NO PEKERJAAN CIVIL Bobot kontrak progress

I STRUKTUR BAJA
1 WAREHOUSE 32 x 66 M (GUDANG BUNGKIL)
PORTAL FRAME 23.42% 50.00%
SOKONG KOLOM 1.64% 50.00%
STRUKTUR ATAP 10.01% 50.00%
STRUKTUR DINDING 3.77% 50.00%
PINTU GERBANG 1.13% 39.71%
2 PROCESSING UK. 23 x 66 M (BANGUNAN PROSES)
PORTAL FRAME 19.84% 100.00%
SOKONG KOLOM 1.64% 100.00%
STRUKTUR ATAP 7.48% 100.00%
STRUKTUR DINDING 4.36% 95.98%
PINTU GERBANG 0.47% 62.00%
3 POWER HOUSE AND BOILER HOUSE UK. 23 x 48 M & SHELL RECEIVE BUILDING 23 x
PORTAL FRAME 14.68% 100.00%
SOKONG KOLOM 0.96% 100.00%
STRUKTUR ATAP 5.64% 100.00%
STUKTUR DINDING 4.95% 96.45%

TOTAL PEKERJAAN SIPIL 100%


ROUNDED

TARGET
KUMULATIF
AKTUAL
KUMULATIF
VARIAN
progress
15-Jul 22-Jul 29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep
3 4 5 6 7 8 9 10

100%
49.71%
11.71% 90%
0.82%
5.00% 80%
1.88%
70%
0.45%
98.95% 60%
19.84% 4.96% 4.96% 4.96% 4.96%
50%
1.64% 0.82% 0.82%
7.48% 40% 2.49%
4.19%
0.29% 30%
99.33%
20%
14.68% 3.67% 3.67% 3.67% 3.67%
0.96% 10% 0.48% 0.48%
5.64% 5.64%
4.77%
0% 2.47% 2.47%
15-Jul 22-Jul 29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep 9-Se
79.37%

15-Jul 22-Jul 29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep


3 4 5 6 7 8 9 10
0.00% 3.67% 3.67% 4.15% 17.23% 7.43% 5.78% 8.28%
0.00% 3.67% 7.34% 11.49% 28.72% 36.15% 41.93% 50.21%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% -3.67% -7.34% -11.49% -28.72% -36.15% -41.93% -50.21%

NOTES
- Progress kumulatif tidak sesuai target karena:
- Bangunan boiler dan power house mulai ereksi tanggal 05 Desember 2018
- Lokasi bangunan bungkis masih proses penimbunan
9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov
11 12 13 14 15 16 17 18 19 20

S 4.68%
CURVE4.68%
STRUKTUR
4.68% BAJA
4.68% 4.68%
0.82% 0.82%
2.50% 2.50% 2.50%

2.49% 2.49%
1.45% 1.45% 1.45%
0.47%

26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-No

9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov
11 12 13 14 15 16 17 18 19 20
2.49% 3.95% 1.45% 1.92% 4.68% 4.68% 4.68% 8.01% 8.01% 2.50%
52.70% 56.65% 58.10% 60.03% 64.71% 69.40% 74.08% 82.09% 90.09% 92.60%

0.00% 5.00% 3.00% 7.00% 4.00% 9.00% 5.27% 36.72% 16.59% 42.91%
0.00% 5.00% 8.00% 10.00% 11.00% 13.00% 14.27% 41.99% 53.31% 59.50%

-52.70% -51.65% -50.10% -50.03% -53.71% -56.40% -59.81% -40.09% -36.78% -33.10%

8
18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan
21 22 23 24 25 26 27 28 29 30

2.50%
0.94% 0.94% 0.94% 0.94%
1.13%

-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan

18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan
21 22 23 24 25 26 27 28 29 30
3.44% 0.94% 0.94% 2.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
96.04% 96.98% 97.92% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

18.58% 43.76% 23.10% 47.82% 30.50% 48.38% 30.99% 48.38% 30.99% 48.38%
61.48% 62.33% 66.85% 70.92% 78.33% 78.88% 79.37% 79.37% 79.37% 79.37%
-34.56% -34.65% -31.07% -29.08% -21.67% -21.12% -20.63% -20.63% -20.63% -20.63%
27-Jan 3-Feb 10-Feb 17-Feb 24-Feb
31 32 33 34 35

TARGET

AKTUAL

20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb

27-Jan 3-Feb 10-Feb 17-Feb 24-Feb


31 32 33 34 35
0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00%

30.99% 48.38% 30.99% 48.38%


79.37% 79.37% 79.37% 79.37%
-20.63% -20.63% -20.63% -20.63%
NO PEKERJAAN CIVIL

I STRUKTUR BAJA
1 WAREHOUSE 32 x 66 M (GUDANG BUNGKIL)

PORTAL FRAME

SOKONG KOLOM
STRUKTUR ATAP
STRUKTUR DINDING
PINTU GERBANG
2 PROCESSING UK. 23 x 66 M (BANGUNAN PROSES)
PORTAL FRAME
SOKONG KOLOM
STRUKTUR ATAP
STRUKTUR DINDING
PINTU GERBANG

POWER HOUSE AND BOILER HOUSE UK. 23 x 48 M & SHELL


3
RECEIVE BUILDING 23 x 12 M

PORTAL FRAME
SOKONG KOLOM
STRUKTUR ATAP
STUKTUR DINDING

TOTAL PEKERJAAN SIPIL


ROUNDED
PROGRESS

S/D INI S/D LALU SAAT INI

50.00% 50.00% 0.00%

50.00% 50.00% 0.00%


50.00% 50.00% 0.00%
50.00% 50.00% 0.00%
39.71% 39.71% 0.00%

100.00% 100.00% 0.00%


100.00% 100.00% 0.00%
100.00% 100.00% 0.00%
95.98% 95.98% 0.00%
62.00% 62.00% 0.00%

100.00% 100.00% 0.00%


100.00% 100.00% 0.00%
100.00% 100.00% 0.00%
96.45% 96.45% 0.00%
STATUS

Fabrikasi selesai

Fabrikasi selesai
Fabrikasi selesai
Fabrikasi selesai
Fabrikasi selesai

Fabrikasi selesai
Fabrikasi selesai
Fabrikasi selesai
Fabrikasi selesai
Fabrikasi selesai

Fabrikasi selesai

Fabrikasi selesai
Fabrikasi selesai
Fabrikasi selesai
Fabrikasi selesai
ISSUE & PROBLEM

- Kolom, rafter, gording dan struktur cladding bangunan


bungkil timbul karat
- Struktur bangunan bungkil belum bisa di ereksi

- Dinding belum ada kepastian mengenai levelnya

- Belum ada aktifitas pengerjaan cladding


- Pintu gerbang belum bisa di ereksi

- Gambar overhead crane turbin belum ada


- Roller over head crane susah diputar dan beberapa
bearing rusak
- Gambar instalasi pipa dan equipment kondensat belum
ada
ACTION PLAN

- Brush dan cat dasar ulang


- Segera dapat segerakan proses penimbunan lokasi
bangunan bungkil dan cor pondasi bangunan bungkil

- Segera didatangkan material


- Segera dapat didatangkan gantungan pintu dan seng
cladding pintu gerbang
- Segera mengirim gambar overhead crane turbin
- Segera dapat diadakan / didatangkan bearing pengganti
dan pelumas (grease)
- Segera mengirim gambar instalasi pipa dan equipment
kondensat tank
PROGRES

BANGUNAN : WAREHOUSE 32 x 66 M (GUDANG BUNGKIL)


LOKASI :
HARGA :

REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI

1. 0 PORTAL FRAME
1. 1 Portal Frame AS 1 1 Unit
Profil
MS - WF 350X175X7X11 Kolom kg 872.96 50% 436.48 436.48 -
MS - WF 350X175X7X11 Rafter kg 1,765.66 50% 882.83 882.83 -
MS - WF 350X175X7X11 Voute kg 86.65 50% 43.33 43.33 -
MS - WF 200X100X5.5X8 Support Kolom kg 253.61 50% 126.81 126.81 -
MS - WF 150X75X5X7 Support Kolom kg 576.88 50% 288.44 288.44 -
MS - WF 150X75X5X7 Kanopi + 9.00 kg 40.12 50% 20.06 20.06 -
MS - WF 150X75X5X7 Vouter WF 150x75x5x7 kg 3.19 50% 1.60 1.60 -
Pengecatan Baja kg 3,599.08 50% 1,799.54 1,799.54 -
Pelat - -
MS - PELAT 19 mm Base Plate WF 350x175x7x11 kg 33.55 50% 16.77 16.77 -
MS - PELAT 19 mm Base Plate WF 200x100x5.5x8 kg 8.95 50% 4.47 4.47 -
MS - PELAT 19 mm Base Plate WF 150x75x5x7 kg 22.36 50% 11.18 11.18 -
MS - PELAT 12 mm Plat Sambung Kolom-Rafter kg 24.06 50% 12.03 12.03 -
MS - PELAT 12 mm Plat Sambung Rafter-Rafter kg 27.36 50% 13.68 13.68 -
MS - PELAT 12 mm Plat Sambung Kolom-Kanopi kg 4.10 50% 2.05 2.05 -
MS - PELAT 8 mm Plat Sambung Rafter-Kolom Support WF 150 kg 6.33 50% 3.16 3.16 -
MS - PELAT 10 mm Plat Sambung WF 350x175x7x11 kg 31.86 50% 15.93 15.93 -
MS - PELAT 6 mm Plat Sambung WF 350x175x7x11 kg 36.88 50% 18.44 18.44 -
MS - PELAT 10 mm Plat Sambung WF 200x100x5.5x8 kg 5.49 50% 2.75 2.75 -
MS - PELAT 6 mm Plat Sambung WF 200x100x5.5x8 kg 6.77 50% 3.39 3.39 -
MS - PELAT 8 mm Plat Sambung WF 150x75x5x7 kg 11.04 50% 5.52 5.52 -
MS - PELAT 6 mm Plat Sambung WF 150x75x5x7 kg 16.56 50% 8.28 8.28 -
MS - PELAT 6 mm Plat Sambung Kanopi kg 1.58 50% 0.79 0.79 -
MS - PELAT 8 mm Plat Penguat Kolom kg 3.07 50% 1.54 1.54 -
MS - PELAT 8 mm Plat Penguat Rafter kg 4.92 50% 2.46 2.46 -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI
MS - PELAT 8 mm Plat Penguat Kanopi kg 0.15 50% 0.08 0.08 -
MS - PELAT 8 mm Stiffener WF 350x175x7x11 kg 62.24 50% 31.12 31.12 -
MS - PELAT 8 mm Stiffener WF 150x75x5x7 kg 1.19 50% 0.60 0.60 -
MS - PELAT 8 mm Dudukan Str. Talang kg 4.55 50% 2.27 2.27 -
MS - PELAT 8 mm End Plate kg 7.69 50% 3.84 3.84 -
Pengecatan Baja kg 320.71 50% 160.36 160.36 -
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Kolom-Rafter Bh 24.00 50% 12.00 12.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Rafter-Rafter Bh 12.00 50% 6.00 6.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Kolom-Kanopi Bh 12.00 50% 6.00 6.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Rafter-Kolom Support Bh 12.00 50% 6.00 6.00 -
BOLT & NUT HTB A325 - Ø 1/2" X 1-1/2" Baut Dudukan St. Talang Bh 8.00 50% 4.00 4.00 -
- - -
1. 2 Portal Frame AS 2-11 10 Unit - - -
Profil - - -
MS - WF 350X175X7X11 Kolom kg 8,729.60 50% 4,364.80 4,364.80 -
MS - WF 350X175X7X11 Rafter kg 17,656.61 50% 8,828.30 8,828.30 -
MS - WF 350X175X7X11 Voute kg 866.51 50% 433.26 433.26 -
MS - WF 150X75X5X7 Kanopi + 9.00 kg 403.48 50% 201.74 201.74 -
MS - WF 150X75X5X7 Vouter WF 150x75x5x7 kg 31.92 50% 15.96 15.96 -
Pengecatan Baja kg 27,688.12 50% 13,844.06 13,844.06 -
Pelat - - -
MS - PELAT 19 mm Base Plate kg 335.45 50% 167.73 167.73 -
MS - PELAT 12 mm Plat Sambung Kolom-Rafter kg 240.64 50% 120.32 120.32 -
MS - PELAT 12 mm Plat Sambung Rafter-Rafter kg 273.61 50% 136.80 136.80 -
MS - PELAT 12 mm Plat Sambung Kolom-Kanopi kg 40.97 50% 20.49 20.49 -
MS - PELAT 10 mm Plat Sambung WF 350x175x7x11 kg 318.58 50% 159.29 159.29 -
MS - PELAT 6 mm Plat Sambung WF 350x175x7x11 kg 368.78 50% 184.39 184.39 -
MS - PELAT 6 mm Plat Sambung Kanopi kg 15.84 50% 7.92 7.92 -
MS - PELAT 8 mm Plat Penguat Kolom kg 30.75 50% 15.37 15.37 -
MS - PELAT 8 mm Plat Penguat Rafter kg 49.20 50% 24.60 24.60 -
MS - PELAT 8 mm Plat Penguat Kanopi kg 1.54 50% 0.77 0.77 -
MS - PELAT 8 mm Stiffener WF 350x175x7x11 kg 622.44 50% 311.22 311.22 -
MS - PELAT 8 mm Stiffener WF 150x75x5x7 kg 11.95 50% 5.97 5.97 -
MS - PELAT 8 mm Dudukan Str. Talang kg 45.50 50% 22.75 22.75 -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI
MS - PELAT 8 mm End Plate kg 76.87 50% 38.44 38.44 -
Pengecatan Baja kg 2,432.11 50% 1,216.06 1,216.06 -
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Kolom-Rafter Bh 240.00 50% 120.00 120.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Rafter-Rafter Bh 120.00 50% 60.00 60.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Kolom-Kanopi Bh 120.00 50% 60.00 60.00 -
BOLT & NUT HTB A325 - Ø 1/2" X 1-1/2" Baut Dudukan St. Talang Bh 80.00 50% 40.00 40.00 -
- - -
1. 1 Portal Frame AS 12 1 Unit - - -
Profil - - -
MS - WF 350X175X7X11 Kolom kg 872.96 50% 436.48 436.48 -
MS - WF 350X175X7X11 Rafter kg 1,765.66 50% 882.83 882.83 -
MS - WF 350X175X7X11 Voute kg 86.65 50% 43.33 43.33 -
MS - WF 200X100X5.5X8 Support Kolom kg 253.61 50% 126.81 126.81 -
MS - WF 150X75X5X7 Support Kolom kg 576.88 50% 288.44 288.44 -
MS - WF 150X75X5X7 Kanopi + 9.00 kg 40.12 50% 20.06 20.06 -
MS - WF 150X75X5X7 Vouter WF 150x75x5x7 kg 3.19 50% 1.60 1.60 -
Pengecatan Baja kg 3,599.08 50% 1,799.54 1,799.54 -
Pelat - - -
MS - PELAT 19 mm Base Plate WF 350x175x7x11 kg 33.55 50% 16.77 16.77 -
MS - PELAT 19 mm Base Plate WF 200x100x5.5x8 kg 8.95 50% 4.47 4.47 -
MS - PELAT 19 mm Base Plate WF 150x75x5x7 kg 22.36 50% 11.18 11.18 -
MS - PELAT 12 mm Plat Sambung Kolom-Rafter kg 24.06 50% 12.03 12.03 -
MS - PELAT 12 mm Plat Sambung Rafter-Rafter kg 27.36 50% 13.68 13.68 -
MS - PELAT 12 mm Plat Sambung Kolom-Kanopi kg 4.10 50% 2.05 2.05 -
MS - PELAT 8 mm Plat Sambung Rafter-Kolom Support kg 6.33 50% 3.16 3.16 -
MS - PELAT 10 mm Plat Sambung WF 350x175x7x11 kg 31.86 50% 15.93 15.93 -
MS - PELAT 6 mm Plat Sambung WF 350x175x7x11 kg 36.88 50% 18.44 18.44 -
MS - PELAT 10 mm Plat Sambung WF 200x100x5.5x8 kg 5.49 50% 2.75 2.75 -
MS - PELAT 6 mm Plat Sambung WF 200x100x5.5x8 kg 6.77 50% 3.39 3.39 -
MS - PELAT 8 mm Plat Sambung WF 150x75x5x7 kg 11.04 50% 5.52 5.52 -
MS - PELAT 6 mm Plat Sambung WF 150x75x5x7 kg 16.56 50% 8.28 8.28 -
MS - PELAT 6 mm Plat Sambung Kanopi kg 1.58 50% 0.79 0.79 -
MS - PELAT 8 mm Plat Penguat Kolom kg 3.07 50% 1.54 1.54 -
MS - PELAT 8 mm Plat Penguat Rafter kg 4.92 50% 2.46 2.46 -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI
MS - PELAT 8 mm Plat Penguat Kanopi kg 0.15 50% 0.08 0.08 -
MS - PELAT 8 mm Stiffener WF 350x175x7x11 kg 62.24 50% 31.12 31.12 -
MS - PELAT 8 mm Stiffener WF 150x75x5x7 kg 1.19 50% 0.60 0.60 -
MS - PELAT 8 mm Dudukan Str. Talang kg 4.55 50% 2.27 2.27 -
MS - PELAT 8 mm End Plate kg 7.69 50% 3.84 3.84 -
Pengecatan Baja kg 320.71 50% 160.36 160.36 -
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Kolom-Rafter Bh 24.00 50% 12.00 12.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Rafter-Rafter Bh 12.00 50% 6.00 6.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Baut Kolom-Kanopi Bh 12.00 50% 6.00 6.00 -
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Rafter-Kolom Support Bh 12.00 50% 6.00 6.00 -
BOLT & NUT HTB A325 - Ø 1/2" X 1-1/2" Baut Dudukan St. Talang Bh 8.00 50% 4.00 4.00 -
- - -
2. 0 SOKONG KOLOM - - -
2. 1 Typical Sokong Kolom - - -
Profil - - -
MS - CNP 100X50X20X2.3 Rangka kg 1,073.60 50% 536.80 536.80 -
Besi Beton Polos Ø 16 mm Kremona kg 1,723.41 50% 861.71 861.71 -
Pengecatan Baja kg 2,797.01 50% 1,398.51 1,398.51 -
Pelat - - -
MS - PELAT 8 mm Plat Pelendes kg 165.67 50% 82.83 82.83 -
Pengecatan Baja kg 165.67 50% 82.83 82.83 -
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Bh 192.00 50% 96.00 96.00 -
- - -
3. 0 STRUKTUR ATAP - - -
3. 1 Rangka Atap Utama - - -
Profil - - -
MS - CNP 150X65X20X2.3 Gording kg 10,626.00 50% 5,313.00 5,313.00 -
MS - CNP 150X65X20X2.3 Rangka Talang kg 759.00 50% 379.50 379.50 -
MS - PELAT STRIP 6 X 50 mm Rangka Talang kg 1,037.24 50% 518.62 518.62 -
Besi Beton Polos Ø 12 mm Sagrod Ø 12 mm kg 795.35 50% 397.67 397.67 -
Besi Beton Polos Ø 16 mm Ikatan Angin kg 1,059.44 50% 529.72 529.72 -
Pengecatan Baja kg 14,277.03 50% 7,138.51 7,138.51 -
Pelat - - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI
MS - PELAT 8 mm Dudukan Gording kg 704.85 50% 352.42 352.42 -
MS - PELAT 8 mm Plat Ikatan angin kg 439.78 50% 219.89 219.89 -
Pengecatan Baja kg 1,144.63 50% 572.31 572.31 -
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 1-3/4" Baut Ikatan Angin Bh 192.00 50% 96.00 96.00 -
BOLT & NUT M 12 X 30 Baut Gording Bh 1,536.00 50% 768.00 768.00 -
Nut M 12 Baut Sagrod Bh 2,376.00 50% 1,188.00 1,188.00 -
Turn Buckle 5/8" Ikatan Angin Bh 96.00 50% 48.00 48.00 -
- - -
3. 2 Rangka Atap Kanopi - - -
Profil - - -
MS - WF 150X75X5X7 Struktur Kanopi kg 105.84 50% 52.92 52.92 -
MS - WF 150X75X5X7 Voute kg 6.38 50% 3.19 3.19 -
MS - CNP 150X65X20X2.3 Gording kg 167.20 50% 83.60 83.60 -
Besi Beton Polos Ø 12 mm Sagrod Ø 12 mm kg 5.83 50% 2.91 2.91 -
Pengecatan Baja kg 285.25 50% 142.62 142.62 -
Pelat - - -
MS - PELAT 8 mm Dudukan Gording kg 13.90 50% 6.95 6.95 -
MS - PELAT 12 mm Plat Plendes kg 16.39 50% 8.19 8.19 -
Pengecatan Baja kg 30.29 50% 15.14 15.14 -
Bolt & Nut - - -
BOLT & NUT M 12 X 30 Baut Gording Bh 32.00 50% 16.00 16.00 -
Nut M 12 Baut Sagrod Bh 16.00 50% 8.00 8.00 -
- - -
4. 0 STRUKTUR DINDING - - -
4. 1 Rangka Dinding As 1 - - -
Profil - - -
MS - CNP 125X50X20X2.3 Rangka dinding kg 934.68 50% 467.34 467.34 -
Besi Beton Polos Ø 12 mm Sagrod kg 61.59 50% 30.79 30.79 -
Pengecatan Baja kg 996.27 50% 498.14 498.14 -
Pelat - - -
MS - PELAT 8 mm Dudukan Rangka kg 14.86 50% 7.43 7.43 -
Pengecatan Baja kg 14.86 50% 7.43 7.43 -
Bolt & Nut - - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 74.00 50% 37.00 37.00 -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI
Nut M 12 Nut Sagrod bh 216.00 50% 108.00 108.00 -
- - -
4. 2 Rangka Dinding As 12 - - -
Profil - - -
MS - CNP 125X50X20X2.3 Rangka dinding kg 934.68 50% 467.34 467.34 -
Besi Beton Polos Ø 12 mm Sagrod kg 61.59 50% 30.79 30.79 -
Pengecatan Baja kg 996.27 50% 498.14 498.14 -
Pelat - - -
MS - PELAT 8 mm Dudukan Rangka kg 14.86 50% 7.43 7.43 -
Pengecatan Baja kg 14.86 50% 7.43 7.43 -
Bolt & Nut - - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 74.00 50% 37.00 37.00 -
Nut M 12 Nut Sagrod bh 216.00 50% 108.00 108.00 -
- - -
4. 3 Rangka Dinding As A - - -
Profil - - -
MS - CNP 125X50X20X2.3 Rangka dinding kg 1,138.20 50% 569.10 569.10 -
MS - L 70X70X7 Bracing kg 566.78 50% 283.39 283.39 -
Besi Beton Polos Ø 12 mm Sagrod kg 62.02 50% 31.01 31.01 -
Pengecatan Baja kg 1,767.00 50% 883.50 883.50 -
Pelat - - -
MS - PELAT 10 mm Plat Simpul kg 157.05 50% 78.52 78.52 -
MS - PELAT 8 mm Dudukan Rangka kg 26.51 50% 13.25 13.25 -
Pengecatan Baja kg 183.56 50% 91.78 91.78 -
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Bracing bh 48.00 50% 24.00 24.00 -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 132.00 50% 66.00 66.00 -
Nut M 12 Nut Sagrod bh 292.00 50% 146.00 146.00 -
- - -
4. 4 Rangka Dinding As B - - -
Profil - - -
MS - CNP 125X50X20X2.3 Rangka dinding kg 1,192.40 50% 596.20 596.20 -
MS - L 70X70X7 Bracing kg 566.78 50% 283.39 283.39 -
Besi Beton Polos Ø 12 mm Sagrod kg 65.86 50% 32.93 32.93 -
Pengecatan Baja kg 1,825.04 50% 912.52 912.52 -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI
Pelat - - -
MS - PELAT 10 mm Plat Simpul kg 157.05 50% 78.52 78.52 -
MS - PELAT 8 mm Dudukan Rangka kg 26.51 50% 13.25 13.25 -
Pengecatan Baja kg 183.56 50% 91.78 91.78 -
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Bracing bh 48.00 50% 24.00 24.00 -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 132.00 50% 66.00 66.00 -
Nut M 12 Nut Sagrod bh 308.00 50% 154.00 154.00 -
- - -
5. 0 PINTU GERBANG 2 Unit - - -
5. 1 Struktur Pintu - - -
Profil - - -
MS - CNP 100X50X20X3.2 Struktur Pintu kg 757.24 50% 378.62 378.62 -
Besi Beton Polos Ø 16 mm Handel Pintu kg 1.90 50% 0.95 0.95 -
Pengecatan Baja kg 759.14 50% 379.57 379.57 -
Pelat - - -
MS - PELAT 10 mm Plat Kunci Gembok kg 0.78 50% 0.39 0.39 -
Pengecatan Baja kg 0.78 50% 0.39 0.39 -
Penutup Pintu - - -
Clading Trimdek m² 72.00 - - -
5. 1 Gantungan Pintu - - -
Profil - - -
MS - WF 150X75X5X7 Gantungan Pintu kg 678.16 50% 339.08 339.08 -
MS - L 60X60X6 Dudukan WF 150x75x5x7 kg 0.81 50% 0.41 0.41 -
Pengecatan Baja kg 678.97 50% 339.49 339.49 -
Pelat - - -
MS - PELAT 10 mm Base Plate kg 7.16 50% 3.58 3.58 -
MS - PELAT 10 mm kg 5.34 50% 2.67 2.67 -
MS - PELAT 10 mm Guide Plate kg 6.28 50% 3.14 3.14 -
MS - PELAT 6 mm End Plate kg 6.35 50% 3.18 3.18 -
Pengecatan Baja kg 25.12 50% 12.56 12.56 -
Aksesoris - - -
Gantungan Pintu Bh 8.00 - - -

JUMLAH
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D SAAT
INI LALU INI
ROUNDED
PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K

50.00% 50.00% 0.00%

50.00% 1.02% 50.00% 1.02% 0.00% 0.00%


50.00% 2.06% 50.00% 2.06% 0.00% 0.00%
50.00% 0.10% 50.00% 0.10% 0.00% 0.00%
50.00% 0.30% 50.00% 0.30% 0.00% 0.00%
50.00% 0.67% 50.00% 0.67% 0.00% 0.00%
50.00% 0.05% 50.00% 0.05% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.54% 50.00% 0.54% 0.00% 0.00%

