Sie sind auf Seite 1von 5

<table cellspacing="0" cellpadding="3" rules="all" border="1" id="grdListado"

style="background-color:White;border-color:Black;border-width:1px;border-
style:Solid;font-family:verdana;font-size:8pt;width:100%;border-
collapse:collapse;">
<tr class="labelTextLeftBold" style="border-color:Gray;font-size:8pt;font-
weight:bold;">
<td>Numero</td><td>Ambito</td><td>Elemento</td><td>Fecha
Inicio</td><td>Fecha Fin</td><td>Trabajos a
Realizar</td><td>Observaciones</td><td>Estado</td><td>Fecha Inicio
Real</td><td>Fecha Fin Real</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>298235</td><td>Nacional</td><td>COSPIQUE - MEMBRILLAL 1 66
kV</td><td>15/07/2019 08:00:00 a.m.</td><td>17/07/2019 04:00:00 p.m.</td><td>PODA Y
TROCHA</td><td>PODA LIGERA BAJO LINEA-PODA EXHAUSTIVA BAJO LINEA-AMPLIACION DE
TROCHA-MANTENIMIENTO DE TROCHA-APILAMIENTO RECOLECCION Y TRASLADO DE
RESIDUOS</td><td>EN EJECUCI�N</td><td>15/07/2019 08:10:00 a.m.</td><td>&nbsp;</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>298258</td><td>Nacional</td><td>TERNERA - TOLUVIEJO 1 110
kV</td><td>02/07/2019 08:00:00 a.m.</td><td>17/07/2019 04:00:00 p.m.</td><td>PODA Y
TROCHA</td><td>PODA LIGERA BAJO LINEA-PODA EXHAUSTIVA BAJO LINEA-AMPLIACION DE
TROCHA-MANTENIMIENTO DE TROCHA-APILAMIENTO RECOLECCION Y TRASLADO DE
RESIDUOS</td><td>EN EJECUCI�N</td><td>02/07/2019 08:29:00 a.m.</td><td>&nbsp;</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>298356</td><td>Local</td><td>CARTAGENA - PROELECTRICA 1 66
kV</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 04:00:00
p.m.</td><td>INSPECCION OCULAR EXHAUSTIVA DE LINEA</td><td>INSPECCION OCULAR BASICA
DE-LINEA-ESTRUCTURAS-AISLAMIENTOS-CIMENTACIONES-HERRAJERIAS DE LAS ESTRUCTURAS-
SISTEMA DE PUESTA TIERRA SPT-INSPECCION DE PODA Y
TROCHA</td><td>EJECUTADO</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019
04:00:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>298357</td><td>Local</td><td>CARTAGENA - PROELECTRICA 2 66
kV</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 04:00:00
p.m.</td><td>INSPECCION OCULAR EXHAUSTIVA DE LINEA</td><td>INSPECCION OCULAR BASICA
DE-LINEA-ESTRUCTURAS-AISLAMIENTOS-CIMENTACIONES-HERRAJERIAS DE LAS ESTRUCTURAS-
SISTEMA DE PUESTA TIERRA SPT-INSPECCION DE PODA Y
TROCHA</td><td>EJECUTADO</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019
04:00:00 p.m.</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>298578</td><td>Local</td><td>SERVICIOS AUX.
MAGANGUE</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 04:00:00
p.m.</td><td>MTTO SERVICIOS AUXILIARES 2M</td><td>INSPECCION OCULAR BASICA DEL
TRAFO SSAA-MANTENIMIENTO DE GRUPO ELECTROGENO-REVISION DEL BANCO DE BATERIAS-
LIMPIEZA Y PRUEBAS TOMA DE DATOS ELECTRICOS Y QUIMICOS EN LAS BATERIAS-REVISION
DE LOS CARGADORES-MANTENIMIENTO DE TABLEROS AC Y DC-LIMPIEZA Y PRUEBAS DE PLANTA
DIESEL Y TRANSFERENCIA</td><td>EJECUTADO</td><td>15/07/2019 08:29:00
a.m.</td><td>15/07/2019 04:06:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>298820</td><td>Local</td><td>SERVICIOS AUX.
BOCAGRANDE</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 04:00:00
p.m.</td><td>MTTO SERVICIOS AUXILIARES 2M</td><td>INSPECCION OCULAR BASICA DEL
TRAFO SSAA-MANTENIMIENTO DE GRUPO ELECTROGENO-REVISION DEL BANCO DE BATERIAS-
