (unloaded structure) -367.3 -131.7 -147.8 -162.4 -177.0
Wind load (loaded structure) -179.1 -59.2 62.4 134.7 157.8
Differential settlement -955.2 -771.4 519.6 267.6 15.5
Temperature rise -381.0 -424.5 -486.3 -549.7 -613.6
Temperature fall 178.1 198.3 227.0 256.4 286.1
Creep & shrinkage 92.3 104.9 122.7 141.0 159.4
Footpath live load -14.3 -6.9 3.7 15.0 26.7
Snow load -215.6 -84.1 50.8 133.6 164.4
Braking load 109.8 88.9 60.4 31.8 3.2
Live Load -1362.0 -592.2 842.0 1010.7 972.3
Seismic in X- direction -1448.9 -1200.9 -845.5 -467.5 -75.6
Seismic in Z- direction -737.6 -364.8 -111.6 -481.4 -698.0
Seismic in Y- direction -104.3 -52.2 -22.6 -67.2 -99.6
Dynamic increment of Earth pr. -122.8 -133.3 -147.8 -162.4 -177.0
Dynamic increment of LL Surcharge 152.3 122.3 81.0 39.5 -2.0

Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 158.876 163.11 179.097 188.679 192.648
Moment -1076.0 -1079.4 -1083.9 -1088.1 -1092.4
The hyperstatic action is only considered for calculation of negative moment at support.

b) Shear force (kN)


Desription At support Near L/8 Near L/4 Near 3L/8 At L/2
Precast girder only 372.0 256.9 171.2 56.2 4.4
Deck slab & X-girder 247.8 187.1 126.4 65.7 5.0
Total DL 619.8 444.0 297.6 121.9 9.4
SIDL (DL) from staad output 14.2 14.8 21.5 33.6 44.9
SIDL (WC) from staad output 91.5 73.6 48.8 24.1 -0.2
Active Earth pressure 7.3 7.3 7.3 7.4 7.4
Earth pressure at rest 12.2 12.3 12.3 12.4 12.4
Earth pressure at K* -21.8 -21.8 -22.0 -22.0 -17.7
Live load surcharge 29.5 29.5 29.7 29.8 29.8
Wind load (unloaded structure) 96.1 77.5 52.0 26.4 0.8
Wind load (loaded structure) 49.0 39.4 26.2 12.9 -0.4
Differential settlement 67.8 67.8 67.8 67.9 67.9
Temperature rise -16.0 -16.1 -16.7 -17.0 -17.2
Temperature fall 7.4 7.5 7.7 7.9 8.0
Creep & shrinkage 4.6 4.6 4.8 4.9 5.0
Footpath live load 2.7 2.7 2.8 3.0 3.1
Snow load 53.5 43.4 29.4 15.3 1.3
Hyperstatic action -1.3 -1.3 -1.2 -1.1 -1.2
Braking load 7.7 7.7 7.7 7.7 7.7
Live Load 572.2 446.3 287.4 179.4 110.5
Seismic in X- direction 91.3 92.3 96.4 102.0 106.7
Seismic in Z- direction 139.0 137.7 127.3 100.2 59.5
Seismic in Y- direction 21.3 20.6 18.0 14.7 10.1
Dynamic increment of Earth pr. -3.9 -3.9 -3.9 -3.9 -3.9
Dynamic increment of LL Surcharge 11.1 11.1 11.1 11.2 11.2

-------------------------------------------------------------------------------------------------------------------------------
69 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.1.6 Load Combination - Ultimate limit state


1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+construction Live load(leading) + wind load(accompany)
DL, Support settle, snow
Transverse
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load Wind load Temp load Long. Seismic Vertical Seismic
prestress loss Seismic

1 1.35 1.35 1.75 1.35 1.5


2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
3 (a) 1.35 1.35 1.75 1.35 1.5 0.9
3 (b) 1 1 1 1 1.5 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5
4 (b) 1 1 1 1 1.15 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9
5 (b) 1 1 1 1 1.5 0.9
6 (a) 1.35 1.35 1.75 1.35 1.15 1.5
6 (b) 1 1 1 1 1.15 1.5
7 (a) 1.35 1.35 1.75 1 0.2 1.5 0.45 0.45
7 (b) 1.35 1.35 1.75 1 0.2 0.45 1.5 0.45
7 (c) 1.35 1.35 1.75 1 0.2 0.45 0.45 1.5
7 (d) 1 1 1 1 0.2 1.5 0.45 0.45
7 (e) 1 1 1 1 0.2 0.45 1.5 0.45
7 (f) 1 1 1 1 0.2 0.45 0.45 1.5
a) Moment At support Near L/8 Near L/4 Near 3L/8 At L/2
1 -6423.7 -786.4 4928.8 6069.0 6374.2
2 (a) -4745.5 -218.6 3348.0 4239.1 4605.4
2 (b) -3676.5 -70.3 2464.0 3044.0 3261.9
3 (a) -6584.9 -839.6 4985.0 6190.2 6516.2
3 (b) -5516.0 -691.3 4101.0 4995.1 5172.8
4 (a) -6172.3 -696.5 4705.3 5900.9 6260.1
4 (b) -5103.3 -548.2 3821.3 4705.9 4916.6
5 (a) -6427.8 -1363.4 5311.9 6503.5 6668.7
5 (b) -5320.3 -1222.0 4381.5 5255.5 5315.7
6 (a) -6136.3 -1065.8 5131.0 6287.2 6489.6
6 (b) -5028.8 -924.4 4200.6 5039.2 5136.6
7 (a) -6669.4 -2139.1 2428.4 3745.5 4532.3
7 (b) -5922.5 -1261.1 3199.0 3730.9 3878.8 (+)ve
7 (c) -5257.5 -933.0 3292.5 4165.7 4507.1 value of
7 (d) -5722.3 -2072.7 1406.6 2396.5 3078.3 seismic
7 (e) -4975.5 -1194.7 2177.2 2382.0 2424.7 force
7 (f) -4310.4 -866.5 2270.7 2816.8 3053.1
7 (a) -1297.7 1464.1 4837.5 5520.6 5483.1
7 (b) -2044.5 586.1 4067.0 5535.1 6136.6 (-)ve value
7 (c) -2709.6 257.9 3973.5 5100.3 5508.3
of seismic
7 (d) -350.6 1530.5 3815.8 4171.6 4029.0
force
7 (e) -1097.5 652.5 3045.2 4186.2 4682.5
7 (f) -1762.5 324.4 2951.7 3751.4 4054.2
Maximum -6669.4 1530.5 5311.9 6503.5 6668.7
Minimum -350.6 -2139.1 1406.6 2382.0 2424.7

b) Shear At support Near L/8 Near L/4 Near 3L/8 At L/2


1 2111.8 1641.5 1153.0 708.7 407.4
2 (a) 1382.1 1072.8 784.2 463.1 226.8
2 (b) 1043.2 812.2 595.9 355.4 177.6
3 (a) 2155.9 1676.9 1176.6 720.3 407.1
3 (b) 1817.0 1416.3 988.3 612.6 357.9
4 (a) 1981.4 1540.7 1088.0 661.5 364.4
4 (b) 1642.5 1280.1 899.7 553.8 315.3
5 (a) 2016.1 1566.7 1078.1 633.6 338.1
5 (b) 1689.1 1318.1 901.8 538.0 299.5
6 (a) 1802.6 1411.4 978.4 571.8 300.5
6 (b) 1475.6 1162.7 802.1 476.2 261.9
7 (a) 1528.1 1221.9 940.0 630.5 405.3
7 (b) 1578.2 1269.6 972.4 628.6 355.7
7 (c) 1454.7 1146.6 857.7 538.8 303.9
7 (d) 1193.5 965.6 756.0 527.1 360.5
7 (e) 1243.6 1013.3 788.4 525.2 310.9
7 (f) 1120.0 890.3 673.7 435.4 259.1
Maximum 2155.9 1676.9 1176.6 720.3 407.4

-------------------------------------------------------------------------------------------------------------------------------
70 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.1.7 Load Combination for Rare Combination (SL1)


1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
DL, Support settle, snow Secondary
Creep &
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Prestress Live load Wind load Temperature effect of
prestress loss Shrinkage
Prestress
1(a) 1 1 1.2 1 1.1 or 0.9 1 1
1(b) 1 1 1 1 1.1 or 0.9 1 1
2 (a) 1 1 1.2 1 1.1 or 0.9 1 1 1
2 (b) 1 1 1 1 1.1 or 0.9 1 1 1
3 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
3 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
4 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
4 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
5 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
5 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
6 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
6 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
5.2 Cable Details
Maximum midspan Moment for outer girder =
Precast Girder Only = 2508.72 kN-m
Deck Slab & Cross Girder = 1818.65 kN-m
SIDL = 549.34 kN-m
Wind load = 94.65 kN-m
Live Load = 972.34 kN-m
Total Moment = 5943.7 kN-m
Sectional Properties Inner Composite Girder at Midspan :-
Area - A = 1.603 m2
Moment of Inertia - I = 0.692 m4
CG from bottom = 1.352 m
Z Bottom = 0.512 m3
Assume Nos. of Cable = N
Ultimate Force of each 19T13 strands P = 3490 kN
Applied Force = 2733 kN
CG From bottom = 0.141 m
"e" from CG of Girder = 1.211 m
Assum overall Loss = 30 %
Stress at bottom of Girder = NP/A+NP*e/ZBottom-M/Zbottom = 0
N = (M/ZBottom)/(P/A+P*e/ZBottom) = 2.03
Say, No of Cables Provided = 3.32

5.2.1 Calculation of Friction & Slip loss

0.300
4

0.350
X X X 3
1.775 0.400

2
4 0.400

1 3 2 0.170 1 0.325
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support

-------------------------------------------------------------------------------------------------------------------------------
71 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

0.25 14.390
Y
4.50
1 2 X 0.17
0.17

0.15 14.640

Cable profile in Plan

0.15
0.30 4
0.350 3

0.400 Z
2
0.400
1 0.170
0.125
0.33 0.25 3.000 4.50 3.00 3.890
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.325-0.125)/(0.25+3-0.15)} = 3.691
o
Vertical bending of Cable 2 =Tan-1{(0.325+0.4-0.125-0.17)/(0.25+3+4.5-0.15)} = 4.514
o
Vertical bending of Cable 3 =Tan-1{(0.325+0.4+0.4-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 5.389
o
Vertical bending of Cable 4 =Tan-1{(0.325+0.4+0.4+0.35-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 6.352
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.325 3.100 0.000 0.125
2 0.000 0.000 0.725 7.600 -0.170 0.125
3 0.000 0.000 1.13 10.600 0.000 0.125
4 0.000 0.000 1.48 10.600 0.000 0.295

Cable Start of Horizontal Bending End of Horizontal Bending Midspan


No. X Y Z X Y Z X Y Z
1 3.100 0.000 0.125 7.600 0.170 0.125 14.490 0.170 0.125
2 3.100 0.000 0.480 7.600 -0.170 0.125 14.490 -0.170 0.125
3 0.000 0.000 0.000 0.000 0.000 0.000 14.490 0.000 0.125
4 0.000 0.000 0.000 0.000 0.000 0.000 14.490 0.000 0.295
C.G. of Cables from Bottom of girder at different Locations
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.598 7.195 10.793 14.390 Distance from
Cable 1 0.293 0.125 0.125 0.125 0.125 Anchorage End
Cable 2 0.686 0.441 0.157 0.125 0.125
Cable 3 1.078 0.786 0.446 0.125 0.125
Cable 4 1.419 1.075 0.674 0.295 0.295

Friction & Slip Loss


Type of Tendon = 19T/13
2
Modulous of Elasticity (E) = 195 Gpa = 1.95E+08 kN/m
Refer figure 6.3, clause no.7.9.2, table no. 18.4 of IRC 112-2011
Cross Sectional Area(A) = 1877 mm2
Ultimate Force of each 19T13 strands (Breaking load each strand =183.7 kN) = 3490.30 kN
Applied Force -P(je) = (90% of 0.1% proof load = =0.9*0.87*183.7) = 2733 kN
Cofficient of Friction (µ) = 0.17 per radian
Wobble factor (k) = 0.002 per meter
Slip (∆L) = 6 mm.
P(je)=P(x)e (µφ+kl) or P(x)=P(je)/e (µφ+kl)

-------------------------------------------------------------------------------------------------------------------------------
72 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2446.79
1-2 3.106 0.00 0.000 1.0062
2 2715.98 2463.71
2-3 4.503 4.622 0.081 1.0230
3 2654.97 2524.72
3-4 6.890 2.781 0.049 1.0223
4 2597.12 2582.57

3.106 4.503 6.890


2732.90 2715.98 2654.97
1 2 3 2597.12
= 4
= 2524.72 2582.57
6.890
2446.79 2463.71
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2582.572 kN
Point of Zero Slip from node 3 = 6.890 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 28.999 m
Extension of cable at each side = 111.59 mm

Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2440.22
1-2 3.110 0.00 0.000 1.0062
2 2715.96 2457.16
2-3 4.517 5.302 0.093 1.0251
3 2649.53 2523.59
3-4 6.890 2.781 0.049 1.0223
4 2591.79 2591.79
3.110 4.517 6.890
2732.90 2715.96
1 2 2649.53 2591.79
= 3
= 2581.33 4
2457.16 2523.59
2440.22 6.890
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2581.33 kN
Point of Zero Slip from node 3 = 6.890 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 29.034 m
Extension of cable = 111.58 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2492.01
1-2 10.647 0.00 0.000 1.0215
2 2675.33 2549.59
2-3 3.890 5.389 0.094 1.0241
3 2612.48 2612.48
10.647 3.890
2732.90 2675.33
1 2 2612.48
= 3
= 2612.46
2549.59 3.890
2492.01
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2612.458 kN
Point of Zero Slip from node 1 = 3.890 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.647+3.89)x2 = 29.074 m
Extension of cable at each side = 112.75 mm

-------------------------------------------------------------------------------------------------------------------------------
73 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Cable 4 6 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 863.02 786.41
1-2 10.665 0.00 0.000 1.0216
2 844.81 804.63
2-3 3.890 6.352 0.111 1.0270
3 822.61 822.61
10.665 3.890
863.02 844.81
1 2 822.61
= 3
= 824.72
804.63 3.521
786.41 Force Diagram before & after Slip Loss
Assume Force of zero slip = 824.7169 kN
Point of Zero Slip from node 1 = 3.521 m
Area of Shaded Portion = ExAx∆L = 693.576 kN-m
Area of Shaded Portion = 693.576 kN-m
Diferance of these two forces = 693.58-693.58 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.665+3.89)x2 = 29.111 m
Extension of cable at each side = 112.84 mm
5.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.598 7.195 10.793 14.390
Cable 1 2449.51 2466.39 2519.10 2551.45 2582.57
Vert. angle 3.691 3.691 3.691 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.293 0.125 0.125 0.125 0.125
Cable 2 2442.94 2459.82 2517.24 2554.93 2591.79
Vert. angle 4.514 4.514 4.514 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.686 0.441 0.157 0.125 0.125
Total cable
forces Normal 4879.79 4913.46 5017.40 5103.37 5174.37
at first stage
CG of Cable 0.489 0.283 0.141 0.125 0.125
Total cable
forces Per.
349.97 352.39 359.87 0.00 0.00
Cable 3 2494.71 2511.47 2530.92 2550.38 2612.48
Vert. angle 5.389 5.389 5.389 5.389 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.078 0.786 0.446 0.125 0.125
Cable 4 787.27 792.55 798.70 822.61 822.61
Vert. angle 6.352 6.352 6.352 6.352 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.419 1.075 0.674 0.295 0.295
Total cable
forces Normal 3266.12 3288.05 3313.53 3356.66 3435.09
CG of Cable 1.160 0.855 0.501 0.166 0.166
Total cable
321.41 323.57 326.08 330.55 0.00
forces CG
Overall Per.of
Cable 0.758 0.512 0.284 0.141 0.141
% loss 9.8 % 9.2 % 7.7 % 6.4 % 5.0 %
5.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 28.999 111.59
Cable 2 29.034 111.58
Cable 3 29.074 112.75
Cable 4 29.111 112.84

-------------------------------------------------------------------------------------------------------------------------------
74 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.3 Construction sequence of precast girder & deck slab


All 4 nos. Precast girders shall be cast over abutment with proper staging or casting yard. After 5 days casting of Girder, first
stage cables shall be stressed as per given force & elongation. Second stage cables shall be stressed after 28 days of casting of
precast girder. All Precast girders shall be placed/erected on PCC levelled plinth over abutment wall. Deck slab & X-Girder shall
be monolithically cast after erecting necessary shuttering from precast girder at 60 days except at top of abutment portion. After
30 days casting of Deck Slab i.e. after 90 days casting of Precast Girder, top of abutment cap shall be cast for jointing of
superstructure & substructure after removing of all shuttering. After 28/30 days jointing of superstructure & substructure i.e.
after 120 days casting of Precast Girder, SIDL shall be laid.
5.3.1 Loss calculation
5.3.1.1 Loss due to Elastic Shortening
Refer clause no.6.4.2.2, Annexure A-2 of IRC 112-2011 Average loss in Cable Stress = 1/2 m f c
f cm (t) = βcc(t)f cm βcc(t) = exp{S[1-(28/(t/t1)0^0.5]}
f ck = Grade of concrete = M 40
f cm (t) = mean concrete compressive strength at age 't' days
f cm = mean concrete compressive strength at age '28' days = 50 Mpa
t = Age of concrete in days = 5 days
t1 = 1 day S = 0.25
βcc(t) = 0.71 f cm (t) = 35.53 Mpa
f ck (t) = 25.53 Mpa
corresponding Ecm = 22x(f cm/12.5)^0.3 = 30.10 Gpa
Ep = 195.00 Gpa m =Modular Ratio = Ec/Ecj = 6.48
To calculate average stress fc at CG of Cables due to Prestress and
Depth of Girder = 1.775 m Assume, Elastic Shortening = 56.15 kN/Cable
2.05 %
2
Area of each Cable = 1877.20 mm Number of cables (cable 1 to 4) = 2.00 Nos
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Sustained Stress of precast girder only at 5 days :-
Dead Load Dead Load Stress at
Cable Force (kN)
Section After fr. & After fr., slip & Cable CG from Stress Moment (kN- Stress Total Stress cable CG
slip loss ES loss soffit (m) (Mpa) m) (kN/m2) (Mpa) (Mpa)
T -1.09 0.00 -1.09
End 4879.79 4767.49 0.489 -1.13 5.74
B 8.33 0.00 8.34
T -2.31 2.55 0.24
L/8 4913.46 4801.16 0.283 1111.10 9.30
B 14.04 -3.02 11.02
T -3.95 4.31 0.35
L/4 5017.40 4905.10 0.141 1877.07 10.27
B 16.23 -5.10 11.13
T -4.21 5.38 1.17
3L/8 5103.37 4991.07 0.125 2342.94 9.72
B 16.73 -6.36 10.37
T -4.27 5.76 1.49
L/2 5174.37 5062.07 0.125 2508.72 9.54
B 16.97 -6.81 10.15
Average stress fc = (5.74+2x(9.3+10.27+9.72)+9.54)/8 = 9.23 Mpa
Average Loss of cable stress = 1/2 m fc = 29.91 Mpa
Loss of each cable due to Elastic shortening = 1/2 m fc As = 56.15 kN
-4.27 Mpa 5.76 Mpa 1.49 Mpa
> -1.57
Mpa
X X + = < 12.26
Mpa
Hence O.K.

16.97 Mpa -6.81 Mpa 10.15 Mpa


Precast Stress due to 1st stage Stress due to DL of Girder Resultant Stress at 7
Girder stressing after loss days
Stress Diagram at Midspan of Precast Girder at 5 days of Casting of Girder
Permissible Compressive stress 0.48xfcm(t) = 12.26 MPa
Permissible tensile stress 0.7xftmj = 1.57 MPa

-------------------------------------------------------------------------------------------------------------------------------
75 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4767+2x(4801+4905+4991)+5062)/8 = 4903.03 kN
Percentage of Initial force = 0.702 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.55 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4903.03/2x2.55/100 = 62.45 kN/Cable

Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 23.11 kN/Cable
5 - 28 days Loss = 26.23 kN/Cable
28 - 60 days Loss = 13.12 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 124.91 kN/Cable
Total = 187.36 kN/Cable
187.362 6.86 %

5.3.1.3 Computation of shrinkage strain (clause no. 6.4.2.6, IRC:112 - 2011)


Total shrinkage strain, εcs = εcd + εc a
Where, εcd is drying shrinkage strain and εca is autogenous shrinkage strain
Maximum Autogenous shrinkage strain εca = 0.00006 (refer table 6.6 of IRC:112 - 2011)
The development of autogenous shrinkage with time εc a(t) = β as(t) x εc a
Where, β as(t) = 1-esp{-0.2sqrt(t)} where t is in days.
The development of dying shrinkage strain in time εcd(t) = β ds(t,ts) * kh x εcd
Where, β ds(t,ts) = (t-ts)/[(t-ts)+0.04sqrt(ho^3) End of curing of concrete t s = 5.00 day
kh is a coefficient depending on notional size ho
Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
Precast Girder only
C/S area of girder at span A c = 0.928 m2 Perimeter in contact with air u = 6.523 m
Nominal size of precast member h 0=2Ac/u = 284.38 mm
Composite Girder
C/S area of comp. girder at span A c = 1.603 m2 Perimeter in contact with air u = 10.473 m
Nominal size of member h0=2Ac/u = 306.03 mm
The drying shrinkage strain ε cd,0 =0.85*((220+110*αds1)*EXP(-αds2*fcm/fcm,o))*β RH/10^6 = 0.0004
Coefficient αds1 (normal cement) = 4.0 Coefficient α ds2 (normal cement) = 0.12
The coefficient β RH = 1.55 x [1-RH/Rho]^3 = 1.02 fcmo = 12.50
Relative humidity of enviroment RH = 70.0 % RHo = 100 %
These are expected mean values, with a coefficient of variation of about 30 percent.
Loss of Prestress due to creep, shrinkage and relaxation as per Euro code
∆Pc+s+r = AP + ∆σPc+s+r = Ap * (εcs*EP+0.8*∆Pr+EP/Ecm*φ(t,to)*σcQP)
1+EP/Ecm*AP/Ac*(1+Ac/Ic*Zcp^2)*(1+0.8*φ(t,to))
Development of shrinkage of concrete
Autogenous Nominal size of Drying
Shrinkage Loss due to
Days shrinkage factor member h0 shrinkage kh strain shrinkage
β as(t) (mm) factor β as(t)

5 0.000 0 0.000 0.000 0.000000 0.00


28 0.653 284 0.107 0.766 0.000074 25.42
60 0.788 306 0.223 0.748 0.000120 16.02
90 0.850 306 0.307 0.748 0.000152 11.19
36500 1.000 306 0.995 0.748 0.000397 84.56
Total 137.192 5.02 %

-------------------------------------------------------------------------------------------------------------------------------
76 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.3.1.4 Computation of creep coefficients (clause no. 6.4.2.7, IRC:112 - 2011)


Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
The creep coefficient φ(t,to) = φo x βc(t,to) as per A2-14of IRC:112 - 2011
Where, φo = φRH x β(fcm) x β(to)
φRH = 1+(1-RH/100)/{0.1*(ho)^1/3} for fcm <= 45MPa
φRH = [1+(1-RH/100)/{0.1*(ho)^1/3} x α1] x α2 for fcm > 45MPa
The coefficient α 1 =(43.75/fcm)^0.7 = 0.91
The coefficient α 2 =(43.75/fcm)^0.2 = 0.97
The coefficient β(fcm) = 18.78/sqrt(fcm) = 2.66
The coefficient β (t0) = 1/(0.1+to^0.2) = 0.68
Where, age of concrete at first loading t 0 =5 day
βc(t,to) =[(t-to)/(β H +t-to)]^0.3
βH = = 1.5 x [1+(0.012RH)^18] x ho + 250 <= 1500 for fcm <= 35MPa
= 1.5 x [1+(0.012RH)^18] x ho + 250α3 <= 1500α3 for fcm <= 35MPa
The coefficient α 3 =(43.75/fcm)^0.5 = 0.94
For temperature greater than 40oC theby 10% in absence of accurate data coefficient may be increased by 10%
in absence of accurate data. This is valid for concrete using normal cement.
Development of creep
Loss due to
Creep
Days h0 (mm) φRH φo βH β c(t,to) creep of
coeff. φo concrete

5 0 0.00 0.000 0.00 0.000 0.000 0.00


28 284 1.38 2.474 678.92 0.359 0.976 103.40
60 306 1.37 2.456 712.80 0.453 1.225 41.42
90 306 1.37 2.456 712.80 0.511 1.380 17.37
36500 306 1.37 2.456 712.80 0.994 2.686 138.31
Total 300.50 11.00 %
5.3.2 Sustained Stress of precast girder at 28 days after stressing of cable
Losses:- Shrinkage = 25.42 kN/Cable
Relaxation = 49.34 kN/Cable
Creep = 103.40 kN/Cable
Total = 178.16 kN/Cable Total Loss for 2 Cables = 356.32 kN
f ck for 28 days strength = M 40 Modulus of elasticity E 33346 MPa
m =Modular Ratio = Ecm/Ecj = 5.85
Stressing of cable no. 4
Elastic Shortening = 58.30 kN/Cable Nomber of cables 1.316 Nos
Relaxation = 23.11 kN/Cable Depth of Girder 1.775 m
Total = 81.41 kN/Cable
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Cable Force (kN)
Stress at 5 loss bet. 5 Cable CG Stress due After fr., Cable CG Total Stress at
Section days - 28 days from soffit to loss After fr. & slip & ES from soffit Stress Stress cable CG
(kN/m2) (Tons) (m) (Mpa) slip loss loss (m) (Mpa) (Mpa) (Mpa)
T -1.09 0.11 3.53 2.54
End -472.92 0.489 3266.12 3159.00 1.160 6.61
B 8.34 -0.83 0.65 8.16
T 0.24 0.23 2.65 3.11
L/8 -472.92 0.283 3288.05 3180.94 0.855 12.26
B 11.02 -1.38 4.36 13.99
T 0.35 0.38 0.06 0.80
L/4 -472.92 0.141 3313.53 3206.41 0.501 15.75
B 11.13 -1.56 7.48 17.04
T 1.17 0.40 -2.43 -0.86
3L/8 -472.92 0.125 3356.66 3249.55 0.166 17.89
B 10.37 -1.59 10.53 19.31
T 1.49 0.40 -2.49 -0.61
L/2 -472.92 0.125 3435.09 3327.98 0.166 17.95
B 10.15 -1.59 10.79 19.36

-------------------------------------------------------------------------------------------------------------------------------
77 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Average stress σs at CG of cables for 28 days = (6.61+2x(12.26+15.75+17.89)+17.95)/8 = 14.54 Mpa


Loss of cable stress = m (fc-fc') = 31.06 Mpa
Loss of each cable due to Elastic shortening = m f c As = 58.30 kN
1.49 Mpa 0.40 Mpa -2.49 Mpa -0.86 Mpa
> -2.12
Mpa
+ + =
< 20.00
Mpa
10.15 Mpa -1.59 Mpa 10.79 Mpa 19.36 Mpa Hence O.K.
Stress due to loss between 5 Stress due to stressing of Resultant Stress at 28
Resultant Stress at 5 days to28 days cables 3 days
Stress Diagram at Midspan of Precast Girder at 28 days of Casting of Girder

Permissible Compressive stress 0.5xfcm = 20.00 MPa


Permissible tensile stress 0.7xftmj = 2.12 MPa

5.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 13.12 kN/Cable Relaxation = 39.35 kN/Cable
Creep = 41.42 kN/Cable Creep = 41.42 kN/Cable
Total = 70.55 kN/Cable Total = 96.78 kN/Cable
actual time dependent losses = 70.55 kN/Cable actual time dependent losses = 96.78 kN/Cable
Total Loss of 4 Cables = 268.45 kN Actual Loss of third Cables = 127.35 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m

Stress at Cable CG Stress due Total Moment Stress Total Stress at


Section 28 days Stress
loss bet. 28 - from soffit to loss due to slab due to slab Stress cable CG
(kN/m2) 60 days (kN) (m) (Mpa) (kN/m2) (kN-m) (Mpa) (Mpa) (Mpa)
Top of girder 2.54 -0.08 2.46 0.00 2.46
End -268.45 0.758 -0.73 5.55
Bottom 8.16 -0.30 7.86 0.00 7.86
Top of girder 3.11 -0.01 3.10 2.47 5.57
L/8 -268.45 0.512 1076.09 9.04
Bottom 13.99 -0.62 13.38 -2.92 10.45
Top of girder 0.80 0.13 0.93 4.25 5.17
L/4 -268.45 0.284 1850.39 10.26
Bottom 17.04 -0.78 16.26 -5.03 11.23
Top of girder -0.86 0.22 -0.65 5.33 4.68
3L/8 -268.45 0.141 2322.17 11.52
Bottom 19.31 -0.89 18.42 -6.31 12.11
Top of girder -0.61 0.22 -0.39 5.72 5.33
L/2 -268.45 0.141 2491.43 11.19
Bottom 19.36 -0.89 18.47 -6.77 11.70
Average stress σs at CG of cables for 60 days = (5.55+2x(9.04+10.26+11.52)+11.19)/8 = 9.80 Mpa

-0.61 Mpa 0.22 Mpa 5.72 Mpa 5.33 Mpa


> -2.12
Mpa

+ + =
< 20.00
Mpa
19.36 Mpa -0.89 Mpa -6.77 Mpa 11.70 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder

5.3.4 Sustained stress of composite girder at 90 days


After 30 days casting of Deck Slab i.e.after 90 days casting of Precast Girder, Shuttering to be removed and
Apply of SIDL shall be done.
fck for precast girder at 90 days of Concrete I.e. 100% of fc = 40 Mpa
Ecj = 33.3 Gpa Es = 195 Gpa
m =Modular Ratio = Ec/Ecj = 5.85
Area of each Cable = 1877.20 mm2
Depth of Composite Girder = 2.000 m
Depth of Precast Girder = 1.775 m
Thickness of deck slab = 225 mm

Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
-------------------------------------------------------------------------------------------------------------------------------
78 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Losses:- Shrinkage = 11.19 kN/Cable


Relaxation = 0.00 kN/Cable
Creep = 17.37 kN/Cable
Total = 28.56 kN/Cable
Total Loss = 94.70 kN/Cable
actual time dependent losses = 94.70 kN

-------------------------------------------------------------------------------------------------------------------------------
79 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Total Stress
Stress due Loss of CG of Cables Stress due Moment due due to Total Stress at
Section
at 60 days Cables from soffit to loss to SIDL SIDL Stress cable CG
(Mpa) (kN) (m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab 0.00 0.00 -0.12 -0.13
Top of girder 2.46 -0.01 -134.00 -0.09 2.36
End -94.70 0.758 5.56
Bottom 7.86 -0.12 0.20 7.95
Top of slab 0.00 0.02 -0.09 -0.07
Top of girder 5.57 -0.01 -92.91 -0.06 5.50
L/8 -94.70 0.512 9.00
Bottom 10.45 -0.21 0.18 10.42
Top of slab 0.00 0.04 -0.01 0.02
Top of girder 5.17 0.00 -11.66 -0.01 5.17
L/4 -94.70 0.284 10.06
Bottom 11.23 -0.26 0.02 11.00
Top of slab 0.00 0.05 0.11 0.15
Top of girder 4.68 0.01 112.38 0.07 4.76
3L/8 -94.70 0.141 11.06
Bottom 12.11 -0.28 -0.22 11.61
Top of slab 0.00 0.05 0.26 0.31
Top of girder 5.33 0.01 275.88 0.17 5.51
L/2 -94.70 0.141 10.45
Bottom 11.70 -0.28 -0.54 10.88
Average stress at 90 days = (5.56+2x(9+10.06+11.06)+10.45)/8 = 9.53 Mpa
0.00 Mpa 0.05 0.26 Mpa 0.31 Mpa
5.33 0.01 Mpa 0.17 5.51 Mpa
Mpa Mpa

+ + =

11.70 -0.28 Mpa -0.54 Mpa 10.88 Mpa


Resultant Stress at 60 Loss of Cables between 60 to Resultant Stress at 90
Stress due to SIDL
days 90 days days
Stress Diagram at Midspan of Composite Girder at 90 days

5.3.5 Sustained Stress of composite girder at α days :-


Losses:- Shrinkage = 84.56 kN/Cable
Relaxation = 124.91 kN/Cable
Creep = 138.31 kN/Cable
Total = 347.78 kN/Cable
Total Loss = 1153.17 kN/Cable
actual time dependent losses = 1153.17 kN

-------------------------------------------------------------------------------------------------------------------------------
80 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)

Top of slab -0.13 -0.03 -1.06 -1.21


Top of girder 2.36 -0.18 158.88 -1075.95 -0.77 1.41
End -1153.17 0.758 5.25
Bottom 7.95 -1.40 1.56 8.11
Top of slab -0.07 0.23 -1.11 -0.95
Top of girder 5.50 0.00 163.11 -1079.43 -0.76 4.74
L/8 -1153.17 0.512 8.91
Bottom 10.42 -1.83 2.01 10.60
Top of slab 0.02 0.47 -1.13 -0.63
Top of girder 5.17 0.17 179.10 -1083.86 -0.77 4.56
L/4 -1153.17 0.284 9.78
Bottom 11.00 -2.23 2.01 10.77
Top of slab 0.15 0.62 -1.14 -0.36
Top of girder 4.76 0.28 188.68 -1088.09 -0.78 4.26
3L/8 -1153.17 0.141 10.59
Bottom 11.61 -2.48 2.01 11.14
Top of slab 0.31 0.62 -1.14 -0.21
Top of girder 5.51 0.28 192.65 -1092.38 -0.79 4.99
L/2 -1153.17 0.141 9.98
Bottom 10.88 -2.48 2.02 10.41
Average stress at α days = (5.25+2x(8.91+9.78+10.59)+9.98)/8 = 9.22 Mpa
0.31 Mpa 0.62 -0.21 Mpa
5.51 Mpa 0.28 Mpa 4.99 Mpa < 19.2 Mpa
Mpa Hence O.K.

+ =

10.88 Mpa -2.48 Mpa 10.41 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at 90 Loss of Cables inbet. 90 to
Resultant Stress at α days
days α days
Stress Diagram at Midspan of Composite Girder with SIDL without Live Load at α days

5.3.6 Stress of composite girder due to live load

Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.21 -0.78 -0.10 -2.09
Top of girder 1.41 -846.16 -107.46 -0.54 -0.07 0.80
End
Bottom 8.11 1.29 0.16 9.55
Top of slab -0.95 -0.17 -0.03 -1.15
Top of girder 4.74 -177.36 -35.50 -0.11 -0.02 4.61
L/8
Bottom 10.60 0.35 0.07 11.01
Top of slab -0.63 1.05 0.04 0.45
Top of girder 4.56 1118.15 37.46 0.68 0.02 5.27
L/4
Bottom 10.77 -2.19 -0.07 8.51
Top of slab -0.36 1.08 0.08 0.79
Top of girder 4.26 1147.74 80.84 0.70 0.05 5.01
3L/8
Bottom 11.14 -2.24 -0.16 8.74
Top of slab -0.21 0.91 0.09 0.79
Top of girder 4.99 975.55 94.65 0.60 0.06 5.65
L/2
Bottom 10.41 -1.91 -0.19 8.32

-------------------------------------------------------------------------------------------------------------------------------
81 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

-0.21 Mpa 0.91 Mpa 0.79 Mpa


4.99 Mpa 0.60 5.65 Mpa < 19.20 Mpa
Mpa Hence O.K.
+ =

10.41 Mpa -1.91 Mpa 8.32 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at α days Stress due to Live Load Resultant Stress at α days

Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 5.6 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -2.1 Mpa
Tension reinforcement at top of support are provided
5.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Moment due Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder to (Mpa)
Top of slab snow (kN-m) 0.34 F=158.88 -1.10
Top of girder 0.24 1.29
End -1.66 373.7 8145.91 0.758 -692.33 -1643.67 -1075.95
Bottom -0.56 7.98
Top of slab -1.11 F=163.11 -0.85
Top of girder 3.62 -0.60
L/8 1892.96 -1183.9 8201.51 0.512 -692.33 -1643.67 -1079.43
Bottom -2.83 15.56
Top of slab 0.12 F=179.10 -0.51
Top of girder 7.47 -4.38
L/4 3222.92 124.8 8330.92 0.284 -692.33 -1643.67 -1083.86
Bottom -9.00 19.85
Top of slab 0.02 F=188.68 -0.30
Top of girder 9.27 -6.85
3L/8 4034.39 24.7 8460.03 0.141 -692.33 -1643.67 -1088.09
Bottom -11.01 22.78
Top of slab -0.17 F=192.65 -0.30
Top of girder 9.82 -6.98
L/2 4327.37 -178.2 8609.46 0.141 -692.33 -1643.67 -1092.38
Bottom -11.41 23.29

Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.46 -0.78 -0.10 4.32 -2.50
Top of girder -0.32 -0.54 -0.07 -1.10 0.90
End -498.46 -846.16 -107.46
Bottom 0.76 1.29 0.16 1.67 -2.39
Top of slab -0.22 -0.17 -0.03 4.32 -2.50
Top of girder -0.14 -0.11 -0.02 -1.10 0.90
L/8 -233.91 -177.36 -35.50
Bottom 0.46 0.35 0.07 1.67 -2.39
Top of slab 0.07 1.05 0.04 4.32 -2.50
Top of girder 0.05 0.68 0.02 -1.10 0.90
L/4 75.41 1118.15 37.46
Bottom -0.15 -2.19 -0.07 1.67 -2.39
Top of slab 0.32 1.08 0.08 4.32 -2.50
Top of girder 0.21 0.70 0.05 -1.10 0.90
3L/8 337.61 1147.74 80.84
Bottom -0.66 -2.24 -0.16 1.67 -2.39
Top of slab 0.51 0.91 0.09 4.32 -2.50
Top of girder 0.34 0.60 0.06 -1.10 0.90
L/2 549.34 975.55 94.65
Bottom -1.07 -1.91 -0.19 1.67 -2.39
5.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
-------------------------------------------------------------------------------------------------------------------------------
82 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

b) Stresses of girder at different load casees


Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.19 -1.10 -1.25 -1.16 -2.03 -1.94 -1.88 -1.78 0.62
Top of girder 1.01 1.08 0.97 1.04 0.43 0.49 0.54 0.60 -0.19
End
Bottom 7.53 7.38 7.63 7.48 8.91 8.76 8.66 8.51 9.82
Top of slab -2.13 -2.09 -2.15 -2.11 -2.32 -2.28 -2.29 -2.25 0.29
Top of girder 2.91 2.93 2.89 2.92 2.78 2.81 2.80 2.83 2.14
L/8
Bottom 11.73 11.63 11.77 11.68 12.11 12.02 12.05 11.96 13.07
Top of slab -0.26 -0.27 -0.23 -0.25 0.81 0.80 0.57 0.55 3.38
Top of girder 3.59 3.58 3.60 3.59 4.29 4.28 4.13 4.12 3.61
L/4
Bottom 8.69 8.72 8.65 8.68 6.46 6.49 6.98 7.01 7.51
Top of slab 0.13 0.07 0.18 0.12 1.25 1.19 1.02 0.95 3.80
Top of girder 3.36 3.32 3.39 3.35 4.09 4.05 3.94 3.89 3.40
3L/8
Bottom 8.71 8.84 8.61 8.74 6.37 6.50 6.87 7.00 7.46
Top of slab 0.18 0.07 0.23 0.13 1.14 1.04 0.95 0.85 3.68
Top of girder 3.95 3.88 3.98 3.91 4.58 4.51 4.45 4.39 3.88
L/2
Bottom 8.27 8.48 8.15 8.37 6.25 6.46 6.65 6.86 7.36

-------------------------------------------------------------------------------------------------------------------------------
83 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.71 -3.47 -3.38 2.54 2.63 -4.28 -4.18 2.63 -4.28
Top of girder -0.13 1.01 1.07 -0.49 -0.43 1.50 1.57 1.57 -0.49
End
Bottom 9.66 7.38 7.23 10.16 10.01 6.11 5.95 10.16 5.95
Top of slab 0.33 -3.80 -3.76 2.06 2.10 -4.76 -4.71 2.10 -4.76
Top of girder 2.17 3.34 3.36 1.72 1.75 3.72 3.75 3.75 1.72
L/8
Bottom 12.98 10.64 10.55 13.65 13.56 9.60 9.51 13.65 9.51
Top of slab 3.37 -0.71 -0.72 4.85 4.83 -1.97 -1.98 4.85 -1.98
Top of girder 3.60 4.81 4.80 3.00 2.99 5.00 4.99 5.00 2.99
L/4
Bottom 7.54 5.07 5.10 8.72 8.75 4.66 4.69 8.75 4.66
Top of slab 3.74 -0.29 -0.35 5.26 5.19 -1.56 -1.62 5.26 -1.62
Top of girder 3.36 4.60 4.56 2.79 2.75 4.78 4.74 4.78 2.75
3L/8
Bottom 7.60 5.03 5.16 8.69 8.83 4.64 4.77 8.84 4.64
Top of slab 3.58 -0.41 -0.51 5.18 5.07 -1.64 -1.74 5.18 -1.74
Top of girder 3.82 5.08 5.02 3.29 3.23 5.29 5.23 5.29 3.23
L/2
Bottom 7.57 4.93 5.14 8.50 8.72 4.45 4.66 8.72 4.45

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.41 -1.32 -1.47 -1.38 -2.25 -2.16 -2.09 -2.00 0.40
Top of girder 1.27 1.34 1.23 1.30 0.69 0.75 0.80 0.86 0.07
End
Bottom 9.13 8.98 9.22 9.07 10.51 10.36 10.25 10.10 11.41
Top of slab -2.30 -2.26 -2.32 -2.28 -2.49 -2.44 -2.46 -2.42 0.12
Top of girder 2.78 2.81 2.77 2.80 2.66 2.69 2.68 2.71 2.02
L/8
Bottom 14.84 14.75 14.88 14.79 15.23 15.13 15.17 15.08 16.19
Top of slab -0.36 -0.37 -0.34 -0.35 0.71 0.70 0.46 0.45 3.28
Top of girder 2.72 2.71 2.73 2.72 3.41 3.40 3.25 3.24 2.74
L/4
Bottom 12.66 12.69 12.62 12.65 10.43 10.46 10.95 10.98 11.48
Top of slab 0.07 0.01 0.12 0.06 1.20 1.13 0.96 0.89 3.74
Top of girder 1.99 1.95 2.02 1.98 2.72 2.68 2.57 2.53 2.03
3L/8
Bottom 13.26 13.40 13.17 13.30 10.93 11.06 11.42 11.56 12.02
Top of slab 0.12 0.01 0.17 0.07 1.08 0.98 0.89 0.79 3.62
Top of girder 2.55 2.48 2.59 2.52 3.18 3.12 3.06 2.99 2.49
L/2
Bottom 12.92 13.14 12.81 13.03 10.91 11.12 11.31 11.52 12.02

-------------------------------------------------------------------------------------------------------------------------------
84 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.49 -3.69 -3.60 2.32 2.41 -4.50 -4.40 2.41 -4.50
Top of girder 0.13 1.27 1.33 -0.24 -0.17 1.76 1.83 1.83 -0.24
End
Bottom 11.26 8.98 8.83 11.76 11.61 7.70 7.55 11.76 7.55
Top of slab 0.16 -3.97 -3.92 1.89 1.93 -4.93 -4.88 1.93 -4.93
Top of girder 2.05 3.22 3.24 1.60 1.63 3.60 3.63 3.63 1.60
L/8
Bottom 16.09 13.75 13.66 16.77 16.67 12.71 12.62 16.77 12.62
Top of slab 3.27 -0.81 -0.82 4.74 4.73 -2.07 -2.09 4.74 -2.09
Top of girder 2.73 3.94 3.93 2.13 2.12 4.13 4.12 4.13 2.12
L/4
Bottom 11.51 9.04 9.07 12.69 12.72 8.64 8.66 12.72 8.64
Top of slab 3.68 -0.35 -0.41 5.20 5.13 -1.62 -1.68 5.20 -1.68
Top of girder 1.99 3.23 3.19 1.42 1.38 3.42 3.37 3.42 1.38
3L/8
Bottom 12.15 9.59 9.72 13.25 13.38 9.19 9.33 13.40 9.19
Top of slab 3.52 -0.47 -0.57 5.12 5.01 -1.70 -1.80 5.12 -1.80
Top of girder 2.42 3.69 3.62 1.90 1.83 3.90 3.83 3.90 1.83
L/2
Bottom 12.23 9.58 9.80 13.16 13.38 9.10 9.32 13.38 9.10
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 16.8 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 4.45 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 1.38 Mpa Hence O.K.
except at support

5.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

-------------------------------------------------------------------------------------------------------------------------------
85 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6
b) Stresses of girder at different load casees
Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.19 -1.10 -1.25 -1.16 -1.83 -1.73 -1.41 -1.32 0.38
Top of girder 1.01 1.08 0.97 1.04 0.57 0.64 0.86 0.93 0.06
End
Bottom 7.53 7.38 7.63 7.48 8.58 8.42 7.88 7.73 9.33
Top of slab -2.13 -2.09 -2.15 -2.11 -2.27 -2.23 -2.19 -2.14 -0.10
Top of girder 2.91 2.93 2.89 2.92 2.81 2.84 2.87 2.90 2.27
L/8
Bottom 11.73 11.63 11.77 11.68 12.02 11.93 11.84 11.74 12.82
Top of slab -0.26 -0.27 -0.23 -0.25 0.55 0.53 -0.03 -0.04 2.69
Top of girder 3.59 3.58 3.60 3.59 4.11 4.11 3.74 3.73 3.55
L/4
Bottom 8.69 8.72 8.65 8.68 7.02 7.05 8.21 8.24 7.89
Top of slab 0.13 0.07 0.18 0.12 0.98 0.92 0.39 0.33 3.10
Top of girder 3.36 3.32 3.39 3.35 3.91 3.87 3.53 3.49 3.34
3L/8
Bottom 8.71 8.84 8.61 8.74 6.95 7.08 8.16 8.30 7.86
Top of slab 0.18 0.07 0.23 0.13 0.91 0.80 0.41 0.31 3.02
Top of girder 3.95 3.88 3.98 3.91 4.42 4.36 4.10 4.03 3.84
L/2
Bottom 8.27 8.48 8.15 8.37 6.74 6.96 7.77 7.99 7.67
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.47 -3.03 -2.93 1.24 1.33 -2.85 -2.76 1.33 -3.03
Top of girder 0.12 1.06 1.12 0.25 0.31 1.44 1.51 1.51 0.06
End
Bottom 9.18 7.30 7.15 8.79 8.64 6.35 6.20 9.33 6.20
Top of slab -0.06 -3.51 -3.46 0.42 0.47 -3.67 -3.62 0.47 -3.67
Top of girder 2.30 3.27 3.30 2.22 2.25 3.42 3.45 3.45 2.22
L/8
Bottom 12.73 10.79 10.70 12.80 12.70 10.36 10.27 12.82 10.27
Top of slab 2.67 -0.72 -0.73 2.54 2.53 -1.55 -1.56 2.69 -1.56
Top of girder 3.54 4.55 4.54 3.07 3.06 4.27 4.26 4.55 3.06
L/4
Bottom 7.92 5.86 5.89 9.26 9.29 6.82 6.85 9.29 5.86
Top of slab 3.04 -0.31 -0.37 2.94 2.88 -1.15 -1.21 3.10 -1.21
Top of girder 3.30 4.34 4.29 2.84 2.80 4.04 4.00 4.34 2.80
3L/8
Bottom 7.99 5.83 5.96 9.26 9.39 6.83 6.96 9.39 5.83
Top of slab 2.92 -0.39 -0.49 2.95 2.85 -1.14 -1.24 3.02 -1.24
Top of girder 3.78 4.84 4.78 3.41 3.34 4.61 4.54 4.84 3.34
L/2
Bottom 7.88 5.64 5.86 8.89 9.10 6.45 6.67 9.10 5.64

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.41 -1.32 -1.47 -1.38 -2.05 -1.95 -1.63 -1.54 0.16
Top of girder 1.27 1.34 1.23 1.30 0.83 0.89 1.12 1.19 0.31
End
Bottom 9.13 8.98 9.22 9.07 10.17 10.02 9.48 9.33 10.92
Top of slab -2.30 -2.26 -2.32 -2.28 -2.44 -2.40 -2.36 -2.31 -0.27
Top of girder 2.78 2.81 2.77 2.80 2.69 2.72 2.75 2.78 2.15
L/8
Bottom 14.84 14.75 14.88 14.79 15.13 15.04 14.95 14.86 15.93
Top of slab -0.36 -0.37 -0.34 -0.35 0.45 0.43 -0.13 -0.14 2.59
Top of girder 2.72 2.71 2.73 2.72 3.24 3.23 2.87 2.86 2.68
L/4
Bottom 12.66 12.69 12.62 12.65 10.99 11.02 12.18 12.21 11.86
Top of slab 0.07 0.01 0.12 0.06 0.92 0.86 0.33 0.27 3.04
Top of girder 1.99 1.95 2.02 1.98 2.54 2.50 2.16 2.12 1.97
3L/8
Bottom 13.26 13.40 13.17 13.30 11.50 11.63 12.72 12.85 12.42
Top of slab 0.12 0.01 0.17 0.07 0.85 0.74 0.35 0.25 2.96
Top of girder 2.55 2.48 2.59 2.52 3.03 2.96 2.71 2.64 2.45
L/2
Bottom 12.92 13.14 12.81 13.03 11.40 11.62 12.43 12.65 12.33

-------------------------------------------------------------------------------------------------------------------------------
86 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.25 -3.25 -3.15 1.02 1.11 -3.07 -2.98 1.11 -3.25
Top of girder 0.38 1.31 1.38 0.50 0.57 1.70 1.77 1.77 0.31
End
Bottom 10.77 8.90 8.74 10.38 10.23 7.95 7.80 10.92 7.80
Top of slab -0.23 -3.68 -3.63 0.25 0.30 -3.84 -3.79 0.30 -3.84
Top of girder 2.18 3.15 3.18 2.10 2.13 3.30 3.33 3.33 2.10
L/8
Bottom 15.84 13.90 13.81 15.91 15.82 13.47 13.38 15.93 13.38
Top of slab 2.57 -0.82 -0.84 2.44 2.43 -1.65 -1.66 2.59 -1.66
Top of girder 2.67 3.68 3.67 2.19 2.18 3.39 3.38 3.68 2.18
L/4
Bottom 11.89 9.83 9.86 13.23 13.26 10.79 10.82 13.26 9.83
Top of slab 2.98 -0.37 -0.43 2.88 2.82 -1.21 -1.27 3.04 -1.27
Top of girder 1.93 2.97 2.93 1.47 1.43 2.67 2.63 2.97 1.43
3L/8
Bottom 12.55 10.39 10.52 13.82 13.95 11.38 11.51 13.95 10.39
Top of slab 2.86 -0.45 -0.55 2.89 2.78 -1.20 -1.30 2.96 -1.30
Top of girder 2.38 3.45 3.38 2.01 1.94 3.21 3.14 3.45 1.94
L/2
Bottom 12.54 10.30 10.51 13.54 13.76 11.11 11.32 13.76 10.30

Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 15.9 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 5.64 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 1.43 Mpa Hence O.K.
except at support
5.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 8754 kN
202.64
NA NA
2000 300

141 250 0.0286 8754 kN


Strain Diagram Stress Diagram
750
Top width of girder = 3000 mm Thickness of compression flange = 225 mm
Width of web = 300 mm Distance of prestress CG from bottom = 141 mm
Depth of girder = 2000 mm
Balanced neutral axis depth = 1252 mm Actual neutral axis depth 202.64 mm
Total strain at the prestress CG = 0.02860 The Section is under reinforced
Total ultimate compressive force = 8754 kN Total ultimate tensile force = 8754 kN
Compressive force CG 84.30 mm Moment of resistance = 15534 kNm
> 6669 kNm Hence O.K.
At support Near L/8 Near L/4 Near 3L/8 At L/2
Ultimate moment -351 1531 5312 6503 6669
Horizontal prestress after all losses (kN) 5891 5947 6076 6205 6355
Pre-strain in the cables after all losses 0.00485 0.00490 0.00501 0.00511 0.00524
Distance of prestress CG from bottom (mm) 758 512 284 141 141
Total width of web (mm) 750 300 300 300 300
Assumed neutral axis from top (mm) 203 203 203 203 203
Total strain at the prestress CG 0.0228 0.0271 0.0311 0.0337 0.0338
Average prestress at failure (MPa) 1406 1406 1406 1406 1406
Total compressive force by concrete (kN) 8754 8754 8754 8754 8754
Total tensile force by prestressing steel (kN) 8754 8754 8754 8754 8754
Difference in forces 0 0 0 0 0
Moment of resistance (kNm) 10130 12281 14275 15525 15527
Effective lever arm between forces (m) 1.157 1.403 1.631 1.773 1.774
Factor of Safety associated with failure -28.89 8.02 2.69 2.39 2.33

-------------------------------------------------------------------------------------------------------------------------------
87 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.4.1 Flexural design at support of girder:-


Negative design moment
3000 0.0248
68.5 225 10244 kN

NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.672 MPa Negative Design Moment = 6669 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 8598.7 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 6669 kNm Hence O.K.
Factor of safety = 17,616/6,669 = 2.64

Positive design moment


Positive Design Moment = 351 kN-m
Hence provide 7 Nos. 20 dia Bottom reinf. Ast = 4398.2 mm2
7 Nos. 20 dia
0 Nos. 25 dia
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 20 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1894 mm
Strain in steel = 0.1393 Actual neutral axis depth = 44.60 mm
Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 1912 kN Total ultimate tensile force = 1912 kN
Compressive force CG 18.55 mm Moment of resistance = 3586 kNm
> 351 kNm Hence O.K.
Factor of safety = 3,586/351 = 10.23

5.4.2 Ductile detailing of PSC Girder:-


As per clause no 6.0 of IS-13920 :1993, ductile detailing of PSC girder (support section) has been done.
i) As per clause no 6.1.1 of IS-13920 :1993, maximum factored axial stress shall be not more than 0.1fck.
Prestressing force after friction & slip at support = 8165.42 kN
Loss = 2254.87 kN
Total force = 5910.55 kN
Factored PSC force = 5910.55 kN
Cross sectional area at support = 2.12 m2
Stress = 2.79 Mpa
< 4.0 kNm Hence O.K.
ii) As per clause no 6.1.2 of IS-13920 :1993, Width to depth ratio shall be more than 0.3
Width of beam at support = 3000 mm
Depth of Beam = 2000 mm
Width to depth ratio = 1.50 Mpa
> 0.3 kNm Hence O.K.
iii) As per clause no 6.1.4 of IS-13920 :1993, Depth shall not be more thal L/4
Span = 28500 mm
Depth of Beam = 2000 mm
< L/4 = 7125.00 mm Hence O.K.
iv) As per clause no 6.2.1(b) of IS-13920 :1993, minimum tension reinforcement shall not be less than 0.24sqrt(fck)/fy
Ast provided Ast = 23562 mm2
Area of girder Ac = 2.12 m2
Tension reinforcement provided Ast/Ac = 0.01112
> 0.24sqrt(fck)/fy= 0.00304 Hence O.K.
vi) As per clause no 6.3.2 of IS-13920 :1993, Shear force due to ductile detailing shall be
Vua = Va D+L - 1.4(MuAh+MuBs)/L
Va D+L = 1.2(D+L)/2 = 1557.27 kN
-------------------------------------------------------------------------------------------------------------------------------
88 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

MuAh = -6669.41 kN
MuBs = -3676.53 kN
L = 27.71 m
Vua = 2080 kN
Maximum design shear at support < 2156 kN

5.5 Design of Shear


Total loss after friction & Slip Loss
Description 1st stage stressing % Loss 2nd stage stressing % Loss
At 5 days
Elastic shortening 56.15 kN 2.1 %
Relaxation 23.11 kN 0.8 %
At 28 days
Elastic shortening 58.30 kN 2.1 % 58.30 kN 2.1 %
Shrinkage 25.42 kN 0.9 %
Relaxation 49.34 kN 1.8 % 23.11 kN 0.8 %
Creep 103.40 kN 3.8 %
At 60 days
Shrinkage 16.02 kN 0.6 % 16.02 kN 0.6 %
Relaxation 13.12 kN 0.5 % 39.35 kN 1.4 %
Creep 41.42 kN 1.5 % 41.42 kN 1.5 %
At 90 days
Shrinkage 11.19 kN 0.4 % 11.19 kN 0.4 %
Relaxation 0.00 kN 0.0 % 0.00 kN 0.0 %
Creep 17.37 kN 0.6 % 17.37 kN 0.6 %
At α days
Shrinkage 84.56 kN 3.1 % 84.56 kN 3.1 %
Relaxation 124.91 kN 4.6 % 124.91 kN 4.6 %
Creep 138.31 kN 5.1 % 138.31 kN 5.1 %
Total 762.61 kN/cable 27.9 % 554.53 kN 20.3 %
Total loss 2254.87 kN
Total long term loss after integration with abutment & deck to be applied in staad for calculation of hyperstatic action
1st stage prestress = 376.34 kN/cable from 90days to α days
2nd stage prestress = 376.34 kN/cable
Total Loss = 1248 kN
CG of cables
At support At dist 1.0m L/8 L/4 3L/8 L/2
CG of cables from bottom 0.796 0.758 0.512 0.284 0.141 0.141
CG of girder from bottom 1.247 1.247 1.352 1.352 1.352 1.352
CG of cable from CG 0.451 0.490 0.840 1.068 1.210 1.211

Vertical Component of Cable Force (kN)


Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.598 7.195 10.793 14.390
Cable 1 2449.51 2466.39 2519.10 2551.45 2582.57
Vert. angle 3.69 3.69 3.69 0.00 0.00
Cable 2 2442.94 2459.82 2517.24 2554.93 2591.79
Vert. angle 4.51 4.51 4.51 0.00 0.00
Cable 3 2494.71 2511.47 2530.92 2550.38 2612.48
Vert. angle 5.39 5.39 5.39 5.39 0.00
Cable 4 787.27 792.55 798.70 822.61 822.61
Vert. angle 6.35 6.35 6.35 6.35 0.00
Total Ver. 490.81 495.38 505.80 259.09 0.00
Comp. of cable
Ultimate Shear at Sections :-
Shear 2156 1677 1177 720 407
Ultimate Load
Moment -351 1531 5312 6503 6669

-------------------------------------------------------------------------------------------------------------------------------
89 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

5.5.1 Section not requiring design shear reinforcement


i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 40 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5891.0 5946.6 6076.1 6205.2 6354.6
Effective width of the web in mm 750 300 300 300 300
Effective Depth of precast Section (d) in mm 1017 1263 1491 1634 1634
Effective Depth of composite Section (d) in mm 1242 1488 1716 1859 1859
K 1.401 1.367 1.341 1.328 1.328
Stress due to Prestress (σcp) (Mpa) 3.573 3.573 3.573 3.573 3.573
Shear Resistance minimum (VRd,cmin) (kN) 802.4 379.1 432.7 466.2 466.2
Reinforcement ratio considering Tendons, ρ1 0.007 0.014 0.012 0.011 0.011
Shear resistance ( VRd,c) (kN) 929.8 495.6 552.8 588.0 588.1
Design Shear resistance ( VRd,c) (kN) 802.4 379.1 432.7 466.2 466.2

ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5891.0 5946.6 6076.1 6205.2 6354.6
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1242 1488 1716 1859 1859
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7

iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.60 7.20 10.79 14.39
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 2155.9 1676.9 1176.6 720.3 407.4
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 490.8 495.4 505.8 259.1 0.0
Total Shear force for the Beam (kN) 1665.1 1181.5 670.8 461.2 407.4
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 2.4370 0.3368 -3.8905 -6.6365 -6.7612
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 432.69 466.15 466.21
Maximum shear capacity of the Section (kN) 4349 2084 2403 2603 2603
Not Not
Whether shear reinforcement required or not Required Required Required
Required Required

-------------------------------------------------------------------------------------------------------------------------------
90 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

iv) Calculation of Shear Resistance when Shear Reinforcement is Required ::


The design for the Vertical stirrups for resisting shear is calculated in the table below as per Cl. No. 10.3.3.2 of IRC:112-2011.
The shear resistance with vertical stirrups is given by,
VRd,s = Asw / s. z. fywd cot θ by Crushing of Compression strut
VRd,max = acw bw z v1 fcd / (cot θ + tan θ) by yielding of the Vertical reinforcement
Grade of reinforcement = Fe 500 Grade of concrete = M40
Design Tensile stress in stirrups (fywd= 0.8fyk/γm) = 347.8 Mpa Concrete Strength (fcd) : = 17.9 Mpa
Minimum Shear reinf. ratio = 0.072sqrt(fck)/fyk = 0.00091 Coeff accounting stress in compression chord ν1
o
Design of Vertical Transverse reinforcement (α = 90 ) = 0.60

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam (kN) 1665.1 1181.5 670.8 461.2 407.4
Lever arm taken from flexural analysis z (m) 1.16 1.40 1.63 1.77 1.77
Angle of compression strut θ (degrees) 28.42 37.01 23.82 23.82 23.82
Dia of shear reinforcement provided (mm) 12+16 16 12 12 12
Number of legs provided 2 2 2 2 2
Spacing of stirrups provided (mm) 100 100 125 125 125
Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 0.68 0.27 0.27 0.27 0.27
Area of shear reinf provided Asw/s (mm2/mm) 6.283 4.021 1.810 1.810 1.810
Check O.K. O.K. O.K. O.K. O.K.
Shear resistance provided by reinf V RD,s (kN) 4673 2602 2325 2529 2529
Coeff accounting stress in comp chord αcw 1.200 1.200 1.200 1.200 1.200
Shear capacity of compression strut V RD,max (kN) 4673 2602 2325 2529 2529
Difference in shear resistance (kN) 0.00 0.00 0.00 0.00 0.00
Shear capacity of the Section (kN) 4673.02 2602.41 2325.03 2528.51 2528.84
Factor of Safety associated with failure 2.81 2.20 3.47 5.48 6.21
Increase in longitudinal tensile force ∆Ftd (kN) 1538.45 783.56 759.75 522.38 461.45
Total longitudinal tensile force (kN) 1235.48 1874.61 4017.19 4189.57 4221.36
Permissible longitudinal tensile force (kN) 8754.17 8754.17 8754.17 8754.17 8754.17
Check Hence O.K. Hence O.K. Hence O.K. Hence O.K. Hence O.K.

5.6. Anchor Block


Check Bearing pressure
According to Manufacture's Catalog Size of anchor flange = 225 mm Dia of Hole = 85 mm
fb = 0.48xfcjxSQRT(A2/A1) or 0.8xfcj Whichever is smaller
2
fcj = = 25.53 N/mm
2
A2 = 96783.6424458995^2- 3.14/4x85^2
= 9.37E+09 mm
2
A1 = 225x225- 3.14/4x85^2 = 44950.5 mm
2
fb = min (0.48fcjsqrt(A2/A1),0.8fcj) 20.43 N/mm
Now, Maximum Cable Force after immediate Losses = 2435.86 T
As per Manufacture's recommendation = 35% of above force to be taken by End Bearing
= 65% of above force to be taken by Anchorage
Cone and Concrete by friction
2 2
Bearing stress = N/A1 = 18.97 N/mm < 20.43 N/mm Hence O.K.
Busting reinforcement in end block
2Yo = 250 mm 2Ypo = 225 mm
Ypo/Yo = 0.90 As per Table 13.1 of IRC 112-2011 Fbst/Pk = 0.120
Fbst = 0.12x1.3x2435.86 = 379.99 kN
2
Area of Steel Required = Fbst/(0.87xfy) = 1004.58 mm
2
Hence Provide 12T- 4L -4Nos along Web and Normal to Web Ast = 1809.56 mm

5.7. Interface Shear Design for Composite section


The shear stress that arises between the interfaces of concrete placed at different times is reffered to as interface
shear. The interface shear is resisted by friction at the interface and by reinforcement placed across the shear plane.
The interface shear stress, Vedi <= the resisting capacity at the section, VRdi
Vedi = β Ved/zbi
Where, β = The ratio of longitudinal force in the new concrete and total longitudinal force
Ved = The tranverse shear force
z = Lever arm
bi = the width of interface
VRdi = µσn + ρfyd[µsinα+cosα] <=0.5vfcd fck = M40
µ = friction for rough surface = 0.7 fyd = 500 Mpa
σn = the minimum co existing normal stress < 0.6fcd = 0.00 Mpa
ρ = As/Aj where As is the area of reinforcement, Aj is the interface area of the joint
ν1 = Coeff accounting stress in compression chord = 0.60
-------------------------------------------------------------------------------------------------------------------------------
91 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

α = the angle of the reinforcement to the interface = 90.00 degree


fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5 = 17.87 Mpa

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam,VEd (kN) 1665.10 1181.55 670.78 461.20 407.41
Ratio of Longitudinal forces (β) 0.99 0.99 0.99 0.99 0.99
Lever arm taken from flexural analysis z (m) 1.157 1.403 1.631 1.773 1.774
Interface Width bi ( mm) 1250 1250 1250 1250 1250
Design value of Shear Stress vEdi ( MPa) 1.14 0.67 0.33 0.21 0.18
Roughness Co-efficient, µ 0.70 0.70 0.70 0.70 0.70
Stress caused by minimum external normal force 0.0 0.0 0.0 0.0 0.0
Dia of shear reinforcement provided (mm) 10 10 10 10 10
Number of legs provided 4 4 4 4 4
Spacing of stirrups provided (mm) 125 125 125 125 125
Minimum reinf.=0.15% of area of interface 1875 1875 1875 1875 1875
Area of Reinforcement at interface, As (mm2/m) 2513.27 2513.27 2513.27 2513.27 2513.27
Area of the joint, Ai (mm2) 281250 281250 281250 281250 281250
Strength reduction factor (ν) 0.60 0.60 0.60 0.60 0.60
Design shear resistance at the Interface (vRdi) 3.13 3.13 3.13 3.13 3.13
Status with respect to the Interface Shear Ok Ok Ok Ok Ok

5.8. Untensioned Reinforcement of Precast Girder


Vertical reiforcement = 0.18 % of web
=0.18%x300x1775 = 958.5 mm2 per meter
Hence provide 2L-12T @ 125 c/c Ast provide= 1808 mm2 per meter

Longitudinal reinforcement = 0.15 % of web


Total Area of Precast Girder at midspan = 0.9275 m2
=0.15%x0.93x1000000 = 1391.25 mm2 per meter
Hence provide 7-12T at Bottomt top & 8-12T at Top Ast provide= 1695 mm2 per meter
Side Face Reinforcement
Side Face Reinforcement = 0.1 % of web Area
2
Area of steel required = 532.5 mm
2
Minimum Reinf. at earth face (0.12%) = 648 mm
Hence Provide 8 Nos. 12 φ on Each Face
2 2
Ast provided = 1809.56 mm /m > 648 mm /m Hence O.K.
Bottom reinforcement of girder at support
Total Area of Precast Girder at midspan = 2.119 m2
=0.15%x2.12x1000000 = 3179.11 mm2 per meter
Hence provide 14 Nos. 20 dia Ast = 4398.2 mm2

5.9 Calculation for Deflection of Longitudinal girders


(i) Precast Girder - Prestress of cables 1, 2, 3 + wt of precast Girder at 5 days
Young Modulus = 3.01E+07 kN/m2
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.598 7.195 10.793 14.390
CG of Precast girder from bottom , m 0.948 0.962 0.962 0.962 0.962
Moment of Inertia for Precast 0.412 0.354 0.354 0.354 0.354
CG of cables 1 to 3 from bot.(m) 0.489 0.283 0.141 0.125 0.125
Moment due to stressing after -2189.97 -3262.10 -4027.09 -4177.86 -4237.66
Moment due to Wt of Precast -1.13 1111.10 1877.07 2342.94 2508.72
Total moment due to prestress+wt
of precast Girder (kN-m) -2191.1 -2151.0 -2150.0 -1834.9 -1728.9
M/EI (1/m) -0.00018 -0.00020 -0.00020 -0.00017 -0.00016

-------------------------------------------------------------------------------------------------------------------------------
92 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.60 3.598 3.598 3.598


A B C D E
-0.00020 2 -0.00017
-0.000176 4 3 -0.000202 -0.000162
1

M/EI Diagram for Ist Stage Prestress after losses at 5 days


At Midspan
Section Marked Distance CG from A M/EI Average M/EI Moment of M/EI about A

A -0.00018
B 4 3.598 1.799 -0.00020 -0.00019 -0.001223854
C 3 3.598 5.396 -0.00020 -0.00020 -0.003915921
D 2 3.598 8.994 -0.00017 -0.00019 -0.006046906
E 1 3.598 12.591 -0.00016 -0.00017 -0.007571111
Total -0.018757792
So, Midspan deflection due to Prestress + wt of precast Girder = = -19 mm
= - L/ 1534

(ii) Precast Girder - Prestress of cables 4,5 + loss of Cables 1 to 3 at 28 days


Young Modulus = 3.33E+07 Mpa
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.598 7.195 10.793 14.390
CG of cables 3 from bot.(m) 1.160 0.855 0.501 0.166 0.166
Moment due to stressing after 668.19 -341.36 -1479.24 -2585.78 -2650.50
Moment due to loss of prestress (kN- 217.24 321.32 388.26 395.86 395.90
Total moment due to prestress+wt 885.4 -20.0 -1091.0 -2189.9 -2254.6
M/EI (1/m) 0.0000644 -0.0000017 -0.0000924 -0.0001854 -0.00019

3.6 3.598 3.598 3.598


A B C D E
2
-0.0000017 -0.0001854
0.0000644 4 3 -0.000092 -0.0001909
1

M/EI Diagram for Ist Stage Prestress after losses at 28 days


At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A
M/EI
A 0.0000644
B 4 3.598 1.799 -0.0000017 0.0000313 0.000202794
C 3 3.598 5.396 -0.000092 -0.0000470 -0.000913013
D 2 3.598 8.994 -0.000185 -0.0001389 -0.004493609
E 1 3.598 12.591 -0.000191 -0.0001881 -0.008522299
Total -0.013726128
So, Midspan deflection due to Prestress +loss = = -13.726 mm
So, Total Midspan deflection at 28 days = = -32.484 mm = - L/ 886

(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.598 7.195 10.793 14.390
CG of all cables from bot.(m) 0.758 0.512 0.284 0.141 0.141
Loss 268.453 268.453 268.453 268.453 268.453
Moment due to prestressing losses 51.104 120.823 181.997 220.310 220.372
Moment due to Wt of Deck Slab -0.527 781.861 1345.854 1691.450 1818.650
Total moment due to prestress+DL 50.577 902.684 1527.851 1911.760 2039.022
M/EI (1/m) 0.0000037 0.0000764 0.0001294 0.0001619 0.00017
3.6 3.598 3.598 3.598
A B C D E
0.000004 0.0000764 0.0001619
4 0.0001294
0.0001726
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000037
B 4 3.598 1.799 0.0000764 0.0000401 0.000259166 0.00164
C 3 3.598 5.396 0.0001294 0.0001029 0.001997362
D 2 3.598 8.994 0.0001619 0.0001456 0.004710998
E 1 3.598 12.591 0.0001726 0.0001672 0.007575559
Total 0.014543085

-------------------------------------------------------------------------------------------------------------------------------
93 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

So, Midspan deflection due to Prestress losses + DL = = 14.543 mm


Total Deflection at 60 days =-32.484+14.543 = -17.941 mm

(iv) Composite Girder - long term losses + SIDL+ Live load


Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.598 7.195 10.793 14.390
CG of Composite girder from bottom , m 1.247 1.352 1.352 1.352 1.352
CG of cables from bot.(m) 0.758 0.512 0.284 0.141 0.141
Moment of Inertia for Composite 0.821 0.692 0.692 0.692 0.692
Loss 1247.872 1247.872 1247.872 1247.872 1247.87
Moment due to prestressing losses 610.888 1048.022 1332.386 1510.480 1510.8
Total moment due to prestress 610.888 1048.022 1332.386 1510.480 1510.8
M/EI (1/m) 0.0000223 0.0000454 0.0000578 0.0000655 0.00007
3.598 3.598 3.598 3.598
A B C D E
0.00002 0.0000454 0.0000655
4 0.0000578 0.0000655
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at α days
At Midspan
Average Moment of M/EI about
Section Marked Distance CG from A M/EI Rotation
M/EI A
A 0.0000223
B 4 3.598 1.799 0.0000454
0.0000339 0.000219209 0.00076
C 3 3.598 5.396 0.0000578
0.0000516 0.001001891
D 2 3.598 8.994 0.0000655
0.0000616 0.001994225
E 1 3.598 12.591 0.0000655
0.0000655 0.002967099
Total 0.006182424
So, Midspan deflection due to Prestress losses = = 6.182 mm
So, Midspan deflection due SIDL = = 1.256 mm 0.00000
So, Midspan deflection due Footpath Live load = = 0.000 mm 0.00000
So, Midspan deflection due Wind load = = 0.445 mm 0.00000
So, Midspan deflection due to earth pr. = = -1.811 mm
So, Midspan deflection due to Live load surcharge = = -0.058 mm
So, Midspan deflection due to Live load surcharge = = 1.337 mm
So, Midspan deflection due Live load snow load braking = = 3.006 mm 0.00000
Total Deflection at mid span 1xDL+1.2xSIDL+1xLL+0.6xWL = -7.510 mm L/ -3832

26 1 SPECTRUM IN X6.388
DIRECTION 0.187 0.037 6.391 0 0 0
2 SPECTRUM IN Z0.011
DIRECTION 1.386 1.118 1.781 0 0 0
3 SPECTRUM IN Y0.014
DIRECTION 0.257 0.089 0.272 0 0 0
4 DEAD LOAD 0.171 -5.134 0.02 5.137 0 0 0
5 SIDL (DL) 0.022 -0.486 0.002 0.487 0 0 0
6 SIDL(WC) 0.024 -0.77 0.004 0.77 0 0 0
7 REMOVAL OF SHUTTER
-0.026 0.787 -0.004 0.787 0 0 0
8 EARTH PR ON ABUTMENT
-0.269 1.811 0.199 1.842 0 0 0
9 LIVE LOAD SURCHARGE
1.204 0.058 0.015 1.206 0 0 0
10 DYNAMIC INCREMENT
-0.172 OF EARTH
1.143 PR. 0.125 1.162 0 0 0
11 DYNAMIC INCREMENT
0.761 OF LL0.036
SURCGARGE 0.01 0.762 0 0 0
12 UNLADEN WIND 0.147
LOAD -0.858 -0.113 0.878 0 0 0
13 LADEN WIND LOAD
0.122 -0.445 -0.103 0.473 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.296 -6.247 -0.002 6.655 0 0 0.001
15 TEMPERATURE0.615
RISE 2.861 -0.497 2.968 0 0 0
16 TEMPERATURE -0.282
FALL -1.337 0.233 1.386 0 0 0
17 CREEP SHRINKAGE
-0.218 DIFF SHRINKAGE
-0.702 0.235 0.772 0 0 0
18 FOOTPATH LIVE0.005
LOAD -0.063 -0.002 0.063 0 0 0
19 SNOW LOAD FOR0.031
70R LL TRACK
-0.934 0.005 0.935 0 0 0
20 SNOW LOAD FOR0.016
LL 70R WHEEL
-0.467 0.002 0.468 0 0 0
21 BRAKING 0.454 -0.01 0 0.454 0 0 0
504 COMBINATION0.081
LOAD CASE-1.185
504 0.014 1.188 0 0 0

26 216 0.075 -2.529 0.014 2.53 0 0 0

-------------------------------------------------------------------------------------------------------------------------------
94 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of PSC Girder LG2

-------------------------------------------------------------------------------------------------------------------------------
95 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.0 Calculation of Stresses for Girder LG2


C/C span = 29.049 m Width of abutment wall = 2.00 m
Length of girder = 28.622 m Width of bearing area = 0.50 m

6.1. Load calculation


6.1.1 Dead Load Moment & Shear for Precast girder only
Unit weight of concrete = 25.00 kN/m3
Cross-sectional area at span = 0.928 m2
Cross-sectional area at support = 1.444 m2
Unit Weight at span = 23.19 kN/m
Unit Weight at support = 36.11 kN/m
Thickness of intermediate Cross Girder = 0.30 m
Thickness of end Cross Girder = 2.00 m
1.250 1.750 1.250

0.475 0.2
0.1 0.053

1.775 1.325 1.025

0.2
0.25

0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN

= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 21.12 1.75 1.75 0.250

0.250 28.122 0.250


28.622
Support Reaction = 373.36 kN
Table : Maximum BM & SF at critical sections
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Dist. for prop. Section(m) 0.000 3.515 7.031 10.546 14.061
Bending Moment (kNm) -1.1 1063.3 1795.0 2240.1 2398.8
Shear Force (kN) 364.3 249.3 167.4 54.3 4.4
6.1.2 Construction load and weight of shuttering & proping.
Assume, Construction Live load = 0.500 kN/m2
Assume, UDL for weight of shuttering = 5.000 kN/m
Effective width of deck slab for end girder = 3.000 m
Weight of shuttering & Conc. Live load = 6.50 kN/m
6.500

0.250 28.12 0.250


Support Reaction = 93.02 kN
Table : Maximum BM & SF at critical sections of outer girders
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.515 7.031 10.546 14.061
Bending Moment (kNm) -0.2 280.9 481.7 602.2 642.4
Shear Force (kN) 91.4 68.5 45.7 22.8 0.0

6.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 3.000 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008

-------------------------------------------------------------------------------------------------------------------------------
96 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

16.875

0.250 28.12 0.250


Support Reaction = 246.50 kN

Table : Maximum BM & SF at critical sections


Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.515 7.031 10.546 14.061
Bending Moment (kNm) -0.5 746.9 1285.8 1616.2 1738.0
Shear Force (kN) 242.3 183.0 123.6 64.3 5.0

6.1.4 Staad output


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
2 1 SPECTRUM IN X DIRECTION
3 186.181 93.117 16.223 3.821 42.801 1542.256
38 -186.181 -93.117 -16.223 -3.821 -30.767 -1449.718
2 SPECTRUM IN Z DIRECTION
3 64.765 90.502 174.174 15.118 332.989 550.348
38 -64.765 -90.502 -174.174 -15.118 -159.799 -459.968
3 SPECTRUM IN Y DIRECTION
3 10.327 20.023 13.346 2.889 25.846 113.202
38 -10.327 -20.023 -13.346 -2.889 -12.63 -93.89
4 DEAD LOAD 3 206.851 619.051 -0.247 -12.974 -2.004 2757.349
38 -206.851 -566.066 0.247 12.974 2.251 -2164.791
5 SIDL (DL) 3 22.454 37.301 1.52 2.621 -1.855 244.383
38 -22.454 -37.301 -1.52 -2.621 0.335 -207.082
6 SIDL(WC) 3 28.943 90.297 -0.631 -3.262 0.004 398.025
38 -28.943 -83.697 0.631 3.262 0.627 -311.028
7 REMOVAL OF SHUTTER
3 -32.371 -94.972 0.196 2.009 0.184 -434.285
38 32.371 88.472 -0.196 -2.009 -0.379 342.563
8 EP ON ABUTMENT 3 654.497 -8.106 -4.61 0.12 8.029 206.999
38 -654.497 8.106 4.61 -0.12 -3.419 -215.105
9 AT REST EP ON ABUTMENT
3 1100.71 -13.612 -7.754 0.201 13.506 348.514
38 -1100.71 13.612 7.754 -0.201 -5.752 -362.125
10 AT K* EP ON ABUTMENT
3 1662.103 -23.899 -11.085 0.544 17.847 436.721
38 -1662.103 23.899 11.085 -0.544 -6.762 -460.62
11 LIVE LOAD SURCHARGE
3 110.728
AT REST -29.714 5.911 0.266 -28.068 -426.035
38 -110.728 29.714 -5.911 -0.266 22.158 396.321
12 DYNAMIC INCREMENT
3 OF388.554
EARTH PR. -4.34 -2.745 0.09 4.785 118.916
38 -388.554 4.34 2.745 -0.09 -2.04 -123.256
13 DYNAMIC INCREMENT
3 OF41.487
LL SURCGARGE
-11.142 2.206 0.101 -10.482 -159.831
38 -41.487 11.142 -2.206 -0.101 8.276 148.689
14 UNLADEN WIND LOAD
3 16.984 97.962 28.024 -2.877 -55.449 427.633
38 -17.424 -91.132 -28.024 2.877 27.425 -333.086
15 LADEN WIND LOAD 3 2.215 49.987 25.295 -1.619 -49.733 210.016
38 -2.615 -46.447 -25.295 1.619 24.438 -161.799
16 DIFFERNTIAL SETTLEMENT
3 9.583 -73.893 -5.694 2.782 17.515 -1093.819
38 -9.583 73.893 5.694 -2.782 -11.821 1019.925
17 TEMPERATURE RISE3 488.64 -16.79 153.972 1.054 -394.707 366.171
38 -488.64 16.79 -153.972 -1.054 240.735 -382.961
18 TEMPERATURE FALL3 -221.762 7.774 -70.759 -0.464 182.232 -171.564
38 221.762 -7.774 70.759 0.464 -111.473 179.338
19 CREEP SHRINKAGE 3 DIFF
-148.117
SHRINKAGE 4.524 -40.885 0.333 125.319 -93.859
38 148.117 -4.524 40.885 -0.333 -84.435 98.383
20 FOOTPATH LIVE LOAD
3 9.366 15.638 0.57 3.504 0.548 103.285
38 -9.366 -15.638 -0.57 -3.504 -1.118 -87.648
21 SNOW LOAD FOR 370R LL TRACK
37.8 110.353 -0.26 -2.497 -0.261 506.051
38 -37.8 -102.853 0.26 2.497 0.522 -399.448
22 SNOW LOAD FOR 3LL 70R WHEEL
18.902 55.18 -0.131 -1.251 -0.131 253.048
38 -18.902 -51.43 0.131 1.251 0.262 -199.743
23 BRAKING 3 -27.515 -7.863 0.48 0.276 -2.238 -117.839
38 25.845 7.863 -0.48 -0.276 1.758 109.976
604 COMBINATION LOAD
3 CASE 35.66
504 1.357 13.057 -2.366 -31.318 890.681
38 -35.66 -1.357 -13.057 2.366 18.261 -889.324

2 3 +ve 90.964 538.744 1.5 0.78 6.078 1571.05


319 LOAD GENERATION,
308 LOAD GENERATION,
LOAD
72 LOAD
#319,
GENERATION,
(1
342
LOAD
of LOAD
26)#308,
GENERATION,
256
LOAD
(16 LOAD
of 26)
#72,GENERATION,
(22
313LOAD
of
LOAD
26)#342,
GENERATION,
LOAD
(24 of 26)
#256, LOAD
(20 of #313,
56) (21 of 26)
-ve -1.127 -3.63 -8.718 -55.684 -3.595 -34.311
25 LOAD GENERATION,
25 LOAD GENERATION,
LOAD
206 LOAD
#25, (1GENERATION,
LOAD
of
40426)LOAD
#25, GENERATION,
(167
ofLOAD
LOAD
26) #206,
GENERATION,
27LOAD
(22
LOADof #404,
26)
GENERATION,
LOAD
(8 of 56)
#67, (17
LOAD
of 26)
#27, (3 of 26)
2 38 +ve 90.964 538.744 1.5 0.78 2.763 1240.542
319 LOAD GENERATION,
308 LOAD GENERATION,
LOAD
72 LOAD
#319,
GENERATION,
(1
342
LOAD
of LOAD
26)#308,
GENERATION,
340
LOAD
(16 LOAD
of 26)
#72,GENERATION,
(22
319LOAD
of
LOAD
26)#342,
GENERATION,
LOAD
(24 of 26)
#340, LOAD
(22 of #319,
26) (1 of 26)
-ve -1.127 -3.63 -8.718 -55.684 -6.892 -33.667
25 LOAD GENERATION,
25 LOAD GENERATION,
LOAD
206 LOAD
#25, (1GENERATION,
LOAD
of
40426)LOAD
#25, GENERATION,
(1210
ofLOAD
26)
LOAD #206,
GENERATION,
27LOAD
(22
LOADof #404,
26)
GENERATION,
LOAD
(8 of 56)
#210,LOAD
(26 of#27,
26) (3 of 26)

