Beruflich Dokumente
Kultur Dokumente
: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 1 of 12
GENERAL INFORMATION
Inspection Type Final inspection
Buyer Name UTN-FRRq (Municip. Reconquista)
ZHEJIANG TUGONG
Vendor Name
INSTRUMENT CO., LTD.
P.O. Number YF20190112-031
Item Number STYE-2000
Display Hydraulic Compression
Product Name
Test machine
Service Performed FRI
Inspection Date 2019/02/27
Shangyu, ZHEJIANG PROVINCE,
Inspection Location
CHINA
Ref. sample(s) Available No
INSPECTION RESULTS
OVERALL CONCLUSION Pending
INSPECTION SUMMARY CONCLUSIONS REMARKS
Defects CRI MAJ MIN
Sample Size 1 1 1
A. Visual And Workmanship Not Applicable AQL 0 2.5 4.0
Max / / /
Found / / 1
B. Quantity Conformity Conform Remark:
C. Product Conformity Conform Remark: see remark 1
D. Packing / Marking / Labeling Pending Remark: see remark 2
E. Data Measurement / Field Test Conform Remark:
F. Special Attention Not Applicable Remark:
REMARKS
1 The paint on the handwheel peeling off and vendor have repaired the defect before packing.
2 Shipping marking for packing has not been got ready by vendor.
3
4
5
6
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 2 of 12
B. Quantity Conformity
Quantity Conformity Conform
Item Number P.O. No Inspection Presented Qty for inspection Number of Cartons
Qty Packed Not packed Packed Not packed
STYE-2000 YF20190112- 1 1 0 1 0
031
Total 1 1 0 1 0
Remark:
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 3 of 12
C. Product Conformity
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 4 of 12
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 5 of 12
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 6 of 12
Nameplate /
Remark: The machine was covered with plastic film and fixed on the wooden case, the Iron pillar was
protect by Rust preventive oil .
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 7 of 12
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 8 of 12
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 9 of 12
Dimension / / / /
Check / / / /
Product / 761Kg / /
Weight / / / /
Check / / / /
Length: Length:
Width: Width
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 10 of 12
Height Height
F. Special Attention
F1 NA NA
N/A
G. Information
G1 Size of carton 113*63*136cm
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 11 of 12
G3 Total cartons were selected randomly for inspection Total cartons were selected randomly
G4 Whether there is Carton number ( If yes, please write it down ) Carton No: NA
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 12 of 12
ANNEX
VALIDATION TEAM
Inspected by TC943008
Inspection date 2019/02/27
Reviewed by Stanley Ye
Review date 2019/02/28
Approved by
Approved date
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.
Report No.: 2019022517012900
INSPECTION REPORT
Report Date: 2019/2/28
Page 13 of 12
Storage
END OF THIS REPORT
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right
for compensation for any apparent and/or hidden defects not detected during our random inspection or occurring thereafter. This report does not evidence shipment, Final
approval is required by client before releasing shipment.