Sie sind auf Seite 1von 4

PROJECT SUMMARY

Sr. No. Attributes Project Details


1. Name of the M/s N R Infracon Private Limited
project (Formerly known as M/s Kamlapur Chini Mills)
has proposed Establishment of New 100 KLPD
distillery (Rectified Spirit/Extra Neutral alcohol /
Ethanol) & Power Generation :5.0 MW and;
Modernization/expansion of sugar plant from 2500
TCD to 8000 TCD along with expansion of power
plant from 6.0 MW to 30 MW.
2. Location of the Village Kamlapur, Tehsil Sidhaouli,
project Distt. Sitapur, Uttar Pradesh
3. Project  Revenue will be generated for the State
Justification Government.
 Employment will be provided to eligible
people of the state.
 Increase in Local Business
 Standard of Living of people will increase.
 Lead to growth in income.
 Enhance National Bio Fuels Policy 2018.
4. Project Area Unit has allotted 74.125 acre land area (existing)
5. Green belt 33 % of Total Project area (24.46 acre)
development
Project Details

Sr. No. Attributes Sugar Expansion New Distillery Details


Details
1 Name Unit has proposed New 100 KLPD distillery
modernization/ (Rectified Spirit/Extra
expansion of sugar plant Neutral alcohol/Ethanol)
from 2500 TCD to & Power Generation:
8000 TCD. 5.0 MW.
along with expansion of
power plant from 6.0 MW
to 30.0 MW
2 Raw Material Sugar cane : 8000 TCD Molasses : 320KLD
Requirement
3 Product White Crystal Sugar 100 KLPD
928 MT/Day (Rectified Spirit/Extra
Neutral alcohol/Ethanol)
4 No. of working days Sugar unit: Distillery unit:
180 days/annum 360 days /annum
5 Product (power) Expansion of power plant Power Generation:
from 6.0 MW to 30.0 5.0 MW.
MW
6 Power Requirement 12.5 MW for 8000 TCD 2.2 MW for 100 KLD
Sugar Plant Distillery Plant.
Additional power will be Additional power will be
exported to power grid. exported to power grid.
7 By Product Molasses : No Any
380 MT/Day
Bagasse:2304 TPD
Pressmud:280 TPD
8 Boiler 75.0 TPH Boiler (existing) Proposed new: 01 no. of
110.0 TPH Boiler (new) 40.0 TPH
(Slop Fired Boiler)
9 Fuel Requirement Bagasse: Slop : 172 KLD ,
(For Boiler) 28.0 TPH will be used as Bagasse: 20 Tonn/day
fuel for existing 75.0 TPH
boiler.
Bagasse:
50.0 TPH will be used as
fuel for new 100 TPH
Boiler
10 Steam Requirement 146 TPH for 8000 TCD 23.0 TPH for 100 KLD
Sugar plant Distillery Plant
11 Air Pollution Control ESP will be installed with ESP will be installed with
System Stack of height 65.0 40.0 TPH slop Fired
meters in order to control Boiler along with stack of
dust emissions from 110.0 65.0 meter height
TPH Boiler. (particulate emission from
Wet scrubber is the stack will be within
installed with existing the permissible limit
Stack of 55.0 meters 150.0 mg/Nm3.)
height with existing 75.0
TPH Boiler.
12 Fresh Water Water Requirement for Water Requirement for
Requirement sugar unit:(For 8000 distillery unit:
TCD) 700.0 KLD
1600.0 KLD (@ 7.0KL/KL of
(@ 0.20 KL/KL of product)
product) ( Net fresh water
( Net fresh water requirement after
requirement after recycling)
recycling)
Domestic Water Domestic Water
Requirement:50.0 KLD Requirement:20.0 KLD
Total water Requirement: Total water Requirement:
1650 KLD 720 KLD
13 Source of fresh Ground water via bore well
water
14 Waste Water Sugar Unit : Distillery unit:
Generation For industrial effluents: Spent Wash 600 KLPD @
1180 KLD
For proper treatment of 6.0 KL/KL of Product
effluent ETP up-to Other Effluents: 900 KLD
tertiary level will be (Condensates)
modified.
 580 KLD treated water
will be discharged. 1. For Spent wash
 600 KLD will be recycled treatment : MEE +
in process and in various Incineration (Slop
other sections.
fired Boiler)
NOTE: 2. For Other effluent :
50% treated water will be Process Condensate
recycled back in process
and As per GSR35(E) Polishing Plant will be
dated 14.01.2016 i.e. installed for treatment of
Environmental Standards various other effluents
for Sugar Industry. We
will discharge 50% of (Condensate, Lees, Floor
treated effluent of B.O.D washing, Blow downs).
less than30 milligram per Domestic effluent shall be
liter in surface water. disposed in Soak pit and
For Domestic waste: Septic tank.
Unit will install new 40
KLD sewage treatment
plant (STP).

15 Sugar unit: Distillery unit :


Solid waste Parti Quan Manage Ash generation: 50 MT/Day:
generation and its cular tity ment Will be used as manure.
management Ash 19.0 Ash Fermenter Sludge: 70.0
gener MT/ generate MT/Day: Will be used as
ation Day d will be manure.
utilized
as
manure
due to
high
organic
and
potash
content.
16 Total project cost Total Project Cost : 15000 lacks (Estimated)
17400.00 Lacs (150 Crores)
(for Sugar expansion)
17 Cost towards Rs. 3500.00 Lakhs Rs. 4000.00 Lakhs
Environmental
protection
measures
(Capital cost)
18 Recurring cost Rs. 40.00 Lakhs Rs. 50.00 Lakhs
towards
Environmental
control measures.
19 Cost towards The proposed CER Cost is Rs. 4.86 Crores (1.5% of capital
Corporate investment), as per office memorandum no. F.No. 22-
Environmental 65/2017-IA.III dated 1st May 2018 as project is green field
Responsibility (new distillery project).
(CER)
20. Employment 500 Persons 150 Persons (For distillery
(For sugar unit) project)