EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
General requirement (NOTE: Use SATR-A-2008 to document
A
findings )
Visual verification of end limits covered by this inspection conformed with SAES-L-350,
A2
the QR (Quality Request for inspection) Para. 15.3
Pipe spools are visually inspected for internal cleanliness (no presence of
loose particles/flakes or debris) prior to welding/bolting to the preceeding
and/or succeeding spools.
NOTES: SAES-L-350,
B1
a. Visual inspection includes the use of video inspection Para. 15.3.2
techniques, visual, scraping & positioning in vertical position.
b. Fine dust are acceptable, unless specified for critical
equipment.)
Equipment sensitive to damage during water flushing are identified and SAES-L-350,
C1
isolated. (Ex: Flow meter, sight glass, soft-seated valves ) Appendix A
Equipment and in-line instruments that may interfere with the flow of
water and debris are removed. (Ex: check valve, control valve, sight SAES-A-004,
C2
glasses, venturies, positive displacement and turbine meters and other in- Para. 7.1.4
line equipment., etc. )
SAES-L-350,
C3 Full bore valves (ball & gate valves) are in full open position.
Appendix A
Page 1 of 4
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Piping / Equipment Internal Cleaning Inspection SAIC-L-2017 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Flushing medium used are any of the following:
a. Plant/process water
SAES-L-350,
C4 b. Raw water (Fire water is acceptable where process water is
Appendix A
not applicable.)
(NOTE: Sea water is not acceptable. )
For stainless steel lines, the flushing medium shall have chloride ion
SAES-L-350,
C5 content less than 50 mg/L. (NOTE: After flushing, the piping systems
Appendix A
shall be completely drained, dried to a dew point below -1°C )
SAES-L-350,
C6 For lines below 4" dia., minimum velocity of water fushing is 3 m/s.
Appendix A
For lines 4" dia. and above, high pressure jet (rotating hose or nozzle) at SAES-L-350,
C7
a minimum pressure of 60.8 mPa (8.8 psi) is used. Appendix A
Medium used for pneumatic flushing is dry air (dew point -1°C or less) or SAES-L-350,
D1
steam with a minimum exit velocity of 15 m/s. Appendix A
Flushing is repeated until cleanliness is verified by observing the SAES-L-350,
D2
absence of any solids impact on a polished metal target at the exit. Appendix A
The air shocking pressure shall never exceed the working pressure of SAES-L-350,
E2
the system and shall never be more than 810 kPa (115 psi). Appendix A
Mechanical scrapers are used on piping system that will not cause SAES-L-350,
F1
damage to the pipe interior surface (ie: piping with internal coating). Appendix A
Degree of cleanliness conforms with the approved internal cleaning SAESL-450,
F2
procedure. Para. 18.2
F3 Internal scrapers have full bore contact with the pipe diameter. Best Practice
Note: Additional checkpoint items or Acceptance Criteria shall be
* added to this checklist upon approval of the Piping Internal Cleaning
Procedure by scraping.
REMARKS:
ATTACHMENT:
1. SATR-A-2008, Piping / Equipment Internal Cleaning Inspection
REFERENCE DOCUMENTS:
1. SAES-A-004, General Requirements for Pressure Testing, (30 June, 2003)
2. SAES-L-350, Construction of Plant Piping, (30 September, 2003)
3. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, (30 September, 2003)
Page 2 of 4
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Piping / Equipment Internal Cleaning Inspection SAIC-L-2017 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
Page 3 of 4
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Piping / Equipment Internal Cleaning Inspection SATR-A-2008 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PIPE CLEANING DIAGRAM (If applicable) LOCATION WORK PERMIT REQD?
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME
SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.
System Description:
Service Fluid: MAOP: System Material Type:
Scraper Type
OBSERVATIONS:
1. Indicate Amount
and/or type of debris
2. Scraper
RESULT (ACC/REJ)
Page 4 of 4