-------------------------------------------------------------------------------------------------------------------------------
97 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


34 1 SPECTRUM IN X DIRECTION
38 167.203 94.154 16.42 3.328 33.765 1449.843
16 -167.203 -94.154 -16.42 -3.328 -18.087 -1203.703
2 SPECTRUM IN Z DIRECTION
38 69.115 89.225 156.846 14.01 227.55 460.066
16 -69.115 -89.225 -156.846 -14.01 -185.792 -225.967
3 SPECTRUM IN Y DIRECTION
38 10.77 19.385 12.249 2.871 18.178 93.891
16 -10.77 -19.385 -12.249 -2.871 -14.232 -45.616
4 DEAD LOAD 38 206.902 566.192 -0.535 -11.25 -0.141 2164.962
16 -206.902 -444.7 0.535 11.25 1.55 -835.073
5 SIDL (DL) 38 23.059 37.388 1.468 2.8 -1.992 206.818
16 -23.059 -37.388 -1.468 -2.8 -1.872 -108.447
6 SIDL(WC) 38 28.863 83.677 -0.544 -3.01 0.429 311.118
16 -28.863 -66.312 0.544 3.01 1.002 -113.798
7 REMOVAL OF SHUTTER
38 -32.34 -88.473 0.173 1.747 -0.066 -342.605
16 32.34 71.371 -0.173 -1.747 -0.389 132.32
8 EP ON ABUTMENT38 655.966 -8.07 -2.217 -0.181 3.986 215.069
16 -655.966 8.07 2.217 0.181 1.847 -236.301
9 AT REST EP ON ABUTMENT
38 1103.182 -13.55 -3.728 -0.306 6.703 362.064
16 -1103.182 13.55 3.728 0.306 3.105 -397.716
10 AT K* EP ON ABUTMENT
38 1665.886 -23.81 -4.818 -0.255 8.088 460.52
16 -1665.886 23.81 4.818 0.255 4.59 -523.166
11 LIVE LOAD SURCHARGE
38 110.152
AT REST -29.747 8.688 0.264 -23.851 -396.365
16 -110.152 29.747 -8.688 -0.264 0.993 318.097
12 DYNAMIC INCREMENT
38 OF389.427
EARTH PR. -4.318 -1.321 -0.091 2.377 123.233
16 -389.427 4.318 1.321 0.091 1.099 -134.595
13 DYNAMIC INCREMENT
38 OF LL41.27
SURCGARGE
-11.155 3.243 0.1 -8.906 -148.705
16 -41.27 11.155 -3.243 -0.1 0.374 119.355
14 UNLADEN WIND LOAD
38 16.799 91.123 26.686 -2.445 -38.688 333.146
16 -17.957 -73.153 -26.686 2.445 -31.526 -117.031
15 LADEN WIND LOAD38 2.056 46.439 24.077 -1.34 -34.806 161.836
16 -3.108 -37.125 -24.077 1.34 -28.543 -51.902
16 DIFFERNTIAL SETTLEMENT
38 9.995 -73.919 -6.004 2.032 13.298 -1020.038
16 -9.995 73.919 6.004 -2.032 2.499 825.548
17 TEMPERATURE RISE
38 527.718 -16.862 181.411 0.889 -351.623 382.791
16 -527.718 16.862 -181.411 -0.889 -125.691 -427.157
18 TEMPERATURE FALL
38 -239.937 7.808 -83.938 -0.389 162.533 -179.258
16 239.937 -7.808 83.938 0.389 58.318 199.801
19 CREEP SHRINKAGE38 DIFF
-163.436
SHRINKAGE 4.554 -61.599 0.268 115.889 -98.337
16 163.436 -4.554 61.599 -0.268 46.185 110.318
20 FOOTPATH LIVE 38
LOAD 9.459 15.625 0.386 3.492 -0.136 87.533
16 -9.459 -15.625 -0.386 -3.492 -0.881 -46.421
21 SNOW LOAD FOR3870R LL TRACK
37.789 102.853 -0.225 -2.189 0.073 399.49
16 -37.789 -83.119 0.225 2.189 0.517 -154.833
22 SNOW LOAD FOR38LL 70R WHEEL
18.897 51.43 -0.113 -1.097 0.037 199.764
16 -18.897 -41.563 0.113 1.097 0.26 -77.426
23 BRAKING 38 -25.866 -7.868 0.591 0.244 -1.735 -109.983
16 21.472 7.868 -0.591 -0.244 0.179 89.283
604 COMBINATION LOAD
38 CASE
35.483
504 1.347 11.92 -2 -24.873 889.364
16 -35.483 -1.347 -11.92 2 -6.49 -885.82

34 38 +ve 87.966 412.327 1.433 0.989 7.435 1242.051


319 LOAD GENERATION,
313 LOAD GENERATION,
LOAD
71 LOAD
#319,
GENERATION,
(1
341
LOAD
of LOAD
26)#313,
GENERATION,
254
LOAD
(21 LOAD
of 26)
#71,GENERATION,
(21
319LOAD
of
LOAD
26)#341,
GENERATION,
LOAD
(23 of 26)
#254, LOAD
(18 of #319,
56) (1 of 26)
-ve -0.109 -2.928 -7.584 -33.836 -1.721 -34.361
25 LOAD GENERATION,
25 LOAD GENERATION,
LOAD
204 LOAD
#25, (1GENERATION,
LOAD
of
25726)LOAD
#25, GENERATION,
(170
ofLOAD
LOAD
26) #204,
GENERATION,
27LOAD
(20
LOADof #257,
26)
GENERATION,
LOAD
(21 of#70,
56) (20
LOAD
of 26)
#27, (3 of 26)
34 16 +ve 87.966 412.327 1.433 0.989 2.104 517.432
319 LOAD GENERATION,
313 LOAD GENERATION,
LOAD
71 LOAD
#319,
GENERATION,
(1
341
LOAD
of LOAD
26)#313,
GENERATION,
73
LOAD
(21LOAD
of 26)
#71,
GENERATION,
(21
326LOAD
of
LOAD
26)#341,
GENERATION,
LOAD
(23 of#73,
26) (23
LOAD
of 26)#326, (8 of 26)
-ve -0.109 -2.928 -7.584 -33.836 -14.052 -339.865
25 LOAD GENERATION,
25 LOAD GENERATION,
LOAD
204 LOAD
#25, (1GENERATION,
LOAD
of
25726)LOAD
#25, GENERATION,
(1206
ofLOAD
26)
LOAD #204,
GENERATION,
136LOAD
(20
LOAD
of #257,
26)GENERATION,
LOAD
(21 of 56)
#206, LOAD
(22 of #136,
26) (4 of 26)

-------------------------------------------------------------------------------------------------------------------------------
98 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


12 1 SPECTRUM IN X DIRECTION
16 137.661 98.537 19.923 1.84 44.141 1203.937
17 -137.661 -98.537 -19.923 -1.84 -30.079 -847.524
2 SPECTRUM IN Z DIRECTION
16 84.957 81.539 129.463 11.605 212.545 225.94
17 -84.957 -81.539 -129.463 -11.605 -257.984 -73.767
3 SPECTRUM IN Y DIRECTION
16 11.84 17.033 10.687 2.657 18.771 45.569
17 -11.84 -17.033 -10.687 -2.657 -20.331 -21.627
4 DEAD LOAD 16 207.644 446.738 -0.356 -5.659 1.311 835.341
17 -207.644 -301.266 0.356 5.659 -0.018 522.708
5 SIDL (DL) 16 25.076 37.417 0.843 3.339 -1.989 107.288
17 -25.076 -37.417 -0.843 -3.339 -1.071 28.577
6 SIDL(WC) 16 28.731 66.243 -0.267 -2.224 0.816 114.103
17 -28.731 -42.277 0.267 2.224 0.153 82.921
7 REMOVAL OF SHUTTER
16 -32.341 -71.421 0.088 0.991 -0.286 -132.4
17 32.341 47.819 -0.088 -0.991 -0.034 -84.088
8 EP ON ABUTMENT16 665.177 -8.015 -2.09 -0.33 4.514 236.27
17 -665.177 8.015 2.09 0.33 3.077 -265.372
9 AT REST EP ON ABUTMENT
16 1118.688 -13.458 -3.517 -0.556 7.595 397.665
17 -1118.688 13.458 3.517 0.556 5.176 -446.532
10 AT K* EP ON ABUTMENT
16 1689.501 -23.685 -4.201 -0.723 8.916 523.077
17 -1689.501 23.685 4.201 0.723 6.34 -609.08
11 LIVE LOAD SURCHARGE
16 107.344
AT REST -29.86 13.154 0.173 -32.696 -318.151
17 -107.344 29.86 -13.154 -0.173 -15.069 209.725
12 DYNAMIC INCREMENT
16 OF394.905
EARTH PR. -4.287 -1.245 -0.187 2.69 134.576
17 -394.905 4.287 1.245 0.187 1.832 -150.142
13 DYNAMIC INCREMENT
16 OF40.208
LL SURCGARGE
-11.197 4.914 0.065 -12.214 -119.376
17 -40.208 11.197 -4.914 -0.065 -5.629 78.716
14 UNLADEN WIND LOAD
16 15.408 73.22 21.062 -1.464 -33.91 117.122
17 -17.006 -48.419 -21.062 1.464 -42.568 103.721
15 LADEN WIND LOAD16 0.777 37.159 18.973 -0.774 -30.635 51.956
17 -2.229 -24.305 -18.973 0.774 -38.256 59.636
16 DIFFERNTIAL SETTLEMENT
16 11.787 -74.146 -7.283 -0.108 16.334 -825.753
17 -11.787 74.146 7.283 0.108 10.111 556.518
17 TEMPERATURE RISE
16 758.992 -17.254 142.662 0.239 -317.129 426.938
17 -758.992 17.254 -142.662 -0.239 -200.896 -489.59
18 TEMPERATURE FALL
16 -348.034 7.993 -65.833 -0.096 145.6 -199.699
17 348.034 -7.993 65.833 0.096 93.448 228.722
19 CREEP SHRINKAGE16 DIFF
-267.531
SHRINKAGE 4.687 -44.343 0.191 81.023 -110.272
17 267.531 -4.687 44.343 -0.191 79.991 127.292
20 FOOTPATH LIVE 16
LOAD 9.654 15.185 -0.073 3.101 -0.622 45.862
17 -9.654 -15.185 0.073 -3.101 0.886 9.277
21 SNOW LOAD FOR1670R LL TRACK
37.88 83.171 -0.109 -1.306 0.376 154.895
17 -37.88 -55.938 0.109 1.306 0.019 97.666
22 SNOW LOAD FOR16LL 70R WHEEL
18.943 41.589 -0.054 -0.655 0.188 77.457
17 -18.943 -27.972 0.054 0.655 0.009 48.837
23 BRAKING 16 -21.706 -7.886 0.883 0.129 -2.135 -89.297
17 15.642 7.886 -0.883 -0.129 -1.071 60.663
604 COMBINATION LOAD
16 CASE
39.118
504 1.35 7.03 -0.749 -20.14 885.946
17 -39.118 -1.35 -7.03 0.749 -5.386 -881.043

12 16 +ve 79.772 401.017 1.467 3.002 10.801 521.27


322 LOAD GENERATION,
314 LOAD GENERATION,
LOAD
70 LOAD
#322,
GENERATION,
(4
77
LOAD
of
LOAD
26)#314,
GENERATION,
206
LOAD
(22 LOAD
of 26)
#70,GENERATION,
(20
326
LOADof
LOAD
26)
#77,GENERATION,
(1 LOAD
of 56) #206, LOAD
(22 of #326,
26) (8 of 26)
-ve 0 -28.558 -4.366 -22.608 -2.365 -335.342
- 133 LOAD GENERATION,
204 LOAD GENERATION,
210
LOAD LOAD
#133,
GENERATION,
139
(1LOAD
ofLOAD
26)#204,
GENERATION,
136LOAD
(20
LOAD
of #210,
26)GENERATION,
LOAD
(26 of 26)
#139, LOAD
(7 of 26)
#136, (4 of 26)
12 17 +ve 79.772 269.543 1.467 3.002 4.084 139.933
322 LOAD GENERATION,
148 LOAD GENERATION,
LOAD
70 LOAD
#322,
GENERATION,
(4
77
LOAD
of
LOAD
26)#148,
GENERATION,
68
LOAD
(16LOAD
of 26)
#70,
GENERATION,
(20
341
LOADof
LOAD
26)
#77,GENERATION,
(1LOAD
of 56)#68, (18
LOAD
of 26)#341, (23 of 26)
-ve 0 -107.85 -4.366 -22.608 -5.286 -823.107
- 140 LOAD GENERATION,
204 LOAD GENERATION,
210
LOAD LOAD
#140,
GENERATION,
254
(8LOAD
ofLOAD
26)#204,
GENERATION,
144LOAD
(20
LOAD
of #210,
26)GENERATION,
LOAD
(26 of 26)
#254, LOAD
(18 of #144,
56) (12 of 26)

-------------------------------------------------------------------------------------------------------------------------------
99 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


13 1 SPECTRUM IN X DIRECTION
17 108.696 104.718 21.137 1.036 41.394 847.575
18 -108.696 -104.718 -21.137 -1.036 -36.609 -467.888
2 SPECTRUM IN Z DIRECTION
17 100.196 61.304 91.47 9.445 110.748 73.924
18 -100.196 -61.304 -91.47 -9.445 -222.498 -293.612
3 SPECTRUM IN Y DIRECTION
17 12.89 13.028 8.428 2.283 12.326 21.668
18 -12.89 -13.028 -8.428 -2.283 -18.773 -61.996
4 DEAD LOAD 17 207.674 304.045 0.064 -2.214 0.709 -522.612
18 -207.674 -158.572 -0.064 2.214 -0.94 1362.528
5 SIDL (DL) 17 26.266 34.817 0.487 2.772 -1.291 -29.552
18 -26.266 -34.817 -0.487 -2.772 -0.476 155.979
6 SIDL(WC) 17 28.593 42.105 -0.108 -1.704 0.611 -82.763
18 -28.593 -18.14 0.108 1.704 -0.219 192.142
7 REMOVAL OF SHUTTER
17 -32.271 -47.89 0.003 0.581 -0.164 84.059
18 32.271 24.287 -0.003 -0.581 0.152 -215.101
8 EP ON ABUTMENT17 670.491 -7.974 -2.528 -0.289 5.002 265.354
18 -670.491 7.974 2.528 0.289 4.178 -294.308
9 AT REST EP ON ABUTMENT
17 1127.633 -13.389 -4.255 -0.487 8.419 446.502
18 -1127.633 13.389 4.255 0.487 7.033 -495.119
10 AT K* EP ON ABUTMENT
17 1703.023 -23.594 -5.263 -0.665 10.417 609.031
18 -1703.023 23.594 5.263 0.665 8.693 -694.704
11 LIVE LOAD SURCHARGE
17 104.053
AT REST -29.943 14.337 0.128 -30.871 -209.714
18 -104.053 29.943 -14.337 -0.128 -21.188 100.987
12 DYNAMIC INCREMENT
17 OF398.067
EARTH PR. -4.263 -1.507 -0.166 2.981 150.131
18 -398.067 4.263 1.507 0.166 2.489 -165.612
13 DYNAMIC INCREMENT
17 OF38.971
LL SURCGARGE
-11.228 5.358 0.048 -11.536 -78.712
18 -38.971 11.228 -5.358 -0.048 -7.919 37.94
14 UNLADEN WIND LOAD
17 15.185 48.544 13.638 -0.95 -15.333 -103.7
18 -16.782 -23.743 -13.638 0.95 -34.189 234.942
15 LADEN WIND LOAD17 0.596 24.371 12.264 -0.492 -13.897 -59.622
18 -2.049 -11.517 -12.264 0.492 -30.636 124.779
16 DIFFERNTIAL SETTLEMENT
17 13.848 -74.386 -7.74 -1.616 15.13 -556.59
18 -13.848 74.386 7.74 1.616 12.975 286.482
17 TEMPERATURE RISE
17 896.226 -17.544 72.656 -0.07 -153.47 489.614
18 -896.226 17.544 -72.656 0.07 -110.356 -553.319
18 TEMPERATURE FALL
17 -411.115 8.129 -33.277 0.042 69.688 -228.734
18 411.115 -8.129 33.277 -0.042 51.145 258.25
19 CREEP SHRINKAGE17 DIFF
-304.134
SHRINKAGE 4.782 -16.769 0.154 21.139 -127.317
18 304.134 -4.782 16.769 -0.154 39.751 144.683
20 FOOTPATH LIVE 17
LOAD 9.747 14.254 0.603 2.388 -2.028 -9.611
18 -9.747 -14.254 -0.603 -2.388 -0.163 61.37
21 SNOW LOAD FOR1770R LL TRACK
37.85 56.017 -0.008 -0.83 0.246 -97.661
18 -37.85 -28.783 0.008 0.83 -0.217 251.621
22 SNOW LOAD FOR17LL 70R WHEEL
18.929 28.012 -0.004 -0.417 0.124 -48.834
18 -18.929 -14.395 0.004 0.417 -0.109 125.828
23 BRAKING 17 -15.95 -7.902 0.93 0.067 -1.884 -60.666
18 9.886 7.902 -0.93 -0.067 -1.492 31.973
604 COMBINATION LOAD
17 CASE
42.865
504 1.4 3.511 -0.178 -12.565 881.116
18 -42.865 -1.4 -3.511 0.178 -0.183 -876.034

13 17 +ve 75.83 285.063 1.659 2.145 10.234 139.839


324 LOAD GENERATION,
148 LOAD GENERATION,
LOAD
69 LOAD
#324,
GENERATION,
(6
81
LOAD
of
LOAD
26)#148,
GENERATION,
206
LOAD
(16 LOAD
of 26)
#69,GENERATION,
(19
341
LOADof
LOAD
26)
#81,GENERATION,
(5 LOAD
of 56) #206, LOAD
(22 of #341,
26) (23 of 26)
-ve 0 -94.537 -3.488 -18.275 -2.946 -820.768
- 140 LOAD GENERATION,
204 LOAD GENERATION,
218
LOAD LOAD
#140,
GENERATION,
141
(8LOAD
ofLOAD
26)#204,
GENERATION,
144LOAD
(20
LOAD
of #218,
26)GENERATION,
LOAD
(8 of 26)
#141, LOAD
(9 of 26)
#144, (12 of 26)
13 18 +ve 75.83 155.944 1.659 2.145 5.347 43.11
324 LOAD GENERATION,
329 LOAD GENERATION,
LOAD
69 LOAD
#324,
GENERATION,
(6
81
LOAD
of
LOAD
26)#329,
GENERATION,
232
LOAD
(11 LOAD
of 26)
#69,GENERATION,
(19
177
LOADof
LOAD
26)
#81,GENERATION,
(5 LOAD
of 56) #232, LOAD
(22 of #177,
26) (19 of 26)
-ve 0 -204.295 -3.488 -18.275 -3.543 -963.989
- 147 LOAD GENERATION,
204 LOAD GENERATION,
218
LOAD LOAD
#147,
GENERATION,
342
(15
LOAD
LOAD
of 26)
#204,
GENERATION,
151LOAD
(20
LOAD
of #218,
26)GENERATION,
LOAD
(8 of 26)
#342, LOAD
(24 of #151,
26) (19 of 26)

-------------------------------------------------------------------------------------------------------------------------------
100 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


14 1 SPECTRUM IN X DIRECTION
18 82.863 109.576 23.14 0.737 33.155 467.818
19 -82.863 -109.576 -23.14 -0.737 -51.709 -72.836
2 SPECTRUM IN Z DIRECTION
18 111.749 31.469 45.183 5.202 23.244 293.715
19 -111.749 -31.469 -45.183 -5.202 -158.248 -405.554
3 SPECTRUM IN Y DIRECTION
18 13.649 7.667 4.668 1.327 3.978 62.022
19 -13.649 -7.667 -4.668 -1.327 -14.281 -84.214
4 DEAD LOAD 18 207.468 160.508 0.567 0.208 0.153 -1362.424
19 -207.468 -15.037 -0.567 -0.208 -2.212 1681.136
5 SIDL (DL) 18 26.785 30.733 0.316 1.421 -0.865 -156.299
19 -26.785 -30.733 -0.316 -1.421 -0.283 267.894
6 SIDL(WC) 18 28.497 17.898 0.007 -1.095 0.443 -192.174
19 -28.497 6.067 -0.007 1.095 -0.467 213.652
7 REMOVAL OF SHUTTER
18 -32.2 -24.341 -0.087 0.286 -0.059 215.09
19 32.2 0.739 0.087 -0.286 0.374 -260.624
8 EP ON ABUTMENT18 672.637 -7.953 -2.319 -0.194 3.298 294.292
19 -672.637 7.953 2.319 0.194 5.124 -323.172
9 AT REST EP ON ABUTMENT
18 1131.245 -13.355 -3.907 -0.326 5.554 495.094
19 -1131.245 13.355 3.907 0.326 8.632 -543.587
10 AT K* EP ON ABUTMENT
18 1708.338 -23.549 -4.642 -0.447 6.613 694.667
19 -1708.338 23.549 4.642 0.447 10.241 -780.177
11 LIVE LOAD SURCHARGE
18 100.205
AT REST -29.98 15.739 0.136 -24.831 -100.941
19 -100.205 29.98 -15.739 -0.136 -32.318 -7.919
12 DYNAMIC INCREMENT
18 OF399.346
EARTH PR. -4.252 -1.384 -0.112 1.969 165.603
19 -399.346 4.252 1.384 0.112 3.058 -181.041
13 DYNAMIC INCREMENT
18 OF37.529
LL SURCGARGE
-11.242 5.882 0.051 -9.279 -37.923
19 -37.529 11.242 -5.882 -0.051 -12.08 -2.899
14 UNLADEN WIND LOAD
18 15.75 23.837 6.015 -0.491 0.972 -234.939
19 -17.348 0.963 -6.015 0.491 -22.813 276.467
15 LADEN WIND LOAD18 1.137 11.568 5.379 -0.248 0.797 -124.775
19 -2.59 1.287 -5.379 0.248 -20.328 143.441
16 DIFFERNTIAL SETTLEMENT
18 16.125 -74.517 -8.324 -2.383 11.698 -286.47
19 -16.125 74.517 8.324 2.383 18.526 15.89
17 TEMPERATURE RISE
18 952.838 -17.667 19.268 -0.108 -51.955 553.438
19 -952.838 17.667 -19.268 0.108 -18.009 -617.59
18 TEMPERATURE FALL
18 -436.957 8.186 -8.828 0.054 23.325 -258.306
19 436.957 -8.186 8.828 -0.054 8.73 288.029
19 CREEP SHRINKAGE18 DIFF
-314.858
SHRINKAGE 4.818 -4.788 0.091 1.144 -144.736
19 314.858 -4.818 4.788 -0.091 16.243 162.229
20 FOOTPATH LIVE 18
LOAD 9.8 13.45 0.618 1.236 -1.583 -61.313
19 -9.8 -13.45 -0.618 -1.236 -0.661 110.149
21 SNOW LOAD FOR1870R LL TRACK
37.792 28.837 0.095 -0.437 0.127 -251.616
19 -37.792 -1.604 -0.095 0.437 -0.472 306.883
22 SNOW LOAD FOR18LL 70R WHEEL
18.899 14.422 0.047 -0.219 0.064 -125.826
19 -18.899 -0.806 -0.047 0.219 -0.237 153.473
23 BRAKING 18 -10.256 -7.91 0.953 0.037 -1.372 -31.97
19 4.192 7.91 -0.953 -0.037 -2.088 3.247
604 COMBINATION LOAD
18 CASE
44.653
504 1.436 0.771 -0.008 -7.547 876.028
19 -44.653 -1.436 -0.771 0.008 4.748 -870.814

14 18 +ve 74.28 159.531 2.013 5.444 8.924 44.247


326 LOAD GENERATION,
329 LOAD GENERATION,
LOAD
68 LOAD
#326,
GENERATION,
(8
89
LOAD
of
LOAD
26)#329,
GENERATION,
207
LOAD
(11 LOAD
of 26)
#68,GENERATION,
(18
177
LOADof
LOAD
26)
#89,GENERATION,
(13LOAD
of 56)#207, LOAD
(23 of #177,
26) (19 of 26)
-ve 0 -190.769 -3.453 -12.403 -2.744 -966.736
- 147 LOAD GENERATION,
204 LOAD GENERATION,
225
LOAD LOAD
#147,
GENERATION,
141
(15
LOAD
LOAD
of 26)
#204,
GENERATION,
151LOAD
(20
LOAD
of #225,
26)GENERATION,
LOAD
(15 of 26)
#141, LOAD
(9 of 26)
#151, (19 of 26)
14 19 +ve 74.28 84.263 2.013 5.444 7.412 14.474
326 LOAD GENERATION,
280 LOAD GENERATION,
LOAD
68 LOAD
#326,
GENERATION,
(8
89
LOAD
of
LOAD
26)#280,
GENERATION,
232
LOAD
(44 LOAD
of 56)
#68,GENERATION,
(18
133
LOADof
LOAD
26)
#89,GENERATION,
(13LOAD
of 56)#232, LOAD
(22 of #133,
26) (1 of 26)
-ve 0 -299.579 -3.453 -12.403 -4.366 -711.033
- 154 LOAD GENERATION,
204 LOAD GENERATION,
225
LOAD LOAD
#154,
GENERATION,
34
(22
LOAD
LOAD
of 26)
#204,
GENERATION,
270LOAD
(20
LOAD
of #225,
26)GENERATION,
LOAD
(15 of#34,
26) (10LOAD
of 26)#270, (34 of 56)

-------------------------------------------------------------------------------------------------------------------------------
101 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 2 34 12 13 14 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.515 7.031 10.546 14.061
Precast girder only -1.1 1063.3 1795.0 2240.1 2398.8
Construction load -0.2 280.9 481.7 602.2 642.4
Deck slab & X-girder -0.5 746.9 1285.8 1616.2 1738.0
Total wt of deck slab = -1.7 1810.2 3080.8 3856.3 4136.8
SIDL (DL) from staad output -207.1 -108.4 28.6 156.0 267.9
SIDL (WC) from staad output -311.0 -113.8 82.9 192.1 213.7
Removal of shutter 342.6 132.3 -84.1 -215.1 -260.6
Active Earth pressure -215.1 -215.1 -265.4 -294.3 -294.3
Earth pressure at rest -348.5 -236.3 -397.7 -446.5 -323.2
Earth pressure at K* -460.6 -523.2 -609.1 -694.7 -792.1
Live load surcharge 396.3 318.1 209.7 101.0 -7.9
Wind load (unloaded structure) -333.1 -117.0 -150.1 -165.6 -181.0
Wind load (loaded structure) -161.8 -51.9 59.6 124.8 143.4
Differential settlement -1019.9 825.5 556.5 286.5 15.9
Temperature rise -383.0 -427.2 -489.6 -553.3 -617.6
Temperature fall 179.3 199.8 228.7 258.3 288.0
Creep & shrinkage 98.4 110.3 127.3 144.7 162.2
Footpath live load -87.6 -46.4 9.3 61.4 110.1
Snow load -199.7 -77.4 48.8 125.8 153.5
Braking load 110.0 89.3 60.7 32.0 3.2
Live Load -1240.5 -517.4 823.1 964.0 711.0
Seismic in X- direction -1449.7 -1203.7 -847.5 -467.9 -72.8
Seismic in Z- direction -460.0 -226.0 -73.8 -293.6 -405.6
Seismic in Y- direction -93.9 -45.6 -21.6 -62.0 -84.2
Dynamic increment of Earth pr. -123.3 -134.6 -150.1 -165.6 -181.0
Dynamic increment of LL Surcharge 148.7 119.4 78.7 37.9 -2.9

Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 35.66 35.483 39.118 42.865 44.653
Moment -889.3 -885.8 -881.0 -876.0 -870.8
The hyperstatic action is only considered for calculation of negative moment at support.

b) Shear force (kN)


Desription At support Near L/8 Near L/4 Near 3L/8 At L/2
Precast girder only 364.3 249.3 167.4 54.3 4.4
Deck slab & X-girder 242.3 183.0 123.6 64.3 5.0
Total DL 606.6 432.2 291.0 118.6 9.4
SIDL (DL) from staad output 37.3 37.4 37.4 34.8 30.7
SIDL (WC) from staad output 83.7 66.3 42.3 18.1 -6.1
Active Earth pressure 8.1 8.1 8.0 8.0 8.0
Earth pressure at rest 13.6 13.6 13.5 13.4 13.4
Earth pressure at K* -23.9 -23.8 -23.7 -23.6 -19.1
Live load surcharge 29.7 29.7 29.9 29.9 30.0
Wind load (unloaded structure) 91.1 73.2 48.4 23.7 -1.0
Wind load (loaded structure) 46.4 37.1 24.3 11.5 -1.3
Differential settlement 73.9 73.9 74.1 74.4 74.5
Temperature rise -16.8 -16.9 -17.3 -17.5 -17.7
Temperature fall 7.8 7.8 8.0 8.1 8.2
Creep & shrinkage 4.5 4.6 4.7 4.8 4.8
Footpath live load 15.6 15.6 15.2 14.3 13.5
Snow load 51.4 41.6 28.0 14.4 0.8
Hyperstatic action 1.4 1.3 1.4 1.4 1.4
Braking load 7.9 7.9 7.9 7.9 7.9
Live Load 538.7 412.3 269.5 155.9 84.3
Seismic in X- direction 93.1 94.2 98.5 104.7 109.6
Seismic in Z- direction 90.5 89.2 81.5 61.3 31.5
Seismic in Y- direction 20.0 19.4 17.0 13.0 7.7
Dynamic increment of Earth pr. -4.3 -4.3 -4.3 -4.3 -4.3
Dynamic increment of LL Surcharge 11.1 11.2 11.2 11.2 11.2

-------------------------------------------------------------------------------------------------------------------------------
102 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.1.6 Load Combination - Ultimate limit state


1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+construction Live load(leading) + wind load(accompany)
DL, Support settle, snow
Transverse
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load Wind load Temp load Long. Seismic Vertical Seismic
prestress loss Seismic

1 1.35 1.35 1.75 1.35 1.5


2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
3 (a) 1.35 1.35 1.75 1.35 1.5 0.9
3 (b) 1 1 1 1 1.5 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5
4 (b) 1 1 1 1 1.15 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9
5 (b) 1 1 1 1 1.5 0.9
6 (a) 1.35 1.35 1.75 1.35 1.15 1.5
6 (b) 1 1 1 1 1.15 1.5
7 (a) 1.35 1.35 1.75 1 0.2 1.5 0.45 0.45
7 (b) 1.35 1.35 1.75 1 0.2 0.45 1.5 0.45
7 (c) 1.35 1.35 1.75 1 0.2 0.45 0.45 1.5
7 (d) 1 1 1 1 0.2 1.5 0.45 0.45
7 (e) 1 1 1 1 0.2 0.45 1.5 0.45
7 (f) 1 1 1 1 0.2 0.45 0.45 1.5
a) Moment At support Near L/8 Near L/4 Near 3L/8 At L/2
1 -6181.3 1590.7 5083.2 6136.1 6031.3
2 (a) -4523.7 2127.0 3518.5 4301.7 4523.1
2 (b) -3511.5 1662.7 2588.6 3096.5 3214.2
3 (a) -6326.9 1544.0 5136.9 6248.4 6160.4
3 (b) -5314.8 1079.7 4207.0 5043.3 4851.5
4 (a) -5920.6 1678.9 4860.1 5953.2 5957.9
4 (b) -4908.5 1214.7 3930.2 4748.1 4649.1
5 (a) -6201.7 1035.7 5467.7 6574.0 6329.5
5 (b) -5150.3 564.0 4491.5 5315.6 5010.6
6 (a) -5928.1 1321.7 5292.4 6358.9 6213.8
6 (b) -4876.8 850.0 4316.2 5100.5 4894.8
7 (a) -6370.2 251.8 2612.9 3898.0 4561.4
7 (b) -5330.9 1278.5 3425.3 4081.0 4212.0 (+)ve
7 (c) -4946.6 1467.8 3480.0 4324.2 4549.4 value of
7 (d) -5480.0 -295.1 1543.8 2536.5 3139.4 seismic
7 (e) -4440.8 731.5 2356.2 2719.5 2790.1 force
7 (f) -4056.4 920.9 2411.0 2962.7 3127.5
7 (a) -1260.6 3741.5 5000.1 5505.5 5229.7
7 (b) -2299.8 2714.9 4187.6 5322.6 5579.1 (-)ve value
7 (c) -2684.2 2525.5 4132.9 5079.4 5241.7
of seismic
7 (d) -370.4 3194.6 3931.0 4144.1 3807.8
force
7 (e) -1409.6 2167.9 3118.5 3961.1 4157.2
7 (f) -1794.0 1978.6 3063.8 3717.9 3819.7
Maximum -6370.2 3741.5 5467.7 6574.0 6329.5
Minimum -370.4 -295.1 1543.8 2536.5 2790.1

b) Shear At support Near L/8 Near L/4 Near 3L/8 At L/2


1 2088.5 1619.8 1154.5 686.3 364.2
2 (a) 1381.8 1075.8 788.2 454.8 204.3
2 (b) 1043.4 814.9 599.5 350.1 162.1
3 (a) 2130.3 1653.2 1176.4 696.7 363.0
3 (b) 1791.9 1392.3 987.6 592.0 320.8
4 (a) 1961.3 1522.9 1088.5 641.3 325.3
4 (b) 1623.0 1262.1 899.8 536.5 283.1
5 (a) 1987.0 1540.7 1075.7 607.8 291.7
5 (b) 1661.8 1292.9 900.0 516.0 260.8
6 (a) 1780.2 1392.8 978.1 550.3 259.6
6 (b) 1455.0 1145.1 802.3 458.5 228.8
7 (a) 1510.4 1206.7 929.7 608.7 372.2
7 (b) 1507.6 1201.6 911.8 563.1 290.2
7 (c) 1433.6 1128.2 844.1 512.4 265.2
7 (d) 1176.8 950.6 745.6 508.6 334.6
7 (e) 1174.0 945.5 727.8 463.1 252.6
7 (f) 1100.0 872.1 660.0 412.4 227.6
Maximum 2130.3 1653.2 1176.4 696.7 364.2

-------------------------------------------------------------------------------------------------------------------------------
103 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.1.7 Load Combination for Rare Combination (SL1)


1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
DL, Support settle, snow Secondary
Creep &
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Prestress Live load Wind load Temperature effect of
prestress loss Shrinkage
Prestress
1(a) 1 1 1.2 1 1.1 or 0.9 1 1
1(b) 1 1 1 1 1.1 or 0.9 1 1
2 (a) 1 1 1.2 1 1.1 or 0.9 1 1 1
2 (b) 1 1 1 1 1.1 or 0.9 1 1 1
3 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
3 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
4 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
4 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
5 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
5 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
6 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
6 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
6.2 Cable Details
Maximum midspan Moment for outer girder =
Precast Girder Only = 2398.76 kN-m
Deck Slab & Cross Girder = 1738.03 kN-m
SIDL = 481.55 kN-m
Wind load = 86.06 kN-m
Live Load = 711.03 kN-m
Total Moment = 5415.4 kN-m
Sectional Properties Inner Composite Girder at Midspan :-
Area - A = 1.603 m2
Moment of Inertia - I = 0.692 m4
CG from bottom = 1.352 m
Z Bottom = 0.512 m3
Assume Nos. of Cable = N
Ultimate Force of each 19T13 strands P = 3490 kN
Applied Force = 2733 kN
CG From bottom = 0.125 m
"e" from CG of Girder = 1.227 m
Assum overall Loss = 30 %
Stress at bottom of Girder = NP/A+NP*e/ZBottom-M/Zbottom = 0
N = (M/ZBottom)/(P/A+P*e/ZBottom) = 1.83
Say, No of Cables Provided = 3.00

6.2.1 Calculation of Friction & Slip loss

0.375
3

0.000
X X X
1.775 0.500

2
0.500

1 3 2 0.170 1 0.400
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support

-------------------------------------------------------------------------------------------------------------------------------
104 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

0.25 14.061
Y
4.50
1 2 X 0.17
0.17

0.15 14.311

Cable profile in Plan

0.15
0.38 4
0.000 3

0.500 Z
2
0.500
1 0.170
0.125
0.40 0.25 3.000 4.50 3.00 3.561
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.4-0.125)/(0.25+3-0.15)} = 5.069
o
Vertical bending of Cable 2 =Tan-1{(0.4+0.5-0.125-0.17)/(0.25+3+4.5-0.15)} = 5.823
o
Vertical bending of Cable 3 =Tan-1{(0.4+0.5+0.5-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 6.859
o
Vertical bending of Cable 4 =Tan-1{(0.4+0.5+0.5+0-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 5.951
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.400 3.100 0.000 0.125
2 0.000 0.000 0.900 7.600 -0.170 0.125
3 0.000 0.000 1.40 10.600 0.000 0.125

Cable Start of Horizontal Bending End of Horizontal Bending Midspan


No. X Y Z X Y Z X Y Z
1 3.100 0.000 0.125 7.600 0.170 0.125 14.161 0.170 0.125
2 3.100 0.000 0.584 7.600 -0.170 0.125 14.161 -0.170 0.125
3 0.000 0.000 0.000 0.000 0.000 0.000 14.161 0.000 0.125
C.G. of Cables from Bottom of girder at different Locations
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.515 7.031 10.546 14.061 Distance from
Cable 1 0.356 0.125 0.125 0.125 0.125 Anchorage End
Cable 2 0.849 0.542 0.183 0.125 0.125
Cable 3 1.340 0.977 0.554 0.125 0.125

Friction & Slip Loss


Type of Tendon = 19T/13
2
Modulous of Elasticity (E) = 195 Gpa = 1.95E+08 kN/m
Refer figure 6.3, clause no.7.9.2, table no. 18.4 of IRC 112-2011
Cross Sectional Area(A) = 1877 mm2
Ultimate Force of each 19T13 strands (Breaking load each strand =183.7 kN) = 3490.30 kN
Applied Force -P(je) = (90% of 0.1% proof load = =0.9*0.87*183.7) = 2733 kN
Cofficient of Friction (µ) = 0.17 per radian
Wobble factor (k) = 0.002 per meter
Slip (∆L) = 6 mm.
P(je)=P(x)e (µφ+kl) or P(x)=P(je)/e (µφ+kl)

-------------------------------------------------------------------------------------------------------------------------------
105 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2434.70
1-2 3.112 0.00 0.000 1.0062
2 2715.95 2451.65
2-3 4.503 5.782 0.101 1.0265
3 2645.81 2521.79
3-4 6.561 2.781 0.049 1.0216
4 2589.87 2577.73

3.112 4.503 6.561


2732.90 2715.95 2645.81
1 2 3 2589.87
= 4
= 2521.79 2577.73
6.561
2434.70 2451.65
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2577.734 kN
Point of Zero Slip from node 3 = 6.561 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 28.353 m
Extension of cable at each side = 109.06 mm

Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2428.42
1-2 3.116 0.00 0.000 1.0063
2 2715.93 2445.40
2-3 4.527 6.452 0.113 1.0286
3 2640.41 2520.91
3-4 6.561 2.781 0.049 1.0216
4 2584.58 2584.58
3.116 4.527 6.561
2732.90 2715.93
1 2 2640.41 2584.58
= 3
= 2576.75 4
2445.40 2520.91
2428.42 6.561
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2576.75 kN
Point of Zero Slip from node 3 = 6.561 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 28.407 m
Extension of cable = 109.13 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2488.56
1-2 10.676 0.00 0.000 1.0216
2 2675.17 2546.29
2-3 3.561 6.859 0.120 1.0279
3 2602.68 2602.68
10.676 3.561
2732.90 2675.17
1 2 2602.68
= 3
= 2610.73
2546.29 3.165
2488.56
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2610.73 kN
Point of Zero Slip from node 1 = 3.165 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.676+3.561)x2 = 28.475 m
Extension of cable at each side = 110.54 mm

-------------------------------------------------------------------------------------------------------------------------------
106 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.515 7.031 10.546 14.061
Cable 1 2437.42 2453.85 2512.68 2546.77 2577.73
Vert. angle 5.069 5.069 5.069 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.356 0.125 0.125 0.125 0.125
Cable 2 2431.15 2447.57 2510.70 2549.08 2584.58
Vert. angle 5.823 5.823 5.823 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.849 0.542 0.183 0.125 0.125
Total cable
forces Normal 4846.49 4879.20 4994.71 5092.86 5162.31
at first stage
CG of Cable 0.602 0.333 0.154 0.125 0.125
Total cable
forces Per.
462.01 465.13 476.17 0.00 0.00
Cable 3 2491.26 2507.57 2526.58 2545.59 2602.68
Vert. angle 6.859 6.859 6.859 6.859 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.340 0.977 0.554 0.125 0.125
Total cable
forces Normal 2473.43 2489.62 2508.49 2527.37 2602.68
CG of Cable 1.340 0.977 0.554 0.125 0.125
Total cable
297.51 299.46 301.73 304.00 0.00
forces CG
Overall Per.of
Cable 0.851 0.551 0.288 0.125 0.125
% loss 10.2 % 9.6 % 7.9 % 6.8 % 5.3 %
6.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 28.353 109.06
Cable 2 28.407 109.13
Cable 3 28.475 110.54

-------------------------------------------------------------------------------------------------------------------------------
107 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.3 Construction sequence of precast girder & deck slab


All 4 nos. Precast girders shall be cast over abutment with proper staging or casting yard. After 5 days casting of Girder, first
stage cables shall be stressed as per given force & elongation. Second stage cables shall be stressed after 28 days of casting of
precast girder. All Precast girders shall be placed/erected on PCC levelled plinth over abutment wall. Deck slab & X-Girder shall
be monolithically cast after erecting necessary shuttering from precast girder at 60 days except at top of abutment portion. After
30 days casting of Deck Slab i.e. after 90 days casting of Precast Girder, top of abutment cap shall be cast for jointing of
superstructure & substructure after removing of all shuttering. After 28/30 days jointing of superstructure & substructure i.e.
after 120 days casting of Precast Girder, SIDL shall be laid.
6.3.1 Loss calculation
6.3.1.1 Loss due to Elastic Shortening
Refer clause no.6.4.2.2, Annexure A-2 of IRC 112-2011 Average loss in Cable Stress = 1/2 m f c
f cm (t) = βcc(t)f cm βcc(t) = exp{S[1-(28/(t/t1)0^0.5]}
f ck = Grade of concrete = M 40
f cm (t) = mean concrete compressive strength at age 't' days
f cm = mean concrete compressive strength at age '28' days = 50 Mpa
t = Age of concrete in days = 5 days
t1 = 1 day S = 0.25
βcc(t) = 0.71 f cm (t) = 35.53 Mpa
f ck (t) = 25.53 Mpa
corresponding Ecm = 22x(f cm/12.5)^0.3 = 30.10 Gpa
Ep = 195.00 Gpa m =Modular Ratio = Ec/Ecj = 6.48
To calculate average stress fc at CG of Cables due to Prestress and
Depth of Girder = 1.775 m Assume, Elastic Shortening = 54.60 kN/Cable
2.00 %
2
Area of each Cable = 1877.20 mm Number of cables (cable 1 to 4) = 2.00 Nos
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Sustained Stress of precast girder only at 5 days :-
Dead Load Dead Load Stress at
Cable Force (kN)
Section After fr. & After fr., slip & Cable CG from Stress Moment (kN- Stress Total Stress cable CG
slip loss ES loss soffit (m) (Mpa) m) (kN/m2) (Mpa) (Mpa)
T -0.01 0.00 -0.01
End 4846.49 4737.28 0.602 -1.13 4.66
B 7.05 0.00 7.05
T -1.75 2.44 0.69
L/8 4879.20 4769.99 0.333 1063.26 8.59
B 13.30 -2.89 10.41
T -3.79 4.12 0.33
L/4 4994.71 4885.50 0.154 1794.96 10.18
B 15.99 -4.88 11.11
T -4.20 5.14 0.94
3L/8 5092.86 4983.65 0.125 2240.12 9.94
B 16.70 -6.08 10.62
T -4.26 5.50 1.25
L/2 5162.31 5053.10 0.125 2398.76 9.78
B 16.94 -6.52 10.42
Average stress fc = (4.66+2x(8.59+10.18+9.94)+9.78)/8 = 8.98 Mpa
Average Loss of cable stress = 1/2 m fc = 29.09 Mpa
Loss of each cable due to Elastic shortening = 1/2 m fc As = 54.60 kN
-4.26 Mpa 5.50 Mpa 1.25 Mpa
> -1.57
Mpa
X X + = < 12.26
Mpa
Hence O.K.

16.94 Mpa -6.52 Mpa 10.42 Mpa


Precast Stress due to 1st stage Stress due to DL of Girder Resultant Stress at 7
Girder stressing after loss days
Stress Diagram at Midspan of Precast Girder at 5 days of Casting of Girder
Permissible Compressive stress 0.48xfcm(t) = 12.26 MPa
Permissible tensile stress 0.7xftmj = 1.57 MPa

-------------------------------------------------------------------------------------------------------------------------------
108 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4737+2x(4770+4885+4984)+5053)/8 = 4883.58 kN
Percentage of Initial force = 0.700 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.49 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4883.58/2x2.49/100 = 60.92 kN/Cable

Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 22.54 kN/Cable
5 - 28 days Loss = 25.59 kN/Cable
28 - 60 days Loss = 12.79 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 121.84 kN/Cable
Total = 182.76 kN/Cable
182.762 6.69 %

6.3.1.3 Computation of shrinkage strain (clause no. 6.4.2.6, IRC:112 - 2011)


Total shrinkage strain, εcs = εcd + εc a
Where, εcd is drying shrinkage strain and εca is autogenous shrinkage strain
Maximum Autogenous shrinkage strain εca = 0.00006 (refer table 6.6 of IRC:112 - 2011)
The development of autogenous shrinkage with time εc a(t) = β as(t) x εc a
Where, β as(t) = 1-esp{-0.2sqrt(t)} where t is in days.
The development of dying shrinkage strain in time εcd(t) = β ds(t,ts) * kh x εcd
Where, β ds(t,ts) = (t-ts)/[(t-ts)+0.04sqrt(ho^3) End of curing of concrete t s = 5.00 day
kh is a coefficient depending on notional size ho
Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
Precast Girder only
C/S area of girder at span A c = 0.928 m2 Perimeter in contact with air u = 6.523 m
Nominal size of precast member h 0=2Ac/u = 284.38 mm
Composite Girder
C/S area of comp. girder at span A c = 1.603 m2 Perimeter in contact with air u = 10.473 m
Nominal size of member h0=2Ac/u = 306.03 mm
The drying shrinkage strain ε cd,0 =0.85*((220+110*αds1)*EXP(-αds2*fcm/fcm,o))*β RH/10^6 = 0.0004
Coefficient αds1 (normal cement) = 4.0 Coefficient α ds2 (normal cement) = 0.12
The coefficient β RH = 1.55 x [1-RH/Rho]^3 = 1.02 fcmo = 12.50
Relative humidity of enviroment RH = 70.0 % RHo = 100 %
These are expected mean values, with a coefficient of variation of about 30 percent.
Loss of Prestress due to creep, shrinkage and relaxation as per Euro code
∆Pc+s+r = AP + ∆σPc+s+r = Ap * (εcs*EP+0.8*∆Pr+EP/Ecm*φ(t,to)*σcQP)
1+EP/Ecm*AP/Ac*(1+Ac/Ic*Zcp^2)*(1+0.8*φ(t,to))
Development of shrinkage of concrete
Autogenous Nominal size of Drying
Shrinkage Loss due to
Days shrinkage factor member h0 shrinkage kh strain shrinkage
β as(t) (mm) factor β as(t)

5 0.000 0 0.000 0.000 0.000000 0.00


28 0.653 284 0.107 0.766 0.000074 25.42
60 0.788 306 0.223 0.748 0.000120 16.02
90 0.850 306 0.307 0.748 0.000152 11.19
36500 1.000 306 0.995 0.748 0.000397 84.56
Total 137.192 5.02 %

-------------------------------------------------------------------------------------------------------------------------------
109 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.3.1.4 Computation of creep coefficients (clause no. 6.4.2.7, IRC:112 - 2011)


Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
The creep coefficient φ(t,to) = φo x βc(t,to) as per A2-14of IRC:112 - 2011
Where, φo = φRH x β(fcm) x β(to)
φRH = 1+(1-RH/100)/{0.1*(ho)^1/3} for fcm <= 45MPa
φRH = [1+(1-RH/100)/{0.1*(ho)^1/3} x α1] x α2 for fcm > 45MPa
The coefficient α 1 =(43.75/fcm)^0.7 = 0.91
The coefficient α 2 =(43.75/fcm)^0.2 = 0.97
The coefficient β(fcm) = 18.78/sqrt(fcm) = 2.66
The coefficient β (t0) = 1/(0.1+to^0.2) = 0.68
Where, age of concrete at first loading t 0 =5 day
βc(t,to) =[(t-to)/(β H +t-to)]^0.3
βH = = 1.5 x [1+(0.012RH)^18] x ho + 250 <= 1500 for fcm <= 35MPa
= 1.5 x [1+(0.012RH)^18] x ho + 250α3 <= 1500α3 for fcm <= 35MPa
The coefficient α 3 =(43.75/fcm)^0.5 = 0.94
For temperature greater than 40oC theby 10% in absence of accurate data coefficient may be increased by 10%
in absence of accurate data. This is valid for concrete using normal cement.
Development of creep
Loss due to
Creep
Days h0 (mm) φRH φo βH β c(t,to) creep of
coeff. φo concrete

5 0 0.00 0.000 0.00 0.000 0.000 0.00


28 284 1.38 2.474 678.92 0.359 0.976 100.56
60 306 1.37 2.456 712.80 0.453 1.225 36.14
90 306 1.37 2.456 712.80 0.511 1.380 15.07
36500 306 1.37 2.456 712.80 0.994 2.686 119.72
Total 271.48 9.93 %
6.3.2 Sustained Stress of precast girder at 28 days after stressing of cable
Losses:- Shrinkage = 25.42 kN/Cable
Relaxation = 48.13 kN/Cable
Creep = 100.56 kN/Cable
Total = 174.10 kN/Cable Total Loss for 2 Cables = 348.20 kN
f ck for 28 days strength = M 40 Modulus of elasticity E 33346 MPa
m =Modular Ratio = Ecm/Ecj = 5.85
Stressing of cable no. 4
Elastic Shortening = 40.96 kN/Cable Nomber of cables 1.000 Nos
Relaxation = 22.54 kN/Cable Depth of Girder 1.775 m
Total = 63.50 kN/Cable
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Cable Force (kN)
Stress at 5 loss bet. 5 Cable CG Stress due After fr., Cable CG Total Stress at
Section days - 28 days from soffit to loss After fr. & slip & ES from soffit Stress Stress cable CG
(kN/m2) (Tons) (m) (Mpa) slip loss loss (m) (Mpa) (Mpa) (Mpa)
T -0.01 0.00 3.56 3.55
End -430.13 0.602 2473.43 2409.93 1.340 5.11
B 7.05 -0.64 -0.50 5.91
T 0.69 0.16 2.70 3.55
L/8 -430.13 0.333 2489.62 2426.12 0.977 10.19
B 10.41 -1.20 2.52 11.73
T 0.33 0.33 0.35 1.01
L/4 -430.13 0.154 2508.49 2444.99 0.554 13.83
B 11.11 -1.41 5.34 15.05
T 0.94 0.36 -2.08 -0.77
3L/8 -430.13 0.125 2527.37 2463.86 0.125 16.15
B 10.62 -1.44 8.26 17.44
T 1.25 0.36 -2.14 -0.53
L/2 -430.13 0.125 2602.68 2539.17 0.125 16.22
B 10.42 -1.44 8.51 17.49

-------------------------------------------------------------------------------------------------------------------------------
110 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Average stress σs at CG of cables for 28 days = (5.11+2x(10.19+13.83+16.15)+16.22)/8 = 12.71 Mpa


Loss of cable stress = m (fc-fc') = 21.82 Mpa
Loss of each cable due to Elastic shortening = m f c As = 40.96 kN
1.25 Mpa 0.36 Mpa -2.14 Mpa -0.77 Mpa
> -2.12
Mpa
+ + =
< 20.00
Mpa
10.42 Mpa -1.44 Mpa 8.51 Mpa 17.49 Mpa Hence O.K.
Stress due to loss between 5 Stress due to stressing of Resultant Stress at 28
Resultant Stress at 5 days to28 days cables 3 days
Stress Diagram at Midspan of Precast Girder at 28 days of Casting of Girder

Permissible Compressive stress 0.5xfcm = 20.00 MPa


Permissible tensile stress 0.7xftmj = 2.12 MPa

6.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 12.79 kN/Cable Relaxation = 38.38 kN/Cable
Creep = 36.14 kN/Cable Creep = 36.14 kN/Cable
Total = 64.95 kN/Cable Total = 90.54 kN/Cable
actual time dependent losses = 64.95 kN/Cable actual time dependent losses = 90.54 kN/Cable
Total Loss of 4 Cables = 220.45 kN Actual Loss of third Cables = 90.54 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m

Stress at Cable CG Stress due Total Moment Stress Total Stress at


Section 28 days Stress
loss bet. 28 - from soffit to loss due to slab due to slab Stress cable CG
(kN/m2) 60 days (kN) (m) (Mpa) (kN/m2) (kN-m) (Mpa) (Mpa) (Mpa)
Top of girder 3.55 -0.11 3.44 0.00 3.44
End -220.45 0.851 -0.73 4.62
Bottom 5.91 -0.20 5.71 0.00 5.71
Top of girder 3.55 -0.03 3.52 2.36 5.88
L/8 -220.45 0.551 1027.82 7.65
Bottom 11.73 -0.48 11.24 -2.79 8.45
Top of girder 1.01 0.10 1.11 4.06 5.17
L/4 -220.45 0.288 1767.52 8.89
Bottom 15.05 -0.64 14.41 -4.80 9.61
Top of girder -0.77 0.19 -0.59 5.09 4.50
3L/8 -220.45 0.125 2218.37 10.24
Bottom 17.44 -0.74 16.70 -6.03 10.67
Top of girder -0.53 0.19 -0.35 5.46 5.12
L/2 -220.45 0.125 2380.39 9.92
Bottom 17.49 -0.74 16.75 -6.47 10.29
Average stress σs at CG of cables for 60 days = (4.62+2x(7.65+8.89+10.24)+9.92)/8 = 8.51 Mpa

-0.53 Mpa 0.19 Mpa 5.46 Mpa 5.12 Mpa


> -2.12
Mpa

+ + =
< 20.00
Mpa
17.49 Mpa -0.74 Mpa -6.47 Mpa 10.29 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder

6.3.4 Sustained stress of composite girder at 90 days


After 30 days casting of Deck Slab i.e.after 90 days casting of Precast Girder, Shuttering to be removed and
Apply of SIDL shall be done.
fck for precast girder at 90 days of Concrete I.e. 100% of fc = 40 Mpa
Ecj = 33.3 Gpa Es = 195 Gpa
m =Modular Ratio = Ec/Ecj = 5.85
Area of each Cable = 1877.20 mm2
Depth of Composite Girder = 2.000 m
Depth of Precast Girder = 1.775 m
Thickness of deck slab = 225 mm

Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
-------------------------------------------------------------------------------------------------------------------------------
111 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Losses:- Shrinkage = 11.19 kN/Cable


Relaxation = 0.00 kN/Cable
Creep = 15.07 kN/Cable
Total = 26.26 kN/Cable
Total Loss = 78.78 kN/Cable
actual time dependent losses = 78.78 kN
Total Stress
Stress due Loss of CG of Cables Stress due Moment due due to Total Stress at
Section
at 60 days Cables from soffit to loss to SIDL SIDL Stress cable CG
(Mpa) (kN) (m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab 0.00 -0.01 -0.16 -0.17
Top of girder 3.44 -0.02 -175.55 -0.11 3.31
End -78.78 0.851 4.65
Bottom 5.71 -0.08 0.27 5.89
Top of slab 0.00 0.01 -0.08 -0.07
Top of girder 5.88 -0.01 -89.93 -0.06 5.82
L/8 -78.78 0.551 7.63
Bottom 8.45 -0.17 0.18 8.45
Top of slab 0.00 0.03 0.03 0.06
Top of girder 5.17 0.00 27.41 0.02 5.19
L/4 -78.78 0.288 8.67
Bottom 9.61 -0.21 -0.05 9.34
Top of slab 0.00 0.04 0.12 0.17
Top of girder 4.50 0.01 133.02 0.08 4.59
3L/8 -78.78 0.125 9.78
Bottom 10.67 -0.24 -0.26 10.17
Top of slab 0.00 0.04 0.21 0.25
Top of girder 5.12 0.01 220.92 0.14 5.26
L/2 -78.78 0.125 9.31
Bottom 10.29 -0.24 -0.43 9.62
Average stress at 90 days = (4.65+2x(7.63+8.67+9.78)+9.31)/8 = 8.27 Mpa
0.00 Mpa 0.04 0.21 Mpa 0.25 Mpa
5.12 0.01 Mpa 0.14 5.26 Mpa
Mpa Mpa

+ + =

10.29 -0.24 Mpa -0.43 Mpa 9.62 Mpa


Resultant Stress at 60 Loss of Cables between 60 to Resultant Stress at 90
Stress due to SIDL
days 90 days days
Stress Diagram at Midspan of Composite Girder at 90 days

6.3.5 Sustained Stress of composite girder at α days :-


Losses:- Shrinkage = 84.56 kN/Cable
Relaxation = 121.84 kN/Cable
Creep = 119.72 kN/Cable
Total = 326.12 kN/Cable
Total Loss = 978.35 kN/Cable
actual time dependent losses = 978.35 kN

-------------------------------------------------------------------------------------------------------------------------------
112 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)

Top of slab -0.17 -0.11 -0.83 -1.11


Top of girder 3.31 -0.21 35.66 -889.32 -0.59 2.51
End -978.35 0.851 4.42
Bottom 5.89 -1.05 1.33 6.18
Top of slab -0.07 0.16 -0.85 -0.76
Top of girder 5.82 -0.02 35.48 -885.82 -0.56 5.23
L/8 -978.35 0.551 7.60
Bottom 8.45 -1.50 1.71 8.67
Top of slab 0.06 0.40 -0.85 -0.40
Top of girder 5.19 0.14 39.12 -881.04 -0.56 4.77
L/4 -978.35 0.288 8.44
Bottom 9.34 -1.89 1.70 9.15
Top of slab 0.17 0.54 -0.85 -0.14
Top of girder 4.59 0.24 42.87 -876.03 -0.56 4.28
3L/8 -978.35 0.125 9.35
Bottom 10.17 -2.13 1.69 9.73
Top of slab 0.25 0.54 -0.84 -0.05
Top of girder 5.26 0.24 44.65 -870.81 -0.56 4.94
L/2 -978.35 0.125 8.87
Bottom 9.62 -2.13 1.67 9.16
Average stress at α days = (4.42+2x(7.6+8.44+9.35)+8.87)/8 = 8.01 Mpa
0.25 Mpa 0.54 -0.05 Mpa
5.26 Mpa 0.24 Mpa 4.94 Mpa < 19.2 Mpa
Mpa Hence O.K.

+ =

9.62 Mpa -2.13 Mpa 1.67 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at 90 Loss of Cables inbet. 90 to
Resultant Stress at α days
days α days
Stress Diagram at Midspan of Composite Girder with SIDL without Live Load at α days

6.3.6 Stress of composite girder due to live load

Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.11 -0.67 -0.09 -1.87
Top of girder 2.51 -734.25 -97.08 -0.47 -0.06 1.97
End
Bottom 6.18 1.12 0.15 7.44
Top of slab -0.76 -0.10 -0.03 -0.90
Top of girder 5.23 -110.05 -31.14 -0.07 -0.02 5.14
L/8
Bottom 8.67 0.22 0.06 8.94
Top of slab -0.40 1.02 0.03 0.66
Top of girder 4.77 1093.50 35.78 0.67 0.02 5.46
L/4
Bottom 9.15 -2.14 -0.07 6.94
Top of slab -0.14 1.03 0.07 0.96
Top of girder 4.28 1096.95 74.87 0.67 0.05 4.99
3L/8
Bottom 9.73 -2.14 -0.15 7.44
Top of slab -0.05 0.67 0.08 0.70
Top of girder 4.94 714.28 86.06 0.44 0.05 5.43
L/2
Bottom 9.16 -1.40 -0.17 7.60

-------------------------------------------------------------------------------------------------------------------------------
113 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

-0.05 Mpa 0.67 Mpa 0.70 Mpa


4.94 Mpa 0.44 5.43 Mpa < 19.20 Mpa
Mpa Hence O.K.
+ =

9.16 Mpa -1.40 Mpa 7.60 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at α days Stress due to Live Load Resultant Stress at α days

Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 5.4 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -1.9 Mpa
Tension reinforcement at top of support are provided
6.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Moment due Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder to (Mpa)
Top of slab snow (kN-m) 0.42 F=35.66 -0.98
Top of girder 0.29 2.46
End -1.66 457.9 7319.92 0.851 -602.84 -1368.13 -889.32
Bottom -0.69 6.01
Top of slab 0.39 F=35.48 -0.68
Top of girder 4.41 0.16
L/8 1810.16 412.7 7368.82 0.551 -602.84 -1368.13 -885.82
Bottom -5.72 13.57
Top of slab 0.15 F=39.12 -0.34
Top of girder 7.17 -3.76
L/4 3080.75 160.6 7503.20 0.288 -602.84 -1368.13 -881.04
Bottom -8.68 18.07
Top of slab 0.03 F=42.87 -0.13
Top of girder 8.87 -6.30
3L/8 3856.29 33.8 7620.23 0.125 -602.84 -1368.13 -876.03
Bottom -10.54 21.07
Top of slab -0.18 F=44.65 -0.12
Top of girder 9.38 -6.42
L/2 4136.78 -191.6 7764.99 0.125 -602.84 -1368.13 -870.81
Bottom -10.86 21.55

Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.47 -0.67 -0.09 4.32 -2.50
Top of girder -0.33 -0.47 -0.06 -1.10 0.90
End -518.11 -734.25 -97.08
Bottom 0.79 1.12 0.15 1.67 -2.39
Top of slab -0.21 -0.10 -0.03 4.32 -2.50
Top of girder -0.14 -0.07 -0.02 -1.10 0.90
L/8 -222.25 -110.05 -31.14
Bottom 0.43 0.22 0.06 1.67 -2.39
Top of slab 0.10 1.02 0.03 4.32 -2.50
Top of girder 0.07 0.67 0.02 -1.10 0.90
L/4 111.50 1093.50 35.78
Bottom -0.22 -2.14 -0.07 1.67 -2.39
Top of slab 0.33 1.03 0.07 4.32 -2.50
Top of girder 0.21 0.67 0.05 -1.10 0.90
3L/8 348.12 1096.95 74.87
Bottom -0.68 -2.14 -0.15 1.67 -2.39
Top of slab 0.45 0.67 0.08 4.32 -2.50
Top of girder 0.29 0.44 0.05 -1.10 0.90
L/2 481.55 714.28 86.06
Bottom -0.94 -1.40 -0.17 1.67 -2.39
6.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)

-------------------------------------------------------------------------------------------------------------------------------
114 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

b) Stresses of girder at different load casees


Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.03 -0.94 -1.09 -0.99 -1.76 -1.66 -1.63 -1.53 0.88
Top of girder 2.11 2.17 2.07 2.13 1.60 1.66 1.69 1.76 0.97
End
Bottom 5.66 5.51 5.75 5.59 6.87 6.71 6.65 6.49 7.78
Top of slab -0.47 -0.43 -0.49 -0.45 -0.59 -0.55 -0.58 -0.54 2.01
Top of girder 4.38 4.41 4.37 4.40 4.31 4.33 4.32 4.34 3.66
L/8
Bottom 7.01 6.93 7.05 6.96 7.26 7.18 7.23 7.15 8.23
Top of slab -0.03 -0.05 -0.01 -0.03 1.01 0.99 0.77 0.75 3.58
Top of girder 3.86 3.85 3.88 3.86 4.55 4.53 4.39 4.37 3.87
L/4
Bottom 7.32 7.37 7.28 7.32 5.14 5.19 5.65 5.69 6.19
Top of slab 0.31 0.24 0.35 0.28 1.38 1.31 1.15 1.08 3.92
Top of girder 3.45 3.41 3.48 3.44 4.15 4.11 4.00 3.96 3.46
3L/8
Bottom 7.61 7.74 7.52 7.66 5.38 5.51 5.85 5.99 6.46
Top of slab 0.25 0.16 0.30 0.21 0.97 0.88 0.83 0.74 3.51
Top of girder 3.95 3.89 3.98 3.92 4.42 4.36 4.33 4.27 3.72
L/2
Bottom 7.40 7.59 7.30 7.49 5.90 6.09 6.19 6.37 7.01

-------------------------------------------------------------------------------------------------------------------------------
115 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.98 -3.21 -3.11 2.78 2.87 -4.04 -3.94 2.87 -4.04
Top of girder 1.04 2.17 2.24 0.65 0.72 2.65 2.72 2.72 0.65
End
Bottom 7.62 5.35 5.19 8.17 8.01 4.11 3.95 8.17 3.95
Top of slab 2.05 -2.08 -2.04 3.76 3.81 -3.05 -3.01 3.81 -3.05
Top of girder 3.68 4.86 4.88 3.23 3.26 5.23 5.26 5.26 3.23
L/8
Bottom 8.14 5.79 5.71 8.84 8.76 4.78 4.70 8.84 4.70
Top of slab 3.56 -0.50 -0.53 5.05 5.03 -1.76 -1.78 5.05 -1.78
Top of girder 3.86 5.07 5.06 3.27 3.25 5.26 5.25 5.26 3.25
L/4
Bottom 6.23 3.75 3.80 7.39 7.43 3.33 3.38 7.43 3.33
Top of slab 3.86 -0.16 -0.23 5.39 5.33 -1.42 -1.49 5.39 -1.49
Top of girder 3.42 4.66 4.62 2.86 2.81 4.85 4.81 4.85 2.81
3L/8
Bottom 6.60 4.03 4.17 7.67 7.80 3.61 3.75 7.80 3.61
Top of slab 3.42 -0.58 -0.67 5.07 4.98 -1.75 -1.84 5.07 -1.84
Top of girder 3.67 4.92 4.86 3.18 3.12 5.17 5.11 5.17 3.12
L/2
Bottom 7.19 4.57 4.76 8.02 8.21 3.97 4.15 8.21 3.97

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.23 -1.13 -1.28 -1.19 -1.96 -1.86 -1.82 -1.73 0.69
Top of girder 2.60 2.66 2.56 2.63 2.09 2.15 2.18 2.25 1.47
End
Bottom 6.87 6.71 6.95 6.80 8.07 7.91 7.85 7.69 8.98
Top of slab -0.61 -0.57 -0.63 -0.59 -0.73 -0.69 -0.72 -0.67 1.88
Top of girder 4.42 4.44 4.40 4.43 4.34 4.36 4.35 4.37 3.69
L/8
Bottom 9.73 9.64 9.76 9.68 9.98 9.89 9.95 9.86 10.94
Top of slab -0.10 -0.12 -0.08 -0.10 0.95 0.93 0.70 0.68 3.52
Top of girder 3.11 3.10 3.12 3.11 3.79 3.78 3.63 3.62 3.12
L/4
Bottom 10.94 10.98 10.90 10.94 8.76 8.80 9.27 9.31 9.80
Top of slab 0.28 0.22 0.32 0.26 1.35 1.29 1.12 1.06 3.90
Top of girder 2.19 2.15 2.22 2.18 2.89 2.85 2.74 2.70 2.20
3L/8
Bottom 11.82 11.96 11.73 11.87 9.59 9.73 10.07 10.20 10.68
Top of slab 0.22 0.13 0.27 0.18 0.94 0.85 0.81 0.72 3.48
Top of girder 2.66 2.60 2.69 2.64 3.13 3.07 3.04 2.98 2.44
L/2
Bottom 11.71 11.90 11.61 11.80 10.21 10.40 10.49 10.68 11.32

-------------------------------------------------------------------------------------------------------------------------------
116 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.78 -3.40 -3.31 2.58 2.68 -4.23 -4.14 2.68 -4.23
Top of girder 1.53 2.66 2.73 1.14 1.21 3.14 3.21 3.21 1.14
End
Bottom 8.82 6.55 6.39 9.37 9.21 5.31 5.16 9.37 5.16
Top of slab 1.92 -2.21 -2.17 3.63 3.67 -3.19 -3.14 3.67 -3.19
Top of girder 3.72 4.89 4.92 3.27 3.29 5.26 5.29 5.29 3.27
L/8
Bottom 10.86 8.51 8.42 11.56 11.47 7.50 7.41 11.56 7.41
Top of slab 3.50 -0.57 -0.59 4.99 4.97 -1.83 -1.85 4.99 -1.85
Top of girder 3.11 4.32 4.31 2.51 2.50 4.51 4.50 4.51 2.50
L/4
Bottom 9.85 7.37 7.41 11.00 11.05 6.95 6.99 11.05 6.95
Top of slab 3.83 -0.19 -0.26 5.37 5.30 -1.45 -1.51 5.37 -1.51
Top of girder 2.16 3.40 3.36 1.59 1.55 3.59 3.55 3.59 1.55
3L/8
Bottom 10.82 8.25 8.38 11.88 12.02 7.83 7.96 12.02 7.83
Top of slab 3.39 -0.61 -0.70 5.04 4.95 -1.77 -1.86 5.04 -1.86
Top of girder 2.38 3.64 3.58 1.89 1.83 3.89 3.83 3.89 1.83
L/2
Bottom 11.50 8.88 9.07 12.33 12.52 8.27 8.46 12.52 8.27
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 12.5 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 3.33 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 1.55 Mpa Hence O.K.
except at support

6.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

-------------------------------------------------------------------------------------------------------------------------------
117 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6
b) Stresses of girder at different load casees
Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.03 -0.94 -1.09 -0.99 -1.58 -1.49 -1.22 -1.13 0.62
Top of girder 2.11 2.17 2.07 2.13 1.72 1.79 1.97 2.04 1.20
End
Bottom 5.66 5.51 5.75 5.59 6.57 6.42 5.97 5.82 7.33
Top of slab -0.47 -0.43 -0.49 -0.45 -0.57 -0.52 -0.51 -0.47 1.61
Top of girder 4.38 4.41 4.37 4.40 4.32 4.35 4.36 4.39 3.78
L/8
Bottom 7.01 6.93 7.05 6.96 7.20 7.12 7.09 7.00 8.01
Top of slab -0.03 -0.05 -0.01 -0.03 0.76 0.73 0.20 0.17 2.90
Top of girder 3.86 3.85 3.88 3.86 4.38 4.36 4.01 4.00 3.82
L/4
Bottom 7.32 7.37 7.28 7.32 5.69 5.73 6.85 6.90 6.55
Top of slab 0.31 0.24 0.35 0.28 1.11 1.05 0.56 0.49 3.24
Top of girder 3.45 3.41 3.48 3.44 3.98 3.94 3.61 3.57 3.41
3L/8
Bottom 7.61 7.74 7.52 7.66 5.93 6.06 7.09 7.23 6.83
Top of slab 0.25 0.16 0.30 0.21 0.79 0.70 0.43 0.34 2.91
Top of girder 3.95 3.89 3.98 3.92 4.30 4.24 4.07 4.01 3.73
L/2
Bottom 7.40 7.59 7.30 7.49 6.27 6.46 7.02 7.21 7.19
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.72 -2.79 -2.69 1.42 1.52 -2.67 -2.57 1.52 -2.79
Top of girder 1.27 2.20 2.27 1.35 1.42 2.55 2.62 2.62 1.20
End
Bottom 7.18 5.31 5.15 6.89 6.73 4.45 4.30 7.33 4.30
Top of slab 1.65 -1.80 -1.76 2.09 2.14 -1.99 -1.95 2.14 -1.99
Top of girder 3.81 4.78 4.81 3.71 3.74 4.91 4.94 4.94 3.71
L/8
Bottom 7.92 5.98 5.89 8.06 7.97 5.62 5.54 8.06 5.54
Top of slab 2.88 -0.51 -0.53 2.76 2.74 -1.32 -1.35 2.90 -1.35
Top of girder 3.80 4.81 4.80 3.34 3.32 4.54 4.52 4.81 3.32
L/4
Bottom 6.60 4.53 4.57 7.90 7.94 5.46 5.51 7.94 4.53
Top of slab 3.17 -0.17 -0.24 3.10 3.04 -0.99 -1.05 3.24 -1.05
Top of girder 3.36 4.40 4.36 2.93 2.88 4.13 4.08 4.40 2.88
3L/8
Bottom 6.97 4.81 4.94 8.18 8.32 5.75 5.88 8.32 4.81
Top of slab 2.82 -0.50 -0.59 2.97 2.88 -1.12 -1.21 2.97 -1.21
Top of girder 3.67 4.72 4.67 3.37 3.32 4.57 4.51 4.72 3.32
L/2
Bottom 7.38 5.16 5.35 8.12 8.31 5.69 5.88 8.31 5.16

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.23 -1.13 -1.28 -1.19 -1.78 -1.68 -1.42 -1.32 0.42
Top of girder 2.60 2.66 2.56 2.63 2.21 2.28 2.47 2.53 1.69
End
Bottom 6.87 6.71 6.95 6.80 7.78 7.62 7.18 7.02 8.54
Top of slab -0.61 -0.57 -0.63 -0.59 -0.70 -0.66 -0.65 -0.61 1.47
Top of girder 4.42 4.44 4.40 4.43 4.36 4.38 4.39 4.42 3.82
L/8
Bottom 9.73 9.64 9.76 9.68 9.92 9.83 9.81 9.72 10.72
Top of slab -0.10 -0.12 -0.08 -0.10 0.69 0.67 0.13 0.11 2.83
Top of girder 3.11 3.10 3.12 3.11 3.62 3.61 3.26 3.24 3.06
L/4
Bottom 10.94 10.98 10.90 10.94 9.30 9.34 10.47 10.51 10.17
Top of slab 0.28 0.22 0.32 0.26 1.09 1.02 0.53 0.46 3.21
Top of girder 2.19 2.15 2.22 2.18 2.72 2.68 2.35 2.31 2.14
3L/8
Bottom 11.82 11.96 11.73 11.87 10.14 10.28 11.31 11.44 11.05
Top of slab 0.22 0.13 0.27 0.18 0.77 0.68 0.41 0.32 2.88
Top of girder 2.66 2.60 2.69 2.64 3.02 2.96 2.78 2.72 2.44
L/2
Bottom 11.71 11.90 11.61 11.80 10.58 10.77 11.33 11.52 11.50

-------------------------------------------------------------------------------------------------------------------------------
118 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.52 -2.98 -2.89 1.23 1.32 -2.86 -2.77 1.32 -2.98
Top of girder 1.76 2.69 2.76 1.84 1.91 3.04 3.11 3.11 1.69
End
Bottom 8.38 6.51 6.35 8.09 7.93 5.66 5.50 8.54 5.50
Top of slab 1.51 -1.94 -1.90 1.96 2.00 -2.13 -2.09 2.00 -2.13
Top of girder 3.84 4.81 4.84 3.74 3.77 4.94 4.97 4.97 3.74
L/8
Bottom 10.64 8.69 8.61 10.77 10.68 8.34 8.25 10.77 8.25
Top of slab 2.81 -0.58 -0.60 2.70 2.68 -1.39 -1.41 2.83 -1.41
Top of girder 3.05 4.06 4.05 2.59 2.57 3.78 3.77 4.06 2.57
L/4
Bottom 10.21 8.14 8.18 11.51 11.56 9.08 9.12 11.56 8.14
Top of slab 3.15 -0.20 -0.26 3.08 3.01 -1.01 -1.08 3.21 -1.08
Top of girder 2.10 3.14 3.10 1.67 1.62 2.86 2.82 3.14 1.62
3L/8
Bottom 11.18 9.02 9.16 12.39 12.53 9.96 10.10 12.53 9.02
Top of slab 2.79 -0.52 -0.61 2.95 2.86 -1.14 -1.23 2.95 -1.23
Top of girder 2.38 3.44 3.38 2.09 2.03 3.29 3.23 3.44 2.03
L/2
Bottom 11.69 9.47 9.66 12.43 12.62 10.00 10.19 12.62 9.47

Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 12.6 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 4.30 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 1.62 Mpa Hence O.K.
except at support
6.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 7920 kN
183.34
NA NA
2000 300

125 250 0.0323 7920 kN


Strain Diagram Stress Diagram
750
Top width of girder = 3000 mm Thickness of compression flange = 225 mm
Width of web = 300 mm Distance of prestress CG from bottom = 125 mm
Depth of girder = 2000 mm
Balanced neutral axis depth = 1252 mm Actual neutral axis depth 183.34 mm
Total strain at the prestress CG = 0.03229 The Section is under reinforced
Total ultimate compressive force = 7920 kN Total ultimate tensile force = 7920 kN
Compressive force CG 76.27 mm Moment of resistance = 14247 kNm
> 6329 kNm Hence O.K.
At support Near L/8 Near L/4 Near 3L/8 At L/2
Ultimate moment -370 3742 5468 6574 6329
Horizontal prestress after all losses (kN) 5394 5443 5578 5695 5839
Pre-strain in the cables after all losses 0.00491 0.00496 0.00508 0.00519 0.00532
Distance of prestress CG from bottom (mm) 851 551 288 125 125
Total width of web (mm) 750 300 300 300 300
Assumed neutral axis from top (mm) 183 183 183 183 183
Total strain at the prestress CG 0.0233 0.0291 0.0343 0.0375 0.0376
Average prestress at failure (MPa) 1406 1406 1406 1406 1406
Total compressive force by concrete (kN) 7920 7920 7920 7920 7920
Total tensile force by prestressing steel (kN) 7920 7920 7920 7920 7920
Difference in forces 0 0 0 0 0
Moment of resistance (kNm) 8489 10870 12950 14241 14241
Effective lever arm between forces (m) 1.072 1.372 1.635 1.798 1.798
Factor of Safety associated with failure -22.92 2.91 2.37 2.17 2.25

-------------------------------------------------------------------------------------------------------------------------------
119 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.4.1 Flexural design at support of girder:-


Negative design moment
3000 0.0248
68.5 225 10244 kN

NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.642 MPa Negative Design Moment = 6370 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 8205.4 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 6370 kNm Hence O.K.
Factor of safety = 17,616/6,370 = 2.77

Positive design moment


Positive Design Moment = 370 kN-m
Hence provide 7 Nos. 20 dia Bottom reinf. Ast = 4398.2 mm2
7 Nos. 20 dia
0 Nos. 25 dia
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 20 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1894 mm
Strain in steel = 0.1393 Actual neutral axis depth = 44.60 mm
Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 1912 kN Total ultimate tensile force = 1912 kN
Compressive force CG 18.55 mm Moment of resistance = 3586 kNm
> 370 kNm Hence O.K.
Factor of safety = 3,586/370 = 9.68

6.4.2 Ductile detailing of PSC Girder:-


As per clause no 6.0 of IS-13920 :1993, ductile detailing of PSC girder (support section) has been done.
i) As per clause no 6.1.1 of IS-13920 :1993, maximum factored axial stress shall be not more than 0.1fck.
Prestressing force after friction & slip at support = 7351.67 kN
Loss = 1925.51 kN
Total force = 5426.16 kN
Factored PSC force = 5426.16 kN
Cross sectional area at support = 2.12 m2
Stress = 2.56 Mpa
< 4.0 kNm Hence O.K.
ii) As per clause no 6.1.2 of IS-13920 :1993, Width to depth ratio shall be more than 0.3
Width of beam at support = 3000 mm
Depth of Beam = 2000 mm
Width to depth ratio = 1.50 Mpa
> 0.3 kNm Hence O.K.
iii) As per clause no 6.1.4 of IS-13920 :1993, Depth shall not be more thal L/4
Span = 28500 mm
Depth of Beam = 2000 mm
< L/4 = 7125.00 mm Hence O.K.
iv) As per clause no 6.2.1(b) of IS-13920 :1993, minimum tension reinforcement shall not be less than 0.24sqrt(fck)/fy
Ast provided Ast = 23562 mm2
Area of girder Ac = 2.12 m2
Tension reinforcement provided Ast/Ac = 0.01112
> 0.24sqrt(fck)/fy= 0.00304 Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
120 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

vi) As per clause no 6.3.2 of IS-13920 :1993, Shear force due to ductile detailing shall be
Vua = Va D+L - 1.4(MuAh+MuBs)/L
D+L
Va = 1.2(D+L)/2 = 1519.63 kN
MuAh = -6370.18 kN
MuBs = -3511.54 kN
L = 27.05 m
Vua = 2031 kN
Maximum design shear at support < 2130 kN

6.5 Design of Shear


Total loss after friction & Slip Loss
Description 1st stage stressing % Loss 2nd stage stressing % Loss
At 5 days
Elastic shortening 54.60 kN 2.0 %
Relaxation 22.54 kN 0.8 %
At 28 days
Elastic shortening 40.96 kN 1.5 % 40.96 kN 1.5 %
Shrinkage 25.42 kN 0.9 %
Relaxation 48.13 kN 1.8 % 22.54 kN 0.8 %
Creep 100.56 kN 3.7 %
At 60 days
Shrinkage 16.02 kN 0.6 % 16.02 kN 0.6 %
Relaxation 12.79 kN 0.5 % 38.38 kN 1.4 %
Creep 36.14 kN 1.3 % 36.14 kN 1.3 %
At 90 days
Shrinkage 11.19 kN 0.4 % 11.19 kN 0.4 %
Relaxation 0.00 kN 0.0 % 0.00 kN 0.0 %
Creep 15.07 kN 0.6 % 15.07 kN 0.6 %
At α days
Shrinkage 84.56 kN 3.1 % 84.56 kN 3.1 %
Relaxation 121.84 kN 4.5 % 121.84 kN 4.5 %
Creep 119.72 kN 4.4 % 119.72 kN 4.4 %
Total 709.54 kN/cable 26.0 % 506.42 kN 18.5 %
Total loss 1925.51 kN
Total long term loss after integration with abutment & deck to be applied in staad for calculation of hyperstatic action
1st stage prestress = 352.38 kN/cable from 90days to α days
2nd stage prestress = 352.38 kN/cable
Total Loss = 1057 kN
CG of cables
At support At dist 1.0m L/8 L/4 3L/8 L/2
CG of cables from bottom 0.900 0.851 0.551 0.288 0.125 0.125
CG of girder from bottom 1.247 1.247 1.352 1.352 1.352 1.352
CG of cable from CG 0.347 0.396 0.801 1.064 1.227 1.227

Vertical Component of Cable Force (kN)


Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.515 7.031 10.546 14.061
Cable 1 2437.42 2453.85 2512.68 2546.77 2577.73
Vert. angle 5.07 5.07 5.07 0.00 0.00
Cable 2 2431.15 2447.57 2510.70 2549.08 2584.58
Vert. angle 5.82 5.82 5.82 0.00 0.00
Cable 3 2491.26 2507.57 2526.58 2545.59 2602.68
Vert. angle 6.86 6.86 6.86 6.86 0.00
Total Ver.
Comp. of cable
540.11 545.17 559.05 219.26 0.00

Ultimate Shear at Sections :-


Shear 2130 1653 1176 697 364
Ultimate Load
Moment -370 3742 5468 6574 6329

-------------------------------------------------------------------------------------------------------------------------------
121 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6.5.1 Section not requiring design shear reinforcement


i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 40 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5394.4 5443.3 5577.7 5694.7 5839.5
Effective width of the web in mm 750 300 300 300 300
Effective Depth of precast Section (d) in mm 924 1224 1487 1650 1650
Effective Depth of composite Section (d) in mm 1149 1449 1712 1875 1875
K 1.417 1.371 1.342 1.327 1.327
Stress due to Prestress (σcp) (Mpa) 3.573 3.573 3.573 3.573 3.573
Shear Resistance minimum (VRd,cmin) (kN) 746.8 370.0 431.8 470.0 470.0
Reinforcement ratio considering Tendons, ρ1 0.007 0.013 0.011 0.010 0.010
Shear resistance ( VRd,c) (kN) 861.5 477.7 542.8 582.6 582.6
Design Shear resistance ( VRd,c) (kN) 746.8 370.0 431.8 470.0 470.0

ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5394.4 5443.3 5577.7 5694.7 5839.5
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1149 1449 1712 1875 1875
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7

iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.52 7.03 10.55 14.06
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 2130.3 1653.2 1176.4 696.7 364.2
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 540.1 545.2 559.0 219.3 0.0
Total Shear force for the Beam (kN) 1590.1 1108.0 617.3 477.4 364.2
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 3.5523 0.9542 -3.4427 -6.2768 -6.3997
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 431.81 470.00 470.01
Maximum shear capacity of the Section (kN) 4022 2030 2398 2626 2626
Not
Whether shear reinforcement required or not Required Required Required Required
Required

-------------------------------------------------------------------------------------------------------------------------------
122 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

iv) Calculation of Shear Resistance when Shear Reinforcement is Required ::


The design for the Vertical stirrups for resisting shear is calculated in the table below as per Cl. No. 10.3.3.2 of IRC:112-2011.
The shear resistance with vertical stirrups is given by,
VRd,s = Asw / s. z. fywd cot θ by Crushing of Compression strut
VRd,max = acw bw z v1 fcd / (cot θ + tan θ) by yielding of the Vertical reinforcement
Grade of reinforcement = Fe 500 Grade of concrete = M40
Design Tensile stress in stirrups (fywd= 0.8fyk/γm) = 347.8 Mpa Concrete Strength (fcd) : = 17.9 Mpa
Minimum Shear reinf. ratio = 0.072sqrt(fck)/fyk = 0.00091 Coeff accounting stress in compression chord ν1
o
Design of Vertical Transverse reinforcement (α = 90 ) = 0.60

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam (kN) 1590.1 1108.0 617.3 477.4 364.2
Lever arm taken from flexural analysis z (m) 1.07 1.37 1.64 1.80 1.80
Angle of compression strut θ (degrees) 28.42 37.01 23.82 23.82 23.82
Dia of shear reinforcement provided (mm) 12+16 16 12 12 12
Number of legs provided 2 2 2 2 2
Spacing of stirrups provided (mm) 100 100 125 125 125
Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 0.68 0.27 0.27 0.27 0.27
Area of shear reinf provided Asw/s (mm2/mm) 6.283 4.021 1.810 1.810 1.810
Check O.K. O.K. O.K. O.K. O.K.
Shear resistance provided by reinf V RD,s (kN) 4328 2546 2331 2563 2564
Coeff accounting stress in comp chord αcw 1.200 1.200 1.200 1.200 1.200
Shear capacity of compression strut V RD,max (kN) 4328 2546 2331 2563 2564
Difference in shear resistance (kN) 0.00 0.00 0.00 0.00 0.00
Shear capacity of the Section (kN) 4328.27 2546.05 2331.19 2563.49 2563.56
Factor of Safety associated with failure 2.72 2.30 3.78 5.37 7.04
Increase in longitudinal tensile force ∆Ftd (kN) 1469.20 734.80 699.21 540.77 412.46
Total longitudinal tensile force (kN) 1123.59 3461.00 4043.32 4197.17 3932.76
Permissible longitudinal tensile force (kN) 7920.44 7920.44 7920.44 7920.44 7920.44
Check Hence O.K. Hence O.K. Hence O.K. Hence O.K. Hence O.K.