50.00% 0.04% 50.00% 0.04% 0.00% 0.00%


50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.03% 50.00% 0.03% 0.00% 0.00%
50.00% 0.03% 50.00% 0.03% 0.00% 0.00%
50.00% 0.03% 50.00% 0.03% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.02% 50.00% 0.02% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.07% 50.00% 0.07% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.05% 50.00% 0.05% 0.00% 0.00%

50.00% 0.00% 50.00% 0.00% 0.00% 0.00%


50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%

50.00% 10.17% 50.00% 10.17% 0.00% 0.00%


50.00% 20.57% 50.00% 20.57% 0.00% 0.00%
50.00% 1.01% 50.00% 1.01% 0.00% 0.00%
50.00% 0.47% 50.00% 0.47% 0.00% 0.00%
50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 4.13% 50.00% 4.13% 0.00% 0.00%

50.00% 0.39% 50.00% 0.39% 0.00% 0.00%


50.00% 0.28% 50.00% 0.28% 0.00% 0.00%
50.00% 0.32% 50.00% 0.32% 0.00% 0.00%
50.00% 0.05% 50.00% 0.05% 0.00% 0.00%
50.00% 0.37% 50.00% 0.37% 0.00% 0.00%
50.00% 0.43% 50.00% 0.43% 0.00% 0.00%
50.00% 0.02% 50.00% 0.02% 0.00% 0.00%
50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 0.06% 50.00% 0.06% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.73% 50.00% 0.73% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.05% 50.00% 0.05% 0.00% 0.00%
PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K
50.00% 0.09% 50.00% 0.09% 0.00% 0.00%
50.00% 0.36% 50.00% 0.36% 0.00% 0.00%

50.00% 0.04% 50.00% 0.04% 0.00% 0.00%


50.00% 0.02% 50.00% 0.02% 0.00% 0.00%
50.00% 0.02% 50.00% 0.02% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%

50.00% 1.02% 50.00% 1.02% 0.00% 0.00%


50.00% 2.06% 50.00% 2.06% 0.00% 0.00%
50.00% 0.10% 50.00% 0.10% 0.00% 0.00%
50.00% 0.30% 50.00% 0.30% 0.00% 0.00%
50.00% 0.67% 50.00% 0.67% 0.00% 0.00%
50.00% 0.05% 50.00% 0.05% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.54% 50.00% 0.54% 0.00% 0.00%

50.00% 0.04% 50.00% 0.04% 0.00% 0.00%


50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.03% 50.00% 0.03% 0.00% 0.00%
50.00% 0.03% 50.00% 0.03% 0.00% 0.00%
50.00% 0.03% 50.00% 0.03% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.02% 50.00% 0.02% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.07% 50.00% 0.07% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.05% 50.00% 0.05% 0.00% 0.00%

50.00% 0.00% 50.00% 0.00% 0.00% 0.00%


50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%
50.00% 0.00% 50.00% 0.00% 0.00% 0.00%

50.00% 50.00% 0.00%

50.00% 17.86% 50.00% 17.86% 0.00% 0.00%


50.00% 22.64% 50.00% 22.64% 0.00% 0.00%
50.00% 5.95% 50.00% 5.95% 0.00% 0.00%

50.00% 2.76% 50.00% 2.76% 0.00% 0.00%


50.00% 0.35% 50.00% 0.35% 0.00% 0.00%

50.00% 0.43% 50.00% 0.43% 0.00% 0.00%

50.00% 50.00% 0.00%

50.00% 28.97% 50.00% 28.97% 0.00% 0.00%


50.00% 2.07% 50.00% 2.07% 0.00% 0.00%
50.00% 2.83% 50.00% 2.83% 0.00% 0.00%
50.00% 1.71% 50.00% 1.71% 0.00% 0.00%
50.00% 2.28% 50.00% 2.28% 0.00% 0.00%
50.00% 4.98% 50.00% 4.98% 0.00% 0.00%
PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K
50.00% 1.92% 50.00% 1.92% 0.00% 0.00%
50.00% 1.20% 50.00% 1.20% 0.00% 0.00%
50.00% 0.40% 50.00% 0.40% 0.00% 0.00%

50.00% 0.07% 50.00% 0.07% 0.00% 0.00%


50.00% 0.57% 50.00% 0.57% 0.00% 0.00%
50.00% 0.88% 50.00% 0.88% 0.00% 0.00%
50.00% 1.14% 50.00% 1.14% 0.00% 0.00%

50.00% 0.29% 50.00% 0.29% 0.00% 0.00%


50.00% 0.02% 50.00% 0.02% 0.00% 0.00%
50.00% 0.46% 50.00% 0.46% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%
50.00% 0.10% 50.00% 0.10% 0.00% 0.00%

50.00% 0.04% 50.00% 0.04% 0.00% 0.00%


50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 0.01% 50.00% 0.01% 0.00% 0.00%

50.00% 0.01% 50.00% 0.01% 0.00% 0.00%


50.00% 0.01% 50.00% 0.01% 0.00% 0.00%

50.00% 50.00% 0.00%

50.00% 6.77% 50.00% 6.77% 0.00% 0.00%


50.00% 0.35% 50.00% 0.35% 0.00% 0.00%
50.00% 0.92% 50.00% 0.92% 0.00% 0.00%

50.00% 0.11% 50.00% 0.11% 0.00% 0.00%


50.00% 0.01% 50.00% 0.01% 0.00% 0.00%

50.00% 0.07% 50.00% 0.07% 0.00% 0.00%


PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K
50.00% 0.21% 50.00% 0.21% 0.00% 0.00%

50.00% 6.77% 50.00% 6.77% 0.00% 0.00%


50.00% 0.35% 50.00% 0.35% 0.00% 0.00%
50.00% 0.92% 50.00% 0.92% 0.00% 0.00%

50.00% 0.11% 50.00% 0.11% 0.00% 0.00%


50.00% 0.01% 50.00% 0.01% 0.00% 0.00%

50.00% 0.07% 50.00% 0.07% 0.00% 0.00%


50.00% 0.21% 50.00% 0.21% 0.00% 0.00%

50.00% 8.25% 50.00% 8.25% 0.00% 0.00%


50.00% 4.11% 50.00% 4.11% 0.00% 0.00%
50.00% 0.35% 50.00% 0.35% 0.00% 0.00%
50.00% 1.64% 50.00% 1.64% 0.00% 0.00%

50.00% 1.14% 50.00% 1.14% 0.00% 0.00%


50.00% 0.19% 50.00% 0.19% 0.00% 0.00%
50.00% 0.17% 50.00% 0.17% 0.00% 0.00%

50.00% 0.05% 50.00% 0.05% 0.00% 0.00%


50.00% 0.13% 50.00% 0.13% 0.00% 0.00%
50.00% 0.29% 50.00% 0.29% 0.00% 0.00%

50.00% 8.64% 50.00% 8.64% 0.00% 0.00%


50.00% 4.11% 50.00% 4.11% 0.00% 0.00%
50.00% 0.38% 50.00% 0.38% 0.00% 0.00%
50.00% 1.69% 50.00% 1.69% 0.00% 0.00%
PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K

50.00% 1.14% 50.00% 1.14% 0.00% 0.00%


50.00% 0.19% 50.00% 0.19% 0.00% 0.00%
50.00% 0.17% 50.00% 0.17% 0.00% 0.00%

50.00% 0.05% 50.00% 0.05% 0.00% 0.00%


50.00% 0.13% 50.00% 0.13% 0.00% 0.00%
50.00% 0.30% 50.00% 0.30% 0.00% 0.00%

39.71% 39.71% 0.00%

50.00% 18.21% 50.00% 18.21% 0.00% 0.00%


50.00% 0.04% 50.00% 0.04% 0.00% 0.00%
50.00% 2.34% 50.00% 2.34% 0.00% 0.00%

50.00% 0.02% 50.00% 0.02% 0.00% 0.00%


50.00% 0.00% 50.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

50.00% 16.31% 50.00% 16.31% 0.00% 0.00%


50.00% 0.02% 50.00% 0.02% 0.00% 0.00%
50.00% 2.09% 50.00% 2.09% 0.00% 0.00%

50.00% 0.17% 50.00% 0.17% 0.00% 0.00%


50.00% 0.13% 50.00% 0.13% 0.00% 0.00%
50.00% 0.15% 50.00% 0.15% 0.00% 0.00%
50.00% 0.15% 50.00% 0.15% 0.00% 0.00%
50.00% 0.08% 50.00% 0.08% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%


PROGRES
S/D INI
BOBOT S/D LALU SAAT BOBOT
INI
BOBOT KONTRA BOBOT BOBOT BOBOT KONTRA
FAKTOR K FAKTOR KONTRAK FAKTOR K
PROGRES

BANGUNAN : PROCESSING UK. 23 x 66 M (BANGUNAN PROSES)


