Sie sind auf Seite 1von 90

AN ISO 9001 : 2015 COMPANY

Sustainable Credibility
Since 1968
WIRE MESH
PRE-QUALIFICATION
&
MATERIAL SUBMITTAL

P.O Box No 660 Abu Dhabi


United Arab Emirates
Tel: (971) 2 6415444 & Fax: (971) 2 6415511 –Head Office
Tel: (971) 2 5500050 & Fax: (971) 2 5500051 – Abu Dhabi (Factory 1)
E-Mail:wiremesh@cicon.net
INDEX

Company Details, Profile & Scope of Supply


Wire Mesh activity
Organizational Chart
CICON’s Quality Policy
ISO Certificates & other Company’s Licenses
Health, Safety & Environment Plan
Process flow chart
Steel proposed and compliance statement
Test reports
Other projects approval
List of Projects
Company Details, Profile & Scope of Supply
I. Company Details, Profile & Scope of Supply

I.1. COMPANY DETAILS:

Company Name : CICON BUILDING MATERIALS

Head Office (Abu Dhabi)

Address : P.O. Box 660, Abu Dhabi, U.A.E.


Telephone No. : 00971 2 6415444
Fax No. : 00971 2 6415511
Email Address : Cicon01@emirates.net.ae

Factory 1 (Abu Dhabi Industrial Area, Mussafah, Abu Dhabi)

Address : P.O. Box 9704, Abu Dhabi, U.A.E.


Telephone No. : 00971 2 5500050
Fax No. : 00971 2 5500051
Email Address : cicon@emirates.net.ae

Factory 2 (Abu Dhabi Industrial Area, Mussafah, Abu Dhabi)

Telephone No. : 00971 2 5506850


Fax No. : 00971 2 5506851
Email Address : cicon@emirates.net.ae

Factory 4 (Dubai Investment Park, Dubai)

Address : P.O. Box 52841, Dubai, U.A.E.


Telephone No. : 00971 4 8853646
Fax No. : 00971 4 8853656
Email Address : cicondxb@cicon.ae

Store / Sales Office (Mussafah, Abu Dhabi)

Telephone No. : 00971 2 5500001


Fax No. : 00971 2 5500052

Office (Dubai Branch)

Address : P.O. Box 3311, Dubai, U.A.E.


Telephone No. : 00971 4 2625256
Fax No. : 00971 4 2625212
`

CICON Signs & Metal Works Division

Address : P.O. Box 660 Abu Dhabi, U.A.E.


P.O Box 3311 Dubai, U.A.E
Telephone No. : 00971 2 6415444 / 00971 4 2625212
Fax No. : 00971 2 6415511 / 00971 2 5507351
Email Address : cicon01@emirates.net.ae

I.2. COMPANY PROFILE & SCOPE OF WORK

CICON is an importer, stockiest and distributor of general building materials and has beenn
established in Abu Dhabi since 1968 with a branch (office, stores & plant) in Dubai.

CICON is registered with Abu Dhabi Chamber of Commerce (Reg. No. 1137) and business
activities include the supply of:

• Welded Wire Mesh


• Deformed steel bars
• Cut & Bend Steel
• Mechanical Coupler
• Epoxy Coating Steel
• Steel Cages for Piles
• Signs & Metal Works
• Billets & Flat Bars
• Wood
• Plywood

CICON has factories in Mussafah for fabrication of welded wire mesh, cut and bent reinforcing
steel, pile cages, and epoxy-coated steel for construction industry in the U.A.E.

Since it was established, CICON has provided its customers with the highest quality of materials
and service at the most competitive rates. Today CICON has become the leader in this field and
achieved high reputation among the contractors, consultants and project managers in the U.A.E.
construction industry.

CICON, being an ISO 9001:2015 company, believes that the satisfaction of the customer is the
success of business and keen to provide continuous dedicated service to our customers.
Wire Mesh activity
`

WIRE MESH ACTIVITY

Manufacture of metal products, production orientation for further processing of reinforcement


bar in the form of Welded Wire fabric, etc. and realization of the ready products according to
the following scheme:

a) Purchase of wire rod in coils


b) Receiving of semi-finished metal products in the form of hot rolled coils
c) Further processing of the product till the necessary condition and realization to the
consumers

We are taking into consideration the fact that recently, the tendency has been outlined for
using the ready-made constructions of bars by the contractors and it is connected with the
increase effectiveness of construction and its quick completion.

RAW MATERIALS

The basic raw materials are wire rods in coils and reinforcement bars. The raw materials are
supplied mainly from U.A.E., Qatar, Turkey and Saudi Arabia.

As a result of tremendous response from the market and the current achievements, CICON
decided to increase its contribution to the market by enhancing the existing production
capacity and adding new products in its list.