6.6. Anchor Block


Check Bearing pressure
According to Manufacture's Catalog Size of anchor flange = 225 mm Dia of Hole = 85 mm
fb = 0.48xfcjxSQRT(A2/A1) or 0.8xfcj Whichever is smaller
2
fcj = = 25.53 N/mm
2
A2 = 90541.1029512036^2- 3.14/4x85^2
= 8.2E+09 mm
2
A1 = 225x225- 3.14/4x85^2 = 44950.5 mm
2
fb = min (0.48fcjsqrt(A2/A1),0.8fcj) 20.43 N/mm
Now, Maximum Cable Force after immediate Losses = 2433.95 T
As per Manufacture's recommendation = 35% of above force to be taken by End Bearing
= 65% of above force to be taken by Anchorage
Cone and Concrete by friction
2 2
Bearing stress = N/A1 = 18.95 N/mm < 20.43 N/mm Hence O.K.
Busting reinforcement in end block
2Yo = 250 mm 2Ypo = 225 mm
Ypo/Yo = 0.90 As per Table 13.1 of IRC 112-2011 Fbst/Pk = 0.120
Fbst = 0.12x1.3x2433.95 = 379.70 kN
2
Area of Steel Required = Fbst/(0.87xfy) = 1003.79 mm
2
Hence Provide 12T- 4L -4Nos along Web and Normal to Web Ast = 1809.56 mm

6.7. Interface Shear Design for Composite section


The shear stress that arises between the interfaces of concrete placed at different times is reffered to as interface
shear. The interface shear is resisted by friction at the interface and by reinforcement placed across the shear plane.
The interface shear stress, Vedi <= the resisting capacity at the section, VRdi
Vedi = β Ved/zbi
Where, β = The ratio of longitudinal force in the new concrete and total longitudinal force
Ved = The tranverse shear force
z = Lever arm
bi = the width of interface
VRdi = µσn + ρfyd[µsinα+cosα] <=0.5vfcd fck = M40
µ = friction for rough surface = 0.7 fyd = 500 Mpa
σn = the minimum co existing normal stress < 0.6fcd = 0.00 Mpa
ρ = As/Aj where As is the area of reinforcement, Aj is the interface area of the joint
ν1 = Coeff accounting stress in compression chord = 0.60
-------------------------------------------------------------------------------------------------------------------------------
123 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

α = the angle of the reinforcement to the interface = 90.00 degree


fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5 = 17.87 Mpa

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam,VEd (kN) 1590.15 1108.02 617.33 477.44 364.16
Ratio of Longitudinal forces (β) 0.99 0.99 0.99 0.99 0.99
Lever arm taken from flexural analysis z (m) 1.072 1.372 1.635 1.798 1.798
Interface Width bi ( mm) 1250 1250 1250 1250 1250
Design value of Shear Stress vEdi ( MPa) 1.18 0.64 0.30 0.21 0.16
Roughness Co-efficient, µ 0.70 0.70 0.70 0.70 0.70
Stress caused by minimum external normal force 0.0 0.0 0.0 0.0 0.0
Dia of shear reinforcement provided (mm) 10 10 10 10 10
Number of legs provided 4 4 4 4 4
Spacing of stirrups provided (mm) 125 125 125 125 125
Minimum reinf.=0.15% of area of interface 1875 1875 1875 1875 1875
Area of Reinforcement at interface, As (mm2/m) 2513.27 2513.27 2513.27 2513.27 2513.27
Area of the joint, Ai (mm2) 281250 281250 281250 281250 281250
Strength reduction factor (ν) 0.60 0.60 0.60 0.60 0.60
Design shear resistance at the Interface (vRdi) 3.13 3.13 3.13 3.13 3.13
Status with respect to the Interface Shear Ok Ok Ok Ok Ok

6.8. Untensioned Reinforcement of Precast Girder


Vertical reiforcement = 0.18 % of web
=0.18%x300x1775 = 958.5 mm2 per meter
Hence provide 2L-12T @ 125 c/c Ast provide= 1808 mm2 per meter

Longitudinal reinforcement = 0.15 % of web


Total Area of Precast Girder at midspan = 0.9275 m2
=0.15%x0.93x1000000 = 1391.25 mm2 per meter
Hence provide 7-12T at Bottomt top & 8-12T at Top Ast provide= 1695 mm2 per meter
Side Face Reinforcement
Side Face Reinforcement = 0.1 % of web Area
2
Area of steel required = 532.5 mm
2
Minimum Reinf. at earth face (0.12%) = 648 mm
Hence Provide 8 Nos. 12 φ on Each Face
2 2
Ast provided = 1809.56 mm /m > 648 mm /m Hence O.K.
Bottom reinforcement of girder at support
Total Area of Precast Girder at midspan = 2.119 m2
=0.15%x2.12x1000000 = 3179.11 mm2 per meter
Hence provide 14 Nos. 20 dia Ast = 4398.2 mm2

6.9 Calculation for Deflection of Longitudinal girders


(i) Precast Girder - Prestress of cables 1, 2, 3 + wt of precast Girder at 5 days
Young Modulus = 3.01E+07 kN/m2
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.515 7.031 10.546 14.061
CG of Precast girder from bottom , m 0.948 0.962 0.962 0.962 0.962
Moment of Inertia for Precast 0.412 0.354 0.354 0.354 0.354
CG of cables 1 to 3 from bot.(m) 0.602 0.333 0.154 0.125 0.125
Moment due to stressing after -1640.36 -3001.61 -3947.25 -4171.65 -4230.16
Moment due to Wt of Precast -1.13 1063.26 1794.96 2240.12 2398.76
Total moment due to prestress+wt
of precast Girder (kN-m) -1641.5 -1938.3 -2152.3 -1931.5 -1831.4
M/EI (1/m) -0.00013 -0.00018 -0.00020 -0.00018 -0.00017

-------------------------------------------------------------------------------------------------------------------------------
124 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.52 3.515 3.515 3.515


A B C D E
-0.00018 2 -0.00018
-0.000132 4 3 -0.000202 -0.000172
1

M/EI Diagram for Ist Stage Prestress after losses at 5 days


At Midspan
Section Marked Distance CG from A M/EI Average M/EI Moment of M/EI about A

A -0.00013
B 4 3.515 1.758 -0.00018 -0.00016 -0.000970146
C 3 3.515 5.273 -0.00020 -0.00019 -0.003556017
D 2 3.515 8.788 -0.00018 -0.00019 -0.005916817
E 1 3.515 12.303 -0.00017 -0.00018 -0.007632652
Total -0.018075632
So, Midspan deflection due to Prestress + wt of precast Girder = = -18 mm
= - L/ 1556

(ii) Precast Girder - Prestress of cables 4,5 + loss of Cables 1 to 3 at 28 days


Young Modulus = 3.33E+07 Mpa
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.515 7.031 10.546 14.061
CG of cables 3 from bot.(m) 1.340 0.977 0.554 0.125 0.125
Moment due to stressing after 944.05 36.48 -997.04 -2062.60 -2125.64
Moment due to loss of prestress (kN- 148.94 270.67 347.53 360.05 360.08
Total moment due to prestress+wt 1093.0 307.1 -649.5 -1702.6 -1765.6
M/EI (1/m) 0.0000795 0.0000260 -0.0000550 -0.0001441 -0.00015

3.5 3.515 3.515 3.515


A B C D E
2
0.0000260 -0.0001441
0.0000795 4 3 -0.000055 -0.0001495
1

M/EI Diagram for Ist Stage Prestress after losses at 28 days


At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A
M/EI
A 0.0000795
B 4 3.515 1.758 0.0000260 0.0000527 0.000325823
C 3 3.515 5.273 -0.000055 -0.0000145 -0.000268638
D 2 3.515 8.788 -0.000144 -0.0000996 -0.003075847
E 1 3.515 12.303 -0.000149 -0.0001468 -0.006349448
Total -0.009368111
So, Midspan deflection due to Prestress +loss = = -9.368 mm
So, Total Midspan deflection at 28 days = = -27.444 mm = - L/ 1025

(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.515 7.031 10.546 14.061
CG of all cables from bot.(m) 0.851 0.551 0.288 0.125 0.125
Loss 220.450 220.450 220.450 220.450 220.450
Moment due to prestressing losses 21.360 90.734 148.620 184.537 184.548
Moment due to Wt of Deck Slab -0.527 746.897 1285.797 1616.173 1738.025
Total moment due to prestress+DL 20.833 837.631 1434.418 1800.710 1922.573
M/EI (1/m) 0.0000015 0.0000709 0.0001214 0.0001525 0.00016
3.5 3.515 3.515 3.515
A B C D E
0.000002 0.0000709 0.0001525
4 0.0001214
0.0001628
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000015
B 4 3.515 1.758 0.0000709 0.0000362 0.000223756 0.00150
C 3 3.515 5.273 0.0001214 0.0000962 0.00178272
D 2 3.515 8.788 0.0001525 0.0001369 0.004230637
E 1 3.515 12.303 0.0001628 0.0001576 0.00681661
Total 0.013053723

-------------------------------------------------------------------------------------------------------------------------------
125 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

So, Midspan deflection due to Prestress losses + DL = = 13.054 mm


Total Deflection at 60 days =-27.444+13.054 = -14.390 mm

(iv) Composite Girder - long term losses + SIDL+ Live load


Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.515 7.031 10.546 14.061
CG of Composite girder from bottom , m 1.247 1.352 1.352 1.352 1.352
CG of cables from bot.(m) 0.851 0.551 0.288 0.125 0.125
Moment of Inertia for Composite 0.821 0.692 0.692 0.692 0.692
Loss 1057.138 1057.138 1057.138 1057.138 1057.14
Moment due to prestressing losses 418.701 847.150 1124.737 1296.969 1297.0
Total moment due to prestress 418.701 847.150 1124.737 1296.969 1297.0
M/EI (1/m) 0.0000153 0.0000367 0.0000488 0.0000562 0.00006
3.515 3.515 3.515 3.515
A B C D E
0.00002 0.0000367 0.0000562
4 0.0000488 0.0000562
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at α days
At Midspan
Average Moment of M/EI about
Section Marked Distance CG from A M/EI Rotation
M/EI A
A 0.0000153
B 4 3.515 1.7580.00002600.0000367 0.000160712 0.00062
C 3 3.515 5.2730.00004280.0000488 0.000792432
D 2 3.515 8.7880.00005250.0000562 0.001621996
E 1 3.515 12.303
0.00005620.0000562 0.002432343
Total 0.005007483
So, Midspan deflection due to Prestress losses = = 5.007 mm
So, Midspan deflection due SIDL = = 1.193 mm 0.00000
So, Midspan deflection due Footpath Live load = = 0.000 mm 0.00000
So, Midspan deflection due Wind load = = 0.398 mm 0.00000
So, Midspan deflection due to earth pr. = = -1.782 mm
So, Midspan deflection due to Live load surcharge = = -0.068 mm
So, Midspan deflection due to Live load surcharge = = 1.285 mm
So, Midspan deflection due Live load snow load braking = = 2.493 mm 0.00000
Total Deflection at mid span 1xDL+1.2xSIDL+1xLL+0.6xWL = -5.784 mm L/ -4862

19 1 SPECTRUM IN X DIRECTION
6.26 0.176 0.037 6.263 0 0 0
2 SPECTRUM IN Z0.068
DIRECTION 1.028 1.119 1.521 0 0 0
3 SPECTRUM IN Y0.014
DIRECTION 0.197 0.089 0.216 0 0 0
4 DEAD LOAD 0.169 -4.773 0.02 4.776 0 0 0
5 SIDL (DL) 0.021 -0.553 0.002 0.553 0 0 0
6 SIDL(WC) 0.024 -0.64 0.004 0.64 0 0 0
7 REMOVAL OF SHUTTER
-0.026 0.723 -0.004 0.723 0 0 0
8 EARTH PR ON ABUTMENT
-0.259 1.782 0.199 1.812 0 0 0
9 LIVE LOAD SURCHARGE
1.187 0.068 0.015 1.189 0 0 0
10 DYNAMIC INCREMENT
-0.165 OF EARTH
1.125 PR. 0.125 1.144 0 0 0
11 DYNAMIC INCREMENT
0.75 OF LL0.042
SURCGARGE 0.01 0.751 0 0 0
12 UNLADEN WIND 0.143
LOAD -0.767 -0.112 0.788 0 0 0
13 LADEN WIND LOAD
0.119 -0.398 -0.102 0.428 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.254 -6.248 -0.002 6.642 0 0 0.001
15 TEMPERATURE0.605
RISE 2.748 -0.495 2.857 0 0 0
16 TEMPERATURE -0.278
FALL -1.285 0.232 1.335 0 0 0
17 CREEP SHRINKAGE
-0.215 DIFF SHRINKAGE
-0.687 0.235 0.758 0 0 0
18 FOOTPATH LIVE0.005
LOAD -0.215 -0.002 0.215 0 0 0
19 SNOW LOAD FOR0.031
70R LL TRACK
-0.847 0.005 0.847 0 0 0
20 SNOW LOAD FOR0.015
LL 70R WHEEL
-0.423 0.002 0.424 0 0 0
21 BRAKING 0.446 -0.01 0 0.446 0 0 0
504 COMBINATION 0.08
LOAD CASE-1.134
504 0.015 1.137 0 0 0

19 325 0.04 -2.06 0.005 2.06 0 0 0

-------------------------------------------------------------------------------------------------------------------------------
126 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of PSC Girder LG1

-------------------------------------------------------------------------------------------------------------------------------
127 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.0 Calculation of Stresses for Girder LG1


C/C span = 28.414 m Width of abutment wall = 2.00 m
Length of girder = 27.964 m Width of bearing area = 0.50 m

7.1. Load calculation


7.1.1 Dead Load Moment & Shear for Precast girder only
Unit weight of concrete = 25.00 kN/m3
Cross-sectional area at span = 0.928 m2
Cross-sectional area at support = 1.444 m2
Unit Weight at span = 23.19 kN/m
Unit Weight at support = 36.11 kN/m
Thickness of intermediate Cross Girder = 0.30 m
Thickness of end Cross Girder = 2.00 m
1.250 1.750 1.250

0.475 0.2
0.1 0.053

1.775 1.325 1.025

0.2
0.25

0.225 0.225
0.75 2.250 0.75
Part of intermediate cross girder {1.25x(1.775-0.25)-(0.93-0.75x0.25)}x0.3x25 = 8.75 kN

= 8.75 kN
36.11 36.11
23.19
0.250 1.75 1.75 20.46 1.75 1.75 0.250

0.250 27.464 0.250


27.964
Support Reaction = 365.73 kN
Table : Maximum BM & SF at critical sections
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Dist. for prop. Section(m) 0.000 3.433 6.866 10.299 13.732
Bending Moment (kNm) -1.1 1016.5 1714.7 2139.7 2291.3
Shear Force (kN) 356.7 241.6 163.6 52.4 4.4
7.1.2 Construction load and weight of shuttering & proping.
Assume, Construction Live load = 0.500 kN/m2
Assume, UDL for weight of shuttering = 5.000 kN/m
Effective width of deck slab for end girder = 2.870 m
Weight of shuttering & Conc. Live load = 6.43 kN/m
6.435

0.250 27.46 0.250


Support Reaction = 89.97 kN
Table : Maximum BM & SF at critical sections of outer girders
Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.433 6.866 10.299 13.732
Bending Moment (kNm) -0.2 265.2 454.8 568.6 606.5
Shear Force (kN) 88.4 66.3 44.2 22.1 0.0

7.1.3 Dead Load Moment & Shear for Deck slab & X-girder
Unit weight of concrete = 25.000 kN/m3
Thickness of deck slab = 0.225 m2
Average width of deck slab at support = 2.870 m
Wt of Inner X-girder (1.75/2x(1.775-0.25))x0.3x25 = 10.008 kN
= 10.008

-------------------------------------------------------------------------------------------------------------------------------
128 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

16.143

0.250 27.46 0.250


Support Reaction = 230.71 kN

Table : Maximum BM & SF at critical sections


Section At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.433 6.866 10.299 13.732
Bending Moment (kNm) -0.5 682.5 1175.3 1477.9 1590.2
Shear Force (kN) 226.7 171.3 115.8 60.4 5.0

7.1.4 Staad output


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 1 SPECTRUM IN X DIRECTION
1 136.618 97.694 17.997 4.613 56.127 1557.328
37 -136.618 -97.694 -17.997 -4.613 -39.003 -1461.918
2 SPECTRUM IN Z DIRECTION
1 109.533 75.506 128.732 12.489 274.93 445.18
37 -109.533 -75.506 -128.732 -12.489 -147.123 -370.656
3 SPECTRUM IN Y DIRECTION
1 17.428 33.066 9.76 4.263 21.339 189.011
37 -17.428 -33.066 -9.76 -4.263 -11.762 -156.384
4 DEAD LOAD 1 203.355 636.005 2.255 4.757 -9.082 2756.78
37 -203.355 -583.02 -2.255 -4.757 6.827 -2147.268
5 SIDL (DL) 1 40.418 161.681 0.723 23.582 -1.491 637.149
37 -40.418 -147.181 -0.723 -19.122 0.768 -482.719
6 SIDL(WC) 1 22.888 64.193 0.505 -5.955 -1.994 282.23
37 -22.888 -59.603 -0.505 5.505 1.49 -220.332
7 REMOVAL OF SHUTTER
1 -30.772 -91.926 -0.412 1.746 1.509 -411.197
37 30.772 85.566 0.412 -1.746 -1.097 322.451
8 EP ON ABUTMENT 1 690.552 -8.59 13.471 -0.046 -30.154 209.458
37 -690.552 8.59 -13.471 0.046 16.683 -218.049
9 AT REST EP ON ABUTMENT
1 1161.394 -14.423 22.681 -0.079 -50.767 352.668
37 -1161.394 14.423 -22.681 0.079 28.086 -367.091
10 AT K* EP ON ABUTMENT
1 1757.779 -25.311 35.574 0.107 -80.656 441.682
37 -1757.779 25.311 -35.574 -0.107 45.082 -466.993
11 LIVE LOAD SURCHARGE
1 167.586
AT REST -31.081 9.21 0.463 -34.793 -428.416
37 -167.586 31.081 -9.21 -0.463 25.583 397.335
12 DYNAMIC INCREMENT
1 OF409.973
EARTH PR. -4.627 7.996 -0.01 -17.903 120.15
37 -409.973 4.627 -7.996 0.01 9.907 -124.778
13 DYNAMIC INCREMENT
1 OF62.688
LL SURCGARGE
-11.657 3.416 0.175 -12.947 -160.746
37 -62.688 11.657 -3.416 -0.175 9.53 149.089
14 UNLADEN WIND LOAD
1 10.047 91.892 19.878 -2.451 -44.832 388.74
37 -10.487 -85.362 -19.878 2.451 24.954 -300.113
15 LADEN WIND LOAD 1 -3.051 46.814 17.656 -1.363 -39.543 190.041
37 2.651 -43.434 -17.656 1.363 21.887 -144.917
16 DIFFERNTIAL SETTLEMENT
1 -8.334 -83.392 -4.839 1.982 18.001 -1184.415
37 8.334 83.392 4.839 -1.982 -13.162 1101.023
17 TEMPERATURE RISE1 1350.974 -22.81 627.933 1.344 -1308.006 318.223
37 -1350.974 22.81 -627.933 -1.344 680.073 -341.033
18 TEMPERATURE FALL1 -636.373 10.604 -290.809 -0.614 612.238 -149.176
37 636.373 -10.604 290.809 0.614 -321.429 159.78
19 CREEP SHRINKAGE 1 DIFF
-810.302
SHRINKAGE 6.179 -219.865 0.046 612.992 -82.776
37 810.302 -6.179 219.865 -0.046 -393.127 88.955
20 FOOTPATH LIVE LOAD
1 19.801 74.495 1.511 3.953 1.837 317.308
37 -19.801 -68.385 -1.511 -3.953 -1.308 -245.868
21 SNOW LOAD FOR 170R LL TRACK
35.742 107.113 0.548 -2.134 -1.97 476.689
37 -35.742 -99.633 -0.548 2.134 1.422 -373.315
22 SNOW LOAD FOR 1LL 70R WHEEL
17.869 53.551 0.275 -1.069 -0.987 238.3
37 -17.869 -49.811 -0.275 1.069 0.713 -186.619
23 BRAKING 1 -24.44 -8.228 0.481 0.257 -2.163 -119.589
37 22.77 8.228 -0.481 -0.257 1.682 111.361
604 COMBINATION LOAD
1 CASE
109.101
504 1.603 23.023 -1.897 -50.692 895.61
37 -109.101 -1.603 -23.023 1.897 27.669 -894.007

1 1 +ve 76.569 145.561 5.864 1.438 4.199 975.546


329 LOAD GENERATION,
326 LOAD GENERATION,
LOAD
210 LOAD
#329,GENERATION,
(11
344
LOAD
of
LOAD
26)
#326,
GENERATION,
319
(8LOAD
ofLOAD
26)#210,
GENERATION,
328
LOAD
(26
LOAD
of #344,
26)GENERATION,
LOAD
(26 of 26)
#319, LOAD
(1 of 26)
#328, (10 of 26)
-ve -19.538 -51.272 -2.755 -50.394 -21.063 -422.901
208 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
319 LOAD
#208,GENERATION,
(24
460
LOAD
of
LOAD
26)
#210,
GENERATION,
210
(26
LOAD
LOAD
of 26)
#319,
GENERATION,
210
LOAD
(1LOAD
of 26)
#460,
GENERATION,
LOAD
(8 of 26)
#210, LOAD
(26 of #210,
26) (26 of 26)
1 37 +ve 76.569 145.561 5.864 1.438 2.175 832.604
329 LOAD GENERATION,
326 LOAD GENERATION,
LOAD
210 LOAD
#329,GENERATION,
(11
344
LOAD
of
LOAD
26)
#326,
GENERATION,
340
(8LOAD
ofLOAD
26)#210,
GENERATION,
329
LOAD
(26
LOAD
of #344,
26)GENERATION,
LOAD
(26 of 26)
#340, LOAD
(22 of #329,
26) (11 of 26)
-ve -19.538 -51.272 -2.755 -50.394 -15.199 -371.629
208 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
319 LOAD
#208,GENERATION,
(24
460
LOAD
of
LOAD
26)
#210,
GENERATION,
210
(26
LOAD
LOAD
of 26)
#319,
GENERATION,
210
LOAD
(1LOAD
of 26)
#460,
GENERATION,
LOAD
(8 of 26)
#210, LOAD
(26 of #210,
26) (26 of 26)

-------------------------------------------------------------------------------------------------------------------------------
129 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


33 1 SPECTRUM IN X DIRECTION
37 116.098 98.55 18.429 4.09 43.432 1461.996
9 -116.098 -98.55 -18.429 -4.09 -11.328 -1216.925
2 SPECTRUM IN Z DIRECTION
37 126.723 73.477 122.232 12.075 192.328 370.564
9 -126.723 -73.477 -122.232 -12.075 -120.828 -187.133
3 SPECTRUM IN Y DIRECTION
37 19.347 32.542 9.448 4.223 15.401 156.375
9 -19.347 -32.542 -9.448 -4.223 -9.124 -75.25
4 DEAD LOAD 37 203.247 581.657 1.418 4.992 -4.206 2144.601
9 -203.247 -463.83 -1.418 -4.992 0.587 -810.691
5 SIDL (DL) 37 39.291 147.3 1.202 19.925 -1.787 482.509
9 -39.291 -110.3 -1.202 -8.544 -1.281 -153.843
6 SIDL(WC) 37 23.242 59.531 0.169 -5.399 -0.752 220.353
9 -23.242 -47.818 -0.169 4.251 0.32 -83.389
7 REMOVAL OF SHUTTER
37 -30.826 -85.522 -0.191 1.517 0.62 -322.434
9 30.826 69.293 0.191 -1.517 -0.132 124.909
8 EP ON ABUTMENT37 691.422 -8.481 11.833 -0.163 -20.433 218.021
9 -691.422 8.481 -11.833 0.163 -9.762 -239.663
9 AT REST EP ON ABUTMENT
37 1162.858 -14.24 19.921 -0.276 -34.398 367.044
9 -1162.858 14.24 -19.921 0.276 -16.435 -403.382
10 AT K* EP ON ABUTMENT
37 1760.051 -25.031 31.364 -0.23 -54.93 466.921
9 -1760.051 25.031 -31.364 0.23 -25.102 -530.795
11 LIVE LOAD SURCHARGE
37 168.076
AT REST -31.105 9.913 0.364 -27.876 -397.367
9 -168.076 31.105 -9.913 -0.364 2.58 317.995
12 DYNAMIC INCREMENT
37 OF410.491
EARTH PR. -4.562 7.029 -0.083 -12.138 124.761
9 -410.491 4.562 -7.029 0.083 -5.8 -136.403
13 DYNAMIC INCREMENT
37 OF LL62.87
SURCGARGE
-11.666 3.684 0.138 -10.38 -149.101
9 -62.87 11.666 -3.684 -0.138 0.98 119.333
14 UNLADEN WIND LOAD
37 8.176 85.267 20.256 -2.128 -32.101 300.096
9 -9.299 -68.604 -20.256 2.128 -19.589 -103.775
15 LADEN WIND LOAD37 -4.773 43.369 18.092 -1.164 -28.519 144.91
9 3.752 -34.744 -18.092 1.164 -17.648 -45.248
16 DIFFERNTIAL SETTLEMENT
37 -7.811 -83.27 -4.923 1.298 13.155 -1100.974
9 7.811 83.27 4.923 -1.298 -0.593 888.491
17 TEMPERATURE RISE
37 1406.759 -22.764 479.911 1.103 -906.589 341.154
9 -1406.759 22.764 -479.911 -1.103 -318.023 -399.243
18 TEMPERATURE FALL
37 -658.905 10.585 -220.46 -0.498 419.628 -159.834
9 658.905 -10.585 220.46 0.498 142.93 186.844
19 CREEP SHRINKAGE37 DIFF
-751.649
SHRINKAGE 6.211 -125.704 0.077 313.02 -88.965
9 751.649 -6.211 125.704 -0.077 7.745 104.813
20 FOOTPATH LIVE 37
LOAD 19.14 68.468 1.79 4.04 0.833 245.924
9 -19.14 -52.877 -1.79 -4.04 -0.197 -91.102
21 SNOW LOAD FOR3770R LL TRACK
35.824 99.582 0.285 -1.869 -0.856 373.295
9 -35.824 -80.495 -0.285 1.869 0.129 -143.538
22 SNOW LOAD FOR37LL 70R WHEEL
17.91 49.785 0.143 -0.936 -0.429 186.609
9 -17.91 -40.242 -0.143 0.936 0.064 -71.746
23 BRAKING 37 -22.733 -8.227 0.464 0.215 -1.675 -111.363
9 18.471 8.227 -0.464 -0.215 0.491 90.369
604 COMBINATION LOAD
37 CASE
112.083
504 1.547 19.463 -1.59 -38.206 893.99
9 -112.083 -1.547 -19.463 1.59 -11.459 -890.042

33 37 +ve 76.419 145.337 4.121 1.636 4.908 832.652


329 LOAD GENERATION,
326 LOAD GENERATION,
LOAD
210 LOAD
#329,GENERATION,
(11
343
LOAD
of
LOAD
26)
#326,
GENERATION,
310
(8LOAD
ofLOAD
26)#210,
GENERATION,
329
LOAD
(26
LOAD
of #343,
26)GENERATION,
LOAD
(25 of 26)
#310, LOAD
(18 of #329,
26) (11 of 26)
-ve -15.941 -51.51 -3.886 -27.447 -11.474 -371.889
207 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
313 LOAD
#207,GENERATION,
(23
462
LOAD
of
LOAD
26)
#210,
GENERATION,
210
(26
LOAD
LOAD
of 26)
#313,
GENERATION,
210
LOAD
(21
LOAD
of #462,
26)GENERATION,
LOAD
(10 of 26)
#210, LOAD
(26 of #210,
26) (26 of 26)
33 9 +ve 76.419 145.337 4.121 1.636 1.545 473.849
329 LOAD GENERATION,
326 LOAD GENERATION,
LOAD
210 LOAD
#329,GENERATION,
(11
343
LOAD
of
LOAD
26)
#326,
GENERATION,
70
(8LOAD
LOAD
of 26)#210,
GENERATION,
331
LOAD
(26
LOAD
of #343,
26)GENERATION,
LOAD
(25 of#70,
26) (20
LOAD
of 26)#331, (13 of 26)
-ve -15.941 -51.51 -3.886 -27.447 -5.2 -240.448
207 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
313 LOAD
#207,GENERATION,
(23
462
LOAD
of
LOAD
26)
#210,
GENERATION,
313
(26
LOAD
LOAD
of 26)
#313,
GENERATION,
210
LOAD
(21
LOAD
of #462,
26)GENERATION,
LOAD
(10 of 26)
#313, LOAD
(21 of #210,
26) (26 of 26)

-------------------------------------------------------------------------------------------------------------------------------
130 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


5 1 SPECTRUM IN X DIRECTION
9 95.996 101.918 16.348 2.308 38.857 1217.064
10 -95.996 -101.918 -16.348 -2.308 -21.71 -860.835
2 SPECTRUM IN Z DIRECTION
9 228.109 64.91 96.47 10.618 150.993 187.292
10 -228.109 -64.91 -96.47 -10.618 -192.365 -62.765
3 SPECTRUM IN Y DIRECTION
9 24.695 29.026 7.926 2.965 13.765 75.639
10 -24.695 -29.026 -7.926 -2.965 -14.863 -31.596
4 DEAD LOAD 9 202.692 452.377 -0.486 -0.234 1.846 807.57
10 -202.692 -310.085 0.486 0.234 -0.119 546.468
5 SIDL (DL) 9 36.37 110.063 0.9 12.036 -2.111 154.952
10 -36.37 -58.562 -0.9 3.805 -1.084 144.505
6 SIDL(WC) 9 23.971 47.62 -0.21 -4.245 0.754 82.966
10 -23.971 -31.317 0.21 2.647 -0.008 57.217
7 REMOVAL OF SHUTTER
9 -30.898 -69.027 0.124 0.978 -0.412 -124.759
10 30.898 46.438 -0.124 -0.978 -0.028 -80.292
8 EP ON ABUTMENT 9 690.24 -8.431 0.648 -0.236 0.197 239.647
10 -690.24 8.431 -0.648 0.236 -2.5 -269.591
9 AT REST EP ON ABUTMENT
9 1160.869 -14.155 1.095 -0.397 0.325 403.354
10 -1160.869 14.155 -1.095 0.397 -4.213 -453.63
10 AT K* EP ON ABUTMENT
9 1756.45 -24.867 2.6 -0.485 -1.797 530.747
10 -1756.45 24.867 -2.6 0.485 -7.439 -619.07
11 LIVE LOAD SURCHARGE
9 AT
161.43
REST -31.03 9.417 0.186 -26.088 -318.074
10 -161.43 31.03 -9.417 -0.186 -7.361 207.861
12 DYNAMIC INCREMENT
9 OF409.793
EARTH PR. -4.529 0.386 -0.131 0.115 136.393
10 -409.793 4.529 -0.386 0.131 -1.487 -152.481
13 DYNAMIC INCREMENT
9 OF60.388
LL SURCGARGE
-11.637 3.513 0.07 -9.737 -119.363
10 -60.388 11.637 -3.513 -0.07 -2.741 78.03
14 UNLADEN WIND LOAD
9 -6.939 68.251 15.481 -1.445 -23.715 103.543
10 5.377 -45.058 -15.481 1.445 -31.269 97.679
15 LADEN WIND LOAD 9 -18.411 34.539 13.951 -0.773 -21.481 45.127
10 16.99 -22.534 -13.951 0.773 -28.068 56.226
16 DIFFERNTIAL SETTLEMENT
9 -3.109 -82.433 -4.989 -0.248 12.226 -888.716
10 3.109 82.433 4.989 0.248 5.494 595.933
17 TEMPERATURE RISE9 1279.594 -22.284 206.772 0.391 -418.836 399.494
10 -1279.594 22.284 -206.772 -0.391 -315.567 -478.642
18 TEMPERATURE FALL9 -590.458 10.365 -93.266 -0.168 186.969 -186.959
10 590.458 -10.365 93.266 0.168 144.289 223.772
19 CREEP SHRINKAGE 9 DIFF
-481.107
SHRINKAGE 6.165 -13.273 0.149 -19.211 -104.839
10 481.107 -6.165 13.273 -0.149 66.353 126.736
20 FOOTPATH LIVE LOAD
9 17.882 53.335 1.74 3.6 -0.24 91.889
10 -17.882 -31.634 -1.74 -3.6 1.305 59.006
21 SNOW LOAD FOR 970R LL TRACK
35.925 80.195 -0.119 -1.248 0.458 143.342
10 -35.925 -53.628 0.119 1.248 -0.036 94.31
22 SNOW LOAD FOR 9LL 70R WHEEL
17.961 40.092 -0.059 -0.626 0.229 71.647
10 -17.961 -26.808 0.059 0.626 -0.019 47.158
23 BRAKING 9 -19.017 -8.183 0.544 0.125 -1.567 -90.375
10 13.085 8.183 -0.544 -0.125 -0.365 61.311
604 COMBINATION LOAD
9 CASE
114.002
504 1.137 10.384 -0.77 -27.065 890.147
10 -114.002 -1.137 -10.384 0.77 -9.817 -886.107

5 9 +ve 77.042 143.227 1.12 3.521 5.772 473.988


328 LOAD GENERATION,
326 LOAD GENERATION,
LOAD
67 LOAD
#328,
GENERATION,
(10
133
LOAD
of
LOAD
26)
#326,
GENERATION,
310
LOAD
(8 ofLOAD
26)
#67,GENERATION,
(17
331LOAD
of
LOAD
26)#133,
GENERATION,
LOAD
(1 of 26)
#310, LOAD
(18 of #331,
26) (13 of 26)
-ve -8.813 -51.484 -2.785 -18.943 -0.707 -244.329
206 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
310 LOAD
#206,GENERATION,
(22
218
LOAD
of
LOAD
26)
#210,
GENERATION,
71
(26
LOAD
LOAD
of 26)
#310,
GENERATION,
210LOAD
(18
LOAD
of #218,
26)GENERATION,
LOAD
(8 of 26)
#71, (21
LOAD
of 26)#210, (26 of 26)
5 10 +ve 77.042 143.227 1.12 3.521 4.052 56.779
328 LOAD GENERATION,
326 LOAD GENERATION,
LOAD
67 LOAD
#328,
GENERATION,
(10
133
LOAD
of
LOAD
26)
#326,
GENERATION,
370
LOAD
(8 ofLOAD
26)
#67,GENERATION,
(17
344LOAD
of
LOAD
26)#133,
GENERATION,
LOAD
(1 of 26)
#370, LOAD
(26 of #344,
26) (26 of 26)
-ve -8.813 -51.484 -2.785 -18.943 -4.12 -216.801
206 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
310 LOAD
#206,GENERATION,
(22
218
LOAD
of
LOAD
26)
#210,
GENERATION,
310
(26
LOAD
LOAD
of 26)
#310,
GENERATION,
143LOAD
(18
LOAD
of #218,
26)GENERATION,
LOAD
(8 of 26)
#310, LOAD
(18 of #143,
26) (11 of 26)

-------------------------------------------------------------------------------------------------------------------------------
131 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


6 1 SPECTRUM IN X DIRECTION
10 83.981 108.283 15.19 1.064 29.884 860.884
11 -83.981 -108.283 -15.19 -1.064 -26.062 -477.612
2 SPECTRUM IN Z DIRECTION
10 333.687 45.297 61.644 9.024 48.85 63.307
11 -333.687 -45.297 -61.644 -9.024 -173.295 -207.683
3 SPECTRUM IN Y DIRECTION
10 30.811 20.568 5.878 2.389 7.446 31.261
11 -30.811 -20.568 -5.878 -2.389 -14.442 -98.784
4 DEAD LOAD 10 202.239 296.491 -0.109 -4.465 1.158 -547.438
11 -202.239 -154.201 0.109 4.465 -0.772 1347.798
5 SIDL (DL) 10 34.864 59.798 0.536 -3.386 -1.345 -143.323
11 -34.864 -8.298 -0.536 -2.865 -0.558 264.252
6 SIDL(WC) 10 24.244 31.317 -0.121 -3.304 0.648 -57.752
11 -24.244 -18.389 0.121 0.462 -0.219 146.021
7 REMOVAL OF SHUTTER
10 -30.898 -46.258 0.041 0.646 -0.254 80.466
11 30.898 23.669 -0.041 -0.646 0.109 -204.647
8 EP ON ABUTMENT10 689.062 -8.455 -1.226 -0.216 3.121 269.585
11 -689.062 8.455 1.226 0.216 1.236 -299.616
9 AT REST EP ON ABUTMENT
10 1158.889 -14.197 -2.064 -0.363 5.252 453.62
11 -1158.889 14.197 2.064 0.363 2.08 -504.043
10 AT K* EP ON ABUTMENT
10 1752.393 -24.906 -2.29 -0.473 6.322 619.052
11 -1752.393 24.906 2.29 0.473 1.812 -707.511
11 LIVE LOAD SURCHARGE
10 149.501
AT REST -30.961 9.58 0.096 -21.415 -207.909
11 -149.501 30.961 -9.58 -0.096 -12.609 97.944
12 DYNAMIC INCREMENT
10 OF409.096
EARTH PR. -4.542 -0.731 -0.122 1.858 152.476
11 -409.096 4.542 0.731 0.122 0.737 -168.609
13 DYNAMIC INCREMENT
10 OF55.933
LL SURCGARGE
-11.611 3.579 0.036 -8.001 -78.047
11 -55.933 11.611 -3.579 -0.036 -4.71 36.808
14 UNLADEN WIND LOAD
10 -21.285 44.823 9.07 -1.011 -5.674 -97.961
11 19.722 -21.63 -9.07 1.011 -26.54 215.972
15 LADEN WIND LOAD10 -31.295 22.404 8.167 -0.534 -5.24 -56.373
11 29.874 -10.4 -8.167 0.534 -23.767 114.628
16 DIFFERNTIAL SETTLEMENT
10 3.419 -81.72 -5.043 -1.417 9.787 -596.47
11 -3.419 81.72 5.043 1.417 8.125 306.224
17 TEMPERATURE RISE
10 1179.294 -21.939 70.944 -0.017 -135.922 478.689
11 -1179.294 21.939 -70.944 0.017 -116.05 -556.61
18 TEMPERATURE FALL
10 -542.264 10.206 -32.026 0.018 60.66 -223.792
11 542.264 -10.206 32.026 -0.018 53.086 260.04
19 CREEP SHRINKAGE10 DIFF
-404.627
SHRINKAGE 6.111 -5.236 0.185 -6.551 -126.711
11 404.627 -6.111 5.236 -0.185 25.147 148.415
20 FOOTPATH LIVE 10
LOAD 17.311 32.474 0.131 2.676 -2.187 -58.229
11 -17.311 -10.773 -0.131 -2.676 -0.337 135.03
21 SNOW LOAD FOR1070R LL TRACK
35.917 53.435 -0.041 -0.867 0.33 -94.552
11 -35.917 -26.869 0.041 0.867 -0.185 237.161
22 SNOW LOAD FOR10LL 70R WHEEL
17.958 26.712 -0.02 -0.435 0.166 -47.279
11 -17.958 -13.428 0.02 0.435 -0.093 118.562
23 BRAKING 10 -14.108 -8.151 0.491 0.072 -1.042 -61.314
11 8.176 8.151 -0.491 -0.072 -0.701 32.365
604 COMBINATION LOAD
10 CASE
111.452
504 0.891 3.559 -0.332 -12.087 886.162
11 -111.452 -0.891 -3.559 0.332 -0.555 -882.998

6 10 +ve 77.958 139.793 1.052 4.456 6.521 57.382


328 LOAD GENERATION,
328 LOAD GENERATION,
LOAD
68 LOAD
#328,
GENERATION,
(10
138
LOAD
of
LOAD
26)
#328,
GENERATION,
208
LOAD
(10 LOAD
of 26)
#68,GENERATION,
(18
344LOAD
of
LOAD
26)#138,
GENERATION,
LOAD
(6 of 26)
#208, LOAD
(24 of #344,
26) (26 of 26)
-ve -5.753 -50.876 -1.715 -17.4 -0.093 -216.214
207 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
254 LOAD
#207,GENERATION,
(23
217
LOAD
of
LOAD
26)
#210,
GENERATION,
73
(26
LOAD
LOAD
of 26)
#254,
GENERATION,
143LOAD
(18
LOAD
of #217,
56)GENERATION,
LOAD
(7 of 26)
#73, (23
LOAD
of 26)#143, (11 of 26)
6 11 +ve 77.958 139.109 1.052 4.456 4.606 113.823
328 LOAD GENERATION,
329 LOAD GENERATION,
LOAD
68 LOAD
#328,
GENERATION,
(10
138
LOAD
of
LOAD
26)
#329,
GENERATION,
229
LOAD
(11 LOAD
of 26)
#68,GENERATION,
(18
210LOAD
of
LOAD
26)#138,
GENERATION,
LOAD
(6 of 26)
#229, LOAD
(19 of #210,
26) (26 of 26)
-ve -5.753 -50.876 -1.715 -17.4 -2.358 -560.342
207 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
254 LOAD
#207,GENERATION,
(23
217
LOAD
of
LOAD
26)
#210,
GENERATION,
340
(26
LOAD
LOAD
of 26)
#254,
GENERATION,
323LOAD
(18
LOAD
of #217,
56)GENERATION,
LOAD
(7 of 26)
#340, LOAD
(22 of #323,
26) (5 of 26)

-------------------------------------------------------------------------------------------------------------------------------
132 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


7 1 SPECTRUM IN X DIRECTION
11 74.234 114.603 13.531 1.108 18.825 477.59
12 -74.234 -114.603 -13.531 -1.108 -31.376 -74.522
2 SPECTRUM IN Z DIRECTION
11 403.117 19.753 27.264 6.364 43.232 207.56
12 -403.117 -19.753 -27.264 -6.364 -131.543 -263.759
3 SPECTRUM IN Y DIRECTION
11 35.175 8.936 2.995 1.54 3.364 98.442
12 -35.175 -8.936 -2.995 -1.54 -11.669 -125.704
4 DEAD LOAD 11 202.233 141.729 0.281 -8.793 0.448 -1348.029
12 -202.233 0.565 -0.281 8.793 -1.448 1598.724
5 SIDL (DL) 11 34.212 10.884 0.277 -0.353 -0.803 -264.119
12 -34.212 40.617 -0.277 -5.898 -0.181 211.316
6 SIDL(WC) 11 24.378 18.366 -0.02 -1.158 0.46 -146.36
12 -24.378 -5.437 0.02 -1.683 -0.39 188.632
7 REMOVAL OF SHUTTER
11 -30.925 -23.54 -0.035 0.414 -0.115 204.766
12 30.925 0.951 0.035 -0.414 0.239 -248.26
8 EP ON ABUTMENT11 690.85 -8.491 -1.109 -0.158 1.063 299.619
12 -690.85 8.491 1.109 0.158 2.876 -329.777
9 AT REST EP ON ABUTMENT
11 1161.898 -14.257 -1.869 -0.265 1.792 504.048
12 -1161.898 14.257 1.869 0.265 4.846 -554.685
10 AT K* EP ON ABUTMENT
11 1755.913 -24.984 -2.104 -0.348 1.78 707.518
12 -1755.913 24.984 2.104 0.348 5.694 -796.255
11 LIVE LOAD SURCHARGE
11 137.907
AT REST -30.941 8.439 0.071 -13.683 -97.95
12 -137.907 30.941 -8.439 -0.071 -16.291 -11.945
12 DYNAMIC INCREMENT
11 OF410.162
EARTH PR. -4.562 -0.662 -0.089 0.637 168.61
12 -410.162 4.562 0.662 0.089 1.715 -184.814
13 DYNAMIC INCREMENT
11 OF51.602
LL SURCGARGE
-11.603 3.153 0.027 -5.112 -36.81
12 -51.602 11.603 -3.153 -0.027 -6.088 -4.403
14 UNLADEN WIND LOAD
11 -29.483 21.435 3.926 -0.66 6.355 -216.161
12 27.92 1.758 -3.926 0.66 -20.3 251.106
15 LADEN WIND LOAD11 -38.66 10.294 3.517 -0.345 5.619 -114.725
12 37.239 1.711 -3.517 0.345 -18.112 129.969
16 DIFFERNTIAL SETTLEMENT
11 9.719 -81.36 -4.351 -2.064 5.586 -306.919
12 -9.719 81.36 4.351 2.064 9.868 17.946
17 TEMPERATURE RISE
11 1081.526 -21.799 14.768 -0.125 -26.449 556.61
12 -1081.526 21.799 -14.768 0.125 -26.006 -634.037
18 TEMPERATURE FALL
11 -497.097 10.143 -6.692 0.064 11.585 -260.039
12 497.097 -10.143 6.692 -0.064 12.185 296.065
19 CREEP SHRINKAGE11 DIFF
-372.978
SHRINKAGE 6.102 -1.831 0.162 -6.286 -148.393
12 372.978 -6.102 1.831 -0.162 12.79 170.064
20 FOOTPATH LIVE 11
LOAD 16.835 11.706 -0.29 1.646 -0.969 -134.731
12 -16.835 9.995 0.29 -1.646 -0.061 137.77
21 SNOW LOAD FOR1170R LL TRACK
35.943 26.721 0.04 -0.574 0.184 -237.336
12 -35.943 -0.153 -0.04 0.574 -0.327 285.062
22 SNOW LOAD FOR11LL 70R WHEEL
17.97 13.354 0.02 -0.288 0.093 -118.65
12 -17.97 -0.071 -0.02 0.288 -0.164 142.491
23 BRAKING 11 -9.25 -8.135 0.354 0.045 -0.432 -32.365
12 3.319 8.135 -0.354 -0.045 -0.824 3.471
604 COMBINATION LOAD
11 CASE
107.715
504 0.79 0.652 -0.163 -6.416 883.074
12 -107.715 -0.79 -0.652 0.163 4.098 -880.267

7 11 +ve 78.64 136.702 0.972 9.562 6.223 110.066


328 LOAD GENERATION,
329 LOAD GENERATION,
LOAD
235 LOAD
#328,GENERATION,
(10
146
LOAD
of
LOAD
26)
#329,
GENERATION,
210
(11
LOAD
LOAD
of 26)
#235,
GENERATION,
210LOAD
(25
LOAD
of #146,
26)GENERATION,
LOAD
(14 of 26)
#210, LOAD
(26 of #210,
26) (26 of 26)
-ve -3.947 -52.025 -1.433 -13.086 -0.775 -558.442
210 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
204 LOAD
#210,GENERATION,
(26
217
LOAD
of
LOAD
26)
#210,
GENERATION,
331
(26
LOAD
LOAD
of 26)
#204,
GENERATION,
323LOAD
(20
LOAD
of #217,
26)GENERATION,
LOAD
(7 of 26)
#331, LOAD
(13 of #323,
26) (5 of 26)
7 12 +ve 78.64 128.927 0.972 9.562 5.261 294.849
328 LOAD GENERATION,
327 LOAD GENERATION,
LOAD
235 LOAD
#328,GENERATION,
(10
146
LOAD
of
LOAD
26)
#327,
GENERATION,
229
(9LOAD
ofLOAD
26)#235,
GENERATION,
210LOAD
(25
LOAD
of #146,
26)GENERATION,
LOAD
(14 of 26)
#229, LOAD
(19 of #210,
26) (26 of 26)
-ve -3.947 -52.025 -1.433 -13.086 -1.567 -1008.987
210 LOAD GENERATION,
210 LOAD GENERATION,
LOAD
204 LOAD
#210,GENERATION,
(26
217
LOAD
of
LOAD
26)
#210,
GENERATION,
85
(26
LOAD
LOAD
of 26)
#204,
GENERATION,
326LOAD
(20
LOAD
of #217,
26)GENERATION,
LOAD
(7 of 26)
#85, (9LOAD
of 56) #326, (8 of 26)

-------------------------------------------------------------------------------------------------------------------------------
133 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.1.5 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) 1 33 5 6 7 Staad Member no
Description At support Near L/8 Near L/4 Near 3L/8 At L/2
Distance (m) 0.000 3.433 6.866 10.299 13.732
Precast girder only -1.1 1016.5 1714.7 2139.7 2291.3
Construction load -0.2 265.2 454.8 568.6 606.5
Deck slab & X-girder -0.5 682.5 1175.3 1477.9 1590.2
Total wt of deck slab = -1.6 1699.1 2890.1 3617.6 3881.5
SIDL (DL) from staad output -482.7 -153.8 144.5 264.3 211.3
SIDL (WC) from staad output -220.3 -83.4 57.2 146.0 188.6
Removal of shutter 322.5 124.9 -80.3 -204.6 -248.3
Active Earth pressure -218.0 -218.0 -269.6 -299.6 -299.6
Earth pressure at rest -352.7 -239.7 -403.4 -453.6 -329.8
Earth pressure at K* -467.0 -530.8 -619.1 -707.5 -808.5
Live load surcharge 0.0 0.0 0.0 0.0 0.0
Wind load (unloaded structure) -300.1 -103.8 -152.5 -168.6 -184.8
Wind load (loaded structure) -144.9 -45.2 56.2 114.6 130.0
Differential settlement -1101.0 -888.5 595.9 306.2 17.9
Temperature rise -341.0 -399.2 -478.6 -556.6 -634.0
Temperature fall 159.8 186.8 223.8 260.0 296.1
Creep & shrinkage 89.0 104.8 126.7 148.4 170.1
Footpath live load -245.9 -91.1 59.0 135.0 137.8
Snow load -186.6 -71.7 47.2 118.6 142.5
Braking load 111.4 90.4 61.3 32.4 3.5
Live Load -832.6 -473.8 216.8 560.3 1009.0
Seismic in X- direction -1461.9 -1216.9 -860.8 -477.6 -74.5
Seismic in Z- direction -370.7 -187.1 -62.8 -207.7 -263.8
Seismic in Y- direction -156.4 -75.3 -31.6 -98.8 -125.7
Dynamic increment of Earth pr. -124.8 -136.4 -152.5 -168.6 -184.8
Dynamic increment of LL Surcharge 149.1 119.3 78.0 36.8 -4.4

Hyperstatic action At support Near L/8 Near L/4 Near 3L/8 At L/2
Axial compresion 109.101 112.083 114.002 111.452 107.715
Moment -894.0 -890.0 -886.1 -883.0 -880.3
The hyperstatic action is only considered for calculation of negative moment at support.

b) Shear force (kN)


Desription At support Near L/8 Near L/4 Near 3L/8 At L/2
Precast girder only 356.7 241.6 163.6 52.4 4.4
Deck slab & X-girder 226.7 171.3 115.8 60.4 5.0
Total DL 583.4 412.9 279.4 112.8 9.4
SIDL (DL) from staad output 147.2 110.3 58.6 8.3 -40.6
SIDL (WC) from staad output 59.6 47.8 31.3 18.4 5.4
Active Earth pressure 8.6 8.5 8.4 8.5 8.5
Earth pressure at rest 14.4 14.2 14.2 14.2 14.3
Earth pressure at K* -25.3 -25.0 -24.9 -24.9 -20.5
Live load surcharge 31.1 31.1 31.0 31.0 30.9
Wind load (unloaded structure) 85.4 68.6 45.1 21.6 -1.8
Wind load (loaded structure) 43.4 34.7 22.5 10.4 -1.7
Differential settlement 83.4 83.3 82.4 81.7 81.4
Temperature rise -22.8 -22.8 -22.3 -21.9 -21.8
Temperature fall 10.6 10.6 10.4 10.2 10.1
Creep & shrinkage 6.2 6.2 6.2 6.1 6.1
Footpath live load 68.4 52.9 31.6 10.8 -10.0
Snow load 49.8 40.2 26.8 13.4 0.1
Hyperstatic action 1.6 1.5 1.1 0.9 0.8
Braking load 8.2 8.2 8.2 8.2 8.1
Live Load 145.6 145.3 143.2 139.1 128.9
Seismic in X- direction 97.7 98.6 101.9 108.3 114.6
Seismic in Z- direction 75.5 73.5 64.9 45.3 19.8
Seismic in Y- direction 33.1 32.5 29.0 20.6 8.9
Dynamic increment of Earth pr. -4.6 -4.6 -4.5 -4.5 -4.6
Dynamic increment of LL Surcharge 11.7 11.7 11.6 11.6 11.6

-------------------------------------------------------------------------------------------------------------------------------
134 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.1.6 Load Combination - Ultimate limit state


1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+construction Live load(leading) + wind load(accompany)
DL, Support settle, snow
Transverse
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load Wind load Temp load Long. Seismic Vertical Seismic
prestress loss Seismic

1 1.35 1.35 1.75 1.35 1.5


2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
3 (a) 1.35 1.35 1.75 1.35 1.5 0.9
3 (b) 1 1 1 1 1.5 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5
4 (b) 1 1 1 1 1.15 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9
5 (b) 1 1 1 1 1.5 0.9
6 (a) 1.35 1.35 1.75 1.35 1.15 1.5
6 (b) 1 1 1 1 1.15 1.5
7 (a) 1.35 1.35 1.75 1 0.2 1.5 0.45 0.45
7 (b) 1.35 1.35 1.75 1 0.2 0.45 1.5 0.45
7 (c) 1.35 1.35 1.75 1 0.2 0.45 0.45 1.5
7 (d) 1 1 1 1 0.2 1.5 0.45 0.45
7 (e) 1 1 1 1 0.2 0.45 1.5 0.45
7 (f) 1 1 1 1 0.2 0.45 0.45 1.5
a) Moment At support Near L/8 Near L/4 Near 3L/8 At L/2
1 -5690.1 -1283.0 3892.6 5280.7 6058.2
2 (a) -4355.6 -726.8 3158.2 3936.2 4055.7
2 (b) -3277.8 -554.0 2263.2 2806.9 2876.4
3 (a) -5820.6 -1323.8 3943.2 5383.9 6175.2
3 (b) -4742.8 -1151.0 3048.2 4254.5 4996.0
4 (a) -5491.1 -1184.8 3858.9 5197.9 5850.6
4 (b) -4413.3 -1012.0 2963.9 4068.6 4671.4
5 (a) -6151.4 -1085.7 4274.6 5722.6 6365.4
5 (b) -5033.6 -920.5 3332.7 4539.4 5175.6
6 (a) -5939.6 -807.5 4290.8 5624.0 6140.5
6 (b) -4821.8 -642.2 3349.0 4440.7 4950.7
7 (a) -6604.6 -2638.2 2124.9 3477.8 4205.6
7 (b) -5458.7 -1556.9 2962.9 3761.3 4006.9 (+)ve
7 (c) -5233.7 -1439.4 2995.6 3875.6 4151.9 value of
7 (d) -5650.2 -2549.3 1088.7 2189.7 2911.0 seismic
7 (e) -4504.4 -1468.0 1926.7 2473.2 2712.3 force
7 (f) -4279.4 -1350.5 1959.4 2587.5 2857.2
7 (a) -1640.3 1201.0 4761.1 5171.8 4781.5
7 (b) -2786.1 119.7 3923.2 4888.3 4980.2 (-)ve value
7 (c) -3011.1 2.2 3890.4 4774.0 4835.2
of seismic
7 (d) -685.9 1289.9 3724.9 3883.7 3486.8
force
7 (e) -1831.8 208.6 2887.0 3600.2 3685.5
7 (f) -2056.7 91.1 2854.2 3485.9 3540.6
Maximum -6604.6 1289.9 4761.1 5722.6 6365.4
Minimum -685.9 -2638.2 1088.7 2189.7 2712.3

b) Shear At support Near L/8 Near L/4 Near 3L/8 At L/2


1 1668.8 1331.3 997.8 625.7 332.5
2 (a) 1463.5 1124.6 790.8 421.1 139.2
2 (b) 1109.3 855.2 603.7 324.5 110.5
3 (a) 1707.9 1362.6 1018.1 635.1 330.9
3 (b) 1353.6 1093.2 830.9 538.5 302.2
4 (a) 1656.1 1311.2 967.5 586.0 285.4
4 (b) 1301.9 1041.8 780.4 489.4 256.7
5 (a) 1557.3 1250.5 917.2 545.0 257.6
5 (b) 1217.0 994.9 743.7 462.1 241.0
6 (a) 1465.8 1184.6 859.4 495.8 219.2
6 (b) 1125.5 929.0 685.9 412.9 202.6
7 (a) 1536.9 1220.2 916.8 574.2 313.9
7 (b) 1513.6 1193.8 877.9 508.1 214.4
7 (c) 1469.0 1150.9 840.3 482.1 203.0
7 (d) 1187.7 955.8 734.6 482.6 290.2
7 (e) 1164.4 929.5 695.8 416.5 190.6
7 (f) 1119.9 886.5 658.1 390.5 179.2
Maximum 1707.9 1362.6 1018.1 635.1 332.5

-------------------------------------------------------------------------------------------------------------------------------
135 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.1.7 Load Combination for Rare Combination (SL1)


1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
DL, Support settle, snow Secondary
Creep &
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Prestress Live load Wind load Temperature effect of
prestress loss Shrinkage
Prestress
1(a) 1 1 1.2 1 1.1 or 0.9 1 1
1(b) 1 1 1 1 1.1 or 0.9 1 1
2 (a) 1 1 1.2 1 1.1 or 0.9 1 1 1
2 (b) 1 1 1 1 1.1 or 0.9 1 1 1
3 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
3 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
4 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
4 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
5 (a) 1 1 1.2 1 1.1 or 0.9 1 0.6 1 1
5 (b) 1 1 1 1 1.1 or 0.9 1 0.6 1 1
6 (a) 1 1 1.2 1 1.1 or 0.9 0.75 1 1 1
6 (b) 1 1 1 1 1.1 or 0.9 0.75 1 1 1
7.2 Cable Details
Maximum midspan Moment for outer girder =
Precast Girder Only = 2291.31 kN-m
Deck Slab & Cross Girder = 1590.21 kN-m
SIDL = 399.95 kN-m
Wind load = 77.98 kN-m
Live Load = 1008.99 kN-m
Total Moment = 5368.4 kN-m
Sectional Properties Inner Composite Girder at Midspan :-
Area - A = 1.603 m2
Moment of Inertia - I = 0.692 m4
CG from bottom = 1.352 m
Z Bottom = 0.512 m3
Assume Nos. of Cable = N
Ultimate Force of each 19T13 strands P = 3490 kN
Applied Force = 2733 kN
CG From bottom = 0.125 m
"e" from CG of Girder = 1.227 m
Assum overall Loss = 30 %
Stress at bottom of Girder = NP/A+NP*e/ZBottom-M/Zbottom = 0
N = (M/ZBottom)/(P/A+P*e/ZBottom) = 1.81
Say, No of Cables Provided = 3.00

7.2.1 Calculation of Friction & Slip loss

0.375
3

0.000
X X X
1.775 0.500

2
0.500

1 3 2 0.170 1 0.400
0.125
0.205 0.340 0.205
0.75 0.75
Section at Midspan Section at Support

-------------------------------------------------------------------------------------------------------------------------------
136 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

0.25 13.732
Y
4.50
1 2 X 0.17
0.17

0.15 13.982

Cable profile in Plan

0.15
0.38 4
0.000 3

0.500 Z
2
0.500
1 0.170
0.125
0.40 0.25 3.000 4.50 3.00 3.232
.
Cable profile in Elevation
o
Vertical bending of Cable 1 =Tan-1{(0.4-0.125)/(0.25+3-0.15)} = 5.069
o
Vertical bending of Cable 2 =Tan-1{(0.4+0.5-0.125-0.17)/(0.25+3+4.5-0.15)} = 5.823
o
Vertical bending of Cable 3 =Tan-1{(0.4+0.5+0.5-0.125-0.17-)/(0.25+3+4.5+3-0.15)}= 6.859
o
Vertical bending of Cable 4 =Tan-1{(0.4+0.5+0.5+0-0.125-0.17)/(0.25+3+4.5+3-0.15)}= 5.951
Radius for 1 to 3 = 20 m
Horizontal bending of Cable 1 2.781 o
Horizontal bending of Cable 2 2.781 o
Position of Cable
Cable Anchorage Location of vertical Bending
No. X Y Z X Y Z
1 0.000 0.000 0.400 3.100 0.000 0.125
2 0.000 0.000 0.900 7.600 -0.170 0.125
3 0.000 0.000 1.40 10.600 0.000 0.125

Cable Start of Horizontal Bending End of Horizontal Bending Midspan


No. X Y Z X Y Z X Y Z
1 3.100 0.000 0.125 7.600 0.170 0.125 13.832 0.170 0.125
2 3.100 0.000 0.584 7.600 -0.170 0.125 13.832 -0.170 0.125
3 0.000 0.000 0.000 0.000 0.000 0.000 13.832 0.000 0.125
C.G. of Cables from Bottom of girder at different Locations
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.433 6.866 10.299 13.732 Distance from
Cable 1 0.356 0.125 0.125 0.125 0.125 Anchorage End
Cable 2 0.849 0.550 0.200 0.125 0.125
Cable 3 1.340 0.987 0.574 0.125 0.125

Friction & Slip Loss


Type of Tendon = 19T/13
2
Modulous of Elasticity (E) = 195 Gpa = 1.95E+08 kN/m
Refer figure 6.3, clause no.7.9.2, table no. 18.4 of IRC 112-2011
Cross Sectional Area(A) = 1877 mm2
Ultimate Force of each 19T13 strands (Breaking load each strand =183.7 kN) = 3490.30 kN
Applied Force -P(je) = (90% of 0.1% proof load = =0.9*0.87*183.7) = 2733 kN
Cofficient of Friction (µ) = 0.17 per radian
Wobble factor (k) = 0.002 per meter
Slip (∆L) = 6 mm.
P(je)=P(x)e (µφ+kl) or P(x)=P(je)/e (µφ+kl)

-------------------------------------------------------------------------------------------------------------------------------
137 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Cable 1 19 T13
Force after
Length (l) in Deflection Angle (φ) Force after
Node Link
meter Degree Radian e (µφ+kl) friction loss
slip loss (kN)
(kN)
1 2732.90 2433.84
1-2 3.112 0.00 0.000 1.0062
2 2715.95 2450.80
2-3 4.503 5.782 0.101 1.0265
3 2645.81 2520.94
3-4 6.232 2.781 0.049 1.0209
4 2591.57 2575.18

3.112 4.503 6.232


2732.90 2715.95 2645.81
1 2 3 2591.57
= 4
= 2520.94 2575.18
6.232
2433.84 2450.80
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2575.179 kN
Point of Zero Slip from node 3 = 6.232 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 27.695 m
Extension of cable at each side = 106.73 mm

Cable 2 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2427.68
1-2 3.116 0.00 0.000 1.0063
2 2715.93 2444.65
2-3 4.527 6.452 0.113 1.0286
3 2640.41 2520.17
3-4 6.232 2.781 0.049 1.0209
4 2586.28 2586.28
3.116 4.527 6.232
2732.90 2715.93
1 2 2640.41 2586.28
= 3
= 2574.30 4
2444.65 2520.17
2427.68 6.232
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2574.30 kN
Point of Zero Slip from node 3 = 6.232 m
Area of Shaded Portion = ExAx∆L = 2196.32 kN-m
Area of Shaded Portion = 2196.32 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.000 kN-m
Hence O.K.
Length of Cable = 27.749 m
Extension of cable = 106.80 mm
Cable 3 19 T13
Force after Force after
Length (l) in Deflection Angle (φ)
Node Link
meter Degree Radian e (µφ+kl) friction loss slip loss
(kN) (kN)
1 2732.90 2487.50
1-2 10.676 0.00 0.000 1.0216
2 2675.17 2545.24
2-3 3.232 6.859 0.120 1.0272
3 2604.39 2604.39
10.676 3.232
2732.90 2675.17
1 2 2604.39
= 3
= 2610.20
2545.24 2.966
2487.50
Force Diagram before & after Slip Loss
Assume Force of zero slip = 2610.203 kN
Point of Zero Slip from node 1 = 2.966 m
Area of Shaded Portion = ExAx∆L = 2196.324 kN-m
Area of Shaded Portion = 2196.324 kN-m
Diferance of these two forces = 2196.32-2196.32 = 0.00 kN-m
Hence O.K.
Length of Cable = (10.676+3.232)x2 = 27.817 m
Extension of cable at each side = 108.17 mm

-------------------------------------------------------------------------------------------------------------------------------
138 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.2.2 Summary of Cable Forces after Friction & Slip at different Points
Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.433 6.866 10.299 13.732
Cable 1 2436.57 2452.55 2509.26 2544.29 2575.18
Vert. angle 5.069 5.069 5.069 0.000 0.000
Hor. angle 0.000 0.000 2.781 0.000 0.000
C.G. 0.356 0.125 0.125 0.125 0.125
Cable 2 2430.40 2446.38 2507.21 2548.35 2586.28
Vert. angle 5.823 5.823 5.823 0.000 0.000
Hor. angle 0.000 0.000 2.781 2.781 0.000
C. G. 0.849 0.550 0.200 0.125 0.125
Total cable
forces Normal 4844.90 4876.72 4987.85 5089.64 5161.46
at first stage
CG of Cable 0.602 0.337 0.163 0.125 0.125
Total cable
forces Per.
461.86 464.89 475.52 0.00 0.00
Cable 3 2490.21 2506.07 2524.63 2543.20 2604.39
Vert. angle 6.859 6.859 6.859 6.859 0.000
Hor. angle 0.000 0.000 0.000 0.000 0.000
C. G. 1.340 0.987 0.574 0.125 0.125
Total cable
forces Normal 2472.38 2488.13 2506.56 2525.00 2604.39
CG of Cable 1.340 0.987 0.574 0.125 0.125
Total cable
297.39 299.28 301.50 303.71 0.00
forces CG
Overall Per.of
Cable 0.851 0.557 0.300 0.125 0.125
% loss 10.3 % 9.7 % 8.0 % 6.9 % 5.3 %
7.2.3 Length of Cables and Extension at each End
Total Length Extension at each End
Cable No
(m) (mm)
Cable 1 27.695 106.73
Cable 2 27.749 106.80
Cable 3 27.817 108.17

-------------------------------------------------------------------------------------------------------------------------------
139 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.3 Construction sequence of precast girder & deck slab


All 4 nos. Precast girders shall be cast over abutment with proper staging or casting yard. After 5 days casting of Girder, first
stage cables shall be stressed as per given force & elongation. Second stage cables shall be stressed after 28 days of casting of
precast girder. All Precast girders shall be placed/erected on PCC levelled plinth over abutment wall. Deck slab & X-Girder shall
be monolithically cast after erecting necessary shuttering from precast girder at 60 days except at top of abutment portion. After
30 days casting of Deck Slab i.e. after 90 days casting of Precast Girder, top of abutment cap shall be cast for jointing of
superstructure & substructure after removing of all shuttering. After 28/30 days jointing of superstructure & substructure i.e.
after 120 days casting of Precast Girder, SIDL shall be laid.
7.3.1 Loss calculation
7.3.1.1 Loss due to Elastic Shortening
Refer clause no.6.4.2.2, Annexure A-2 of IRC 112-2011 Average loss in Cable Stress = 1/2 m f c
f cm (t) = βcc(t)f cm βcc(t) = exp{S[1-(28/(t/t1)0^0.5]}
f ck = Grade of concrete = M 40
f cm (t) = mean concrete compressive strength at age 't' days
f cm = mean concrete compressive strength at age '28' days = 50 Mpa
t = Age of concrete in days = 5 days
t1 = 1 day S = 0.25
βcc(t) = 0.71 f cm (t) = 35.53 Mpa
f ck (t) = 25.53 Mpa
corresponding Ecm = 22x(f cm/12.5)^0.3 = 30.10 Gpa
Ep = 195.00 Gpa m =Modular Ratio = Ec/Ecj = 6.48
To calculate average stress fc at CG of Cables due to Prestress and
Depth of Girder = 1.775 m Assume, Elastic Shortening = 55.18 kN/Cable
2.02 %
2
Area of each Cable = 1877.20 mm Number of cables (cable 1 to 4) = 2.00 Nos
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Sustained Stress of precast girder only at 5 days :-
Cable Force (kN) Cable CG from Stress Dead Load Dead Load Total Stress Stress at
Section After fr. & After fr., slip & soffit (m) (Mpa) Moment (kN- Stress (Mpa) cable CG
slip loss ES loss m) (kN/m2) (Mpa)
T -0.01 0.00 -0.01
End 4844.90 4734.54 0.602 -1.13 4.66
B 7.05 0.00 7.05
T -1.70 2.33 0.63
L/8 4876.72 4766.36 0.337 1016.52 8.60
B 13.23 -2.76 10.47
T -3.69 3.93 0.24
L/4 4987.85 4877.49 0.163 1714.73 10.19
B 15.85 -4.66 11.19
T -4.20 4.91 0.71
3L/8 5089.64 4979.28 0.125 2139.66 10.16
B 16.69 -5.81 10.88
T -4.26 5.26 1.00
L/2 5161.46 5051.10 0.125 2291.31 10.02
B 16.93 -6.22 10.71
Average stress fc = (4.66+2x(8.6+10.19+10.16)+10.02)/8 = 9.07 Mpa
Average Loss of cable stress = 1/2 m fc = 29.39 Mpa
Loss of each cable due to Elastic shortening = 1/2 m fc As = 55.18 kN
-4.26 Mpa 5.26 Mpa 1.00 Mpa
> -1.57
Mpa
X X + = < 12.26
Mpa
Hence O.K.

16.93 Mpa -6.22 Mpa 10.71 Mpa


Precast Stress due to 1st stage Stress due to DL of Girder Resultant Stress at 7
Girder stressing after loss days
Stress Diagram at Midspan of Precast Girder at 5 days of Casting of Girder
Permissible Compressive stress 0.48xfcm(t) = 12.26 MPa
Permissible tensile stress 0.7xftmj = 1.57 MPa

-------------------------------------------------------------------------------------------------------------------------------
140 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.3.1.2 Loss due to Relaxation of Steel (clause no. 6.3.6 of IRC 112-2011)
Total Relaxation Loss at service condition = 3 x (1000 hr. value)
Initial force after Friction, slip & ES loss (4735+2x(4766+4877+4979)+5051)/8 = 4878.99 kN
Percentage of Initial force = 0.699 UTS
Relaxation Loss at 1000hr. for low relaxation steel = 2.49 % of initial force
Relaxation Loss at 1000hr. for low relaxation steel 4878.99/2x2.49/100 = 60.66 kN/Cable

Immediate Loss i.e 1 hr. of stressing as per Table 6.2 of IRC 112-2011, = 37 % of Total Loss
5 - 28 days Loss 23 days 552 = 42.00 % of Total Loss
28 - 60 days Loss 32 days 768 = 21.00 % of Total Loss
60 - 90 days Loss 30 days = 0.00 % of Total Loss
90 - α days Loss = 200.0 % of Total Loss
i.e. 3 x (1000 hr. value)
Immediate Loss i.e 1 hr. of stressing = 22.45 kN/Cable
5 - 28 days Loss = 25.48 kN/Cable
28 - 60 days Loss = 12.74 kN/Cable
60 - 90 days Loss = 0.00 kN/Cable
90-α days Loss = 121.33 kN/Cable
Total = 181.99 kN/Cable
181.988 6.66 %

7.3.1.3 Computation of shrinkage strain (clause no. 6.4.2.6, IRC:112 - 2011)


Total shrinkage strain, εcs = εcd + εc a
Where, εcd is drying shrinkage strain and εca is autogenous shrinkage strain
Maximum Autogenous shrinkage strain εca = 0.00006 (refer table 6.6 of IRC:112 - 2011)
The development of autogenous shrinkage with time εc a(t) = β as(t) x εc a
Where, β as(t) = 1-esp{-0.2sqrt(t)} where t is in days.
The development of dying shrinkage strain in time εcd(t) = β ds(t,ts) * kh x εcd
Where, β ds(t,ts) = (t-ts)/[(t-ts)+0.04sqrt(ho^3) End of curing of concrete t s = 5.00 day
kh is a coefficient depending on notional size ho
Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
Precast Girder only
C/S area of girder at span A c = 0.928 m2 Perimeter in contact with air u = 6.523 m
Nominal size of precast member h 0=2Ac/u = 284.38 mm
Composite Girder
C/S area of comp. girder at span A c = 1.603 m2 Perimeter in contact with air u = 10.473 m
Nominal size of member h0=2Ac/u = 306.03 mm
The drying shrinkage strain ε cd,0 =0.85*((220+110*αds1)*EXP(-αds2*fcm/fcm,o))*β RH/10^6 = 0.0004
Coefficient αds1 (normal cement) = 4.0 Coefficient α ds2 (normal cement) = 0.12
The coefficient β RH = 1.55 x [1-RH/Rho]^3 = 1.02 fcmo = 12.50
Relative humidity of enviroment RH = 70.0 % RHo = 100 %
These are expected mean values, with a coefficient of variation of about 30 percent.
Loss of Prestress due to creep, shrinkage and relaxation as per Euro code
∆Pc+s+r = AP + ∆σPc+s+r = Ap * (εcs*EP+0.8*∆Pr+EP/Ecm*φ(t,to)*σcQP)
1+EP/Ecm*AP/Ac*(1+Ac/Ic*Zcp^2)*(1+0.8*φ(t,to))
Development of shrinkage of concrete
Autogenous Nominal size of Drying
Shrinkage Loss due to
Days shrinkage factor member h0 shrinkage kh strain shrinkage
β as(t) (mm) factor β as(t)

5 0.000 0 0.000 0.000 0.000000 0.00


28 0.653 284 0.107 0.766 0.000074 25.42
60 0.788 306 0.223 0.748 0.000120 16.02
90 0.850 306 0.307 0.748 0.000152 11.19
36500 1.000 306 0.995 0.748 0.000397 84.56
Total 137.192 5.02 %

-------------------------------------------------------------------------------------------------------------------------------
141 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.3.1.4 Computation of creep coefficients (clause no. 6.4.2.7, IRC:112 - 2011)


Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
The creep coefficient φ(t,to) = φo x βc(t,to) as per A2-14of IRC:112 - 2011
Where, φo = φRH x β(fcm) x β(to)
φRH = 1+(1-RH/100)/{0.1*(ho)^1/3} for fcm <= 45MPa
φRH = [1+(1-RH/100)/{0.1*(ho)^1/3} x α1] x α2 for fcm > 45MPa
The coefficient α 1 =(43.75/fcm)^0.7 = 0.91
The coefficient α 2 =(43.75/fcm)^0.2 = 0.97
The coefficient β(fcm) = 18.78/sqrt(fcm) = 2.66
The coefficient β (t0) = 1/(0.1+to^0.2) = 0.68
Where, age of concrete at first loading t 0 =5 day
βc(t,to) =[(t-to)/(β H +t-to)]^0.3
βH = = 1.5 x [1+(0.012RH)^18] x ho + 250 <= 1500 for fcm <= 35MPa
= 1.5 x [1+(0.012RH)^18] x ho + 250α3 <= 1500α3 for fcm <= 35MPa
The coefficient α 3 =(43.75/fcm)^0.5 = 0.94
For temperature greater than 40oC theby 10% in absence of accurate data coefficient may be increased by 10%
in absence of accurate data. This is valid for concrete using normal cement.
Development of creep
Loss due to
Creep
Days h0 (mm) φRH φo βH β c(t,to) creep of
coeff. φo concrete

5 0 0.00 0.000 0.00 0.000 0.000 0.00


28 284 1.38 2.474 678.92 0.359 0.976 101.62
60 306 1.37 2.456 712.80 0.453 1.225 36.29
90 306 1.37 2.456 712.80 0.511 1.380 15.62
36500 306 1.37 2.456 712.80 0.994 2.686 123.67
Total 277.20 10.14 %
7.3.2 Sustained Stress of precast girder at 28 days after stressing of cable
Losses:- Shrinkage = 25.42 kN/Cable
Relaxation = 47.92 kN/Cable
Creep = 101.62 kN/Cable
Total = 174.96 kN/Cable Total Loss for 2 Cables = 349.91 kN
f ck for 28 days strength = M 40 Modulus of elasticity E 33346 MPa
m =Modular Ratio = Ecm/Ecj = 5.85
Stressing of cable no. 4
Elastic Shortening = 40.51 kN/Cable Nomber of cables 1.000 Nos
Relaxation = 22.45 kN/Cable Depth of Girder 1.775 m
Total = 62.95 kN/Cable
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m
Cable Force (kN)
Stress at 5 loss bet. 5 Cable CG Stress due After fr., Cable CG Total Stress at
Section days - 28 days from soffit to loss After fr. & slip & ES from soffit Stress Stress cable CG
(kN/m2) (Tons) (m) (Mpa) slip loss loss (m) (Mpa) (Mpa) (Mpa)
T -0.01 0.00 3.56 3.55
End -430.93 0.602 2472.38 2409.43 1.340 5.11
B 7.05 -0.64 -0.50 5.91
T 0.63 0.15 2.75 3.54
L/8 -430.93 0.337 2488.13 2425.18 0.987 10.17
B 10.47 -1.20 2.45 11.72
T 0.24 0.33 0.46 1.03
L/4 -430.93 0.163 2506.56 2443.61 0.574 13.72
B 11.19 -1.40 5.21 15.00
T 0.71 0.36 -2.08 -1.00
3L/8 -430.93 0.125 2525.00 2462.04 0.125 16.37
B 10.88 -1.44 8.25 17.69
T 1.00 0.36 -2.14 -0.78
L/2 -430.93 0.125 2604.39 2541.44 0.125 16.48
B 10.71 -1.44 8.52 17.78

-------------------------------------------------------------------------------------------------------------------------------
142 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Average stress σs at CG of cables for 28 days = (5.11+2x(10.17+13.72+16.37)+16.48)/8 = 12.76 Mpa


Loss of cable stress = m (fc-fc') = 21.58 Mpa
Loss of each cable due to Elastic shortening = m f c As = 40.51 kN
1.00 Mpa 0.36 Mpa -2.14 Mpa -1.00 Mpa
> -2.12
Mpa
+ + =
< 20.00
Mpa
10.71 Mpa -1.44 Mpa 8.52 Mpa 17.78 Mpa Hence O.K.
Stress due to loss between 5 Stress due to stressing of Resultant Stress at 28
Resultant Stress at 5 days to28 days cables 3 days
Stress Diagram at Midspan of Precast Girder at 28 days of Casting of Girder

Permissible Compressive stress 0.5xfcm = 20.00 MPa


Permissible tensile stress 0.7xftmj = 2.12 MPa

7.3.3. Sustained Stress of precast girder at 60 days after Casting of Deck with X-Girder
Losses for first 3 cables:- Losses for last 1 cable:-
Shrinkage = 16.02 kN/Cable Shrinkage = 16.02 kN/Cable
Relaxation = 12.74 kN/Cable Relaxation = 38.22 kN/Cable
Creep = 36.29 kN/Cable Creep = 36.29 kN/Cable
Total = 65.05 kN/Cable Total = 90.53 kN/Cable
actual time dependent losses = 65.05 kN/Cable actual time dependent losses = 90.53 kN/Cable
Total Loss of 4 Cables = 220.63 kN Actual Loss of third Cables = 90.53 kN
Depth of Precast Girder = 1.775 m
Sectional Properties of Precast Girder at Midspan = Sectional Properties of Precast Girder at Support =
2 2
Area = 0.928 m Area = 1.444 m
4 4
I= 0.354 m I= 0.412 m
CG = 0.962 m CG = 0.948 m

Stress at Cable CG Stress due Total Moment Stress Total Stress at


Section 28 days Stress
loss bet. 28 - from soffit to loss due to slab due to slab Stress cable CG
(kN/m2) 60 days (kN) (m) (Mpa) (kN/m2) (kN-m) (Mpa) (Mpa) (Mpa)
Top of girder 3.55 -0.11 3.44 0.00 3.44
End -220.63 0.851 -0.71 4.62
Bottom 5.91 -0.20 5.70 0.00 5.71
Top of girder 3.54 -0.03 3.51 2.17 5.68
L/8 -220.63 0.557 947.78 7.73
Bottom 11.72 -0.48 11.24 -2.57 8.67
Top of girder 1.03 0.10 1.13 3.74 4.87
L/4 -220.63 0.300 1630.18 9.08
Bottom 15.00 -0.63 14.37 -4.43 9.94
Top of girder -1.00 0.19 -0.81 4.70 3.88
3L/8 -220.63 0.125 2046.49 10.86
Bottom 17.69 -0.74 16.95 -5.56 11.39
Top of girder -0.78 0.19 -0.59 5.04 4.45
L/2 -220.63 0.125 2196.71 10.61
Bottom 17.78 -0.74 17.04 -5.97 11.08
Average stress σs at CG of cables for 60 days = (4.62+2x(7.73+9.08+10.86)+10.61)/8 = 8.82 Mpa

-0.78 Mpa 0.19 Mpa 5.04 Mpa 4.45 Mpa


> -2.12
Mpa

+ + =
< 20.00
Mpa
17.78 Mpa -0.74 Mpa -5.97 Mpa 11.08 Mpa Hence O.K.
Resultant Stress at 28 Stress due to loss between 28 Stress due to DL of Slab & Resultant Stress at 60
days to 60 days wt of shuttering days
Stress Diagram at Midspan of Precast Girder at 60 days of Casting of Girder

7.3.4 Sustained stress of composite girder at 90 days


After 30 days casting of Deck Slab i.e.after 90 days casting of Precast Girder, Shuttering to be removed and
Apply of SIDL shall be done.
fck for precast girder at 90 days of Concrete I.e. 100% of fc = 40 Mpa
Ecj = 33.3 Gpa Es = 195 Gpa
m =Modular Ratio = Ec/Ecj = 5.85
Area of each Cable = 1877.20 mm2
Depth of Composite Girder = 2.000 m
Depth of Precast Girder = 1.775 m
Thickness of deck slab = 225 mm

Sectional Properties of Composite Girder at Midspan = Sectional Properties of Composite Girder at Support =
2 2
Area = 1.603 m Area = 2.119 m
4 4
I= 0.692 m I= 0.821 m
CG = 1.352 m CG = 1.247 m
-------------------------------------------------------------------------------------------------------------------------------
143 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Losses:- Shrinkage = 11.19 kN/Cable


Relaxation = 0.00 kN/Cable
Creep = 15.62 kN/Cable
Total = 26.81 kN/Cable
Total Loss = 80.43 kN/Cable
actual time dependent losses = 80.43 kN
Total Stress
Stress due Loss of CG of Cables Stress due Moment due due to Total Stress at
Section
at 60 days Cables from soffit to loss to SIDL SIDL Stress cable CG
(Mpa) (kN) (m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab 0.00 -0.01 -0.35 -0.36
Top of girder 3.44 -0.02 -380.60 -0.24 3.18
End -80.43 0.851 4.75
Bottom 5.71 -0.09 0.58 6.20
Top of slab 0.00 0.01 -0.11 -0.10
Top of girder 5.68 -0.01 -112.32 -0.07 5.60
L/8 -80.43 0.557 7.74
Bottom 8.67 -0.18 0.22 8.71
Top of slab 0.00 0.03 0.11 0.14
Top of girder 4.87 0.00 121.43 0.07 4.94
L/4 -80.43 0.300 8.72
Bottom 9.94 -0.22 -0.24 9.49
Top of slab 0.00 0.04 0.19 0.23
Top of girder 3.88 0.01 205.63 0.13 4.02
3L/8 -80.43 0.125 10.27
Bottom 11.39 -0.24 -0.40 10.74
Top of slab 0.00 0.04 0.14 0.18
Top of girder 4.45 0.01 151.69 0.09 4.55
L/2 -80.43 0.125 10.11
Bottom 11.08 -0.24 -0.30 10.54
Average stress at 90 days = (4.75+2x(7.74+8.72+10.27)+10.11)/8 = 8.54 Mpa
0.00 Mpa 0.04 0.14 Mpa 0.18 Mpa
4.45 0.01 Mpa 0.09 4.55 Mpa
Mpa Mpa

+ + =

11.08 -0.24 Mpa -0.30 Mpa 10.54 Mpa


Resultant Stress at 60 Loss of Cables between 60 to Resultant Stress at 90
Stress due to SIDL
days 90 days days
Stress Diagram at Midspan of Composite Girder at 90 days

7.3.5 Sustained Stress of composite girder at α days :-


Losses:- Shrinkage = 84.56 kN/Cable
Relaxation = 121.33 kN/Cable
Creep = 123.67 kN/Cable
Total = 329.56 kN/Cable
Total Loss = 988.68 kN/Cable
actual time dependent losses = 988.68 kN

-------------------------------------------------------------------------------------------------------------------------------
144 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Total Stress Loss bet. 90 CG of Cables Stress due to Axial Force Moment due Stress due Total Stress Stress at
at 90 days days-α
α days from soffit (m) loss (Mpa) due to to to at α days cable CG
Section (Mpa) (kN) hyperstatic Hyperstatic Hyperstatic without live (Mpa)
action (kN) action (kN-m) action (Mpa) load (Mpa)

Top of slab -0.36 -0.11 -0.87 -1.34


Top of girder 3.18 -0.21 109.10 -894.01 -0.63 2.34
End -988.68 0.851 4.47
Bottom 6.20 -1.06 1.31 6.44
Top of slab -0.10 0.16 -0.89 -0.82
Top of girder 5.60 -0.03 112.08 -890.04 -0.60 4.98
L/8 -988.68 0.557 7.67
Bottom 8.71 -1.50 1.69 8.90
Top of slab 0.14 0.39 -0.88 -0.35
Top of girder 4.94 0.14 114.00 -886.11 -0.60 4.48
L/4 -988.68 0.300 8.47
Bottom 9.49 -1.89 1.68 9.28
Top of slab 0.23 0.55 -0.88 -0.09
Top of girder 4.02 0.25 111.45 -883.00 -0.59 3.67
3L/8 -988.68 0.125 9.80
Bottom 10.74 -2.15 1.67 10.26
Top of slab 0.18 0.55 -0.88 -0.14
Top of girder 4.55 0.25 107.72 -880.27 -0.59 4.21
L/2 -988.68 0.125 9.64
Bottom 10.54 -2.15 1.67 10.05
Average stress at α days = (4.47+2x(7.67+8.47+9.8)+9.64)/8 = 8.25 Mpa
0.18 Mpa 0.55 -0.14 Mpa
4.55 Mpa 0.25 Mpa 4.21 Mpa < 19.2 Mpa
Mpa Hence O.K.