LIMPIEZA Y PRUEBAS TOMA DE DATOS ELECTRICOS Y QUIMICOS EN LAS BATERIAS-REVISION
DE LOS CARGADORES-MANTENIMIENTO DE TABLEROS AC Y DC-LIMPIEZA Y PRUEBAS DE PLANTA
DIESEL Y TRANSFERENCIA</td><td>EJECUTADO</td><td>15/07/2019 09:01:00
a.m.</td><td>15/07/2019 05:52:00 p.m.</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>299031</td><td>Local</td><td>SERVICIOS AUX.
MEMBRILLAL</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 04:00:00
p.m.</td><td>MTTO SERVICIOS AUXILIARES 2M</td><td>INSPECCION OCULAR BASICA DEL
TRAFO SSAA-MANTENIMIENTO DE GRUPO ELECTROGENO-REVISION DEL BANCO DE BATERIAS-
LIMPIEZA Y PRUEBAS TOMA DE DATOS ELECTRICOS Y QUIMICOS EN LAS BATERIAS-REVISION
DE LOS CARGADORES-MANTENIMIENTO DE TABLEROS AC Y DC-LIMPIEZA Y PRUEBAS DE PLANTA
DIESEL Y TRANSFERENCIA</td><td>EJECUTADO</td><td>15/07/2019 08:07:00
a.m.</td><td>15/07/2019 03:38:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>299276</td><td>Local</td><td>Mod.Com - GAMBOTE</td><td>15/07/2019
08:00:00 a.m.</td><td>15/07/2019 03:00:00 p.m.</td><td>INSPECCION OCULAR BASICA DE
SSEE</td><td>INSPECCION A-LOS EQUIPOS DE LA SSEE-AL EDIFICIO O CASETA-VERIFICACION
DE INDICADORES DE EQUIPOS-CABLES DE POTENCIA-
CARCAMOS</td><td>CANCELADO</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>299277</td><td>Local</td><td>Mod.Com - GAMBOTE</td><td>15/07/2019
08:00:00 a.m.</td><td>15/07/2019 03:00:00 p.m.</td><td>MANTENIMIENTO ILUMINACION
INTERNA Y EXTERNA</td><td>REVISION DE ILUMINACION Y O CAMBIO DE ELEMENTOS -
BOMBILLOS - BALASTROS - ARRANCADORES - CONDENSADORES -
CABLES</td><td>CANCELADO</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>299278</td><td>Local</td><td>SERVICIOS AUX.
GAMBOTE</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 03:00:00
p.m.</td><td>MTTO SERVICIOS AUXILIARES 2M</td><td>MANTENIMIENTO DE GRUPO
ELECTROGENO-REVISION DEL BANCO DE BATERIAS-LIMPIEZA Y PRUEBAS DE VOLTAJE-
IMPEDANCIA-SULFATACION-SECADO CON EQUIPO ANALIZADOR DE BATERIAS EC2000 MARCA BECOR
</td><td>CANCELADO</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>299560</td><td>Local</td><td>Mod.Com - SAN JUAN
NEPOMUCENO</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 03:00:00
p.m.</td><td>INSPECCION OCULAR BASICA DE SSEE</td><td>INSPECCION A-LOS EQUIPOS DE
LA SSEE-AL EDIFICIO O CASETA-VERIFICACION DE INDICADORES DE EQUIPOS-CABLES DE
POTENCIA-CARCAMOS</td><td>EJECUTADO</td><td>15/07/2019 08:17:00
a.m.</td><td>15/07/2019 03:40:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>299561</td><td>Local</td><td>Mod.Com - SAN JUAN
NEPOMUCENO</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 03:00:00
p.m.</td><td>INSPECCION TERMOGRAFICA EN SSEE</td><td>VERIFICACION DE PUNTOS
CALIENTES EN TODAS LAS CONEXIONES DE LOS EQUIPOS O ELEMENTOS QUE CONFORMAN LA
SSEE</td><td>EJECUTADO</td><td>15/07/2019 08:18:00 a.m.</td><td>15/07/2019 03:40:00
p.m.</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>303134</td><td>Local</td><td>Mod.Com - RIO VIEJO</td><td>15/07/2019
09:00:00 a.m.</td><td>15/07/2019 02:00:00 p.m.</td><td>INSPECCION OCULAR BASICA DE
SSEE</td><td>INSPECCION A LOS EQUIPOS DE LA SSEE|AL EDIFICIO O CASETA|VERIFICACION
DE INDICADORES DE EQUIPOS|CABLES DE POTENCIA|
CARCAMOS</td><td>EJECUTADO</td><td>15/07/2019 09:12:00 a.m.</td><td>15/07/2019