LOKASI :
HARGA : Rp 229,201,000.00

REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR

1. 0 PORTAL FRAME
1. 1 Portal Frame AS 1 1 Unit
Profil
MS - WF 350X175X7X11 Kolom kg 872.96 100% 872.96 872.96 - 100.00%
MS - WF 350X175X7X11 Rafter kg 1,155.98 100% 1,155.98 1,155.98 - 100.00%
MS - WF 350X175X7X11 Voute kg 88.88 100% 88.88 88.88 - 100.00%
MS - WF 300X150X6.5X9 Support Kolom kg 734.10 100% 734.10 734.10 - 100.00%
MS - WF 150X75X5X7 Kanopi + 9.00 kg 40.12 100% 40.12 40.12 - 100.00%
MS - WF 150X75X5X7 Voute kg 3.19 100% 3.19 3.19 - 100.00%
Pengecatan Baja kg 2,895.23 100% 2,895.23 2,895.23 - 100.00%
Pelat - - -
MS - PELAT 19 mm Base Plate WF 350x175x7x11 kg 33.55 100% 33.55 33.55 - 100.00%
MS - PELAT 19 mm Base Plate WF 300x150x6.5x9 kg 20.87 100% 20.87 20.87 - 100.00%
MS - PELAT 12 mm Plat Sambung Rafter-Rafter kg 24.06 100% 24.06 24.06 - 100.00%
MS - PELAT 12 mm Plat Sambung Rafter-Kolom kg 24.06 100% 24.06 24.06 - 100.00%
MS - PELAT 8 mm Plat Sambung Kolom Support-Rafter kg 5.35 100% 5.35 5.35 - 100.00%
MS - PELAT 12 mm Plat Sambung Kolom-Kanopi kg 4.10 100% 4.10 4.10 - 100.00%
MS - PELAT 10 mm Plat Dubling kg 31.86 100% 31.86 31.86 - 100.00%
MS - PELAT 6 mm Plat Dubling kg 36.88 100% 36.88 36.88 - 100.00%
MS - PELAT 8 mm Penguat Plat Sambung Rafter kg 15.37 100% 15.37 15.37 - 100.00%
MS - PELAT 8 mm Stiffner WF 350 kg 41.50 100% 41.50 41.50 - 100.00%
MS - PELAT 8 mm Stiffner WF 300 kg 6.92 100% 6.92 6.92 - 100.00%
MS - PELAT 8 mm Stiffner WF 150 kg 1.19 100% 1.19 1.19 - 100.00%
MS - PELAT 8 mm End Plate kg 7.69 100% 7.69 7.69 - 100.00%
Pengecatan Baja kg 253.39 100% 253.39 253.39 - 100.00%
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Rafter-Rafter Bh 12.00 100% 12.00 12.00 - 100.00%
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Rafter Bh 24.00 100% 24.00 24.00 - 100.00%
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 12.00 100% 12.00 12.00 - 100.00%
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom Support-Rafter Bh 12.00 100% 12.00 12.00 - 100.00%
- - -
1. 2 Portal Frame 2 - 11 10 Unit - - -
Profil - - -
MS - WF 350X175X7X11 Kolom kg 8,729.60 100% 8,729.60 8,729.60 - 100.00%
MS - WF 350X175X7X11 Rafter kg 11,559.78 100% 11,559.78 11,559.78 - 100.00%
MS - WF 350X175X7X11 Voute kg 888.83 100% 888.83 888.83 - 100.00%
MS - WF 150X75X5X7 Kanopi + 9.00 kg 401.24 100% 401.24 401.24 - 100.00%
MS - WF 150X75X5X7 Voute kg 31.92 100% 31.92 31.92 - 100.00%
Pengecatan Baja kg 21,611.37 100% 21,611.37 21,611.37 - 100.00%
Pelat - - -
MS - PELAT 19 mm Base Plate WF 350x175x7x11 kg 335.45 100% 335.45 335.45 - 100.00%
MS - PELAT 12 mm Plat Sambung Rafter-Rafter kg 240.64 100% 240.64 240.64 - 100.00%
MS - PELAT 12 mm Plat Sambung Rafter-Kolom kg 240.64 100% 240.64 240.64 - 100.00%
MS - PELAT 12 mm Plat Sambung Kolom-Kanopi kg 40.97 100% 40.97 40.97 - 100.00%
MS - PELAT 10 mm Plat Dubling kg 318.58 100% 318.58 318.58 - 100.00%
MS - PELAT 6 mm Plat Dubling kg 368.78 100% 368.78 368.78 - 100.00%
MS - PELAT 8 mm Penguat Plat Sambung Rafter kg 153.75 100% 153.75 153.75 - 100.00%
MS - PELAT 8 mm Stiffner WF 350 kg 553.28 100% 553.28 553.28 - 100.00%
MS - PELAT 8 mm Stiffner WF 150 kg 11.95 100% 11.95 11.95 - 100.00%
MS - PELAT 8 mm End Plate kg 76.87 100% 76.87 76.87 - 100.00%
Pengecatan Baja kg 2,340.91 100% 2,340.91 2,340.91 - 100.00%
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Rafter-Rafter Bh 120.00 100% 120.00 120.00 - 100.00%
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Rafter Bh 240.00 100% 240.00 240.00 - 100.00%
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 120.00 100% 120.00 120.00 - 100.00%
Jackroof - - -
Profil - - -
MS - WF 150X75X5X7 Rafter kg 770.00 100% 770.00 770.00 - 100.00%
MS - WF 150X75X5X7 Kolom kg 235.20 100% 235.20 235.20 - 100.00%
MS - PELAT 10 mm Plat Pelendes kg 57.75 100% 57.75 57.75 - 100.00%
MS - PELAT 6 mm Stiffner WF 150 kg 26.87 100% 26.87 26.87 - 100.00%
Pengecatan Baja kg 1,089.82 100% 1,089.82 1,089.82 - 100.00%
Bolt & Nut - - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Baut Rafter-Rafter Jackroof Bh 80.00 100% 80.00 80.00 - 100.00%
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Baut Rafter-Kolom Jackroof Bh 80.00 100% 80.00 80.00 - 100.00%
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Baut Kolom Jackrof-Rafter WF 350 Bh 80.00 100% 80.00 80.00 - 100.00%
1. 3 Portal Frame AS 12 1 Unit - - -
Profil - - -
MS - WF 350X175X7X11 Kolom kg 872.96 100% 872.96 872.96 - 100.00%
MS - WF 350X175X7X11 Rafter kg 1,155.98 100% 1,155.98 1,155.98 - 100.00%
MS - WF 350X175X7X11 Voute kg 88.88 100% 88.88 88.88 - 100.00%
MS - WF 300X150X6.5X9 Gelagar kg 880.80 100% 880.80 880.80 - 100.00%
MS - WF 150X75X5X7 Kanopi + 9.00 kg 40.12 100% 40.12 40.12 - 100.00%
MS - WF 150X75X5X7 Voute kg 3.19 100% 3.19 3.19 - 100.00%
MS - L 60X60X6 kg 513.62 100% 513.62 513.62 - 100.00%
Pengecatan Baja kg 3,555.56 100% 3,555.56 3,555.56 - 100.00%
Pelat - - -
MS - PELAT 19 mm Base Plate WF 350x175x7x11 kg 33.55 100% 33.55 33.55 - 100.00%
MS - PELAT 12 mm Plat Sambung Rafter-Rafter kg 24.06 100% 24.06 24.06 - 100.00%
MS - PELAT 12 mm Plat Sambung Rafter-Kolom kg 24.06 100% 24.06 24.06 - 100.00%
MS - PELAT 12 mm Plat Sambung Kolom-Kanopi kg 4.10 100% 4.10 4.10 - 100.00%
MS - PELAT 12 mm Plat Sambung Kolom-Gelagar kg 15.40 100% 15.40 15.40 - 100.00%
MS - PELAT 12 mm Plat Simpul kg 127.13 100% 127.13 127.13 - 100.00%
MS - PELAT 10 mm Plat Dubling kg 31.86 100% 31.86 31.86 - 100.00%
MS - PELAT 6 mm Plat Dubling kg 36.88 100% 36.88 36.88 - 100.00%
MS - PELAT 8 mm Penguat Plat Sambung Rafter kg 15.37 100% 15.37 15.37 - 100.00%
MS - PELAT 8 mm Stiffner WF 350 kg 41.50 100% 41.50 41.50 - 100.00%
MS - PELAT 8 mm Stiffner WF 300 kg 20.75 100% 20.75 20.75 - 100.00%
MS - PELAT 8 mm Stiffner WF 150 kg 1.19 100% 1.19 1.19 - 100.00%
MS - PELAT 8 mm End Plate kg 7.69 100% 7.69 7.69 - 100.00%
Pengecatan Baja kg 383.54 100% 383.54 383.54 - 100.00%
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Rafter-Rafter Bh 12.00 100% 12.00 12.00 - 100.00%
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Rafter Bh 24.00 100% 24.00 24.00 - 100.00%
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 12.00 100% 12.00 12.00 - 100.00%
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Gelagar Bh 20.00 100% 20.00 20.00 - 100.00%
- - -
2. 0 SOKONG KOLOM - - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR
2. 1 Typical Sokong Kolom - - -
Profil - - -
MS - CNP 100X50X20X2.3 Rangka kg 1,073.60 100% 1,073.60 1,073.60 - 100.00%
Besi Beton Polos Ø 16 mm Kremona kg 1,723.41 100% 1,723.41 1,723.41 - 100.00%
Pengecatan Baja kg 2,797.01 100% 2,797.01 2,797.01 - 100.00%
Pelat - - -
MS - PELAT 8 mm Plat Pelendes kg 165.67 100% 165.67 165.67 - 100.00%
Pengecatan Baja kg 165.67 100% 165.67 165.67 - 100.00%
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Bh 192.00 100% 192.00 192.00 - 100.00%
- - -
3. 0 STRUKTUR ATAP - - -
3. 1 Rangka Atap Utama - - -
Profil - - -
MS - CNP 150X65X20X2.3 Gording kg 7,590.00 100% 7,590.00 7,590.00 - 100.00%
MS - CNP 150X65X20X2.3 Rangka Talang kg 759.00 100% 759.00 759.00 - 100.00%
MS - PELAT STRIP 6 X 50 mm Rangka Talang kg 1,118.04 100% 1,118.04 1,118.04 - 100.00%
Besi Beton Polos Ø 12 mm Sagrod Ø 12 mm kg 532.16 100% 532.16 532.16 - 100.00%
Besi Beton Polos Ø 16 mm Ikatan Angin kg 111.64 100% 111.64 111.64 - 100.00%
Pengecatan Baja kg 10,110.84 100% 10,110.84 10,110.84 - 100.00%
Pelat - - -
MS - PELAT 8 mm Dudukan Gording kg 497.76 100% 497.76 497.76 - 100.00%
MS - PELAT 8 mm Plat Talang kg 50.83 100% 50.83 50.83 - 100.00%
MS - PELAT 8 mm Plat Talang kg 3.77 100% 3.77 3.77 - 100.00%
MS - PELAT 8 mm Plat Ikatan angin kg 219.89 100% 219.89 219.89 - 100.00%
Pengecatan Baja kg 772.25 100% 772.25 772.25 - 100.00%
Bolt & Nut - - -
BOLT & NUT HTB A325 - Ø 5/8" X 1-3/4" Baut Ikatan Angin Bh 96.00 100% 96.00 96.00 - 100.00%
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Baut Talang Bh 96.00 100% 96.00 96.00 - 100.00%
BOLT & NUT M 12 X 30 Baut Gording Bh 960.00 100% 960.00 960.00 - 100.00%
Nut M 12 Baut Sagrod Bh 1,672.00 100% 1,672.00 1,672.00 - 100.00%
Turn Buckle 5/8" Ikatan Angin Bh 48.00 100% 48.00 48.00 - 100.00%
3. 2 Rangka Atap Kanopi As 12 - - -
Profil - - -
MS - L 60X60X6 Struktur Kanopi kg 312.19 100% 312.19 312.19 - 100.00%
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR
MS - CNP 125X50X20X2.3 Gording kg 325.20 100% 325.20 325.20 - 100.00%
Besi Beton Polos Ø 12 mm Sagrod Ø 12 mm kg 13.64 100% 13.64 13.64 - 100.00%
Pengecatan Baja kg 651.03 100% 651.03 651.03 - 100.00%
Pelat - - -
MS - PELAT 8 mm Plat Sambung kg 12.59 100% 12.59 12.59 - 100.00%
Pengecatan Baja kg 12.59 100% 12.59 12.59 - 100.00%
Bolt & Nut - - -
BOLT & NUT M 12 X 30 Baut Gording Bh 72.00 100% 72.00 72.00 - 100.00%
Nut M 12 Baut Sagrod Bh 64.00 100% 64.00 64.00 - 100.00%
3. 3 Rangka Atap Kanopi As 1 - - -
Profil - - -
MS - WF 150X75X5X7 kg 85.15 100% 85.15 85.15 - 100.00%
MS - CNP 125X50X20X2.3 kg 74.53 100% 74.53 74.53 - 100.00%
Besi Beton Polos Ø 12 mm Sagrod kg 14.87 100% 14.87 14.87 - 100.00%
Pengecatan Baja kg 174.54 100% 174.54 174.54 - 100.00%
Pelat - - -
MS - PELAT 8 mm Stiffener kg 1.79 100% 1.79 1.79 - 100.00%
MS - PELAT 10 mm Plat Sambung Kolom-Kanopi kg 5.12 100% 5.12 5.12 - 100.00%
Pengecatan Baja kg 6.91 100% 6.91 6.91 - 100.00%
Bolt & Nut - - -
BOLT & NUT M 12 X 30 Bh 36.00 100% 36.00 36.00 - 100.00%
Nut M 12 Bh 72.00 100% 72.00 72.00 - 100.00%
- - -
4. 0 STRUKTUR DINDING - - -
4. 1 Rangka Dinding As A - - -
Profil - - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 2,024.00 100% 2,024.00 2,024.00 - 100.00%
Besi Beton Polos Ø 12 mm Sagrod kg 94.94 100% 94.94 94.94 - 100.00%
Pipa Hitam STK 41 - Ø 2-1/2" - 3.2 mm kg 415.44 100% 415.44 415.44 - 100.00%
Pengecatan Baja kg 2,534.38 100% 2,534.38 2,534.38 - 100.00%
Pelat - - -
MS - PELAT 10 mm Plat Simpul Bracing kg 247.51 100% 247.51 247.51 - 100.00%
MS - PELAT 8 mm Dudukan Rangka kg 35.34 100% 35.34 35.34 - 100.00%
Pengecatan Baja kg 282.86 100% 282.86 282.86 - 100.00%
Bolt & Nut - - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 176.00 100% 176.00 176.00 - 100.00%
Nut M 12 Nut Sagrod bh 352.00 100% 352.00 352.00 - 100.00%
4. 2 Rangka Dinding As D - - -
Profil - - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 2,024.00 90% 1,821.60 1,821.60 - 90.00%
Besi Beton Polos Ø 12 mm Sagrod kg 94.94 90% 85.45 85.45 - 90.00%
Pipa Hitam STK 41 - Ø 2-1/2" - 3.2 mm kg 415.44 90% 373.90 373.90 - 90.00%
Pengecatan Baja kg 2,534.38 90% 2,280.95 2,280.95 - 90.00%
Pelat - - -
MS - PELAT 10 mm Plat Simpul Bracing kg 247.51 90% 222.76 222.76 - 90.00%
MS - PELAT 8 mm Dudukan Rangka kg 35.34 90% 31.81 31.81 - 90.00%
Pengecatan Baja kg 282.86 95% 268.71 268.71 - 95.00%
Bolt & Nut - - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 176.00 90% 158.40 158.40 - 90.00%
Nut M 12 Nut Sagrod bh 352.00 90% 316.80 316.80 - 90.00%
4. 3 Rangka Dinding As 1 - - -
Profil - - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 914.88 100% 914.88 914.88 - 100.00%
Besi Beton Polos Ø 12 mm Sagrod kg 53.60 100% 53.60 53.60 - 100.00%
Pengecatan Baja kg 968.48 100% 968.48 968.48 - 100.00%
Pelat - - -
MS - PELAT 8 mm Dudukan Rangka kg 10.44 100% 10.44 10.44 - 100.00%
Pengecatan Baja kg 10.44 100% 10.44 10.44 - 100.00%
Bolt & Nut - - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 52.00 100% 52.00 52.00 - 100.00%
Nut M 12 Nut Sagrod bh 178.00 100% 178.00 178.00 - 100.00%
4. 4 Rangka Dinding As 12 - - -
Profil - - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 263.84 100% 263.84 263.84 - 100.00%
MS - CNP 100X50X20X2.3 kg 93.53 100% 93.53 93.53 - 100.00%
Pengecatan Baja kg 357.38 100% 357.38 357.38 - 100.00%
Pelat - - -
MS - PELAT 3 mm kg 5.10 100% 5.10 5.10 - 100.00%
Pengecatan Baja kg 5.10 100% 5.10 5.10 - 100.00%
- - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR
5. 0 PINTU GERBANG - - -
5. 1 Pintu Gerbang Uk 3000 x 4000 mm - - -
Profil - - -
MS - WF 150X75X5X7 Struktur Gantungan Pintu kg 121.94 75% 91.46 91.46 - 75.00%
MS - CNP 100X50X20X3.2 Struktur Pintu kg 187.00 75% 140.25 140.25 - 75.00%
MS - L 60X60X6 Dudukan Struktur Gantungan kg 0.81 75% 0.61 0.61 - 75.00%
Besi Beton Polos Ø 16 mm Handel Pintu kg 0.95 75% 0.71 0.71 - 75.00%
Pengecatan Baja kg 310.70 100% 310.70 310.70 - 100.00%
Pelat - - -
MS - PELAT 10 mm Pelat Guide kg 3.14 50% 1.57 1.57 - 50.00%
MS - PELAT 10 mm Pelat Gembok kg 0.39 50% 0.20 0.20 - 50.00%
MS - PELAT 8 mm kg 1.41 50% 0.71 0.71 - 50.00%
MS - PELAT 6 mm End Plate kg 1.59 50% 0.79 0.79 - 50.00%
Pengecatan Baja kg 6.53 - - - 0.00%
Penutup Pintu - - -
Clading Trimdek m² 12.00 - - - 0.00%
Aksesoris - - -
Gantungan Pintu Bh 4.00 - - - 0.00%
- - -
5. 2 Pintu Gerbang Uk 3000 x 3000 mm - - -
Profil - - -
MS - WF 150X75X5X7 Struktur Gantungan Pintu kg 111.50 100% 111.50 111.50 - 100.00%
MS - CNP 100X50X20X3.2 Struktur Pintu kg 14.85 75% 11.14 11.14 - 75.00%
MS - L 60X60X6 Dudukan Struktur Gantungan kg 0.41 75% 0.30 0.30 - 75.00%
Besi Beton Polos Ø 16 mm Handel Pintu kg 0.48 50% 0.24 0.24 - 50.00%
Pengecatan Baja kg 127.23 100% 127.23 127.23 - 100.00%
Pelat - - -
MS - PELAT 10 mm Pelat Guide kg 1.57 75% 1.18 1.18 - 75.00%
MS - PELAT 10 mm Pelat Gembok kg 2.24 75% 1.68 1.68 - 75.00%
MS - PELAT 8 mm kg 0.71 75% 0.53 0.53 - 75.00%
MS - PELAT 6 mm End Plate kg 0.53 75% 0.40 0.40 - 75.00%
MS - PELAT 2 mm kg 141.30 75% 105.98 105.98 - 75.00%
Pengecatan Baja kg 146.34 50% 73.17 73.17 - 50.00%
Penutup Pintu - - -
Clading Trimdek m² 9.00 - - - 0.00%
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME S/D
NO SATUAN PEKERJAAN
S/D S/D SAAT BOBOT
INI LALU INI FAKTOR
Aksesoris - - -
Gantungan Pintu Bh 3.00 - - - 0.00%

