1. Name of the M/s N R Infracon Private Limited project (Formerly known as M/s Kamlapur Chini Mills) has proposed Establishment of New 100 KLPD distillery (Rectified Spirit/Extra Neutral alcohol / Ethanol) & Power Generation :5.0 MW and; Modernization/expansion of sugar plant from 2500 TCD to 8000 TCD along with expansion of power plant from 6.0 MW to 30 MW. 2. Location of the Village Kamlapur, Tehsil Sidhaouli, project Distt. Sitapur, Uttar Pradesh 3. Project Revenue will be generated for the State Justification Government. Employment will be provided to eligible people of the state. Increase in Local Business Standard of Living of people will increase. Lead to growth in income. Enhance National Bio Fuels Policy 2018. 4. Project Area Unit has allotted 74.125 acre land area (existing) 5. Green belt 33 % of Total Project area (24.46 acre) development Project Details
Sr. No. Attributes Sugar Expansion New Distillery Details
Details 1 Name Unit has proposed New 100 KLPD distillery modernization/ (Rectified Spirit/Extra expansion of sugar plant Neutral alcohol/Ethanol) from 2500 TCD to & Power Generation: 8000 TCD. 5.0 MW. along with expansion of power plant from 6.0 MW to 30.0 MW 2 Raw Material Sugar cane : 8000 TCD Molasses : 320KLD Requirement 3 Product White Crystal Sugar 100 KLPD 928 MT/Day (Rectified Spirit/Extra Neutral alcohol/Ethanol) 4 No. of working days Sugar unit: Distillery unit: 180 days/annum 360 days /annum 5 Product (power) Expansion of power plant Power Generation: from 6.0 MW to 30.0 5.0 MW. MW 6 Power Requirement 12.5 MW for 8000 TCD 2.2 MW for 100 KLD Sugar Plant Distillery Plant. Additional power will be Additional power will be exported to power grid. exported to power grid. 7 By Product Molasses : No Any 380 MT/Day Bagasse:2304 TPD Pressmud:280 TPD 8 Boiler 75.0 TPH Boiler (existing) Proposed new: 01 no. of 110.0 TPH Boiler (new) 40.0 TPH (Slop Fired Boiler) 9 Fuel Requirement Bagasse: Slop : 172 KLD , (For Boiler) 28.0 TPH will be used as Bagasse: 20 Tonn/day fuel for existing 75.0 TPH boiler. Bagasse: 50.0 TPH will be used as fuel for new 100 TPH Boiler 10 Steam Requirement 146 TPH for 8000 TCD 23.0 TPH for 100 KLD Sugar plant Distillery Plant 11 Air Pollution Control ESP will be installed with ESP will be installed with System Stack of height 65.0 40.0 TPH slop Fired meters in order to control Boiler along with stack of dust emissions from 110.0 65.0 meter height TPH Boiler. (particulate emission from Wet scrubber is the stack will be within installed with existing the permissible limit Stack of 55.0 meters 150.0 mg/Nm3.) height with existing 75.0 TPH Boiler. 12 Fresh Water Water Requirement for Water Requirement for Requirement sugar unit:(For 8000 distillery unit: TCD) 700.0 KLD 1600.0 KLD (@ 7.0KL/KL of (@ 0.20 KL/KL of product) product) ( Net fresh water ( Net fresh water requirement after requirement after recycling) recycling) Domestic Water Domestic Water Requirement:50.0 KLD Requirement:20.0 KLD Total water Requirement: Total water Requirement: 1650 KLD 720 KLD 13 Source of fresh Ground water via bore well water 14 Waste Water Sugar Unit : Distillery unit: Generation For industrial effluents: Spent Wash 600 KLPD @ 1180 KLD For proper treatment of 6.0 KL/KL of Product effluent ETP up-to Other Effluents: 900 KLD tertiary level will be (Condensates) modified. 580 KLD treated water will be discharged. 1. For Spent wash 600 KLD will be recycled treatment : MEE + in process and in various Incineration (Slop other sections. fired Boiler) NOTE: 2. For Other effluent : 50% treated water will be Process Condensate recycled back in process and As per GSR35(E) Polishing Plant will be dated 14.01.2016 i.e. installed for treatment of Environmental Standards various other effluents for Sugar Industry. We will discharge 50% of (Condensate, Lees, Floor treated effluent of B.O.D washing, Blow downs). less than30 milligram per Domestic effluent shall be liter in surface water. disposed in Soak pit and For Domestic waste: Septic tank. Unit will install new 40 KLD sewage treatment plant (STP).
15 Sugar unit: Distillery unit :
Solid waste Parti Quan Manage Ash generation: 50 MT/Day: generation and its cular tity ment Will be used as manure. management Ash 19.0 Ash Fermenter Sludge: 70.0 gener MT/ generate MT/Day: Will be used as ation Day d will be manure. utilized as manure due to high organic and potash content. 16 Total project cost Total Project Cost : 15000 lacks (Estimated) 17400.00 Lacs (150 Crores) (for Sugar expansion) 17 Cost towards Rs. 3500.00 Lakhs Rs. 4000.00 Lakhs Environmental protection measures (Capital cost) 18 Recurring cost Rs. 40.00 Lakhs Rs. 50.00 Lakhs towards Environmental control measures. 19 Cost towards The proposed CER Cost is Rs. 4.86 Crores (1.5% of capital Corporate investment), as per office memorandum no. F.No. 22- Environmental 65/2017-IA.III dated 1st May 2018 as project is green field Responsibility (new distillery project). (CER) 20. Employment 500 Persons 150 Persons (For distillery (For sugar unit) project)