02:00:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>306095</td><td>Local</td><td>CHINU - COVEQAS 1 110
kV</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 04:00:00
p.m.</td><td>INSPECCION OCULAR EXHAUSTIVA DE LINEA</td><td>Equipo energizado sin
riesgo de disparo. INSPECCION OCULAR BASICA DE: LINEA. ESTRUCTURAS. AISLAMIENTOS.
CIMENTACIONES. HERRAJERIAS DE LAS ESTRUCTURAS. SISTEMA DE PUESTA TIERRA SPT.
COMPROBACION DE DISTANCIAS DE SEGURIDAD EN LA TRAYECTORIA DE LA LINEA DE LAS
LINEAS O CABLES SUBTERRANEOS (CARCAMOS Y TRAZAS). INSPECCION CON DRONE. INSPECCION
DE PODA Y TROCHA.</td><td>EJECUTADO</td><td>15/07/2019 08:36:00
a.m.</td><td>15/07/2019 04:20:00 p.m.</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>306244</td><td>Local</td><td>EL CARMEN - TOLUVIEJO 1 110
kV</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 04:00:00 p.m.</td><td>PODA Y
TROCHA</td><td>Trabajo en caliente sin riesgo de disparo. PODA LIGERA BAJO LINEA.
PODA EXHAUSTIVA BAJO LINEA. AMPLIACION DE TROCHA. MANTENIMIENTO DE TROCHA.
APILAMIENTO RECOLECCION Y TRASLADO DE RESIDUOS. APLICACION DE CICATRIZANTE.
AVIFAUNA (NIDOS DE AVES Y AVISPAS).</td><td>EJECUTADO</td><td>15/07/2019 09:02:00
a.m.</td><td>15/07/2019 04:13:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>308933</td><td>Local</td><td>Mod.Com - BERRUGAS</td><td>15/07/2019
07:00:00 a.m.</td><td>15/07/2019 09:00:00 a.m.</td><td>DESMONTE LIMPIEZA Y
FUMIGACION</td><td>TRABAJOS DE JARDINERIA Y LIMPIEZA DE MALEZA.TRATAMIENTO
HERBICIDAS PLAGUICIDAS Y RATICIDAS</td><td>EJECUTADO</td><td>15/07/2019 07:28:00
a.m.</td><td>15/07/2019 09:00:00 a.m.</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>308934</td><td>Local</td><td>Mod.Com - SAN
ONOFRE</td><td>15/07/2019 10:00:00 a.m.</td><td>15/07/2019 12:00:00
p.m.</td><td>DESMONTE LIMPIEZA Y FUMIGACION</td><td>TRABAJOS DE JARDINERIA Y
LIMPIEZA DE MALEZA.TRATAMIENTO HERBICIDAS PLAGUICIDAS Y
RATICIDAS</td><td>EJECUTADO</td><td>15/07/2019 10:00:00 a.m.</td><td>15/07/2019
12:00:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>308935</td><td>Local</td><td>Mod.Com - TOLU
VIEJO</td><td>15/07/2019 01:00:00 p.m.</td><td>15/07/2019 04:30:00
p.m.</td><td>DESMONTE LIMPIEZA Y FUMIGACION</td><td>TRABAJOS DE JARDINERIA Y
LIMPIEZA DE MALEZA.TRATAMIENTO HERBICIDAS PLAGUICIDAS Y
RATICIDAS</td><td>EJECUTADO</td><td>15/07/2019 01:00:00 p.m.</td><td>15/07/2019
04:30:00 p.m.</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>308936</td><td>Local</td><td>Mod.Com - TOLU</td><td>15/07/2019
05:00:00 p.m.</td><td>15/07/2019 06:00:00 p.m.</td><td>DESMONTE LIMPIEZA Y
FUMIGACION</td><td>TRABAJOS DE JARDINERIA Y LIMPIEZA DE MALEZA.TRATAMIENTO
HERBICIDAS PLAGUICIDAS Y RATICIDAS</td><td>EJECUTADO</td><td>15/07/2019 05:00:00
p.m.</td><td>15/07/2019 05:38:00 p.m.</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>309194</td><td>Local</td><td>NUEVA MONTERIA - RIO SINU 1 110
KV</td><td>15/07/2019 08:00:00 a.m.</td><td>15/07/2019 05:00:00
p.m.</td><td>REVISION MEDICION Y DIAGNOSTICO DE LOS SPT DE LINEA</td><td>MEDICION
DE RESISTENCIA DE CONEXION A TIERRA. MEDICION DE TENSION DE PASO Y
CONTACTO</td><td>CANCELADO</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>311926</td><td>Nacional</td><td>EL BOSQUE 1 66
KV</td><td>08/07/2019 07:00:00 a.m.</td><td>16/07/2019 05:00:00
p.m.</td><td>Actividades previas:

- Pruebas de estabilidad de la diferencial de transformador 87T.


- Validaci�n con scada de las pruebas de comando del nuevo modulo bah�a trafo
TBQ06.
- Verificaci�n de la sincronizacion entre 220 y 66 kV
- Pruebas de secuencias de fases y faseo, entre el TP del transformador TBQE06 y
los TPs de las barras
1 y 2 nivel 66 kV.
- Pruebas de disparo por 50BF.

Energizaci�n y Puesta en servicio tercer transformador subestaci�n bosque 220/66kV.

Actividades:
- Validaci�n de alarmas activas.
- Conexi�n de disparos a la diferencial de barras.
- Validaci�n posici�n de TAP del transformador.
- Verificar que el registrador de fallas se encuentre en servicio y que arranque
con el cierre de los
nterruptores.
- Selectores en Remoto.
- Validaciones de la posici�n de los seccionadores e interruptor.</td><td>- El d�a
15 de Julio 2019 transformador entrar� en vac�o a partir de las 15:00
- El d�a 16 de Julio 2019 transformador tomar� carga a partir de las 15:00.

De acuerdo a las condiciones operativas en las cuales trabajara el transformador 6,


se requiere cerrar o abrir el acople, pero esta condici�n esta sujeta a la
generaci�n diaria de la Zona. Esta condici�n es netamente operativa.</td><td>EN
EJECUCI�N</td><td>08/07/2019 07:15:00 a.m.</td><td>&nbsp;</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>312215</td><td>Local</td><td>SIMITI 1 6.5MVA
34.5/13.8KV</td><td>15/07/2019 07:00:00 a.m.</td><td>15/07/2019 05:00:00
p.m.</td><td>Mantenimiento General del Transformador de Potencia:
Cambio de empaques que est�n en mal estado, Cambio de tornilleria que este en mal
estado, Revisi�n de las Protecciones Mec�nicas del Transformador, Mantenimiento
Metalmec�nico. </td><td>Se requiere el Transformador Deseneregizado.

Con el personal de PyT se realizaran maniobras de pruebas a interruptores


asociados se revisaran Incidencia SGIT Comandos NE y senales activas
</td><td>REPROGRAMADO</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>312383</td><td>Nacional</td><td>EL BOSQUE CAMPO M010 220
kV</td><td>08/07/2019 01:00:00 p.m.</td><td>16/07/2019 05:00:00 p.m.</td><td>Bajo
esta consignaci�n se realizar�n pruebas con impacto en el SIN sobre equipos no
declarados en operaci�n comercial (ver protocolo de pruebas en archivo adjunto)
Bajo esta consignaci�n se energiza el activo: TRAFO N�6 DE CEN ENERGY
Proyecto de expansi�n asociado: GENP-433_UPME STR 02-2017 -Tercer transformador
Bosque 150 MVA 22011066 kV
Trabajos simult�neos con otras consignaciones</td><td>En simult�neo se ejecutar� la
consignaci�n C0168618 (ver SNC)
Se requiere BT EL BOSQUE 6 150 MVA 220 KV DesenergizadaDespejada de 08/07/2019
13:00 a 16/07/2019 07:59.
Se presenta Riesgo de disparo sobre BT EL BOSQUE 6 150 MVA 220 KV el
16/07/2019 de 08:00 a 17:00.