JUMLAH
DIBULATKAN
PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK

100.00% 100.00% 0.00%

2.40% 100.00% 2.40% 0.00% 0.00%


3.18% 100.00% 3.18% 0.00% 0.00%
0.24% 100.00% 0.24% 0.00% 0.00%
2.02% 100.00% 2.02% 0.00% 0.00%
0.11% 100.00% 0.11% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00% 0.00%
1.02% 100.00% 1.02% 0.00% 0.00%

0.09% 100.00% 0.09% 0.00% 0.00%


0.06% 100.00% 0.06% 0.00% 0.00%
0.07% 100.00% 0.07% 0.00% 0.00%
0.07% 100.00% 0.07% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00% 0.00%
0.09% 100.00% 0.09% 0.00% 0.00%
0.10% 100.00% 0.10% 0.00% 0.00%
0.04% 100.00% 0.04% 0.00% 0.00%
0.11% 100.00% 0.11% 0.00% 0.00%
0.02% 100.00% 0.02% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00% 0.00%
0.02% 100.00% 0.02% 0.00% 0.00%
0.09% 100.00% 0.09% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00% 0.00%


0.01% 100.00% 0.01% 0.00% 0.00%
PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
0.00% 100.00% 0.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00% 0.00%

24.01% 100.00% 24.01% 0.00% 0.00%


31.80% 100.00% 31.80% 0.00% 0.00%
2.44% 100.00% 2.44% 0.00% 0.00%
1.10% 100.00% 1.10% 0.00% 0.00%
0.09% 100.00% 0.09% 0.00% 0.00%
7.60% 100.00% 7.60% 0.00% 0.00%

0.92% 100.00% 0.92% 0.00% 0.00%


0.66% 100.00% 0.66% 0.00% 0.00%
0.66% 100.00% 0.66% 0.00% 0.00%
0.11% 100.00% 0.11% 0.00% 0.00%
0.88% 100.00% 0.88% 0.00% 0.00%
1.01% 100.00% 1.01% 0.00% 0.00%
0.42% 100.00% 0.42% 0.00% 0.00%
1.52% 100.00% 1.52% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00% 0.00%
0.21% 100.00% 0.21% 0.00% 0.00%
0.82% 100.00% 0.82% 0.00% 0.00%

0.04% 100.00% 0.04% 0.00% 0.00%


0.09% 100.00% 0.09% 0.00% 0.00%
0.04% 100.00% 0.04% 0.00% 0.00%

2.12% 100.00% 2.12% 0.00% 0.00%


0.65% 100.00% 0.65% 0.00% 0.00%
0.16% 100.00% 0.16% 0.00% 0.00%
0.07% 100.00% 0.07% 0.00% 0.00%
0.38% 100.00% 0.38% 0.00% 0.00%
PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
0.03% 100.00% 0.03% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00% 0.00%

2.40% 100.00% 2.40% 0.00% 0.00%


3.18% 100.00% 3.18% 0.00% 0.00%
0.24% 100.00% 0.24% 0.00% 0.00%
2.42% 100.00% 2.42% 0.00% 0.00%
0.11% 100.00% 0.11% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00% 0.00%
1.41% 100.00% 1.41% 0.00% 0.00%
1.25% 100.00% 1.25% 0.00% 0.00%

0.09% 100.00% 0.09% 0.00% 0.00%


0.07% 100.00% 0.07% 0.00% 0.00%
0.07% 100.00% 0.07% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00% 0.00%
0.04% 100.00% 0.04% 0.00% 0.00%
0.35% 100.00% 0.35% 0.00% 0.00%
0.09% 100.00% 0.09% 0.00% 0.00%
0.10% 100.00% 0.10% 0.00% 0.00%
0.04% 100.00% 0.04% 0.00% 0.00%
0.11% 100.00% 0.11% 0.00% 0.00%
0.06% 100.00% 0.06% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00% 0.00%
0.02% 100.00% 0.02% 0.00% 0.00%
0.13% 100.00% 0.13% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00% 0.00%


0.01% 100.00% 0.01% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00% 0.00%

100.00% 100.00% 0.00%


PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK

35.73% 100.00% 35.73% 0.00% 0.00%


45.29% 100.00% 45.29% 0.00% 0.00%
11.90% 100.00% 11.90% 0.00% 0.00%

5.51% 100.00% 5.51% 0.00% 0.00%


0.71% 100.00% 0.71% 0.00% 0.00%

0.86% 100.00% 0.86% 0.00% 0.00%

100.00% 100.00% 0.00%

55.36% 100.00% 55.36% 0.00% 0.00%


5.54% 100.00% 5.54% 0.00% 0.00%
8.15% 100.00% 8.15% 0.00% 0.00%
3.07% 100.00% 3.07% 0.00% 0.00%
0.64% 100.00% 0.64% 0.00% 0.00%
9.43% 100.00% 9.43% 0.00% 0.00%

3.63% 100.00% 3.63% 0.00% 0.00%


0.37% 100.00% 0.37% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00% 0.00%
1.60% 100.00% 1.60% 0.00% 0.00%
0.72% 100.00% 0.72% 0.00% 0.00%

0.09% 100.00% 0.09% 0.00% 0.00%


0.09% 100.00% 0.09% 0.00% 0.00%
0.95% 100.00% 0.95% 0.00% 0.00%
1.65% 100.00% 1.65% 0.00% 0.00%
1.53% 100.00% 1.53% 0.00% 0.00%

2.28% 100.00% 2.28% 0.00% 0.00%


PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
2.37% 100.00% 2.37% 0.00% 0.00%
0.08% 100.00% 0.08% 0.00% 0.00%
0.61% 100.00% 0.61% 0.00% 0.00%

0.09% 100.00% 0.09% 0.00% 0.00%


0.01% 100.00% 0.01% 0.00% 0.00%

0.07% 100.00% 0.07% 0.00% 0.00%


0.06% 100.00% 0.06% 0.00% 0.00%

0.62% 100.00% 0.62% 0.00% 0.00%


0.54% 100.00% 0.54% 0.00% 0.00%
0.09% 100.00% 0.09% 0.00% 0.00%
0.16% 100.00% 0.16% 0.00% 0.00%

0.01% 100.00% 0.01% 0.00% 0.00%


0.04% 100.00% 0.04% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00% 0.00%

0.04% 100.00% 0.04% 0.00% 0.00%


0.07% 100.00% 0.07% 0.00% 0.00%

95.98% 95.98% 0.00%

25.33% 100.00% 25.33% 0.00% 0.00%


0.94% 100.00% 0.94% 0.00% 0.00%
5.20% 100.00% 5.20% 0.00% 0.00%
4.06% 100.00% 4.06% 0.00% 0.00%

3.10% 100.00% 3.10% 0.00% 0.00%


0.44% 100.00% 0.44% 0.00% 0.00%
0.45% 100.00% 0.45% 0.00% 0.00%
PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
0.30% 100.00% 0.30% 0.00% 0.00%
0.60% 100.00% 0.60% 0.00% 0.00%

22.80% 90.00% 22.80% 0.00% 0.00%


0.84% 90.00% 0.84% 0.00% 0.00%
4.68% 90.00% 4.68% 0.00% 0.00%
3.65% 90.00% 3.65% 0.00% 0.00%

2.79% 90.00% 2.79% 0.00% 0.00%


0.40% 90.00% 0.40% 0.00% 0.00%
0.43% 95.00% 0.43% 0.00% 0.00%

0.27% 90.00% 0.27% 0.00% 0.00%


0.54% 90.00% 0.54% 0.00% 0.00%

11.45% 100.00% 11.45% 0.00% 0.00%


0.53% 100.00% 0.53% 0.00% 0.00%
1.55% 100.00% 1.55% 0.00% 0.00%

0.13% 100.00% 0.13% 0.00% 0.00%


0.02% 100.00% 0.02% 0.00% 0.00%

0.09% 100.00% 0.09% 0.00% 0.00%


0.30% 100.00% 0.30% 0.00% 0.00%

3.30% 100.00% 3.30% 0.00% 0.00%


1.17% 100.00% 1.17% 0.00% 0.00%
0.57% 100.00% 0.57% 0.00% 0.00%

0.06% 100.00% 0.06% 0.00% 0.00%


0.01% 100.00% 0.01% 0.00% 0.00%
PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
62.00% 62.00% 0.00%

10.61% 75.00% 10.61% 0.00% 0.00%


16.27% 75.00% 16.27% 0.00% 0.00%
0.07% 75.00% 0.07% 0.00% 0.00%
0.07% 75.00% 0.07% 0.00% 0.00%
4.61% 100.00% 4.61% 0.00% 0.00%

0.18% 50.00% 0.18% 0.00% 0.00%


0.02% 50.00% 0.02% 0.00% 0.00%
0.08% 50.00% 0.08% 0.00% 0.00%
0.09% 50.00% 0.09% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

12.94% 100.00% 12.94% 0.00% 0.00%


1.29% 75.00% 1.29% 0.00% 0.00%
0.04% 75.00% 0.04% 0.00% 0.00%
0.02% 50.00% 0.02% 0.00% 0.00%
1.89% 100.00% 1.89% 0.00% 0.00%

0.14% 75.00% 0.14% 0.00% 0.00%


0.19% 75.00% 0.19% 0.00% 0.00%
0.06% 75.00% 0.06% 0.00% 0.00%
0.05% 75.00% 0.05% 0.00% 0.00%
12.29% 75.00% 12.29% 0.00% 0.00%
1.09% 50.00% 1.09% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