+ =

10.54 Mpa -2.15 Mpa 10.05 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at 90 Loss of Cables inbet. 90 to
Resultant Stress at α days
days α days
Stress Diagram at Midspan of Composite Girder with SIDL without Live Load at α days

7.3.6 Stress of composite girder due to live load

Total Stress
Section Total Stress Stress due Stress due to at α days
without live Total Live Load 0.6 x Wind load to Live Load wind Load with live load
load (Mpa) Moment(kN-m) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -1.34 -0.66 -0.08 -2.08
Top of girder 2.34 -721.24 -86.95 -0.46 -0.06 1.82
End
Bottom 6.44 1.10 0.13 7.67
Top of slab -0.82 -0.36 -0.03 -1.21
Top of girder 4.98 -383.48 -27.15 -0.23 -0.02 4.73
L/8
Bottom 8.90 0.75 0.05 9.70
Top of slab -0.35 0.26 0.03 -0.06
Top of girder 4.48 278.11 33.74 0.17 0.02 4.67
L/4
Bottom 9.28 -0.54 -0.07 8.67
Top of slab -0.09 0.56 0.06 0.53
Top of girder 3.67 592.71 68.78 0.36 0.04 4.08
3L/8
Bottom 10.26 -1.16 -0.13 8.97
Top of slab -0.14 0.95 0.07 0.88
Top of girder 4.21 1012.46 77.98 0.62 0.05 4.88
L/2
Bottom 10.05 -1.98 -0.15 7.92

-------------------------------------------------------------------------------------------------------------------------------
145 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

-0.14 Mpa 0.95 Mpa 0.88 Mpa


4.21 Mpa 0.62 4.88 Mpa < 19.20 Mpa
Mpa Hence O.K.
+ =

10.05 Mpa -1.98 Mpa 7.92 Mpa > -1.41 Mpa


Hence O.K.
Resultant Stress at α days Stress due to Live Load Resultant Stress at α days

Stress Diagram at Midspan of Composite Girder with SIDL & Live Load at α days
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 4.9 Mpa
Permissible Tensile stress in concrete at service = -1.41 Mpa > -2.1 Mpa
Tension reinforcement at top of support are provided
7.3.7 Summary of Stresses for Precast girder only
Sectional Properties of Precast Girder
Precast Girder Midspan Support Composite Girder Midspan Support
Area = 0.928 1.444 m2 Area = 1.603 2.119 m2
I= 0.354 0.412 m4 I= 0.692 0.821 m4
CG = 0.962 0.948 m CG = 1.352 1.247 m
Z Top of slab = 1.067 1.091 3
m
Z Top = 0.436 0.499 m3 Z Top = 1.635 1.556 m3
Zbottom = 0.368 0.435 m3 Zbottom = 0.512 0.658 m3
DL Moment
Moment due to
Stress Prestressing force & Loss
Section earth pr. Diff Prestress CG of cables Loss of pre. Loss of Moment due Stress
(kN-m) (Mpa)
settle, creep, (kN) (m) Girder (kN) comp. girder to (Mpa)
Top of slab snow (kN-m) 0.49 F=109.10 -1.02
Top of girder 0.34 2.42
End -1.63 536.4 7317.28 0.851 -604.24 -1380.27 -894.01
Bottom -0.81 5.97
Top of slab -1.23 F=112.08 -0.74
Top of girder 3.09 0.19
L/8 1699.07 -1314.5 7364.85 0.557 -604.24 -1380.27 -890.04
Bottom -2.05 13.40
Top of slab 0.18 F=114.00 -0.40
Top of girder 6.75 -3.62
L/4 2890.08 191.9 7494.41 0.300 -604.24 -1380.27 -886.11
Bottom -8.23 17.78
Top of slab 0.04 F=111.45 -0.17
Top of girder 8.33 -6.34
3L/8 3617.56 42.4 7614.64 0.125 -604.24 -1380.27 -883.00
Bottom -9.91 20.98
Top of slab -0.19 F=107.72 -0.17
Top of girder 8.78 -6.47
L/2 3881.51 -200.3 7765.85 0.125 -604.24 -1380.27 -880.27
Bottom -10.15 21.49

Section SIDL Live load Wind load - loaded structure Temp (+ve) Temp (-ve)
Moment Stress Moment (kN- Stress Moment Stress Stress Stress
(kN-m) (Mpa) m) (Mpa) (kN-m) (Mpa) (Mpa) (Mpa)
Top of slab -0.64 -0.66 -0.08 4.32 -2.50
Top of girder -0.45 -0.46 -0.06 -1.10 0.90
End -703.05 -721.24 -86.95
Bottom 1.07 1.10 0.13 1.67 -2.39
Top of slab -0.22 -0.36 -0.03 4.32 -2.50
Top of girder -0.15 -0.23 -0.02 -1.10 0.90
L/8 -237.23 -383.48 -27.15
Bottom 0.46 0.75 0.05 1.67 -2.39
Top of slab 0.19 0.26 0.03 4.32 -2.50
Top of girder 0.12 0.17 0.02 -1.10 0.90
L/4 201.72 278.11 33.74
Bottom -0.39 -0.54 -0.07 1.67 -2.39
Top of slab 0.38 0.56 0.06 4.32 -2.50
Top of girder 0.25 0.36 0.04 -1.10 0.90
3L/8 410.27 592.71 68.78
Bottom -0.80 -1.16 -0.13 1.67 -2.39
Top of slab 0.37 0.95 0.07 4.32 -2.50
Top of girder 0.24 0.62 0.05 -1.10 0.90
L/2 399.95 1012.46 77.98
Bottom -0.78 -1.98 -0.15 1.67 -2.39
7.3.8 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)

-------------------------------------------------------------------------------------------------------------------------------
146 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 0.75 0.75 1
Wind load 0.6 0.6 0.6 0.6 1 1
Temp (+ve) 0.6
Temp (-ve)

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 1 1 1 0.75 0.75 0.75 0.75
Wind load
Temp (+ve) 0.6 1 1
Temp (-ve) 0.6 0.6 1 1

b) Stresses of girder at different load casees


Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.20 -1.07 -1.25 -1.12 -1.91 -1.78 -1.78 -1.65 0.73
Top of girder 1.98 2.07 1.94 2.03 1.48 1.57 1.57 1.66 0.85
End
Bottom 5.84 5.63 5.92 5.71 7.02 6.80 6.80 6.58 7.94
Top of slab -2.16 -2.12 -2.18 -2.13 -2.54 -2.49 -2.46 -2.41 0.07
Top of girder 3.10 3.12 3.09 3.11 2.85 2.88 2.90 2.93 2.20
L/8
Bottom 10.57 10.48 10.60 10.51 11.35 11.26 11.18 11.09 12.32
Top of slab 0.04 0.01 0.06 0.03 0.32 0.29 0.27 0.23 2.89
Top of girder 3.64 3.61 3.65 3.62 3.82 3.79 3.78 3.76 3.15
L/4
Bottom 7.30 7.38 7.26 7.34 6.72 6.80 6.83 6.91 7.76
Top of slab 0.35 0.27 0.39 0.31 0.94 0.86 0.83 0.75 3.49
Top of girder 2.92 2.87 2.94 2.89 3.31 3.26 3.23 3.18 2.62
3L/8
Bottom 8.01 8.17 7.93 8.09 6.77 6.93 7.01 7.17 7.86
Top of slab 0.11 0.04 0.16 0.08 1.10 1.03 0.90 0.82 3.65
Top of girder 3.26 3.21 3.29 3.24 3.91 3.86 3.77 3.72 3.22
L/2
Bottom 8.25 8.41 8.16 8.31 6.18 6.34 6.61 6.77 7.27

-------------------------------------------------------------------------------------------------------------------------------
147 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.86 -3.36 -3.23 2.62 2.75 -4.20 -4.07 2.75 -4.20
Top of girder 0.94 2.05 2.14 0.53 0.62 2.53 2.62 2.62 0.53
End
Bottom 7.72 5.50 5.29 8.33 8.12 4.27 4.06 8.33 4.06
Top of slab 0.11 -4.02 -3.98 1.88 1.93 -4.93 -4.89 1.93 -4.93
Top of girder 2.23 3.40 3.43 1.82 1.85 3.82 3.85 3.85 1.82
L/8
Bottom 12.23 9.89 9.79 12.80 12.71 8.74 8.65 12.80 8.65
Top of slab 2.86 -1.19 -1.23 4.56 4.52 -2.26 -2.30 4.56 -2.30
Top of girder 3.12 4.35 4.32 2.66 2.64 4.66 4.64 4.66 2.64
L/4
Bottom 7.84 5.33 5.40 8.56 8.64 4.51 4.59 8.64 4.51
Top of slab 3.41 -0.60 -0.67 5.08 5.00 -1.74 -1.81 5.08 -1.81
Top of girder 2.57 3.82 3.77 2.09 2.04 4.09 4.04 4.09 2.04
3L/8
Bottom 8.02 5.42 5.58 8.81 8.97 4.76 4.92 8.97 4.76
Top of slab 3.58 -0.44 -0.51 5.14 5.06 -1.68 -1.75 5.14 -1.75
Top of girder 3.17 4.42 4.37 2.62 2.57 4.62 4.57 4.62 2.57
L/2
Bottom 7.43 4.84 4.99 8.43 8.59 4.38 4.53 8.59 4.38

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.40 -1.28 -1.45 -1.32 -2.11 -1.98 -1.98 -1.85 0.52
Top of girder 2.46 2.55 2.43 2.52 1.96 2.05 2.06 2.15 1.34
End
Bottom 7.03 6.82 7.11 6.90 8.21 8.00 7.99 7.77 9.13
Top of slab -2.31 -2.26 -2.32 -2.28 -2.68 -2.64 -2.60 -2.56 -0.08
Top of girder 3.13 3.16 3.12 3.15 2.89 2.92 2.94 2.97 2.24
L/8
Bottom 13.25 13.16 13.28 13.19 14.03 13.94 13.86 13.77 15.00
Top of slab -0.04 -0.07 -0.02 -0.05 0.24 0.21 0.19 0.15 2.81
Top of girder 2.91 2.89 2.92 2.90 3.09 3.07 3.06 3.04 2.42
L/4
Bottom 10.86 10.94 10.82 10.90 10.28 10.35 10.38 10.46 11.32
Top of slab 0.31 0.24 0.35 0.27 0.91 0.83 0.79 0.72 3.46
Top of girder 1.65 1.60 1.68 1.63 2.04 1.99 1.96 1.91 1.35
3L/8
Bottom 12.21 12.37 12.13 12.29 10.97 11.13 11.21 11.37 12.05
Top of slab 0.08 0.00 0.12 0.05 1.07 1.00 0.86 0.79 3.62
Top of girder 1.96 1.92 1.99 1.94 2.61 2.56 2.48 2.43 1.92
L/2
Bottom 12.55 12.70 12.46 12.61 10.48 10.63 10.91 11.07 11.57

-------------------------------------------------------------------------------------------------------------------------------
148 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.65 -3.57 -3.44 2.42 2.54 -4.40 -4.27 2.54 -4.40
Top of girder 1.43 2.53 2.62 1.01 1.10 3.01 3.10 3.10 1.01
End
Bottom 8.92 6.70 6.48 9.52 9.31 5.47 5.25 9.52 5.25
Top of slab -0.03 -4.17 -4.12 1.74 1.78 -5.08 -5.03 1.78 -5.08
Top of girder 2.27 3.44 3.47 1.86 1.89 3.86 3.89 3.89 1.86
L/8
Bottom 14.91 12.57 12.47 15.48 15.39 11.42 11.33 15.48 11.33
Top of slab 2.78 -1.28 -1.31 4.48 4.44 -2.34 -2.38 4.48 -2.38
Top of girder 2.40 3.62 3.60 1.94 1.91 3.94 3.91 3.94 1.91
L/4
Bottom 11.39 8.88 8.96 12.12 12.20 8.06 8.14 12.20 8.06
Top of slab 3.38 -0.63 -0.71 5.04 4.97 -1.77 -1.85 5.04 -1.85
Top of girder 1.30 2.55 2.50 0.82 0.77 2.82 2.77 2.82 0.77
3L/8
Bottom 12.21 9.62 9.78 13.01 13.17 8.95 9.11 13.17 8.95
Top of slab 3.54 -0.47 -0.55 5.11 5.03 -1.71 -1.78 5.11 -1.78
Top of girder 1.87 3.12 3.07 1.33 1.28 3.33 3.28 3.33 1.28
L/2
Bottom 11.73 9.13 9.29 12.73 12.89 8.67 8.83 12.89 8.67
Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 15.5 Mpa
Permissible concreteTensile stress at bottom of girder at service = -2.12 Mpa < 4.06 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= -2.12 Mpa < 0.77 Mpa Hence O.K.
except at support

7.3.9 Load Combination for frequent Combination (SL2) - for prestressing member
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
a) Load combination
Load Case 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

Load Case 5 (b) 5 (c) 5 (d) 6 (a) 6 (b) 6 (c) 6 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 0.9 0.9 0.9 0.9 0.9 0.9 0.9
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6

Load Case 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
DL 1 1 1 1 1 1 1 1 1
SIDL 1.2 1 1.2 1 1.2 1 1.2 1 1.2
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.2 0.2 0.75
Wind load 0.6 0.6 0.5 0.5 0.6 0.6
Temp (+ve) 0.5
Temp (-ve)

-------------------------------------------------------------------------------------------------------------------------------
149 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Load Case 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d)


DL 1 1 1 1 1 1 1
SIDL 1 1.2 1 1.2 1 1.2 1
Prestress 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Live load 0.75 0.75 0.75 0.2 0.2 0.2 0.2
Wind load
Temp (+ve) 0.5 0.6 0.6
Temp (-ve) 0.5 0.5 0.6 0.6
b) Stresses of girder at different load casees
Section 1 (a) 1 (b) 2 (a) 2 (b) 3 (a) 3 (b) 4 (a) 4 (b) 5 (a)
Top of slab -1.20 -1.07 -1.25 -1.12 -1.74 -1.61 -1.38 -1.25 0.46
Top of girder 1.98 2.07 1.94 2.03 1.60 1.69 1.85 1.94 1.08
End
Bottom 5.84 5.63 5.92 5.71 6.73 6.52 6.14 5.93 7.50
Top of slab -2.16 -2.12 -2.18 -2.13 -2.44 -2.40 -2.25 -2.20 -0.27
Top of girder 3.10 3.12 3.09 3.11 2.91 2.94 3.04 3.07 2.37
L/8
Bottom 10.57 10.48 10.60 10.51 11.16 11.07 10.75 10.66 11.97
Top of slab 0.04 0.01 0.06 0.03 0.26 0.22 0.12 0.08 2.40
Top of girder 3.64 3.61 3.65 3.62 3.77 3.75 3.68 3.66 3.21
L/4
Bottom 7.30 7.38 7.26 7.34 6.86 6.94 7.15 7.23 7.73
Top of slab 0.35 0.27 0.39 0.31 0.80 0.72 0.50 0.42 2.92
Top of girder 2.92 2.87 2.94 2.89 3.21 3.16 3.02 2.97 2.64
3L/8
Bottom 8.01 8.17 7.93 8.09 7.08 7.24 7.70 7.86 7.98
Top of slab 0.11 0.04 0.16 0.08 0.86 0.79 0.35 0.27 2.98
Top of girder 3.26 3.21 3.29 3.24 3.75 3.70 3.41 3.36 3.17
L/2
Bottom 8.25 8.41 8.16 8.31 6.69 6.85 7.76 7.92 7.60
Section 5 (b) 5 (c ) 5 (d) 6 (a) 6 (b) 6 (c) 6 (c) Max comp.Max Tension
Top of slab 0.59 -2.95 -2.82 1.26 1.39 -2.83 -2.70 1.39 -2.95
Top of girder 1.17 2.08 2.17 1.22 1.31 2.42 2.51 2.51 1.08
End
Bottom 7.28 5.47 5.26 7.06 6.85 4.63 4.41 7.50 4.41
Top of slab -0.23 -3.68 -3.64 0.36 0.40 -3.73 -3.69 0.40 -3.73
Top of girder 2.40 3.37 3.40 2.39 2.42 3.59 3.62 3.62 2.37
L/8
Bottom 11.87 9.94 9.84 11.72 11.63 9.29 9.19 11.97 9.19
Top of slab 2.36 -1.01 -1.05 2.69 2.65 -1.40 -1.44 2.69 -1.44
Top of girder 3.19 4.21 4.19 3.01 2.99 4.21 4.18 4.21 2.99
L/4
Bottom 7.81 5.70 5.78 8.19 8.27 5.76 5.84 8.27 5.70
Top of slab 2.84 -0.49 -0.56 3.05 2.97 -1.04 -1.12 3.05 -1.12
Top of girder 2.59 3.64 3.59 2.33 2.28 3.53 3.48 3.64 2.28
3L/8
Bottom 8.14 5.95 6.11 8.78 8.94 6.35 6.51 8.94 5.95
Top of slab 2.91 -0.43 -0.50 2.89 2.82 -1.20 -1.27 2.98 -1.27
Top of girder 3.12 4.17 4.12 2.72 2.67 3.92 3.87 4.17 2.67
L/2
Bottom 7.76 5.57 5.73 8.85 9.01 6.42 6.58 9.01 5.57

Section 7 (a) 7 (b) 8 (a) 8 (b) 9 (a) 9 (b) 10 (a) 10 (b) 11 (a)
Top of slab -1.40 -1.28 -1.45 -1.32 -1.94 -1.81 -1.58 -1.46 0.26
Top of girder 2.46 2.55 2.43 2.52 2.08 2.17 2.33 2.42 1.56
End
Bottom 7.03 6.82 7.11 6.90 7.92 7.71 7.33 7.12 8.69
Top of slab -2.31 -2.26 -2.32 -2.28 -2.59 -2.55 -2.40 -2.35 -0.42
Top of girder 3.13 3.16 3.12 3.15 2.95 2.98 3.08 3.11 2.41
L/8
Bottom 13.25 13.16 13.28 13.19 13.84 13.74 13.43 13.34 14.65
Top of slab -0.04 -0.07 -0.02 -0.05 0.18 0.14 0.03 0.00 2.32
Top of girder 2.91 2.89 2.92 2.90 3.05 3.02 2.96 2.93 2.49
L/4
Bottom 10.86 10.94 10.82 10.90 10.42 10.50 10.71 10.79 11.28
Top of slab 0.31 0.24 0.35 0.27 0.76 0.68 0.46 0.39 2.89
Top of girder 1.65 1.60 1.68 1.63 1.94 1.89 1.75 1.70 1.37
3L/8
Bottom 12.21 12.37 12.13 12.29 11.27 11.43 11.90 12.06 12.18
Top of slab 0.08 0.00 0.12 0.05 0.83 0.75 0.31 0.24 2.95
Top of girder 1.96 1.92 1.99 1.94 2.45 2.40 2.12 2.07 1.88
L/2
Bottom 12.55 12.70 12.46 12.61 10.99 11.14 12.06 12.22 11.90

-------------------------------------------------------------------------------------------------------------------------------
150 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Section 11 (b) 11 (c) 11 (d) 12 (a) 12 (b) 12 (c) 12 (d) Max comp.Max Tension
Top of slab 0.39 -3.15 -3.02 1.05 1.18 -3.04 -2.91 1.18 -3.15
Top of girder 1.65 2.56 2.65 1.71 1.80 2.90 3.00 3.00 1.56
End
Bottom 8.48 6.66 6.45 8.26 8.04 5.82 5.61 8.69 5.61
Top of slab -0.38 -3.83 -3.78 0.21 0.25 -3.88 -3.84 0.25 -3.88
Top of girder 2.44 3.41 3.44 2.43 2.46 3.63 3.66 3.66 2.41
L/8
Bottom 14.55 12.62 12.52 14.40 14.31 11.97 11.87 14.65 11.87
Top of slab 2.28 -1.09 -1.13 2.61 2.57 -1.48 -1.52 2.61 -1.52
Top of girder 2.46 3.49 3.46 2.29 2.26 3.48 3.46 3.49 2.26
L/4
Bottom 11.36 9.26 9.34 11.75 11.83 9.32 9.40 11.83 9.26
Top of slab 2.81 -0.52 -0.60 3.01 2.94 -1.08 -1.15 3.01 -1.15
Top of girder 1.32 2.37 2.32 1.06 1.01 2.26 2.21 2.37 1.01
3L/8
Bottom 12.34 10.15 10.31 12.98 13.14 10.55 10.71 13.14 10.15
Top of slab 2.87 -0.46 -0.53 2.86 2.78 -1.23 -1.31 2.95 -1.31
Top of girder 1.83 2.88 2.83 1.43 1.38 2.63 2.58 2.88 1.38
L/2
Bottom 12.05 9.87 10.02 13.15 13.31 10.72 10.87 13.31 9.87

Permissible compressive stress in concrete at service = 0.48 x fck = 19.20 Mpa > 14.6 Mpa
Permissible concreteTensile stress at bottom of girder at service = 0.00 Mpa < 4.41 Mpa Hence O.K.
Permissible concrete Tensile stress at top of girder at service= 0.00 Mpa < 1.01 Mpa Hence O.K.
except at support
7.4 Check for ultimate strength of girder in Flexure :-
Grade of concrete = M40 Modulus of elasticity of concrete E = 33346 MPa
Design yield strength fpd = 17.87 MPa Modulus of elasticity of steel = 195.00 Gpa
3000 0.00350 17.87
225 7920 kN
183.34
NA NA
2000 300

125 250 0.0323 7920 kN


Strain Diagram Stress Diagram
750
Top width of girder = 3000 mm Thickness of compression flange = 225 mm
Width of web = 300 mm Distance of prestress CG from bottom = 125 mm
Depth of girder = 2000 mm
Balanced neutral axis depth = 1252 mm Actual neutral axis depth 183.34 mm
Total strain at the prestress CG = 0.03229 The Section is under reinforced
Total ultimate compressive force = 7920 kN Total ultimate tensile force = 7920 kN
Compressive force CG 76.27 mm Moment of resistance = 14247 kNm
> 6365 kNm Hence O.K.
At support Near L/8 Near L/4 Near 3L/8 At L/2
Ultimate moment -686 1290 4761 5723 6365
Horizontal prestress after all losses (kN) 5378 5426 5556 5676 5827
Pre-strain in the cables after all losses 0.00490 0.00494 0.00506 0.00517 0.00531
Distance of prestress CG from bottom (mm) 851 557 300 125 125
Total width of web (mm) 750 300 300 300 300
Assumed neutral axis from top (mm) 183 183 183 183 183
Total strain at the prestress CG 0.0233 0.0290 0.0340 0.0375 0.0376
Average prestress at failure (MPa) 1406 1406 1406 1406 1406
Total compressive force by concrete (kN) 7920 7920 7920 7920 7920
Total tensile force by prestressing steel (kN) 7920 7920 7920 7920 7920
Difference in forces 0 0 0 0 0
Moment of resistance (kNm) 8489 10822 12853 14241 14241
Effective lever arm between forces (m) 1.072 1.366 1.623 1.798 1.798
Factor of Safety associated with failure -12.38 8.39 2.70 2.49 2.24

-------------------------------------------------------------------------------------------------------------------------------
151 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.4.1 Flexural design at support of girder:-


Negative design moment
3000 0.0248
68.5 225 10244 kN

NA NA
2000
238.91
10244 kN
0.00350 17.87
Strain Diagram Stress Diagram
750
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1819 mm
R = Mu/bd2 = 0.665 MPa Negative Design Moment = 6605 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 8513.4 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 7094.1 mm2
Hence provide 25 dia @ 250 c/c Top reinf. Ast = 23561.9 mm2
25 dia @ 250 c/c
25 dia @ 125 c/c
Bottom reinf. 14 Nos. 20 dia (50% of main reinforcement)
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 829.51 mm Actual neutral axis depth = 238.91 mm
Strain in steel = 0.0231 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 10244 kN Total ultimate tensile force = 10244 kN
Compressive force CG 99.39 mm Moment of resistance = 17616 kNm
> 6605 kNm Hence O.K.
Factor of safety = 17,616/6,605 = 2.67

Positive design moment


Positive Design Moment = 686 kN-m
Hence provide 7 Nos. 20 dia Bottom reinf. Ast = 4398.2 mm2
7 Nos. 20 dia
0 Nos. 25 dia
Width of the section = 3000 mm Depth of the section = 2000 mm
Clear Cover = 40 mm Main dia of bar used = 20 mm
Dia of shear reinf. = 16 mm Effective depth, d = 1894 mm
Strain in steel = 0.1393 Actual neutral axis depth = 44.60 mm
Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 1912 kN Total ultimate tensile force = 1912 kN
Compressive force CG 18.55 mm Moment of resistance = 3586 kNm
> 686 kNm Hence O.K.
Factor of safety = 3,586/686 = 5.23

7.4.2 Ductile detailing of PSC Girder:-


As per clause no 6.0 of IS-13920 :1993, ductile detailing of PSC girder (support section) has been done.
i) As per clause no 6.1.1 of IS-13920 :1993, maximum factored axial stress shall be not more than 0.1fck.
Prestressing force after friction & slip at support = 7349.02 kN
Loss = 1938.87 kN
Total force = 5410.15 kN
Factored PSC force = 5410.15 kN
Cross sectional area at support = 2.12 m2
Stress = 2.55 Mpa
< 4.0 kNm Hence O.K.
ii) As per clause no 6.1.2 of IS-13920 :1993, Width to depth ratio shall be more than 0.3
Width of beam at support = 3000 mm
Depth of Beam = 2000 mm
Width to depth ratio = 1.50 Mpa
> 0.3 kNm Hence O.K.
iii) As per clause no 6.1.4 of IS-13920 :1993, Depth shall not be more thal L/4
Span = 28500 mm
Depth of Beam = 2000 mm
< L/4 = 7125.00 mm Hence O.K.
iv) As per clause no 6.2.1(b) of IS-13920 :1993, minimum tension reinforcement shall not be less than 0.24sqrt(fck)/fy
Ast provided Ast = 23562 mm2
Area of girder Ac = 2.12 m2
Tension reinforcement provided Ast/Ac = 0.01112
> 0.24sqrt(fck)/fy= 0.00304 Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
152 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

vi) As per clause no 6.3.2 of IS-13920 :1993, Shear force due to ductile detailing shall be
Vua = Va D+L - 1.4(MuAh+MuBs)/L
D+L
Va = 1.2(D+L)/2 = 1122.87 kN
MuAh = -6604.56 kN
MuBs = -3277.76 kN
L = 26.41 m
Vua = 1647 kN
Maximum design shear at support < 1708 kN

7.5 Design of Shear


Total loss after friction & Slip Loss
Description 1st stage stressing % Loss 2nd stage stressing % Loss
At 5 days
Elastic shortening 55.18 kN 2.0 %
Relaxation 22.45 kN 0.8 %
At 28 days
Elastic shortening 40.51 kN 1.5 % 40.51 kN 1.5 %
Shrinkage 25.42 kN 0.9 %
Relaxation 47.92 kN 1.8 % 22.45 kN 0.8 %
Creep 101.62 kN 3.7 %
At 60 days
Shrinkage 16.02 kN 0.6 % 16.02 kN 0.6 %
Relaxation 12.74 kN 0.5 % 38.22 kN 1.4 %
Creep 36.29 kN 1.3 % 36.29 kN 1.3 %
At 90 days
Shrinkage 11.19 kN 0.4 % 11.19 kN 0.4 %
Relaxation 0.00 kN 0.0 % 0.00 kN 0.0 %
Creep 15.62 kN 0.6 % 15.62 kN 0.6 %
At α days
Shrinkage 84.56 kN 3.1 % 84.56 kN 3.1 %
Relaxation 121.33 kN 4.4 % 121.33 kN 4.4 %
Creep 123.67 kN 4.5 % 123.67 kN 4.5 %
Total 714.51 kN/cable 26.1 % 509.85 kN 18.7 %
Total loss 1938.87 kN
Total long term loss after integration with abutment & deck to be applied in staad for calculation of hyperstatic action
1st stage prestress = 356.37 kN/cable from 90days to α days
2nd stage prestress = 356.37 kN/cable
Total Loss = 1069 kN
CG of cables
At support At dist 1.0m L/8 L/4 3L/8 L/2
CG of cables from bottom 0.900 0.851 0.557 0.300 0.125 0.125
CG of girder from bottom 1.247 1.247 1.352 1.352 1.352 1.352
CG of cable from CG 0.347 0.396 0.795 1.052 1.227 1.227

Vertical Component of Cable Force (kN)


Position Support L/8 L/4 3L/8 L/2
Cable No 0.500 3.433 6.866 10.299 13.732
Cable 1 2436.57 2452.55 2509.26 2544.29 2575.18
Vert. angle 5.07 5.07 5.07 0.00 0.00
Cable 2 2430.40 2446.38 2507.21 2548.35 2586.28
Vert. angle 5.82 5.82 5.82 0.00 0.00
Cable 3 2490.21 2506.07 2524.63 2543.20 2604.39
Vert. angle 6.86 6.86 6.86 6.86 0.00
Total Ver.
Comp. of cable
538.30 543.22 556.62 218.39 0.00

Ultimate Shear at Sections :-


Shear 1708 1363 1018 635 332
Ultimate Load
Moment -686 1290 4761 5723 6365

-------------------------------------------------------------------------------------------------------------------------------
153 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

7.5.1 Section not requiring design shear reinforcement


i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 40 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5378.4 5426.0 5555.5 5675.8 5827.0
Effective width of the web in mm 750 300 300 300 300
Effective Depth of precast Section (d) in mm 924 1218 1475 1650 1650
Effective Depth of composite Section (d) in mm 1149 1443 1700 1875 1875
K 1.417 1.372 1.343 1.327 1.327
Stress due to Prestress (σcp) (Mpa) 3.573 3.573 3.573 3.573 3.573
Shear Resistance minimum (VRd,cmin) (kN) 746.8 368.6 428.9 470.0 470.0
Reinforcement ratio considering Tendons, ρ1 0.007 0.013 0.011 0.010 0.010
Shear resistance ( VRd,c) (kN) 861.5 476.1 539.8 582.6 582.6
Design Shear resistance ( VRd,c) (kN) 746.8 368.6 428.9 470.0 470.0

ii) Shear Capacity of Uncracked Section as per clause 10.3.2(2) of IRC 112-2010
The shear resistance of the beam section uncracked in flexure is given below:-
VRd,c = ( I * bwc )/ S x √ (fctd2 + k1 σcp fctd)
Where, I = Moment of inertia bwc= Width of beam after deduction due to duct
S = First moment of area between cetroidal axis and extreme compression fibre about the centrodial axis.
fctd = design tensile strength of concrete = fctk/γm = 1.41 Mpa
Description Support L/8 L/4 3L/8 L/2
Prestress Force after all losses (kN) 5378.4 5426.0 5555.5 5675.8 5827.0
Effective width of the Web 750 300 300 300 300
Effective Depth of the Section (d) 1149 1443 1700 1875 1875
Stress due to Prestress (σcp) 3.573 3.573 3.573 3.573 3.573
Design tensile strength of the Concrete (fctd) 1.41 1.41 1.41 1.41 1.41
First moment of inertia about the CG (S) 2.45E+09 1.75E+09 1.75E+09 1.75E+09 1.75E+09
Transmission length factor, k1 1.00 1.00 1.00 1.00 1.00
Moment of Inertia (I) (mm4) 8.2E+11 6.9E+11 6.9E+11 6.9E+11 6.9E+11
Design Shear resistance ( VRd,c) (kN) 666.7 315.7 315.7 315.7 315.7

iii) Summary of the Shear resistance of the Beam when shear reinforcement isn't required :
The maximum shear capacity of the Beam as cl.10.3.2 (5) of IRC 112-2010
VEd ≤ 0.50 bw d ν fcd where, ν = 0.60 [ 1 - fck/310]
Description Support L/8 L/4 3L/8 L/2
Distance from bearing in m 0.00 3.43 6.87 10.30 13.73
Distance modification factor β for Precast Beam 1.00 1.00 1.00 1.00 1.00
Distance modification factor β for Composite 0.25 1.00 1.00 1.00 1.00
Effective Shear for Precast Beam 1707.9 1362.6 1018.1 635.1 332.5
Effective Shear for Composite Section (kN) 0.0 0.0 0.0 0.0 0.0
Effective Shear due to prestressing force (kN) 538.3 543.2 556.6 218.4 0.0
Total Shear force for the Beam (kN) 1169.6 819.4 461.4 416.7 332.5
Precast member Area (m2) 1.44 0.93 0.93 0.93 0.93
Zb (m3) 0.44 0.37 0.37 0.37 0.37
Composite member Area (m2) 2.12 1.60 1.60 1.60 1.60
Zb (m3) 0.66 0.51 0.51 0.51 0.51
Stress due to prestress at tensile fibre σ bpt (MPa) 3.5516 1.0553 -3.2319 -6.2716 -6.3999
Section at Maximum Bending Moment Uncracked Uncracked Cracked Cracked Cracked
Shear capacity of Beam Section (kN) 666.69 315.69 428.93 470.00 470.01
Maximum shear capacity of the Section (kN) 4022 2021 2381 2626 2626
Not Not
Whether shear reinforcement required or not Required Required Required
Required Required

-------------------------------------------------------------------------------------------------------------------------------
154 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

iv) Calculation of Shear Resistance when Shear Reinforcement is Required ::


The design for the Vertical stirrups for resisting shear is calculated in the table below as per Cl. No. 10.3.3.2 of IRC:112-2011.
The shear resistance with vertical stirrups is given by,
VRd,s = Asw / s. z. fywd cot θ by Crushing of Compression strut
VRd,max = acw bw z v1 fcd / (cot θ + tan θ) by yielding of the Vertical reinforcement
Grade of reinforcement = Fe 500 Grade of concrete = M40
Design Tensile stress in stirrups (fywd= 0.8fyk/γm) = 347.8 Mpa Concrete Strength (fcd) : = 17.9 Mpa
Minimum Shear reinf. ratio = 0.072sqrt(fck)/fyk = 0.00091 Coeff accounting stress in compression chord ν1
o
Design of Vertical Transverse reinforcement (α = 90 ) = 0.60

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam (kN) 1169.6 819.4 461.4 416.7 332.5
Lever arm taken from flexural analysis z (m) 1.07 1.37 1.62 1.80 1.80
Angle of compression strut θ (degrees) 28.42 37.01 23.82 23.82 23.82
Dia of shear reinforcement provided (mm) 12+16 16 12 12 12
Number of legs provided 2 2 2 2 2
Spacing of stirrups provided (mm) 100 100 125 125 125
Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 0.68 0.27 0.27 0.27 0.27
Area of shear reinf provided Asw/s (mm2/mm) 6.283 4.021 1.810 1.810 1.810
Check O.K. O.K. O.K. O.K. O.K.
Shear resistance provided by reinf V RD,s (kN) 4328 2535 2314 2563 2564
Coeff accounting stress in comp chord αcw 1.200 1.200 1.200 1.200 1.200
Shear capacity of compression strut V RD,max (kN) 4328 2535 2314 2563 2564
Difference in shear resistance (kN) 0.00 0.00 0.00 0.00 0.00
Shear capacity of the Section (kN) 4328.32 2534.73 2313.72 2563.49 2563.56
Factor of Safety associated with failure 3.70 3.09 5.01 6.15 7.71
Increase in longitudinal tensile force ∆Ftd (kN) 1080.59 543.37 522.65 471.98 376.59
Total longitudinal tensile force (kN) 440.60 1487.43 3456.61 3654.85 3916.86
Permissible longitudinal tensile force (kN) 7920.44 7920.44 7920.44 7920.44 7920.44
Check Hence O.K. Hence O.K. Hence O.K. Hence O.K. Hence O.K.

7.6. Anchor Block


Check Bearing pressure
According to Manufacture's Catalog Size of anchor flange = 225 mm Dia of Hole = 85 mm
fb = 0.48xfcjxSQRT(A2/A1) or 0.8xfcj Whichever is smaller
2
fcj = = 25.53 N/mm
2
A2 = 90529.0284042651^2- 3.14/4x85^2
= 8.2E+09 mm
2
A1 = 225x225- 3.14/4x85^2 = 44950.5 mm
2
fb = min (0.48fcjsqrt(A2/A1),0.8fcj) 20.43 N/mm
Now, Maximum Cable Force after immediate Losses = 2432.32 T
As per Manufacture's recommendation = 35% of above force to be taken by End Bearing
= 65% of above force to be taken by Anchorage
Cone and Concrete by friction
2 2
Bearing stress = N/A1 = 18.94 N/mm < 20.43 N/mm Hence O.K.
Busting reinforcement in end block
2Yo = 250 mm 2Ypo = 225 mm
Ypo/Yo = 0.90 As per Table 13.1 of IRC 112-2011 Fbst/Pk = 0.120
Fbst = 0.12x1.3x2432.32 = 379.44 kN
2
Area of Steel Required = Fbst/(0.87xfy) = 1003.12 mm
2
Hence Provide 12T- 4L -4Nos along Web and Normal to Web Ast = 1809.56 mm

7.7. Interface Shear Design for Composite section


The shear stress that arises between the interfaces of concrete placed at different times is reffered to as interface
shear. The interface shear is resisted by friction at the interface and by reinforcement placed across the shear plane.
The interface shear stress, Vedi <= the resisting capacity at the section, VRdi
Vedi = β Ved/zbi
Where, β = The ratio of longitudinal force in the new concrete and total longitudinal force
Ved = The tranverse shear force
z = Lever arm
bi = the width of interface
VRdi = µσn + ρfyd[µsinα+cosα] <=0.5vfcd fck = M40
µ = friction for rough surface = 0.7 fyd = 500 Mpa
σn = the minimum co existing normal stress < 0.6fcd = 0.00 Mpa
ρ = As/Aj where As is the area of reinforcement, Aj is the interface area of the joint
ν1 = Coeff accounting stress in compression chord = 0.60
-------------------------------------------------------------------------------------------------------------------------------
155 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

α = the angle of the reinforcement to the interface = 90.00 degree


fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5 = 17.87 Mpa

Description Support L/8 L/4 3L/8 L/2


Shear demand of Beam,VEd (kN) 1169.55 819.36 461.44 416.71 332.49
Ratio of Longitudinal forces (β) 0.99 0.99 0.99 0.99 0.99
Lever arm taken from flexural analysis z (m) 1.072 1.366 1.623 1.798 1.798
Interface Width bi ( mm) 1250 1250 1250 1250 1250
Design value of Shear Stress vEdi ( MPa) 0.87 0.48 0.23 0.18 0.15
Roughness Co-efficient, µ 0.70 0.70 0.70 0.70 0.70
Stress caused by minimum external normal force 0.0 0.0 0.0 0.0 0.0
Dia of shear reinforcement provided (mm) 10 10 10 10 10
Number of legs provided 4 4 4 4 4
Spacing of stirrups provided (mm) 125 125 125 125 125
Minimum reinf.=0.15% of area of interface 1875 1875 1875 1875 1875
Area of Reinforcement at interface, As (mm2/m) 2513.27 2513.27 2513.27 2513.27 2513.27
Area of the joint, Ai (mm2) 281250 281250 281250 281250 281250
Strength reduction factor (ν) 0.60 0.60 0.60 0.60 0.60
Design shear resistance at the Interface (vRdi) 3.13 3.13 3.13 3.13 3.13
Status with respect to the Interface Shear Ok Ok Ok Ok Ok

7.8. Untensioned Reinforcement of Precast Girder


Vertical reiforcement = 0.18 % of web
=0.18%x300x1775 = 958.5 mm2 per meter
Hence provide 2L-12T @ 125 c/c Ast provide= 1808 mm2 per meter

Longitudinal reinforcement = 0.15 % of web


Total Area of Precast Girder at midspan = 0.9275 m2
=0.15%x0.93x1000000 = 1391.25 mm2 per meter
Hence provide 7-12T at Bottomt top & 8-12T at Top Ast provide= 1695 mm2 per meter
Side Face Reinforcement
Side Face Reinforcement = 0.1 % of web Area
2
Area of steel required = 532.5 mm
2
Minimum Reinf. at earth face (0.12%) = 648 mm
Hence Provide 8 Nos. 12 φ on Each Face
2 2
Ast provided = 1809.56 mm /m > 648 mm /m Hence O.K.
Bottom reinforcement of girder at support
Total Area of Precast Girder at midspan = 2.119 m2
=0.15%x2.12x1000000 = 3179.11 mm2 per meter
Hence provide 14 Nos. 20 dia Ast = 4398.2 mm2

7.9 Calculation for Deflection of Longitudinal girders


(i) Precast Girder - Prestress of cables 1, 2, 3 + wt of precast Girder at 5 days
Young Modulus = 3.01E+07 kN/m2
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.433 6.866 10.299 13.732
CG of Precast girder from bottom , m 0.948 0.962 0.962 0.962 0.962
Moment of Inertia for Precast 0.412 0.354 0.354 0.354 0.354
CG of cables 1 to 3 from bot.(m) 0.602 0.337 0.163 0.125 0.125
Moment due to stressing after -1639.39 -2979.35 -3899.86 -4167.99 -4228.48
Moment due to Wt of Precast -1.13 1016.52 1714.73 2139.66 2291.31
Total moment due to prestress+wt
of precast Girder (kN-m) -1640.5 -1962.8 -2185.1 -2028.3 -1937.2
M/EI (1/m) -0.00013 -0.00018 -0.00020 -0.00019 -0.00018

-------------------------------------------------------------------------------------------------------------------------------
156 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

3.43 3.433 3.433 3.433


A B C D E
-0.00018 2 -0.00019
-0.000132 4 3 -0.000205 -0.000182
1

M/EI Diagram for Ist Stage Prestress after losses at 5 days


At Midspan
Section Marked Distance CG from A M/EI Average M/EI Moment of M/EI about A

A -0.00013
B 4 3.433 1.717 -0.00018 -0.00016 -0.000931814
C 3 3.433 5.150 -0.00020 -0.00019 -0.003439088
D 2 3.433 8.583 -0.00019 -0.00020 -0.005822337
E 1 3.433 12.016 -0.00018 -0.00019 -0.007671573
Total -0.017864812
So, Midspan deflection due to Prestress + wt of precast Girder = = -18 mm
= - L/ 1537

(ii) Precast Girder - Prestress of cables 4,5 + loss of Cables 1 to 3 at 28 days


Young Modulus = 3.33E+07 Mpa
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.433 6.866 10.299 13.732
CG of cables 3 from bot.(m) 1.340 0.987 0.574 0.125 0.125
Moment due to stressing after 943.86 60.45 -948.13 -2061.08 -2127.54
Moment due to loss of prestress (kN- 149.21 269.36 344.55 360.71 360.75
Total moment due to prestress+wt 1093.1 329.8 -603.6 -1700.4 -1766.8
M/EI (1/m) 0.0000795 0.0000279 -0.0000511 -0.0001440 -0.00015

3.4 3.433 3.433 3.433


A B C D E
2
0.0000279 -0.0001440
0.0000795 4 3 -0.000051 -0.0001496
1

M/EI Diagram for Ist Stage Prestress after losses at 28 days


At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A
M/EI
A 0.0000795
B 4 3.433 1.717 0.0000279 0.0000537 0.000316427
C 3 3.433 5.150 -0.000051 -0.0000116 -0.000204866
D 2 3.433 8.583 -0.000144 -0.0000975 -0.002873562
E 1 3.433 12.016 -0.000150 -0.0001468 -0.006054117
Total -0.008816119
So, Midspan deflection due to Prestress +loss = = -8.816 mm
So, Total Midspan deflection at 28 days = = -26.681 mm = - L/ 1029

(iii) Precast Girder - Prestress + wt of precast Girder +wt of deck slab at 60 days
Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.433 6.866 10.299 13.732
CG of all cables from bot.(m) 0.851 0.557 0.300 0.125 0.125
Loss 220.630 220.630 220.630 220.630 220.630
Moment due to prestressing losses 21.380 89.462 146.038 184.688 184.699
Moment due to Wt of Deck Slab -0.504 682.547 1175.350 1477.902 1590.206
Total moment due to prestress+DL 20.876 772.009 1321.388 1662.590 1774.904
M/EI (1/m) 0.0000015 0.0000654 0.0001119 0.0001408 0.00015
3.4 3.433 3.433 3.433
A B C D E
0.000002 0.0000654 0.0001408
4 0.0001119
0.0001503
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at 60 days
At Midspan
Average
Section Marked Distance CG from A M/EI Moment of M/EI about A Rotation
M/EI
A 0.0000015
B 4 3.433 1.717 0.0000654 0.0000334 0.000197048 0.00135
C 3 3.433 5.150 0.0001119 0.0000886 0.001566579
D 2 3.433 8.583 0.0001408 0.0001263 0.003721733
E 1 3.433 12.016 0.0001503 0.0001455 0.006002326
Total 0.011487686

-------------------------------------------------------------------------------------------------------------------------------
157 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

So, Midspan deflection due to Prestress losses + DL = = 11.488 mm


Total Deflection at 60 days =-26.681+11.488 = -15.193 mm

(iv) Composite Girder - long term losses + SIDL+ Live load


Section At support Near L/8 At L/4 At 3L/8 At L/2
Distance 0.000 3.433 6.866 10.299 13.732
CG of Composite girder from bottom , m 1.247 1.352 1.352 1.352 1.352
CG of cables from bot.(m) 0.851 0.557 0.300 0.125 0.125
Moment of Inertia for Composite 0.821 0.692 0.692 0.692 0.692
Loss 1069.112 1069.112 1069.112 1069.112 1069.11
Moment due to prestressing losses 423.457 850.220 1124.376 1311.660 1311.7
Total moment due to prestress 423.457 850.220 1124.376 1311.660 1311.7
M/EI (1/m) 0.0000155 0.0000369 0.0000488 0.0000569 0.00006
3.433 3.433 3.433 3.433
A B C D E
0.00002 0.0000369 0.0000569
4 0.0000488 0.0000569
3 1
2
M/EI Diagram for Ist Stage Prestress after losses at α days
At Midspan
Average Moment of M/EI about
Section Marked Distance CG from A M/EI Rotation
M/EI A
A 0.0000155
B 4 3.433 1.717 0.0000369
0.0000262 0.000154183 0.00061
C 3 3.433 5.150 0.0000488
0.0000428 0.000756821
D 2 3.433 8.583 0.0000569
0.0000528 0.001556135
E 1 3.433 12.016 0.0000569
0.0000569 0.002346127
Total 0.004813267
So, Midspan deflection due to Prestress losses = = 4.813 mm
So, Midspan deflection due SIDL = = 1.285 mm 0.00000
So, Midspan deflection due Footpath Live load = = 0.000 mm 0.00000
So, Midspan deflection due Wind load = = 0.354 mm 0.00000
So, Midspan deflection due to earth pr. = = -1.754 mm
So, Midspan deflection due to Live load surcharge = = -0.076 mm
So, Midspan deflection due to Live load surcharge = = 1.229 mm
So, Midspan deflection due Live load snow load braking = = 2.265 mm 0.00000
Total Deflection at mid span 1xDL+1.2xSIDL+1xLL+0.6xWL = -6.962 mm L/ -3945

12 1 SPECTRUM IN X6.131
DIRECTION 0.173 0.037 6.134 0 0 0
2 SPECTRUM IN Z0.136
DIRECTION 0.94 1.12 1.468 0 0 0
3 SPECTRUM IN Y0.016
DIRECTION 0.257 0.089 0.272 0 0 0
4 DEAD LOAD 0.167 -4.482 0.02 4.486 0 0 0
5 SIDL (DL) 0.021 -0.797 0.002 0.797 0 0 0
6 SIDL(WC) 0.023 -0.488 0.004 0.489 0 0 0
7 REMOVAL OF SHUTTER
-0.025 0.659 -0.004 0.66 0 0 0
8 EARTH PR ON ABUTMENT
-0.249 1.754 0.199 1.783 0 0 0
9 LIVE LOAD SURCHARGE
1.169 0.076 0.015 1.171 0 0 0
10 DYNAMIC INCREMENT
-0.159 OF EARTH
1.107 PR. 0.126 1.125 0 0 0
11 DYNAMIC INCREMENT
0.738 OF LL0.048
SURCGARGE 0.01 0.74 0 0 0
12 UNLADEN WIND 0.139
LOAD -0.68 -0.111 0.702 0 0 0
13 LADEN WIND LOAD
0.115 -0.354 -0.102 0.386 0 0 0
14 DIFFERNTIAL SETTLEMENT
-2.21 -6.248 -0.002 6.628 0 0 0
15 TEMPERATURE0.597
RISE 2.626 -0.497 2.739 0 0 0
16 TEMPERATURE -0.274
FALL -1.229 0.233 1.281 0 0 0
17 CREEP SHRINKAGE
-0.212 DIFF SHRINKAGE
-0.67 0.236 0.742 0 0 0
18 FOOTPATH LIVE0.005
LOAD -0.406 -0.002 0.406 0 0 0
19 SNOW LOAD FOR 0.03
70R LL TRACK
-0.764 0.005 0.765 0 0 0
20 SNOW LOAD FOR0.015
LL 70R WHEEL
-0.382 0.002 0.382 0 0 0
21 BRAKING 0.437 -0.009 0 0.437 0 0 0
504 COMBINATION0.078
LOAD CASE-1.082
504 0.015 1.085 0 0 0

12 326 0.009 -1.874 0.005 1.874 0 0 0

-------------------------------------------------------------------------------------------------------------------------------
158 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of Central Cross Girder

-------------------------------------------------------------------------------------------------------------------------------
159 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

8.0 Central Cross girder


Span = 3m
Width of beam = 300 mm Depth of beam = 1750 mm
8.1 Load calculation
8.1.1 Staad output
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
88 1 SPECTRUM IN X DIRECTION
19 0.347 7.53 42.79 0.59 61.377 68.463
26 -0.347 -7.53 -42.79 -0.59 -67 -88.799
2 SPECTRUM IN Z DIRECTION
19 3.409 14.113 23.998 0.635 36.233 94.004
26 -3.409 -14.113 -23.998 -0.635 -35.764 -134.59
3 SPECTRUM IN Y DIRECTION
19 0.336 9.834 1.625 0.098 2.466 24.911
26 -0.336 -9.834 -1.625 -0.098 -2.436 -29.71
4 DEAD LOAD 19 -0.306 -2.496 -0.838 0.026 1.228 92.869
26 0.306 2.496 0.838 -0.026 1.286 -100.358
5 SIDL (DL) 19 0.669 -22.795 -0.255 -0.008 0.378 235.581
26 -0.669 22.795 0.255 0.008 0.388 -303.967
6 SIDL(WC) 19 -0.175 -3.86 -0.067 0.005 0.101 -30.676
26 0.175 3.86 0.067 -0.005 0.101 19.096
7 REMOVAL OF SHUTTER
19 0.083 -0.195 0.148 -0.001 -0.224 -0.231
26 -0.083 0.195 -0.148 0.001 -0.221 -0.353
9 AT K* EP ON ABUTMENT
19 3.983 0.507 4.3 0.125 -6.26 -1.684
26 -3.983 -0.507 -4.3 -0.125 -6.639 3.204
10 LIVE LOAD SURCHARGE
19 0.084
AT REST 0.235 -31.98 -0.245 49.102 1.538
26 -0.084 -0.235 31.98 0.245 46.84 -0.834
11 DYNAMIC INCREMENT
19 OF
0.921
EARTH PR.
0.115 1.049 0.03 -1.528 -0.385
26 -0.921 -0.115 -1.049 -0.03 -1.619 0.728
12 DYNAMIC INCREMENT
19 OF
0.031
LL SURCGARGE
0.088 -11.955 -0.092 18.356 0.576
26 -0.031 -0.088 11.955 0.092 17.507 -0.314
13 UNLADEN WIND19 LOAD 16.524 -0.619 -1.387 -0.015 2.215 5.505
26 -16.524 0.619 1.387 0.015 1.945 -7.362
14 LADEN WIND LOAD
19 14.878 -0.305 -1.201 -0.015 1.923 2.898
26 -14.878 0.305 1.201 0.015 1.679 -3.812
15 DIFFERNTIAL SETTLEMENT
19 -0.01 -0.014 16.123 1.743 -24.955 -0.321
26 0.01 0.014 -16.123 -1.743 -23.414 0.279
16 TEMPERATURE 19RISE 27.81 -0.12 16.165 -0.04 -27.422 11.812
26 -27.81 0.12 -16.165 0.04 -21.073 -12.171
17 TEMPERATURE 19FALL -12.469 0.041 -7.401 0.018 12.568 -5.618
26 12.469 -0.041 7.401 -0.018 9.637 5.741
18 CREEP SHRINKAGE
19 DIFF 0.073
SHRINKAGE
-0.193 -3.226 0.017 5.828 -3.509
26 -0.073 0.193 3.226 -0.017 3.851 2.931
19 FOOTPATH LIVE19LOAD 0.187 5.56 -0.872 -0.01 1.38 56.789
26 -0.187 -5.56 0.872 0.01 1.234 -40.108
20 SNOW LOAD FOR 19 70R LL
-0.086
TRACK -0.203 -0.163 0.002 0.246 6.447
26 0.086 0.203 0.163 -0.002 0.243 -7.056
21 SNOW LOAD FOR 19 LL 70R
-0.043
WHEEL -0.106 -0.081 0.001 0.123 3.266
26 0.043 0.106 0.081 -0.001 0.122 -3.585
22 BRAKING 19 -0.012 -0.001 -2.074 -0.03 3.361 -0.03
26 0.012 0.001 2.074 0.03 2.86 0.027
604 COMBINATION19 LOAD CASE
2.048 504 1.9 0.93 0.005 -1.511 -0.999
26 -2.048 -1.9 -0.93 -0.005 -1.279 6.698

88 19 +ve 0.001 131.399 7.558 8.424 8.998 334.302


185 LOAD GENERATION,
269 LOAD GENERATION,
201LOAD
LOAD#185,
231
GENERATION,
LOAD
LOAD
(2 of 26)
#269,
GENERATION,
139 LOAD
LOAD
(34 ofGENERATION,
209
#201,
56) LOAD
(18 of
#231,
GENERATION,
26)LOAD
(22 of#139,
26) LOAD
(8 of #209,
26) (2
-ve -1.083 -102.401 -5.289 -6.538 -12.023 -686.633
312 LOAD GENERATION,
326 LOAD GENERATION,
234LOAD
LOAD#312,
93
GENERATION,
LOAD
LOAD
(21 of
GENERATION,
#326,
201
26) LOAD
LOAD
(9 of 26)
GENERATION,
324
#234,
LOAD
LOAD
(25#93,
of
GENERATION,
26)
(18
LOAD
of 56)
#201,LOAD
(18 of#324,
26) (7
88 26 +ve 0.001 131.399 7.558 8.424 10.652 330.384
185 LOAD GENERATION,
269 LOAD GENERATION,
201LOAD
LOAD#185,
231
GENERATION,
LOAD
LOAD
(2 of 26)
#269,
GENERATION,
201 LOAD
LOAD
(34 ofGENERATION,
209
#201,
56) LOAD
(18 of
#231,
GENERATION,
26)LOAD
(22 of#201,
26) LOAD
(18 of#209,
26) (2
-ve -1.083 -102.401 -5.289 -6.538 -8.318 -572.901
312 LOAD GENERATION,
326 LOAD GENERATION,
234LOAD
LOAD#312,
93
GENERATION,
LOAD
LOAD
(21 of
GENERATION,
#326,
234
26) LOAD
LOAD
(9 of 26)
GENERATION,
269
#234,
LOAD
LOAD
(25#93,
of
GENERATION,
26)
(18
LOAD
of 56)
#234,LOAD
(25 of#269,
26) (3

-------------------------------------------------------------------------------------------------------------------------------
160 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

8.1.2 Summary of Bending Moment & Shear Force for outer girder
a) Bending Moment (kNm) Moment Shear
Staad Node no 19 26 19 26
Dead load = 92.9 -100.4 -2.5 2.5
SIDL (DL) from staad output 235.6 -304.0 -22.8 22.8
SIDL (WC) from staad output -30.7 19.1 -3.9 3.9
Removal of shutter -0.2 -0.4 -0.2 0.2
Earth pressure -1.7 3.2 0.5 -0.5
Live load surcharge 0.0 0.0 0.2 -0.2
Wind load (unloaded structure) 5.5 -7.4 -0.6 0.6
Wind load (loaded structure) 2.9 -3.8 -0.3 0.3
Differential settlement -0.3 0.3 0.0 0.0
Temperature rise 11.8 -12.2 -0.1 0.1
Temperature fall -5.6 5.7 0.0 0.0
Creep & shrinkage -3.5 2.9 -0.2 0.2
Footpath live load 56.8 -40.1 5.6 -5.6
Snow load 3.3 -3.6 -0.1 0.1
Braking load 0.0 0.0 0.0 0.0
Live Load 334.3 -686.6 131.4 -102.4
Seismic in X- direction 68.5 -88.8 7.5 -7.5
Seismic in Y- direction 94.0 -134.6 14.1 -14.1
Seismic in Z- direction 24.9 -29.7 9.8 -9.8
Dynamic increment of Earth pr. -0.4 0.7 0.1 -0.1
Dynamic increment of LL Surcharge 0.6 -0.3 0.1 -0.1

Hyperstatic action At support Near L/8


Axial compresion 2.048 -2.048
Moment -1.0 6.7

8.1.3 Load Combination - Ultimate limit state


1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+construction Live load(leading) + wind load(accompany)

Load DL, Support settle, snow


Transverse Vertical
load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load Wind load Temp load Long. Seismic
Case prestress loss Seismic Seismic

1 1.35 1.35 1.75 1.35 1.5


2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
3 (a) 1.35 1.35 1.75 1.35 1.5 0.9
3 (b) 1 1 1 1 1.5 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5
4 (b) 1 1 1 1 1.15 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9
5 (b) 1 1 1 1 1.5 0.9
6 (a) 1.35 1.35 1.75 1.35 1.15 1.5
6 (b) 1 1 1 1 1.15 1.5
7 (a) 1.35 1.35 1.75 1 0.2 1.5 0.45 0.45
7 (b) 1.35 1.35 1.75 1 0.2 0.45 0.45 1.5
7 (c) 1.35 1.35 1.75 1 0.2 0.45 1.5 0.45
7 (d) 1 1 1 1 0.2 1.5 0.45 0.45
7 (e) 1 1 1 1 0.2 0.45 0.45 1.5
7 (f) 1 1 1 1 0.2 0.45 1.5 0.45

-------------------------------------------------------------------------------------------------------------------------------
161 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Moment Shear
1 972.0 -1590.1 164.4 -120.9
2 (a) 393.7 -511.0 -42.0 42.0
2 (b) 302.7 -386.9 -30.2 30.2
3 (a) 976.9 -1596.7 163.8 -120.3
3 (b) 886.0 -1472.5 175.6 -132.1
4 (a) 843.4 -1346.8 115.5 -82.2
4 (b) 752.4 -1222.6 127.3 -93.9
5 (a) 982.6 -1601.0 164.3 -120.8
5 (b) 891.7 -1476.8 176.0 -132.5
6 (a) 852.8 -1354.0 116.3 -82.9
6 (b) 761.9 -1229.8 128.0 -94.7
7 (a) 620.4 -853.6 8.2 -2.4
7 (b) 574.7 -791.6 10.7 -4.9 (+)ve
7 (c) 647.2 -901.7 15.2 -9.4 value of
7 (d) 528.9 -728.3 20.2 -14.4 seismic
7 (e) 483.1 -666.3 22.6 -16.8 force
7 (f) 555.7 -776.4 27.1 -21.3
7 (a) 308.0 -439.3 -35.9 41.7
7 (b) 353.7 -501.4 -38.3 44.1 (-)ve
7 (c) 281.2 -391.2 -42.8 48.6 value of
7 (d) 216.4 -314.0 -24.0 29.8 seismic
7 (e) 262.2 -376.1 -26.4 32.2 force
7 (f) 189.6 -266.0 -30.9 36.7
Maximum 982.6 -266.0 176.0 48.6
Minimum 189.6 -1601.0 -42.8 -132.5

4.1.7 Load Combination for Servicibility limit state


Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
DL, Support settle, snow
Load Case load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load Wind load Temperature
prestress loss

1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1
2 (b) 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.6
3 (b) 1 1 1 1 1 0.6
4 (a) 1 1 1.2 1 0.75 1
4 (b) 1 1 1 1 0.75 1
5 (a) 1 1 1.2 1 1 0.6
5 (b) 1 1 1 1 1 0.6
6 (a) 1 1 1.2 1 0.75 1
6 (b) 1 1 1 1 0.75 1
Quasi-permanent (SL3)
1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5

-------------------------------------------------------------------------------------------------------------------------------
162 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Summary of Bending Moment & Shear Force of Cross girders


Rare Combination (SL1)
1(a) 288.8 -372.8
1(b) 294.9 -376.6
2 (a) 294.3 -380.2
2 (b) 300.4 -384.0
3 (a) 683.2 -1103.9
3 (b) 689.3 -1107.7
4 (a) 587.6 -925.2
4 (b) 593.7 -929.0
5 (a) 687.0 -1106.8
5 (b) 693.1 -1110.6
6 (a) 593.9 -930.0
6 (b) 600.0 -933.8
Maximum 693.1 -372.8
Minimum 288.8 -1110.6
Quasi-permanent (SL3)
1 342.1 -437.4
2 (a) 348.0 -443.5
2 (b) 300.8 -382.7
Maximum 348.0 -382.7
Minimum 300.8 -443.5

8.2 Check for ultimate strength of girder in Flexure :-


Consider rectangular beam for design of end cross girder.
0.00350 17.87
225 1281 kN
298.63
NA NA
1750

99.5 0.0158 1281 kN


Strain Diagram Stress Diagram
300
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 300 mm Depth of the section = 1750 mm
Clear Cover = 50 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 12 mm Effective depth, d = 1651 mm
R = Mu/bd2 = 1.959 MPa Design Moment = 1601 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 2372.1 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 643.7 mm2
Hence provide 3 Nos. 25 dia Ast = 2945.2 mm2
3 Nos. 25 dia > Hence O.K.
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 752.67 mm Actual neutral axis depth = 298.63 mm
Strain in steel = 0.0158 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 1281 kN Total ultimate tensile force = 1281 kN
Compressive force CG 124.23 mm Moment of resistance = 1954 kNm
> 1601 kNm Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
163 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Inner Cross girder


Description At support Span
Moment 982.62 1601.02
Width 300.00 300.00
Depth 1651 1651
R = Mu/bd2 1.20 1.96
pt 0.00287 0.00479
Ast required for bending 1419.6 2372.1
Ast required for shear 316.8 238.5
Ast required 1736.3 2610.6
3 Nos. 3 Nos.
1st layers
25 dia + 25 dia +
Reinf provided
3 Nos. 3 Nos.
2nd layers
25 dia 25 dia
Ast provided 2945.2 2945.2
Actual NA 299 299
Strain in steel 0.0158 0.0158
Stress in steel 434.8 434.8
Total ultimate tensile force = 1281 1281
Total ultimate compressive force 1281 1281
Difference of force 0 0
Compressive force CG 124.2 124.2
Moment of resistance 1954 1954
Factor of Safety 2.0 1.2
Shear design
VED= Design Shear Force of the concrete section = 176.0 kN
VRD,C= Design Shear Resistance of the concrete section [0.12K(80p1fck)^0.33+0.15σCP]bwd
Grade Concrete = M40 Grade of steel = Fe 500
Width of beam = 300 mm Effective depth, d 1651 mm
z = 1526 mm
K= 1+sqrt(200/d)<=2.0 = 1.35
vmin = 0.031K^1.5xfck^0.5 = 0.31 MPa
p1 = Asl/bwd <=0.02 = 0.0059
σCP = = 0.00 MPa
VRD,C= = 211.8 kN
Design Tensile stress in stirrups (fywd= 0.8fyk/γm) = 347.8 Mpa
VRD,S= VED - VRD,C = (Asw/s) z fywd Cotθ = -35.8 kN
Asv , provided Cotθ= 1 = 402.12 mm2
Sv = Spacing required = -5969.6 mm
Minimum Spacing required (ASW /sbw=0.072*sqrt(fck)/fyk) = 1472 mm
Hence Provide 2 -L 16 Stirrups @ 125 c/c

VRd,s = Asw / s. z. fywd cot θ by yielding of the Vertical reinforcement


VRd,max = acw bw z v1 fcd / (cot θ + tan θ) by Crushing of Compression strut
Concrete Strength (fcd) : = 17.9 Mpa Coeff accounting stress in compression chord ν1 = 0.60

-------------------------------------------------------------------------------------------------------------------------------
164 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Inner Cross girder


Description At support Span
Prestress Force after all losses (kN) 0.0 0.0
Shear demand of Beam (kN) 176.0 132.5
Width of beam, b (mm) 300.0 300.0
Effective depth, d 1650.5 1650.5
Lever arm taken from flexural analysis z (m) 1526.3 1526.3
K= 1.35 1.35
vmin = 0.31 0.31
p1 = 0.0059 0.0059
VRD,C= 211.78 211.78
Shear reinf. Shear reinf.
Check Not required Not required
Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 0.273 0.273
Dia of shear reinforcement provided (mm) 16 16
Number of legs provided 2 2
Spacing of stirrups provided (mm) 150 150
Area of shear reinf provided Asw/s (mm2/mm) 2.681 2.681
Angle of compression strut θ (degrees) 32.58 32.58
Shear resistance provided by reinf V RD,s (kN) 2227 2227
Coeff accounting stress in comp chord αcw 1.000 1.000
Shear capacity of compression strut V RD,max (kN) 2227 2227
Difference in shear resistance (kN) 0.00 0.00
Shear capacity of the Section (kN) 2227 2227
Factor of Safety associated with failure 12.65 16.81
Increase in longitudinal tensile force ∆Ftd (kN) 137.73 103.69
Area of steel required for shear due stut & tie model 316.77 238.49
8.5. Servicebility limit State Method
8.5.1. Flexure member Design of end girder support section
Grade Concrete = M40 Grade of steel = Fe 500
Bending Compression of concrete = 19.20 Mpa fctm = Mean tensile strength of concrete
= 2.12 Mpa
E of reinforcement = 200000 MPa E of concrete = 33346 MPa
Modular ratio =Es/Ecm = 6.00 Tensile stress of steel = 240 Mpa
Width of Section = 300 mm Depth of Section = 1750 mm
Clear Cover = 50 mm Effective depth, d = 1651 mm
Minimum reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 643.70 mm2
Hence provide 3 Nos. 25 Ast = 2945.2 mm2
3 Nos. 25 Moment = 1110.6 kN

Balanced neutral axis depth = Actual neutral axis depth =


= 535.16 mm 385.91 mm
Strain in steel = 0.00124
Stress in steel = 247.8 MPa
Comp. stress of concrete = 12.61 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00038 12.61
729.78
385.91
NA NA

729.78
0.00124
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 729.78 kN Total tensile force = 729.78 kN
Compressive force CG = 128.64 mm Moment of resistance = 1110.63 kNm

-------------------------------------------------------------------------------------------------------------------------------
165 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Rare Combination (SL1) Quasi-permanent Combination (SL2)


Inner Cross girder Inner Cross girder
Description At support Span At support Span
h or D 1750 1750 1750 1750
b 300 300 300 300
d 1651 1651 1651 1651
Moment 693.09 1110.63 347.96 443.49
Reinf provided 3 Nos. 3 Nos. 3 Nos. 3 Nos.
25 dia + 25 dia + 25 dia + 25 dia +
3 Nos. 3 Nos. 3 Nos. 3 Nos.
25 dia 25 dia 25 dia 25 dia
Ast provided 2945.2 2945.2 2945.2 2945.2
Stress in concrete 7.87 12.61 3.95 5.03
Actual NA 386 386 386 386
Stress in steel 154.6 247.8 77.6 98.9
Total ultimate tensile force = 455 730 229 291
Total ultimate compressive force 455 730 229 291
Difference of force 0 0 0 0
Compressive force CG 128.6 128.6 128.6 128.6
Moment of resistance 693 1111 348 443
Diff. of moment 0.0 0.0 0.0 0.0

8.5.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 123.35 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]=
248.8 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.039
fct,eff = = 2.12 Mpa εsm-εcm = 0.000451
>= 0.6σsc/Es= 0.00037
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 25.0 mm k2 = 0.5
Sr,max = 277.7 mm Crack width, Wk = = 0.125 mm
< 0.3 mm OK
Inner Cross girder
Description At support Span
Stress in steel, σs 98.1 123.4
As 2945.2 2945.2
Actual NA 386 386
hc,eff 248.8 248.8
ρp,eff 0.039 0.039
εsm-εcm 0.00032 0.00045
φeq 25.0 25.0
Crack spacing Sr,max 277.7 277.7
Crack width, Wk 0.090 0.125
Check <0.3 O.K. <0.3 O.K.
7.6. Side face reinforcement
Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 643.70 mm2
Side face reinf. 0.1% bd = 495.15 mm2
Hence provide 7 Nos. 16 dia on each span Ast = 2814.9 mm2

-------------------------------------------------------------------------------------------------------------------------------
166 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of Deck slab

-------------------------------------------------------------------------------------------------------------------------------
167 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.0 Design of Deck Slab


Assume Width of Slab = 1.000 m
Maximum cantilever span of deck slab = 2.352 m
9.1 Design of Cantilever Slab beyond outer longitudinal girder
500 mm
Wearing course.
65
225 225 mm

300 2202 mm
2352 mm

Cross Section Showing Cantilever slab

i) Dead load Wt (kN) D (m) M (kN-m)


Slab Uniform 0.225x2.20x25 12.39 1.101 13.637

ii) SIDL Wt (kN) D (m) M (kN-m)


Wearing course 0.065x(2.20-0.5)x22 2.43 0.851 2.071
Crash barrier 7.50 1.967 14.753
Total 9.93 16.82

iii) Live load Only Class-A shall be applicable in cantilever slab


Class-A Loading
171.00 kN 500 mm
150
65
225 mm
225
1080
1302
L= 2202 mm

Cross Section Showing placing of Class-A Loading


Axle Loads 11.4 t 114 kN
Size of wheel W= 500 mm
B= 250 mm
Impact Factor 50 %
Total live load of two axles on Cantilever slab 114x(1+50/100) = 171.0 kN
As per Annexure B-3 of IRC 112:2011 bef = 1.2a+b1
a = The distance of the C.G. of loading from support = 1.302 m
b1= The breadth of con.area of the wheel over slab = 0.630 m
bef = 2.192 m
> 1.200 m overlaps
Modified bef 2.19+1.2 = 3.392 m
Dispersed width along tranverse direction =500+(0.065+0.225)x2 = 1.080 m
Dispersion within cantilever slab
Shear = 171.0/2/3.39 25.20 kN/m width
Moment = 25.20x1.30 32.81 kN-m/m width
iv) Summary of moment
DL SIDL Class A Total
Shear 12.39 9.93 25.20 47.52
Moment 13.64 16.82 32.81 63.28

-------------------------------------------------------------------------------------------------------------------------------
168 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.2 Deck slab between girders


9.2.1 Dead Load +SIDL CG
Dead load 0.225*25 = 5.625 kN/m
SIDL Crash barrier = 7.50 kN/m 0.235 1.963 m
Wearing course 0.065*22 = 1.43 kN/m 0.50 2.352 m
Footpath load 0.1*22 = 2.20 kN/m 2.198 0.698 m
Railing = 7.00 kN/m 0.948 m
7.5 7.5 7
1.43 kN/m

2.352 3 3 3 1.198

Dead load & SIDL position over Deck

9.2.2 Live Load


i) 70R- Track Loading Add snow load = 5.00 kN/m

4.57

0.84 0.840
2.9
2.06
2.06
1.5

2.35 3 3 3 1.20
70R- Track Loading position over Deck for maximum moment
Centre to centre distance between X-gider b = 2.355 m
Span L = 3 m
Total Load = 700 kN
Impact Factor = 25 %
Dispersion of load along direction of movement
As per Annexure B-3 of IRC 112:2011 bef = α a(1-a/L)+b1
b/L = 0.79 α = 2.6
a1 = 1.5 m
Thickness of W/C = 65 mm Thick. of Deck slab = 225 mm
b1 =4.57+0.065x2 = 4.70 m
bef 1 = 6.650 m

For Second Wheel a2 = 0.56 m


bef 2 = 5.884 m
Dispersion of load along Span
Effective Width = =0.84+(0.065+0.225)x2 = 1.420 m
Intensity of Loading =700/2x(1+0.25)/(6.65x1.42) = 46.3 kN/m
Intensity of Loading =700/2x(1+0.25)/(5.88x1.42) = 52.4 kN/m

ii) 70R- Wheel Loading Add snow load = 2.50 kN/m


40T Bogie loading

=10/((0.86-0.05)x5.273x10) 1.22

0.234
0.86 0.86
2.79
1.93
Position of 70R Wheel bogie load

-------------------------------------------------------------------------------------------------------------------------------
169 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

1.93
1.5

2.35 3 3 3 2.35
70R- Track Loading position over Deck for maximum moment
Total Load = 400 kN
Impact Factor = 25 %
Dispersion of load along direction of movement
As per Annexure B-3 of IRC 112:2011 bef = α a(1-a/L)+b1
α = 2.6 a = 1.5 m
Thickness of W/C = 65 mm Thick. of Deck slab = 225 mm
b1 =0.234+0.065x2 = 0.364 m
bef = 2.314 m
> 1.220 m Overlaps.
Modified bef =2.314+1.22 = 3.534 m

For Second Wheel a2 = 0.43 m


bef 2 = 1.322 m
Modified bef =1.322+1.22 = 2.542 m
Dispersion of load along Span
Effective Width = =0.860+(0.065+0.225)x2 = 1.440 m
< 1.930 m Not overlaps.
Intensity of Loading =400/2x(1+0.25)/(3.534x1.440) = 49.1 kN/m
Intensity of Loading =400/2x(1+0.25)/(2.542x1.440) = 68.3 kN/m
Add snow load = 2.50 kN/m

iii) Class-A Loading


2 Nos. 11.4 T Axle

1.2

0.250
0.5 0.50
2.3
1.8
Position of Class-A loading

1.500 1.8 1.7 1.8

2.35 3 3 3 2.35
70R- Track Loading position over Deck for maximum moment
Each Axle load = 114 kN
Impact Factor = 50 %
Dispersion of load along direction of movement
As per Annexure B-3 of IRC 112:2011 bef = α a(1-a/L)+b1
α = 2.6 For Ist Wheel a = 1.500 m
Thickness of W/C = 65 mm Thick. of Deck slab = 225 mm
b1 =0.250+0.065x2 = 0.380 m bef = 2.030 m
> 1.200 m Overlaps.
Modified bef1 = 3.230 m

For 2nd Wheel a = 0.30 m


bef = 1.082 m
< 1.200 kN-m Not overlaps.
Modified bef2 = 2.164 m

For 3rd Wheel a = 2.00 m


bef = 2.113 m
> 1.200 m Overlaps.
Modified bef3 = 3.313 m

For 4th Wheel a = 0.80 m


bef = 1.905 m
> 1.200 m Overlaps.
Modified bef4 = 3.105 m
Dispersion of load along Span
Effective Width = =0.5+(0.065+0.225)x2 = 1.080 m
Intensity of 1st Wheel =114x(1+0.50)/(3.230x1.080) = 49.0 kN/m
Intensity of 2nd Wheel=114x(1+0.50)/(2.164x1.080) = 73.2 kN/m
-------------------------------------------------------------------------------------------------------------------------------
170 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Intensity of 3rd Wheel=114x(1+0.50)/(3.313x1.080) = 47.8 kN/m


Intensity of 4th Wheel =114x(1+0.50)/(3.105x1.080) = 51.0 kN/m
Staad Outputs
2 1 SELFWEIGHT0 0 13.216 0 0 0 15.558
0.75 0 8.997 0 0 0 7.228
1.5 0 4.779 0 0 0 2.062
2.25 0 0.56 0 0 0 0.06
3 0 -3.659 0 0 0 1.223
2 SIDL 0 0 9.419 0 0 0 18.33
0.75 0 8.347 0 0 0 11.668
1.5 0 7.274 0 0 0 5.809
2.25 0 6.202 0 0 0 0.756
3 0 5.129 0 0 0 -3.493
3 70R TRACKED LIVE 0 LOAD 0 34.852 0 0 0 13.83
0.75 0 31.102 0 0 0 -10.903
1.5 0 -5.521 0 0 0 -21.153
2.25 0 -42.144 0 0 0 -2.621
3 0 -53.754 0 0 0 30.983
4 70R WHEELED LIVE 0 LOAD 0 30.911 0 0 0 6.915
0.75 0 29.036 0 0 0 -15.565
1.5 0 -8.191 0 0 0 -23.912
2.25 0 -45.418 0 0 0 -3.279
3 0 -67.1 0 0 0 34.36
5 CLASS A LIVE LOAD 0 0 11.481 0 0 0 -6.915
0.75 0 13.356 0 0 0 -16.228
1.5 0 -11.229 0 0 0 -19.804
2.25 0 -35.814 0 0 0 0.616
3 0 -51.507 0 0 0 28.881
9.2.3 Summary of Moments from staad output
Member Node Location DL SIDL LL Total
2 2 Mid span -2.062 -5.809 23.912 16.041
Inner
2 3 1.223 -3.493 34.36 32.09
support

9.3 Summary of Bending Moment of slab


Tranverse section of slab
Location End Inner
Span
support support
DL 13.64 -2.062 1.223
Service SIDL 16.82 -5.809 -3.493
condition
Live Load 32.81 23.912 34.36

9.3.1 Ultimate limit State


Load Combination - 1) Dead load +SIDL
2) Dead load +SIDL+Live load
Load Case DL SIDL LL
1(a) 1.35 1.75
Service
condition
1(b) 1.35 1.75 1.5
1(c) 1 1 1.5

-------------------------------------------------------------------------------------------------------------------------------
171 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Tranverse section of slab


End support Inner support
Load Case (kN-m)
Span (kN-m)
(kN-m)

1(a) 47.85 -12.95 -4.46


Service
condition
1(b) 97.08 22.92 47.08
1(c) 79.68 28.00 49.27
Total 97.08 28.00 49.27
9.3.2 Servicibility limit State for Rare Combination (SL1)
Load Combination - 1) Dead load +SIDL
2) Dead load +SIDL+Live load
Load Case DL SIDL LL
1(a) 1 1.2
Service
condition
1(b) 1 1.2 1
1(c) 1 1 1
Tranverse section of slab
End support Inner support
Load Case (kN-m)
Span (kN-m)
(kN-m)

1(a) 33.83 -9.03 -2.97


Service
condition
1(b) 66.64 14.88 31.39
1(c) 63.28 16.04 32.09
Total 66.64 16.04 32.09

9.3.3 Servicibility limit State for Quasi-permanent Combination (SL2)


Load Combination - 1) Dead load +SIDL
Load Case DL SIDL
Service
condition
1 1 1.2

Tranverse section of slab


End support Inner support
Load Case (kN-m)
Span (kN-m)
(kN-m)
Service
1 33.83 -9.03 -2.97
condition

9.4 Check for ultimate strength of girder in Flexure :-


Design of End support
0.00350 17.87
854 kN
59.73
225 NA NA

48 0.0069 854 kN
1000 Strain Diagram Stress Diagram

Grade Concrete = M40 Grade of steel = Fe 500


Width of the section = 1000 mm Depth of the section = 225 mm
Clear Cover = 40 mm Main dia of bar used = 16 mm
Dia of shear reinf. = 0 mm Effective depth, d = 177 mm
R = Mu/bd2 = 3.099 MPa Design Moment = 97.08 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 1399.1 mm2
Lower fractile tensile fctm = 2.12 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 230.1 mm2
Hence provide 16 dia @ 160 c/c Ast = 1963.5 mm2
12 dia @ 160 c/c > 1399.1 mm2 Hence O.K.

