Sie sind auf Seite 1von 1

DATE REV.

DESCRIPTION

07-04-19 - DESIGN AND BUILD TENDER DOCUMENTS ISSUANCE

01a REVISE SCHEDULE


FAN COIL UNIT (FCU) SCHEDULE: DX-SPLIT AIR CONDITIONING SCHEDULE:
13-05-19 01 DESIGN AND BUILD TENDER ADDENDUM DOCUMENTS

02a ADDITION OF NOTES

31-05-19 02 DESIGN AND BUILD TENDER ADDENDUM DOCUMENTS

CHILLED WATER PUMP (CHWP) SCHEDULE:

PLATE HEAT EXCHANGER (PHEX) SCHEDULE:

PRE-COOLED AIR HANDLING UNIT (PAHU) SCHEDULE:

HEAT RECOVERY UNIT (HRU) SCHEDULE:

GENERAL NOTES :
- LEVELS/ ELEVATIONS ARE IN QATAR NATION HEIGHT DATUM (QNHD) AND IN METERS

CLIENT:

LUSAIL REAL ESTATE DEVELOPMENT COMPANY


P.O. BOX 26060 DOHA, STATE OF QATAR
TEL: +974 4497 4444 FAX: +974 4497 7563
PROJECT MANAGER:

ELLISDON
OFFICE NO. 203, FLOOR 2, ARAFAT BUSINESS CENTER, P.O. BOX: 55734, DOHA, QATAR
TEL: +974 4423 1278 FAX: +971 4515 3401
ARCHITECTURAL:

DP ARCHITECTS PTE LTD


6 RAFFLES BOULEVARD, #04-100 MARINA SQUARE,
SINGAPORE 039594
TEL: +65 6338 3988 FAX: +65 6337 9989
ARCHITECT OF RECORD:

BLDG.NO.100, LBN SEENA STREET 950, ZONE 24, AL MUNTAZAH


P.O. BOX 1148 DOHA, STATE OF QATAR
TEL: +974 4423 1278 FAX: +971 4515 3401
CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL ENGINEER:

DP ENGINEERS PTE LTD


INTERIOR DESIGN:

DP DESIGN PTE LTD


KEY PLAN

·
·
·
·
· N
·

PROJECT TITLE
·
· DESIGN AND BUILD OF MIXED USE
BUILDINGS - COMMERCIAL BOULEVARD
· (BP18A)

· DRAWING TITLE

· HVAC SYSTEM

PLOT BC.C1.16-17
EQUIPMENT SCHEDULE 1
DESIGN AND BUILD TENDER
ADDENDUM DOCUMENTS SCALE DATE DESIGNED DRAWN

31 MAY 2019 DP Architects Pte Ltd N.T.S 07/04/2019 DPE JL/RBP


STAGE CONTRACT CHECKED APPROVED
FINAL SCHEMATIC DESIGN T MC EK GYP
N JOB NO. DRAWING NO. REV.
DP Architects Pte Ltd QA16A.0001 LUS-BP18A-DPA-DWG-C1.16_17-GN-ME-0002 02
THIS DRAWING IS THE PROPERTY OF DP ARCHITECTS PTE LTD
NO PART OF THE DRAWING MAY BE REPRODUCED IN ANY MANNER
WHATSOEVER WITHOUT PERMISSION FROM DP ARCHITECTS PTE LTD

Das könnte Ihnen auch gefallen