PROGRES
S/D INI S/D LALU SAAT INI
BOBOT BOBOT BOBOT BOBOT BOBOT
KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK

0.00% 0.00% 0.00% 0.00% 0.00%


PROGRES

BANGUNAN : POWER HOUSE AND BOILER HOUSE UK. 23 x 48 M & SHELL RECEIVE BUILDING 23 x 12 M
LOKASI :
HARGA : 177,892,000.00

REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU

1. 0 PORTAL FRAME
1. 1 Portal Frame AS 1 1 Unit
Profil
MS - WF 350X175X7X11 Kolom kg 882.88 100% 882.88 882.88
MS - WF 350X175X7X11 Rafter kg 1,169.87 100% 1,169.87 1,169.87
MS - WF 350X175X7X11 Voute kg 122.21 100% 122.21 122.21
MS - WF 300X150X6.5X9 Kanopi + 9.00 kg 63.49 100% 63.49 63.49
MS - WF 300X150X6.5X9 Kanopi + 4.50 kg 199.83 100% 199.83 199.83
MS - WF 300X150X6.5X9 Support Kolom kg 771.43 100% 771.43 771.43
Pengecatan Baja kg 3,209.72 100% 3,209.72 3,209.72
Pelat - -
MS - PELAT 22 mm Base Plate WF 350 kg 29.62 100% 29.62 29.62
MS - PELAT 22 mm Base Plate WF 300 kg 22.30 100% 22.30 22.30
MS - PELAT 12 mm Pelat Sambung Rafter-Rafter kg 23.24 100% 23.24 23.24
MS - PELAT 12 mm Pelat Sambung Rafter-Kolom kg 23.73 100% 23.73 23.73
MS - PELAT 10 mm Pelat Sambung Kolom-Kanopi kg 21.75 100% 21.75 21.75
MS - PELAT 10 mm Pelat Sambung Rafter-Kolom Support kg 9.79 100% 9.79 9.79
MS - PELAT 10 mm Plat Penguat Base Plate WF 350 kg 2.01 100% 2.01 2.01
MS - PELAT 10 mm Plat Penguat Base Plate WF 300 kg 1.00 100% 1.00 1.00
MS - PELAT 10 mm Plat Penguat Rafter kg 4.71 100% 4.71 4.71
MS - PELAT 10 mm Plat Penguat Kolom kg 2.35 100% 2.35 2.35
MS - PELAT 10 mm Stiffener WF 350 kg 60.54 100% 60.54 60.54
MS - PELAT 8 mm Stiffener WF 300 kg 5.10 100% 5.10 5.10
MS - PELAT 8 mm End Plate kg 7.40 100% 7.40 7.40
Pengecatan Baja kg 213.56 100% 213.56 213.56
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Rafter-Rafter Bh 16.00 100% 16.00 16.00
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Kolom-Rafter Bh 32.00 100% 32.00 32.00
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Rafter-Kolom Support Bh 8.00 100% 8.00 8.00
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 32.00 100% 32.00 32.00
- -
1. 2 Portal Frame AS 2 - 4 3 Unit - -
Profil - -
MS - WF 350X175X7X11 Kolom kg 2,648.64 100% 2,648.64 2,648.64
MS - WF 350X175X7X11 Rafter kg 3,509.60 100% 3,509.60 3,509.60
MS - WF 350X175X7X11 Voute WF 350 kg 366.64 100% 366.64 366.64
MS - WF 300X150X6.5X9 Kanopi + 9.00 kg 190.47 100% 190.47 190.47
MS - WF 300X150X6.5X9 Kanopi + 4.50 kg 190.47 100% 190.47 190.47
MS - WF 150X75X5X7 Rafter kg 264.60 100% 264.60 264.60
MS - WF 150X75X5X7 Kolom kg 72.24 100% 72.24 72.24
MS - WF 150X75X5X7 Voute WF 150 kg 21.88 100% 21.88 21.88
Pengecatan Baja kg 7,264.55 100% 7,264.55 7,264.55
Pelat - -
MS - PELAT 22 mm Base Plate WF 350 kg 88.87 100% 88.87 88.87
MS - PELAT 12 mm Pelat Sambung Rafter-Rafter kg 69.72 100% 69.72 69.72
MS - PELAT 12 mm Pelat Sambung Rafter-Kolom kg 71.20 100% 71.20 71.20
MS - PELAT 10 mm Pelat Sambung Kolom-Kanopi kg 32.63 100% 32.63 32.63
MS - PELAT 10 mm Pelat Sambung Rafter WF 350-Kolom Jackroof kg 8.71 100% 8.71 8.71
MS - PELAT 10 mm Pelat Sambung Kolom Jackroof-Rafter Jackroof kg 8.71 100% 8.71 8.71
MS - PELAT 10 mm Pelat Sambung Rafter - Rafter Jackroof kg 14.83 100% 14.83 14.83
MS - PELAT 10 mm Plat Penguat Base Plate WF 350 kg 6.03 100% 6.03 6.03
MS - PELAT 10 mm Plat Penguat Rafter kg 14.12 100% 14.12 14.12
MS - PELAT 10 mm Plat Penguat Kolom kg 7.06 100% 7.06 7.06
MS - PELAT 10 mm Stiffener WF 350 kg 207.55 100% 207.55 207.55
MS - PELAT 6 mm Stiffener WF 150 kg 8.06 100% 8.06 8.06
MS - PELAT 8 mm End Plate kg 22.21 100% 22.21 22.21
Pengecatan Baja kg 559.70 100% 559.70 559.70
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Rafter-Rafter Bh 48.00 100% 48.00 48.00
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Kolom-Rafter Bh 96.00 100% 96.00 96.00
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 48.00 100% 48.00 48.00
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Baut Jackroof Bh 72.00 100% 72.00 72.00
- -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
1. 3 Portal Frame AS 5 1 Unit - -
Profil - -
MS - WF 350X175X7X11 Kolom + 12.00 kg 1,026.72 100% 1,026.72 1,026.72
MS - WF 350X175X7X11 Kolom Tambahan + 14.00 kg 352.16 100% 352.16 352.16
MS - WF 350X175X7X11 Rafter + 14.00 kg 1,169.87 100% 1,169.87 1,169.87
MS - WF 350X175X7X11 Rafter + 12.00 kg 1,169.87 100% 1,169.87 1,169.87
MS - WF 350X175X7X11 Voute + 14.00 kg 122.21 100% 122.21 122.21
MS - WF 350X175X7X11 Voute + 9.00 kg 122.21 100% 122.21 122.21
MS - WF 300X150X6.5X9 Kanopi + 14.00 kg 63.49 100% 63.49 63.49
MS - WF 300X150X6.5X9 Kanopi + 9.00 kg 63.49 100% 63.49 63.49
MS - WF 300X150X6.5X9 Kanopi + 4.50 kg 63.49 100% 63.49 63.49
Pengecatan Baja kg 352.16 100% 352.16 352.16
Pengecatan Baja kg 3,801.35 100% 3,801.35 3,801.35
Pelat - -
MS - PELAT 22 mm Base Plate kg 29.62 100% 29.62 29.62
MS - PELAT 12 mm Pelat Sambung Rafter-Rafter kg 23.24 100% 23.24 23.24
MS - PELAT 12 mm Pelat Sambung Rafter-Kolom + 9.00 kg 23.73 100% 23.73 23.73
MS - PELAT 12 mm Pelat Sambung Rafter-Kolom + 14.00 kg 23.73 100% 23.73 23.73
MS - PELAT 10 mm Pelat Sambung Kolom-Kanopi kg 16.31 100% 16.31 16.31
MS - PELAT 10 mm Plat Penguat Base Plate WF 350 kg 2.01 100% 2.01 2.01
MS - PELAT 10 mm Plat Penguat Rafter kg 4.71 100% 4.71 4.71
MS - PELAT 10 mm Plat Penguat Kolom kg 2.35 100% 2.35 2.35
MS - PELAT 10 mm Stiffener WF 350 kg 60.54 100% 60.54 60.54
MS - PELAT 10 mm Plat Sambung Kolom WF 350 kg 123.04 100% 123.04 123.04
MS - PELAT 6 mm Plat Sambung Kolom WF 350 kg 39.51 100% 39.51 39.51
MS - PELAT 8 mm End Plate kg 7.40 100% 7.40 7.40
Pengecatan Baja kg 162.55 100% 162.55 162.55
Pengecatan Baja kg 193.65 100% 193.65 193.65
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Rafter-Rafter Bh 32.00 100% 32.00 32.00
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Rafter-Kolom Bh 64.00 100% 64.00 64.00
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 24.00 100% 24.00 24.00
- -
1. 4 Portal Frame AS 6 - 8 3 Unit - -
Profil - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
MS - WF 350X175X7X11 Kolom + 12.00 kg 3,080.16 100% 3,080.16 3,080.16
MS - WF 350X175X7X11 Kolom Tambahan + 14.00 kg 1,056.48 100% 1,056.48 1,056.48
MS - WF 300X150X6.5X9 Rafter + 14.00 kg 2,593.96 100% 2,593.96 2,593.96
MS - WF 300X150X6.5X9 Voute + 14.00 kg 238.81 100% 238.81 238.81
MS - WF 300X150X6.5X9 Kanopi + 14.00 kg 190.47 100% 190.47 190.47
MS - WF 300X150X6.5X9 Kanopi + 9.00 kg 190.47 100% 190.47 190.47
MS - WF 300X150X6.5X9 Kanopi + 4.50 kg 190.47 100% 190.47 190.47
MS - WF 150X75X5X7 Rafter kg 264.60 100% 264.60 264.60
MS - WF 150X75X5X7 Kolom kg 72.24 100% 72.24 72.24
MS - WF 150X75X5X7 Voute WF 150 kg 21.88 100% 21.88 21.88
Pengecatan Baja kg 1,056.48 100% 1,056.48 1,056.48
Pengecatan Baja kg 6,843.06 100% 6,843.06 6,843.06
Pelat - -
MS - PELAT 22 mm Base Plate kg 88.87 100% 88.87 88.87
MS - PELAT 12 mm Pelat Sambung Rafter-Rafter kg 69.72 100% 69.72 69.72
MS - PELAT 12 mm Pelat Sambung Rafter-Kolom + 14.00 kg 71.20 100% 71.20 71.20
MS - PELAT 10 mm Pelat Sambung Kolom-Kanopi kg 48.94 100% 48.94 48.94
MS - PELAT 10 mm Pelat Sambung Rafter WF 350-Kolom Jackroof kg 8.71 100% 8.71 8.71
MS - PELAT 10 mm Pelat Sambung Kolom Jackroof-Rafter Jackroof kg 8.71 100% 8.71 8.71
MS - PELAT 10 mm Pelat Sambung Rafter - Rafter Jackroof kg 14.83 100% 14.83 14.83
MS - PELAT 10 mm Plat Penguat Base Plate WF 350 kg 6.03 100% 6.03 6.03
MS - PELAT 10 mm Plat Penguat Rafter kg 14.12 100% 14.12 14.12
MS - PELAT 10 mm Plat Penguat Kolom kg 7.06 100% 7.06 7.06
MS - PELAT 10 mm Stiffener WF 350 kg 207.55 100% 207.55 207.55
MS - PELAT 6 mm Stiffener WF 150 kg 8.06 100% 8.06 8.06
MS - PELAT 10 mm Plat Sambung Kolom WF 350 kg 369.12 100% 369.12 369.12
MS - PELAT 6 mm Plat Sambung Kolom WF 350 kg 118.54 100% 118.54 118.54
MS - PELAT 8 mm End Plate kg 22.21 100% 22.21 22.21
Pengecatan Baja kg 487.65 100% 487.65 487.65
Pengecatan Baja kg 576.01 100% 576.01 576.01
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Rafter-Rafter Bh 48.00 100% 48.00 48.00
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Kolom-Rafter Bh 96.00 100% 96.00 96.00
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 72.00 100% 72.00 72.00
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Baut Jackroof Bh 72.00 100% 72.00 72.00
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
- -
1. 5 Portal Frame AS 9-12 4 Unit - -
Pelat - -
MS - WF 350X175X7X11 Kolom + 12.00 kg 4,106.88 100% 4,106.88 4,106.88
MS - WF 350X175X7X11 Kolom Tambahan + 14.00 kg 1,408.64 100% 1,408.64 1,408.64
MS - WF 350X175X7X11 Rafter + 14.00 kg 4,679.46 100% 4,679.46 4,679.46
MS - WF 350X175X7X11 Voute + 14.00 kg 488.86 100% 488.86 488.86
MS - WF 300X150X6.5X9 Kanopi + 14.00 kg 253.96 100% 253.96 253.96
MS - WF 300X150X6.5X9 Kanopi + 9.00 kg 253.96 100% 253.96 253.96
MS - WF 300X150X6.5X9 Kanopi + 4.50 kg 253.96 100% 253.96 253.96
MS - WF 150X75X5X7 Rafter kg 352.80 100% 352.80 352.80
MS - WF 150X75X5X7 Kolom kg 96.32 100% 96.32 96.32
MS - WF 150X75X5X7 Voute WF 150 kg 29.18 100% 29.18 29.18
Pengecatan Baja kg 1,408.64 100% 1,408.64 1,408.64
Pengecatan Baja kg 10,515.39 100% 10,515.39 10,515.39
Pelat - -
MS - PELAT 22 mm Base Plate kg 118.49 100% 118.49 118.49
MS - PELAT 12 mm Pelat Sambung Rafter-Rafter kg 92.96 100% 92.96 92.96
MS - PELAT 12 mm Pelat Sambung Rafter-Kolom + 14.00 kg 94.94 100% 94.94 94.94
MS - PELAT 10 mm Pelat Sambung Kolom-Kanopi kg 65.25 100% 65.25 65.25
MS - PELAT 10 mm Pelat Sambung Rafter WF 350-Kolom Jackroof kg 11.61 100% 11.61 11.61