E of reinforcement = 200000 MPa Max strain in concrete = 0.0035


E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 80.72 mm Actual neutral axis depth = 59.73 mm
Strain in steel = 0.0069 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 854 kN Total ultimate tensile force = 854 kN
Compressive force CG 24.85 mm Moment of resistance = 130 kNm
> 97 kNm Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
172 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Tranverse section of slab


Description End Inner
Span
support support
Moment 97.08 28.00 49.27
Width 1000 1000.00 1000.00
Overall depth 225 225 225
Effective depth 177 177 177
R = Mu/bd2 3.10 0.89 1.57
pt 0.00790 0.00211 0.00380
Ast required for bending 1399.1 373.5 671.8
12 dia 12 dia 12 dia
@ 160 c/c @ 160 c/c @ 160 c/c
Reinf provided
16 dia 12 dia 12 dia
@ 160 c/c @ 160 c/c @ 160 c/c
Ast provided 1963.5 1413.7 1413.7
Actual NA 60 43 43
Strain in steel 0.0069 0.0109 0.0109
Stress in steel 434.8 434.8 434.8
Total ultimate tensile force = 854 615 615
Total ultimate compressive force 854 615 615
Difference of force 0 0 0
Compressive force CG 24.8 17.9 17.9
Moment of resistance 130 98 98
Factor of Safety 1.3 3.5 2.0
9.5. Servicebility limit State Method
9.5.1. Flexure member
Grade Concrete = M40 Grade of steel = Fe 500
Bending Compression of concrete = 19.20 Mpa fctm = Mean tensile strength of concrete = 2.12 Mpa
E of reinforcement = 200000 MPa E of concrete = 33346 MPa
Modular ratio =Es/Ecm = 6.00 Tensile stress of steel = 240 Mpa
Width of Section = 1000 mm Depth of Section = 225 mm
Clear Cover = 40 mm Effective depth, d = 177 mm
Minimum reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 230.10 mm2
Hence provide 12 dia @ 160 c/c Ast = 1963.5 mm2
16 dia 160 c/c
Design Moment = 66.64 kN-m
Balanced neutral axis depth = = 57.39 mm Actual neutral axis depth = 53.86 mm
Strain in steel = 0.00107 Stress in steel = 213.4 MPa
Comp. stress of concrete = 15.56 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00047 15.56
419.00
53.86
NA NA

419.00
0.00107
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 419.00 kN Total tensile force = 419.00 kN
Compressive force CG = 17.95 mm Moment of resistance = 66.64 kNm

-------------------------------------------------------------------------------------------------------------------------------
173 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Rare Combination (SL1) Quasi-permanent Combination (SL2)


Tranverse section of slab Tranverse section of slab
Description
End support Span Inner support End support Span Inner support

h or D 225 225 225 225 225 225


b 1000 1000 1000 1000 1000 1000
d 177 177 177 177 177 177
Moment 66.64 16.04 32.09 33.83 -9.03 -2.97
Reinf provided 12 dia 12 dia 12 dia 12 dia 12 dia 12 dia
@ 160 c/c @ 160 c/c @ 160 c/c @ 160 c/c @ 160 c/c @ 160 c/c
16 dia 12 dia 12 dia 16 dia 12 dia 12 dia
@ 160 c/c @ 160 c/c @ 160 c/c @ 160 c/c @ 160 c/c @ 160 c/c
Ast provided 1963.5 1413.7 1413.7 1963.5 1413.7 1413.7
Stress in concrete 15.6 4.2 8.5 7.9 -2.4 -0.8
Actual NA 53.86 46.96 46.96 53.86 46.96 46.96
Stress in steel 213.4 70.3 140.7 108.3 -39.6 -13.0
Total ultimate tensile force = 419 99 199 213 -56 -18
Total ultimate compressive force 419 99 199 213 -56 -18
Difference of force 0 0 0 0 0 0
Compressive force CG 18.0 15.7 15.7 18.0 15.7 15.7
Moment of resistance 67 16 32 34 -9 -3
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0

9.5.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 213.40 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 112.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.017
fct,eff = = 2.12 Mpa εsm-εcm = 0.000731
>= 0.6σsc/Es= 0.00064
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 40 mm
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 14.3 mm k2 = 0.5
Sr,max = 275.1 mm Crack width, Wk = = 0.201 mm
< 0.3 mm OK
Tranverse section of slab
Description End Inner
Span
support support
Stress in steel, σs 213.4 70.3 140.7
As 1963.5 1413.7 1413.7
Actual NA 54 47 47
hc,eff 112.5 112.5 112.5
ρp,eff 0.017 0.013 0.013
εsm-εcm 0.00073 0.00021 0.00042
φeq 14.3 12.0 12.0
Crack spacing Sr,max 275.1 298.3 298.3
Crack width, Wk 0.201 0.063 0.126
Check <0.3 O.K. <0.3 O.K. <0.3 O.K.

9.5.3. Tranverse reinforcement


Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 230.10 mm2
Main reinf. provided = 1963.5 mm2
As per clause 16.6.1.1 (3) of IRC-112:2011, minimum tranverse reinforcement is 20% of main reinforcement.
Minimum tranverse reinforcement = 392.7 mm2
As per clause 16.5.4 (4) of IRC-112:2011,the area of surface reinforcement is 0.01 Act ext.
Where Act ext is the area of cover = 400.0 mm2
Stress at top of deck slab near support section exceeds the permissible tensile stress i.e. 1.53Mpa.
Necessary reinforcement shall be provided to resist the tensile stress of deck slab.
Maximum tensile stress = -5.16 MPa Maximum tensile force = 580.72 kN/m width
Permissible working stress = 240.00 MPa Area of reinforcement required = 2419.65 mm2
Hence Provide 16 dia 125 c/c at top Ast provided = 2513.27 mm2
12 dia 125 c/c at bottom Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
174 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of Column

-------------------------------------------------------------------------------------------------------------------------------
175 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.0 Detailed Design of Abutment wall


9.1 Abutment A1
Formation Level = 888.397 m
Foundation bottom level = 869.397 m
Length of wall = 13.100 m
Width of wall = 2.000 m
Depth of superstructure = 2.000 m
Depth of Foundation at abutment base = 2.400 m
Height of wall = 14.600 m

9.1.1 Summary of loads & moments


Weight of girder =388.62+380.99+373.36+365.73 = 1508.71 kN
Weght of deck =295.04+252.05+246.50+230.71+(13.1-12)/2*(30-2)*2/3*0.225*25 = 1082.06 kN
Weight of cap =13.1*2*2*25 = 1310.00 kN
Weight of wall =13.1*2*14.6*25 = 9563.00 kN

Total Dead load = 13463.77 kN


Moment due to Ecentritricity of girder =(1,508.71+1,082.06)*(2/2-0.5/2) = 1943.08 kN-m

Bottom support section Mid section Top support section


Description Vertical load Shear Moment Vertical load Shear Moment Vertical load Shear Moment
Seismic in X- direction -599.1 -1885.1 21139.8 599.1 1885.1 7551.9 387.6 1213.9 4597.2
Seismic in Z- direction -3398.0 -407.0 1720.9 3398.0 407.0 1245.0 1049.5 296.6 2928.7
Seismic in Y- direction -305.1 -55.0 227.6 305.1 55.0 194.3 143.9 60.3 511.6
Dead load = -13463.8 860.5 1943.1 -8682.3 -860.5 -1943.1 -3900.8 -860.5 -1943.1
SIDL (DL) from staad output -322.4 111.3 338.1 -322.4 -111.3 -468.9 -322.4 -111.3 -1332.9
SIDL (WC) from staad output-353.5 122.5 369.2 -353.5 -122.5 -518.8 -353.5 -122.5 -1468.6
Earth pressure k* 91.7 -15647.1 -30150.8 -91.7 2005.1 33235.0 -91.7 -6671.5 7750.3
Earth pressure at rest 51.74 -12197.4 -20330.2 -51.7 874.4 23347.5 -51.7 -4442.9 4912.5
Live load surcharge 120.9 -1505.8 8592.4 -120.9 728.6 -492.5 -120.9 -102.1 1947.3
Dynamic increment of Earth pr. 16.5 -2555.4 -6468.9 -16.5 431.1 7859.2 -16.5 -1563.3 1746.2
Dynamic increment of LL Surcharge
45.3 -562.4 -3214.7 -45.3 272.4 188.5 -45.3 -37.6 725.9
Wind load (unloaded structure)-407.6 116.3 83.4 407.6 -116.3 -759.8 407.6 -116.3 -1647.2
Wind load (loaded structure) -208.0 49.5 94.2 208.0 -49.5 -452.8 208.0 -49.5 -823.5
Differential settlement 286.5 79.3 -2771.6 -286.5 -79.3 2484.1 -286.5 -79.3 2174.3
Temperature rise 77.6 1525.3 18930.8 -77.6 -1525.3 -7872.2 -77.6 -1525.3 -3963.5
Temperature fall -36.0 -695.0 -8713.0 36.0 695.0 3674.6 36.0 695.0 1718.0
Creep & shrinkage -21.8 -602.0 -6379.7 21.8 602.0 2015.5 21.8 602.0 2654.7
Footpath live load -87.5 29.4 91.4 87.5 -29.4 -121.6 87.5 -29.4 -349.5
Snow load -228.5 79.0 238.6 228.5 -79.0 -334.3 228.5 -79.0 -947.0
Braking load 31.3 -116.9 -1446.2 -31.3 116.9 -598.9 -31.3 116.9 -308.4
Hyperstatic action -2.8 341.5 1688.1 2.8 -341.5 -787.9 2.8 -341.5 3437.6
Live Load Max -1492.0 1.8 1512.0 -1492.0 1.8 177.8 -1679.5 170.0 2.5
Min 72.0 -341.8 -526.0 72.0 -341.8 -1845.1 58.1 -660.3 -5209.1
9.1.2 Ultimate limit state
9.1.2.1 Load Combination As per Clause 706 of IRC:78-2014
1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+Live load(leading) + Temp load(accompany)
6) Dead load +SIDL+Live load(accompany) + Temp load(lead)
7) Dead load +SIDL+Live load(accompany) +seismic load(leading)
Load DL, Support settle, snow
Transverse Vertical
load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load LL Surcharge Wind load Temp load Long. Seismic
Case prestress loss Seismic Seismic
1 1.35 1.35 1.75 1.35 1.5 1.2
2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
3 (a) 1.35 1.35 1.75 1.35 1.5 1.2 0.9
3 (b) 1 1 1 1 1.5 1.2 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.2 1.5
4 (b) 1 1 1 1 1.15 1.2 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 1.2 0.9
5 (b) 1 1 1 1 1.5 1.2 0.9
6 (a) 1.35 1.35 1.75 1.35 1.15 1.2 1.5
6 (b) 1 1 1 1 1.15 1.2 1.5
7 (a) 1.35 1.35 1.75 1 0.2 0.2 1.5 0.45 0.45
7 (b) 1.35 1.35 1.75 1 0.2 0.2 0.45 1.5 0.45
7 (c) 1.35 1.35 1.75 1 0.2 0.2 0.45 0.45 1.5
7 (d) 1 1 1 1 0.2 0.2 1.5 0.45 0.45
7 (e) 1 1 1 1 0.2 0.2 0.45 1.5 0.45
7 (f) 1 1 1 1 0.2 0.2 0.45 0.45 1.5

-------------------------------------------------------------------------------------------------------------------------------
176 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Bottom support section Mid section Top support section


Vertical load Shear Moment Vertical load Shear Moment Vertical load Shear Moment
1 -21292.3 -21670.6 -36184.5 -15242.6 2326.8 43857.4 -9068.8 -10131.3 14705.3
2 (a) -19726.4 -19560.6 -46606.2 -12332.5 1144.0 44122.8 -5877.4 -10569.4 10880.9
2 (b) -14665.9 -14480.4 -34600.1 -8871.9 838.5 32541.8 -4090.4 -7838.1 7854.5
3 (a) -21479.6 -21626.1 -36099.7 -15055.4 2282.2 43449.8 -8881.6 -10175.8 13964.2
3 (b) -16419.1 -16545.9 -24093.6 -11594.8 1976.7 31868.9 -7094.6 -7444.5 10937.8
4 (a) -21062.5 -21566.4 -36098.2 -14428.0 2221.3 43368.1 -8188.6 -10295.6 13699.5
4 (b) -16002.0 -16486.2 -24092.1 -10967.5 1915.8 31787.1 -6401.6 -7564.3 10673.1
5 (a) -21168.6 -20297.8 -19146.8 -15312.4 954.0 36772.4 -9138.6 -11504.1 11138.2
5 (b) -16122.1 -15217.6 -7140.7 -11851.9 648.4 25191.4 -7351.6 -8772.8 8111.8
6 (a) -20580.2 -19352.6 -7843.4 -14856.4 7.5 32239.0 -8617.0 -12509.4 8989.4
6 (b) -15533.7 -14272.4 4162.7 -11395.9 -298.0 20658.0 -6830.0 -9778.1 5963.0
7 (a) -21949.9 -21558.0 -12188.4 -10691.8 4516.9 57225.2 -5720.9 -8399.9 22105.9
(+)ve 7 (b) -24906.1 -17322.8 -25785.8 -7735.6 2512.2 42350.8 -5008.6 -7721.6 18520.4
value of 7 (c) -21658.5 -16953.3 -27353.8 -10983.2 2142.7 41247.6 -5959.4 -7969.8 15982.5
seismic 7 (d) -16871.3 -21954.2 -10735.1 -7263.3 4913.2 57276.5 -3966.0 -8003.7 21792.0
force 7 (e) -19827.5 -17719.1 -24332.5 -4307.1 2908.5 42402.1 -3253.6 -7325.3 18206.6
7 (f) -16579.9 -17349.6 -25900.5 -7554.7 2539.0 41298.9 -4204.5 -7573.5 15668.7
7 (a) -16617.2 -26578.3 -82019.9 -21853.8 -20268.8 -5824.5 -20409.9 -24859.2 -17271.4
(-)ve 7 (b) -13661.1 -30813.4 -68422.5 -24810.0 -18264.1 9049.9 -21122.3 -25537.6 -13685.9
value of7 (c) -16908.7 -31182.9 -66854.5 -21562.4 -17894.6 10153.1 -20171.4 -25289.4 -11148.1
seismic 7 (d) -11538.6 -21961.0 -75174.2 -16751.9 -15461.4 -1740.9 -15308.0 -20051.8 -13553.0
force 7 (e) -8582.5 -26196.2 -61576.7 -19708.0 -13456.7 13133.5 -16020.3 -20730.2 -9967.5
7 (f) -11830.1 -26565.7 -60008.7 -16460.4 -13087.2 14236.7 -15069.5 -20482.0 -7429.6
Maximum V -24906.1 -17322.8 -25785.8 -24810.0 -18264.1 9049.9 -21122.3 -25537.6 -13685.9
Minimum V -8582.5 -26196.2 -61576.7 -4307.1 2908.5 42402.1 -3253.6 -7325.3 18206.6
Max shear -16908.7 -31182.9 -66854.5 -21853.8 -20268.8 -5824.5 -21122.3 -25537.6 -13685.9
Max moment -15533.7 -14272.4 4162.7 -7263.3 4913.2 57276.5 -5720.9 -8399.9 22105.9
Min moment -16579.9 -26578.3 -82019.9 -21853.8 -20268.8 -5824.5 -20409.9 -24859.2 -17271.4
9.1.2.2 Design of Pier in Ultimate Limit State
1. Material data
[a] Concrete data (parabolic rectangular stress-strain relation)
Characteristic strength = 40.0 MPa E value of concrete = 33346 MPa
Peak strain at failure εcu2 = 0.0035 Strain at peak stress εc2 = 0.0020
Strength reduction α = 0.67 Partial factor of safety γc = 1.50
Design strength fcd = 17.84 MPa
[b] Reinforcement data (idealized elastic-perfectly plastic stress-strain relation)
Grade of steel = 500.0 MPa E value of steel = 200000 MPa
Partial factor of safety γs = 1.15 Design strength of steel fsd = 434.78 MPa
Yield strain of steel = 0.0022 Failure strain of steel = 0.1600
2. Geometric details
[a] Dimension detail of column
Actual column length = 14.60 m Effective length multiplier = 1.50
Width of section = 13100 mm
Depth of section = 2000 mm Radius of gyration, i = 577.4 mm
Effective length of col l e = 21.90 m Slenderness ratio λ = 37.93
Reinforcement provided
Tension face At bottom 107 Nos. T 32 = 86055 mm2
At Top & middle 54 Nos. T 32 = 69446 mm2
53 Nos. T 25
Compression face 54 Nos. T 32 = 69446 mm2
53 Nos. T 25
Side side 12 Nos. T 25 = 5890 mm2
12 Nos. T 25 = 5890 mm2
Stiruups 16 T @ 100 c/c Total = 167281 mm2
12 T @ 100 c/c or 150672 mm2
Ductile detailing for Seismic case, (although, this is applicable for seismic zone III, IV, V)
For rectangular Column
As per Clause No. 7.4 of IS 13920:1993, Ash = 0.18ShSDkxfck/fy[Ag/Ak-1.0)
Ash Area of tranverse Reinforcement = 201.1 mm2
D Larger Dimensionr of Column = 2000 mm
h Larger dimension of Core measured to the outside of the spiral = 308.3333 mm
fck = M40
fy = M500
Ag Gross area of the Column cross section = 26200000 mm2
Ak Area of the Concrete core = 23957500 mm2
S Specing of spiral or hoop = 483.79 mm
Say 100 mm
d' = 82.000 mm Pt = 0.638 %
d'/D = 0.041 Pt/fck = 0.016
φef = effective creep ratio = φ(∞,o) * Moeqp/Moed
-------------------------------------------------------------------------------------------------------------------------------
177 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

[a] Parameters for limiting slenderness ratio


λlim value is given by as per Eq 11.1 of IRC 112-2011
λlim = 20 * A * B * C / SQRT (n) A = 1/( 1+0.2*φef)
As per Eq A2-14, 15, 16 of IRC 112-2011
φef = effective creep ratio = φ(∞,o) * Moeqp/Moed φo = φRH * β(fcm) *β (t0) Moed = BM in ULS
φ(∞,o) = φo* β (∞,0) φo = φRH * β(fcm) *β (t0) β (∞,0) =1
φRH = 1+ (1-RH/100)/0.1*h0^1/3 RH = relative humidity = 70 %
h0 = 2*Ac/u 868 mm φRH = 1.31
β(fcm) = 18.78/sqrt(fcm) 2.66 β (t0) = 1/(0.1+to^0.2) 0.488
to = age in days of loading = 28 days So, φ0 = 1.705
φ(∞,o) = φo* β (∞,0) 1.705
Moeqp = 10000.0 kNm Moed = 4162.7 kNm
So, φef = 4.10 So , A = 0.550
B = SQRT( 1+2w) 1.15 C = 1.7 - rm rm = 1
w= As*fyd/Ac*fcd = 0.156 C= 0.7
n= Ned/Ac*fcd 0.053 λlim = 20 * A * B * C / SQRT (n) 38.17
[b] Eccentricity due to slenderness
M2 = Ned * e2 Ned = Design Axial Force e2 = deflection = (1/r)*le^2/C
le = effective length = = 21.90 m C= 10
1/r = curvature = Kr* Kφ * 1/r0 kr= (nu-n)/(nu-nbal)<=1 ..Eq 11.9 of IRC 112-2011
nu = 1+w = = 1.156 n= NED/AcxfCD
nbal = = 0.4
Kφ = 1+ β * φ ef φ ef = = 4.10
β= 0.35+fck/200- = 0.297 The coefficient Kφ = 2.22
1/r0 = fyd/(Es*0.45*d) = 0.0004 1/m

[c] Design bending moment


Moment of
n = N ed / M Ed
Load case N Ed (kN) M 0Ed (kNm) λ lim Kr e 2 (m) Resistance, M R/MED Check
(A c f cd ) (kNm) M R (kN-m)
Bottom Support section
1 24906.1 25785.8 0.05 38.17 1.00 0.000 25785.8 94290 3.66 O.K.
2 8582.5 61576.7 0.02 65.02 1.00 0.000 61576.7 79946 1.30 O.K.
3 16908.7 66854.5 0.04 46.33 1.00 0.000 66854.5 87411 1.31 O.K.
4 15533.7 4162.7 0.03 48.33 1.00 0.000 4162.7 87411 21.00 O.K.
5 16579.9 82019.9 0.04 46.78 1.00 0.000 82019.9 87121 1.06 O.K.
Middle Span section
6 24810.0 9049.9 0.05 38.24 1.00 0.000 9049.9 81562 9.01 O.K.
7 4307.1 42402.1 0.01 91.79 1.00 0.000 42402.1 63119 1.49 O.K.
8 21853.8 5824.5 0.05 40.75 1.00 0.000 5824.5 78933 13.55 O.K.
9 7263.3 57276.5 0.02 70.68 1.00 0.000 57276.5 68888 1.20 O.K.
10 21853.8 5824.5 0.05 40.75 1.00 0.000 5824.5 78933 13.55 O.K.
Top Support section
11 21122.3 13685.9 0.05 41.45 1.00 0.000 13685.9 78933 5.77 O.K.
12 3253.6 18206.6 0.01 105.61 1.00 0.000 18206.6 62166 3.41 O.K.
13 21122.3 13685.9 0.05 41.45 1.00 0.000 13685.9 78933 5.77 O.K.
14 5720.9 22105.9 0.01 79.64 1.00 0.000 22105.9 64397 2.91 O.K.
15 20409.9 17271.4 0.04 42.17 1.00 0.000 17271.4 78933 4.57 O.K.
9.1.2.2 Capacity of the section at bottom of wall
[a] Cross section
Width of column = 13100.0 mm Depth of column = 2000.0 mm
Clear cover = 75.0 mm Effective depth = 1893 mm
Effective cover d' = 107.0 mm
[a] Concrete property (parabolic rectangular stress-strain relation)
Characteristic strength = 40.0 MPa E value of concrete = 33346 MPa
Peak strain at failure εcu2 = 0.0035 Strain at peak stress εc2 = 0.0020
Strength reduction α = 0.67 Partial factor of safety γc = 1.50
Design strength fcd = 17.84 MPa

-------------------------------------------------------------------------------------------------------------------------------
178 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Stress Stress

= 0.0020 = 0.0035 Strain Yeild strain = 0.00217 Strain


Stress - strain diagram for concrete Stress - strain diagram for steel
0.0035
Asc = = 86055 mm2
190.42 CG
Compression Zone
2000.0 NA

Ast = = 69446 mm2 Tension Zone


13100.0 Strain Block for concrete & Steel

[b] Reinforcement property (idealized elastic-perfectly plastic stress-strain relation)


Grade of steel fy = 500.0 MPa E value of steel = 200000 MPa
Partial factor of safety γs = 1.15 Yield strain of steel = fy/(1.15*Es) = 0.00217
Design strength of steel fsd = 434.78 MPa Max. strain of steel = fy/(1.15*Es)+0.002 = 0.00417
Reinforcement provided
Tension face 107 Nos. T 32 = 86055 mm2

Compression face 54T 32 Nos. = 69446 mm2


53T 25 Nos.
Side sides 12T 25 Nos. = 5890 mm3 at each side
Assume Neutral axis depth = 190.42 mm
The section is divided into 12 segments in depths i.e; depth of each segments = = 167 mm
Contribution from concrete:
Depth CG Moment (KN-
Sl no Section Length (mm) Area (mm2) Strain Stress (MPa) Force (KN)
(mm) (mm) m)
1 1 13100 166.67 2183333.3 83.3 0.0020 17.83 38934.8 35690.3
2 2 13100 166.67 2183333.3 250.0 -0.0011 0.00 0.0 0.0
3 3 13100 166.67 2183333.3 416.7 -0.0042 0.00 0.0 0.0
4 4 13100 166.67 2183333.3 583.3 -0.0072 0.00 0.0 0.0
5 5 13100 166.67 2183333.3 750.0 -0.0103 0.00 0.0 0.0
6 6 13100 166.67 2183333.3 916.7 -0.0133 0.00 0.0 0.0
7 7 13100 166.67 2183333.3 1083.3 -0.0164 0.00 0.0 0.0
8 8 13100 166.67 2183333.3 1250.0 -0.0195 0.00 0.0 0.0
9 9 13100 166.67 2183333.3 1416.7 -0.0225 0.00 0.0 0.0
10 10 13100 166.67 2183333.3 1583.3 -0.0256 0.00 0.0 0.0
11 11 13100 166.67 2183333.3 1750.0 -0.0287 0.00 0.0 0.0
12 12 13100 166.67 2183333.3 1916.7 -0.0317 0.00 0.0 0.0
38934.83 35690.26
Contribution from Steel: Spacing of side reinforcements = 198.4 mm
CG Moment (KN-
Sl no Section Area (mm2) Strain Stress (MPa) Force (KN)
(mm) m)
1 1 69446 107.0 0.0015 290.37 20164.7 18007.0
2 2 1473 305.4 -0.0021 -422.85 -622.7 -432.5
3 3 1473 503.9 -0.0058 -434.78 -640.3 -317.6
4 4 1473 702.3 -0.0094 -434.78 -640.3 -190.6
5 5 1473 900.8 -0.0131 -434.78 -640.3 -63.5
6 6 1473 1099.2 -0.0167 -434.78 -640.3 63.5
7 7 1473 1297.7 -0.0204 -434.78 -640.3 190.6
8 8 1473 1496.1 -0.0240 -434.78 -640.3 317.6
9 9 1473 1694.6 -0.0276 -434.78 -640.3 444.7
10 10 86055 1893.0 -0.0313 -434.78 -37415.0 33411.6
TOTAL 167281 -22354.9 51430.8
TOTAL CAPACITY OF THE SECTION
FORCE= 16579.91 kN MOMENT= 87121 kNm

9.1.2.3 Capacity of the section at middle of wall


[a] Cross section
Width of column = 13100.0 mm Depth of column = 2000.0 mm
Clear cover = 75.0 mm Effective depth = 1893.0 mm
Effective cover d' = 107.0 mm
[a] Concrete property (parabolic rectangular stress-strain relation)
Characteristic strength = 40.0 MPa E value of concrete = 33346 MPa
Peak strain at failure εcu2 = 0.0035 Strain at peak stress εc2 = 0.0020
Strength reduction α = 0.67 Partial factor of safety γc = 1.50
Design strength fcd = 17.84 MPa

-------------------------------------------------------------------------------------------------------------------------------
179 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Stress Stress

= 0.0020 = 0.0035 Strain Yeild strain = 0.00217 Strain


Stress - strain diagram for concrete Stress - strain diagram for steel
0.0035
Asc = = 69446 mm2
129.05 CG
Compression Zone
2000.0 NA

Ast = = 69446 mm2 Tension Zone


13100.0 Strain Block for concrete & Steel

[b] Reinforcement property (idealized elastic-perfectly plastic stress-strain relation)


Grade of steel fy = 500.0 MPa E value of steel = 200000 MPa
Partial factor of safety γs = 1.15 Yield strain of steel = fy/(1.15*Es) = 0.00217
Design strength of steel fsd = 434.78 MPa Max. strain of steel = fy/(1.15*Es)+0.002 = 0.00417
Reinforcement provided
Tension face 54 Nos. T 32 = 69446 mm2
53 Nos. T 25
Compression face 54 Nos. T 32 = 69446 mm2
53 Nos. T 25
Side sides 12 Nos. T 25 = 5890 mm3 at each side
Assume Neutral axis depth = 129.05 mm
The section is divided into 12 segments in depths i.e; depth of each segments = = 167 mm
Contribution from concrete:
Depth CG Moment (KN-
Sl no Section Length (mm) Area (mm2) Strain Stress (MPa) Force (KN)
(mm) (mm) m)
1 1 13100 166.67 2183333.3 83.3 0.0012 15.26 33319.0 30542.5
2 2 13100 166.67 2183333.3 250.0 -0.0033 0.00 0.0 0.0
3 3 13100 166.67 2183333.3 416.7 -0.0078 0.00 0.0 0.0
4 4 13100 166.67 2183333.3 583.3 -0.0123 0.00 0.0 0.0
5 5 13100 166.67 2183333.3 750.0 -0.0168 0.00 0.0 0.0
6 6 13100 166.67 2183333.3 916.7 -0.0214 0.00 0.0 0.0
7 7 13100 166.67 2183333.3 1083.3 -0.0259 0.00 0.0 0.0
8 8 13100 166.67 2183333.3 1250.0 -0.0304 0.00 0.0 0.0
9 9 13100 166.67 2183333.3 1416.7 -0.0349 0.00 0.0 0.0
10 10 13100 166.67 2183333.3 1583.3 -0.0394 0.00 0.0 0.0
11 11 13100 166.67 2183333.3 1750.0 -0.0440 0.00 0.0 0.0
12 12 13100 166.67 2183333.3 1916.7 -0.0485 0.00 0.0 0.0
33319.04 30542.46
Contribution from Steel: Spacing of side reinforcements = 198.4 mm
CG Moment (KN-
Sl no Section Area (mm2) Strain Stress (MPa) Force (KN)
(mm) m)
1 1 69446 107.0 0.0006 111.13 7717.8 6892.0
2 2 1473 305.4 -0.0048 -434.78 -640.3 -444.7
3 3 1473 503.9 -0.0102 -434.78 -640.3 -317.6
4 4 1473 702.3 -0.0155 -434.78 -640.3 -190.6
5 5 1473 900.8 -0.0209 -434.78 -640.3 -63.5
6 6 1473 1099.2 -0.0263 -434.78 -640.3 63.5
7 7 1473 1297.7 -0.0317 -434.78 -640.3 190.6
8 8 1473 1496.1 -0.0371 -434.78 -640.3 317.6
9 9 1473 1694.6 -0.0425 -434.78 -640.3 444.7
10 10 69446 1893.0 -0.0478 -434.78 -30193.8 26963.0
TOTAL 150672 -27598.2 33855.0
TOTAL CAPACITY OF THE SECTION
FORCE= 5720.89 kN MOMENT= 64397 kNm

-------------------------------------------------------------------------------------------------------------------------------
180 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.1.2.4 Shear design


VRD= Design Shear Force of the concrete section = 31182.9 kN
Vccd= Design component of Shear Force in the compression area due to inclined compression chord
Vtd= Design component of Shear Force in tensile reinforcement due to inclined tensile chord
VRd.s= Design value of Shear Force for yielding of vertical shear reinforcement
VRD= VRd.s + Vccd + Vtd Here, Vccd= Vtd = 0.0 kN
Hence, VRD= VRd.s
Along Long Direction (X-X)
Design the section without shear reinforcement Design shear = = 31182.9 kN
VRD,C= Design Shear Resistance of the concrete section = [0.12K(80p1fck)^0.33+0.15σCP]bwd
Grade Concrete = M40 Grade of steel = Fe 500
Width of beam = 13100 mm Effective depth, d = 1893 mm
K= 1+sqrt(200/d)<=2.0 = 1.33 z = 1703 mm
vmin = 0.30 MPa p1 = Asl/bwd <=0.02 = 0.0067
σCP = = 0.00 MPa δ = 0.000 rad
Reduction of shear force as per cl. No. 10.3.2 (5) of IRC:112-2011 Mtanδ/d = 0.0 kN
αV = d= 1893 mm β = αV /2d = 0.5
VRD,C = 10867.0 kN > V-Mtand/d = 31182.9 kN
Hence shear reinforcement required

Design the section with shear reinforcement


Max VEd = 0.5bwdvfcd v= 0.6*(1 - fck/310)
Max Ved = 115577.4 kN > 31182.9 kN Hence O.K.
Design Tensile stress in stirrups (fywd= 0.8fyk/γm) = 347.8 Mpa
VRd,s = Asw / s. z. fywd cot θ by yielding of the Vertical reinforcement
VRd,max = acw bw z v1 fcd / (cot θ + tan θ) by Crushing of Compression strut
Concrete Strength (fcd) = 17.8 Mpa Coeff accounting stress in compression chord n1 = 0.60
The maximum effective cross sectional shear reinforcement, Aswmax for Cotφ =1
VRD,S = VRd,max (Asw/s) z fywd Cotθ ≤
acw bw z v1 fcd / (cot θ + tan θ)
For, Cotθ =1 (Asw/s) fywd ≤
1/2 acw bw v1 fcd
acw = 1 Asw/s ≤
1/2 acw bw v1 fcd/fywd ≤ 201.54 mm
Minimum Asw/s required (ASW /sbw=0.072*sqrt(fck)/fyk) = 11.931 mm
Hence Provide At top & bottom support 52 - L 12 Stirrups @ 100 c/c
At Midspan 52 - L 12 Stirrups @ 150 c/c
Asv , provided = 5926.30 mm2 Asv /s, provided = 59.263 mm
Shear resistance provided by reinf V RD,S = (Asw/s) z fywd Cotθ
Shear capacity of compression strut V RD,max = acw bw z v1 fcd / (cot θ + tan θ)
V RD,S = 84532.5 kN Assume, θ = 22.55 degree
V RD,max = 84532.5 kN V RD,S - V RD,max = 0.0 kN
Shear design
Bottom support Midspan Top support
Description
section section section
Prestress Force after all losses (kN) 0.0 0.0 0.0
Design Shear Force of the concrete (kN) 31182.9 4913.2 24810.0
Shear demand of Beam (kN) 31182.9 4913.2 24810.0
Width of beam, b (mm) 13100 13100 13100
Effective depth, d 1893 1893 1893
Lever arm taken from flexural analysis z (m) 1703 1703 1703
K= 1.33 1.33 1.33
vmin = 0.30 0.30 0.30
p1 = 0.0067 0.0056 0.0056
VRD,C= 10867.02 7415.80 10220.12
Shear reinf. Shear reinf. Shear reinf.
Check required Not required required

Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 11.931 11.931 11.931
Area of shear reinforcement provided (mm) 5926.30 5926.30 5926.30
Spacing of stirrups provided (mm) 100.000 150.000 100.000
Area of shear reinf provided Asw/s (mm2/mm) 59.263 39.509 59.263
Angle of compression strut θ (degrees) 22.55 18.24 22.55
Shear resistance provided by reinf V RD,s (kN) 84533 70976 84533
Coeff accounting stress in comp chord αcw 1.000 1.000 1.000
Shear capacity of compression strut V RD,max (kN) 84533 70976 84533
Difference in shear resistance (kN) 0.0 0.0 0.0
Shear capacity of the Section (kN) 84533 70976 84533
Factor of Safety associated with failure 2.71 14.45 3.41
Longitudinal tensile force ∆Ftd (kN) 37554 7452 29879
Area of steel required for shear due stut & tie model 86374 17140 68722

-------------------------------------------------------------------------------------------------------------------------------
181 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.1.3 Servicebility limit State Method


9.1.3.1 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
Wind on
DL, Support Live load Wind on loaded
Load Case SIDL(DL) SIDL(WC) Earth pr. Live load unloaded Temperature
settle, snow load surcharge structure
structure

1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1
2 (b) 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.8 0.6
3 (b) 1 1 1 1 1 0.8 0.6
4 (a) 1 1 1.2 1 0.75 0.8 1
4 (b) 1 1 1 1 0.75 0.8 1
5 (a) 1 1 1.2 1 1 0.8 0.6
5 (b) 1 1 1 1 1 0.8 0.6
6 (a) 1 1 1.2 1 0.75 0.8 1
6 (b) 1 1 1 1 0.75 0.8 1
9.1.3.2 Load Combination for Quasi-permanent (SL3) - for RCC structure
1) Dead load +SIDL
2) Dead load +SIDL+Temperature(lead)
Wind on
DL, Support Wind on loaded
Load Case SIDL(WC) Earth pr. Earth pr. Live load unloaded Temperature
settle structure
structure
1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5
Rare Combination
Bottom support section Midspan section Top support section
Load Case V (kN) M (kN-m) V (kN) M (kN-m) V (kN) M (kN-m)
1(a) -14125.24 -24830.64 -9514.04 23690.23 -4732.54 7193.82
1(b) -14054.55 -24904.47 -9443.34 23794.00 -4661.84 7487.54
2 (a) -14532.79 -24747.27 -9106.49 22930.46 -4324.99 5546.63
2 (b) -14462.10 -24821.11 -9035.79 23034.23 -4254.29 5840.35
3 (a) -15701.60 -17742.95 -10921.76 22481.86 -6327.75 7602.20
3 (b) -15630.90 -17816.79 -10851.06 22585.62 -6257.06 7895.92
4 (a) -15397.73 -17744.56 -10479.60 22436.38 -5838.72 7436.65
4 (b) -15327.04 -17818.40 -10408.91 22540.15 -5768.03 7730.37
5 (a) -15558.49 -32847.98 -11064.86 34845.74 -6470.86 11964.82
5 (b) -15487.79 -32921.81 -10994.17 34949.51 -6400.16 12258.54
6 (a) -15185.83 -36372.50 -10691.50 36451.22 -6050.62 12815.87
6 (b) -15115.14 -36446.33 -10620.80 36554.99 -5979.92 13109.59
MaxV -15701.60 -17743.0 -11064.86 34845.7 -6470.86 11964.8
MinV -14054.55 -24904.5 -9035.79 23034.2 -4254.29 5840.3
MaxM -15701.60 -17743.0 -10620.80 36555.0 -5979.92 13109.6
MinM -15115.14 -36446.3 -10479.60 22436.4 -4324.99 5546.6
Quasi-permanent
1 -14119.04 -24836.85 -9507.83 23700.21 -4726.33 7220.96
2 (a) -14040.33 -25192.13 -9529.74 29651.54 -4748.24 8076.91
2 (b) -14032.64 -25259.75 -9465.25 29745.33 -4683.75 8343.49

9.1.3.3 Uniaxial Stress check


Material Data
Grade of Concrete = M40
Grade of Steel = Fe500
Permissible bending tensile stress in concrete (σct) = 1.41 Mpa
Permissible bending compressive stress in concrete (σcb) = 19.20 Mpa
Permissible tensile stress in steel (σst) = 400.00 Mpa
Es = 200000 Mpa
Creep Coefficient, φ = 1 Ecm of concrete = 33346 MPa
Ec, eff = Ecm /(1+φ) = 16673 MPa
Modular Ratio = 12.00
Geometric data
Width of wall = 2000.0 mm Length of wall = 13100.0 mm
Clear cover (d'') = 75 mm Effective cover (d'=d''+φ/2) = 103 mm
Width of wall (d) = 1897.0 mm

-------------------------------------------------------------------------------------------------------------------------------
182 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Reinforcement at bottom
Bar Diameter (φ) = T 32 mm Number of bars = 107 Nos.
Bar Diameter (φ) = T 32 mm Number of bars = 54 Nos.
= T 25 mm = 53 Nos.
2 2
Reinforcement area (Ast) 86054.51 mm Reinforcement area (Ast) 69445.69 mm
2
Total Reinforcement area (A = 155500 mm Reinforcement % = 0.626
Min reinforcement % = 0.300 (Ok)
2
Cross-sectional area of uncracked section = 27909807 mm
4
Moment of inertia of uncracked section = 1.011E+13 mm

Reinforcement at midspan and Top


Bar Diameter (φ) = T 32 mm Number of bars = 54 Nos.
Bar Diameter (φ) = T 25 mm Number of bars = 53 Nos.
2 2
Reinforcement area (Ast) 69445.69 mm Reinforcement area (Ast) 69445.69 mm
2
Reinforcement area (Ast) = = 138891 mm Reinforcement % = 0.559
Total Reinforcement area (A = 0.300 (Ok)
2
Cross-sectional area of uncracked section = 27727184 mm
4
Moment of inertia of uncracked section = 9.962E+12 mm

Neutral axis Eff.area of Net


Comp. stress Bending stress Eccentricity
Load Case V (kN) Meq (kN-m) Check depth (n), cracked eccentrici
(Mpa) (Mpa) (mm)
Yassum section (mm2) ty (mm)

15702 17743 2.32 -1.19 Uncracked section 861.9 13087184 472.53 657.48
14055 24904 2.84 -1.83 Cracked section 675.7 10647487 527.83 1244.15
Bottom 15702 17743 2.23 -1.10 Uncracked section 861.9 13087184 472.53 657.48
support 15115 36446 3.96 -2.88 Cracked section 603.1 9695943 544.24 1867.00
section 14119 24837 2.84 -1.82 Cracked section 677.8 10675343 527.30 1231.80
14040 25192 2.87 -1.86 Cracked section 672.1 10600455 528.73 1265.54
14033 25260 2.87 -1.87 Cracked section 671.2 10588441 528.96 1271.11
11065 34846 3.67 -2.87 Cracked section 511.1 8292473 593.59 2555.64
9036 23034 2.48 -1.84 Cracked section 542.4 8702629 587.92 1961.31
10621 36555 3.81 -3.05 Cracked section 500.3 8150279 595.32 2846.51
Midspan
10480 22436 2.48 -1.73 Cracked section 575.8 9139578 580.89 1560.07
section
9508 23700 2.56 -1.88 Cracked section 546.3 8753142 587.15 1905.55
9530 29652 3.12 -2.44 Cracked section 512.7 8313013 593.33 2518.15
9465 29745 3.13 -2.45 Cracked section 511.4 8296045 593.54 2549.04
6471 11965 1.35 -0.89 Uncracked section 610.9 9598993 572.55 1276.48
4254 5840 0.70 -0.40 Uncracked section 711.3 10914263 544.39 828.42
Top support 5980 13110 1.44 -1.02 Uncracked section 570.8 9073962 582.00 1610.27
section 4726 7221 0.85 -0.51 Uncracked section 669.7 10369445 556.73 971.08
4748 8077 0.93 -0.59 Uncracked section 634.5 9908273 566.45 1134.58
4684 8343 0.95 -0.62 Uncracked section 621.1 9732407 569.96 1211.41

-------------------------------------------------------------------------------------------------------------------------------
183 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Compressive
Eff. M.I. of Stress at stress in Tensile stress
Calculated NA ycal-yassum
Load Case cracked
(mm)
Ycal (mm) neutral axis concrete in steel (σsbt)
section (mm4) (mm) (Mpa)
(σcbc)

2.8779E+12 334.47 334.47 0 0.000 3.09 -44.54


2.6962E+12 203.53 203.53 0 0.000 4.38 -95.01
Bottom 2.8779E+12 334.47 334.47 0 0.000 3.09 -44.54
support 2.6666E+12 147.31 147.30 0 0.000 6.38 -164.26
section 2.6974E+12 205.12 205.12 0 0.000 4.37 -94.30
2.6943E+12 200.84 200.84 0 0.000 4.43 -96.90
2.6938E+12 200.15 200.15 0 0.000 4.44 -97.36
2.2193E+12 104.72 104.72 0 0.000 6.51 -211.82
2.225E+12 130.36 130.36 0 0.000 4.32 -129.42
2.2179E+12 95.60 95.60 0 0.000 6.82 -228.38
Midspan
2.2341E+12 156.68 156.68 0 0.000 4.21 -115.98
section
2.2259E+12 133.45 133.45 0 0.000 4.45 -131.88
2.2195E+12 106.03 106.03 0 0.000 5.54 -179.53
2.2194E+12 104.95 104.95 0 0.000 5.56 -180.69
2.2474E+12 183.41 183.41 0 0.000 2.25 -56.70
2.3116E+12 255.66 255.66 0 0.000 1.08 -21.69
Top support 2.2325E+12 152.79 152.79 0 0.000 2.46 -68.62
section 2.2799E+12 226.42 226.42 0 0.000 1.35 -29.64
2.2588E+12 200.93 200.93 0 0.000 1.51 -36.12
2.2521E+12 191.02 191.02 0 0.000 1.56 -38.56

Maximum compressive stress = 6.82 Mpa < 19.20 Mpa Hence O.K.
Maximum tensile stress = 228.38 Mpa < 400.00 Mpa Hence O.K.

9.1.3.4 Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 97.36 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 257.5 mm
Ac,eff = 3373250 mm2 As/Ac,eff = 0.0255
fct,eff = = 3.03 Mpa εsm-εcm = 0.00029
>= 0.6σsc/Es= 0.0002921
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 75.00 mm 50 mm
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 32.0 mm k2 = 0.5
Sr,max = 468.2 mm Crack width, Wk = = 0.137 mm
< 0.3 mm OK
Bottom support section Midspan section Top support section
Description 1 2 3 1 2 3 1 2 3
Stress in steel, σs 94.3 96.9 97.4 131.9 179.5 180.7 29.6 36.1 38.6
As 86054.5 86054.5 86054.5 69445.7 69445.7 69445.7 69445.7 69445.7 69445.7
Diameter 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Actual NA 678 672 671 546 513 511 670 634 621
hc,eff 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5
Ac,eff 3373250 3373250 3373250 3373250 3373250 3373250 3373250 3373250 3373250
ρp,eff 0.026 0.026 0.026 0.021 0.021 0.021 0.021 0.021 0.021
εsm-εcm 0.00028 0.00029 0.00029 0.00040 0.00054 0.00054 0.00009 0.00011 0.00012
φeq 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Crack spacing Sr,max 468.2 468.2 468.2 434.2 434.2 434.2 519.2 519.2 519.2
Crack width, Wk 0.132 0.136 0.137 0.172 0.234 0.235 0.046 0.056 0.060
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.

-------------------------------------------------------------------------------------------------------------------------------
184 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.2 Abutment A2
Formation Level = 890.548 m
Foundation bottom level = 870.548 m
Length of wall = 12.000 m
Width of wall = 2.000 m
Depth of superstructure = 2.000 m
Depth of Foundation at abutment base = 2.400 m
Height of wall = 15.600 m

9.2.1 Summary of loads & moments


Weight of girder =388.62+380.99+373.36+365.73 = 1508.71 kN
Weght of deck =295.04+252.05+246.50+230.71 = 1024.31 kN
Weight of cap =12*2*2*25 = 1200.00 kN
Weight of wall =12*2*15.6*25 = 9360.00 kN

Total Dead load = 13093.02 kN


Moment due to Ecentritricity of girder =(1,508.71+1,024.31)*(2/2-0.5/2) = 1899.76 kN-m

Output of Midas file Bottom support section Mid section Top support section
Description Vertical load Shear Moment Vertical load Shear Moment Vertical load Shear Moment
Seismic in X- direction -482.2 -1350.2 13569.4 482.2 1350.2 3219.9 417.2 658.3 5155.5
Seismic in Z- direction -5395.2 -375.9 1503.2 5395.2 375.9 1424.9 1414.9 277.0 2571.0
Seismic in Y- direction -498.5 -48.7 191.5 498.5 48.7 194.7 175.9 56.4 446.9
Dead load = -13093.0 -860.0 -1899.8 -8413.0 -860.0 1899.8 -3733.0 860.0 1899.8
SIDL (DL) from staad output -317.2 -111.2 -524.1 -317.2 -111.2 337.4 -317.2 111.2 1256.0
SIDL (WC) from staad output-347.7 -122.4 -576.9 -347.7 -122.4 372.1 -347.7 122.4 1383.2
Earth pressure k* 91.7 15994.4 36262.9 -91.7 -2008.4 -32588.2 91.7 6711.5 -5108.0
Earth pressure at rest -51.7 12792.9 26338.1 51.7 -987.3 -22878.7 51.7 4463.0 -3420.3
Live load surcharge -120.9 -324.3 3855.7 120.9 324.3 -1342.1 120.9 324.3 1343.6
Dynamic increment of Earth pr. 16.5 2689.3 -8444.1 16.5 -474.4 7714.4 16.5 1570.7 1272.6
Dynamic increment of LL Surcharge
-45.3 -121.5 1444.5 45.3 121.5 502.6 45.3 121.5 503.7
Wind load (unloaded structure)
-417.0 -166.1 930.9 417.0 166.1 -356.7 417.0 166.1 1715.3
Wind load (loaded structure) -219.3 -94.8 581.3 219.3 94.8 -153.6 219.3 94.8 -924.6
Differential settlement 286.5 -85.7 1310.4 -286.5 85.7 -1642.5 286.5 85.7 -1994.4
Temperature rise 77.6 -1524.4 -18180.1 -77.6 1524.4 6366.2 77.6 1524.4 6227.1
Temperature fall 36.0 694.5 8350.4 -36.0 -694.5 -2967.9 -36.0 -694.5 -2769.6
Creep & shrinkage 21.8 600.8 6327.0 -21.8 -600.8 -1670.5 -21.8 -600.8 -3293.3
Footpath live load -86.1 -29.1 -137.8 86.1 29.1 87.7 86.1 29.1 328.3
Snow load -224.7 -79.0 -372.2 224.7 79.0 239.8 224.7 79.0 891.9
Braking load -31.3 -77.1 -898.4 31.3 77.1 -300.7 31.3 77.1 336.8
Hyperstatic action 2.8 -341.6 -2113.2 -2.8 341.6 534.2 -2.8 341.6 3355.8
Live Load Max -1277.4 338.1 25.1 -1277.4 338.1 1293.0 -1418.5 619.0 4595.8
Min 45.6 0.0 -1663.2 45.6 0.0 -113.0 40.0 -118.5 0.0
9.2.2 Ultimate limit state
9.2.2.1 Load Combination As per Clause 706 of IRC:78-2014
1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+Live load(leading) + Temp load(accompany)
6) Dead load +SIDL+Live load(accompany) + Temp load(lead)
7) Dead load +SIDL+Live load(accompany) +seismic load(leading)

Load DL, Support settle, snow


Transverse Vertical
load,Creep & shrinkage, SIDL(DL) SIDL(WC) Earth pr. Live load LL Surcharge Wind load Temp load Long. Seismic
Case prestress loss Seismic Seismic

1 1.35 1.35 1.75 1.35 1.5 1.2


2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
3 (a) 1.35 1.35 1.75 1.35 1.5 1.2 0.9
3 (b) 1 1 1 1 1.5 1.2 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.2 1.5
4 (b) 1 1 1 1 1.15 1.2 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 1.2 0.9
5 (b) 1 1 1 1 1.5 1.2 0.9
6 (a) 1.35 1.35 1.75 1.35 1.15 1.2 1.5
6 (b) 1 1 1 1 1.15 1.2 1.5
7 (a) 1.35 1.35 1.75 1 0.2 0.2 1.5 0.45 0.45
7 (b) 1.35 1.35 1.75 1 0.2 0.2 0.45 1.5 0.45
7 (c) 1.35 1.35 1.75 1 0.2 0.2 0.45 0.45 1.5
7 (d) 1 1 1 1 0.2 0.2 1.5 0.45 0.45
7 (e) 1 1 1 1 0.2 0.2 0.45 1.5 0.45
7 (f) 1 1 1 1 0.2 0.2 0.45 0.45 1.5

-------------------------------------------------------------------------------------------------------------------------------
185 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Bottom support section Mid section Top support section


Vertical load Shear Moment Vertical load Shear Moment Vertical load Shear Moment
1 -19401.5 16333.9 26015.8 -11568.1 -3447.1 -25086.4 -7156.0 8899.7 10163.5
2 (a) -20064.5 15854.8 36088.0 -11042.0 -2968.0 -26743.0 -4724.0 7671.9 3232.7
2 (b) -14921.8 11716.0 27264.8 -7914.0 -2097.6 -20058.6 -3234.0 5711.2 2651.8
3 (a) -19598.9 16248.6 26538.9 -11370.7 -3361.8 -25224.6 -6780.7 9049.2 11707.3
3 (b) -14456.1 12109.8 17715.7 -8242.8 -2491.4 -18540.2 -5290.8 7088.6 11126.4
4 (a) -19705.4 16228.9 27832.4 -11296.2 -3342.1 -25202.7 -6075.1 8895.1 10895.2
4 (b) -14562.6 12090.0 19009.2 -8168.3 -2471.7 -18518.3 -4585.2 6934.4 8626.6
5 (a) -19175.5 21281.1 46929.6 -11794.1 -5450.7 -40865.3 -7134.5 11310.2 5392.5
5 (b) -14083.0 16021.7 34632.7 -8616.0 -4222.9 -30782.6 -5658.6 8562.5 5402.3
6 (a) -19128.8 21735.0 52884.6 -11872.8 -5904.6 -42532.0 -6700.8 10639.6 1889.4
6 (b) -14036.2 16475.6 40587.7 -8694.7 -4676.8 -32449.3 -5224.8 7892.0 1899.2
7 (a) -22618.5 16689.4 42537.8 -8420.4 -2431.6 -10576.4 -4197.4 11812.6 12490.3
(+)ve 7 (b) -27794.4 14888.6 38734.5 -3279.0 -2956.5 -20561.3 -3167.1 9763.0 8440.3
value of 7 (c) -22652.9 15232.1 37357.2 -8420.6 -3300.1 -21853.0 -4468.0 9531.3 6209.9
seismic 7 (d) -17493.9 17028.0 42932.9 -5274.3 -1906.8 -11899.6 -2689.4 11414.0 10712.3
force 7 (e) -22669.8 15227.3 39129.6 -133.0 -2431.7 -21884.5 -1659.1 9364.4 6662.3
7 (f) -17528.2 15570.8 37752.3 -5274.5 -2775.2 -23176.1 -2960.0 9132.7 4432.0
7 (a) -15895.3 -3405.3 10596.1 -21560.3 -22011.0 -65057.4 -20117.9 -14574.8 -26057.7
(-)ve 7 (b) -10719.4 -1604.5 14399.4 -26701.7 -21486.1 -55072.5 -21148.2 -12525.2 -22007.7
value of 7 (c) -15860.9 -1948.0 15776.6 -21560.1 -21142.5 -53780.9 -19847.3 -12293.5 -19777.4
seismic 7 (d) -10770.6 1214.9 14908.8 -16776.3 -17204.6 -61133.1 -15133.3 -10029.9 -23984.3
force 7 (e) -5594.7 3015.7 18712.1 -21917.6 -16679.7 -51148.2 -16163.6 -7980.3 -19934.3
7 (f) -10736.3 2672.2 20089.4 -16776.1 -16336.1 -49856.5 -14862.7 -7748.6 -17703.9
Maximum V -27794.4 14888.6 38734.5 -26701.7 -21486.1 -55072.5 -21148.2 -12525.2 -22007.7
Minimum V -5594.7 3015.7 18712.1 -133.0 -2431.7 -21884.5 -1659.1 9364.4 6662.3
Max shear -15895.3 -3405.3 10596.1 -21560.3 -22011.0 -65057.4 -20117.9 -14574.8 -26057.7
Max moment -19128.8 21735.0 52884.6 -8420.4 -2431.6 -10576.4 -4197.4 11812.6 12490.3
Min moment -17528.2 -3405.3 10596.1 -21560.3 -22011.0 -65057.4 -20117.9 -14574.8 -26057.7
9.2.2.2 Design of Pier in Ultimate Limit State
1. Material data
[a] Concrete data (parabolic rectangular stress-strain relation)
Characteristic strength = 40.0 MPa E value of concrete = 33346 MPa
Peak strain at failure εcu2 = 0.0035 Strain at peak stress εc2 = 0.0020
Strength reduction α = 0.67 Partial factor of safety γc = 1.50
Design strength fcd = 17.84 MPa
[b] Reinforcement data (idealized elastic-perfectly plastic stress-strain relation)
Grade of steel = 500.0 MPa E value of steel = 200000 MPa
Partial factor of safety γs = 1.15 Design strength of steel fsd = 434.78 MPa
Yield strain of steel = 0.0022 Failure strain of steel = 0.1600

2. Geometric details
[a] Dimension detail of column
Actual column length = 15.60 m Effective length multiplier = 1.50
Width of section = 12000 mm
Depth of section = 2000 mm Radius of gyration, i = 577.4 mm
Effective length of col l e = 23.40 m Slenderness ratio λ = 40.53
Reinforcement provided
Tension face At bottom 97 Nos. T 32 48.5 = 78012 mm2
At Top & middle 49 Nos. T 32 = 62970 mm2
48 Nos. T 25
Compression face 49 Nos. T 32 = 62970 mm2
48 Nos. T 25
Side side 12 Nos. T 25 = 5890 mm2
12 Nos. T 25 = 5890 mm2
Stiruups 16 T @ 100 c/c Total = 152763 mm2
12 T @ 100 c/c or = 137721 mm2

Ductile detailing for Seismic case, (although, this is applicable for seismic zone III, IV, V)
For rectangular Column
As per Clause No. 7.4 of IS 13920:1993, Ash = 0.18ShSDkxfck/fy[Ag/Ak-1.0)
Ash Area of tranverse Reinforcement = 201.1 mm2
D Larger Dimensionr of Column = 2000 mm
h Larger dimension of Core measured to the outside of the spiral = 308.3333 mm
fck = M40
fy = M500

-------------------------------------------------------------------------------------------------------------------------------
186 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Ag Gross area of the Column cross section = 24000000 mm2


Ak Area of the Concrete core = 21922500 mm2
S Specing of spiral or hoop = 477.85 mm
Say 100 mm
d' = 82.000 mm Pt = 0.637 %
d'/D = 0.041 Pt/fck = 0.016
φef = effective creep ratio = φ(∞,o) * Moeqp/Moed
[a] Parameters for limiting slenderness ratio
λlim value is given by as per Eq 11.1 of IRC 112-2011
λlim = 20 * A * B * C / SQRT (n) A = 1/( 1+0.2*φef)
As per Eq A2-14, 15, 16 of IRC 112-2011
φef = effective creep ratio = φ(∞,o) * Moeqp/Moed φo = φRH * β(fcm) *β (t0) Moed = BM in ULS
φ(∞,o) = φo* β (∞,0) φo = φRH * β(fcm) *β (t0) β (∞,0) =1
φRH = 1+ (1-RH/100)/0.1*h0^1/3 RH = relative humidity = 70 %
h0 = 2*Ac/u 857 mm φRH = 1.32
β(fcm) = 18.78/sqrt(fcm) 2.66 β (t0) = 1/(0.1+to^0.2) 0.488
to = age in days of loading = 28 days So, φ0 = 1.707
φ(∞,o) = φo* β (∞,0) 1.707
Moeqp = 10000.0 kNm Moed = 52884.6 kNm
So, φef = 0.32 So , A = 0.939

B = SQRT( 1+2w) 1.14 C = 1.7 - rm rm = 1


w= As*fyd/Ac*fcd = 0.155 C= 0.7
n= Ned/Ac*fcd 0.065 λlim = 20 * A * B * C / SQRT (n) 59.08
[b] Eccentricity due to slenderness
M2 = Ned * e2 Ned = Design Axial Force e2 = deflection = (1/r)*le^2/C
le = effective length = = 23.40 m C= 10
1/r = curvature = Kr* Kφ * 1/r0 kr= (nu-n)/(nu-nbal)<=1 ..Eq 11.9 of IRC 112-2011
nu = 1+w = = 1.155 n= NED/AcxfCD
nbal = = 0.4
Kφ = 1+ β * φ ef φ ef = = 0.32
β= 0.35+fck/200- = 0.280 The coefficient Kφ = 1.09
1/r0 = fyd/(Es*0.45*d) = 0.0004 1/m
[c] Design bending moment
Moment of
n = N ed / M Ed
Load case N Ed (kN) M 0Ed (kNm) λ lim Kr e 2 (m) Resistance, M R/MED Check
(A c f cd ) (kNm) M R (kN-m)
Bottom Support section
1 27794.4 38734.5 0.06 59.08 1.00 0.000 38734.5 89908 2.32 O.K.
2 5594.7 18712.1 0.01 131.68 1.00 0.000 18712.1 70942 3.79 O.K.
3 15895.3 10596.1 0.04 78.12 1.00 0.000 10596.1 80175 7.57 O.K.
4 19128.8 52884.6 0.04 71.21 1.00 0.000 52884.6 83022 1.57 O.K.
5 17528.2 10596.1 0.04 74.40 1.00 0.000 10596.1 81613 7.70 O.K.
Middle Span section
6 26701.7 55072.5 0.06 60.28 1.00 0.000 55072.5 78091 1.42 O.K.
7 133.0 21884.5 0.00 854.03 1.00 0.000 21884.5 54255 2.48 O.K.
8 21560.3 65057.4 0.05 67.08 1.00 0.000 65057.4 73565 1.13 O.K.
9 8420.4 10576.4 0.02 107.34 1.00 0.000 10576.4 61750 5.84 O.K.
10 21560.3 65057.4 0.05 67.08 1.00 0.000 65057.4 73565 1.13 O.K.
Top Support section
11 21148.2 22007.7 0.05 67.73 1.00 0.000 22007.7 73201 3.33 O.K.
12 1659.1 6662.3 0.00 241.81 1.00 0.000 6662.3 55637 8.35 O.K.
13 20117.9 26057.7 0.05 69.44 1.00 0.000 26057.7 73201 2.81 O.K.
14 4197.4 12490.3 0.01 152.03 1.00 0.000 12490.3 57933 4.64 O.K.
15 20117.9 26057.7 0.05 69.44 1.00 0.000 26057.7 82488 3.17 O.K.

9.2.2.2 Capacity of the section at bottom of wall


[a] Cross section
Width of column = 12000.0 mm Depth of column = 2000.0 mm
Clear cover = 75.0 mm Effective depth = 1893 mm
Effective cover d' = 107.0 mm
[a] Concrete property (parabolic rectangular stress-strain relation)
Characteristic strength = 40.0 MPa E value of concrete = 33346 MPa
Peak strain at failure εcu2 = 0.0035 Strain at peak stress εc2 = 0.0020
Strength reduction α = 0.67 Partial factor of safety γc = 1.50
Design strength fcd = 17.84 MPa

-------------------------------------------------------------------------------------------------------------------------------
187 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Stress Stress

= 0.0020 = 0.0035 Strain Yeild strain = 0.00217 Strain


Stress - strain diagram for concrete Stress - strain diagram for steel
0.0035
Asc = = 78012 mm2
227.08 CG
Compression Zone
2000.0 NA
Ast = = 62970 mm2 Tension Zone
12000.0 Strain Block for concrete & Steel

[b] Reinforcement property (idealized elastic-perfectly plastic stress-strain relation)


Grade of steel fy = 500.0 MPa E value of steel = 200000 MPa
Partial factor of safety γs = 1.15 Yield strain of steel = fy/(1.15*Es) = 0.00217
Design strength of steel fsd = 434.78 MPa Max. strain of steel = fy/(1.15*Es)+0.002 = 0.00417
Reinforcement provided
Tension face 97 Nos. T 32 = 78012 mm2
Compression face 49 Nos. T 32 = 62970 mm2
48 Nos. T 25
Side sides 12 Nos. T 25 = 5890 mm3 at each side
Assume Neutral axis depth = 227.08 mm
The section is divided into 12 segments in depths i.e; depth of each segments = = 167 mm
Contribution from concrete:
Depth CG Moment (KN-
Sl no Section Length (mm) Area (mm2) Strain Stress (MPa) Force (KN)
(mm) (mm) m)
1 1 12000 166.67 2000000 83.3 0.0022 17.84 35674.5 32701.6
2 2 12000 166.67 2000000 250.0 -0.0004 0.00 0.0 0.0
3 3 12000 166.67 2000000 416.7 -0.0029 0.00 0.0 0.0
4 4 12000 166.67 2000000 583.3 -0.0055 0.00 0.0 0.0
5 5 12000 166.67 2000000 750.0 -0.0081 0.00 0.0 0.0
6 6 12000 166.67 2000000 916.7 -0.0106 0.00 0.0 0.0
7 7 12000 166.67 2000000 1083.3 -0.0132 0.00 0.0 0.0
8 8 12000 166.67 2000000 1250.0 -0.0158 0.00 0.0 0.0
9 9 12000 166.67 2000000 1416.7 -0.0183 0.00 0.0 0.0
10 10 12000 166.67 2000000 1583.3 -0.0209 0.00 0.0 0.0
11 11 12000 166.67 2000000 1750.0 -0.0235 0.00 0.0 0.0
12 12 12000 166.67 2000000 1916.7 -0.0260 0.00 0.0 0.0
35674.47 32701.60
Contribution from Steel: Spacing of side reinforcements = 198.4 mm
CG Moment (KN-
Sl no Section Area (mm2) Strain Stress (MPa) Force (KN)
(mm) m)
1 1 62970 107.0 0.0019 352.71 22210.3 19833.8
2 2 1473 305.4 -0.0012 -241.58 -355.8 -247.1
3 3 1473 503.9 -0.0043 -434.78 -640.3 -317.6
4 4 1473 702.3 -0.0073 -434.78 -640.3 -190.6
5 5 1473 900.8 -0.0104 -434.78 -640.3 -63.5
6 6 1473 1099.2 -0.0134 -434.78 -640.3 63.5
7 7 1473 1297.7 -0.0165 -434.78 -640.3 190.6
8 8 1473 1496.1 -0.0196 -434.78 -640.3 317.6
9 9 1473 1694.6 -0.0226 -434.78 -640.3 444.7
10 10 78012 1893.0 -0.0257 -434.78 -33918.3 30289.0
TOTAL 152763 -16545.7 50320.4
TOTAL CAPACITY OF THE SECTION
FORCE= 19128.80 kN MOMENT= 83022 kNm

-------------------------------------------------------------------------------------------------------------------------------
188 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.2.2.3 Capacity of the section at middle of wall


[a] Cross section
Width of column = 12000.0 mm Depth of column = 2000.0 mm
Clear cover = 75.0 mm Effective depth = 1893.0 mm
Effective cover d' = 107.0 mm
[a] Concrete property (parabolic rectangular stress-strain relation)
Characteristic strength = 40.0 MPa E value of concrete = 33346 MPa
Peak strain at failure εcu2 = 0.0035 Strain at peak stress εc2 = 0.0020
Strength reduction α = 0.67 Partial factor of safety γc = 1.50
Design strength fcd = 17.84 MPa

Stress Stress

= 0.0020 = 0.0035 Strain Yeild strain = 0.00217 Strain


Stress - strain diagram for concrete Stress - strain diagram for steel
0.0035
Asc = = 62970 mm2
127.45 CG
Compression Zone
2000.0 NA
Ast = = 62970 mm2 Tension Zone
12000.0 Strain Block for concrete & Steel

[b] Reinforcement property (idealized elastic-perfectly plastic stress-strain relation)


Grade of steel fy = 500.0 MPa E value of steel = 200000 MPa
Partial factor of safety γs = 1.15 Yield strain of steel = fy/(1.15*Es) = 0.00217
Design strength of steel fsd = 434.78 MPa Max. strain of steel = fy/(1.15*Es)+0.002 = 0.00417
Reinforcement provided
Tension face 49 Nos. T 32 = 62970 mm2
48 Nos. T 25
Compression face 49 Nos. T 32 = 62970 mm2
48 Nos. T 25
Side sides 12 Nos. T 25 = 5890 mm3 at each side
Assume Neutral axis depth = 127.45 mm
The section is divided into 12 segments in depths i.e; depth of each segments = = 167 mm
Contribution from concrete:
Depth CG Moment (KN-
Sl no Section Length (mm) Area (mm2) Strain Stress (MPa) Force (KN)
(mm) (mm) m)
1 1 12000 166.67 2000000 83.3 0.0012 15.07 30130.1 27619.3
2 2 12000 166.67 2000000 250.0 -0.0034 0.00 0.0 0.0
3 3 12000 166.67 2000000 416.7 -0.0079 0.00 0.0 0.0
4 4 12000 166.67 2000000 583.3 -0.0125 0.00 0.0 0.0
5 5 12000 166.67 2000000 750.0 -0.0171 0.00 0.0 0.0
6 6 12000 166.67 2000000 916.7 -0.0217 0.00 0.0 0.0
7 7 12000 166.67 2000000 1083.3 -0.0262 0.00 0.0 0.0
8 8 12000 166.67 2000000 1250.0 -0.0308 0.00 0.0 0.0
9 9 12000 166.67 2000000 1416.7 -0.0354 0.00 0.0 0.0
10 10 12000 166.67 2000000 1583.3 -0.0400 0.00 0.0 0.0
11 11 12000 166.67 2000000 1750.0 -0.0446 0.00 0.0 0.0
12 12 12000 166.67 2000000 1916.7 -0.0491 0.00 0.0 0.0
30130.14 27619.29
Contribution from Steel: Spacing of side reinforcements = 198.4 mm
CG Moment (KN-
Sl no Section Area (mm2) Strain Stress (MPa) Force (KN)
(mm) m)
1 1 62970 107.0 0.0006 104.30 6567.7 5865.0
2 2 1473 305.4 -0.0049 -434.78 -640.3 -444.7
3 3 1473 503.9 -0.0103 -434.78 -640.3 -317.6
4 4 1473 702.3 -0.0158 -434.78 -640.3 -190.6
5 5 1473 900.8 -0.0212 -434.78 -640.3 -63.5
6 6 1473 1099.2 -0.0267 -434.78 -640.3 63.5
7 7 1473 1297.7 -0.0321 -434.78 -640.3 190.6
8 8 1473 1496.1 -0.0376 -434.78 -640.3 317.6
9 9 1473 1694.6 -0.0430 -434.78 -640.3 444.7
10 10 62970 1893.0 -0.0485 -434.78 -27378.3 24448.8
TOTAL 137721 -25932.7 30313.8
TOTAL CAPACITY OF THE SECTION
FORCE= 4197.42 kN MOMENT= 57933 kNm

-------------------------------------------------------------------------------------------------------------------------------
189 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.2.2.4 Shear design


VRD= Design Shear Force of the concrete section = 3405.3 kN
Vccd= Design component of Shear Force in the compression area due to inclined compression chord
Vtd= Design component of Shear Force in tensile reinforcement due to inclined tensile chord
VRd.s= Design value of Shear Force for yielding of vertical shear reinforcement
VRD= VRd.s + Vccd + Vtd Here, Vccd= Vtd = 0.0 kN
Hence, VRD= VRd.s
Along Long Direction (X-X)
Design the section without shear reinforcement Design shear = = 3405.3 kN
VRD,C= Design Shear Resistance of the concrete section = [0.12K(80p1fck)^0.33+0.15σCP]bwd
Grade Concrete M40 = Grade of steel = Fe 500
Width of beam 12000 mm
= Effective depth, d = 1893 mm
K= 1+sqrt(200/d)<=2.0 = 1.33 z = 1666 mm
vmin = 0.30 MPa p1 = Asl/bwd <=0.02 = 0.0067
σCP = = 0.00 MPa δ = 0.000 rad
Reduction of shear force as per cl. No. 10.3.2 (5) of IRC:112-2011 Mtanδ/d = 0.0 kN
αV = d= 1893 mm β = αV /2d = 0.5
VRD,C = 9944.4 kN > V-Mtand/d = 3405.3 kN
Hence shear reinforcement Not required
Design the section with shear reinforcement
Max VEd = 0.5bwdvfcd v= 0.6*(1 - fck/310)
Max Ved = 105872.4 kN > 3405.3 kN Hence O.K.
Design Tensile stress in stirrups (fywd= 0.8fyk/γm) = 347.8 Mpa
VRd,s = Asw / s. z. fywd cot θ by yielding of the Vertical reinforcement
VRd,max = acw bw z v1 fcd / (cot θ + tan θ) by Crushing of Compression strut
Concrete Strength (fcd) = 17.8 Mpa Coeff accounting stress in compression chord n1 = 0.60
The maximum effective cross sectional shear reinforcement, Aswmax for Cotφ =1
VRD,S = VRd,max (Asw/s) z fywd Cotθ ≤ acw bw z v1 fcd / (cot θ + tan θ)
For, Cotθ =1 (Asw/s) fywd ≤ 1/2 acw bw v1 fcd
acw = 1 Asw/s ≤ 1/2 acw bw v1 fcd/fywd ≤ 184.62 mm
Minimum Asw/s required (ASW /sbw=0.072*sqrt(fck)/fyk) = 10.929 mm
Hence Provide At top & bottom support 49 - L 12 Stirrups @ 100 c/c
At Midspan 49 - L 12 Stirrups @ 150 c/c
Asv , provided = 5541.77 mm2 Asv /s, provided = 55.418 mm
Shear resistance provided by reinf V RD,S = (Asw/s) z fywd Cotθ
Shear capacity of compression strut V RD,max = acw bw z v1 fcd / (cot θ + tan θ)
V RD,S = 76414.7 kN Assume, θ = 22.79 degree
V RD,max = 76414.7 kN V RD,S - V RD,max = 0.0 kN
Shear design
Bottom support Midspan Top support
Description
section section section
Prestress Force after all losses (kN) 0.0 0.0 0.0
Design Shear Force of the concrete (kN) 3405.3 2431.6 26701.7
Shear demand of Beam (kN) 3405.3 2431.6 26701.7
Width of beam, b (mm) 12000 12000 12000
Effective depth, d 1893 1893 1893
Lever arm taken from flexural analysis z (m) 1666 1666 1666
K= 1.33 1.33 1.33
vmin = 0.30 0.30 0.30
p1 = 0.0067 0.0055 0.0055
VRD,C= 9944.41 6793.10 9330.54
Shear reinf. Not Shear reinf. Shear reinf.
Check required Not required required
Minimum area of Shear reinf. reqd Asw/s (mm2/mm) 10.929 10.929 10.929
Area of shear reinforcement provided (mm) 5541.77 5541.77 5541.77
Spacing of stirrups provided (mm) 100.000 150.000 100.000
Area of shear reinf provided Asw/s (mm2/mm) 55.418 36.945 55.418
Angle of compression strut θ (degrees) 22.79 18.44 22.79
Shear resistance provided by reinf V RD,s (kN) 76415 64202 76415
Coeff accounting stress in comp chord αcw 1.000 1.000 1.000
Shear capacity of compression strut V RD,max (kN) 76415 64202 76415
Difference in shear resistance (kN) 0.0 0.0 0.0
Shear capacity of the Section (kN) 76415 64202 76415
Factor of Safety associated with failure 22.44 26.40 2.86
Longitudinal tensile force ∆Ftd (kN) 4052 3646 31770
Area of steel required for shear due stut & tie model 9319 8386 73071

-------------------------------------------------------------------------------------------------------------------------------
190 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

9.2.3 Servicebility limit State Method


9.2.3.1 Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
Wind on
DL, Support Live load Wind on loaded
Load Case SIDL(DL) SIDL(WC) Earth pr. Live load unloaded Temperature
settle, snow load surcharge structure
structure

1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1
2 (b) 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.8 0.6
3 (b) 1 1 1 1 1 0.8 0.6
4 (a) 1 1 1.2 1 0.75 0.8 1
4 (b) 1 1 1 1 0.75 0.8 1
5 (a) 1 1 1.2 1 1 0.8 0.6
5 (b) 1 1 1 1 1 0.8 0.6
6 (a) 1 1 1.2 1 0.75 0.8 1
6 (b) 1 1 1 1 0.75 0.8 1

9.2.3.2 Load Combination for Quasi-permanent (SL3) - for RCC structure


1) Dead load +SIDL
2) Dead load +SIDL+Temperature(lead)
Wind on
DL, Support Wind on loaded
Load Case SIDL(WC) Earth pr. Earth pr. Live load unloaded Temperature
settle structure
structure

1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5

Rare Combination
Bottom support section Midspan section Top support section
Load Case V (kN) M (kN-m) V (kN) M (kN-m) V (kN) M (kN-m)
1(a) -14365.79 25753.07 -8609.09 -19449.11 -4502.16 4344.21
1(b) -14296.26 25868.45 -8539.55 -19523.53 -4432.63 4067.56
2 (a) -14782.80 26683.97 -8192.08 -19805.83 -4085.15 6059.56
2 (b) -14713.27 26799.35 -8122.55 -19880.25 -4015.62 5782.91
3 (a) -14409.78 22114.65 -8473.86 -18192.25 -4372.52 2706.07
3 (b) -14340.25 22230.03 -8404.33 -18266.66 -4302.99 2429.42
4 (a) -14495.21 22572.81 -8411.25 -18322.55 -4308.51 2338.35
4 (b) -14425.68 22688.19 -8341.71 -18396.96 -4238.97 2061.70
5 (a) -14113.20 36700.95 -8770.45 -29590.34 -4485.79 -88.57
5 (b) -14043.67 36816.33 -8700.91 -29664.75 -4416.26 -365.22
6 (a) -14096.50 40266.75 -8809.96 -30846.36 -4523.90 -1194.29
6 (b) -14026.96 40382.13 -8740.43 -30920.77 -4454.37 -1470.94
MaxV -14782.80 26684.0 -8809.96 -30846.4 -4523.90 -1194.3
MinV -14026.96 40382.1 -8122.55 -19880.2 -4015.62 5782.9
MaxM -14026.96 40382.1 -8473.86 -18192.2 -4085.15 6059.6
MinM -14409.78 22114.7 -8740.43 -30920.8 -4454.37 -1470.9
Quasi-permanent
1 -13786.63 28373.89 -9176.07 -22740.97 -3923.00 330.00
2 (a) -13625.22 29208.65 -9337.49 -29267.40 -3901.10 1755.91
2 (b) -13561.77 29324.03 -9274.04 -29334.89 -3837.65 1504.70

9.2.3.3 Uniaxial Stress check


Material Data
Grade of Concrete = M40
Grade of Steel = Fe500
Permissible bending tensile stress in concrete (σct) = 1.41 Mpa
Permissible bending compressive stress in concrete (σcb) = 19.20 Mpa
Permissible tensile stress in steel (σst) = 400.00 Mpa
Es = 200000 Mpa
Creep Coefficient, φ = 1 Ecm of concrete = 33346 MPa
Ec, eff = Ecm /(1+φ) = 16673 MPa
-------------------------------------------------------------------------------------------------------------------------------
191 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Modular Ratio = 12.00


Geometric data
Width of wall = 2000.0 mm Length of wall = 12000.0 mm
Clear cover (d'') = 75 mm Effective cover (d'=d''+φ/2) = 103 mm
Width of wall (d) = 1897.0 mm
Reinforcement at bottom
Bar Diameter (φ) = T 32 mm Number of bars = 97 Nos.
Bar Diameter (φ) = T 32 mm Number of bars = 49 Nos.
= T 25 mm = 48 Nos.
2 2
Reinforcement area (Ast) 78012.03 mm Reinforcement area (Ast) 62970.08 mm
2
Reinforcement area (Ast) = = 140982 mm Reinforcement % = 0.619
Min reinforcement % = 0.300 (Ok)
2
Cross-sectional area of uncracked section = 25550173 mm
4
Moment of inertia of uncracked section = 9.247E+12 mm

Reinforcement at midspan and Top


Bar Diameter (φ) = T 32
mm Number of bars = 49Nos.
= T 25
mm = 48Nos.
Bar Diameter (φ) = T 32
mm Number of bars = 49Nos.
= T 25
mm = 48Nos.
2 2
Reinforcement area (Ast) 62970.08 mm Reinforcement area (Ast) 62970.08 mm
2
Reinforcement area (Ast) = = 125940 mm Reinforcement % = 0.553
Min reinforcement % = 0.300 (Ok)
2
Cross-sectional area of uncracked section = 25384778 mm
4
Moment of inertia of uncracked section = 9.114E+12 mm

Neutral axis Eff.area of Net


Comp. stress Bending stress Eccentricity
Load Case V (kN) Meq (kN-m) Check depth (n), cracked eccentrici
(Mpa) (Mpa) (mm)
Yassum section (mm2) ty (mm)

14783 26684 3.46 -2.31 Cracked section 668.1 9644962 530.91 1274.16
14027 40382 4.69 -3.59 Cracked section 570.8 8477294 551.61 2327.28
Bottom 14027 40382 4.69 -3.59 Cracked section 570.8 8477294 551.61 2327.28
support 14410 22115 2.83 -1.70 Cracked section 719.6 10263936 517.35 1017.34
section 13787 28374 3.45 -2.37 Cracked section 634.3 9239841 538.89 1519.18
13625 29209 3.53 -2.46 Cracked section 625.0 9128178 540.95 1602.77
13562 29324 3.54 -2.48 Cracked section 623.1 9105379 541.37 1620.89
8810 30846 3.51 -2.82 Cracked section 496.5 7405149 597.17 2904.13
8123 19880 2.36 -1.72 Cracked section 547.5 8018063 588.06 1859.48
8474 18192 2.20 -1.53 Cracked section 573.1 8325463 582.58 1564.28
Midspan
8740 30921 3.51 -2.83 Cracked section 495.3 7391240 597.35 2940.33
section
9176 22741 2.69 -1.97 Cracked section 545.3 7991542 588.51 1889.78
9337 29267 3.37 -2.64 Cracked section 509.8 7565800 595.04 2539.36
9274 29335 3.37 -2.65 Cracked section 508.7 7551712 595.24 2567.88
4524 -1194 0.05 0.30 Uncracked section 3861.8 47789263 -903.88 639.88
4016 5783 0.75 -0.44 Uncracked section 689.5 9721952 551.86 888.25
Top support 4085 6060 0.78 -0.46 Uncracked section 678.2 9586403 555.19 928.12
section 3923 -330 0.12 0.19 Uncracked section 3312.1 41193166 -634.37 550.25
3901 -1756 -0.03 0.33 Uncracked section 4431.3 54623704 -1184.48 734.37
3838 -1505 0.00 0.30 Uncracked section 4253.8 52493368 -1096.90 704.81

-------------------------------------------------------------------------------------------------------------------------------
192 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Compressive
Eff. M.I. of Stress at stress in Tensile stress
Calculated NA ycal-yassum
Load Case cracked
(mm)
Ycal (mm) neutral axis concrete in steel (σsbt)
section (mm4) (mm) (Mpa)
(σcbc)

2.4452E+12 198.97 198.97 0 0.000 5.15 -113.56


2.4143E+12 122.37 122.37 0 0.000 7.72 -215.11
Bottom 2.4143E+12 122.37 122.37 0 0.000 7.72 -215.11
support 2.4747E+12 237.00 237.00 0 0.000 4.26 -83.66
section 2.4311E+12 173.20 173.20 0 0.000 5.46 -130.49
2.4279E+12 165.95 165.95 0 0.000 5.62 -137.24
2.4273E+12 164.47 164.47 0 0.000 5.64 -138.39
2.0134E+12 93.62 93.62 0 0.000 6.31 -213.49
2.0215E+12 135.59 135.59 0 0.000 4.09 -120.94
2.0281E+12 155.73 155.73 0 0.000 3.75 -103.79
Midspan
2.0133E+12 92.64 92.64 0 0.000 6.32 -214.64
section
2.0211E+12 133.83 133.82 0 0.000 4.68 -139.12
2.015E+12 104.88 104.88 0 0.000 6.00 -195.81
2.0148E+12 103.90 103.90 0 0.000 6.01 -196.85
5.9872E+13 1957.91 1957.92 0 0.000 0.19 1.14
2.0844E+12 241.37 241.37 0 0.000 1.18 -24.79
Top support 2.0767E+12 233.41 233.41 0 0.000 1.24 -26.69
section 3.8029E+13 1677.75 1677.75 0 0.000 0.19 0.96
9.0131E+13 2246.85 2246.85 0 0.000 0.14 0.97
7.9801E+13 2156.90 2156.90 0 0.000 0.14 0.96

Maximum compressive stress = 7.72 Mpa < 19.20 Mpa Hence O.K.
Maximum tensile stress = 215.11 Mpa < 400.00 Mpa Hence O.K.