Bajo esta consignaci�n se realizar�n pruebas con impacto en el SIN sobre equipos no
declarados en operaci�n comercial (ver protocolo de pruebas en archivo adjunto)
Bajo esta consignaci�n se energiza el activo: TRAFO N�6 DE CEN ENERGY
Proyecto de expansi�n asociado: GENP-433_UPME STR 02-2017 -Tercer transformador
Bosque 150 MVA 22011066 kV
Trabajos simult�neos con otras consignaciones</td><td>EN
EJECUCI�N</td><td>08/07/2019 01:29:00 p.m.</td><td>&nbsp;</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>312530</td><td>Local</td><td>Mod.Com - BAYUNCA</td><td>26/06/2019
08:00:00 a.m.</td><td>15/07/2019 06:00:00 p.m.</td><td>Obras civiles para
construcci�n c�rcamo, banco de ductos, cajas de paso y base para instalaci�n de
transformador de puesta a tierra.
Adecuaci�n de celda para instalaci�n de rel� de
sobrecorriente.</td><td>&nbsp;</td><td>EJECUTADO</td><td>26/06/2019 08:17:00
a.m.</td><td>15/07/2019 06:00:00 p.m.</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>312590</td><td>Nacional</td><td>BT BAYUNCA 1 60 MVA 66
kV</td><td>08/07/2019 07:30:00 a.m.</td><td>02/08/2019 05:30:00
p.m.</td><td>Montaje de estructura met�lica soporte de cables de potencia 34,5 kV.
Tendido de cables de potencia entre transformador de puesta a tierra y
transformador de potencia.
Instalaci�n de terminales premoldeados a cables de potencia.
Instalaci�n, conexionado y pruebas de rel� de sobrecorriente ZIV 8IRV para
transformador de puesta a tierra.
Tendido de cableado de control de transformador de puesta a tierra hasta celda 34,5
kV (Rel� de sobrecorriente).
Integraci�n de Rele de sobrecorriente ZIV 8IRV.
Pruebas de disparo de protecciones.

</td><td>&nbsp;</td><td>EN EJECUCI�N</td><td>08/07/2019 07:38:00


a.m.</td><td>&nbsp;</td>
</tr><tr style="color:Black;background-color:AliceBlue;border-color:Gray;">
<td>312591</td><td>Nacional</td><td>BT MONTERIA 1 40 MVA 110
kV</td><td>15/07/2019 08:00:00 a.m.</td><td>02/08/2019 05:30:00
p.m.</td><td>Levantamiento de informaci�n y planimetr�a de control y protecciones
en la celda de 110kV del Transformador #1.</td><td>Riesgo de disparo sobre la
bah�a consignada BT MONTERIA 1 40 MVA 110 kV.</td><td>EN
EJECUCI�N</td><td>15/07/2019 08:23:00 a.m.</td><td>&nbsp;</td>
</tr><tr style="color:Black;border-color:Gray;">
<td>314374</td><td>Nacional</td><td>BT CERROMATOSO 1 150 MVA 110
kV</td><td>14/07/2019 05:30:00 a.m.</td><td>04/08/2019 05:00:00
p.m.</td><td>Observaciones CND:

TRANSELCA S.A. E.S.P. debe informar a los agentes involucrados o afectados por esta
intervenci�n.

Transelca inform� que :Como consigna operativas, durante el periodo que se


encuentre la S/E M�vil conectada a una de las barras:
1. No se deben realizar transferencias de un solo campo hacia la Barra en la cual
se encuentra conectada la M�vil, porque compromete la bah�a de acople, poniendo en
Riesgo la S/E.
2. No desenergizar la Barra en la cual se encuentra conectada la M�vil, porque se
indispone el campo conectado a ella.</td><td>Se confirma que el esquema de
deslastre en Cerromatoso quede habilitado al selector de Electricaribe durante el
mantenimiento CERROMATOSO 1 150 MVA 500/110/34.5 KV en las fchas de 14-07-2019 y el
04-08-2019 por indisponibilidad de Generaci�n III, si durante las fechas
mencionadas queda en servicio Gecelca III no hay necesidad de habilitar el esquema.

Bajo esta consignaci�n no se energizan nuevos activos


Proyecto de expansi�n asociado:
Reposici�nCambioEquipos</td><td>EJECUTADO</td><td>14/07/2019 06:03:00
a.m.</td><td>14/07/2019 06:21:00 p.m.</td>
</tr><tr style="color:White;background-color:#E9E9E9;border-color:Gray;">

<td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbs
p;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr>
</table>

Das könnte Ihnen auch gefallen