MS - PELAT 10 mm Pelat Sambung Kolom Jackroof-Rafter Jackroof kg 11.61 100% 11.61 11.61
MS - PELAT 10 mm Pelat Sambung Rafter - Rafter Jackroof kg 19.77 100% 19.77 19.77
MS - PELAT 10 mm Plat Penguat Base Plate WF 350 kg 8.04 100% 8.04 8.04
MS - PELAT 10 mm Plat Penguat Rafter kg 18.83 100% 18.83 18.83
MS - PELAT 10 mm Plat Penguat Kolom kg 9.42 100% 9.42 9.42
MS - PELAT 10 mm Stiffener WF 350 kg 276.73 100% 276.73 276.73
MS - PELAT 6 mm Stiffener WF 150 kg 10.75 100% 10.75 10.75
MS - PELAT 10 mm Plat Sambung Kolom WF 350 kg 263.66 100% 263.66 263.66
MS - PELAT 6 mm Plat Sambung Kolom WF 350 kg 295.02 100% 295.02 295.02
MS - PELAT 8 mm End Plate kg 29.61 100% 29.61 29.61
Pengecatan Baja kg 558.68 100% 558.68 558.68
Pengecatan Baja kg 768.02 100% 768.02 768.02
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Rafter-Rafter Bh 64.00 100% 64.00 64.00
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Kolom-Rafter Bh 128.00 100% 128.00 128.00
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 96.00 100% 96.00 96.00
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Baut Jackroof Bh 96.00 100% 96.00 96.00
- -
1. 5 Portal Frame AS 13 - -
Profil - -
MS - WF 350X175X7X11 Kolom + 12.00 kg 1,026.72 100% 1,026.72 1,026.72
MS - WF 350X175X7X11 Kolom Tambahan + 14.00 kg 352.16 100% 352.16 352.16
MS - WF 350X175X7X11 Rafter + 14.00 kg 1,169.87 100% 1,169.87 1,169.87
MS - WF 350X175X7X11 Voute + 14.00 kg 122.21 100% 122.21 122.21
MS - WF 300X150X6.5X9 Support Kolom kg 880.80 100% 880.80 880.80
MS - WF 300X150X6.5X9 Kolom Tambahan Support kg 257.63 100% 257.63 257.63
MS - WF 300X150X6.5X9 Kanopi + 14.00 kg 63.49 100% 63.49 63.49
MS - WF 300X150X6.5X9 Kanopi + 9.00 kg 199.83 100% 199.83 199.83
MS - WF 300X150X6.5X9 Kanopi + 4.50 kg 199.83 100% 199.83 199.83
Pengecatan Baja kg 609.79 100% 609.79 609.79
Pengecatan Baja kg 3,662.75 100% 3,662.75 3,662.75
Pelat - -
MS - PELAT 22 mm Base Plate WF 350 kg 29.62 100% 29.62 29.62
MS - PELAT 22 mm Base Plate WF 300 kg 22.30 100% 22.30 22.30
MS - PELAT 12 mm Pelat Sambung Rafter-Rafter kg 23.24 100% 23.24 23.24
MS - PELAT 12 mm Pelat Sambung Rafter-Kolom kg 23.73 100% 23.73 23.73
MS - PELAT 10 mm Pelat Sambung Kolom-Kanopi kg 21.75 100% 21.75 21.75
MS - PELAT 10 mm Pelat Sambung Rafter-Kolom Support kg 9.79 100% 9.79 9.79
MS - PELAT 10 mm Plat Penguat Base Plate WF 350 kg 2.01 100% 2.01 2.01
MS - PELAT 10 mm Plat Penguat Base Plate WF 300 kg 1.00 100% 1.00 1.00
MS - PELAT 10 mm Plat Penguat Rafter kg 4.71 100% 4.71 4.71
MS - PELAT 10 mm Plat Penguat Kolom kg 2.35 100% 2.35 2.35
MS - PELAT 10 mm Stiffener WF 350 kg 60.54 100% 60.54 60.54
MS - PELAT 8 mm Stiffener WF 300 kg 5.10 100% 5.10 5.10
MS - PELAT 10 mm Plat Sambung Kolom WF 350 kg 65.91 100% 65.91 65.91
MS - PELAT 6 mm Plat Sambung Kolom WF 350 kg 65.85 100% 65.85 65.85
MS - PELAT 10 mm Plat Sambung Kolom WF 300 kg 45.20 100% 45.20 45.20
MS - PELAT 6 mm Plat Sambung Kolom WF 300 kg 54.19 100% 54.19 54.19
MS - PELAT 8 mm End Plate kg 7.40 100% 7.40 7.40
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
Pengecatan Baja kg 231.15 100% 231.15 231.15
Pengecatan Baja kg 213.56 100% 213.56 213.56
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Rafter-Rafter Bh 16.00 100% 16.00 16.00
BOLT & NUT HTB A325 - Ø 3/4" X 2" Baut Kolom-Rafter Bh 32.00 100% 32.00 32.00
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Rafter-Kolom Support Bh 8.00 100% 8.00 8.00
BOLT & NUT HTB A325 - Ø 5/8" X 2" Baut Kolom-Kanopi Bh 56.00 100% 56.00 56.00
- -
2. 0 SOKONG KOLOM - -
2. 1 Typical Sokong Kolom - -
Profil - -
MS - CNP 150X50X20X3.2 Rangka kg 2,143.68 100% 2,143.68 2,143.68
MS - L 75X75X6 Dudukan kg 98.93 100% 98.93 98.93
MS - L 75X75X6 Penggantung Sagrod kg 82.44 100% 82.44 82.44
Besi Beton Polos Ø 16 mm Kremona kg 708.17 100% 708.17 708.17
Pengecatan Baja kg 3,033.22 100% 3,033.22 3,033.22
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 1/2" X 1-1/2" Bh 192.00 100% 192.00 192.00
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Bh 104.00 100% 104.00 104.00
BOLT & NUT HTB A325 - Ø 5/8" X 1-3/4" Bh 78.00 100% 78.00 78.00
- -
3. 0 STRUKTUR ATAP - -
3. 1 Rangka Atap Utama - -
Profil - -
MS - CNP 125X50X20X3.2 Gording kg 8,795.20 100% 8,795.20 8,795.20
Besi Beton Polos Ø 12 mm Sagrod Ø 12 mm kg 665.08 100% 665.08 665.08
Besi Beton Polos Ø 16 mm Ikatan Angin kg 786.35 100% 786.35 786.35
Pengecatan Baja kg 10,246.62 100% 10,246.62 10,246.62
Pelat - -
MS - PELAT 8 mm Dudukan Gording kg 329.33 100% 329.33 329.33
MS - PELAT 8 mm Plat Ikatan angin kg 354.23 100% 354.23 354.23
Pengecatan Baja kg 683.56 100% 683.56 683.56
Bolt & Nut - -
BOLT & NUT M 12 X 30 Baut Gording Bh 1,024.00 100% 1,024.00 1,024.00
Nut M 12 Baut Sagrod Bh 1,792.00 100% 1,792.00 1,792.00
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
Turn Buckle 5/8" Ikatan Angin Bh 128.00 100% 128.00 128.00
- -
3. 2 Rangka atap Jackroof - -
Profil - -
MS - CNP 125X50X20X3.2 Gording kg 1,987.20 100% 1,987.20 1,987.20
Besi Beton Polos Ø 12 mm Sagrod kg 96.13 100% 96.13 96.13
MS - L 40X40X4 Rangka Flashing kg 232.00 100% 232.00 232.00
Pengecatan Baja kg 2,315.33 100% 2,315.33 2,315.33
Pelat - -
MS - PELAT 8 mm Dudukan Gording kg 77.19 100% 77.19 77.19
Pengecatan Baja kg 77.19 100% 77.19 77.19
Bolt & Nut - -
BOLT & NUT M 12 X 30 Baut Gording Bh 240.00 100% 240.00 240.00
Nut M 12 Bh 384.00 100% 384.00 384.00
- -
3. 3 Rangka Atap Kanopi + 9.00 - -
Profil - -
MS - CNP 125X50X20X3.2 Gording kg 1,511.68 100% 1,511.68 1,511.68
MS - CNP 125X50X20X3.2 Penguat Ujung kg 44.16 100% 44.16 44.16
Besi Beton Polos Ø 12 mm kg 52.39 100% 52.39 52.39
Pengecatan Baja kg 1,608.23 100% 1,608.23 1,608.23
Pelat - -
MS - PELAT 8 mm Dudukan Gording kg 56.60 100% 56.60 56.60
MS - PELAT 6 mm Plat Simpul kg 14.40 100% 14.40 14.40
Pengecatan Baja kg 71.00 100% 71.00 71.00
Bolt & Nut - -
BOLT & NUT M 12 X 30 Bh 240.00 100% 240.00 240.00
Nut M 12 Bh 164.00 100% 164.00 164.00
- -
3. 4 Rangka Atap Kanopi + 4.50 - -
Profil - -
MS - CNP 125X50X20X3.2 Gording kg 2,434.69 100% 2,434.69 2,434.69
MS - CNP 125X50X20X3.2 Penguat Ujung kg 88.32 100% 88.32 88.32
Besi Beton Polos Ø 12 mm kg 84.34 100% 84.34 84.34
Pengecatan Baja kg 2,607.34 100% 2,607.34 2,607.34
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
Pelat - -
MS - PELAT 8 mm Dudukan Gording kg 77.19 100% 77.19 77.19
MS - PELAT 6 mm Plat Simpul kg 28.80 100% 28.80 28.80
Pengecatan Baja kg 105.99 100% 105.99 105.99
Bolt & Nut - -
BOLT & NUT M 12 X 30 Bh 304.00 100% 304.00 304.00
Nut M 12 Bh 264.00 100% 264.00 264.00
- -
4. 0 STUKTUR DINDING - -
4. 1 Rangka Dinding As A - -
Profil - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 3,753.60 100% 3,753.60 3,753.60
Besi Beton Polos Ø 12 mm Sagrod kg 195.29 100% 195.29 195.29
Pengecatan Baja kg 3,948.89 100% 3,948.89 3,948.89
Pelat - -
MS - PELAT 8 mm Dudukan Rangka kg 81.93 100% 81.93 81.93
Pengecatan Baja kg 81.93 100% 81.93 81.93
Bolt & Nut - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 408.00 100% 408.00 408.00
Nut M 12 Nut Sagrod bh 816.00 100% 816.00 816.00
- -
4. 2 Rangka Dinding As B - -
Profil - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 3,827.20 90% 3,444.48 3,444.48
Besi Beton Polos Ø 12 mm Sagrod kg 199.84 90% 179.85 179.85
Pengecatan Baja kg 4,027.04 100% 4,027.04 4,027.04
Pelat - -
MS - PELAT 8 mm Dudukan Rangka kg 83.54 90% 75.18 75.18
Pengecatan Baja kg 83.54 100% 83.54 83.54
Bolt & Nut - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 832.00 90% 748.80 748.80
Nut M 12 Nut Sagrod bh 832.00 90% 748.80 748.80
- -
4. 3 Rangka Dinding As 1 - -
Profil - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
MS - CNP 125X50X20X3.2 Rangka dinding kg 1,155.64 100% 1,155.64 1,155.64
Besi Beton Polos Ø 12 mm Sagrod kg 63.67 100% 63.67 63.67
Pengecatan Baja kg 1,219.31 100% 1,219.31 1,219.31
Pelat - -
MS - PELAT 8 mm Dudukan Rangka kg 16.87 100% 16.87 16.87
MS - PELAT 8 mm Gantungan Sagrod kg 1.66 100% 1.66 1.66
Pengecatan Baja kg 18.52 100% 18.52 18.52
Bolt & Nut - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 84.00 100% 84.00 84.00
Nut M 12 Nut Sagrod bh 238.00 100% 238.00 238.00
- -
4. 4 Rangka Dinding As 5 - -
Profil - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 977.35 100% 977.35 977.35
Pengecatan Baja kg 977.35 100% 977.35 977.35
- -
4. 5 Rangka Dinding As 13 - -
Profil - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 1,757.81 90% 1,582.03 1,582.03
Besi Beton Polos Ø 12 mm Sagrod kg 106.27 90% 95.64 95.64
Pengecatan Baja kg 1,864.07 100% 1,864.07 1,864.07
Pelat - -
MS - PELAT 8 mm Dudukan Rangka kg 27.31 100% 27.31 27.31
MS - PELAT 8 mm Gantungan Sagrod kg 1.05 100% 1.05 1.05
Pengecatan Baja kg 28.36 100% 28.36 28.36
Bolt & Nut - -
BOLT & NUT M 12 X 30 Baut Rangka Dinding bh 272.00 100% 272.00 272.00
Nut M 12 Nut Sagrod bh 394.00 100% 394.00 394.00
- -
4. 6 Rangka Dinding As 2,4,6,12 - -
Profil - -
MS - CNP 125X50X20X3.2 Rangka dinding kg 233.07 100% 233.07 233.07
Pengecatan Baja kg 233.07 100% 233.07 233.07
- -
4. 7 Bracing Kolom - -
REALISASI PEKERJAAN
KETERANGAN SAT VOLUME
NO SATUAN PEKERJAAN
S/D S/D
INI LALU
Profil - -
Pipa Hitam STK 41 - Ø 2-1/2" - 3.2 mm Bracing Kolom kg 1,407.71 100% 1,407.71 1,407.71
Pengecatan Baja kg 1,407.71 100% 1,407.71 1,407.71
Pelat - -
MS - PELAT 10 mm Plat Simpul kg 208.73 100% 208.73 208.73
Pengecatan Baja kg 208.73 100% 208.73 208.73
Bolt & Nut - -
BOLT & NUT HTB A325 - Ø 5/8" X 2" bh 256.00 100% 256.00 256.00