9.2.3.4 Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 138.39 Mpa αe =Es/Ecm = 5.998
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 257.5 mm
Ac,eff = 3090000 mm2 As/Ac,eff = 0.0252
fct,eff = = 3.03 Mpa εsm-εcm = 0.00042
>= 0.6σsc/Es= 0.0004152
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 75.00 mm 50
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 32.0 mm k2 = 0.5
Sr,max = 470.5 mm Crack width, Wk = = 0.195 mm
< 0.3 mm OK
Bottom support section Midspan section Top support section
Description 1 2 3 1 2 3 1 2 3
Stress in steel, σs 130.5 137.2 138.4 139.1 195.8 196.8 -1.0 1.0 1.0
As 78012.0 78012.0 78012.0 62970.1 62970.1 62970.1 62970.1 62970.1 62970.1
Diameter 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Actual NA 634 625 623 545 510 509 3312 4431 4254
hc,eff 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5 257.5
Ac,eff 3090000 3090000 3090000 3090000 3090000 3090000 3090000 3090000 3090000
ρp,eff 0.025 0.025 0.025 0.020 0.020 0.020 0.020 0.020 0.020
εsm-εcm 0.00039 0.00041 0.00042 0.00042 0.00059 0.00059 0.00000 0.00000 0.00000
φeq 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
Crack spacing Sr,max 470.5 470.5 470.5 436.9 436.9 436.9 521.9 521.9 521.9
Crack width, Wk 0.184 0.194 0.195 0.182 0.257 0.258 -0.002 0.002 0.002
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.

-------------------------------------------------------------------------------------------------------------------------------
193 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Bearing Capacity Calculation

-------------------------------------------------------------------------------------------------------------------------------
194 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

10.0 Bearing Capacity of Foundation


10.1 Bearing Capacity for Abutment A1
Formation Level = 888.397 m
Foundation bottom level = 869.397 m
Length of wall = 13.100 m
Width of wall = 2.000 m
Width of Foundation = 10.000 m
Length of Foundation = 13.100 m
Depth of Foundation at abutment base = 2.400 m
Depth of Foundation at edge = 1.250
Foundation top level at abutment wall = 871.797 m
m

10.1.1 Summary
Load caseof loads & Fx
moments
kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 SPECTRUM IN X DIRECTION 1914.7 706.5 195.9 2188.5 323.2 24859.8
2 SPECTRUM IN Z DIRECTION 410.2 4200.5 1439.0 4488.2 436.1 2237.9
3 SPECTRUM IN Y DIRECTION 63.8 367.1 90.8 290.3 49.6 336.0
4 DEAD LOAD 866.7 13463.8 2.2 222.7 22.9 1943.1
5 SIDL (DL) 112.1 322.4 0.6 39.6 -16.5 -560.6
6 SIDL(WC) 123.4 353.5 0.2 20.1 16.2 -616.7
7 REMOVAL OF SHUTTER -134.6 -386.5 -0.4 -29.8 -4.6 672.5
8 EARTH PR ON AT REST -16207.6 -51.7 -2576.6 -7331.1 59.3 48275.1
9 EARTH PR ON k* -19595.9 -91.7 -3287.4 -10108.2 70.6 64760.8
9 LIVE LOAD SURCHARGE -1739.2 -120.9 49.2 -614.0 220.8 11839.0
-4076.9
10 DYNAMIC INCREMENT OF EARTH PR. -16.5 -707.6 -2120.4 21.1 12952.5
11 DYNAMIC INCREMENT OF LL -649.5
SURCGARGE -45.3 18.4 -229.8 82.3 4427.2
12 UNLADEN WIND LOAD 103.4 407.6 112.4 362.4 -28.5 -269.0
13 LADEN WIND LOAD 37.4 208.0 100.9 314.2 -29.2 38.4
14 DIFFERNTIAL SETTLEMENT 41.6 -143.3 -26.1 212.6 129.0 2847.0
15 TEMPERATURE RISE 1536.3 -77.6 3.8 1715.2 238.0 -21941.7
16 TEMPERATURE FALL -700.0 36.0 -1.9 -790.0 -105.7 10084.5
-605.9
17 CREEP SHRINKAGE DIFF SHRINKAGE 21.8 -4.6 -584.2 27.6 7570.9
18 FOOTPATH LIVE LOAD 29.5 87.5 1.2 29.6 -28.8 -147.8
159.1
19 SNOW LOAD FOR 70R LL TRACK 456.8 0.4 33.8 7.6 -795.3
79.6
20 SNOW LOAD FOR LL 70R WHEEL 228.5 0.2 16.9 3.8 -397.8
21 BRAKING -118.2 -31.3 3.3 -119.3 -20.5 1678.6
22 HYPERSTATIC ACTION 344.1 2.8 -0.4 142.3 63.1 -2372.8
Max 360.0 1491.5 15.0 129.7 238.1 356.7
Live load
Min -7.4 -80.9 -16.9 -236.2 -57.4 -2061.5
10.1.2 Load Combination As per Clause 706 of IRC:78-2014
1) Dead load +SIDL+Live load incl. braking & centrifugal force
2) Dead load +SIDL+Wind load - unloaded strructure
3) Dead load +SIDL+Live load incl. braking & centrifugal force + wind load - loaded structure
4) Dead load +SIDL+Live load incl. braking & centrifugal force + Longitudinal seismic
5) Dead load +SIDL+Live load incl. braking & centrifugal force + Tranverse seismic
6) Construction stage - Dead load +SIDL+construction live load
7) Construction stage - Dead load +SIDL+construction live load+ wind load
8) Construction stage - Dead load +SIDL+construction live load+ Longitudinal seismic
9) Construction stage - Dead load +SIDL+construction live load+Tranverse seismic
DL, Support
Wind on
settle, snow Wind on loaded Tranverse Vertical
Load Case SIDL SIDL(WC) Earth pr. LL unloaded
structure
Temp load Long. Seismic
Seismic Seismic
load,Creep &
structure
shrinkage,
Normal 1 (a) 1 1 1 1 1
Case 1 (b) 1 1 1 1 1
Wind 2 1 1 1 1 1
Case 3 (a) 1 1 1 1 1 1
3 (b) 1 1 1 1 1 1
Temp 4 (a) 1 1 1 1 1 1
Case 4 (b) 1 1 1 1 1 1
5 (a) 1 1 1 1 0.2 1 0.3 0.3
Seismic 5 (b) 1 1 1 1 0.2 -1 -0.3 -0.3
case 6 (a) 1 1 1 1 0.2 0.3 1 0.3
6 (b) 1 1 1 1 0.2 -0.3 -1 -0.3

-------------------------------------------------------------------------------------------------------------------------------
195 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Counterweght

2.00

4.00 4.00

2.40
1.250

10.00

Dead/Earth load calculation over foundation


Width of footing = 10.000 m Unit wt of concrete = 25 kN/m2
Length of footing = 13.100 m Unit wt of soil = 19 kN/m2
Depth of footing = 2.400 m Depth of footing at edge = 1.250 m
Thickness of wall = 2.000 m
Height of fill at back side = 16.600 m
Height of fill at front side = 5 m

Weight of foundation = 5535 kN CG = -0.587 Moment = -3251 kN-m


Weight of retaining wall = 4814 kN CG = -3.000 Moment = -14442 kN-m
Weight of Earth at back = 16527 kN CG = -3.000 Moment = -49581 kN-m
Weight of Earth at front = 4978 kN CG = 3.000 Moment = 14934 kN-m
Total Vertical load = 31854 kN Total moment = -52340 kN-m

Load Case HL (kN) V (kN) HT (kN) Mx (kN-m) MT (kN-m) ML (kN-m)


Normal 1 (a) -16713.89 47478.39 -2535.84 -7835.01 715.13 18074.70
Case 1 (b) -13449.84 46496.95 -2620.55 -7159.48 -239.04 -17072.70
2 -15142.69 46459.08 -2492.10 -6898.72 277.03 4079.15
Wind
3 (a) -16676.45 47686.41 -2434.94 -7520.82 685.92 18113.07
case
3 (b) -13412.39 46704.97 -2519.66 -6845.29 -268.25 -17034.33
Temp 4 (a) -16826.77 47481.81 -3297.73 -5505.84 743.68 779.75
case 4 (b) -17041.03 46258.54 -3278.38 -8835.43 231.14 -10689.65
5 (a) -18209.17 48351.90 -2625.12 -6104.00 959.75 50105.11
Seismic 5 (b) -12283.77 44354.84 -2531.58 -8852.72 -582.17 -47502.89
case 6 (a) -15953.78 50840.97 -1272.50 -2849.13 966.39 22103.99
6 (b) -14539.16 41865.76 -3884.21 -12107.59 -588.81 -19501.77
10.1.3 Stability Check
Factor of Safety Normal case Wind/Seismic Case
Check against Sliding = 1.5 = 1.25
Check against Overturning = 2.0 = 1.50
Gross Bearing pressure = 500.0 kN/m2 = 625.0 kN/m2

a) Check against Sliding


Vertical Load = W kN
Horizontal Long Active Force = EaL kN
Horizontal Tranverse active Force = EaT kN
Horizontal Active Force = sqrt(EaL^2+EaT^2) = Ea kN
Horizontal Passive Earth Force = Ep kN
Friction coefficient between soil and concrete (µ) = 0.50 Contact between soil & concrete
0.70 Contact between fissured rock & concrete
0.80 Contact between hard rock & concrete
Factor of Safety = Wsxµ/(Ea-Ep) < 1.50

(b) Check against Overturning


Restoring Moment due to vertical loads = Rw kN-m = W*B/2
5
Overturning Moment due to lateral force = Oa kN-m =sqrt(OaL^2+OaT^2)
Restoring Moment due to Horz. Passive Earth Force = Rp kN-m
Total Restoring Moment ( R) = Rw+Rp kN-m
Total Overturning Moment( O) = Oa kN-m
Factor of Safety = R/O < 2.00

-------------------------------------------------------------------------------------------------------------------------------
196 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

(c) Check Bearing Pressure


Total Vertical Load = W kN
Total Restoring Moment = RaL kN-m
Total Overturning long Moment = OaL kN-m
Foundation Dimension along Long. Direction (B) = 10.00 m
Foundation Dimension along Trans. Direction (L) = 13.10 m
Centre of Gravity of Vertical Load about Toe = (RaL-OaL)/W m < B/6
Total Overturning Tranverse Moment ( OT) = OaT kN-m
C.G. of Vertical Load about Centre of Base (eT) = (RaT-OaT)/W m < L/6
Base Pressure at heel = W/BxL-6xWxeL/(LxB^2)-6xWxeT/(L^2xB) > 0
Base Pressure at toe = W/BxL+6xWxeL/(LxB^2)+6xWxeT/(L^2xB) < Bearing pressure

a) Check against Sliding


Load Case W EaL EaT Ea Ep µ Wsxm/(Ea-Ep) Check
Normal Case
1 47478.39 16713.89 -2535.84 16905.17 0 0.70 2.0 > 1.50 OK.
2 46496.95 13449.84 -2620.55 13702.75 0 0.70 2.4 > 1.50 OK.
Wind case
5 46459.08 15142.69 -2492.10 15346.39 0 0.70 2.1 > 1.25 OK.
6 47686.41 16676.45 -2434.94 16853.27 0 0.70 2.0 > 1.25 OK.
46704.97 13412.39 -2519.66
Temp case
7 47481.81 16826.77 -3297.73 17146.87 0 0.70 1.9 > 1.25 OK.
8 46258.54 17041.03 -3278.38 17353.51 0 0.70 1.9 > 1.25 OK.
Seismic case
9 48351.90 18209.17 -2625.12 18397.42 0 0.70 1.8 > 1.25 OK.
10 44354.84 12283.77 -2531.58 12541.93 0 0.70 2.5 > 1.25 OK.
11 50840.97 15953.78 -1272.50 16004.45 0 0.70 2.2 > 1.25 OK.
12 41865.76 14539.16 -3884.21 15049.07 0 0.70 1.9 > 1.25 OK.
However, 1000x750mm shear key has been provided for full length of abutment.
(b) Check against Overturning
Load Case Rw OaL OaT Oa Rp (Ra+Rp)/ Oa Check
Normal Case
1 237392 18075 715 18089 0 13.124 > 2.00 OK.
2 232485 -17073 -239 17074 0 13.616 > 2.00 OK.
Wind case
5 232295 4079 277 4089 0 56.816 > 1.50 OK.
6 238432 18113 686 18126 0 13.154 > 1.50 OK.
7 233525 -17034 -268 0
Temp case
8 237409 780 744 1078 0 220.327 > 1.50 OK.
9 231293 -10690 231 10692 0 21.632 > 1.50 OK.
Seismic case
10 241760 50105 960 50114 0 4.824 > 1.50 OK.
11 221774 -47503 -582 47506 0 4.668 > 1.50 OK.
12 254205 22104 966 22125 0 11.489 > 1.50 OK.
13 209329 -19502 -589 19511 0 10.729 > 1.50 OK.
(c) Check Bearing Pressure
Base Width (B) = 10.000 m B/6 = 1.667 m
Length of Abutment (L) = 13.100 m L/6 = 2.183 m
Load W RaL OaL RaT OaT eL eT Max Base pr. at Min Base pr. at Max Base pr. Min Base pr. Check
Case hill side (kN/m2) hill side (kN/m2) at valley side at valley side
(kN/m2) (kN/m2)

Normal Case
1 47478 18075 0 715 0 0.381 0.015 448 282 443 277 OK.
2 46497 -17073 0 -239 0 -0.367 -0.005 276 432 278 434 OK.
Wind case
5 46459 4079 0 277 0 0.088 0.006 374 337 372 335 OK.
6 47686 18113 0 686 0 0.380 0.014 449 283 445 279 OK.
7 46705 -17034 0 -268 0 -0.365 -0.006 278 434 279 435 OK.
Temp case
8 47482 780 0 744 0 0.016 0.016 369 361 363 356 OK.
9 46259 -10690 0 231 0 -0.231 0.005 305 403 303 401 OK.
Seismic case
10 48352 50105 0 960 0 1.036 0.020 602 143 595 136 OK.
11 44355 -47503 0 -582 0 -1.071 -0.013 119 554 123 558 OK.
12 50841 22104 0 966 0 0.435 0.019 493 290 486 283 OK.
13 41866 -19502 0 -589 0 -0.466 -0.014 228 407 232 411 OK.

-------------------------------------------------------------------------------------------------------------------------------
197 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Max. base pressure Allowable base pressure


Maximum bearing capacity at Normal case = 447.7 kN/m2 = 500.0 kN/m2
Maximum bearing capacity at Wind case = 449.4 kN/m2 = 625.0 kN/m2
Maximum bearing capacity at Temperature case = 402.9 kN/m2 = 625.0 kN/m2
Maximum bearing capacity at Seismic case = 601.9 kN/m2 = 625.0 kN/m2
Maximum allowable bearing pressure for all cases = 481.6 kN/m2 = 500.0 kN/m2
Hence O.K.
10.2 Bearing Capacity for Abutment A2
Formation Level = 890.477 m
Foundation bottom level = 870.477 m
Length of wall = 12.000 m
Width of wall = 2.000 m
Width of Foundation = 10.000 m
Length of Foundation = 12.500 m
Depth of Foundation at abutment base = 2.400 m
Depth of Foundation at edge = 1.250 m
Foundation top level at abutment wall = 872.877 m

10.2.1 Summary of loads & moments


Load case Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 SPECTRUM IN X DIRECTION 1378.6 536.1 137.9 1512.2 196.0 16231.9
2 SPECTRUM IN Z DIRECTION 330.6 6838.2 2144.0 5976.9 192.8 1805.9
3 SPECTRUM IN Y DIRECTION 60.2 620.0 168.4 469.6 26.3 300.6
4 DEAD LOAD -866.7 13093.0 -2.2 359.5 -32.2 -1899.8
5 SIDL (DL) -112.1 317.2 -0.6 55.7 10.4 745.7
6 SIDL(WC) -123.4 347.7 -0.2 44.9 -14.8 823.0
7 REMOVAL OF SHUTTER 134.6 -380.1 0.4 -54.4 6.1 -897.0
9 EARTH PR ON ABUTMENT 16696.6 51.7 -2615.4 -7779.1 56.5 -55376.8
8 EARTH PR ON k* 19839.0 91.7 -3292.9 -10382.6 73.3 -71490.5
9 LIVE LOAD SURCHARGE -332.8 120.9 -49.2 218.7 -47.3 4515.2
4171.5
10 DYNAMIC INCREMENT OF EARTH PR. 16.5 -711.7 -2246.9 19.6 -15160.3
11 DYNAMIC INCREMENT OF LL -124.7
SURCGARGE 45.3 -18.4 82.0 -17.7 1691.6
12 UNLADEN WIND LOAD -154.4 417.0 105.5 385.6 -0.6 1221.1
13 LADEN WIND LOAD -83.9 219.3 94.9 325.3 3.2 732.7
14 DIFFERNTIAL SETTLEMENT -83.1 286.5 26.1 -169.7 78.9 2447.8
15 TEMPERATURE RISE -1536.3 77.6 -3.8 1689.6 -221.4 21187.8
16 TEMPERATURE FALL 700.0 -36.0 1.9 -775.8 99.6 -9720.4
605.9
17 CREEP SHRINKAGE DIFF SHRINKAGE -21.8 4.6 -577.2 10.2 -7517.2
18 FOOTPATH LIVE LOAD -29.5 86.1 -1.2 24.9 21.8 194.6
-159.1
19 SNOW LOAD FOR 70R LL TRACK 449.3 -0.4 63.3 -8.8 1060.8
-79.6
20 SNOW LOAD FOR LL 70R WHEEL 224.7 -0.2 31.6 -4.4 530.6
21 BRAKING -78.1 31.3 -3.3 74.5 -11.8 1051.9
22 HYPERSTATIC ACTION -344.1 -2.8 0.4 196.7 -48.7 2794.7
Max 1.8 1279.8 17.2 154.3 51.5 2235.3
Live load
Min -357.7 -53.3 -10.7 -88.3 -170.8 -1.0

10.2.2 Load Combination As per Clause 706 of IRC:78-2014


1) Dead load +SIDL+Live load incl. braking & centrifugal force
2) Dead load +SIDL+Wind load - unloaded strructure
3) Dead load +SIDL+Live load incl. braking & centrifugal force + wind load - loaded structure
4) Dead load +SIDL+Live load incl. braking & centrifugal force + Longitudinal seismic
5) Dead load +SIDL+Live load incl. braking & centrifugal force + Tranverse seismic
6) Construction stage - Dead load +SIDL+construction live load
7) Construction stage - Dead load +SIDL+construction live load+ wind load
8) Construction stage - Dead load +SIDL+construction live load+ Longitudinal seismic
9) Construction stage - Dead load +SIDL+construction live load+Tranverse seismic
DL, Support Wind on
Wind on loaded Tranverse Vertical
Load Case settle, snow SIDL SIDL(WC) Earth pr. LL unloaded
structure
Temp load Long. Seismic
Seismic Seismic
load,Creep & structure
Normal 1 (a) shrinkage,
1 1 1 1 1
Case 1 (b) 1 1 1 1 1
Wind 2 1 1 1 1 1
Case 3 (a) 1 1 1 1 1 1
3 (b) 1 1 1 1 1 1
Temp 4 (a) 1 1 1 1 1 1
Case 4 (b) 1 1 1 1 1 1
5 (a) 1 1 1 1 0.2 1 0.3 0.3
Seismic 5 (b) 1 1 1 1 0.2 -1 -0.3 -0.3
case 6 (a) 1 1 1 1 0.2 0.3 1 0.3
6 (b) 1 1 1 1 0.2 -0.3 -1 -0.3
-------------------------------------------------------------------------------------------------------------------------------
198 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------------------------
199 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Counterweght

2.00

4.00 4.0

2.40
1.250

10.00

Dead/Earth load calculation over foundation


Width of footing = 10.000 m Unit wt of concrete = 25 kN/m2
Length of footing = 12.500 m Unit wt of soil = 19 kN/m2
Depth of footing = 2.400 m Depth of footing at edge = 1.250 m
Thickness of wall = 2.000 m
Height of fill at back side = 17.600 m
Height of fill at front side = 5 m

Weight of foundation = 5281 kN CG = -0.389 Moment = -2052 kN-m


Weight of retaining wall = 5808 kN CG = 3.000 Moment = 17424 kN-m
Weight of Earth at back = 12841 kN CG = 3.000 Moment = 38523 kN-m
Weight of Earth at front = 4750 kN CG = -3.000 Moment = -14250 kN-m
Total Vertical load = 28680 kN Total moment = 39644 kN-m

Load Case HL (kN) V (kN) HT (kN) Mx (kN-m) MT (kN-m) ML (kN-m)


Normal 1 (a) 15254.87 44494.57 -2623.92 -7365.33 70.04 -9810.45
Case 1 (b) 15883.52 42283.97 -2599.04 -7854.72 -191.76 -28076.47
2 15539.04 43393.48 -2481.96 -7452.02 55.28 -16586.32
Wind
3 (a) 15170.98 44713.85 -2529.03 -7040.08 73.27 -9077.72
case
3 (b) 15799.63 42503.25 -2504.14 -7529.47 -188.53 -27343.74
Temp 4 (a) 17193.83 44491.15 -3256.01 -8497.89 -87.26 -40159.77
case 4 (b) 17156.83 42522.38 -3329.51 -8549.97 -443.74 -18487.30
5 (a) 21148.37 46115.42 -2493.27 -6461.90 322.36 -12812.87
Seismic 5 (b) 10321.87 39544.18 -2733.07 -8850.79 -383.57 -27172.92
case 6 (a) 17582.00 50483.67 -577.92 -1821.24 318.77 -13482.98
6 (b) 13888.24 35175.93 -4648.42 -13491.45 -379.97 -26502.81

10.2.3 Stability Check


Factor of Safety Normal case Wind/Seismic Case
Check against Sliding = 1.5 = 1.25
Check against Overturning = 2.0 = 1.50
Gross Bearing pressure = 500.0 kN/m2 = 625.0 kN/m2

a) Check against Sliding


Vertical Load = W kN
Horizontal Long Active Force = EaL kN
Horizontal Tranverse active Force = EaT kN
Horizontal Active Force = sqrt(EaL^2+EaT^2) = Ea kN
Horizontal Passive Earth Force = Ep kN
Friction coefficient between soil and concrete (µ) = 0.50 Contact between soil & concrete
0.70 Contact between fissured rock & concrete
0.80 Contact between hard rock & concrete
Factor of Safety = Wsxµ/(Ea-Ep) < 1.50

(b) Check against Overturning


Restoring Moment due to vertical loads = Rw kN-m = W*B/2
5
Overturning Moment due to lateral force = Oa kN-m =sqrt(OaL^2+OaT^2)
Restoring Moment due to Horz. Passive Earth Force = Rp kN-m
Total Restoring Moment ( R) = Rw+Rp kN-m
Total Overturning Moment( O) = Oa kN-m
Factor of Safety = R/O < 2.00

-------------------------------------------------------------------------------------------------------------------------------
200 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

(c) Check Bearing Pressure


Total Vertical Load = W kN
Total Restoring Moment = RaL kN-m
Total Overturning long Moment = OaL kN-m
Foundation Dimension along Long. Direction (B) = 10.00 m
Foundation Dimension along Trans. Direction (L) = 12.50 m
Centre of Gravity of Vertical Load about Toe = (RaL-OaL)/W m < B/6
Total Overturning Tranverse Moment ( OT) = OaT kN-m
C.G. of Vertical Load about Centre of Base (eT) = (RaT-OaT)/W m < L/6
Base Pressure at heel = W/BxL-6xWxeL/(LxB^2)-6xWxeT/(L^2xB) > 0
Base Pressure at toe = W/BxL+6xWxeL/(LxB^2)+6xWxeT/(L^2xB) < Bearing pressure

a) Check against Sliding


Load Case W EaL EaT Ea Ep µ Wsxm/(Ea-Ep) Check

Normal Case
1 44494.57 -15254.87 -2623.92 15478.89 0 0.70 2.0 > 1.50 OK.
2 42283.97 -15883.52 -2599.04 16094.76 0 0.70 1.8 > 1.50 OK.
Wind case
5 43393.48 -15539.04 -2481.96 15736.00 0 0.70 1.9 > 1.25 OK.
6 44713.85 -15170.98 -2529.03 15380.33 0 0.70 2.0 > 1.25 OK.
42503.25 -15799.63 -2504.14
Temp case
7 44491.15 -17193.83 -3256.01 17499.41 0 0.70 1.8 > 1.25 OK.
8 42522.38 -17156.83 -3329.51 17476.91 0 0.70 1.7 > 1.25 OK.
Seismic case
9 46115.42 -21148.37 -2493.27 21294.84 0 0.70 1.5 > 1.25 OK.
10 39544.18 -10321.87 -2733.07 10677.58 0 0.70 2.6 > 1.25 OK.
11 50483.67 -17582.00 -577.92 17591.50 0 0.70 2.0 > 1.25 OK.
12 35175.93 -13888.24 -4648.42 14645.51 0 0.70 1.7 > 1.25 OK.
However, 1000x750mm shear key has been provided for full length of abutment.

(b) Check against Overturning


Load Case Rw OaL OaT Oa Rp (Ra+Rp)/ Oa Check
Normal Case
1 222473 -9810 70 9811 0 22.677 > 2.00 OK.
2 211420 -28076 -192 28077 0 7.530 > 2.00 OK.
Wind case
5 216967 -16586 55 16586 0 13.081 > 1.50 OK.
6 223569 -9078 73 9078 0 24.628 > 1.50 OK.
7 212516 -27344 -189 0
Temp case
8 222456 -40160 -87 40160 0 5.539 > 1.50 OK.
9 212612 -18487 -444 18493 0 11.497 > 1.50 OK.
Seismic case
10 230577 -12813 322 12817 0 17.990 > 1.50 OK.
11 197721 -27173 -384 27176 0 7.276 > 1.50 OK.
12 252418 -13483 319 13487 0 18.716 > 1.50 OK.
13 175880 -26503 -380 26506 0 6.636 > 1.50 OK.

(c) Check Bearing Pressure


Base Width (B) = 10.000 m B/6 = 1.667 m
Length of Abutment (L) = 12.500 m L/6 = 2.083 m
Load W RaL OaL RaT OaT eL eT Max Base pr. at Min Base pr. at Max Base pr. Min Base pr. Check
Case hill side (kN/m2) hill side (kN/m2) at valley side at valley side
(kN/m2) (kN/m2)
Normal Case
1 44495 -9810 0 70 0 -0.220 0.002 309 403 309 403 OK.
2 42284 -28076 0 -192 0 -0.664 -0.005 203 472 204 474 OK.
Wind case
5 43393 -16586 0 55 0 -0.382 0.001 268 427 267 427 OK.
6 44714 -9078 0 73 0 -0.203 0.002 314 402 314 401 OK.
7 42503 -27344 0 -189 0 -0.643 -0.004 208 471 210 472 OK.
Temp case
8 44491 -40160 0 -87 0 -0.903 -0.002 163 548 163 549 OK.
9 42522 -18487 0 -444 0 -0.435 -0.010 250 427 253 431 OK.
Seismic case
10 46115 -12813 0 322 0 -0.278 0.007 309 432 306 429 OK.
11 39544 -27173 0 -384 0 -0.687 -0.010 184 445 187 448 OK.
12 50484 -13483 0 319 0 -0.267 0.006 340 470 338 467 OK.
13 35176 -26503 0 -380 0 -0.753 -0.011 153 407 156 410 OK.
-------------------------------------------------------------------------------------------------------------------------------
201 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Max. base pressure Allowable base pressure


Maximum bearing capacity at Normal case = 473.8 kN/m2 = 500.0 kN/m2
Maximum bearing capacity at Wind case = 472.0 kN/m2 = 625.0 kN/m2
Maximum bearing capacity at Temperature case = 549.0 kN/m2 = 625.0 kN/m2
Maximum bearing capacity at Seismic case = 469.8 kN/m2 = 625.0 kN/m2
Maximum allowable bearing pressure for all cases = 477.4 kN/m2 = 500.0 kN/m2
Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
202 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design of Footing

-------------------------------------------------------------------------------------------------------------------------------
203 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.0 Detailed design of Abutment Foundation


11.1 Detailed design of Foundation for Abutment A1
Formation Level = 888.397 m
Foundation bottom level = 869.397 m
Length of wall = 13.100 m
Width of wall = 2.000 m
Width of Foundation = 10.000 m
Length of Foundation = 13.100 m
Depth of Foundation at abutment base = 2.400 m
Depth of Foundation at edge = 1.250 m
Summary of loads & moments
Load case Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 SPECTRUM IN X DIRECTION 1914.7 706.5 195.9 2188.5 323.2 24859.8
2 SPECTRUM IN Z DIRECTION 410.2 4200.5 1439.0 4488.2 436.1 2237.9
3 SPECTRUM IN Y DIRECTION 63.8 367.1 90.8 290.3 49.6 336.0
4 DEAD LOAD 866.7 13463.8 2.2 222.7 22.9 1943.1
5 SIDL (DL) 112.1 322.4 0.6 39.6 -16.5 -560.6
6 SIDL(WC) 123.4 353.5 0.2 20.1 16.2 -616.7
7 REMOVAL OF SHUTTER -134.6 -386.5 -0.4 -29.8 -4.6 672.5
8 EARTH PR ON ABUTMENT -16207.6 -51.7 -2576.6 -7331.1 59.3 48275.1
9 EARTH PR ON k* -19595.9 -91.7 -3287.4 -10108.2 70.6 64760.8
9 LIVE LOAD SURCHARGE -1739.2 -120.9 49.2 -614.0 220.8 11839.0
10 DYNAMIC INCREMENT OF EARTH-4076.9
PR. -16.5 -707.6 -2120.4 21.1 12952.5
-649.5
11 DYNAMIC INCREMENT OF LL SURCGARGE -45.3 18.4 -229.8 82.3 4427.2
12 UNLADEN WIND LOAD 103.4 407.6 112.4 362.4 -28.5 -269.0
13 LADEN WIND LOAD 37.4 208.0 100.9 314.2 -29.2 38.4
14 DIFFERNTIAL SETTLEMENT 41.6 -143.3 -26.1 212.6 129.0 2847.0
15 TEMPERATURE RISE 1536.3 -77.6 3.8 1715.2 238.0 -21941.7
16 TEMPERATURE FALL -700.0 36.0 -1.9 -790.0 -105.7 10084.5
-605.9
17 CREEP SHRINKAGE DIFF SHRINKAGE 21.8 -4.6 -584.2 27.6 7570.9
18 FOOTPATH LIVE LOAD 29.5 87.5 1.2 29.6 -28.8 -147.8
19 SNOW LOAD FOR 70R LL TRACK 159.1 456.8 0.4 33.8 7.6 -795.3
20 SNOW LOAD FOR LL 70R WHEEL 79.6 228.5 0.2 16.9 3.8 -397.8
21 BRAKING -118.2 -31.3 3.3 -119.3 -20.5 1678.6
22 HYPERSTATIC ACTION 344.1 2.8 -0.4 142.3 63.1 -2372.8
Max 360.0 1491.5 15.0 129.7 238.1 356.7
Live load
Min -7.4 -80.9 -16.9 -236.2 -57.4 -2061.5

11.1.1 Ultimate limit state


11.1.1.1 Load Combination As per Clause 706 of IRC:78-2014
1) Dead load +SIDL+Live load
2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+Live load(leading) + Temp load(accompany)
6) Dead load +SIDL+Live load(accompany) + Temp load(lead)
7) Dead load +SIDL+Live load(accompany) +seismic load(leading)
Load Load Case DL, Support SIDL(DL) SIDL(WC) Earth pr. Live load Wind on Wind on loaded Temp load Long. Seismic Transverse Vertical
settle, snow load unloaded structure Seismic Seismic
Case structure
Normal 1 1.35 1.35 1.75 1.35 1.5
Case 1 (a) 1 1 1 1 1.5
2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
Wind 3 (a) 1.35 1.35 1.75 1.35 1.5 0.9
Case 3 (b) 1 1 1 1 1.5 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5
4 (b) 1 1 1 1 1.15 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9
Temp 5 (b) 1 1 1 1 1.5 0.9
Case 6 (a) 1.35 1.35 1.75 1.35 1.15 1.5
6 (b) 1 1 1 1 1.15 1.5
7 (a) 1.35 1.35 1.75 1.35 0.2 1.5 0.45 0.45
7 (b) 1 1 1 1 0.2 -1.5 -0.45 -0.45
Seismic 7 (c) 1.35 1.35 1.75 1.35 0.2 0.45 1.5 0.45
case 7 (d) 1 1 1 1 0.2 -0.45 -1.5 -0.45
7 (e) 1.35 1.35 1.75 1.35 0.2 0.45 0.45 1.5
7 (f) 1 1 1 1 0.2 -0.45 -0.45 -1.5

-------------------------------------------------------------------------------------------------------------------------------
204 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Counterweght

2.00

4.00 4.0

2.40
1.250

10.00
Dead/Earth load calculation over foundation
Width of footing = 10.000 m Unit wt of concrete = 25 kN/m2
Length of footing = 13.100 m Unit wt of soil = 19 kN/m2
Depth of footing = 2.400 m Depth of footing at edge = 1.250 m
Thickness of wall = 2.000 m
Height of fill at back side = 16.600 m
Height of fill at front side = 5 m

Weight of foundation = 5535 kN CG = 0.389 Moment = 2151 kN-m


Weight of retaining wall = 5478 kN CG = -3.000 Moment = -16434 kN-m
Weight of Earth at back = 12364 kN CG = -3.000 Moment = -37091 kN-m
Weight of Earth at front = 4978 kN CG = 3.000 Moment = 14934 kN-m
Total Vertical load = 28354 kN Total moment = -36440 kN-m
Factored Vertical load = 38278 kN Factored moment = -49194.1 kN-m

Load Case HL (kN) V (kN) HT (kN) Mx (kN-m) MT (kN-m) ML (kN-m)


Normal 1 -22734.58 59727.22 -3413.01 -10655.31 1033.37 47678.21
Case 1 (a) -12510.17 53001.17 -2654.70 -6896.13 -382.30 -21790.06
2 (a) -20377.78 58198.25 -3347.41 -9250.87 376.22 26684.89
2 (b) -15174.14 53374.16 -2383.63 -7142.65 4.80 1396.61
3 (a) -22700.87 59914.44 -3322.21 -10372.53 1007.09 47712.74
Wind case
3 (b) -12476.46 53188.38 -2563.89 -6613.36 -408.59 -21755.53
4 (a) -22164.66 59539.84 -3285.71 -9983.14 846.18 42931.48
4 (b) -13111.77 53257.58 -2479.46 -6609.19 -325.83 -16228.13
5 (a) -25330.04 59887.13 -4448.11 -14194.33 622.35 61251.47
5 (b) -17124.56 52710.06 -3288.31 -9050.60 174.49 -7293.35
Temp case
6 (a) -25844.98 59367.03 -4456.05 -14682.37 492.84 66641.52
6 (b) -16251.85 52650.22 -3279.33 -7990.95 340.29 -19097.63
7 (a) -24625.29 60894.80 -3553.81 -8001.40 1359.34 94351.17
7 (b) -12897.46 49636.09 -2459.25 -10178.00 -621.32 -52581.05
Seismic 7 (c) -21447.62 64628.41 -1524.87 -3119.10 1369.30 52349.49
case 7 (d) -14916.63 45997.69 -4526.81 -14577.76 -804.19 -19876.50
7 (e) -21811.41 60603.29 -2940.49 -7526.87 963.52 50352.52
7 (f) -14552.84 50022.80 -3111.18 -10169.98 -398.41 -17879.54

11.1.1.2 Bearing Pressure


Base Width (B) = 10.000 m
Length of Abutment (L) = 13.100 m
Load W RaL OaL RaT OaT eL eT Max Base pr. at Min Base pr. at Max Base pr. at Min Base pr. attoe
Case heal side heal side toe side (kN/m2) side (kN/m2)
(kN/m2) (kN/m2)

1 59727 47678 0 1033 0 0.798 0.017 241 234 678 671


1 (a) 53001 -21790 0 -382 0 -0.411 -0.007 503 506 303 306
2 (a) 58198 26685 0 376 0 0.459 0.006 323 321 568 565
2 (b) 53374 1397 0 5 0 0.026 0.000 401 401 414 414
3 (a) 59914 47713 0 1007 0 0.796 0.017 242 235 679 672
3 (b) 53188 -21756 0 -409 0 -0.409 -0.008 504 507 305 308
4 (a) 59540 42931 0 846 0 0.721 0.014 261 255 654 648
4 (b) 53258 -16228 0 -326 0 -0.305 -0.006 480 482 331 333
5 (a) 59887 61251 0 622 0 1.023 0.010 179 174 740 736
5 (b) 52710 -7293 0 174 0 -0.138 0.003 436 435 370 368
6 (a) 59367 66642 0 493 0 1.123 0.008 150 146 760 757
6 (b) 52650 -19098 0 340 0 -0.363 0.006 491 488 316 313
7 (a) 60895 94351 0 1359 0 1.549 0.022 37 28 902 892
7 (b) 49636 -52581 0 -621 0 -1.059 -0.013 618 622 136 140
7 (c) 64628 52349 0 1369 0 0.810 0.021 258 249 738 728
7 (d) 45998 -19877 0 -804 0 -0.432 -0.017 439 445 257 263
7 (e) 60603 50353 0 964 0 0.831 0.016 235 229 697 690
7 (f) 50023 -17880 0 -398 0 -0.357 -0.008 462 465 299 301
-------------------------------------------------------------------------------------------------------------------------------
205 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.1.1.3 Calculation of Moment & Shear at critical section

A 10.00 X D

T
Y Y
Heel side Toe side
13.10
L

2.0
B C

Critical section for shear X


1.688

2.40 AB CD 2.40
1.25
4.000 4.000
10.000

Wt.of base slab*1.35 81.0 kN/m2 123.2 kN/m2 Effective depth = 2.4*1000-75-25/2
Wt.of fill*1.5 425.8 kN/m2 128.3 kN/m2 = 2312.5 mm
Total downward load 506.8 kN/m2 251.4 kN/m2
11.1.1.4 Moment & Shear at X-X i.e. long direction
Avg design Avg design Avg design Avg design Moment
Moment Shear at dist Shear at dist
base pr. along base pr. base pr. at base pr. at along Long -
Load Case along Long - d along Long- d along Long-
long-AB along long- face wall-AB face wall- CD AB (kN-
CD (kN-m/m) AB (kN/m) CD (kN/m)
(kN/m2) CD (kN/m2) (kN/m2) (kN/m2) m/m)
1 -269 423 8 146 -18544.4 34645.7 -4660.8 8057.1
1 (a) -2 53 20 31 527.6 4812.1 50.9 1075.4
2 (a) -185 315 15 115 -12377.9 26032.9 -3151.9 6032.2
2 (b) -106 162 2 55 -7335.7 13272.2 -1837.6 3089.8
3 (a) -268 424 9 147 -18406.8 34807.7 -4632.1 8091.6
3 (b) -1 55 21 33 665.2 4974.0 79.6 1109.9
4 (a) -249 400 11 140 -17023.5 32825.0 -4292.9 7626.0
4 (b) -26 81 17 38 -1225.1 6975.0 -373.9 1586.8
5 (a) -330 486 -4 160 -23194.3 39551.4 -5776.2 9226.5
5 (b) -71 118 4 42 -4808.2 9682.0 -1218.3 2246.4
6 (a) -359 507 -13 161 -25507.7 41032.7 -6317.6 9592.4
6 (b) -17 63 15 31 -700.9 5479.0 -234.9 1242.8
7 (a) -474 646 -26 198 -34039.2 52008.7 -8391.9 12182.3
7 (b) 113 -113 22 -23 8673.9 -8718.4 2074.6 -2084.0
7 (c) -253 482 41 188 -16267.8 40211.0 -4226.8 9277.4
7 (d) -65 9 -35 -21 -5748.8 -117.2 -1291.9 54.6
7 (e) -275 442 12 155 -18784.9 36287.9 -4738.0 8430.1
7 (f) -43 49 -6 12 -3231.6 3805.9 -780.8 901.9
+ve means Upward pressure Maximum 8673.9 52008.7 2074.6 12182.3
Minimum -34039.2 -8718.4 -8391.9 -2084.0

11.1.1.5 Check for ultimate strength of foundation slab in Flexure :-


Consider rectangular beam for design
13100.0 0.00350 17.87
36646 kN
194.26
NA NA
2313

0.0382 36646 kN
Strain Diagram Stress Diagram
a) Support moment
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 13100.0 mm Depth of the section = 2400 mm
Clear Cover = 75 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 0 mm Effective depth, d 2312.5 = 2313 mm
R = Mu/bd2 = 0.742 MPa Design Moment = 52009 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 52857.9 mm2
Lower fractile tensile fctm = 1.94 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100

-------------------------------------------------------------------------------------------------------------------------------
206 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 39381.9 mm2
Hence provide 32 dia @ 125 c/c Ast = 84285.2 mm2
0 dia @ 125 c/c > Hence O.K.
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 32308 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 1054.6 mm Actual neutral axis depth = 194.26 mm
Strain in steel = 0.03816394 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 36646 kN Total ultimate tensile force = 36646 kN
Compressive force CG 80.81 mm Moment of resistance = 81782 kNm
> 52009 kNm Hence O.K.
Flexure Design
Heel side Toe side
Description
Maximum Minimum Maximum Minimum
Moment 8673.9 -34039.2 52008.7 -8718.4
Width 13100 13100 13100 13100
Depth 2313 2313 2313 2313
R = Mu/bd2 0.12 -0.49 0.74 -0.12
pt 0.0000 0.0000 0.0000 0.0000
Ast required for bending 82.4 -323.2 493.8 -82.8
Ast required for shear 0.0 0.0 0.0 0.0
Total Ast required 82.4 323.2 493.8 82.8
1st layers 32 dia 25 dia 32 dia 25 dia
Reinf provided 125 c/c 125 c/c 125 c/c 125 c/c
2nd layers 0 dia 0 dia 0 dia 0 dia
125 c/c 125 c/c 125 c/c 125 c/c
Ast provided 84285.2 51443.6 84285.2 51443.6
Actual NA 194 119 194 119
Strain in steel 0.0382 0.0648 0.0382 0.0648
Stress in steel 434.8 434.8 434.8 434.8
Total tension = 36646 22367 36646 22367
Total compression 36646 22367 36646 22367
Difference of force 0 0 0 0
Compressive force CG 80.8 49.3 80.8 49.3
Moment of resistance 81782 50620 81782 50620
Factor of Safety 9.4 1.5 1.6 5.8
Pt 0.0028 0.00170 0.0028 0.0017

11.1.1.6 Shear design


VRD= Design Shear Force of the concrete section = 12182.3 kN
Vccd= Design component of Shear Force in the compression area due to inclined compression chord
Vtd= Design component of Shear Force in tensile reinforcement due to inclined tensile chord
VRd.s= Design value of Shear Force for yielding of vertical shear reinforcement
VRD= VRd.s + Vccd + Vtd Here, Vccd= Vtd = 0.0 kN
Hence, VRD= VRd.s
Along Long Direction (X-X)
Design the section without shear reinforcement Design shear = = 12182.3 kN
VRD,C= Design Shear Resistance of the concrete section = [0.12K(80p1fck)^0.33+0.15σCP]bwd
Grade Concrete = M40 Grade of steel = Fe 500
Width of beam = 13100 mm Effective depth, d = 2313 mm
K= 1+sqrt(200/d)<=2.0 = 1.29 z = 2232 mm
vmin = 0.29 MPa p1 = Asl/bwd <=0.02 = 0.0028
σCP = = 0.00 MPa δ = 0.280 rad
Reduction of shear force as per cl. No. 10.3.2 (5) of IRC:112-2011 Mtanδ/d = 458.4 kN
αV = d= 2313 mm β = αV /2d = 0.5
VRD,C = 9679.4 kN > V-Mtand/d = 11723.9 kN
Hence shear reinforcement required or 12,182.35x0.5= 6091.2 kN

-------------------------------------------------------------------------------------------------------------------------------
207 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.1.2 Servicebility limit State Method


Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
Wind on
DL, Support Wind on loaded
Load Case SIDL(DL) SIDL(WC) Earth pr. Live load unloaded Temperature
settle, snow load structure
structure
1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1 1
2 (b) 1 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.6
3 (b) 1 1 1 1 1 0.6
4 (a) 1 1 1.2 1 0.75 1
4 (b) 1 1 1 1 0.75 1
5 (a) 1 1 1.2 1 1 0.6
5 (b) 1 1 1 1 1 0.6
6 (a) 1 1 1.2 1 0.75 1
6 (b) 1 1 1 1 0.75 1
Load Combination for Quasi-permanent (SL3) - for RCC structure
1) Dead load +SIDL
2) Dead load +SIDL+Temperature(lead)
Wind on
Wind on loaded
Load Case DL, Support settle SIDL(WC) Earth pr. Earth pr. Live load unloaded Temperature
structure
structure
1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5
Rare Combination
Load Case HL (kN) V (kN) HT (kN) Mx (kN-m) MT (kN-m) ML (kN-m)
1(a) -18609.71 42583.02 -3315.33 -10034.13 320.09 36610.61
1(b) -18717.52 42798.86 -3263.10 -10463.26 58.84 31039.88
2 (a) -18468.90 43198.58 -3102.01 -9357.58 262.43 36379.96
2 (b) -18576.70 43414.43 -3049.78 -9786.71 1.18 30809.23
3 (a) -20055.08 44134.70 -3186.10 -10419.54 712.21 50360.16
3 (b) -16448.24 44654.96 -3238.93 -9382.06 50.32 17754.30
4 (a) -19673.14 43861.18 -3162.92 -10150.38 598.12 46943.87
4 (b) -16994.96 44305.34 -3189.49 -9479.55 36.38 21096.80
5 (a) -20497.52 44031.51 -3247.76 -11082.07 666.32 56387.82
5 (b) -16890.68 44551.77 -3300.59 -10044.58 4.42 23781.97
6 (a) -20410.54 43689.21 -3265.67 -11254.59 521.62 56989.98
6 (b) -17732.36 44133.36 -3292.24 -10583.76 -40.11 31142.91
Quasi-permanent
1 -18611.98 42576.81 -3315.23 -10030.23 313.54 36621.84
2 (a) -18961.95 42594.83 -3316.16 -10425.24 260.69 41664.08
2 (b) -19067.49 42816.88 -3264.03 -10858.27 5.98 41776.19

11.1.2.1 Bearing Pressure


Foundation Dimension along Long. Direction (L) = 10.00 m
Foundation Dimension along Trans. Direction (T)= 13.10 m
Max Base pr. at Min Base pr. at Min Base pr.
Max Base pr. at
Load Case W ML MT eL eT heal side heal side
toe side (kN/m2)
attoe side
(kN/m2) (kN/m2) (kN/m2)
Rare Combination
1(a) 42583 36611 320 0.860 0.008 158 156 494 492
1(b) 42799 31040 59 0.725 0.001 185 184 469 469
2 (a) 43199 36380 262 0.842 0.006 164 162 497 495
2 (b) 43414 30809 1 0.710 0.000 190 190 473 473
3 (a) 44135 50360 712 1.141 0.016 109 104 570 565
3 (b) 44655 17754 50 0.398 0.001 260 259 422 422
4 (a) 43861 46944 598 1.070 0.014 122 118 552 548
4 (b) 44305 21097 36 0.476 0.001 242 241 435 435
5 (a) 44032 56388 666 1.281 0.015 80 76 597 592
5 (b) 44552 23782 4 0.534 0.000 231 231 449 449
6 (a) 43689 56990 522 1.304 0.012 74 71 596 593
6 (b) 44133 31143 -40 0.706 -0.001 194 194 479 480
Quasi-permanent Combination
1 42577 36622 314 0.860 0.007 158 156 494 492
2 (a) 42595 41664 261 0.978 0.006 135 133 517 515
2 (b) 42817 41776 6 0.976 0.000 136 135 518 518

-------------------------------------------------------------------------------------------------------------------------------
208 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.1.2.2 Calculation of Moment & Shear at critical section


A 10.00 X D

T
Y

Heel side 13.10 Toe side


L

2.0
B C
X

2.40 AB CD 2.40
1.25
4.000 4.000
10.000

Wt.of base slab 60.0 kN/m2 45.6 kN/m2 Effective depth = 2.4*1000-75-32/2
Wt.of fill 315.4 kN/m2 95.0 kN/m2 = 2309 mm
Total downward load 375.4 kN/m2 140.6 kN/m2

Moment & Shear at X-X i.e. long direction


Avg design Avg design Avg design Avg design Moment
Moment
base pr. along base pr. base pr. at base pr. at along Long -
Load Case along Long -
long-AB along long- face-AB side face-CD side AB (kN-
CD (kN-m/m)
(kN/m2) CD (kN/m2) (kN/m2) (kN/m2) m/m)

Rare Combination
1(a) -218 352 10 10 -14881.9 13001.8
1(b) -191 328 17 17 -12748.3 12639.6
2 (a) -212 356 15 15 -14308.2 13472.1
2 (b) -185 332 22 22 -12174.6 13110.0
3 (a) -269 427 9 9 -18480.4 15563.1
3 (b) -116 282 43 43 -6586.9 12849.1
4 (a) -256 409 10 10 -17496.6 15016.3
4 (b) -134 294 37 37 -8043.1 12890.3
5 (a) -298 454 3 3 -20684.6 16059.2
5 (b) -144 308 37 37 -8791.2 13345.2
6 (a) -303 454 0 0 -21170.4 15843.1
6 (b) -181 339 27 27 -11716.9 13717.1
Maximum -6586.9 16059.2
Minimum -21170.4 12639.6
Quasi-permanent Combination
1 -218 352 10 10 -14890.8 12997.9
2 (a) -241 375 5 5 -16651.2 13496.3
2 (b) -240 378 7 7 -16513.0 13684.7
+ve means upward pressure Maximum -14890.8 13684.7
Minimum -16651.2 12997.9

11.1.2.3 Servicebility limit State Design


Flexure Design Design moment = 16059.2 kN-m
Grade Concrete = M40 Grade of steel = Fe 500
Bending Compression of concrete = 19.20 Mpa fctm = Mean tensile strength of concrete = 1.94 Mpa
E of reinforcement = 200000 MPa E of concrete = 32308 MPa
Creep Coefficient, φ = 1 Ec, eff =Ecm /(1+φ) = 16154 MPa
Modular ratio =Es/Ecm = 12.38 Tensile stress of steel = 400 Mpa
Width of Section = 13100 mm Depth of Section = 2400 mm
Clear Cover = 75 mm Effective depth, d = 2313 mm
Minimum reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 0.0 mm2
Hence provide 32 dia @ 125 c/c Ast = 84285.2 mm2
0 dia @ 125 c/c > Hence O.K.
Balanced neutral axis depth = = 862.00 mm Actual neutral axis depth = 532.52 mm
Strain in steel = 0.00045 MPa Stress in steel = 89.2 MPa
Strain in steel = 0.00016 MPa Comp. stress of concrete = 2.16 Mpa

-------------------------------------------------------------------------------------------------------------------------------
209 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Stress-strain diagram at Serviceability Limit State condition

0.00013 2.16
533 7521.88

NA NA

89.24
0.00045
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 7521.9 kN Total tensile force = 7521.9 kN
Compressive force CG = 177.5 mm Moment of resistance = 16059.2 kNm
Rare Combination Quasi-permanent Combination
Heel side Toe side Heel side Toe side
Description Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum
h or D 2400 2400 2400 2400 2400 2400 2400 2400
b 13100 13100 13100 13100 13100 13100 13100 13100
d 2313 2313 2313 2313 2313 2313 2313 2313
Moment 6586.88 -21170.44 16059.17 0.00 14890.77 -16651.22 13684.75 0.10
Reinf provided 32 dia 25 dia 32 dia 25 dia 32 dia 25 dia 32 dia 25 dia
125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c
0 dia 0 dia 0 dia 0 dia 0 dia 0 dia 0 dia 0 dia
125 c/c 125 c/c 125 c/c 0 c/c 125 c/c 125 c/c 125 c/c 0 c/c
Ast provided 84285.2 84285.2 51443.6 0.0 84285.2 84285.2 51443.6 0.0
Stress in concrete 0.9 2.8 2.6 2.0 2.2 2.2
Actual NA 533 533 428 533 533 428
Stress in steel 36.6 117.6 143.9 82.8 92.5 122.6
Total ultimate tensile force = 3085 9916 7401 6975 7799 6307
Total ultimate compressive force3085 9916 7401 6975 7799 6307
Difference of force 0 0 0 0 0 0
Compressive force CG 177.5 177.5 142.7 177.5 177.5 142.7
Moment of resistance 6587 -21170 16059 14891 -16651 13685
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0
Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 82.75 Mpa αe =Es/Ecm = 6.190
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 218.8 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.029
fct,eff = = 3.03 Mpa εsm-εcm = 0.00025
>= 0.6σsc/Es= 0.00025
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 75 mm 107
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 32.000 mm k2 = 0.5
Sr,max = 440.0 mm Crack width, Wk = = 0.109 mm
Heel side Toe side < 0.3 mm OK
Description Maximum Minimum Maximum
Stress in steel, σs 82.8 92.5 122.6
As 84285.2 84285.2 51443.6
Actual NA 533 533 428
hc,eff 218.8 218.8 218.8
ρp,eff 0.029 0.029 0.018
εsm-εcm 0.00025 0.00028 0.00037
φeq 32.0 25.0 32.0
Crack spacing Sr,max 440.0 399.5 558.0
Crack width, Wk 0.109 0.111 0.205
Check <0.3 O.K. <0.3 O.K. <0.3 O.K.

11.1.3 Details of Reinforcement


Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 3006.3 mm2/m
As per clause 16.6.1.1 (3) of IRC-112:2011, minimum tranverse reinforcement is 20% of main reinforcement.
Minimum tranverse reinforcement Longitudinal direction = 6434.0 mm2/m
Tranverse direction = 1286.8 mm2/m
Hence provide Top long 25 dia @ 125 c/c Ast provided = 1608.5 mm2
Top Tranv 16 dia @ 125 c/c Hence OK.
Bottom long 32 dia @ 125 c/c
Bottom Tranv 16 dia @ 125 c/c
Side face 16 dia @ 150 c/c
Open link 12 dia @ 250 c/c Staggered

-------------------------------------------------------------------------------------------------------------------------------
210 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.2 Detailed design of Foundation for Abutment A2


Formation Level = 890.477 m
Foundation bottom level = 870.477 m
Length of wall = 12.000 m
Width of wall = 2.000 m
Width of Foundation = 10.000 m
Length of Foundation = 12.500 m
Depth of Foundation at abutment base = 2.400 m
Depth of Foundation at edge = 1.250 m
Summary of loads & moments
Load case Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 SPECTRUM IN X DIRECTION 1378.6 536.1 137.9 1512.2 196.0 16231.9
2 SPECTRUM IN Z DIRECTION 330.6 6838.2 2144.0 5976.9 192.8 1805.9
3 SPECTRUM IN Y DIRECTION 60.2 620.0 168.4 469.6 26.3 300.6
4 DEAD LOAD -866.7 13093.0 -2.2 359.5 -32.2 -1899.8
5 SIDL (DL) -112.1 317.2 -0.6 55.7 10.4 745.7
6 SIDL(WC) -123.4 347.7 -0.2 44.9 -14.8 823.0
7 REMOVAL OF SHUTTER 134.6 -380.1 0.4 -54.4 6.1 -897.0
9 EARTH PR ON k* 16696.6 51.7 -2615.4 -7779.1 56.5 -55376.8
9 EARTH PR ON AT REST 19839.0 91.7 -3292.9 -10382.6 73.3 -71490.5
9 LIVE LOAD SURCHARGE -332.8 120.9 -49.2 218.7 -47.3 4515.2
10 DYNAMIC INCREMENT OF EARTH4171.5
PR. 16.5 -711.7 -2246.9 19.6 -15160.3
-124.7
11 DYNAMIC INCREMENT OF LL SURCGARGE 45.3 -18.4 82.0 -17.7 1691.6
12 UNLADEN WIND LOAD -154.4 417.0 105.5 385.6 -0.6 1221.1
13 LADEN WIND LOAD -83.9 219.3 94.9 325.3 3.2 732.7
14 DIFFERNTIAL SETTLEMENT -83.1 286.5 26.1 -169.7 78.9 2447.8
15 TEMPERATURE RISE -1536.3 77.6 -3.8 1689.6 -221.4 21187.8
16 TEMPERATURE FALL 700.0 -36.0 1.9 -775.8 99.6 -9720.4
605.9
17 CREEP SHRINKAGE DIFF SHRINKAGE -21.8 4.6 -577.2 10.2 -7517.2
18 FOOTPATH LIVE LOAD -29.5 86.1 -1.2 24.9 21.8 194.6
19 SNOW LOAD FOR 70R LL TRACK-159.1 449.3 -0.4 63.3 -8.8 1060.8
20 SNOW LOAD FOR LL 70R WHEEL-79.6 224.7 -0.2 31.6 -4.4 530.6
21 BRAKING -78.1 31.3 -3.3 74.5 -11.8 1051.9
22 HYPERSTATIC ACTION -344.1 -2.8 0.4 196.7 -48.7 2794.7
Max 1.8 1279.8 17.2 154.3 51.5 2235.3
Live load
Min -357.7 -53.3 -10.7 -88.3 -170.8 -1.0

11.2.1 Ultimate limit state


11.2.1.1 Load Combination As per Clause 706 of IRC:78-2014

1) Dead load +SIDL+Live load


2) Dead load +SIDL+ wind load (unloaded structure)
3) Dead load +SIDL+Live load(lead) + wind load (accompany) (loaded structure)
4) Dead load +SIDL+Live load(accompany) + wind load(lead) (loaded structure)
5) Dead load +SIDL+Live load(leading) + Temp load(accompany)
6) Dead load +SIDL+Live load(accompany) + Temp load(lead)
7) Dead load +SIDL+Live load(accompany) +seismic load(leading)
Load Case DL, Support SIDL(DL) SIDL(WC) Earth pr. Live load Wind on Wind on loaded Temp load Long. Seismic Transverse Vertical
Load settle, snow load unloaded structure Seismic Seismic
Case structure

Normal 1 1.35 1.35 1.75 1.35 1.5


Case 1 (a) 1 1 1 1 1.5
2 (a) 1.35 1.35 1.75 1.35 1.5
2 (b) 1 1 1 1 1.5
Wind 3 (a) 1.35 1.35 1.75 1.35 1.5 0.9
Case 3 (b) 1 1 1 1 1.5 0.9
4 (a) 1.35 1.35 1.75 1.35 1.15 1.5
4 (b) 1 1 1 1 1.15 1.5
5 (a) 1.35 1.35 1.75 1.35 1.5 0.9
Temp 5 (b) 1 1 1 1 1.5 0.9
Case 6 (a) 1.35 1.35 1.75 1.35 1.15 1.5
6 (b) 1 1 1 1 1.15 1.5
7 (a) 1.35 1.35 1.75 1.35 0.2 1.5 0.45 0.45
7 (b) 1 1 1 1 0.2 -1.5 -0.45 -0.45
Seismic 7 (c) 1.35 1.35 1.75 1.35 0.2 0.45 1.5 0.45
case 7 (d) 1 1 1 1 0.2 -0.45 -1.5 -0.45
7 (e) 1.35 1.35 1.75 1.35 0.2 0.45 0.45 1.5
7 (f) 1 1 1 1 0.2 -0.45 -0.45 -1.5

-------------------------------------------------------------------------------------------------------------------------------
211 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Counterweght

2.00

4.00 4.0

2.00
1.250

10.00

Dead/Earth load calculation over foundation


Width of footing = 10.000 m Unit wt of concrete = 25 kN/m2
Length of footing = 12.500 m Unit wt of soil = 19 kN/m2
Depth of footing = 2.400 m Depth of footing at edge = 1.250 m
Thickness of wall = 2.000 m
Height of fill at back side = 17.600 m
Height of fill at front side = 5 m

Weight of foundation = 5281 kN CG = -0.244 Moment = -1291 kN-m


Weight of retaining wall = 5808 kN CG = 3.000 Moment = 17424 kN-m
Weight of Earth at back = 12306 kN CG = 3.000 Moment = 36917.76 kN-m
Weight of Earth at front = 4750 kN CG = -3.000 Moment = -14250 kN-m
Total Vertical load = 28145 kN Total moment = 38801 kN-m
Factored Vertical load = 37996 kN Factored moment = 52381.06 kN-m

Load Case HL (kN) V (kN) HT (kN) Mx (kN-m) MT (kN-m) ML (kN-m)


Normal 1 24721.22 59766.03 -4462.40 -13369.08 113.39 -34607.81
Case 1 (a) 19037.85 51579.94 -3256.15 -10636.47 -219.90 -34140.25
2 (a) 25147.47 58114.40 -4249.46 -13499.12 91.25 -44771.61
2 (b) 18770.51 52384.60 -3158.94 -9523.20 -86.06 -24248.55
3 (a) 24645.73 59963.39 -4376.99 -13076.36 116.30 -33948.35
Wind case
3 (b) 18962.35 51777.30 -3170.75 -10343.74 -216.99 -33480.79
4 (a) 24748.91 59563.62 -4307.29 -13046.52 113.28 -36307.65
4 (b) 18903.70 51950.67 -3128.05 -10023.80 -183.62 -31160.47
5 (a) 21608.13 59498.34 -3472.36 -10880.59 251.37 -28375.38
5 (b) 14013.50 51791.21 -2655.92 -6184.40 -506.94 7815.20
Temp case
6 (a) 22065.12 58987.70 -3475.70 -11434.86 289.57 -35426.27
6 (b) 13199.88 51837.24 -2655.24 -5122.40 -591.77 20828.23
7 (a) 33605.34 62045.50 -4262.77 -12061.17 490.46 -39911.13
7 (b) 10318.89 47618.23 -3516.44 -11848.81 -551.85 -27172.83
Seismic 7 (c) 28255.78 68597.88 -1389.75 -5100.17 485.07 -40916.31
case 7 (d) 15930.32 40970.64 -6350.84 -18982.07 -509.21 -29719.99
7 (e) 27971.86 62068.72 -3464.13 -10882.81 310.21 -42496.91
7 (f) 16214.25 47499.79 -4276.46 -13199.44 -334.35 -28139.38

11.2.1.2 Bearing Pressure


Base Width (B) = 10.000 m
Length of Abutment (L) = 12.500 m

-------------------------------------------------------------------------------------------------------------------------------
212 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Load W RaL OaL RaT OaT eL eT Max Base pr. at Min Base pr. at Max Base pr. at Min Base pr. At
Case heal side heal side toe side (kN/m2) toe side (kN/m2)
(kN/m2) (kN/m2)

1 59766 -34608 0 113 0 -0.579 0.002 645 644 312 312


1 (a) 51580 -34140 0 -220 0 -0.662 -0.004 576 577 248 250
2 (a) 58114 -44772 0 91 0 -0.770 0.002 680 679 250 250
2 (b) 52385 -24249 0 -86 0 -0.463 -0.002 535 536 302 303
3 (a) 59963 -33948 0 116 0 -0.566 0.002 643 642 317 316
3 (b) 51777 -33481 0 -217 0 -0.647 -0.004 574 576 253 254
4 (a) 59564 -36308 0 113 0 -0.610 0.002 651 650 303 302
4 (b) 51951 -31160 0 -184 0 -0.600 -0.004 564 566 265 267
5 (a) 59498 -28375 0 251 0 -0.477 0.004 613 611 341 339

5 (b)
51791 7815 0 -507 0 0.151 -0.010 375 379 450 454
6 (a) 58988 -35426 0 290 0 -0.601 0.005 643 641 303 301
6 (b) 51837 20828 0 -592 0 0.402 -0.011 312 317 512 517
7 (a) 62045 -39911 0 490 0 -0.643 0.008 690 686 307 303
7 (b) 47618 -27173 0 -552 0 -0.571 -0.012 509 513 248 253
7 (c) 68598 -40916 0 485 0 -0.596 0.007 747 743 354 351
7 (d) 40971 -29720 0 -509 0 -0.725 -0.012 468 472 183 187
7 (e) 62069 -42497 0 310 0 -0.685 0.005 702 699 294 291
7 (f) 47500 -28139 0 -334 0 -0.592 -0.007 514 516 244 246

11.2.1.3 Calculation of Moment & Shear at critical section

A 10.00 X D

T
Y Y
Heel side
12.50
L

2.0
B C

Critical section for shear X


1.688

2.40 AB CD 2.40
1.25
4.000 4.000
10.000

Wt.of base slab*1.35 81.0 kN/m2 123.2 kN/m2 Effective depth = 2.4*1000-75-25/2
Wt.of fill*1.5 451.4 kN/m2 128.3 kN/m2 = 2312.5 mm
Total downward load 532.4 kN/m2 251.4 kN/m2
11.2.1.4 Moment & Shear at X-X i.e. long direction
Avg design base Avg design base Avg design base Avg design base Moment along Moment along Shear at dist d Shear at dist d
Load Case pr. along long-AB pr. along long- pr. at face wall-AB pr. at face wall- Long - AB (kN- Long - CD (kN- along Long-AB along Long-CD
(kN/m2) CD (kN/m2) (kN/m2) CD (kN/m2) m/m) m/m) (kN/m) (kN/m)

1 112 61 91 81 10497.5 6740.4 2267.2 1368.9


1 (a) 44 -3 25 16 3784.0 356.1 846.5 26.8
2 (a) 147 -1 88 58 12753.8 1841.5 2843.9 234.8
2 (b) 3 51 22 32 945.9 4481.7 149.7 995.2
3 (a) 110 65 92 83 10423.2 7130.4 2245.0 1457.7
3 (b) 42 2 26 18 3709.8 746.2 824.3 115.7
4 (a) 118 51 91 78 10933.9 5980.2 2376.1 1191.7
4 (b) 33 15 25 22 3031.7 1701.6 658.2 340.2
5 (a) 80 88 83 85 8089.5 8720.1 1697.5 1848.3
5 (b) -156 200 -13 58 -10815.3 15293.5 -2649.0 3593.6
6 (a) 110 50 86 74 10162.9 5829.7 2204.8 1168.7
6 (b) -218 263 -25 71 -15359.0 19910.9 -3736.5 4696.6
7 (a) 155 53 115 94 14187.8 6697.2 3098.2 1307.2
7 (b) -21 -1 -13 -9 -1837.9 -360.7 -408.5 -55.3
7 (c) 213 101 168 146 19783.5 11585.3 4288.5 2328.3
7 (d) -62 -66 -64 -65 -6259.4 -6575.4 -1315.9 -1391.4
7 (e) 168 41 117 92 15116.6 5805.6 3319.8 1093.5
7 (f) -17 -7 -13 -11 -1592.4 -795.7 -347.1 -156.6
+ve means Upward pressure Maximum 19783.5 19910.9 4288.5 4696.6
Minimum -15359.0 -6575.4 -3736.5 -1391.4

-------------------------------------------------------------------------------------------------------------------------------
213 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.2.1.5 Check for ultimate strength of foundation slab in Flexure :-


Consider rectangular beam for design
12500.0 0.00350 17.87
34967 kN
194.26
NA NA
2313

0.0382 34967 kN
Strain Diagram Stress Diagram
a) Support moment
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 12500.0 mm Depth of the section = 2400 mm
Clear Cover = 75 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 0 mm Effective depth, d 2312.5 = 2313 mm
R = Mu/bd2 = 0.298 MPa Design Moment = 19911 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 19967.0 mm2
Lower fractile tensile fctm = 1.94 MPa Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 37578.1 mm2
Hence provide @32 dia 125 c/c Ast = 80424.8 mm2
@ 0 dia 125 c/c > Hence O.K.
E of reinforcement =
200000 MPa Max strain in concrete = 0.0035
E of concrete =
32308 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 1054.6 mm Actual neutral axis depth = 194.26 mm
Strain in steel = 0.03816394 Stress in steel = 434.8 MPa
Section is under reinforced, Hence ok
Total ultimate compressive force = 34967 kN Total ultimate tensile force = 34967 kN
Compressive force CG 80.81 mm Moment of resistance = 78036 kNm
> 19911 kNm
Flexure Design Hence O.K.
Heel side Toe side
Description
Maximum Minimum Maximum Minimum
Moment 19783.5 -15359.0 19910.9 -6575.4
Width 12500 12500 12500 12500
Depth 2313 2313 2313 2313
R = Mu/bd2 0.30 -0.23 0.30 -0.10
pt 0.0000 0.0000 0.0000 0.0000
Ast required for bending -240.3 186.6 -241.9 79.9
Ast required for shear 0.0 0.0 0.0 0.0
Total Ast required 0.0 186.6 0.0 79.9
1st layers 32 dia 25 dia 32 dia 25 dia
Reinf provided 125 c/c 125 c/c 125 c/c 125 c/c
2nd layers 0 dia 0 dia 0 dia 0 dia
125 c/c 125 c/c 125 c/c 125 c/c
Ast provided 80424.8 49087.4 80424.8 49087.4
Actual NA 194 119 194 119
Strain in steel 0.0382 0.0648 0.0382 0.0648
Stress in steel 434.8 434.8 434.8 434.8
Total tension = 34967 21342 34967 21342
Total compression 34967 21342 34967 21342
Difference of force 0 0 0 0
Compressive force CG 80.8 49.3 80.8 49.3
Moment of resistance 78036 48301 78036 48301
Factor of Safety 3.9 3.1 3.9 7.3
Pt 0.0028 0.00170 0.0028 0.0017
11.2.1.6 Shear design
VRD= Design Shear Force of the concrete section = 4696.6 kN
Vccd= Design component of Shear Force in the compression area due to inclined compression chord
Vtd= Design component of Shear Force in tensile reinforcement due to inclined tensile chord
VRd.s= Design value of Shear Force for yielding of vertical shear reinforcement
VRD= VRd.s + Vccd + Vtd Here, Vccd= Vtd = 0.0 kN
Hence, VRD= VRd.s
Along Long Direction (X-X)
Design the section without shear reinforcement Design shear = = 4696.6 kN
VRD,C= Design Shear Resistance of the concrete section = [0.12K(80p1fck)^0.33+0.15σCP]bwd
Grade Concrete = M40 Grade of steel = Fe 500
Width of beam = 12500 mm Effective depth, d = 2313 mm
K= 1+sqrt(200/d)<=2.0 = 1.29 z = 2232 mm
vmin = 0.29 MPa p1 = Asl/bwd <=0.02 = 0.0028
σCP = = 0.00 MPa δ = 0.280 rad
Reduction of shear force as per cl. No. 10.3.2 (5) of IRC:112-2011 Mtanδ/d = 208.5 kN
αV = d= 2313 mm β = αV /2d = 0.5
VRD,C = 9236.1 kN > V-Mtand/d = 4488.2 kN
Hence shear reinforcement not required or 4,696.64x0.5= 2348.3 kN

-------------------------------------------------------------------------------------------------------------------------------
214 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.2.2 Servicebility limit State Method


Load Combination for Rare Combination (SL1)
1) Dead load +SIDL+Prestress
2) Dead load +SIDL+Prestress+ wind load(lead) (unloaded structure)
3) Dead load +SIDL+Prestress+Live load(lead)+wind load (accompany)
4) Dead load +SIDL+Prestress+Live load(accompany)+wind load (lead)
5) Dead load +SIDL+Prestress+Live load(lead)+Temperature(accompany)
6) Dead load +SIDL+Prestress+Live load(accompany)+Temperature(lead)
Wind on
DL, Support Wind on loaded
Load Case SIDL(DL) SIDL(WC) Earth pr. Live load unloaded Temperature
settle, snow load structure
structure
1(a) 1 1 1.2 1
1(b) 1 1 1 1
2 (a) 1 1 1.2 1 1 1
2 (b) 1 1 1 1 1 1
3 (a) 1 1 1.2 1 1 0.6
3 (b) 1 1 1 1 1 0.6
4 (a) 1 1 1.2 1 0.75 1
4 (b) 1 1 1 1 0.75 1
5 (a) 1 1 1.2 1 1 0.6
5 (b) 1 1 1 1 1 0.6
6 (a) 1 1 1.2 1 0.75 1
6 (b) 1 1 1 1 0.75 1
Load Combination for Quasi-permanent (SL3) - for RCC structure
1) Dead load +SIDL
2) Dead load +SIDL+Temperature(lead)
Wind on
Wind on loaded
Load Case DL, Support settle SIDL(WC) Earth pr. Earth pr. Live load unloaded Temperature
structure
structure

1 1 1.2 1 1
2 (a) 1 1.2 1 1 0.5
2 (b) 1 1 1 1 0.5

Rare Combination
Load Case HL (kN) V (kN) HT (kN) Mx (kN-m) MT (kN-m) ML (kN-m)
1(a) 18811.24 42550.88 -3264.95 -10432.16 69.67 -34600.17
1(b) 19002.17 41908.28 -3317.18 -10101.66 -85.18 -39660.46
2 (a) 18572.91 43187.17 -3064.56 -9721.27 72.31 -32646.35
2 (b) 18763.84 42544.57 -3116.79 -9390.76 -82.53 -37706.64
3 (a) 18322.30 44200.55 -3244.48 -9764.68 85.78 -26163.58
3 (b) 19335.10 43253.52 -3191.65 -10020.45 49.25 -42357.91
4 (a) 18398.40 43908.74 -3197.40 -9752.66 83.53 -27869.72
4 (b) 19205.73 43037.82 -3170.84 -9861.86 17.42 -41280.55
5 (a) 18792.61 44047.36 -3300.30 -10425.31 143.57 -32435.48
5 (b) 19805.41 43100.33 -3247.47 -10681.08 107.05 -48629.81
6 (a) 19182.24 43653.42 -3290.44 -10853.71 179.85 -38322.89
6 (b) 19989.57 42782.50 -3263.88 -10962.91 113.74 -51733.71
Quasi-permanent
1 18813.50 42544.79 -3265.04 -10429.99 74.71 -34615.62
2 (a) 19163.48 42526.78 -3264.11 -10817.89 124.49 -39475.84
2 (b) 19352.15 41890.26 -3316.25 -10489.55 -35.40 -39624.98

11.2.2.1 Bearing Pressure


Foundation Dimension along Long. Direction (L) = 10.00 m
Foundation Dimension along Trans. Direction (T)= 12.50 m
Max Base pr. at Min Base pr. at Max Base pr. at Min Base pr.
Load Case W ML MT eL eT heal side heal side toe side (kN/m2) attoe side
(kN/m2) (kN/m2) (kN/m2)
Rare Combination
1(a) 42551 -34600 70 -0.813 0.002 507 506 175 174
1(b) 41908 -39660 -85 -0.946 -0.002 525 526 145 145
2 (a) 43187 -32646 72 -0.756 0.002 502 502 189 189
2 (b) 42545 -37707 -83 -0.886 -0.002 521 522 159 160
3 (a) 44201 -26164 86 -0.592 0.002 480 479 228 228
3 (b) 43254 -42358 49 -0.979 0.001 550 549 143 143
4 (a) 43909 -27870 84 -0.635 0.002 485 485 218 217
4 (b) 43038 -41281 17 -0.959 0.000 543 542 146 146
5 (a) 44047 -32435 144 -0.736 0.003 509 508 197 196
5 (b) 43100 -48630 107 -1.128 0.002 579 578 112 111
6 (a) 43653 -38323 180 -0.878 0.004 534 532 166 165
6 (b) 42782 -51734 114 -1.209 0.003 591 590 94 94
Quasi-permanent Combination
1 42545 -34616 75 -0.814 0.002 507 506 174 174
2 (a) 42527 -39476 124 -0.928 0.003 530 529 151 150
2 (b) 41890 -39625 -35 -0.946 -0.001 525 525 145 145
-------------------------------------------------------------------------------------------------------------------------------
215 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.2.2.2 Calculation of Moment & Shear at critical section


A 10.00 X D

T
Y
12.50
L
2.0
B C
X

2.40 AB CD 2.40
1.25
4.000 4.000
10.000

Wt.of base slab 60.0 kN/m2 45.6 kN/m2 Effective depth = 2.4*1000-75-32/2
Wt.of fill 334.4 kN/m2 95.0 kN/m2 = 2309 mm
Total downward load 394.4 kN/m2 140.6 kN/m2
Moment & Shear at X-X i.e. long direction
Avg design Avg design Avg design Avg design Moment
Moment
base pr. along base pr. base pr. at base pr. at along Long -
Load Case along Long -
long-AB along long- face-AB side face-CD side AB (kN-
CD (kN-m/m)
(kN/m2) CD (kN/m2) (kN/m2) (kN/m2) m/m)

Rare Combination
1(a) 112 34 81 81 10163.6 6505.6
1(b) 131 4 80 80 11430.8 5505.7
2 (a) 108 48 84 84 9984.9 7202.2
2 (b) 127 19 84 84 11252.1 6202.3
3 (a) 85 87 86 86 8513.7 8635.2
3 (b) 155 2 94 94 13456.5 6323.0
4 (a) 91 77 85 85 8880.8 8238.0
4 (b) 148 6 91 91 12904.7 6253.8
5 (a) 114 56 91 91 10598.8 7910.6
5 (b) 184 -29 99 99 15541.6 5598.3
6 (a) 139 25 93 93 12356.1 7030.2
6 (b) 196 -47 99 99 16379.9 5046.1
Maximum 16379.9 8635.2
Minimum 8513.7 5046.1
Quasi-permanent Combination
1 112 34 81 81 10164.2 6499.2
2 (a) 135 10 85 85 11860.6 6018.2
2 (b) 131 4 80 80 11403.9 5494.7
+ve means upward pressure Maximum 11860.6 6499.2
Minimum 10164.2 5494.7

11.2.2.3 Servicebility limit State Design


Flexure Design Design moment = 16379.9 kN-m
Grade Concrete = M40 Grade of steel = Fe 500
Bending Compression of concrete = 19.20 Mpa fctm = Mean tensile strength of concrete = 1.94 Mpa
E of reinforcement = 200000 MPa E of concrete = 32308 MPa
Creep Coefficient, φ = 1 Ec, eff =Ecm /(1+φ) = 16154 MPa
Modular ratio =Es/Ecm = 12.38 Tensile stress of steel = 400 Mpa
Width of Section = 12500 mm Depth of Section = 2400 mm
Clear Cover = 75 mm Effective depth, d = 2313 mm
Minimum reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 0.0 mm2
Hence provide 32 dia
@ 125 c/c Ast = 80424.8 mm2
@0 dia 125 c/c > Hence O.K.
Balanced neutral axis depth = = 862.00 mm Actual neutral axis depth = 532.52 mm
Strain in steel = 0.00048 MPa Stress in steel = 95.4 MPa
Strain in steel = 0.00018 MPa Comp. stress of concrete = 2.31 Mpa
Stress-strain diagram at Serviceability Limit State condition

0.00014 2.31
533 7672.12

NA NA

95.40
0.00048
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok =
Total compressive force = 7672.1 kN Total tensile force = 7672.1 kN
Compressive force CG = 177.5 mm Moment of resistance = 16379.9 kNm

-------------------------------------------------------------------------------------------------------------------------------
216 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Rare Combination Quasi-permanent Combination


Heel side Toe side Heel side Toe side
Description Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum
h or D 2400 2400 2400 2400 2400 2400 2400 2400
b 12500 12500 12500 12500 12500 12500 12500 12500
d 2313 2313 2313 2313 2313 2313 2313 2313
Moment 16379.93 8513.68 8635.24 0.00 11860.58 10164.20 6499.24 0.10
Reinf provided 32 dia 25 dia 32 dia 25 dia 32 dia 25 dia 32 dia 25 dia
125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c 125 c/c
0 dia 0 dia 0 dia 0 dia 0 dia 0 dia 0 dia 0 dia
125 c/c 125 c/c 125 c/c 0 c/c 125 c/c 125 c/c 125 c/c 0 c/c
Ast provided 80424.8 80424.8 49087.4 0.0 80424.8 80424.8 49087.4 0.0
Stress in concrete 2.3 -1.2 1.5 -1.7 -1.4 1.1
Actual NA 533 533 428 533 533 428
Stress in steel 95.4 -49.6 81.1 -69.1 -59.2 61.0
Total ultimate tensile force = 7672 -3988 3980 -5555 -4761 2995
Total ultimate compressive force7672 -3988 3980 -5555 -4761 2995
Difference of force 0 0 0 0 0 0
Compressive force CG 177.5 177.5 142.7 177.5 177.5 142.7
Moment of resistance 16380 8514 8635 11861 10164 6499
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0
Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = -69.07 Mpa αe =Es/Ecm = 6.190
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 218.8 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.029
fct,eff = = 3.03 Mpa εsm-εcm = -0.00021
>= 0.6σsc/Es= -0.00021
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 75 mm 107
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 32.000 mm k2 = 0.5
Sr,max = 440.0 mm Crack width, Wk = = -0.091 mm
Heel side Toe side < 0.3 mm OK
Description Maximum Minimum Maximum
Stress in steel, σs 69.1 59.2 61.0
As 80424.8 80424.8 49087.4
Actual NA 533 533 428
hc,eff 218.8 218.8 218.8
ρp,eff 0.029 0.029 0.018
εsm-εcm 0.00021 0.00018 0.00018
φeq 32.0 25.0 32.0
Crack spacing Sr,max 440.0 399.5 558.0
Crack width, Wk 0.091 0.071 0.102
Check <0.3 O.K. <0.3 O.K. <0.3 O.K.
11.2.3 Details of Reinforcement
Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 3006.3 mm2/m
As per clause 16.6.1.1 (3) of IRC-112:2011, minimum tranverse reinforcement is 20% of main reinforcement.
Minimum tranverse reinforcement Longitudinal direction = 6434.0 mm2/m
Tranverse direction = 1286.8 mm2/m
Hence provide Top long 25 dia @ 125 c/c Ast provided = 1608.5 mm2
Top Tranv 16 dia @ 125 c/c Hence OK.
Bottom long 32 dia @ 125 c/c
Bottom Tranv 16 dia @ 125 c/c
Side face 16 dia @ 150 c/c
Open link 12 dia @ 250 c/c Staggered

-------------------------------------------------------------------------------------------------------------------------------
217 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Staad Inputs

-------------------------------------------------------------------------------------------------------------------------------
218 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.0 Staad Analysis

Node No & Dimensions

Member No

-------------------------------------------------------------------------------------------------------------------------------
219 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

11.1 Analysis of Integral bridge


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 25-Sep-18
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 28.414 0 0; 3 -0.3175 0 3; 4 28.7315 0 3; 5 -0.6485 0 6;
6 29.0625 0 6; 7 -0.971 0 9; 8 29.385 0 9; 9 3.55175 0 0; 10 7.1035 0 0;
11 10.6552 0 0; 12 14.207 0 0; 13 17.7587 0 0; 14 21.3105 0 0; 15 24.8622 0 0;
16 3.31362 0 3; 17 6.94475 0 3; 18 10.5759 0 3; 19 14.207 0 3; 20 17.8381 0 3;
21 21.4692 0 3; 22 25.1004 0 3; 23 3.06538 0 6; 24 6.77925 0 6; 25 10.4931 0 6;
26 14.207 0 6; 27 17.9209 0 6; 28 21.6348 0 6; 29 25.3486 0 6; 30 2.8235 0 9;
31 6.618 0 9; 32 10.4125 0 9; 33 14.207 0 9; 34 18.0015 0 9; 35 21.796 0 9;
36 25.5905 0 9; 37 1 0 0; 38 0.6825 0 3; 39 0.3515 0 6; 40 0.0289999 0 9;
41 27.414 0 0; 42 27.7315 0 3; 43 28.0625 0 6; 44 28.385 0 9; 45 0.2 0 -2.3;
46 1.2 0 -2.08; 47 3.65175 0 -1.78; 48 7.2035 0 -1.37; 49 10.6552 0 -1.14;
50 14.207 0 -1.05; 51 17.7587 0 -1.14; 52 21.2605 0 -1.23; 53 24.7622 0 -1.34;
54 27.264 0 -1.51; 55 28.234 0 -1.58; 56 -1.171 0 10.52; 57 -0.141 0 10.68;
58 2.7035 0 10.92; 59 6.518 0 11.16; 60 10.4125 0 11.26; 61 14.207 0 11.2;
62 18.0515 0 11.04; 63 21.876 0 10.85; 64 25.6905 0 10.65; 65 28.535 0 10.48;
66 29.565 0 10.43; 79 0 -1.375 0; 80 28.414 -1.375 0; 81 -0.3175 -1.375 3;
82 28.7315 -1.375 3; 83 -0.6485 -1.375 6; 84 29.0625 -1.375 6;
85 -0.971 -1.375 9; 86 29.385 -1.375 9; 87 0.2 -1.375 -2.3;
88 28.234 -1.375 -1.58; 89 -1.171 -1.375 10.52; 90 29.565 -1.375 10.43;
91 0 -1.875 0; 92 28.414 -1.875 0; 93 -0.3175 -1.875 3; 94 28.7315 -1.875 3;
95 -0.6485 -1.875 6; 96 29.0625 -1.875 6; 97 -0.971 -1.875 9;
98 29.385 -1.875 9; 99 0.2 -1.875 -2.3; 100 28.234 -1.875 -1.58;
101 -1.171 -1.875 10.52; 102 29.565 -1.875 10.43; 115 0 -18.375 0;
116 -0.3175 -18.375 3; 117 -0.6485 -18.375 6; 118 -0.971 -18.375 9;
119 0.2 -18.375 -2.3; 120 -1.171 -18.375 10.52; 121 28.414 -19.375 0;
122 28.7315 -19.375 3; 123 29.0625 -19.375 6; 124 29.385 -19.375 9;
125 28.234 -19.375 -1.58; 126 29.565 -19.375 10.43; 127 0 -16.375 0;
128 -0.3175 -16.375 3; 129 -0.6485 -16.375 6; 130 -0.971 -16.375 9;
131 0.2 -16.375 -2.3; 132 -1.171 -16.375 10.52; 133 28.414 -17.375 0;
134 28.7315 -17.375 3; 135 29.0625 -17.375 6; 136 29.385 -17.375 9;
137 28.234 -17.375 -1.58; 138 29.565 -17.375 10.43; 139 0.2 -9.125 -2.3;
140 0 -9.125 0; 141 -0.3175 -9.125 3; 142 -0.6485 -9.125 6;
143 -0.971 -9.125 9; 144 -1.171 -9.125 10.52; 145 28.234 -9.625 -1.58;
146 28.414 -9.625 0; 147 28.7315 -9.625 3; 148 29.0625 -9.625 6;
149 29.385 -9.625 9; 150 29.565 -9.625 10.43;
MEMBER INCIDENCES
1 1 37; 2 3 38; 3 5 39; 4 7 40; 5 9 10; 6 10 11; 7 11 12; 8 12 13; 9 13 14;
10 14 15; 11 15 41; 12 16 17; 13 17 18; 14 18 19; 15 19 20; 16 20 21; 17 21 22;
18 22 42; 19 23 24; 20 24 25; 21 25 26; 22 26 27; 23 27 28; 24 28 29; 25 29 43;
26 30 31; 27 31 32; 28 32 33; 29 33 34; 30 34 35; 31 35 36; 32 36 44; 33 37 9;
34 38 16; 35 39 23; 36 40 30; 37 41 2; 38 42 4; 39 43 6; 40 44 8; 41 45 46;
42 46 47; 43 47 48; 44 48 49; 45 49 50; 46 50 51; 47 51 52; 48 52 53; 49 53 54;
50 54 55; 51 56 57; 52 57 58; 53 58 59; 54 59 60; 55 60 61; 56 61 62; 57 62 63;
58 63 64; 59 64 65; 60 65 66; 61 45 1; 62 1 3; 63 3 5; 64 5 7; 65 7 56;
66 46 37; 67 37 38; 68 38 39; 69 39 40; 70 40 57; 71 47 9; 72 9 16; 73 16 23;
74 23 30; 75 30 58; 76 48 10; 77 10 17; 78 17 24; 79 24 31; 80 31 59; 81 49 11;
82 11 18; 83 18 25; 84 25 32; 85 32 60; 86 50 12; 87 12 19; 88 19 26; 89 26 33;
90 33 61; 91 51 13; 92 13 20; 93 20 27; 94 27 34; 95 34 62; 96 52 14; 97 14 21;
98 21 28; 99 28 35; 100 35 63; 101 53 15; 102 15 22; 103 22 29; 104 29 36;
105 36 64; 106 54 41; 107 41 42; 108 42 43; 109 43 44; 110 44 65; 111 55 2;
112 2 4; 113 4 6; 114 6 8; 115 8 66; 117 45 87; 118 87 99; 119 99 139;
120 131 119; 122 1 79; 123 79 91; 124 91 140; 125 127 115; 127 3 81; 128 81 93;
129 93 141; 130 128 116; 132 5 83; 133 83 95; 134 95 142; 135 129 117;
137 7 85; 138 85 97; 139 97 143; 140 130 118; 142 56 89; 143 89 101;
144 101 144; 145 132 120; 147 55 88; 148 88 100; 149 100 145; 150 137 125;
152 2 80; 153 80 92; 154 92 146; 155 133 121; 157 4 82; 158 82 94; 159 94 147;
160 134 122; 162 6 84; 163 84 96; 164 96 148; 165 135 123; 167 8 86; 168 86 98;
169 98 149; 170 136 124; 172 66 90; 173 90 102; 174 102 150; 175 138 126;
176 139 131; 177 140 127; 178 141 128; 179 142 129; 180 143 130; 181 144 132;
182 145 137; 183 146 133; 184 147 134; 185 148 135; 186 149 136; 187 150 138;
193 87 79; 194 79 81; 195 81 83; 196 83 85; 197 85 89; 198 99 91; 199 91 93;
200 93 95; 201 95 97; 202 97 101; 203 139 140; 204 140 141; 205 141 142;
206 142 143; 207 143 144; 208 131 127; 209 127 128; 210 128 129; 211 129 130;
212 130 132; 213 119 115; 214 115 116; 215 116 117; 216 117 118; 217 118 120;
223 88 80; 224 80 82; 225 82 84; 226 84 86; 227 86 90; 228 100 92; 229 92 94;
230 94 96; 231 96 98; 232 98 102; 233 145 146; 234 146 147; 235 147 148;
236 148 149; 237 149 150; 238 137 133; 239 133 134; 240 134 135; 241 135 136;
242 136 138; 243 125 121; 244 121 122; 245 122 123; 246 123 124; 247 124 126;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 3.3346e+007
-------------------------------------------------------------------------------------------------------------------------------
220 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

POISSON 0.17
DENSITY 25
ALPHA 1.2e-005
DAMP 0.05
ISOTROPIC CONCRETE1
E 3.3346e+007
POISSON 0.17
DENSITY 0
ALPHA 1.2e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
5 TO 10 12 TO 17 19 TO 24 26 TO 31 PRIS AX 1.6025 IX 0.0382 IY 0.5581 IZ 0.6916
11 18 25 32 TO 36 PRIS AX 1.847 IX 0.0648 IY 0.5689 IZ 0.7512
1 TO 4 37 TO 40 PRIS AX 2.1194 IX 0.1649 IY 0.6034 IZ 0.8213
41 TO 60 PRIS YD 0.225 ZD 0.5
66 TO 70 106 TO 110 PRIS YD 0.225 ZD 1.5
71 TO 86 90 TO 105 PRIS YD 0.225 ZD 3.5
117 TO 120 142 TO 145 147 TO 150 172 TO 176 181 182 187 PRIS YD 2.3 ZD 0.5
122 TO 125 127 TO 130 132 TO 135 137 TO 140 177 TO 180 PRIS YD 2.3 ZD 3.02
198 TO 202 213 TO 217 228 TO 232 243 TO 247 PRIS YD 2 ZD 1
208 TO 212 238 TO 242 PRIS YD 2 ZD 3.5
203 TO 207 PRIS YD 2 ZD 7.25
193 TO 197 223 TO 227 PRIS YD 0.5 ZD 2
61 TO 65 111 TO 115 PRIS YD 2.3 ZD 2
233 TO 237 PRIS YD 2 ZD 7.75
MEMBER PROPERTY AMERICAN
152 TO 155 157 TO 160 162 TO 165 167 TO 170 183 TO 186 PRIS YD 2 ZD 2.77
MEMBER PROPERTY AMERICAN
87 TO 89 PRIS AX 1.2563 IX 0.0255 IY 0.8423 IZ 0.3147
CONSTANTS
BETA 90 MEMB 193 TO 217 223 TO 247
BETA 353 MEMB 147 TO 150 152 TO 155 157 TO 160 162 TO 165 167 TO 170 -
172 TO 175 182 TO 187
BETA 7 MEMB 117 TO 120 122 TO 125 127 TO 130 132 TO 135 137 TO 140 -
142 TO 145 176 TO 181
MATERIAL CONCRETE MEMB 1 TO 65 87 TO 89 111 TO 115 117 TO 120 122 TO 125 127 -
128 TO 130 132 TO 135 137 TO 140 142 TO 145 147 TO 150 152 TO 155 157 TO 160 -
162 TO 165 167 TO 170 172 TO 187
MATERIAL CONCRETE1 MEMB 66 TO 86 90 TO 110 193 TO 217 223 TO 247
SUPPORTS
115 TO 126 FIXED
*115 TO 125 -
*126 FIXED BUT MY KFX 4.89898e+006 KFY 7.34847e+006 KFZ 4.89898e+006 -
*KMX 4.8e+007 KMZ 1.8e+007
CUT OFF MODE SHAPE 50
DEFINE 1893 LOAD
ZONE 0.24 RF 2 I 1.2 SS 1 ST 1 DM 0.05 DT 2
*********************************************************************
JOINT WEIGHT
1 WEIGHT 403.926
2 WEIGHT 353.574
3 WEIGHT 416.838
4 WEIGHT 410.673
5 WEIGHT 414.644
6 WEIGHT 406.47
7 WEIGHT 343.95
8 WEIGHT 330.224
9 WEIGHT 197.432
10 WEIGHT 211.226
11 WEIGHT 206.904
12 WEIGHT 199.886
13 WEIGHT 207.118
14 WEIGHT 211.221
15 WEIGHT 196.008
16 WEIGHT 161.095
17 WEIGHT 173.895
18 WEIGHT 171.124
19 WEIGHT 189.974
20 WEIGHT 171.048
21 WEIGHT 173.826
22 WEIGHT 161.147
23 WEIGHT 160.19
24 WEIGHT 166.765
25 WEIGHT 163.054
26 WEIGHT 123.966
27 WEIGHT 163.444
28 WEIGHT 167.332
29 WEIGHT 160.49
-------------------------------------------------------------------------------------------------------------------------------
221 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

30 WEIGHT 191.056
31 WEIGHT 207.163
32 WEIGHT 205.12
33 WEIGHT 244.207
34 WEIGHT 203.251
35 WEIGHT 203.758
36 WEIGHT 188.962
37 WEIGHT 127.067
38 WEIGHT 109.8
39 WEIGHT 113.335
40 WEIGHT 135.253
41 WEIGHT 126.993
42 WEIGHT 109.884
43 WEIGHT 113.296
44 WEIGHT 135.095
45 WEIGHT 113.322
46 WEIGHT 5.519
47 WEIGHT 10.598
48 WEIGHT 11.129
49 WEIGHT 7.163
50 WEIGHT 10.081
51 WEIGHT 7.081
52 WEIGHT 11.058
53 WEIGHT 11.769
54 WEIGHT 5.702
55 WEIGHT 80.706
56 WEIGHT 83.112
57 WEIGHT 6.868
58 WEIGHT 16.481
59 WEIGHT 20.648
60 WEIGHT 19.606
61 WEIGHT 10.817
62 WEIGHT 21.174
63 WEIGHT 23.304
64 WEIGHT 18.384
65 WEIGHT 7.09
66 WEIGHT 78.477
79 WEIGHT 141.383
80 WEIGHT 129.986
81 WEIGHT 141.713
82 WEIGHT 130.177
83 WEIGHT 141.688
84 WEIGHT 129.981
85 WEIGHT 141.547
86 WEIGHT 129.874
87 WEIGHT 23.484
88 WEIGHT 22.986
89 WEIGHT 23.31
90 WEIGHT 23.246
91 WEIGHT 585.126
92 WEIGHT 571.502
93 WEIGHT 585.222
94 WEIGHT 571.521
95 WEIGHT 585.205
96 WEIGHT 571.397
97 WEIGHT 585.188
98 WEIGHT 571.408
99 WEIGHT 96.789
100 WEIGHT 102.742
101 WEIGHT 96.721
102 WEIGHT 102.929
115 WEIGHT 151
116 WEIGHT 151
117 WEIGHT 151
118 WEIGHT 151
119 WEIGHT 25
120 WEIGHT 25
121 WEIGHT 138.5
122 WEIGHT 138.5
123 WEIGHT 138.5
124 WEIGHT 138.5
125 WEIGHT 25
126 WEIGHT 25
127 WEIGHT 698.375
128 WEIGHT 698.376
129 WEIGHT 698.376
130 WEIGHT 698.376
131 WEIGHT 115.624
132 WEIGHT 115.623
-------------------------------------------------------------------------------------------------------------------------------
222 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

133 WEIGHT 675.189


134 WEIGHT 675.19
135 WEIGHT 675.189
136 WEIGHT 675.188
137 WEIGHT 121.871
138 WEIGHT 121.873
139 WEIGHT 181.331
140 WEIGHT 1094.72
141 WEIGHT 1094.69
142 WEIGHT 1094.69
143 WEIGHT 1094.72
144 WEIGHT 181.347
145 WEIGHT 193.951
146 WEIGHT 1073.31
147 WEIGHT 1073.27
148 WEIGHT 1073.3
149 WEIGHT 1073.34
150 WEIGHT 193.834
DEFINE MOVING LOAD
TYPE 1 LOAD 77 77 77 77 77
DIST 0.917 0.917 0.917 0.917 WID 2.06
TYPE 2 LOAD 96.12 96.12 96.12 96.12 67.85 67.85 45.23
DIST 1.37 3.05 1.37 2.13 1.52 3.96 WID 1.93
TYPE 3 LOAD 15.27 15.27 64.46 64.46 38.45 38.45 38.45 38.45
DIST 1.1 3.2 1.2 4.3 3 3 3 WID 1.8
*LOAD 1 SEISMIC LOAD IN X DIRECTION
*1893 LOAD X 1
*LOAD 2 SEISMIC LOAD IN Z DIRECTION
*1893 LOAD Z 1
*LOAD 3 SEISMIC LOAD IN Y DIRECTION
*1893 LOAD Y 0.67
****************************************************************************
LOAD 1 SPECTRUM IN X DIRECTION
JOINT LOAD
1 FX 403.926 FY 403.926 FZ 403.926
2 FX 353.574 FY 353.574 FZ 353.574
3 FX 416.838 FY 416.838 FZ 416.838
4 FX 410.673 FY 410.673 FZ 410.673
5 FX 414.644 FY 414.644 FZ 414.644
6 FX 406.47 FY 406.47 FZ 406.47
7 FX 343.95 FY 343.95 FZ 343.95
8 FX 330.224 FY 330.224 FZ 330.224
9 FX 197.432 FY 197.432 FZ 197.432
10 FX 211.226 FY 211.226 FZ 211.226
11 FX 206.904 FY 206.904 FZ 206.904
12 FX 199.886 FY 199.886 FZ 199.886
13 FX 207.118 FY 207.118 FZ 207.118
14 FX 211.221 FY 211.221 FZ 211.221
15 FX 196.008 FY 196.008 FZ 196.008
16 FX 161.095 FY 161.095 FZ 161.095
17 FX 173.895 FY 173.895 FZ 173.895
18 FX 171.124 FY 171.124 FZ 171.124
19 FX 189.974 FY 189.974 FZ 189.974
20 FX 171.048 FY 171.048 FZ 171.048
21 FX 173.826 FY 173.826 FZ 173.826
22 FX 161.147 FY 161.147 FZ 161.147
23 FX 160.19 FY 160.19 FZ 160.19
24 FX 166.765 FY 166.765 FZ 166.765
25 FX 163.054 FY 163.054 FZ 163.054
26 FX 123.966 FY 123.966 FZ 123.966
27 FX 163.444 FY 163.444 FZ 163.444
28 FX 167.332 FY 167.332 FZ 167.332
29 FX 160.49 FY 160.49 FZ 160.49
30 FX 191.056 FY 191.056 FZ 191.056
31 FX 207.163 FY 207.163 FZ 207.163
32 FX 205.12 FY 205.12 FZ 205.12
33 FX 244.207 FY 244.207 FZ 244.207
34 FX 203.251 FY 203.251 FZ 203.251
35 FX 203.758 FY 203.758 FZ 203.758
36 FX 188.962 FY 188.962 FZ 188.962
37 FX 127.067 FY 127.067 FZ 127.067
38 FX 109.8 FY 109.8 FZ 109.8
39 FX 113.335 FY 113.335 FZ 113.335
40 FX 135.253 FY 135.253 FZ 135.253
41 FX 126.993 FY 126.993 FZ 126.993
42 FX 109.884 FY 109.884 FZ 109.884
43 FX 113.296 FY 113.296 FZ 113.296
44 FX 135.095 FY 135.095 FZ 135.095
45 FX 113.322 FY 113.322 FZ 113.322
-------------------------------------------------------------------------------------------------------------------------------
223 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

46 FX 5.519 FY 5.519 FZ 5.519


47 FX 10.598 FY 10.598 FZ 10.598
48 FX 11.129 FY 11.129 FZ 11.129
49 FX 7.163 FY 7.163 FZ 7.163
50 FX 10.081 FY 10.081 FZ 10.081
51 FX 7.081 FY 7.081 FZ 7.081
52 FX 11.058 FY 11.058 FZ 11.058
53 FX 11.769 FY 11.769 FZ 11.769
54 FX 5.702 FY 5.702 FZ 5.702
55 FX 80.706 FY 80.706 FZ 80.706
56 FX 83.112 FY 83.112 FZ 83.112
57 FX 6.868 FY 6.868 FZ 6.868
58 FX 16.481 FY 16.481 FZ 16.481
59 FX 20.648 FY 20.648 FZ 20.648
60 FX 19.606 FY 19.606 FZ 19.606
61 FX 10.817 FY 10.817 FZ 10.817
62 FX 21.174 FY 21.174 FZ 21.174
63 FX 23.304 FY 23.304 FZ 23.304
64 FX 18.384 FY 18.384 FZ 18.384
65 FX 7.09 FY 7.09 FZ 7.09
66 FX 78.477 FY 78.477 FZ 78.477
79 FX 141.383 FY 141.383 FZ 141.383
80 FX 129.986 FY 129.986 FZ 129.986
81 FX 141.713 FY 141.713 FZ 141.713
82 FX 130.177 FY 130.177 FZ 130.177
83 FX 141.688 FY 141.688 FZ 141.688
84 FX 129.981 FY 129.981 FZ 129.981
85 FX 141.547 FY 141.547 FZ 141.547
86 FX 129.874 FY 129.874 FZ 129.874
87 FX 23.484 FY 23.484 FZ 23.484
88 FX 22.986 FY 22.986 FZ 22.986
89 FX 23.31 FY 23.31 FZ 23.31
90 FX 23.246 FY 23.246 FZ 23.246
91 FX 585.126 FY 585.126 FZ 585.126
92 FX 571.502 FY 571.502 FZ 571.502
93 FX 585.222 FY 585.222 FZ 585.222
94 FX 571.521 FY 571.521 FZ 571.521
95 FX 585.205 FY 585.205 FZ 585.205
96 FX 571.397 FY 571.397 FZ 571.397
97 FX 585.188 FY 585.188 FZ 585.188
98 FX 571.408 FY 571.408 FZ 571.408
99 FX 96.789 FY 96.789 FZ 96.789
100 FX 102.742 FY 102.742 FZ 102.742
101 FX 96.721 FY 96.721 FZ 96.721
102 FX 102.929 FY 102.929 FZ 102.929
115 FX 151 FY 151 FZ 151
116 FX 151 FY 151 FZ 151
117 FX 151 FY 151 FZ 151
118 FX 151 FY 151 FZ 151
119 FX 25 FY 25 FZ 25
120 FX 25 FY 25 FZ 25
121 FX 138.5 FY 138.5 FZ 138.5
122 FX 138.5 FY 138.5 FZ 138.5
123 FX 138.5 FY 138.5 FZ 138.5
124 FX 138.5 FY 138.5 FZ 138.5
125 FX 25 FY 25 FZ 25
126 FX 25 FY 25 FZ 25
127 FX 698.375 FY 698.375 FZ 698.375
128 FX 698.376 FY 698.376 FZ 698.376
129 FX 698.376 FY 698.376 FZ 698.376
130 FX 698.376 FY 698.376 FZ 698.376
131 FX 115.624 FY 115.624 FZ 115.624
132 FX 115.623 FY 115.623 FZ 115.623
133 FX 675.189 FY 675.189 FZ 675.189
134 FX 675.19 FY 675.19 FZ 675.19
135 FX 675.189 FY 675.189 FZ 675.189
136 FX 675.188 FY 675.188 FZ 675.188
137 FX 121.871 FY 121.871 FZ 121.871
138 FX 121.873 FY 121.873 FZ 121.873
139 FX 181.331 FY 181.331 FZ 181.331
140 FX 1094.72 FY 1094.72 FZ 1094.72
141 FX 1094.69 FY 1094.69 FZ 1094.69
142 FX 1094.69 FY 1094.69 FZ 1094.69
143 FX 1094.72 FY 1094.72 FZ 1094.72
144 FX 181.347 FY 181.347 FZ 181.347
145 FX 193.951 FY 193.951 FZ 193.951
146 FX 1073.31 FY 1073.31 FZ 1073.31
147 FX 1073.27 FY 1073.27 FZ 1073.27
148 FX 1073.3 FY 1073.3 FZ 1073.3
-------------------------------------------------------------------------------------------------------------------------------
224 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

149 FX 1073.34 FY 1073.34 FZ 1073.34


150 FX 193.834 FY 193.834 FZ 193.834
**************************************************************************
SPECTRUM SRSS 1893 X 0.048 ACC SCALE 1 DAMP 0.05 MIS 0
SOIL TYPE 1
**************************************************************************
LOAD 2 SPECTRUM IN Z DIRECTION
SPECTRUM SRSS 1893 Z 0.048 ACC SCALE 1 DAMP 0.05 MIS 0
SOIL TYPE 1
**************************************************************************
LOAD 3 SPECTRUM IN Y DIRECTION
SPECTRUM SRSS 1893 Y 0.048 ACC SCALE 0.67 DAMP 0.05 MIS 0
SOIL TYPE 1
LOAD 4 DEAD LOAD
SELFWEIGHT Y -1 LIST 1 TO 65 111 TO 115 117 TO 120 122 TO 125 127 TO 130 132 -
133 TO 135 137 TO 140 142 TO 145 147 TO 150 152 TO 155 157 TO 160 162 TO 165 -
167 TO 170 172 TO 175
SELFWEIGHT Y -1 LIST 187
SELFWEIGHT Y -1 LIST 186
SELFWEIGHT Y -1 LIST 185
SELFWEIGHT Y -1 LIST 184
SELFWEIGHT Y -1 LIST 183
SELFWEIGHT Y -1 LIST 182
SELFWEIGHT Y -1 LIST 180
SELFWEIGHT Y -1 LIST 179
SELFWEIGHT Y -1 LIST 178
SELFWEIGHT Y -1 LIST 181
SELFWEIGHT Y -1 LIST 177
SELFWEIGHT Y -1 LIST 176
LOAD 5 SIDL (DL)
MEMBER LOAD
1 4 TO 11 26 TO 33 36 37 40 UNI GY -7.5
4 26 31 32 36 40 UMOM GX 11.44
27 TO 30 UMOM GX 14.15
1 5 10 11 33 37 UMOM GX 4.88
6 TO 9 UMOM GX 8.1
1 5 TO 11 33 37 UNI GY -7
1 5 10 11 33 37 UMOM GX -9.34
6 TO 9 UMOM GX -6.34
LOAD 6 SIDL(WC)
MEMBER LOAD
4 26 31 32 36 40 UNI GY -6.07
4 26 31 32 36 40 UMOM GX -0.73
27 TO 30 UNI GY -6.87
27 TO 30 UMOM GX 0.42
2 3 12 TO 25 34 35 38 39 UNI GY -6.6
1 5 10 11 33 37 UNI GY -1.29
1 5 10 11 33 37 UMOM GX 1.55
6 TO 9 UNI GY -0.34
6 TO 9 UMOM GX 0.49
1 5 TO 11 33 37 UNI GY -3.3
1 5 10 11 33 37 UMOM GX -1.1
6 TO 9 UMOM GX 0.31
LOAD 7 REMOVAL OF SHUTTER
MEMBER LOAD
4 26 TO 32 36 40 UNI GY 6.72
2 3 12 TO 25 34 35 38 39 UNI GY 6.5
1 5 TO 11 33 37 UNI GY 6.36
LOAD 8 LOADTYPE None TITLE AT REST EP ON ABUTMENT
JOINT LOAD
45 56 FX 0.87 MZ -0.18
MEMBER LOAD
117 142 LIN Y 2.8 8.9
118 143 LIN Y 8.9 11.2
119 144 LIN Y 11.2 43.5
181 TRAP Y 59.7 75.9 3.625 7.25
181 TRAP Y 43.5 59.7 0 3.625
176 TRAP Y 59.7 75.9 3.625 7.25
176 TRAP Y 43.5 59.7 0 3.625
120 145 LIN Y 75.9 84.8
JOINT LOAD
1 3 5 7 FX 5.27 MZ -1.09
MEMBER LOAD
122 127 132 137 LIN Y 16.8 53.9
123 128 133 138 LIN Y 53.9 67.4
124 129 134 139 LIN Y 67.4 262.9
180 TRAP Y 360.6 458.3 3.625 7.25
180 TRAP Y 262.9 360.6 0 3.625
179 TRAP Y 360.6 458.3 3.625 7.25
-------------------------------------------------------------------------------------------------------------------------------
225 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

179 TRAP Y 262.9 360.6 0 3.625


178 TRAP Y 360.6 458.3 3.625 7.25
178 TRAP Y 262.9 360.6 0 3.625
177 TRAP Y 360.6 458.3 3.625 7.25
177 TRAP Y 262.9 360.6 0 3.625
125 130 135 140 LIN Y 458.3 512.2
JOINT LOAD
55 66 FX -0.87 MZ 0.18
MEMBER LOAD
147 172 LIN Y -2.8 -8.9
148 173 LIN Y -8.9 -11.2
149 174 LIN Y -11.2 -45.8
187 TRAP Y -63.05 -80.3 3.875 7.75
187 TRAP Y -45.8 -63.05 0 3.875
182 TRAP Y -63.05 -80.3 3.875 7.75
182 TRAP Y -45.8 -63.05 0 3.875
150 175 LIN Y -80.3 -89.3
JOINT LOAD
2 4 6 8 FX -4.83 MZ 1
MEMBER LOAD
152 157 162 167 LIN Y -15.5 -49.5
153 158 163 168 LIN Y -49.5 -61.8
154 159 164 169 LIN Y -61.8 -253.5
186 TRAP Y -349.3 -445.1 3.875 7.75
186 TRAP Y -253.5 -349.3 0 3.875
185 TRAP Y -349.3 -445.1 3.875 7.75
185 TRAP Y -253.5 -349.3 0 3.875
184 TRAP Y -349.3 -445.1 3.875 7.75
184 TRAP Y -253.5 -349.3 0 3.875
183 TRAP Y -349.3 -445.1 3.875 7.75
183 TRAP Y -253.5 -349.3 0 3.875
155 160 165 170 LIN Y -445.1 -494.6
LOAD 9 LOADTYPE None TITLE AT K* EP ON ABUTMENT
JOINT LOAD
45 56 FX 1.45 MZ -0.3
MEMBER LOAD
117 142 LIN Y 4.6 14.9
118 143 LIN Y 14.9 18.6
119 144 LIN Y 18.6 70.6
120 145 LIN Y 75.9 84.8
JOINT LOAD
1 3 5 7 FX 8.77 MZ -1.81
MEMBER LOAD
122 127 132 137 LIN Y 28.1 89.8
123 128 133 138 LIN Y 89.8 112.2
124 129 134 139 LIN Y 112.2 426.5
125 130 135 140 LIN Y 458.3 512.2
JOINT LOAD
55 66 FX -1.43 MZ 0.3
MEMBER LOAD
147 172 LIN Y -4.6 -14.9
148 173 LIN Y -14.9 -18.6
149 174 LIN Y -18.6 -74.3
150 175 LIN Y -80.3 -89.3
JOINT LOAD
2 4 6 8 FX -8.04 MZ 1.66
MEMBER LOAD
152 157 162 167 LIN Y -25.7 -82.4
153 158 163 168 LIN Y -82.4 -102.9
154 159 164 169 LIN Y -102.9 -411.8
155 160 165 170 LIN Y -445.1 -494.6
181 TRAP Y 70.6 70.6 0 3.625
176 TRAP Y 70.6 70.6 0 3.625
181 TRAP Y 70.6 75.9 3.625 7.25
176 TRAP Y 70.6 75.9 3.625 7.25
180 TRAP Y 426.5 426.5 0 3.625
179 TRAP Y 426.5 426.5 0 3.625
178 TRAP Y 426.5 426.5 0 3.625
177 TRAP Y 426.5 426.5 0 3.625
180 TRAP Y 426.5 458.3 3.625 7.25
179 TRAP Y 426.5 458.3 3.625 7.25
178 TRAP Y 426.5 458.3 3.625 7.25
177 TRAP Y 426.5 458.3 3.625 7.25
187 TRAP Y -74.3 -74.3 0 3.875
182 TRAP Y -74.3 -74.3 0 3.875
187 TRAP Y -74.3 -80.3 3.875 7.75
182 TRAP Y -74.3 -80.3 3.875 7.75
186 TRAP Y -411.8 -411.8 0 3.875
185 TRAP Y -411.8 -411.8 0 3.875
-------------------------------------------------------------------------------------------------------------------------------
226 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

184 TRAP Y -411.8 -411.8 0 3.875


183 TRAP Y -411.8 -411.8 0 3.875
186 TRAP Y -411.8 -445.1 3.875 7.75
185 TRAP Y -411.8 -445.1 3.875 7.75
184 TRAP Y -411.8 -445.1 3.875 7.75
183 TRAP Y -411.8 -445.1 3.875 7.75
************Tranverse Earth Pr.***********
*JOINT LOAD
*56 FZ -3.11 MX -0.82
*MEMBER LOAD
*142 LIN Z -10 -31.8
*143 LIN Z -31.8 -39.8
*144 LIN Z -39.8 -155.3
*181 LIN Z -155.3 -270.7
*145 LIN Z -270.7 -302.6
*JOINT LOAD
*66 FZ -3.11 MX -0.82
*MEMBER LOAD
*172 LIN Z -10 -31.8
*173 LIN Z -31.8 -39.8
*174 LIN Z -39.8 -163.2
*187 LIN Z -163.2 -286.6
*175 LIN Z -286.6 -318.5
LOAD 10 LOADTYPE None TITLE LIVE LOAD SURCHARGE AT REST
JOINT LOAD
45 56 FX 3.3 MZ -1.05
JOINT LOAD
1 3 5 7 FX 20.22 MZ -6.32
MEMBER LOAD
117 TO 120 142 TO 145 UNI GX 5.4
181 UNI GX 5.4 3.625 7.25
181 UNI GX 5.4 0 3.625
176 UNI GX 5.4 3.625 7.25
176 UNI GX 5.4 0 3.625
122 TO 125 127 TO 130 132 TO 135 UNI GX 32.4
179 UNI GX 32.4 3.625 7.25
179 UNI GX 32.4 0 3.625
178 UNI GX 32.4 3.625 7.25
178 UNI GX 32.4 0 3.625
177 UNI GX 32.4 3.625 7.25
177 UNI GX 32.4 0 3.625
LOAD 11 DYNAMIC INCREMENT OF EARTH PR.
JOINT LOAD
45 56 FX 0.33 MZ -0.102
MEMBER LOAD
117 142 LIN Y 1 3.4
118 143 LIN Y 3.4 4.2
119 144 LIN Y 4.2 16.3
181 TRAP Y 16.3 28.5 0 3.625
176 TRAP Y 16.3 28.5 0 3.625
120 145 LIN Y 28.5 31.8
JOINT LOAD
1 3 5 7 FX 1.98 MZ -0.62
MEMBER LOAD
122 127 132 137 LIN Y 6.3 20.2
123 128 133 138 LIN Y 20.2 25.3
124 129 134 139 LIN Y 25.3 98.6
180 TRAP Y 98.6 172 0 3.625
179 TRAP Y 98.6 172 0 3.625
178 TRAP Y 98.6 172 0 3.625
177 TRAP Y 98.6 172 0 3.625
125 130 135 140 LIN Y 172 192.2
JOINT LOAD
55 66 FX -0.33 MZ 0.102
MEMBER LOAD
147 172 LIN Y -1 -3.4
148 173 LIN Y -3.4 -4.2
149 174 LIN Y -4.2 -17.2
187 TRAP Y -17.2 -30.2 0 3.875
182 TRAP Y -17.2 -30.2 0 3.875
150 175 LIN Y -30.2 -33.5
JOINT LOAD
2 4 6 8 FX -1.81 MZ 0.57
MEMBER LOAD
152 157 162 167 LIN Y -5.8 -18.6
153 158 163 168 LIN Y -18.6 -23.2
154 159 164 169 LIN Y -23.2 -95.1
186 TRAP Y -95.1 -167 0 3.875
185 TRAP Y -95.1 -167 0 3.875
-------------------------------------------------------------------------------------------------------------------------------
227 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

184 TRAP Y -95.1 -167 0 3.875


183 TRAP Y -95.1 -167 0 3.875
155 160 165 170 LIN Y -167 -185.6
************Tranverse Earth Pr.***********
*JOINT LOAD
*56 FZ -1.96 MX -0.61
*MEMBER LOAD
*142 LIN Z -6.3 -20.1
*143 LIN Z -20.1 -25.1
*144 LIN Z -25.1 -98.0
*181 LIN Z -98.0 -170.9
*145 LIN Z -170.9 -191.0
*JOINT LOAD
*66 FZ -1.96 MX -0.61
*MEMBER LOAD
*172 LIN Z -6.3 -20.1
*173 LIN Z -20.1 -25.1
*174 LIN Z -25.1 -103.0
*187 LIN Z -103.0 -180.9
*175 LIN Z -180.9 -201.0
LOAD 12 DYNAMIC INCREMENT OF LL SURCGARGE
JOINT LOAD
45 56 FX 1.26 MZ -0.52
JOINT LOAD
1 3 5 7 FX 7.79 MZ -3.16
MEMBER LOAD
117 TO 120 142 TO 145 UNI GX 2
181 UNI GX 2 3.625 7.25
181 UNI GX 2 0 3.625
176 UNI GX 2 3.625 7.25
176 UNI GX 2 0 3.625
122 TO 125 127 TO 130 132 TO 135 UNI GX 12.1
179 UNI GX 12.1 3.625 7.25
179 UNI GX 12.1 0 3.625
178 UNI GX 12.1 3.625 7.25
178 UNI GX 12.1 0 3.625
177 UNI GX 12.1 3.625 7.25
177 UNI GX 12.1 0 3.625
LOAD 13 UNLADEN WIND LOAD
MEMBER LOAD
51 TO 60 UNI Z -7.09
1 TO 40 UNI X 0.44
4 26 TO 32 36 40 UNI GY -7.83
2 3 12 TO 25 34 35 38 39 UNI GY -6.83
1 5 TO 11 33 37 UNI GY -6.53
LOAD 14 LADEN WIND LOAD
MEMBER LOAD
51 TO 60 UNI Z -6.37
1 TO 40 UNI X 0.4
4 26 TO 32 36 40 UNI GY -4.06
2 3 12 TO 25 34 35 38 39 UNI GY -3.54
1 5 TO 11 33 37 UNI GY -3.38
LOAD 15 DIFFERNTIAL SETTLEMENT
SUPPORT DISPLACEMENT LOAD
115 TO 120 FY -0.0125
LOAD 16 TEMPERATURE RISE
TEMPERATURE LOAD
1 TO 40 TEMP 36.25
1 TO 40 STRAIN 4.5e-005
JOINT LOAD
1 3 5 7 MZ -1188
2 4 6 8 MZ 1188
LOAD 17 TEMPERATURE FALL
TEMPERATURE LOAD
1 TO 40 TEMP -16.25
1 TO 40 STRAIN -3.8e-005
JOINT LOAD
1 3 5 7 MZ 515
2 4 6 8 MZ -515
LOAD 18 CREEP SHRINKAGE DIFF SHRINKAGE
TEMPERATURE LOAD
1 TO 40 STRAIN -0.000421
JOINT LOAD
1 3 5 7 MZ 794.1
2 4 6 8 MZ -794.1
LOAD 19 FOOTPATH LIVE LOAD
MEMBER LOAD
1 5 TO 11 33 37 UNI GY -6.11
1 5 10 11 33 37 UMOM GY -2.04
-------------------------------------------------------------------------------------------------------------------------------
228 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

6 TO 9 UMOM GY 0.58
LOAD 20 SNOW LOAD FOR 70R LL TRACK
MEMBER LOAD
4 26 TO 32 36 40 UNI GY -8.33
2 3 12 TO 25 34 35 38 39 UNI GY -7.5
1 5 TO 11 33 37 UNI GY -7.48
LOAD 21 SNOW LOAD FOR LL 70R WHEEL
MEMBER LOAD
4 26 TO 32 36 40 UNI GY -4.17
2 3 12 TO 25 34 35 38 39 UNI GY -3.75
1 5 TO 11 33 37 UNI GY -3.74
LOAD 22 BRAKING
MEMBER LOAD
1 TO 40 UNI X 1.67
LOAD 23 PRESTRESS LOSS
MEMBER PRESTRESS LOAD
4 40 FORCE -1215 ES -0.451 EM -0.451 EE -0.451
32 36 FORCE -1215 ES -0.49 EM -0.49 EE -0.49
26 31 FORCE -1215 ES -0.845 EM -0.845 EE -0.845
27 30 FORCE -1215 ES -1.078 EM -1.078 EE -1.078
28 29 FORCE -1215 ES -1.21 EM -1.21 EE -1.21
3 39 FORCE -1247 ES -0.451 EM -0.451 EE -0.451
25 35 FORCE -1247 ES -0.49 EM -0.49 EE -0.49
19 24 FORCE -1247 ES -0.84 EM -0.84 EE -0.84
20 23 FORCE -1247 ES -1.068 EM -1.068 EE -1.068
21 22 FORCE -1247 ES -1.21 EM -1.21 EE -1.21
2 38 FORCE -1056 ES -0.347 EM -0.347 EE -0.347
18 34 FORCE -1056 ES -0.396 EM -0.396 EE -0.396
12 17 FORCE -1056 ES -0.801 EM -0.801 EE -0.801
13 16 FORCE -1056 ES -1.064 EM -1.064 EE -1.064
14 15 FORCE -1056 ES -1.227 EM -1.227 EE -1.227
1 37 FORCE -1068 ES -0.347 EM -0.347 EE -0.347
11 33 FORCE -1068 ES -0.396 EM -0.396 EE -0.396
5 10 FORCE -1068 ES -0.795 EM -0.795 EE -0.795
6 9 FORCE -1068 ES -1.052 EM -1.052 EE -1.052
7 8 FORCE -1068 ES -1.227 EM -1.227 EE -1.227
LOAD 24 POSTSTRESS LOSS
MEMBER POSTSTRESS LOAD
4 40 FORCE -1215 ES -0.451 EM -0.451 EE -0.451
32 36 FORCE -1215 ES -0.49 EM -0.49 EE -0.49
26 31 FORCE -1215 ES -0.845 EM -0.845 EE -0.845
27 30 FORCE -1215 ES -1.078 EM -1.078 EE -1.078
28 29 FORCE -1215 ES -1.21 EM -1.21 EE -1.21
3 39 FORCE -1247 ES -0.451 EM -0.451 EE -0.451
25 35 FORCE -1247 ES -0.49 EM -0.49 EE -0.49
19 24 FORCE -1247 ES -0.84 EM -0.84 EE -0.84
20 23 FORCE -1247 ES -1.068 EM -1.068 EE -1.068
21 22 FORCE -1247 ES -1.21 EM -1.21 EE -1.21
2 38 FORCE -1056 ES -0.347 EM -0.347 EE -0.347
18 34 FORCE -1056 ES -0.396 EM -0.396 EE -0.396
12 17 FORCE -1056 ES -0.801 EM -0.801 EE -0.801
13 16 FORCE -1056 ES -1.064 EM -1.064 EE -1.064
14 15 FORCE -1056 ES -1.227 EM -1.227 EE -1.227
1 37 FORCE -1068 ES -0.347 EM -0.347 EE -0.347
11 33 FORCE -1068 ES -0.396 EM -0.396 EE -0.396
5 10 FORCE -1068 ES -0.795 EM -0.795 EE -0.795
6 9 FORCE -1068 ES -1.052 EM -1.052 EE -1.052
7 8 FORCE -1068 ES -1.227 EM -1.227 EE -1.227
*********70R Track loading************
LOAD GENERATION 26
TYPE 1 -1 0 8.4 XINC 0.5 ZINC 0.0262
LOAD GENERATION 26
TYPE 1 12 0 9.08 XINC 0.5 ZINC -0.0296
LOAD GENERATION 56
TYPE 1 -1 0 7.03 XINC 0.5
LOAD GENERATION 26
TYPE 1 -0.5 0 3.88 XINC 0.5 ZINC 0.0481
LOAD GENERATION 26
TYPE 1 12.5 0 5.13 XINC 0.5 ZINC -0.0204
**********70R Wheel loading************
LOAD GENERATION 26
TYPE 2 -7 0 8.39 XINC 0.5 ZINC 0.0262
LOAD GENERATION 26
TYPE 2 6 0 9.07 XINC 0.5 ZINC -0.0296
LOAD GENERATION 56
TYPE 2 -7 0 6.965 XINC 0.5
LOAD GENERATION 26
TYPE 2 -7 0 3.76 XINC 0.5 ZINC 0.0481
LOAD GENERATION 26
-------------------------------------------------------------------------------------------------------------------------------
229 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

TYPE 2 6 0 5.01 XINC 0.5 ZINC -0.0204


**********Class A loading************
LOAD GENERATION 26
TYPE 3 -7 0 9.62 XINC 0.5 ZINC 0.0262
TYPE 3 -7 0 6.12 XINC 0.5 ZINC 0.0262
LOAD GENERATION 26
TYPE 3 6 0 10.3 XINC 0.5 ZINC -0.0296
TYPE 3 6 0 6.8 XINC 0.5 ZINC -0.0296
LOAD GENERATION 56
TYPE 3 -7 0 8.65 XINC 0.5
TYPE 3 -7 0 5.15 XINC 0.5
LOAD GENERATION 26
TYPE 3 -7 0 2.4 XINC 0.5 ZINC 0.0481
TYPE 3 -7 0 5.9 XINC 0.5 ZINC 0.0481
LOAD GENERATION 26
TYPE 3 6 0 3.65 XINC 0.5 ZINC -0.0204
TYPE 3 6 0 7.15 XINC 0.5 ZINC -0.0204
LOAD COMB 604 COMBINATION LOAD CASE 504
23 1.0 24 -1.0
PERFORM ANALYSIS
FINISH

11.2 Analysis of Deck slab


STAAD PLANE
START JOB INFORMATION
ENGINEER DATE 28-jan-09
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 2.352 0 0; 3 5.352 0 0; 4 8.352 0 0; 5 11.352 0 0; 6 12.55 0 0;
MEMBER INCIDENCES
1 1 2; 2 2 3; 3 3 4; 4 4 5; 5 5 6;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 3.23e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER PROPERTY AMERICAN
1 TO 5 PRIS YD 0.225 ZD 1
SUPPORTS
2 TO 5 FIXED BUT MX MY MZ
LOAD 1 SELFWEIGHT
SELFWEIGHT Y -1
LOAD 2 SIDL
MEMBER LOAD
1 CON GY -7.5 0.235
1 UNI GY -1.43 0.5 2.352
2 3 UNI GY -1.43
4 UNI GY -1.43 0 1.698
4 CON GY -7.5 1.963
4 UNI GY -2.2 2.198 3
5 UNI GY -2.2 0 0.698
5 CON GY -7 0.948
LOAD 3 70R TRACKED LIVE LOAD
MEMBER LOAD
2 UNI GY -46.3 0.790 2.210
2 UNI GY -52.4 2.85 3.000
3 UNI GY -52.4 0.000 1.270
1 TO 5 UNI GY -5.00
LOAD 4 70R WHEELED LIVE LOAD
MEMBER LOAD
2 UNI GY -49.1 0.780 2.220
2 UNI GY -68.3 2.71 3.000
3 UNI GY -68.3 0.000 1.150
1 TO 5 UNI GY -2.50
LOAD 5 CLASS A LIVE LOAD
MEMBER LOAD
2 UNI GY -49.0 0.960 2.040
2 UNI GY -73.2 2.760 3.000
3 UNI GY -73.2 0.000 0.840
3 UNI GY -47.8 1.460 2.540
4 UNI GY -51.0 0.260 1.340
1 TO 5 UNI GY 2.50
-------------------------------------------------------------------------------------------------------------------------------
230 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

PERFORM ANALYSIS
LOAD LIST ALL
PRINT MEMBER FORCES LIST 1 TO 5
FINISH

-------------------------------------------------------------------------------------------------------------------------------
231 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design Data for RCC cantilever Return wall

-------------------------------------------------------------------------------------------------------------------------------
232 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

12.0 Design Data for RCC cantilever Retaining wall over foundation Ht = 17.60 m
1.1 Geometric details
Max. Finished road level = 890.55 m
Minimum ground level = 882.23 m
RL at founding level = 870.55 m
Thickness of abutment foundation = 2.400 m
Thickness of retaining wall at base = 2.400 m
Thickness of retaining wall at top = 0.500 m
1.2 Details of wearing coat and backfill matterial
Angle of internal friction (φ) = 30.00 degrees Angle of wall friction (δ) = 20.00 degrees
Slope of backfill soil (β) = 0.00 degrees Angle of earthside wall (α) = 6.16 degrees
Unit weight of soil = 19.0 kN/m3 Surcharge 1.2xγsoil

1.3 Material details


1.3.1 Concrete details [ IRC:112-2011 ]
Grade of concrete = M40 Mean concrete strength fcm = 50.00 MPa
Modulus of elasticity Ecm = 33346 MPa Mean tensile strength fctm = 3.03 MPa
Lower fractile tensile fctm = 2.12 MPa Upper fractile tensile fctm95 = 3.94 MPa
Material safety factor γm = 1.50 Design concrete strength fcd = 17.87 MPa
Unit weight of concrete = 25.00 kN/m3 Coeff of thermal expansion = 12 E-06 /0C
Permissible Compressive stress at rare combination of loads = 19.20 MPa
Permissible Compressive stress at frequent combination of loads = 14.40 MPa
Permissible tensile stress = 1.41 MPa Modular ratio m = E p /E c

1.3.2 Reinforcing details [ IRC:112-2011 ]


Grade of reinforcement Fe 500 Modulus of elasticity = 200000 MPa
Material safety factor gs = 1.15 Design yield strength fyd = 434.78 MPa
Design yield strain eyd = 0.0022 Permissible working stress = 240.00 MPa
Density of Steel = 78.50 kN/m3

1.4 Miscellaneous Details


Safe bearing capacity = 300.0 kN/m2 SBC at seismic case = 375.0 kN/m2
Thk of PCC below base slab = 0.100 m Thk of filling below base slab = 0.600 m
Clear cover of base slab = 75 mm Clear cover of vertical wall = 50 mm
Seismic zone Zone IV

1.5 Factor of Safety Normal case Seismic Case


Check against Sliding = 1.5 = 1.25
Check against Overturning = 2.0 = 1.50

1.6 Sketch
890.548 m

500

7500 7
1438
o 12500
= 6.16

17600

2063
α

2400 870.5 m

2400

Section of Retaining Wall

-------------------------------------------------------------------------------------------------------------------------------
233 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

12.1 Earth Pressure


12.1.1 Active earth Pressure on vertical wall at normal case 0.00 kN/m2

Active earth pressure coefficient at Normal case Ka


= Cos2(φ-α)
Cos2α*Cos(α+δ)*[1+{Sin(φ+δ)*Sin(φ-β)/(Cos(α-δ)*Cos(δ+α))}1/2]2
Note :- 115.11 kN/m2
α = Angle subtended by the earth side wall with the Active Earth pr. diagram
vertical on the earth side = 0.11 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Active earth pressure coefficient at Normal case = Ka = 0.344
Earth pressure = γs * height of wall * Ka
Horz. earth pr. at bottom slab = 0.344x(17.60)x19 = 115.1 kN/m2
Earth pr. due to LL surcharge = 0.344x1.2x19 = 7.848 kN/m2

Horizontal Force = Area of earth Pr. diagram * Cos(δ+α)


Active Earth pressure
Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
7.5m below
7.5 0.00 49.05 165.1 3.15 520.07
top of wall
12.5m below
12.5 0.00 81.75 458.6 5.25 2407.73
top of wall
Top of base
17.6 0.00 115.11 909.2 7.39 6720.71
slab

Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment 2
Location 7.848 kN/m
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
7.5m below
7.5 7.85 7.85 52.8 3.75 198.12
top of wall
12.5m below
12.5 7.85 7.85 88.1 6.25 550.34
top of wall
Top of base Earth pr. Diagram for live load
17.6 7.85 7.85 124.0 8.80 1091.02
slab Surcharge

12.1.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 52.91 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.11 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014.  z  S a 
   
Where, Ah = Horizontal Seismic Coefficient  2  g 
Ah =
 R 
 
z = zone factor = For Zone IV = 0.24  I 
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
So, Sa/g = = 2.50
Horizontal coefficient - Ah 0.24/2x2.5/(2.5/1.2) = 0.14
Vertical coefficient - Av =2/3Ah = 0.10
λ = Ah/(1+Av) = 0.13
Active earth pressure coefficient at seismic case = Ka = 0.502
Active earth pressure coefficient at normal case = Ka = 0.344
-------------------------------------------------------------------------------------------------------------------------------
234 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Dynamic increment of static earth pressure coefficient = 0.158


Dynamic increment of Horz. earth pr. at bottom slab = 0.158*(17.60)*19 = 52.91 kN/m2
Dynamic increment of Earth pr. due to LL surcharge = 0.158*22.8 = 3.61 kN/m2

Dynamic increment of Horizontal Earth pressure


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
7.5m below
7.5 0.00 22.54 75.9 3.75 284.56
top of wall
12.5m below
12.5 0.00 37.57 210.8 6.25 1317.40
top of wall
Wall above
17.6 0.00 52.91 417.9 8.80 3677.27
base slab

Dynamic increment of Horizontal Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
7.5m below
7.5 3.61 3.61 24.3 4.95 120.20
top of wall
12.5m below
12.5 3.61 3.61 40.5 8.25 333.88
top of wall
Wall above
17.6 3.61 3.61 57.0 11.62 661.91
base slab

Seismic force of retaininf wall


Height Force Lever arm Moment
Location Weight
(m) (kN) (m) (kN-m)
7.5m below
7.5 363.28 52.3 3.75 196.17
top of wall
12.5m below
12.5 800.78 115.3 6.25 720.70
top of wall
Wall above
17.6 1276.00 183.7 8.80 1616.95
base slab

Summary of Moment
DL Earth fill EP Live load LL Surcharge Seismic Dy. Incr. of Dynamic inc. of LL
earth pr. surcharge

Wall above base slab 0 0 6720.71 0.0 1091.02 1616.95 3677.27 661.91
12.5m below top of wall 0 0 2407.73 0.0 550.34 720.70 1317.40 333.88
7.5m below top of wall 0 0 520.07 0.0 198.12 196.17 284.56 120.20
Summary of Shear
DL Earth fill EP Live load LL Surcharge Seismic Dy. Incr. of Dynamic inc. of LL
earth pr. surcharge
Wall above base slab 0 0 909.19 0.0 123.98 183.7 417.9 57.0
12.5m below top of wall 0 0 458.61 0.0 88.05 115.3 210.8 40.5
7.5m below top of wall 0 0 165.10 0.0 52.83 52.3 75.9 24.3

-------------------------------------------------------------------------------------------------------------------------------
235 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

12.2 Design of vertical wall


12.2.1 Load combination
12.2.1.1 Ultimate limit State As per table 3.2 of IRC 6:2014
Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
4) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge+Seismic
Dynamic Dynamic
LL
Load Case DL Earth fill EP Live load
Surcharge
Seismic inc. of earth inc. of LL
pr. surcharge
1 1.35
2 1.35 1.5 1.5
3 (a) 1.35 1.5 1.5 1.5 1.2
3 (b) 1 1.5 1 1.5 1.2
3 (c) 1 1.5 1 1.15 1.2
4 (a) 1.35 1 1 0.2 0.2 1.50 1.00 0.20
4 (b) 1 1 1 0.2 0.2 1.50 1.00 0.20

Basic Combination (UL1)


Type of Wall above base slab 12.5m below top of wall7.5m below top of wall
Moment Shear Moment Shear Moment
loads
(kN-m) (kN) (kN-m) (kN) (kN-m) Shear (kN)
1 0.00 0.00 0.00 0.00 0.00 0.00
2 10081.07 1363.78 3611.59 687.92 780.10 247.65
3 (a) 11390.30 1512.56 4272.00 793.59 1017.85 311.05
3 (b) 8029.94 1057.96 3068.13 564.28 757.82 228.50
3 (c) 8029.94 1057.96 3068.13 564.28 757.82 228.50
4 (a) 13174.00 1638.87 4983.03 868.07 1162.55 334.88
4 (b) 13174.00 1638.87 4983.03 868.07 1162.55 334.88
Maximum 13174.00 1638.87 4983.03 868.07 1162.55 334.88
12.2.1.2 Serviceability limit state
Rare Combination (SL1) Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
Load Case DL Earth fill EP Live load LL Surcharge
1 1
2 1 1 1
3 1 1 1 1 0.8
12.2.1.3 Quasi-permanent (SL3) Load Combination
1) Dead load
2) Dead load+Earth pressure
Load Case DL Earth fill EP
1 1
2 1 1 1
Moment Rare Combination (SL1) Quasi-permanent (SL3)
12.5m 7.5m
At top of
Type of loads below top below top At top of
base slab of wall of wall base slab 0.00 m
1 0.00 0.00 0.00 0.00 0.00
2 6720.71 2407.73 520.07 6720.71 2407.73
3 7593.53 2848.00 678.57
Maximum 7593.53 2848.00 678.57 6720.71 2407.73

12.3 Design of sections


12.3.1. Ultimate limit State Method
12.3.1.1. Flexure member Design of wall at base
Grade Concrete = M40 Grade of steel = Fe 500
Width of the section = 1000 mm Depth of the section = 2400 mm
Clear Cover = = 75 mm Main dia of bar used = 32 mm
Dia of shear reinf. = 0 mm Effective depth, d = 2277 mm
R = Mu/bd2 = 2.541 MPa Design Moment = 13174 kN-m
Mu,Lim/bd2 = 0.133xfck = 5.32 MPa Ast = 14447.1 mm2
Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 2960.1 mm2
Hence provide 32 dia @ 150 c/c Ast = 17268.3 mm2
32 dia @ 150 c/c
25 dia @ 150 c/c > Hence O.K.
25 dia @ 150 c/c
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 33346 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 1038.37 mm Actual neutral axis depth = 521.39 mm
Strain in steel = 0.011785 Stress in steel = 434.8 MPa

-------------------------------------------------------------------------------------------------------------------------------
236 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Stress-strain diagram at Ultimate Limit State condition


0.00350 17.87
7508 kN
521.39
NA NA

0.01179 7508 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 7508 kN Total ultimate tensile force = 7508 kN
Compressive force CG 216.90 mm Moment of resistance = 15467 kNm
< 13174 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 12.5m below 7.5m
top of
below
wall top of wall
Moment 13174.00 4983.03 1162.55
D 2400.00 2062.50 1437.50
b 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00
d 2277.00 1939.50 1362.5
R = Mu/bd2 2.54 1.32 0.63
pt 0.00634 0.00317 0.00147
Ast required 14447.1 6150.5 1998.2
32 dia + 32 dia + 0 dia +
32 dia + 32 dia + 0 dia +
Reinf provided 25 dia + 0 dia + 0 dia
25 dia + 25 dia 25 dia
150 c/c 150 c/c 150 c/c
Ast provided 17268.3 13995.8 3272.5
Actual NA 521 423 99
Strain in steel 0.0118 0.0126 0.0448
Stress in steel 434.8 434.8 434.8
Total ultimate tensile force =7508 6085 1423
7508
Total ultimate compressive force 6085 1423
Difference of force 0 0 0
Compressive force CG 216.9 175.8 41.1
Moment of resistance 15467 10732 1880
Factor of Safety 1.174 2.154 1.617
Check Safe Safe Safe
12.3.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 40 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5

-------------------------------------------------------------------------------------------------------------------------------
237 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Description Wall above base slab 12.5m below7.5m


top of
below
wall top of wall
Prestress Force after all losses (kN)
0.0 0.0 0.0
Effective width in mm 1000 1000 1000
Effective Depth (d) in mm 2277 1940 1363
K 1.296 1.321 1.383
Stress due to Prestress ( 0 0 0
Shear Resistance minimum (V658.9 577.4 434.5
Ast provided 17268.3 13995.8 3272.5
Reinforcement ratio, ρ1 0.008 0.007 0.002
Shear resistance ( VRd,c) (kN)1014.7 866.5 443.3
Design Shear resistance ( V 1014.7 866.5 443.3
1638.87
Max.shear at 1d dist.from face (kN) 868.07 334.88
M tanδ/d 624.59 277.36 64.71
Effective shear 1014.28 590.71 270.17
Factor of Safety 1.00 1.47 1.64
Check Safe Safe Safe

12.4Servicebility limit State Method


12.4.1. Flexure member Design of wall
Grade Concrete = M40 Grade of steel = Fe 500
Bending Compression of concrete = 19.20 Mpa fctm = Mean tensile strength of concrete = 3.03 Mpa
E of reinforcement = 200000 MPa E of concrete = 33346 MPa
Creep Coefficient, φ = 1 Ec, eff = Ecm /(1+φ) = 16673 MPa
Modular ratio =Es/Ec,eff = 12.00 Tensile stress of steel = 400 Mpa
Width of Section = 1000 mm Depth of Section = 2400 mm
Clear Cover = = 50 mm Effective depth, d = 2277 mm
Minimum reinforcement0.26xfctm/fykxbtxd but not less than 0.0013btd = 3586.79 mm2
Hence provide 32 dia @ 150 c/c Ast = 13995.8 mm2
32 dia @ 150 c/c
25 dia @ 150 c/c Design of moment = 7593.53 kNm

Balanced neutral axis depth = = 832.01 mm Actual neutral axis depth = 722.47 mm
Strain in steel = 0.00133 Stress in steel = 266.5 MPa
Strain in concrete = 0.00062 Comp. stress of concrete = 10.32 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00062 10.32
3729.31
722.47
NA NA

266.46
0.00133
Strain Diagram Stress Diagram
=
Total compressive force = 3729.31 kN Total tensile force = 3729.31 kN
Compressive force CG = 240.82 mm Moment of resistance = 7593.53 kNm

-------------------------------------------------------------------------------------------------------------------------------
238 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Rare Combination (SL1) Quasi-permanent (SL3)


Wall 12.5m
Description above below top Wall above
base slab of wall base slab 0
h or D 2400 2063 2400 2063
b 1000 1000 1000 1000
d 2277 1940 2277 1940
Moment 7593.53 2848.00 6720.71 2407.73
Reinf provided 32 dia + 32 dia + 32 dia + 32 dia +
32 dia + 32 dia + 32 dia + 32 dia +
25 dia + 0 dia + 25 dia + 0 dia +
25 dia + 25 dia + 25 dia + 25 dia +
150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 17268.3 13995.8 17268.3 13995.8
Stress in concrete 9.6 5.0 8.5 4.3
Actual NA 786 656 786 656
Stress in steel 218.2 118.3 193.1 100.0
Total ultimate tensile force =3768 1655 3335 1399
3768
Total ultimate compressive force 1655 3335 1399
Difference of force 0 0 0 0
Compressive force CG 262.0 218.8 262.0 218.8
Moment of resistance 7594 2848 6721 2408
Diff. of moment 0.0 0.0 0.0 0.0
Maximum compressive stress of concrete= 9.6 Mpa < 19.2 Mpa Hence O.K.
Maximum tensile stress of steel= 218.2 Mpa < 400.0 Mpa Hence O.K.

12.4.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 193.15 Mpa αe =Es/Ecm = 11.996
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 307.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.046
fct,eff = = 2.12 Mpa εsm-εcm = 0.000786
>= 0.6σsc/Es= 0.000579
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 28.9 mm k2 = 0.5
Sr,max = 278.1 mm Crack width, Wk = = 0.218 mm
< 0.3 mm OK
Total for Quasi-permanent (SL3)
Wall 12.5m
Description above below top
base slab of wall
Stress in steel, σs 193.1 100.0
As 17268.3 13995.8
Actual NA 786 656
hc,eff 307.5 307.5
ρp,eff 0.056 0.046
εsm-εcm 0.00081 0.00032
φeq 30.0 32.0
effective cover, c 75.0 75.0
Crack spacing Sr,max 345.9 374.5
Crack width, Wk 0.279 0.120
Check <0.3 O.K. <0.3 O.K.

-------------------------------------------------------------------------------------------------------------------------------
239 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

12.4.3 Deflection at cantilever edge due to earth pressure & LL surcharge

110.36 7.04
kN/m2 kN/m2
A 15.2 m B

8 7 6 5 4 3 2 1
5826.52 0.00
kN-m/m kN-m/m
15.2 m

E= = 33346 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.500 0.01042 0.00 0
2 2.171 2.171 0.771 0.03826 31.22 0.00002 0.00003
3 2.171 4.343 1.043 0.09451 183.35 0.00006 0.00029
4 2.171 6.514 1.314 0.18919 544.06 0.00009 0.00085
5 2.171 8.686 1.586 0.33227 1201.04 0.00011 0.00161
6 2.171 10.857 1.857 0.53377 2241.99 0.00013 0.00249
7 2.171 13.029 2.129 0.80368 3754.59 0.00014 0.00345
8 2.171 15.200 2.400 1.15200 5826.52 0.00015 0.00447
Total 0.01319 m
So, Total deflection = = 13.186 mm = L/ 1153

12.5. Tranverse reinforcement


Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 2232.10 mm2
As per clause 16.6.1.1 (3) of IRC-112:2011, minimum tranverse reinforcement is 20% of main reinforcement.
Main reinforcement Tranv. Ast provd.
Location Reinf. Provided Check
Maximum Minimum Reinf. (mm2)
Outer face of vertical wall 2232.10 20 dia @ 125 c/c 2513.3 O.K.
Earth face of vertical wall 17268.3 3272.5 1363.346 16 dia @ 125 c/c 1608.5 O.K.

32 dia
@ 150 c/c
20 dia @ 125 c/c
32 dia
@ 150 c/c

16 dia 16 dia @ 125 c/c


9400 @ 125 c/c

25 dia
@ 150 c/c
4000

Reinforcement Details of Retaining wall

-------------------------------------------------------------------------------------------------------------------------------
240 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design Data for RCC cantilever Retaining wall - RW-01

-------------------------------------------------------------------------------------------------------------------------------
241 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

13.0 Design Data for RCC cantilever Retaining wall - RW-01 Ht = 7.40 m
1.1 Geometric details
Max. Finished road level = 887.90 m
Minimum ground level = 882.50 m
Minimum Depth of Foundation as per cl. 205.2.1 of IRC: 78-2014 = 2.000 m
RL at founding level = 880.50 m
Width of foundation Width of toe = 1.800 m
Width of heel = 3.200 m
Thickness of Stem at base = 0.900 m
Thickness of Toe = 0.800 m
Total width of foundation = 5.900 m
Friction coefficient bet. soil and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.50
Friction coefficient bet. Rock and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.70

1.2 Details of wearing coat and backfill matterial


Angle of internal friction (φ) = 30.00 degrees Angle of wall friction (δ) = 20.00 degrees
Slope of backfill soil (β) = 0.00 degrees Angle of earthside wall (α) = 5.19 degrees
Unit weight of soil = 19.0 kN/m3 Surcharge 1.2xγsoil

1.3 Material details


1.3.1 Concrete details [ IRC:112-2011 ]
Grade of concrete = M35 Mean concrete strength fcm = 45.00 MPa
Modulus of elasticity Ecm = 32308 MPa Mean tensile strength fctm = 2.77 MPa
Lower fractile tensile fctm = 1.94 MPa Upper fractile tensile fctm95 = 3.60 MPa
Material safety factor γm = 1.50 Design concrete strength fcd = 15.63 MPa
Unit weight of concrete = 25.00 kN/m3 Coeff of thermal expansion = 12 E-06 /0C
Permissible Compressive stress at rare combination of loads = 16.80 MPa
Permissible Compressive stress at frequent combination of loads = 12.60 MPa
Permissible tensile stress = 1.29 MPa Modular ratio m = E p /E c

1.3.2 Reinforcing details [ IRC:112-2011 ]


Grade of reinforcement Fe 500 Modulus of elasticity = 200000 MPa
Material safety factor gs = 1.15 Design yield strength fyd = 434.78 MPa
Design yield strain eyd = 0.0022 Permissible working stress = 240.00 MPa
Density of Steel = 78.50 kN/m3

1.4 Miscellaneous Details


Safe bearing capacity = 300.0 kN/m2 SBC at seismic case = 375.0 kN/m2
Thk of PCC below base slab = 0.100 m Thk of filling below base slab = 0.600 m
Clear cover of base slab = 75 mm Clear cover of vertical wall = 50 mm
Seismic zone Zone IV

1.5 Factor of Safety Normal case Seismic Case


Check against Sliding = 1.5 = 1.25
Check against Overturning = 2.0 = 1.50

-------------------------------------------------------------------------------------------------------------------------------
242 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

1.6 Sketch
12
887.900 m
13
300

3000 7
573
o

= 5.19
5400
8

1 882.500 m
2

11
2000
500 9 4 3 10
5
800 880.5 m
300 6
3200 900 1800
5900
Section of Retaining Wall

13.1 Load Calculation


13.1.1 Load Calculation of Retaining wall - per m width
Horz. Lever Moment (kN- Ver. Lever Moment (kN-
Sl No Load Calculation Area(m2) Weight (kN)
arm(m) m) arm(m) m)
Wt. of Retaining wall only
1 (5.40+2-0.8)x0.3 1.98 49.50 1.95 96.52 4.10 202.95
2 1/2x(5.40+2-0.8)x(0.9-0.3) 1.98 49.50 2.30 113.85 3.00 148.50
3 0.9x0.5 0.45 11.25 2.25 25.31 0.55 6.19
4 1/2x3.2x0.5 0.80 20.00 3.77 75.33 0.47 9.33
5 1/2x1.8x0.5 0.45 11.25 1.20 13.50 0.47 5.25
6 5.9x0.3 1.77 44.25 2.95 130.54 0.15 6.64
7 Crash barrier 10.00 2.06 20.58 7.65 76.50
Wt. of Soil
7 1/2x(5.40+2-0.8)x(0.9-0.3) 1.98 37.62 2.50 94.05 5.20 195.62
8 3.2x(5.40+2-0.8) 21.12 401.28 4.30 1725.50 4.10 1645.25
9 1/2x3.2x0.5 0.80 15.20 4.83 73.47 0.63 9.63
10 1/2x1.8x0.5 0.45 8.55 0.60 5.13 0.63 5.42
11 1.8x(2-0.8) 2.16 41.04 0.90 36.94 1.40 57.46
12 1/2x(3.2+0.9-0.3)^2xTan(0.00) 0.00 0.00 4.63 0.00 7.52 0.00
Live Load Surcharge
13 (3.2+0.9-0.3)x1.2 4.56 86.64 4.00 346.56 8.60 745.10
Vertical load due to self wt of Retaining Wall 195.75 475.64 455.36
Vertical load due to earth fill 503.69 1935.09 1913.37
Vertical load due to Live load surcharge 86.64 346.56 745.10

13.1.2 Superimposed dead load (SIDL)


Load Calculation of crash barrier 175 50 175
Unit weight of concrete = 25.00 kN/m3 50
2 Weight Lever Moment g mm
Sl No Load Calculation Area(m ) 200
(KN) arm(m) (KN-m)
a (0.45-0.05)x0.415 0.166 4.150 0.275 1.141
b 1/2x(0.5+0.25+0.415)x0.05 0.029 0.728 0.033 0.024 500 f
c (0.5+0.25)x0.175 0.131 3.281 0.138 0.451 c
d 0.25x0.05 0.013 0.313 0.250 0.078 d
e 1/2x0.25x0.175 0.022 0.547 0.333 0.182 250 b
f 1/2x0.5x0.05 0.013 0.313 0.242 0.076 e
g 0.100 0.138 0.014 a
Total 0.373 9.431 1.966 415
Say 10.000 kN/m 450
cg 0.208 m

-------------------------------------------------------------------------------------------------------------------------------
243 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

13.2 Earth Pressure


13.2.1 Active earth Pressure on vertical wall at normal case 0.00 kN/m2

Active earth pressure coefficient at Normal case Ka


= Cos2(φ-α)
Cos α*Cos(α+δ)*[1+{Sin(φ+δ)*Sin(φ-β)/(Cos(α-δ)*Cos(δ+α))}1/2]2
2

Note :- 47.30 kN/m2


α = Angle subtended by the earth side wall with the Active Earth pr. diagram
vertical on the earth side = 0.09 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Active earth pressure coefficient at Normal case = Ka = 0.336
Earth pressure = γs * height of wall * Ka
Horz. earth pr. at top of base slab = 0.336x(5.40+2.00-0.8)x19 = 42.19 kN/m2
Horz. earth pr. at bottom slab = 0.336x(5.40+2)x19 = 47.30 kN/m2
Earth pr. due to LL surcharge = 0.336x1.2x19 = 7.671 kN/m2

Horizontal Force = Area of earth Pr. diagram * Cos(δ+α)


Active Earth pressure
Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
3m below
3.0 0.00 19.90 27.0 1.26 34.03
top of wall
Top of base
6.6 0.00 42.19 126.0 2.77 349.23
slab
At
7.4 0.00 47.30 158.4 3.11 492.23
foundation

Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment 2
Location 7.671 kN/m
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
3m below
3.0 7.67 7.67 20.8 1.50 31.24
top of wall
Top of base
6.6 7.67 7.67 45.8 3.30 151.18
slab
At
7.4 7.67 7.67 51.4 3.70 190.05 7.671 kN/m
2
foundation
Earth pr. Diagram for live load
Surcharge

13.2.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 21.95 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.09 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014.  z  S a 
   
Where, Ah = Horizontal Seismic Coefficient  2  g 
Ah =
 R 
 
z = zone factor = For Zone IV = 0.24  I 
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
So, Sa/g = = 2.50
Horizontal coefficient - Ah 0.24/2x2.5/(2.5/1.2) = 0.14
Vertical coefficient - Av =2/3Ah = 0.10
λ = Ah/(1+Av) = 0.13
Active earth pressure coefficient at seismic case = Ka = 0.493
Active earth pressure coefficient at normal case = Ka = 0.336
Dynamic increment of static earth pressure coefficient = 0.156
-------------------------------------------------------------------------------------------------------------------------------
244 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Dynamic increment of Horz. earth pr. at top of base slab = 0.156*(5.40+2-0.8)*19 = 19.58 kN/m2
Dynamic increment of Horz. earth pr. at bottom slab = 0.156*(5.40+2)*19 = 21.95 kN/m2
Dynamic increment of Earth pr. due to LL surcharge = 0.156*22.8 = 3.56 kN/m2

Dynamic increment of Horizontal Earth pressure


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
3m below
3.0 0.00 8.90 12.1 1.50 18.12
top of wall
Wall above
6.6 0.00 19.58 58.5 3.30 192.91
base slab
At
7.4 0.00 21.95 73.5 3.70 271.90
foundation

Dynamic increment of Horizontal Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
3m below
3.0 3.56 3.56 9.7 1.98 19.13
top of wall
Wall above
6.6 3.56 3.56 21.3 4.36 92.60
base slab
At
7.4 3.56 3.56 23.8 4.88 116.40
foundation
13.2.3 Summary of Loads
At bottom of slab Wall above base slab
Sl No. Type of loads
Load Force Moment Load Force Moment
1 Dead load of retaining wall 195.75 0.00 475.64 109.00 0.00 0.00
2 Earth fill 503.69 0.00 1935.09 0.00 0.00 0.00
3 Active earth Pr. 0.00 158.38 492.23 0.00 125.98 349.23
4 Live load 86.64 0.00 346.56 0.00 0.00 0.00
5 Active LL surcharge 0.00 51.37 190.05 0.00 45.81 151.18
a) Seismic force of dead load 18.79 28.19 65.57 10.46 15.70 61.62
b) Seismic force of earth 0.00 0.00 0.00 0.00 0.00 0.00
7 c) Seismic force due to LL surcharge 0.00 0.00 0.00 0.00 0.00 0.00
d)Dynamic increment of Hor. earth pr. 0 73.5 271.90 0 58.5 192.91
e)Dynamic increment of LL surcharge 0 23.8 116.40 0 21.3 92.60

13.3 Verification of equilibrium


Load Combination As per table 1 of IRC :6-2014
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
4) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge+Seismic
LL Vertical
Load Case DL Earth fill EP Live load
Surcharge
Seismic
Seismic

1 1
2 1 1 1
3 1 1 1 1 1
4 1 1 1 0.2 0.2 1 0.33
Load combination at bottom of base slab for verification of equilibrium
Load Case Restoring Forces Overturning Forces
Vertical load Lateral Moment (kN- Vertical load Lateral force Moment
(kN) force (kN) m) (kN) (kN) (kN-m)
1 195.75 0.00 475.64 0.00 0.00 0.00
2 699.44 0.00 2410.73 0.00 158.38 492.23
3 786.08 0.00 2757.29 0.00 209.74 682.28
4 722.97 0.00 2480.04 0.00 275.09 890.99
5 710.57 0.00 2480.04 0.00 275.09 890.99

13.3.1 Stability Check


13.3.1.1 Check against Sliding As per clause no. 706.3.4 IRC: 78-2014
a) Retaining wall only
Vertical Load (Ws) = 195.75 kN
Horizontal Active Earth Force (Ea) = 0.00 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety µWs/(Ea-Ep) Infinity > 1.5 Hence O.K.
b) Retaining wall+Earth Pressure only at normal case
Vertical Load (Ws) = 699.44 kN
Horizontal Active Earth Force (Ea) = 158.38 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety µWs/(Ea-Ep) = 2.21 > 1.5 Hence O.K.
c) Retaining wall+Earth Pressure + Live Load Surcharge at normal case
Vertical Load (Ws) = 786.08 kN
Horizontal Active Earth Force (Ea) = 209.74 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
-------------------------------------------------------------------------------------------------------------------------------
245 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Friction coefficient between soil and concrete (µ) = 0.50


Factor of Safety =Wsxµ/(Ea-Ep) = 1.87 > 1.5 Hence O.K.

d) Earth Pressure + Live Load Surcharge at Seismic case


Vertical Load (Ws) = 710.57 kN
Horizontal Active Earth Force (Ea) = 275.09 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety =Wsxµ/(Ea-Ep) = = 1.29 < 1.25 Hence O.K.
13.3.1.2 Check against Overturning
a) RCC Retaining wall only
Restoring Moment due to Self Weight (Rw) = 475.64 kN-m
Overturning Moment due to Earh pressure = 0.00 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 475.64 kN-m
Total Overturning Moment
=Oa( O) = 0.00 kN-m
Factor of Safety =R/O Infinity > 2 Hence O.K.
b) Retaining wall+Earth Pressure only at normal case
Restoring Moment due to Self Weight (Rw) = 2410.73 kN-m
Overturning Moment due to Earh pressure = 492.23 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 2410.73 kN-m
Total Overturning Moment
=Oa( O) = 492.23 kN-m
Factor of Safety =R/O = 4.90 > 2 Hence O.K.
c) Retaining wall+Earth Pressure +Live Load Surcharge
Restoring Moment due to Self Weight (Rw) = 2757.29 kN-m
Overturning Moment due to Earh pressure = 682.28 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 2757.29 kN-m
Total Overturning Moment
=Oa( O) = 682.28 kN-m
Factor of Safety =R/O = 4.04 > 2 Hence O.K.
d) Earth Pressure + Live Load Surcharge at Seismic case
Restoring Moment due to Self Weight (Rw) = 2480.04 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Overturning Moment due to Horz. Active Earth Force (Oa) = 890.99 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 2480.04 kN-m
Total Overturning Moment
=Oa( O) = 890.99 kN-m
Factor of Safety =R/O = 2.78 > 1.5 Hence O.K.
13.3.1.3 Check Bearing Pressure
a) Only RCC Retaining wall
Total Vertical Load(W) = 195.75 kN
Total Restoring Moment ( R) = 475.64 kN-m
Total Overturning Moment ( O) = 0.00 kN-m
Base Width (B) = 5.90 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 2.430 m
C.G. of Vertical Load about Centre of Base (e) = 0.52 m < B/6 Hence O.K.
Base Pressure at toe = 50.73 kN/m2 < 300.00 kN/m2
Base Pressure at heel = 15.63 kN/m2 > 0.00 kN/m2
Hence O.K.
b)Retaining wall+ Earth Pressure only
Total Vertical Load(W) = 699.44 kN
Total Restoring Moment ( R) = 2410.73 kN-m
Total Overturning Moment ( O) = 492.23 kN-m
Base Width (B) = 5.90 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 2.74 m
C.G. of Vertical Load about Centre of Base (e) = 0.21 m < B/6 Hence O.K.
Base Pressure at toe =W/B+6xWxe/(B^2) = 143.52 kN/m2 < 300.00 kN/m2
Base Pressure at heel=W/B-6xWxe/(B^2) = 93.58 kN/m2 > 0.00 kN/m2
Hence O.K.
c) Retaining wall+Earth Pressure +Live Load Surcharge
Total Vertical Load(W) = 786.08 kN
Total Restoring Moment ( R) = 2757.29 kN-m
Total Overturning Moment ( O) = 682.28 kN-m
Base Width (B) = 5.90 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 2.64 m
C.G. of Vertical Load about Centre of Base (e) = 0.31 m < B/6 Hence O.K.
Base Pressure at toe =W/B-6xWxe/(B^2) = 175.28 kN/m2 < 300.00 kN/m2
Base Pressure at heel=W/B+6xWxe/(B^2) = 91.19 kN/m2 > 0.00 kN/m2
Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
246 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

d) Earth Pressure + Live Load Surcharge at Seismic case


Total Vertical Load(W) = 722.97 kN
Total Restoring Moment ( R) = 2480.04 kN-m
Total Overturning Moment ( O) = 890.99 kN-m
Base Width (B) = 5.900 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W =2.198 m
C.G. of Vertical Load about Centre of Base (e) = 0.752 m < B/6 Hence O.K.
Base Pressure at toe =W/B-6xWxe/(B^2) = 216.254 kN/m2 < 375.00 kN/m2
Base Pressure at heel=W/B+6xWxe/(B^2) = 28.821 kN/m2 > 0.00 kN/m2
Hence O.K.