JUMLAH
DIBULATKAN
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK

100.00% 100.00% 0.00%

- 100.00% 1.64% 100.00% 1.64% 0.00% 0.00%


- 100.00% 2.17% 100.00% 2.17% 0.00% 0.00%
- 100.00% 0.23% 100.00% 0.23% 0.00% 0.00%
- 100.00% 0.12% 100.00% 0.12% 0.00% 0.00%
- 100.00% 0.37% 100.00% 0.37% 0.00% 0.00%
- 100.00% 1.43% 100.00% 1.43% 0.00% 0.00%
- 100.00% 0.76% 100.00% 0.76% 0.00% 0.00%
-
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.11% 100.00% 0.11% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
-
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
-
-
-
- 100.00% 4.92% 100.00% 4.92% 0.00% 0.00%
- 100.00% 6.52% 100.00% 6.52% 0.00% 0.00%
- 100.00% 0.68% 100.00% 0.68% 0.00% 0.00%
- 100.00% 0.35% 100.00% 0.35% 0.00% 0.00%
- 100.00% 0.35% 100.00% 0.35% 0.00% 0.00%
- 100.00% 0.49% 100.00% 0.49% 0.00% 0.00%
- 100.00% 0.13% 100.00% 0.13% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 1.73% 100.00% 1.73% 0.00% 0.00%
-
- 100.00% 0.17% 100.00% 0.17% 0.00% 0.00%
- 100.00% 0.13% 100.00% 0.13% 0.00% 0.00%
- 100.00% 0.13% 100.00% 0.13% 0.00% 0.00%
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.39% 100.00% 0.39% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.13% 100.00% 0.13% 0.00% 0.00%
-
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
-
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
-
-
- 100.00% 1.91% 100.00% 1.91% 0.00% 0.00%
- 100.00% 1.31% 100.00% 1.31% 0.00% 0.00%
- 100.00% 2.17% 100.00% 2.17% 0.00% 0.00%
- 100.00% 2.17% 100.00% 2.17% 0.00% 0.00%
- 100.00% 0.23% 100.00% 0.23% 0.00% 0.00%
- 100.00% 0.23% 100.00% 0.23% 0.00% 0.00%
- 100.00% 0.12% 100.00% 0.12% 0.00% 0.00%
- 100.00% 0.12% 100.00% 0.12% 0.00% 0.00%
- 100.00% 0.12% 100.00% 0.12% 0.00% 0.00%
- 100.00% 0.17% 100.00% 0.17% 0.00% 0.00%
- 100.00% 0.90% 100.00% 0.90% 0.00% 0.00%
-
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.11% 100.00% 0.11% 0.00% 0.00%
- 100.00% 0.46% 100.00% 0.46% 0.00% 0.00%
- 100.00% 0.15% 100.00% 0.15% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.08% 100.00% 0.08% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
-
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
-
-
-
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
- 100.00% 5.73% 100.00% 5.73% 0.00% 0.00%
- 100.00% 3.93% 100.00% 3.93% 0.00% 0.00%
- 100.00% 4.82% 100.00% 4.82% 0.00% 0.00%
- 100.00% 0.44% 100.00% 0.44% 0.00% 0.00%
- 100.00% 0.35% 100.00% 0.35% 0.00% 0.00%
- 100.00% 0.35% 100.00% 0.35% 0.00% 0.00%
- 100.00% 0.35% 100.00% 0.35% 0.00% 0.00%
- 100.00% 0.49% 100.00% 0.49% 0.00% 0.00%
- 100.00% 0.13% 100.00% 0.13% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.50% 100.00% 0.50% 0.00% 0.00%
- 100.00% 1.63% 100.00% 1.63% 0.00% 0.00%
-
- 100.00% 0.17% 100.00% 0.17% 0.00% 0.00%
- 100.00% 0.09% 100.00% 0.09% 0.00% 0.00%
- 100.00% 0.09% 100.00% 0.09% 0.00% 0.00%
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.39% 100.00% 0.39% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 1.37% 100.00% 1.37% 0.00% 0.00%
- 100.00% 0.44% 100.00% 0.44% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.23% 100.00% 0.23% 0.00% 0.00%
- 100.00% 0.14% 100.00% 0.14% 0.00% 0.00%
-
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
-
-
-
- 100.00% 7.63% 100.00% 7.63% 0.00% 0.00%
- 100.00% 5.24% 100.00% 5.24% 0.00% 0.00%
- 100.00% 8.70% 100.00% 8.70% 0.00% 0.00%
- 100.00% 0.91% 100.00% 0.91% 0.00% 0.00%
- 100.00% 0.47% 100.00% 0.47% 0.00% 0.00%
- 100.00% 0.47% 100.00% 0.47% 0.00% 0.00%
- 100.00% 0.47% 100.00% 0.47% 0.00% 0.00%
- 100.00% 0.66% 100.00% 0.66% 0.00% 0.00%
- 100.00% 0.18% 100.00% 0.18% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
- 100.00% 0.67% 100.00% 0.67% 0.00% 0.00%
- 100.00% 2.50% 100.00% 2.50% 0.00% 0.00%
-
- 100.00% 0.22% 100.00% 0.22% 0.00% 0.00%
- 100.00% 0.09% 100.00% 0.09% 0.00% 0.00%
- 100.00% 0.09% 100.00% 0.09% 0.00% 0.00%
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.51% 100.00% 0.51% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.98% 100.00% 0.98% 0.00% 0.00%
- 100.00% 1.10% 100.00% 1.10% 0.00% 0.00%
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.27% 100.00% 0.27% 0.00% 0.00%
- 100.00% 0.18% 100.00% 0.18% 0.00% 0.00%
-
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
-
-
-
- 100.00% 1.91% 100.00% 1.91% 0.00% 0.00%
- 100.00% 1.31% 100.00% 1.31% 0.00% 0.00%
- 100.00% 2.17% 100.00% 2.17% 0.00% 0.00%
- 100.00% 0.23% 100.00% 0.23% 0.00% 0.00%
- 100.00% 1.64% 100.00% 1.64% 0.00% 0.00%
- 100.00% 0.96% 100.00% 0.96% 0.00% 0.00%
- 100.00% 0.12% 100.00% 0.12% 0.00% 0.00%
- 100.00% 0.37% 100.00% 0.37% 0.00% 0.00%
- 100.00% 0.37% 100.00% 0.37% 0.00% 0.00%
- 100.00% 0.29% 100.00% 0.29% 0.00% 0.00%
- 100.00% 0.87% 100.00% 0.87% 0.00% 0.00%
-
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.11% 100.00% 0.11% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.25% 100.00% 0.25% 0.00% 0.00%
- 100.00% 0.24% 100.00% 0.24% 0.00% 0.00%
- 100.00% 0.17% 100.00% 0.17% 0.00% 0.00%
- 100.00% 0.20% 100.00% 0.20% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
- 100.00% 0.11% 100.00% 0.11% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
-
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
- 100.00% 0.03% 100.00% 0.03% 0.00% 0.00%
-
- 100.00% 100.00% 0.00%
-
-
- 100.00% 60.86% 100.00% 60.86% 0.00% 0.00%
- 100.00% 2.81% 100.00% 2.81% 0.00% 0.00%
- 100.00% 2.34% 100.00% 2.34% 0.00% 0.00%
- 100.00% 20.11% 100.00% 20.11% 0.00% 0.00%
- 100.00% 11.01% 100.00% 11.01% 0.00% 0.00%
-
- 100.00% 1.47% 100.00% 1.47% 0.00% 0.00%
- 100.00% 0.80% 100.00% 0.80% 0.00% 0.00%
- 100.00% 0.60% 100.00% 0.60% 0.00% 0.00%
-
- 100.00% 100.00% 0.00%
-
-
- 100.00% 42.52% 100.00% 42.52% 0.00% 0.00%
- 100.00% 3.22% 100.00% 3.22% 0.00% 0.00%
- 100.00% 3.80% 100.00% 3.80% 0.00% 0.00%
-
-
- 100.00% 1.59% 100.00% 1.59% 0.00% 0.00%
- 100.00% 1.71% 100.00% 1.71% 0.00% 0.00%
- 100.00% 0.42% 100.00% 0.42% 0.00% 0.00%
-
- 100.00% 1.34% 100.00% 1.34% 0.00% 0.00%
- 100.00% 2.34% 100.00% 2.34% 0.00% 0.00%
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
- 100.00% 5.40% 100.00% 5.40% 0.00% 0.00%
-
-
-
- 100.00% 9.61% 100.00% 9.61% 0.00% 0.00%
- 100.00% 0.46% 100.00% 0.46% 0.00% 0.00%
- 100.00% 1.12% 100.00% 1.12% 0.00% 0.00%
- 100.00% 0.00% 100.00% 0.00% 0.00% 0.00%
-
- 100.00% 0.37% 100.00% 0.37% 0.00% 0.00%
- 100.00% 0.05% 100.00% 0.05% 0.00% 0.00%
-
- 100.00% 0.31% 100.00% 0.31% 0.00% 0.00%
- 100.00% 0.50% 100.00% 0.50% 0.00% 0.00%
-
-
-
- 100.00% 7.31% 100.00% 7.31% 0.00% 0.00%
- 100.00% 0.21% 100.00% 0.21% 0.00% 0.00%
- 100.00% 0.25% 100.00% 0.25% 0.00% 0.00%
- 100.00% 0.99% 100.00% 0.99% 0.00% 0.00%
-
- 100.00% 0.27% 100.00% 0.27% 0.00% 0.00%
- 100.00% 0.07% 100.00% 0.07% 0.00% 0.00%
- 100.00% 0.04% 100.00% 0.04% 0.00% 0.00%
-
- 100.00% 0.31% 100.00% 0.31% 0.00% 0.00%
- 100.00% 0.21% 100.00% 0.21% 0.00% 0.00%
-
-
-
- 100.00% 11.77% 100.00% 11.77% 0.00% 0.00%
- 100.00% 0.43% 100.00% 0.43% 0.00% 0.00%
- 100.00% 0.41% 100.00% 0.41% 0.00% 0.00%
- 100.00% 1.61% 100.00% 1.61% 0.00% 0.00%
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
-
- 100.00% 0.37% 100.00% 0.37% 0.00% 0.00%
- 100.00% 0.14% 100.00% 0.14% 0.00% 0.00%
- 100.00% 0.07% 100.00% 0.07% 0.00% 0.00%
-
- 100.00% 0.40% 100.00% 0.40% 0.00% 0.00%
- 100.00% 0.34% 100.00% 0.34% 0.00% 0.00%
-
- 96.45% 96.45% 0.00%
-
-
- 100.00% 20.72% 100.00% 20.72% 0.00% 0.00%
- 100.00% 1.08% 100.00% 1.08% 0.00% 0.00%
- 100.00% 2.79% 100.00% 2.79% 0.00% 0.00%
-
- 100.00% 0.45% 100.00% 0.45% 0.00% 0.00%
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
-
- 100.00% 0.61% 100.00% 0.61% 0.00% 0.00%
- 100.00% 1.22% 100.00% 1.22% 0.00% 0.00%
-
-
-
- 90.00% 19.01% 90.00% 19.01% 0.00% 0.00%
- 90.00% 0.99% 90.00% 0.99% 0.00% 0.00%
- 100.00% 2.84% 100.00% 2.84% 0.00% 0.00%
-
- 90.00% 0.41% 90.00% 0.41% 0.00% 0.00%
- 100.00% 0.06% 100.00% 0.06% 0.00% 0.00%
-
- 90.00% 1.12% 90.00% 1.12% 0.00% 0.00%
- 90.00% 1.12% 90.00% 1.12% 0.00% 0.00%
-
-
-
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
- 100.00% 6.38% 100.00% 6.38% 0.00% 0.00%
- 100.00% 0.35% 100.00% 0.35% 0.00% 0.00%
- 100.00% 0.86% 100.00% 0.86% 0.00% 0.00%
-
- 100.00% 0.09% 100.00% 0.09% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
-
- 100.00% 0.13% 100.00% 0.13% 0.00% 0.00%
- 100.00% 0.35% 100.00% 0.35% 0.00% 0.00%
-
-
-
- 100.00% 10.79% 100.00% 10.79% 0.00% 0.00%
- 100.00% 1.38% 100.00% 1.38% 0.00% 0.00%
-
-
-
- 90.00% 8.73% 90.00% 8.73% 0.00% 0.00%
- 90.00% 0.53% 90.00% 0.53% 0.00% 0.00%
- 100.00% 1.32% 100.00% 1.32% 0.00% 0.00%
-
- 100.00% 0.15% 100.00% 0.15% 0.00% 0.00%
- 100.00% 0.01% 100.00% 0.01% 0.00% 0.00%
- 100.00% 0.02% 100.00% 0.02% 0.00% 0.00%
-
- 100.00% 0.41% 100.00% 0.41% 0.00% 0.00%
- 100.00% 0.59% 100.00% 0.59% 0.00% 0.00%
-
-
-
- 100.00% 1.29% 100.00% 1.29% 0.00% 0.00%
- 100.00% 0.16% 100.00% 0.16% 0.00% 0.00%
-
-
PROGRES
ERJAAN
S/D INI S/D LALU SAAT INI
SAAT BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
INI FAKTOR KONTRAK FAKTOR KONTRAK FAKTOR KONTRAK
-
- 100.00% 7.77% 100.00% 7.77% 0.00% 0.00%
- 100.00% 0.99% 100.00% 0.99% 0.00% 0.00%
-
- 100.00% 1.15% 100.00% 1.15% 0.00% 0.00%
- 100.00% 0.15% 100.00% 0.15% 0.00% 0.00%
-
- 100.00% 0.38% 100.00% 0.38% 0.00% 0.00%