13.4 Calculation of moment & shear of base slab


13.4.1 Retaining wall only

Heel side Toe side


800
300
3200 1800
5900

Wt.of base slab 7.5 kN/m2 20 20 kN/m2 7.5 kN/m2


Wt.of earth fill 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure -15.6 kN/m2 -34.7 -40.0 kN/m2 -50.7 kN/m2
Total pr. -8.1 kN/m2 -14.7 -20.0 kN/m2 -43.2 kN/m2
Moment -52.8 -57.5 kN-m/m
Shear at dist d for toe and face of wall for heel -36.5 -36.8 kN/m

13.4.2 Earth fill


W= 503.69 kN M= 1935.09 kN M/W = 3.842 m
e= -0.89 m B= 5.9 m
Wt.of earth fill 134.9 kN/m2 125.4 22.8 kN/m2 32.3 kN/m2
Base pressure -162.8 kN/m2 -78.8 -55.2 kN/m2 -7.9 kN/m2
Total pr. -27.9 kN/m2 46.6 -32.4 kN/m2 24.4 kN/m2
Moment -15.7 8.8 kN-m/m
Shear at dist d for toe and face of wall for heel 29.9 8.6 kN/m

13.4.3 Earth Pressure at Normal case


W= 0.00 kN M= 492.23 kN B= 5.9 m
Wt.of earth fill 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 84.8 kN/m2 -7.2 -33.1 kN/m2 -84.8 kN/m2
Total pr. 84.8 kN/m2 -7.2 -33.1 kN/m2 -84.8 kN/m2
Moment 277.3 -109.5 kN-m/m
Shear at dist d 124.2 -70.5 kN/m

-------------------------------------------------------------------------------------------------------------------------------
247 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

13.4.4 Live load


W= 86.64 kN M= 346.56 kN M/W = 4.000 m
e= -1.05 m B= 5.9 m
Wt.of earth fill = 22.80 kN/m2 22.8 0 kN/m2 0 kN/m2
Base pressure -30.4 kN/m2 -13.4 -8.6 kN/m2 1.0 kN/m2
Total pr. -7.6 kN/m2 9.4 -8.6 kN/m2 1.0 kN/m2
Moment -9.7 -3.6 kN-m/m
Shear at dist d 3.0 -1.7 kN/m

13.4.5 Live load surcharge at Normal case


W= 0.00 kN M= 190.05 kN B= 5.9 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 32.8 kN/m2 -2.8 -12.8 kN/m2 -32.8 kN/m2
Total pr. 32.8 kN/m2 -2.8 -12.8 kN/m2 -32.8 kN/m2
Moment 107.0 -42.3
Shear at dist d 48.0 -27.2

13.4.6 Seismic of retaining wall


W= 18.79 kN M= 65.57 kN B= 5.9 m
Vertical seismic -3.18508 kN/m2 -3.185085 -3.185085 kN/m2 -3.185085 kN/m2
Base pressure 11.3 kN/m2 -1.0 -4.4 kN/m2 -11.3 kN/m2
Total pr. 8.1 kN/m2 -4.1 -7.6 kN/m2 -14.5 kN/m2
Moment 20.6 -12.5 kN-m/m
Shear at dist d 6.4 -8.8 kN/m

13.4.7 Dynamic increment of Earth Pressure at seismic case


W= 0.00 kN M= 271.90 kN B= 5.9 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 46.9 kN/m2 -4.0 -18.3 kN/m2 -46.9 kN/m2
Total pr. 46.9 kN/m2 -4.0 -18.3 kN/m2 -46.9 kN/m2
Moment 153.1 -60.5
Shear at dist d 68.6 -58.6

13.4.8 Dynamic increment of Ll surcharge at seismic case


W= 0.00 kN M= 116.40 kN B= 5.9 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 20.1 kN/m2 -1.7 -7.8 kN/m2 -20.1 kN/m2
Total pr. 20.1 kN/m2 -1.7 -7.8 kN/m2 -20.1 kN/m2
Moment 65.6 -25.9
Shear at dist d 29.4 -25.1
Summary of Moment
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 349.23 0.0 151.18 254.53 92.60
3m below top of wall 0 0 34.03 0.0 31.24 38.66 19.13
At heel slab -52.8 -15.7 277.3 -9.7 107.0 173.79 65.56
At toe slab -57.5 8.8 -109.5 -3.6 -42.3 -73.00 -25.10
Summary of Shear
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 125.98 0.0 45.81 56.4 21.3
3m below top of wall 0 0 27.01 0.0 20.82 26.2 9.7
At heel slab -36.5 29.9 124.2 3.0 48.0 75.0 29.4
At toe slab -36.8 8.6 -70.5 -1.7 -27.2 -67.4 -25.1

-------------------------------------------------------------------------------------------------------------------------------
248 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

13.5 Design of vertical wall


13.5.1 Load combination
13.5.1.1 Ultimate limit State As per table 3.2 of IRC 6:2014
Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
4) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge+Seismic
Dynamic
LL
Load Case DL Earth fill EP Live load
Surcharge
Seismic inc. of LL
surcharge
1 1.35
2 1.35 1.5 1.5
3 (a) 1.35 1.5 1.5 1.5 1.2
3 (b) 1 1.5 1 1.5 1.2
3 (c) 1 1.5 1 1.15 1.2
4 (a) 1.35 1 1 0.2 0.2 1.50 0.20
4 (b) 1 1 1 0.2 0.2 1.50 0.20

Basic Combination (UL1)


TypeWall
of above base slab 3m below top of wall At heel slab At toe slab
Moment Shear Moment Moment Moment
loads
(kN-m) (kN) (kN-m) Shear (kN) (kN-m) Shear (kN) (kN-m) Shear (kN)
1 0.00 0.00 0.00 0.00 -71.24 -49.23 -77.62 -49.65
2 523.84 188.97 51.04 40.51 321.18 182.00 -228.64 -142.46
3 (a) 705.25 243.95 88.52 65.50 435.08 244.07 -284.70 -177.60
3 (b) 530.64 180.96 71.51 51.99 314.89 194.71 -209.83 -129.49
3 (c) 530.64 180.96 71.51 51.99 318.29 193.66 -208.58 -128.91
4 (a) 779.78 223.96 102.09 72.36 483.63 233.48 -301.98 -223.39
4 (b) 779.78 223.96 102.09 72.36 502.10 246.24 -281.85 -210.51
Maximum 779.78 243.95 102.09 72.36 502.10 246.24 -301.98 -223.39

13.5.1.2 Serviceability limit state


Rare Combination (SL1) Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
Load Case DL Earth fill EP Live load LL Surcharge
1 1
2 1 1 1
3 1 1 1 1 0.8
13.5.1.3 Quasi-permanent (SL3) Load Combination
1) Dead load
2) Dead load+Earth pressure
Load Case DL Earth fill EP
1 1
2 1 1 1
Moment Rare Combination (SL1) Quasi-permanent (SL3)
At top of 3m below At heel At top of At heel
Type of loads
base slab top of wall slab At toe slab base slab slab At toe slab
1 0.00 0.00 -52.77 -57.50 0.00 -52.77 -57.50
2 349.23 34.03 208.85 -158.17 349.23 208.85 -158.17
3 470.17 59.02 284.78 -195.55
Maximum 470.17 59.02 284.78 -195.55 349.23 208.85 -158.17

13.6 Design of sections


13.6.1. Ultimate limit State Method
13.6.1.1. Flexure member Design of wall at base
Grade Concrete = M35 Grade of steel = Fe 500
Width of the section = 1000 mm Depth of the section = 900 mm
Clear Cover = = 75 mm Main dia of bar used = 20 mm
Dia of shear reinf. = 0 mm Effective depth, d = 805 mm
R = Mu/bd2 = 1.203 MPa Design Moment = 780 kN-m
Mu,Lim/bd2 = 0.133xfck = 4.655 MPa Ast = 2322.7 mm2
Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 1046.5 mm2
Hence provide 20 dia @ 150 c/c Ast = 3434.8 mm2
16 dia @ 150 c/c
0 dia @ 150 c/c > Hence O.K.
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 32308 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 367.10 mm Actual neutral axis depth = 118.52 mm
Strain in steel = 0.020272 Stress in steel = 434.8 MPa

-------------------------------------------------------------------------------------------------------------------------------
249 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Stress-strain diagram at Ultimate Limit State condition


0.00350 15.63
1493 kN
118.52
NA NA

0.02027 1493 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 1493 kN Total ultimate tensile force = 1493 kN
Compressive force CG 49.31 mm Moment of resistance = 1129 kNm
< 780 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 3m below top of wall
At heel slab At toe slab
Moment 779.78 102.09 502.10 301.98
D 900.00 572.73 800.00 800.00
b 1000.00 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00 75.00
d 817.00 497.7 715.0 715.0
R = Mu/bd2 1.17 0.41 0.98 0.59
pt 0.00280 0.00096 0.00234 0.00139
Ast required 2285.6 478.1 1670.2 990.6
20 dia + 0 dia + 20 dia + 20 dia +
Reinf provided 16 dia + 16 dia +
150 c/c 150 c/c 125 c/c 150 c/c
Ast provided 3434.8 1340.4 2513.3 2094.4
Actual NA 119 46 87 72
Strain in steel 0.0206 0.0342 0.0254 0.0311
Stress in steel 434.8 434.8 434.8 434.8
Total ultimate tensile force =1493 583 1093 911
1493
Total ultimate compressive force 583 1093 911
Difference of force 0 0 0 0
Compressive force CG 49.3 19.2 36.1 30.1
Moment of resistance 1146 279 742 624
Factor of Safety 1.470 2.732 1.478 2.065
Check Safe Safe Safe Safe
13.6.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 35 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Wall above base slab 3m below top of wall
At heel slab At toe slab
Prestress Force after all losses (kN)
0.0 0.0 0.0 0.0
Effective width in mm 1000 1000 1000 1000
Effective Depth (d) in mm 817 498 715 715
K 1.495 1.634 1.529 1.529
Stress due to Prestress ( 0 0 0 0
Shear Resistance minimum (V273.8 190.6 247.9 247.9
Ast provided 3434.8 1340.4 2513.3 2094.4
Reinforcement ratio, ρ1 0.004 0.003 0.004 0.003
Shear resistance ( VRd,c) (kN) 330.6 190.1 279.0 262.7
Design Shear resistance ( V 330.6 190.6 279.0 262.7
243.95
Max.shear at 1d dist.from face (kN) 72.36 246.24 223.39
M tanδ/d 86.77 18.65 109.73 117.32
Effective shear 157.18 53.71 136.51 106.07
Factor of Safety 2.10 3.55 2.04 2.48
Check Safe Safe Safe Safe

-------------------------------------------------------------------------------------------------------------------------------
250 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

13.6.2. Servicebility limit State Method


13.6.2.1. Flexure member Design of wall
Grade Concrete = M35 Grade of steel = Fe 500
Bending Compression of concrete = 16.80 Mpa fctm = Mean tensile strength of concrete = 2.77 Mpa
E of reinforcement = 200000 MPa E of concrete = 32308 MPa
Creep Coefficient, φ = 1 Ec, eff = Ecm /(1+φ) = 16154 MPa
Modular ratio =Es/Ec,eff = 12.38 Tensile stress of steel = 400 Mpa
Width of Section = 1000 mm Depth of Section = 900 mm
Clear Cover = = 50 mm Effective depth, d = 805 mm
Minimum reinforcement0.26xfctm/fykxbtxd but not less than 0.0013btd = 1160.05 mm2
Hence provide 20 dia @ 150 c/c Ast = 3434.8 mm2
16 dia @ 150 c/c
0 dia @ 150 c/c Design of moment = 470.17 kNm

Balanced neutral axis depth = = 275.39 mm Actual neutral axis depth = 222.57 mm
Strain in steel = 0.00094 Stress in steel = 187.3 MPa
Strain in concrete = 0.00036 Comp. stress of concrete = 5.78 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00036 5.78
643.35
222.57
NA NA

187.30
0.00094
Strain Diagram Stress Diagram
=
Total compressive force = 643.35 kN Total tensile force = 643.35 kN
Compressive force CG = 74.19 mm Moment of resistance = 470.17 kNm
Rare Combination (SL1) Quasi-permanent (SL3)
Wall Wall
Description above 3m below At heel above 3m below At heel
base slab top of wall slab At toe slab base slab top of wall slab At toe slab
h or D 900 573 800 800 900 573 800 800
b 1000 1000 1000 1000 1000 1000 1000 1000
d 817 498 715 715 817 498 715 715
Moment 470.17 59.02 284.78 195.55 349.23 0.00 208.85 158.17
Reinf provided 20 dia + 0 dia + 20 dia + 20 dia + 20 dia + 0 dia + 20 dia + 20 dia +
16 dia + 16 dia + 0 dia 0 dia 16 dia + 16 dia + 0 dia 0 dia

150 c/c 150 c/c 125 c/c 150 c/c 150 c/c 150 c/c 125 c/c 150 c/c
Ast provided 3434.8 1340.4 2513.3 2094.4 3434.8 1340.4 2513.3 2094.4
Stress in concrete 5.6 2.3 4.8 3.5 4.2 0.0 3.5 2.9
Actual NA 224 113 182 168 224 113 182 168
Stress in steel 184.4 95.7 173.2 141.7 137.0 0.0 127.0 114.6
Total ultimate tensile force = 634 128 435 297 471 0 319 240
Total ultimate compressive force634 128 435 297 471 0 319 240
Difference of force 0 0 0 0 0 0 0 0
Compressive force CG 74.8 37.7 60.7 56.1 74.8 37.7 60.7 56.1
Moment of resistance 470 59 285 196 349 0 209 158
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Maximum compressive stress of concrete= 5.6 Mpa < 16.8 Mpa Hence O.K.
Maximum tensile stress of steel= 184.4 Mpa < 400.0 Mpa Hence O.K.

13.6.2.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 136.99 Mpa αe =Es/Ecm = 12.381
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 237.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.014
fct,eff = = 1.94 Mpa εsm-εcm = 0.000411
>= 0.6σsc/Es= 0.000411
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 20.0 mm k2 = 0.5
Sr,max = 405.1 mm Crack width, Wk = = 0.166 mm
< 0.3 mm OK

-------------------------------------------------------------------------------------------------------------------------------
251 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Total for Quasi-permanent (SL3)


Wall
Description above 3m below At heel
base slab top of wall slab At toe slab
Stress in steel, σs 137.0 0.0 127.0 114.6
As 3434.8 1340.4 2513.3 2094.4
Actual NA 224 113 182 168
hc,eff 207.5 187.5 237.5 237.5
ρp,eff 0.017 0.007 0.011 0.009
εsm-εcm 0.00041 0.00000 0.00038 0.00034
φeq 18.2 16.0 20.0 20.0
effective cover, c 75.0 0.0 75.0 75.0
Crack spacing Sr,max 442.1 380.5 576.3 640.6
Crack width, Wk 0.182 0.000 0.220 0.220
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.

13.6.3 Deflection at cantilever edge due to earth pressure & LL surcharge

45.12 6.94
kN/m2 kN/m2
A 6.6 m B

8 7 6 5 4 3 2 1
500.41 0.00
kN-m/m kN-m/m
6.6 m

E= = 32308 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.300 0.00225 0.00 0
2 0.943 0.943 0.386 0.00478 4.10 0.00003 0.00001
3 0.943 1.886 0.471 0.00873 20.49 0.00007 0.00007
4 0.943 2.829 0.557 0.01441 55.26 0.00012 0.00021
5 0.943 3.771 0.643 0.02214 114.53 0.00016 0.00043
6 0.943 4.714 0.729 0.03223 204.40 0.00020 0.00071
7 0.943 5.657 0.814 0.04499 330.99 0.00023 0.00104
8 0.943 6.600 0.900 0.06075 500.41 0.00025 0.00139
Total 0.00386 m
So, Total deflection = = 3.862 mm = L/ 1709

13.7. Tranverse reinforcement


Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 752.95 mm2
As per clause 16.6.1.1 (3) of IRC-112:2011, minimum tranverse reinforcement is 20% of main reinforcement.
Main reinforcement Tranv. Ast provd.
Location Reinf. Provided Check
Maximum Minimum Reinf. (mm2)
Outer face of vertical wall 752.95 12 dia @ 150 c/c 754.0 O.K.
Earth face of vertical wall 3434.8 1340.4 340.130 10 dia @ 150 c/c 523.6 O.K.
Base slab 2513.3 2513.3 376.991 10 dia @ 150 c/c 523.6 O.K.

-------------------------------------------------------------------------------------------------------------------------------
252 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

20 dia
@ 150 c/c
12 dia @ 150 c/c
16 dia
@ 150 c/c

10 dia 10 dia @ 150 c/c


4500 @ 150 c/c

20 dia @ 125 c/c

10 dia @ 150 c/c


20 dia @ 150 c/c
1120 Toe side

Reinforcement Details of Retaining wall

-------------------------------------------------------------------------------------------------------------------------------
253 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design Data for RCC cantilever Retaining wall - RW-02

-------------------------------------------------------------------------------------------------------------------------------
254 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

14.0 Design Data for RCC cantilever Retaining wall - RW-01 Ht = 11.80 m
1.1 Geometric details
Max. Finished road level = 888.10 m
Minimum ground level = 878.30 m
Minimum Depth of Foundation as per cl. 205.2.1 of IRC: 78-2014 = 2.000 m
RL at founding level = 876.30 m
Width of foundation Width of toe = 2.500 m
Width of heel = 5.500 m
Thickness of Stem at base = 1.400 m
Thickness of Toe = 1.200 m
Total width of foundation = 9.400 m
Friction coefficient bet. soil and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.50
Friction coefficient bet. Rock and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.70

1.2 Details of wearing coat and backfill matterial


Angle of internal friction (φ) = 30.00 degrees Angle of wall friction (δ) = 20.00 degrees
Slope of backfill soil (β) = 0.00 degrees Angle of earthside wall (α) = 5.92 degrees
Unit weight of soil = 19.0 kN/m3 Surcharge 1.2xγsoil

1.3 Material details


1.3.1 Concrete details [ IRC:112-2011 ]
Grade of concrete = M35 Mean concrete strength fcm = 45.00 MPa
Modulus of elasticity Ecm = 32308 MPa Mean tensile strength fctm = 2.77 MPa
Lower fractile tensile fctm = 1.94 MPa Upper fractile tensile fctm95 = 3.60 MPa
Material safety factor γm = 1.50 Design concrete strength fcd = 15.63 MPa
Unit weight of concrete = 25.00 kN/m3 Coeff of thermal expansion = 12 E-06 /0C
Permissible Compressive stress at rare combination of loads = 16.80 MPa
Permissible Compressive stress at frequent combination of loads = 12.60 MPa
Permissible tensile stress = 1.29 MPa Modular ratio m = E p /E c

1.3.2 Reinforcing details [ IRC:112-2011 ]


Grade of reinforcement Fe 500 Modulus of elasticity = 200000 MPa
Material safety factor gs = 1.15 Design yield strength fyd = 434.78 MPa
Design yield strain eyd = 0.0022 Permissible working stress = 240.00 MPa
Density of Steel = 78.50 kN/m3

1.4 Miscellaneous Details


Safe bearing capacity = 300.0 kN/m2 SBC at seismic case = 375.0 kN/m2
Thk of PCC below base slab = 0.100 m Thk of filling below base slab = 0.600 m
Clear cover of base slab = 75 mm Clear cover of vertical wall = 50 mm
Seismic zone Zone IV

1.5 Factor of Safety Normal case Seismic Case


Check against Sliding = 1.5 = 1.25
Check against Overturning = 2.0 = 1.50

-------------------------------------------------------------------------------------------------------------------------------
255 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

1.6 Sketch
12
888.100 m
13
300

6000 7
923
o 9000

= 5.92
9800
8
1234
α

1 878.300 m
2

11
2000
900 9 4 3 10
5
1200 876.3 m
300 6
5500 1400 2500
9400
Section of Retaining Wall

14.2. Load Calculation


14.2.1 Load Calculation of Retaining wall - per m width
Horz. Lever Moment (kN- Ver. Lever Moment (kN-
Sl No Load Calculation Area(m2) Weight (kN)
arm(m) m) arm(m) m)
Wt. of Retaining wall only
1 (9.80+2-1.2)x0.3 3.18 79.50 2.65 210.68 6.50 516.75
2 1/2x(9.80+2-1.2)x(1.4-0.3) 5.83 145.75 3.17 461.54 4.73 689.88
3 1.4x0.9 1.26 31.50 3.20 100.80 0.75 23.63
4 1/2x5.5x0.9 2.48 61.88 5.73 354.75 0.60 37.13
5 1/2x2.5x0.9 1.13 28.13 1.67 46.88 0.60 16.88
6 9.4x0.3 2.82 70.50 4.70 331.35 0.15 10.58
7 Crash barrier 10.00 2.76 27.58 12.05 120.50
Wt. of Soil
7 1/2x(9.80+2-1.2)x(1.4-0.3) 5.83 110.77 3.53 391.39 8.27 915.70
8 5.5x(9.80+2-1.2) 58.30 1107.70 6.65 7366.21 6.50 7200.05
9 1/2x5.5x0.9 2.48 47.03 7.57 355.82 0.90 42.32
10 1/2x2.5x0.9 1.13 21.38 0.83 17.81 0.90 19.24
11 2.5x(2-1.2) 2.00 38.00 1.25 47.50 1.60 60.80
12 1/2x(5.5+1.4-0.3)^2xTan(0.00) 0.00 0.00 7.20 0.00 12.03 0.00
Live Load Surcharge
13 (5.5+1.4-0.3)x1.2 7.92 150.48 6.10 917.93 13.00 1956.24
Vertical load due to self wt of Retaining Wall 427.25 1533.58 1415.33
Vertical load due to earth fill 1324.87 8178.73 8238.11
Vertical load due to Live load surcharge 150.48 917.93 1956.24

14.2.2 Superimposed dead load (SIDL)


Load Calculation of crash barrier 175 50 175
Unit weight of concrete = 25.00 kN/m3 50
2 Weight Lever Moment g mm
Sl No Load Calculation Area(m ) 200
(KN) arm(m) (KN-m)
a (0.45-0.05)x0.415 0.166 4.150 0.275 1.141
b 1/2x(0.5+0.25+0.415)x0.05 0.029 0.728 0.033 0.024 500 f
c (0.5+0.25)x0.175 0.131 3.281 0.138 0.451 c
d 0.25x0.05 0.013 0.313 0.250 0.078 d
e 1/2x0.25x0.175 0.022 0.547 0.333 0.182 250 b
f 1/2x0.5x0.05 0.013 0.313 0.242 0.076 e
g 0.100 0.138 0.014 a
Total 0.373 9.431 1.966 415
Say 10.000 kN/m 450
cg 0.208 m

-------------------------------------------------------------------------------------------------------------------------------
256 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

14.2.3 Earth Pressure


14.2.3.1 Active earth Pressure on vertical wall at normal case 0.00 kN/m2

Active earth pressure coefficient at Normal case Ka


= Cos2(φ-α)
Cos α*Cos(α+δ)*[1+{Sin(φ+δ)*Sin(φ-β)/(Cos(α-δ)*Cos(δ+α))}1/2]2
2

Note :- 76.74 kN/m2


α = Angle subtended by the earth side wall with the Active Earth pr. diagram
vertical on the earth side = 0.10 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Active earth pressure coefficient at Normal case = Ka = 0.342
Earth pressure = γs * height of wall * Ka
Horz. earth pr. at top of base slab = 0.342x(9.80+2.00-1.2)x19 = 68.94 kN/m2
Horz. earth pr. at bottom slab = 0.342x(9.80+2)x19 = 76.74 kN/m2
Earth pr. due to LL surcharge = 0.342x1.2x19 = 7.805 kN/m2

Horizontal Force = Area of earth Pr. diagram * Cos(δ+α)


Active Earth pressure
Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
6m below
6.0 0.00 39.02 105.3 2.52 265.32
top of wall
9m below
9.0 0.00 58.53 236.9 3.78 895.47
top of wall
9.313m
below top of 9.3 0.00 60.57 253.6 3.91 992.03
wall
Top of base
10.6 0.00 68.94 328.6 4.45 1462.99
slab
At
11.8 0.00 76.74 407.2 4.96 2018.23
foundation

Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment 2
Location 7.805 kN/m
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
6m below
6.0 7.80 7.80 42.1 3.00 126.35
top of wall
9m below
9.0 7.80 7.80 63.2 4.50 284.28
top of wall
9.313m
below top of 9.3 7.80 7.80 65.4 4.66 304.36
2
wall 7.805 kN/m
Top of base Earth pr. Diagram for live load
10.6 7.80 7.80 74.4 5.30 394.34
slab Surcharge
At
11.8 7.80 7.80 82.8 5.90 488.67
foundation

14.2.3.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 35.35 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.10 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014.  z  S a 
   
Where, Ah = Horizontal Seismic Coefficient  2  g 
Ah =
 R 
 
z = zone factor = For Zone IV = 0.24  I 
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
-------------------------------------------------------------------------------------------------------------------------------
257 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0
So, Sa/g = = 2.50
Horizontal coefficient - Ah 0.24/2x2.5/(2.5/1.2) = 0.14
Vertical coefficient - Av =2/3Ah = 0.10
λ = Ah/(1+Av) = 0.13
Active earth pressure coefficient at seismic case = Ka = 0.500
Active earth pressure coefficient at normal case = Ka = 0.342
Dynamic increment of static earth pressure coefficient = 0.158
Dynamic increment of Horz. earth pr. at top of base slab = 0.158*(9.80+2-1.2)*19 = 31.76 kN/m2
Dynamic increment of Horz. earth pr. at bottom slab = 0.158*(9.80+2)*19 = 35.35 kN/m2
Dynamic increment of Earth pr. due to LL surcharge = 0.158*22.8 = 3.60 kN/m2

Dynamic increment of Horizontal Earth pressure


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
6m below
6.0 0.00 17.98 48.5 3.00 145.51
top of wall
9m below
9.0 0.00 26.96 109.1 4.50 491.09
top of wall
9.313m
below top of 9.3 0.00 27.90 116.8 4.66 544.04
wall
Wall above
10.6 0.00 31.76 151.4 5.30 802.33
base slab
At
11.8 0.00 35.35 187.6 5.90 1106.83
foundation

Dynamic increment of Horizontal Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
6m below
6.0 3.60 3.60 19.4 3.96 76.83
top of wall
9m below
9.0 3.60 3.60 29.1 5.94 172.86
top of wall
9.313m
below top of 9.3 3.60 3.60 30.1 6.15 185.08
wall
Wall above
10.6 3.60 3.60 34.3 7.00 239.79
base slab
At
11.8 3.60 3.60 38.2 7.79 297.16
foundation

14.2.4 Summary of Loads


At bottom of slab Wall above base slab
Sl No. Type of loads
Load Force Moment Load Force Moment
1 Dead load of retaining wall 427.25 0.00 1533.58 235.25 0.00 0.00
2 Earth fill 1324.87 0.00 8178.73 0.00 0.00 0.00
3 Active earth Pr. 0.00 407.23 2018.23 0.00 328.61 1462.99
4 Live load 150.48 0.00 917.93 0.00 0.00 0.00
5 Active LL surcharge 0.00 82.83 488.67 0.00 74.40 394.34
a) Seismic force of dead load 41.02 61.52 203.81 22.58 33.88 191.11
b) Seismic force of earth 0.00 0.00 0.00 0.00 0.00 0.00
7 c) Seismic force due to LL surcharge 0.00 0.00 0.00 0.00 0.00 0.00
d)Dynamic increment of Hor. earth pr. 0 187.6 1106.83 0 151.4 802.33
e)Dynamic increment of LL surcharge 0 38.2 297.16 0 34.3 239.79

-------------------------------------------------------------------------------------------------------------------------------
258 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

14.3. Verification of equilibrium


Load Combination As per table 1 of IRC :6-2014
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
4) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge+Seismic
LL Vertical
Load Case DL Earth fill EP Live load
Surcharge
Seismic
Seismic

1 1
2 1 1 1
3 1 1 1 1 1
4 1 1 1 0.2 0.2 1 0.33
Load combination at bottom of base slab for verification of equilibrium
Load Case Restoring Forces Overturning Forces
Vertical load Lateral Moment (kN- Vertical load Lateral force Moment
(kN) force (kN) m) (kN) (kN) (kN-m)
1 427.25 0.00 1533.58 0.00 0.00 0.00
2 1752.12 0.00 9712.30 0.00 407.23 2018.23
3 1902.60 0.00 10630.23 0.00 490.06 2506.90
4 1795.75 0.00 9895.89 0.00 680.55 3486.03
5 1768.68 0.00 9895.89 0.00 680.55 3486.03

14.3.1 Stability Check


14.3.1.1 Check against Sliding As per clause no. 706.3.4 IRC: 78-2014
a) Retaining wall only
Vertical Load (Ws) = 427.25 kN
Horizontal Active Earth Force (Ea) = 0.00 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety µWs/(Ea-Ep) Infinity > 1.5 Hence O.K.
b) Retaining wall+Earth Pressure only at normal case
Vertical Load (Ws) = 1752.12 kN
Horizontal Active Earth Force (Ea) = 407.23 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety µWs/(Ea-Ep) = 2.15 > 1.5 Hence O.K.
c) Retaining wall+Earth Pressure + Live Load Surcharge at normal case
Vertical Load (Ws) = 1902.60 kN
Horizontal Active Earth Force (Ea) = 490.06 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety =Wsxµ/(Ea-Ep) = 1.94 > 1.5 Hence O.K.

d) Earth Pressure + Live Load Surcharge at Seismic case


Vertical Load (Ws) = 1768.68 kN
Horizontal Active Earth Force (Ea) = 680.55 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety =Wsxµ/(Ea-Ep) = = 1.30 < 1.25 Hence O.K.

14.3.1.2 Check against Overturning


a) RCC Retaining wall only
Restoring Moment due to Self Weight (Rw) = 1533.58 kN-m
Overturning Moment due to Earh pressure = 0.00 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 1533.58 kN-m
Total Overturning Moment
=Oa( O) = 0.00 kN-m
Factor of Safety =R/O Infinity > 2 Hence O.K.
b) Retaining wall+Earth Pressure only at normal case
Restoring Moment due to Self Weight (Rw) = 9712.30 kN-m
Overturning Moment due to Earh pressure = 2018.23 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 9712.30 kN-m
Total Overturning Moment
=Oa( O) = 2018.23 kN-m
Factor of Safety =R/O = 4.81 > 2 Hence O.K.
c) Retaining wall+Earth Pressure +Live Load Surcharge
Restoring Moment due to Self Weight (Rw) = 10630.23 kN-m
Overturning Moment due to Earh pressure = 2506.90 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 10630.23 kN-m
Total Overturning Moment
=Oa( O) = 2506.90 kN-m
Factor of Safety =R/O = 4.24 > 2 Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
259 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

d) Earth Pressure + Live Load Surcharge at Seismic case


Restoring Moment due to Self Weight (Rw) = 9895.89 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Overturning Moment due to Horz. Active Earth Force (Oa) = 3486.03 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 9895.89 kN-m
Total Overturning Moment
=Oa( O) = 3486.03 kN-m
Factor of Safety =R/O = 2.84 > 1.5 Hence O.K.

14.3.1.3 Check Bearing Pressure


a) Only RCC Retaining wall
Total Vertical Load(W) = 427.25 kN
Total Restoring Moment ( R) = 1533.58 kN-m
Total Overturning Moment ( O) = 0.00 kN-m
Base Width (B) = 9.40 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 3.589 m
C.G. of Vertical Load about Centre of Base (e) = 1.11 m < B/6 Hence O.K.
Base Pressure at toe = 77.67 kN/m2 < 300.00 kN/m2
Base Pressure at heel = 13.23 kN/m2 > 0.00 kN/m2
Hence O.K.
b)Retaining wall+ Earth Pressure only
Total Vertical Load(W) = 1752.12 kN
Total Restoring Moment ( R) = 9712.30 kN-m
Total Overturning Moment ( O) = 2018.23 kN-m
Base Width (B) = 9.40 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 4.39 m
C.G. of Vertical Load about Centre of Base (e) = 0.31 m < B/6 Hence O.K.
Base Pressure at toe =W/B+6xWxe/(B^2) = 223.12 kN/m2 < 300.00 kN/m2
Base Pressure at heel=W/B-6xWxe/(B^2) = 149.67 kN/m2 > 0.00 kN/m2
Hence O.K.
c) Retaining wall+Earth Pressure +Live Load Surcharge
Total Vertical Load(W) = 1902.60 kN
Total Restoring Moment ( R) = 10630.23 kN-m
Total Overturning Moment ( O) = 2506.90 kN-m
Base Width (B) = 9.40 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 4.27 m
C.G. of Vertical Load about Centre of Base (e) = 0.43 m < B/6 Hence O.K.
Base Pressure at toe =W/B-6xWxe/(B^2) = 258.01 kN/m2 < 300.00 kN/m2
Base Pressure at heel=W/B+6xWxe/(B^2) = 146.80 kN/m2 > 0.00 kN/m2
Hence O.K.

d) Earth Pressure + Live Load Surcharge at Seismic case


Total Vertical Load(W) = 1795.75 kN
Total Restoring Moment ( R) = 9895.89 kN-m
Total Overturning Moment ( O) = 3486.03 kN-m
Base Width (B) = 9.400 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W =3.569 m
C.G. of Vertical Load about Centre of Base (e) = 1.131 m < B/6 Hence O.K.
Base Pressure at toe =W/B-6xWxe/(B^2) = 328.894 kN/m2 < 375.00 kN/m2
Base Pressure at heel=W/B+6xWxe/(B^2) = 53.180 kN/m2 > 0.00 kN/m2
Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
260 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

14.4 Calculation of moment & shear of base slab


14.4.1 Retaining wall only
Heel side Toe side
1200
300
5500 2500
9400
Wt.of base slab 7.5 kN/m2 30 30 kN/m2 7.5 kN/m2
Wt.of earth fill 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure -13.2 kN/m2 -50.9 -60.5 kN/m2 -77.7 kN/m2
Total pr. -5.7 kN/m2 -20.9 -30.5 kN/m2 -70.2 kN/m2
Moment -163.3 -178.0 kN-m/m
Shear at dist d for toe and face of wall for heel -73.3 -77.8 kN/m

14.4.2 Earth fill


W = 1324.87 kN M= 8178.73 kN M/W = 6.173 m
e= -1.47 m B= 9.4 m
Wt.of earth fill 218.5 kN/m2 201.4 15.2 kN/m2 32.3 kN/m2
Base pressure -273.5 kN/m2 -118.4 -78.9 kN/m2 -8.4 kN/m2
Total pr. -55.0 kN/m2 83.0 -63.7 kN/m2 23.9 kN/m2
Moment -135.9 -16.6 kN-m/m
Shear at dist d for toe and face of wall for heel 77.1 1.5 kN/m

14.4.3 Earth Pressure at Normal case


W= 0.00 kN M= 2018.23 kN B= 9.4 m
Wt.of earth fill 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 137.0 kN/m2 -23.3 -64.1 kN/m2 -137.0 kN/m2
Total pr. 137.0 kN/m2 -23.3 -64.1 kN/m2 -137.0 kN/m2
Moment 1264.3 -352.3 kN-m/m
Shear at dist d 312.7 -153.5 kN/m

14.4.4 Live load


W= 150.48 kN M= 917.93 kN M/W = 6.100 m
e= -1.40 m B= 9.4 m
Wt.of earth fill = 22.80 kN/m2 22.8 0 kN/m2 0 kN/m2
Base pressure -30.3 kN/m2 -13.6 -9.3 kN/m2 -1.7 kN/m2
Total pr. -7.5 kN/m2 9.2 -9.3 kN/m2 -1.7 kN/m2
Moment -29.2 -7.7 kN-m/m
Shear at dist d 4.7 -2.2 kN/m

14.4.5 Live load surcharge at Normal case


W= 0.00 kN M= 488.67 kN B= 9.4 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 33.2 kN/m2 -5.6 -15.5 kN/m2 -33.2 kN/m2
Total pr. 33.2 kN/m2 -5.6 -15.5 kN/m2 -33.2 kN/m2
Moment 305.5 -85.3
Shear at dist d 75.7 -37.2
14.4.6 Seismic of retaining wall
W= 41.02 kN M= 203.81 kN B= 9.4 m
Vertical seismic -4.3634 kN/m2 -4.363404 -4.363404 kN/m2 -4.363404 kN/m2
Base pressure 13.8 kN/m2 -2.4 -6.5 kN/m2 -13.8 kN/m2
Total pr. 9.5 kN/m2 -6.7 -10.8 kN/m2 -18.2 kN/m2
Moment 61.7 -29.8 kN-m/m
Shear at dist d 7.6 -14.7 kN/m

14.4.7 Dynamic increment of Earth Pressure at seismic case


W= 0.00 kN M= 1106.83 kN B= 9.4 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 75.2 kN/m2 -12.8 -35.2 kN/m2 -75.2 kN/m2
Total pr. 75.2 kN/m2 -12.8 -35.2 kN/m2 -75.2 kN/m2
Moment 692.0 -193.2
Shear at dist d 171.5 -137.9
14.4.8 Dynamic increment of Ll surcharge at seismic case
W= 0.00 kN M= 297.16 kN B= 9.4 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 20.2 kN/m2 -3.4 -9.4 kN/m2 -20.2 kN/m2
Total pr. 20.2 kN/m2 -3.4 -9.4 kN/m2 -20.2 kN/m2
Moment 185.8 -51.9
Shear at dist d 46.0 -37.0

-------------------------------------------------------------------------------------------------------------------------------
261 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Summary of Moment
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 1462.99 0.0 394.34 993.44 239.79
9m below top of wall 0 0 895.47 0.0 284.28 586.65 172.86
6m below top of wall 0 0 265.32 0.0 126.35 209.21 76.83
At heel slab -163.3 -135.9 1264.3 -29.2 305.5 753.66 185.78
At toe slab -178.0 -16.6 -352.3 -7.7 -85.3 -223.00 -37.03
Summary of Shear
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 253.63 0.0 65.37 178.4 30.1
9m below top of wall 0 0 236.90 0.0 63.17 139.9 29.1
6m below top of wall 0 0 105.29 0.0 42.12 79.3 19.4
At heel slab -73.3 77.1 312.7 4.7 75.7 179.1 46.0
At toe slab -77.8 1.5 -153.5 -2.2 -37.2 -152.6 -37.0

14.5 Design of vertical wall


14.5.1 Load combination
14.5.1.1 Ultimate limit State As per table 3.2 of IRC 6:2014
Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
4) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge+Seismic
Dynamic
LL
Load Case DL Earth fill EP Live load
Surcharge
Seismic inc. of LL
surcharge
1 1.35
2 1.35 1.5 1.5
3 (a) 1.35 1.5 1.5 1.5 1.2
3 (b) 1 1.5 1 1.5 1.2
3 (c) 1 1.5 1 1.15 1.2
4 (a) 1.35 1 1 0.2 0.2 1.50 0.20
4 (b) 1 1 1 0.2 0.2 1.50 0.20

Basic Combination (UL1)


Wall above base slab 9m below top of wall 6m below top of wall At heel slab At toe slab
Type of
loads Moment Shear Moment Shear Moment Moment Moment
(kN-m) (kN) (kN-m) (kN) (kN-m) Shear (kN) (kN-m) Shear (kN) (kN-m) Shear (kN)
1 0.00 0.00 0.00 0.00 0.00 0.00 -220.52 -99.01 -240.30 -105.07
2 2194.49 380.45 1343.21 355.35 397.99 157.93 1472.10 485.73 -793.67 -333.17
3 (a) 2667.69 458.89 1684.34 431.15 549.60 208.47 1794.85 583.66 -907.61 -381.02
3 (b) 1936.19 332.07 1236.60 312.70 416.94 155.83 1219.88 452.96 -669.15 -277.02
3 (c) 1936.19 332.07 1236.60 312.70 416.94 155.83 1230.12 451.31 -666.45 -276.26
4 (a) 3079.97 540.28 1866.87 465.19 619.78 236.49 2130.79 584.74 -969.73 -501.30
4 (b) 3079.97 540.28 1866.87 465.19 619.78 236.49 2187.96 610.41 -907.43 -474.06
Maximum 3079.97 540.28 1866.87 465.19 619.78 236.49 2187.96 610.41 -969.73 -501.30

14.5.1.2 Serviceability limit state


Rare Combination (SL1) Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
Load Case DL Earth fill EP Live load LL Surcharge
1 1
2 1 1 1
3 1 1 1 1 0.8
14.5.1.3 Quasi-permanent (SL3) Load Combination
1) Dead load
2) Dead load+Earth pressure
Load Case DL Earth fill EP
1 1
2 1 1 1

-------------------------------------------------------------------------------------------------------------------------------
262 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Moment Rare Combination (SL1) Quasi-permanent (SL3)

At top of 9m below 6m below At heel


Type of loads At toe slab At top of At heel At toe slab
base slab top of wall top of wall slab base slab At toe slab slab
1 0.00 0.00 0.00 -163.35 -178.00 0.00 0.00 -163.35 -178.00
2 1462.99 895.47 265.32 965.07 -546.91 1462.99 895.47 965.07 -546.91
3 1778.46 1122.89 366.40 1180.23 -622.87
Maximum 1778.46 1122.89 366.40 1180.23 -622.87 1462.99 895.47 965.07 -546.91

14.6 Design of sections


14.6.1. Ultimate limit State Method
14.6.1.1. Flexure member Design of wall at base
Grade Concrete = M35 Grade of steel = Fe 500
Width of the section = 1000 mm Depth of the section = 1400 mm
Clear Cover = = 75 mm Main dia of bar used = 25 mm
Dia of shear reinf. = 0 mm Effective depth, d = 1288 mm
R = Mu/bd2 = 1.858 MPa Design Moment = 3080 kN-m
Mu,Lim/bd2 = 0.133xfck = 4.655 MPa Ast = 5883.8 mm2
Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 1673.8 mm2
Hence provide 25 dia @ 150 c/c Ast = 7461.3 mm2
20 dia @ 150 c/c
20 dia @ 150 c/c > Hence O.K.
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 32308 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 587.13 mm Actual neutral axis depth = 257.46 mm
Strain in steel = 0.014003 Stress in steel = 434.8 MPa

Stress-strain diagram at Ultimate Limit State condition


0.00350 15.63
3244 kN
257.46
NA NA

0.01400 3244 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 3244 kN Total ultimate tensile force = 3244 kN
Compressive force CG 107.10 mm Moment of resistance = 3829 kNm
< 3080 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 9m below top 6mofbelow At heel slab
wall top of wall At toe slab
Moment 3079.97 1866.87 619.78 2187.96 969.73
D 1400.00 1233.96 922.64 1200.00 1200.00
b 1000.00 1000.00 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00 75.00 75.00
d 1295.00 1146.5 835.1 1112.5 1112.5
R = Mu/bd2 1.84 1.42 0.89 1.77 0.78
pt 0.00451 0.00343 0.00211 0.00433 0.00185
Ast required 5844.7 3936.7 1759.1 4819.8 2058.4
25 dia + 25 dia + 25 dia + 25 dia + 16 dia +
20 dia + 20 dia + 0 dia +
Reinf provided
20 dia + 0 dia 0 dia 25 dia 25 dia
150 c/c 150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 7461.3 5366.9 3272.5 6545.0 4612.9
Actual NA 257 185 113 226 159
Strain in steel 0.0141 0.0182 0.0224 0.0137 0.0210
Stress in steel 434.8 434.8 434.8 434.8 434.8
Total ultimate tensile force =3244 2333 1423 2846 2006
3244
Total ultimate compressive force 2333 1423 2846 2006
Difference of force 0 0 0 0 0
Compressive force CG 107.1 77.0 47.0 94.0 66.2
Moment of resistance 3854 2495 1121 2898 2098
Factor of Safety 1.251 1.337 1.809 1.325 2.164
Check Safe Safe Safe Safe Safe

-------------------------------------------------------------------------------------------------------------------------------
263 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

14.6.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 35 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Wall above base slab 9m below top
6mofbelow
wall top of wall
At heel slab At toe slab
Prestress Force after all losses (kN)
0.0 0.0 0.0 0.0 0.0
Effective width in mm 1000 1000 1000 1000 1000
Effective Depth (d) in mm 1181 1146 835 916 681
K 1.412 1.418 1.489 1.467 1.542
Stress due to Prestress ( 0 0 0 0 0
Shear Resistance minimum (V363.1 354.9 278.4 298.6 239.0
Ast provided 7461.3 5366.9 3272.5 6545.0 4612.9
Reinforcement ratio, ρ1 0.006 0.005 0.004 0.007 0.007
Shear resistance ( VRd,c) (kN) 516.2 455.9 329.0 433.5 332.6
Design Shear resistance ( V 516.2 455.9 329.0 433.5 332.6
540.28
Max.shear at 1d dist.from face (kN) 465.19 236.49 610.41 501.30
M tanδ/d 270.72 168.98 56.10 390.80 381.06
Effective shear 269.55 296.21 180.39 219.60 120.24
Factor of Safety 1.91 1.54 1.82 1.97 2.77
Check Safe Safe Safe Safe Safe

14.6.2. Servicebility limit State Method


14.6.2.1. Flexure member Design of wall
Grade Concrete = M35 Grade of steel = Fe 500
Bending Compression of concrete = 16.80 Mpa fctm = Mean tensile strength of concrete = 2.77 Mpa
E of reinforcement = 200000 MPa E of concrete = 32308 MPa
Creep Coefficient, φ = 1 Ec, eff = Ecm /(1+φ) = 16154 MPa
Modular ratio =Es/Ec,eff = 12.38 Tensile stress of steel = 400 Mpa
Width of Section = 1000 mm Depth of Section = 1400 mm
Clear Cover = = 50 mm Effective depth, d = 1288 mm
Minimum reinforcement0.26xfctm/fykxbtxd but not less than 0.0013btd = 1855.36 mm2
Hence provide 25 dia @ 150 c/c Ast = 7461.3 mm2
20 dia @ 150 c/c
20 dia @ 150 c/c Design of moment = 1778.46 kNm

Balanced neutral axis depth = = 440.46 mm Actual neutral axis depth = 404.01 mm
Strain in steel = 0.00103 Stress in steel = 206.8 MPa
Strain in concrete = 0.00047 Comp. stress of concrete = 7.64 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00047 7.64
1542.69
404.01
NA NA

206.76
0.00103
Strain Diagram Stress Diagram
=
Total compressive force = 1542.69 kN Total tensile force = 1542.69 kN
Compressive force CG = 134.67 mm Moment of resistance = 1778.46 kNm

-------------------------------------------------------------------------------------------------------------------------------
264 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Rare Combination (SL1) Quasi-permanent (SL3)


Wall Wall
Description above 9m below At heel above At heel
base slab top of wall slab At toe slab base slab At toe slab slab At toe slab
h or D 1400 1234 1200 1200 1400 1234 1200 1200
b 1000 1000 1000 1000 1000 1000 1000 1000
d 1295 1146 1113 1113 1295 1146 1113 1113
Moment 1778.46 1122.89 1180.23 622.87 1462.99 895.47 965.07 546.91
Reinf provided 25 dia + 25 dia + 25 dia + 16 dia + 25 dia + 25 dia + 25 dia + 16 dia +
20 dia + 20 dia + 25 dia 25 dia 20 dia + 20 dia + 25 dia 25 dia
20 dia 0 dia 20 dia
150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 7461.3 5366.9 6545.0 4612.9 7461.3 5366.9 6545.0 4612.9
Stress in concrete 7.6 6.6 6.8 4.1 6.2 5.2 5.5 3.6
Actual NA 405 329 351 304 405 329 351 304
Stress in steel 205.5 201.8 181.2 133.5 169.1 161.0 148.1 117.2
Total ultimate tensile force =1533 1083 1186 616 1261 864 970 541
1533
Total ultimate compressive force 1083 1186 616 1261 864 970 541
Difference of force 0 0 0 0 0 0 0 0
Compressive force CG 135.1 109.8 117.1 101.3 135.1 109.8 117.1 101.3
Moment of resistance 1778 1123 1180 623 1463 895 965 547
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Maximum compressive stress of concrete= 7.6 Mpa < 16.8 Mpa Hence O.K.
Maximum tensile stress of steel= 205.5 Mpa < 400.0 Mpa Hence O.K.

14.6.2.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 169.05 Mpa αe =Es/Ecm = 12.381
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 281.3 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.027
fct,eff = = 1.94 Mpa εsm-εcm = 0.000602
>= 0.6σsc/Es= 0.000507
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 22.8 mm k2 = 0.5
Sr,max = 316.0 mm Crack width, Wk = = 0.190 mm
< 0.3 mm OK
Total for Quasi-permanent (SL3)
Wall
Description above 9m below At heel
base slab top of wall slab At toe slab
Stress in steel, σs 169.1 161.0 148.1 117.2
As 7461.3 5366.9 6545.0 4612.9
Actual NA 405 329 351 304
hc,eff 262.5 218.8 281.3 281.3
ρp,eff 0.028 0.025 0.023 0.016
εsm-εcm 0.00061 0.00055 0.00047 0.00035
φeq 21.9 22.8 25.0 21.5
effective cover, c 75.0 75.0 75.0 75.0
Crack spacing Sr,max 386.1 412.8 437.6 477.7
Crack width, Wk 0.237 0.226 0.207 0.168
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.

-------------------------------------------------------------------------------------------------------------------------------
265 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

14.6.2.3 Deflection at cantilever edge due to earth pressure & LL surcharge

69.02 7.02
kN/m2 kN/m2
A 10.6 m B

8 7 6 5 4 3 2 1
1857.33 0.00
kN-m/m kN-m/m
10.6 m

E= = 32308 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.300 0.00225 0.00 0
2 1.514 1.514 0.457 0.00796 12.31 0.00005 0.00003
3 1.514 3.029 0.614 0.01932 66.31 0.00011 0.00027
4 1.514 4.543 0.771 0.03826 187.59 0.00015 0.00074
5 1.514 6.057 0.929 0.06672 401.74 0.00019 0.00136
6 1.514 7.571 1.086 0.10665 734.35 0.00021 0.00206
7 1.514 9.086 1.243 0.15999 1211.02 0.00023 0.00282
8 1.514 10.600 1.400 0.22867 1857.33 0.00025 0.00362
Total 0.01089 m
So, Total deflection = = 10.891 mm = L/ 973

14.7. Tranverse reinforcement


Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 1098.81 mm2
As per clause 16.6.1.1 (3) of IRC-112:2011, minimum tranverse reinforcement is 20% of main reinforcement.
Main reinforcement Tranv. Ast provd.
Location Reinf. Provided Check
Maximum Minimum Reinf. (mm2)
Outer face of vertical wall 1098.81 16 dia @ 150 c/c 1340.4 O.K.
Earth face of vertical wall 7461.3 3272.5 774.926 16 dia @ 150 c/c 1340.4 O.K.
Base slab 6545.0 3272.5 654.498 16 dia @ 150 c/c 1340.4 O.K.

25 dia
@ 150 c/c
16 dia @ 150 c/c
20 dia
@ 150 c/c

16 dia 16 dia @ 150 c/c


5700 @ 150 c/c

20 dia
@ 150 c/c
3000
1250
25 dia @ 150 c/c 25 dia @ 150 c/c

16 dia @ 150 c/c


25 dia @ 150 c/c 16 dia @ 150 c/c
896 Toe side

Reinforcement Details of Retaining wall

-------------------------------------------------------------------------------------------------------------------------------
266 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Design Data for RCC cantilever Retaining wall - RW-03

-------------------------------------------------------------------------------------------------------------------------------
267 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.0 Design Data for RCC cantilever Retaining wall - RW-01 Ht = 4.45 m
1.1 Geometric details
Max. Finished road level = 890.75 m
Minimum ground level = 888.30 m
Minimum Depth of Foundation as per cl. 205.2.1 of IRC: 78-2014 = 2.000 m
RL at founding level = 886.30 m
Width of foundation Width of toe = 1.000 m
Width of heel = 2.200 m
Thickness of Stem at base = 0.500 m
Thickness of Toe = 0.400 m
Total width of foundation = 3.700 m
Friction coefficient bet. soil and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.50
Friction coefficient bet. Rock and concrete (as per cl. no. 706.3.4 IRC: 78-2014) = 0.70

1.2 Details of wearing coat and backfill matterial


Angle of internal friction (φ) = 30.00 degrees Angle of wall friction (δ) = 20.00 degrees
Slope of backfill soil (β) = 0.00 degrees Angle of earthside wall (α) = 2.83 degrees
Unit weight of soil = 19.0 kN/m3 Surcharge 1.2xγsoil

1.3 Material details


1.3.1 Concrete details [ IRC:112-2011 ]
Grade of concrete = M35 Mean concrete strength fcm = 45.00 MPa
Modulus of elasticity Ecm = 32308 MPa Mean tensile strength fctm = 2.77 MPa
Lower fractile tensile fctm = 1.94 MPa Upper fractile tensile fctm95 = 3.60 MPa
Material safety factor γm = 1.50 Design concrete strength fcd = 15.63 MPa
Unit weight of concrete = 25.00 kN/m3 Coeff of thermal expansion = 12 E-06 /0C
Permissible Compressive stress at rare combination of loads = 16.80 MPa
Permissible Compressive stress at frequent combination of loads = 12.60 MPa
Permissible tensile stress = 1.29 MPa Modular ratio m = E p /E c

1.3.2 Reinforcing details [ IRC:112-2011 ]


Grade of reinforcement Fe 500 Modulus of elasticity = 200000 MPa
Material safety factor gs = 1.15 Design yield strength fyd = 434.78 MPa
Design yield strain eyd = 0.0022 Permissible working stress = 240.00 MPa
Density of Steel = 78.50 kN/m3

1.4 Miscellaneous Details


Safe bearing capacity = 300.0 kN/m2 SBC at seismic case = 375.0 kN/m2
Thk of PCC below base slab = 0.100 m Thk of filling below base slab = 0.600 m
Clear cover of base slab = 75 mm Clear cover of vertical wall = 50 mm
Seismic zone Zone IV

1.5 Factor of Safety Normal case Seismic Case


Check against Sliding = 1.5 = 1.25
Check against Overturning = 2.0 = 1.50

-------------------------------------------------------------------------------------------------------------------------------
268 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

1.6 Sketch
12
890.750 m
13
300

2000 7
399
o

= 2.83
2450
8

1 888.300 m
2

11
2000
100 9 4 3 10
5
400 886.3 m
300 6
2200 500 1000
3700
Section of Retaining Wall

15.1 Load Calculation


15.1.1 Load Calculation of Retaining wall - per m width
Horz. Lever Moment (kN- Ver. Lever Moment (kN-
Sl No Load Calculation Area(m2) Weight (kN)
arm(m) m) arm(m) m)
Wt. of Retaining wall only
1 (2.45+2-0.4)x0.3 1.22 30.38 1.15 34.93 2.43 73.66
2 1/2x(2.45+2-0.4)x(0.5-0.3) 0.41 10.13 1.37 13.84 1.75 17.72
3 0.5x0.1 0.05 1.25 1.25 1.56 0.35 0.44
4 1/2x2.2x0.1 0.11 2.75 2.23 6.14 0.33 0.92
5 1/2x1x0.1 0.05 1.25 0.67 0.83 0.33 0.42
6 3.7x0.3 1.11 27.75 1.85 51.34 0.15 4.16
7 Crash barrier 10.00 1.26 12.58 4.70 47.00
Wt. of Soil
7 1/2x(2.45+2-0.4)x(0.5-0.3) 0.41 7.70 1.43 11.03 3.10 23.85
8 2.2x(2.45+2-0.4) 8.91 169.29 2.60 440.15 2.43 410.53
9 1/2x2.2x0.1 0.11 2.09 2.97 6.20 0.37 0.77
10 1/2x1x0.1 0.05 0.95 0.33 0.32 0.37 0.35
11 1x(2-0.4) 1.60 30.40 0.50 15.20 1.20 36.48
12 1/2x(2.2+0.5-0.3)^2xTan(0.00) 0.00 0.00 2.90 0.00 4.49 0.00
Live Load Surcharge
13 (2.2+0.5-0.3)x1.2 2.88 54.72 2.50 136.80 5.65 309.17
Vertical load due to self wt of Retaining Wall 83.50 121.23 144.31
Vertical load due to earth fill 210.43 472.90 471.98
Vertical load due to Live load surcharge 54.72 136.80 309.17

15.1.2 Superimposed dead load (SIDL)


Load Calculation of crash barrier 175 50 175
Unit weight of concrete = 25.00 kN/m3 50
2 Weight Lever Moment g mm
Sl No Load Calculation Area(m ) 200
(KN) arm(m) (KN-m)
a (0.45-0.05)x0.415 0.166 4.150 0.275 1.141
b 1/2x(0.5+0.25+0.415)x0.05 0.029 0.728 0.033 0.024 500 f
c (0.5+0.25)x0.175 0.131 3.281 0.138 0.451 c
d 0.25x0.05 0.013 0.313 0.250 0.078 d
e 1/2x0.25x0.175 0.022 0.547 0.333 0.182 250 b
f 1/2x0.5x0.05 0.013 0.313 0.242 0.076 e
g 0.100 0.138 0.014 a
Total 0.373 9.431 1.966 415
Say 10.000 kN/m 450
cg 0.208 m

-------------------------------------------------------------------------------------------------------------------------------
269 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.2 Earth Pressure


15.2.1 Active earth Pressure on vertical wall at normal case 0.00 kN/m2

Active earth pressure coefficient at Normal case Ka


= Cos2(φ-α)
Cos α*Cos(α+δ)*[1+{Sin(φ+δ)*Sin(φ-β)/(Cos(α-δ)*Cos(δ+α))}1/2]2
2

Note :- 26.89 kN/m2


α = Angle subtended by the earth side wall with the Active Earth pr. diagram
vertical on the earth side = 0.05 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Active earth pressure coefficient at Normal case = Ka = 0.318
Earth pressure = γs * height of wall * Ka
Horz. earth pr. at top of base slab = 0.318x(2.45+2.00-0.4)x19 = 24.48 kN/m2
Horz. earth pr. at bottom slab = 0.318x(2.45+2)x19 = 26.89 kN/m2
Earth pr. due to LL surcharge = 0.318x1.2x19 = 7.252 kN/m2

Horizontal Force = Area of earth Pr. diagram * Cos(δ+α)


Active Earth pressure
Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
2m below
2.0 0.00 13.26 12.2 0.84 10.27
top of wall
Top of base
4.1 0.00 24.48 45.7 1.70 77.71
slab
At
4.45 0.00 26.89 55.2 1.87 103.08
foundation

Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment 2
Location 7.252 kN/m
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
2m below
2.0 7.25 7.25 13.4 1.00 13.37
top of wall
Top of base
4.05 7.25 7.25 27.1 2.03 54.82
slab
At
4.45 7.25 7.25 29.7 2.23 66.18
7.252 kN/m
2
foundation
Earth pr. Diagram for live load
Surcharge

15.2.2 Active earth Pressure on vertical wall at seismic case 0.00 kN/m2
(As per IS: 1893-2002)
Active earth pressure coefficient at Normal case Ka
= (1+-Av )*Cos2(φ− λ -α)
Cosλ∗Cos2α*Cos(α+δ+λ)*[1+{Sin(φ+δ)*Sin(φ-β−λ)/(Cos(α-β)*Cos(δ+α+λ))}1/2]2
Note :- 12.79 kN/m2
α = Angle subtended by the earth side wall with the
vertical on the earth side = 0.05 radians
φ = Angle of internal friction of the earth fill = 0.52 radians
δ = Angle of friction of the earth side wall with the earth=2φ/3 = 0.35 radians
β = Inclination of the earth fill surface with horizontal = 0.00 radians
γs = Unit weight of Soil at normal case = 19.00 kN/m2
Surcharge = 1.2xγsoil = 22.80 kN/m2
Seismic forces on the structure are calculated as per Cl 222, IRC : 6 - 2014.  z  S a 
   
Where, Ah = Horizontal Seismic Coefficient  2  g 
Ah =
 R 
 
z = zone factor = For Zone IV = 0.24  I 
I = Importance factor = = 1.20
R = Response Reduction factor = = 2.50
Sa/g = 2.5 for 0.0 < T < 0.55 For Medium Soil
= 1.36/T for 0.55 < T < 4.0

-------------------------------------------------------------------------------------------------------------------------------
270 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

So, Sa/g = = 2.50


Horizontal coefficient - Ah 0.24/2x2.5/(2.5/1.2) = 0.14
Vertical coefficient - Av =2/3Ah = 0.10
λ = Ah/(1+Av) = 0.13
Active earth pressure coefficient at seismic case = Ka = 0.469
Active earth pressure coefficient at normal case = Ka = 0.318
Dynamic increment of static earth pressure coefficient = 0.151
Dynamic increment of Horz. earth pr. at top of base slab = 0.151*(2.45+2-0.4)*19 = 11.64 kN/m2
Dynamic increment of Horz. earth pr. at bottom slab = 0.151*(2.45+2)*19 = 12.79 kN/m2
Dynamic increment of Earth pr. due to LL surcharge = 0.151*22.8 = 3.45 kN/m2

Dynamic increment of Horizontal Earth pressure


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
2m below
2.0 0.00 5.75 5.3 1.00 5.30
top of wall
Wall above
4.05 0.00 11.64 21.7 2.03 43.99
base slab
At
4.45 0.00 12.79 26.2 2.23 58.35
foundation

Dynamic increment of Horizontal Earth pressure due to Live Load Surcharge


Height Pr. at top Pr. at Bot. Force Lever arm Moment
Location
(m) (kN/m2) (kN/m2) (kN) (m) (kN-m)
2m below
2.0 3.45 3.45 6.4 1.32 8.39
top of wall
Wall above
4.05 3.45 3.45 12.9 2.67 34.41
base slab
At
4.45 3.45 3.45 14.1 2.94 41.54
foundation

15.2.3 Summary of Loads


At bottom of slab Wall above base slab
Sl No. Type of loads
Load Force Moment Load Force Moment
1 Dead load of retaining wall 83.50 0.00 121.23 50.50 0.00 0.00
2 Earth fill 210.43 0.00 472.90 0.00 0.00 0.00
3 Active earth Pr. 0.00 55.15 103.08 0.00 45.68 77.71
4 Live load 54.72 0.00 136.80 0.00 0.00 0.00
5 Active LL surcharge 0.00 29.75 66.18 0.00 27.07 54.82
a) Seismic force of dead load 8.02 12.02 20.78 4.85 7.27 19.93
b) Seismic force of earth 0.00 0.00 0.00 0.00 0.00 0.00
7 c) Seismic force due to LL surcharge 0.00 0.00 0.00 0.00 0.00 0.00
d)Dynamic increment of Hor. earth pr. 0 26.2 58.35 0 21.7 43.99
e)Dynamic increment of LL surcharge 0 14.1 41.54 0 12.9 34.41

-------------------------------------------------------------------------------------------------------------------------------
271 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.3 Verification of equilibrium


Load Combination As per table 1 of IRC :6-2014
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
4) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge+Seismic
LL Vertical
Load Case DL Earth fill EP Live load
Surcharge
Seismic
Seismic

1 1
2 1 1 1
3 1 1 1 1 1
4 1 1 1 0.2 0.2 1 0.33
Load combination at bottom of base slab for verification of equilibrium
Load Case Restoring Forces Overturning Forces
Vertical load Lateral Moment (kN- Vertical load Lateral force Moment
(kN) force (kN) m) (kN) (kN) (kN-m)
1 83.50 0.00 121.23 0.00 0.00 0.00
2 293.93 0.00 594.13 0.00 55.15 103.08
3 348.65 0.00 730.93 0.00 84.90 169.26
4 307.51 0.00 621.49 0.00 102.18 203.76
5 302.22 0.00 621.49 0.00 102.18 203.76

15.3.1 Stability Check


15.3.1.1 Check against Sliding As per clause no. 706.3.4 IRC: 78-2014
a) Retaining wall only
Vertical Load (Ws) = 83.50 kN
Horizontal Active Earth Force (Ea) = 0.00 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety µWs/(Ea-Ep) Infinity > 1.5 Hence O.K.
b) Retaining wall+Earth Pressure only at normal case
Vertical Load (Ws) = 293.93 kN
Horizontal Active Earth Force (Ea) = 55.15 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety µWs/(Ea-Ep) = 2.66 > 1.5 Hence O.K.
c) Retaining wall+Earth Pressure + Live Load Surcharge at normal case
Vertical Load (Ws) = 348.65 kN
Horizontal Active Earth Force (Ea) = 84.90 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety =Wsxµ/(Ea-Ep) = 2.05 > 1.5 Hence O.K.

d) Earth Pressure + Live Load Surcharge at Seismic case


Vertical Load (Ws) = 302.22 kN
Horizontal Active Earth Force (Ea) = 102.18 kN
Horizontal Passive Earth Force (Ep) = 0.00 kN
Friction coefficient between soil and concrete (µ) = 0.50
Factor of Safety =Wsxµ/(Ea-Ep) = = 1.48 < 1.25 Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
272 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.3.1.2 Check against Overturning


a) RCC Retaining wall only
Restoring Moment due to Self Weight (Rw) = 121.23 kN-m
Overturning Moment due to Earh pressure = 0.00 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 121.23 kN-m
Total Overturning Moment
=Oa( O) = 0.00 kN-m
Factor of Safety =R/O Infinity > 2 Hence O.K.
b) Retaining wall+Earth Pressure only at normal case
Restoring Moment due to Self Weight (Rw) = 594.13 kN-m
Overturning Moment due to Earh pressure = 103.08 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 594.13 kN-m
Total Overturning Moment
=Oa( O) = 103.08 kN-m
Factor of Safety =R/O = 5.76 > 2 Hence O.K.
c) Retaining wall+Earth Pressure +Live Load Surcharge
Restoring Moment due to Self Weight (Rw) = 730.93 kN-m
Overturning Moment due to Earh pressure = 169.26 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 730.93 kN-m
Total Overturning Moment
=Oa( O) = 169.26 kN-m
Factor of Safety =R/O = 4.32 > 2 Hence O.K.

d) Earth Pressure + Live Load Surcharge at Seismic case


Restoring Moment due to Self Weight (Rw) = 621.49 kN-m
Restoring Moment due to Horz. Passive Earth Force (Rp) = 0.00 kN-m
Overturning Moment due to Horz. Active Earth Force (Oa) = 203.76 kN-m
Total Restoring Moment
=Rw+Rp
( R) = 621.49 kN-m
Total Overturning Moment
=Oa( O) = 203.76 kN-m
Factor of Safety =R/O = 3.05 > 1.5 Hence O.K.

15.3.1.3 Check Bearing Pressure


a) Only RCC Retaining wall
Total Vertical Load(W) = 83.50 kN
Total Restoring Moment ( R) = 121.23 kN-m
Total Overturning Moment ( O) = 0.00 kN-m
Base Width (B) = 3.70 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 1.452 m
C.G. of Vertical Load about Centre of Base (e) = 0.40 m < B/6 Hence O.K.
Base Pressure at toe = 37.14 kN/m2 < 300.00 kN/m2
Base Pressure at heel = 8.00 kN/m2 > 0.00 kN/m2
Hence O.K.
b)Retaining wall+ Earth Pressure only
Total Vertical Load(W) = 293.93 kN
Total Restoring Moment ( R) = 594.13 kN-m
Total Overturning Moment ( O) = 103.08 kN-m
Base Width (B) = 3.70 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 1.67 m
C.G. of Vertical Load about Centre of Base (e) = 0.18 m < B/6 Hence O.K.
Base Pressure at toe =W/B+6xWxe/(B^2) = 102.54 kN/m2 < 300.00 kN/m2
Base Pressure at heel=W/B-6xWxe/(B^2) = 56.34 kN/m2 > 0.00 kN/m2
Hence O.K.
c) Retaining wall+Earth Pressure +Live Load Surcharge
Total Vertical Load(W) = 348.65 kN
Total Restoring Moment ( R) = 730.93 kN-m
Total Overturning Moment ( O) = 169.26 kN-m
Base Width (B) = 3.70 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W = 1.61 m
C.G. of Vertical Load about Centre of Base (e) = 0.24 m < B/6 Hence O.K.
Base Pressure at toe =W/B-6xWxe/(B^2) = 130.75 kN/m2 < 300.00 kN/m2
Base Pressure at heel=W/B+6xWxe/(B^2) = 57.71 kN/m2 > 0.00 kN/m2
Hence O.K.

d) Earth Pressure + Live Load Surcharge at Seismic case


Total Vertical Load(W) = 307.51 kN
Total Restoring Moment ( R) = 621.49 kN-m
Total Overturning Moment ( O) = 203.76 kN-m
Base Width (B) = 3.700 m
Centre of Gravity of Vertical Load about Toe (B/2-e)
=(R-O)/W =1.358 m
C.G. of Vertical Load about Centre of Base (e) = 0.492 m < B/6 Hence O.K.
Base Pressure at toe =W/B-6xWxe/(B^2) = 149.366 kN/m2 < 375.00 kN/m2
Base Pressure at heel=W/B+6xWxe/(B^2) = 16.858 kN/m2 > 0.00 kN/m2
Hence O.K.

-------------------------------------------------------------------------------------------------------------------------------
273 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.4 Calculation of moment & shear of base slab


15.4.1 Retaining wall only

Heel side Toe side


400
300
2200 1000
3700

Wt.of base slab 7.5 kN/m2 10 10 kN/m2 7.5 kN/m2


Wt.of earth fill 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure -8.0 kN/m2 -25.3 -29.3 kN/m2 -37.1 kN/m2
Total pr. -0.5 kN/m2 -15.3 -19.3 kN/m2 -29.6 kN/m2
Moment -13.2 -13.1 kN-m/m
Shear at dist d for toe and face of wall for heel -17.4 -15.9 kN/m

15.4.2 Earth fill


W= 210.43 kN M= 472.90 kN M/W = 2.247 m
e= -0.40 m B= 3.7 m
Wt.of earth fill 78.85 kN/m2 76.95 30.4 kN/m2 32.3 kN/m2
Base pressure -93.5 kN/m2 -49.9 -40.0 kN/m2 -20.2 kN/m2
Total pr. -14.7 kN/m2 27.0 -9.6 kN/m2 12.1 kN/m2
Moment -1.9 2.4 kN-m/m
Shear at dist d for toe and face of wall for heel 13.6 3.3 kN/m

15.4.3 Earth Pressure at Normal case


W= 0.00 kN M= 103.08 kN B= 3.7 m
Wt.of earth fill 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 45.2 kN/m2 -8.5 -20.8 kN/m2 -45.2 kN/m2
Total pr. 45.2 kN/m2 -8.5 -20.8 kN/m2 -45.2 kN/m2
Moment 66.0 -18.5 kN-m/m
Shear at dist d 40.3 -22.7 kN/m

15.4.4 Live load


W= 54.72 kN M= 136.80 kN M/W = 2.500 m
e= -0.65 m B= 3.7 m
Wt.of earth fill = 22.80 kN/m2 22.8 0 kN/m2 0 kN/m2
Base pressure -30.4 kN/m2 -11.8 -7.6 kN/m2 0.8 kN/m2
Total pr. -7.6 kN/m2 11.0 -7.6 kN/m2 0.8 kN/m2
Moment -3.4 -1.0 kN-m/m
Shear at dist d 3.7 -1.0 kN/m

15.4.5 Live load surcharge at Normal case


W= 0.00 kN M= 66.18 kN B= 3.7 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 29.0 kN/m2 -5.5 -13.3 kN/m2 -29.0 kN/m2
Total pr. 29.0 kN/m2 -5.5 -13.3 kN/m2 -29.0 kN/m2
Moment 42.3 -11.9
Shear at dist d 25.9 -14.6

15.4.6 Seismic of retaining wall


W= 8.02 kN M= 20.78 kN B= 3.7 m
Vertical seismic -2.16649 kN/m2 -2.166486 -2.166486 kN/m2 -2.166486 kN/m2
Base pressure 9.1 kN/m2 -1.7 -4.2 kN/m2 -9.1 kN/m2
Total pr. 6.9 kN/m2 -3.9 -6.4 kN/m2 -11.3 kN/m2
Moment 8.1 -3.0 kN-m/m
Shear at dist d 3.4 -3.6 kN/m

15.4.7 Dynamic increment of Earth Pressure at seismic case


W= 0.00 kN M= 58.35 kN B= 3.7 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 25.6 kN/m2 -4.8 -11.7 kN/m2 -25.6 kN/m2
Total pr. 25.6 kN/m2 -4.8 -11.7 kN/m2 -25.6 kN/m2
Moment 37.3 -10.5
Shear at dist d 22.8 -18.7

-------------------------------------------------------------------------------------------------------------------------------
274 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.4.8 Dynamic increment of Ll surcharge at seismic case


W= 0.00 kN M= 41.54 kN B= 3.7 m
Wt. of LL surcharge 0 kN/m2 0 0 kN/m2 0 kN/m2
Base pressure 18.2 kN/m2 -3.4 -8.4 kN/m2 -18.2 kN/m2
Total pr. 18.2 kN/m2 -3.4 -8.4 kN/m2 -18.2 kN/m2
Moment 26.5 -7.5
Shear at dist d 16.2 -13.3
Summary of Moment
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 77.71 0.0 54.82 63.91 34.41
2m below top of wall 0 0 10.27 0.0 13.37 11.94 8.39
At heel slab -13.2 -1.9 66.0 -3.4 42.3 45.32 26.52
At toe slab -13.1 2.4 -18.5 -1.0 -11.9 -13.46 -13.29
Summary of Shear
DL Earth fill EP Live load LL Seismic Dynamic inc. of
Surcharge LL surcharge
Wall above base slab 0 0 45.68 0.0 27.07 24.0 12.9
2m below top of wall 0 0 12.23 0.0 13.37 11.3 6.4
At heel slab -17.4 13.6 40.3 3.7 25.9 26.2 16.2
At toe slab -15.9 3.3 -22.7 -1.0 -14.6 -22.3 -13.3

15.5 Design of vertical wall


15.5.1 Load combination
15.5.1.1 Ultimate limit State As per table 3.2 of IRC 6:2014
Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
4) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge+Seismic
Dynamic
LL
Load Case DL Earth fill EP Live load
Surcharge
Seismic inc. of LL
surcharge
1 1.35
2 1.35 1.5 1.5
3 (a) 1.35 1.5 1.5 1.5 1.2
3 (b) 1 1.5 1 1.5 1.2
3 (c) 1 1.5 1 1.15 1.2
4 (a) 1.35 1 1 0.2 0.2 1.50 0.20
4 (b) 1 1 1 0.2 0.2 1.50 0.20

Basic Combination (UL1)


Wall above base slab 2m below top of wall At heel slab At toe slab
Type of
loads Moment Shear Moment Moment Moment
(kN-m) (kN) (kN-m) Shear (kN) (kN-m) Shear (kN) (kN-m) Shear (kN)
1 0.00 0.00 0.00 0.00 -17.77 -23.49 -17.67 -21.49
2 116.56 68.53 15.40 18.34 78.41 57.31 -41.82 -50.55
3 (a) 182.35 101.01 31.45 34.38 124.04 93.94 -57.60 -69.60
3 (b) 143.49 78.17 26.31 28.27 95.65 79.88 -43.76 -52.67
3 (c) 143.49 78.17 26.31 28.27 96.84 78.58 -43.40 -52.31
4 (a) 191.42 89.74 32.53 33.13 127.40 78.79 -59.19 -80.06
4 (b) 191.42 89.74 32.53 33.13 132.01 84.88 -54.61 -74.49
Maximum 191.42 101.01 32.53 34.38 132.01 93.94 -59.19 -80.06

15.5.1.2 Serviceability limit state


Rare Combination (SL1) Load Combination
1) Dead load only
2) Dead load + Earth fill + Active Earth pressure
3) Dead load + Earth Fill + Live load+Active Earth pressure+LL Surcharge
Load Case DL Earth fill EP Live load LL Surcharge
1 1
2 1 1 1
3 1 1 1 1 0.8
15.5.1.3 Quasi-permanent (SL3) Load Combination
1) Dead load
2) Dead load+Earth pressure
Load Case DL Earth fill EP
1 1
2 1 1 1

Moment Rare Combination (SL1) Quasi-permanent (SL3)

At top of
Type of loads 2m below At heel At toe slab At top of At heel At toe slab
base slab top of wall slab base slab slab
1 0.00 0.00 -13.16 -13.09 0.00 -13.16 -13.09
2 77.71 10.27 50.96 -29.19 77.71 50.96 -29.19
3 121.56 20.96 81.38 -39.71
Maximum 121.56 20.96 81.38 -39.71 77.71 50.96 -29.19

-------------------------------------------------------------------------------------------------------------------------------
275 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.6 Design of sections


15.6.1. Ultimate limit State Method
15.6.1.1. Flexure member Design of wall at base
Grade Concrete = M35 Grade of steel = Fe 500
Width of the section = 1000 mm Depth of the section = 500 mm
Clear Cover = = 75 mm Main dia of bar used = 16 mm
Dia of shear reinf. = 0 mm Effective depth, d = 409 mm
R = Mu/bd2 = 1.144 MPa Design Moment = 191 kN-m
Mu,Lim/bd2 = 0.133xfck = 4.655 MPa Ast = 1119.8 mm2
Where, pt = fck/(2*fy)*(1-sqrt(1-(4.598*R/fck))*100
Min. reinforcement 0.26xfctm/fykxbtxd but not less than 0.0013btd = 531.7 mm2
Hence provide 16 dia @ 150 c/c Ast = 2094.4 mm2
12 dia @ 150 c/c
0 dia @ 150 c/c > Hence O.K.
E of reinforcement = 200000 MPa Max strain in concrete = 0.0035
E of concrete = 32308 MPa Min strain in steel = 0.0042
Balanced neutral axis depth = 186.51 mm Actual neutral axis depth = 72.27 mm
Strain in steel = 0.016308 Stress in steel = 434.8 MPa

Stress-strain diagram at Ultimate Limit State condition


0.00350 15.63
911 kN
72.27
NA NA

0.01631 911 kN
Strain Diagram Stress Diagram
Section is under reinforced, Hence ok
Total ultimate compressive force = 911 kN Total ultimate tensile force = 911 kN
Compressive force CG 30.06 mm Moment of resistance = 345 kNm
< 191 kNm Hence O.K.
Basic Combination (UL1) -moment
Description Wall above base slab 2m below top of wall
At heel slab At toe slab
Moment 191.42 32.53 132.01 59.19
D 500.00 398.77 400.00 400.00
b 1000.00 1000.00 1000.00 1000.00
Clear cover 75.00 75.00 75.00 75.00
d 419.00 323.8 315.0 317.0
R = Mu/bd2 1.09 0.31 1.33 0.59
pt 0.00260 0.00072 0.00321 0.00138
Ast required 1090.9 233.4 1009.7 437.9
16 dia + 0 dia + 20 dia + 16 dia +
Reinf provided 12 dia + 12 dia +
150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 2094.4 754.0 2094.4 1340.4
Actual NA 72 26 72 46
Strain in steel 0.0168 0.0401 0.0118 0.0205
Stress in steel 434.8 434.8 434.8 434.8
Total ultimate tensile force = 911 328 911 583
Total ultimate compressive force911 328 911 583
Difference of force 0 0 0 0
Compressive force CG 30.1 10.8 30.1 19.2
Moment of resistance 354 103 259 174
Factor of Safety 1.850 3.154 1.965 2.932
Check Safe Safe Safe Safe

-------------------------------------------------------------------------------------------------------------------------------
276 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.6.1.2. Shear
i) Shear Capacity of Cracked Section as per clause 10.3.2(2) of IRC 112-2010
VRD.C = [0.12*K(80*ρ1*fck)^0.33+0.15σcp]*bw*d Subject to VRD.C MIN = {vmin + 0.15σCP)*bw*d
Where, K = 1+sqrt(200/d) <= 2 Where, d is in millimeters
ρ1 = Asl/(bw*d) <= 0.02 fck = 35 Mpa
σcp = NEd/Ac <= 0.2xfcd Where, NEd = axial compression, Ac = Area of section
vmin = 0.031*K^1.5*fck^0.5 fcd = αcc*fck/γm where, αcc =0.67 and γm = 1.5
Description Wall above base slab 2m below top of wall
At heel slab At toe slab
Prestress Force after all losses (kN)
0.0 0.0 0.0 0.0
Effective width in mm 1000 1000 1000 1000
Effective Depth (d) in mm 419 324 315 317
K 1.691 1.786 1.797 1.794
Stress due to Prestress ( 0 0 0 0
Shear Resistance minimum (V169.0 141.7 139.1 139.7
Ast provided 2094.4 754.0 2094.4 1340.4
Reinforcement ratio, ρ1 0.005 0.002 0.007 0.004
Shear resistance ( VRd,c) (kN) 203.1 128.8 178.3 154.3
Design Shear resistance ( V 203.1 141.7 178.3 154.3
101.01
Max.shear at 1d dist.from face (kN) 34.38 93.94 80.06
M tanδ/d 22.56 4.96 19.05 18.79
Effective shear 78.45 29.42 74.89 61.27
Factor of Safety 2.59 4.82 2.38 2.52
Check Safe Safe Safe Safe

15.6.2. Servicebility limit State Method


15.6.2.1. Flexure member Design of wall
Grade Concrete = M35 Grade of steel = Fe 500
Bending Compression of concrete = 16.80 Mpa fctm = Mean tensile strength of concrete = 2.77 Mpa
E of reinforcement = 200000 MPa E of concrete = 32308 MPa
Creep Coefficient, φ = 1 Ec, eff = Ecm /(1+φ) = 16154 MPa
Modular ratio =Es/Ec,eff = 12.38 Tensile stress of steel = 400 Mpa
Width of Section = 1000 mm Depth of Section = 500 mm
Clear Cover = = 50 mm Effective depth, d = 409 mm
Minimum reinforcement0.26xfctm/fykxbtxd but not less than 0.0013btd = 589.39 mm2
Hence provide 16 dia @ 150 c/c Ast = 2094.4 mm2
12 dia @ 150 c/c
0 dia @ 150 c/c Design of moment = 121.56 kNm

Balanced neutral axis depth = = 139.92 mm Actual neutral axis depth = 122.00 mm
Strain in steel = 0.00079 Stress in steel = 157.6 MPa
Strain in concrete = 0.00033 Comp. stress of concrete = 5.41 Mpa
Stress-strain diagram at Serviceability Limit State condition
0.00033 5.41
330.04
122.00
NA NA

157.58
0.00079
Strain Diagram Stress Diagram
=
Total compressive force = 330.04 kN Total tensile force = 330.04 kN
Compressive force CG = 40.67 mm Moment of resistance = 121.56 kNm

-------------------------------------------------------------------------------------------------------------------------------
277 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

Rare Combination (SL1) Quasi-permanent (SL3)


Wall Wall
Description above 2m below At heel above 2m below At heel
base slab top of wall slab At toe slab base slab top of wall slab At toe slab
h or D 500 399 400 400 500 399 400 400
b 1000 1000 1000 1000 1000 1000 1000 1000
d 419 324 315 317 419 324 315 317
Moment 121.56 20.96 81.38 39.71 77.71 20.96 50.96 29.19
Reinf provided 16 dia + 0 dia + 20 dia + 16 dia + 16 dia + 0 dia + 20 dia + 16 dia +
12 dia + 12 dia + 0 dia 0 dia 12 dia + 12 dia + 0 dia 0 dia

150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c 150 c/c
Ast provided 2094.4 754.0 2094.4 1340.4 2094.4 754.0 2094.4 1340.4
Stress in concrete 5.2 2.0 5.6 3.2 3.3 2.0 3.5 2.3
Actual NA 124 69 104 87 124 69 104 87
Stress in steel 153.7 92.4 138.7 102.9 98.2 92.4 86.8 75.6
Total ultimate tensile force = 322 70 290 138 206 70 182 101
Total ultimate compressive force322 70 290 138 206 70 182 101
Difference of force 0 0 0 0 0 0 0 0
Compressive force CG 41.2 23.0 34.8 29.1 41.2 23.0 34.8 29.1
Moment of resistance 122 21 81 40 78 21 51 29
Diff. of moment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Maximum compressive stress of concrete= 5.6 Mpa < 16.8 Mpa Hence O.K.
Maximum tensile stress of steel= 153.7 Mpa < 400.0 Mpa Hence O.K.

15.6.2.2. Check for crack width Check crack width As per IRC : 112-2011
Crack width, Wk = Sr,max * (εsm-εcm)
Where, εsm-εcm = (σsc-kt*fct,eff/ρp,eff*(1+αe*ρp,eff))/Es >= 0.6σsc/Es
σsc = 98.22 Mpa αe =Es/Ecm = 12.381
kt = 0.5 hc,eff=min of [2.5(h-d),(h-x/3),h/2]= 227.5 mm
Ac,eff =b*hc,eff ρp,eff = As/Ac,eff = 0.009
fct,eff = = 1.94 Mpa εsm-εcm = 0.000295
>= 0.6σsc/Es= 0.000295
Sr,max =3.4c+0.425*k1*k2*φ/ρp,eff Where, c = 50 mm
= 75
k1 = 0.8
φeq=(n1*φ1^2+n2*φ2^2)/((n1*φ1+n2*φ2) = 16.0 mm k2 = 0.5
Sr,max = 465.5 mm Crack width, Wk = = 0.137 mm
< 0.3 mm OK
Total for Quasi-permanent (SL3)
Wall
Description above 2m below At heel
base slab top of wall slab At toe slab
Stress in steel, σs 98.2 92.4 86.8 75.6
As 2094.4 754.0 2094.4 1340.4
Actual NA 124 69 104 87
hc,eff 202.5 187.5 227.5 227.5
ρp,eff 0.010 0.004 0.009 0.006
εsm-εcm 0.00029 0.00028 0.00026 0.00023
φeq 14.3 12.0 20.0 16.0
effective cover, c 75.0 0.0 75.0 75.0
Crack spacing Sr,max 489.8 507.3 624.3 716.6
Crack width, Wk 0.144 0.141 0.163 0.163
Check <0.3 O.K. <0.3 O.K. <0.3 O.K. <0.3 O.K.

-------------------------------------------------------------------------------------------------------------------------------
278 of 279
Ramban Banihal Project HCC MNB-03 - 30m Integral bridge
---------------------------------------------------------------------------------- -------------------------------------------------------------------------------------

15.6.3 Deflection at cantilever edge due to earth pressure & LL surcharge

29.24 6.68
kN/m2 kN/m2
A 4.1 m B

8 7 6 5 4 3 2 1
132.53 0.00
kN-m/m kN-m/m
4.05 m

E= = 32308 Mpa
Cumulati Moment
Moment
Section Distance ve Depth I M/EI of M/EI
(kN-m)
distance about B
1 0.000 0.000 0.300 0.00225 0.00 0
2 0.579 0.579 0.329 0.00296 1.35 0.00001 0.00000
3 0.579 1.157 0.357 0.00380 6.29 0.00005 0.00002
4 0.579 1.736 0.386 0.00478 16.19 0.00010 0.00007
5 0.579 2.314 0.414 0.00593 32.40 0.00017 0.00016
6 0.579 2.893 0.443 0.00724 56.29 0.00024 0.00031
7 0.579 3.471 0.471 0.00873 89.21 0.00032 0.00051
8 0.579 4.050 0.500 0.01042 132.53 0.00039 0.00077
Total 0.00184 m
So, Total deflection = = 1.837 mm = L/ 2204

15.7. Tranverse reinforcement


Minimum main reinf. 0.26xfctm/fykxbtxd but not less than 0.0013btd = 469.06 mm2
As per clause 16.6.1.1 (3) of IRC-112:2011, minimum tranverse reinforcement is 20% of main reinforcement.
Main reinforcement Tranv. Ast provd.
Location Reinf. Provided Check
Maximum Minimum Reinf. (mm2)
Outer face of vertical wall 469.06 12 dia @ 150 c/c 754.0 O.K.
Earth face of vertical wall 2094.4 754.0 201.062 10 dia @ 150 c/c 523.6 O.K.
Base slab 2094.4 2094.4 314.159 10 dia @ 150 c/c 523.6 O.K.

16 dia
@ 150 c/c
12 dia @ 150 c/c
12 dia
@ 150 c/c

10 dia 10 dia @ 150 c/c


2700 @ 150 c/c

20 dia @ 150 c/c

10 dia @ 150 c/c


16 dia @ 150 c/c
896 Toe side

Reinforcement Details of Retaining wall

-------------------------------------------------------------------------------------------------------------------------------