Given below is a brief account of our various productions:

PRODUCTS PLANNED QUANTITY


1) Wire Straightening 5,000 MT / Month
2) Welded Wire Mesh 3,000 MT / Month

Welded Wire Mesh is in accordance with BS 4483

CICON offers the contractors a fast and efficient service in delivering steel. Through the factor
process, quality control procedures are rigorously monitored to ensure that processed steel
meet the site requirements.
Organizational Chart
`
CICON’s Quality Policy
ISO Certificates & other Company’s Licenses
CERTIFICATE
OF APPROVAL
Product Conformity Certification
This is to certify that
Cicon Building Materials
at its establishment at
Cicon Epoxy & Steel Cutting plant, Abu Dhabi
has satisfied the Authority that it operates a quality management system that complies with the
requirements of BS EN ISO 9001 and the relevant CARES Quality and Operations Assessment
Schedules. Where appropriate, and as listed below, it has further satisfied the Authority that it
manufactures and/or supplies products that conform with the stated product standards and is
entitled to use the CARES marks on its products using the processes and procedures registered
with the Authority.

Scope of certification:
Processing of steel reinforcement to BS 8666:2000 and BS 4466 and the stocking and
distribution of BS 4449, BS 4482 and BS 4483
Dextra Bartec standard mechanical couplers to CARES Appendix TA1-B: BS4449 B500B,
size range 12 to 40mm

This certificate remains the property of the Authority and is issued subject to the Regulations of
the Authority. This certificate is uncontrolled when printed. To check the validity of this certificate
please visit www.ukcares.com or contact us on +44 1732 450000.
CERTIFICATE NUMBER FIRST APPROVAL ISSUE DATE EXPIRY DATE
091003 October 2009 01 January 2019 31 December 2019

SIGNED FOR UK CERTIFICATION AUTHORITY FOR REINFORCING STEELS

Lee Brankley,
Chief Executive Officer

The use of the Accreditation Mark indicates accreditation in respect of those activities covered by the accreditation certificate number 002.
UK Certification Authority for Reinforcing Steels, Pembroke House, 21 Pembroke Road, Sevenoaks, Kent, TN13 1XR, UK.
A Company Limited by Guarantee. Registered in England No. 1762448.
Cert. Ref: AllC112010 55201 265
CERTIFICATE
OF APPROVAL
Product Conformity Certification
This is to certify that
Cicon Building Materials
at its establishment at
Cicon Steel Bar Fabrication, Dubai
has satisfied the Authority that it operates a quality management system that complies with the
requirements of BS EN ISO 9001 and the relevant CARES Quality and Operations Assessment
Schedules. Where appropriate, and as listed below, it has further satisfied the Authority that it
manufactures and/or supplies products that conform with the stated product standards and is
entitled to use the CARES marks on its products using the processes and procedures registered
with the Authority.

Scope of certification:
Processing of steel reinforcement to BS 8666:2000 and BS 4466 and the stocking and
distribution of BS 4449, BS 4482 and BS 4483
Dextra Bartec standard mechanical couplers to CARES Appendix TA1-B: BS4449 460B, size
range 12 to 40mm

This certificate remains the property of the Authority and is issued subject to the Regulations of
the Authority. This certificate is uncontrolled when printed. To check the validity of this certificate
please visit www.ukcares.com or contact us on +44 1732 450000.
CERTIFICATE NUMBER FIRST APPROVAL ISSUE DATE EXPIRY DATE
091004 October 2009 01 January 2019 31 December 2019

SIGNED FOR UK CERTIFICATION AUTHORITY FOR REINFORCING STEELS

Lee Brankley,
Chief Executive Officer

The use of the Accreditation Mark indicates accreditation in respect of those activities covered by the accreditation certificate number 002.
UK Certification Authority for Reinforcing Steels, Pembroke House, 21 Pembroke Road, Sevenoaks, Kent, TN13 1XR, UK.
A Company Limited by Guarantee. Registered in England No. 1762448.
Cert. Ref: AllC112010 55202 266
INDUSTRIAL LICENSE ‫ﺭﺧﺼـــﺔ ﺻﻨـــﺎﻋﻴﺔ‬
License No IN-1001686 ‫ﺭﻗــﻢ ﺍﻟﺮﺧﺼــﺔ‬

License Status : Production ‫ ﺇﻧﺘـــــــﺎﺝ‬: ‫ﺣﺎﻟﺔ ﺍﻟﺮﺧﺼﺔ‬


Legal Form : Limited Liability Company ‫ ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺆﻭﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ‬: ‫ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻲ‬
ADCCI No : - : ‫ﻋﻀﻮﻳﺔ ﺍﻟﻐﺮﻓﺔ‬

First Issue Date : 09/07/2008 : ‫ﺗﺎﺭﻳﺦ ﺃﻭﻝ ﺇﺻﺪﺍﺭ‬ Enviroment No. : 1672 : ‫ﺍﻟﺮﻗﻢ ﺍﻟﺒﻴﺌﻲ‬
Issue Date : 09/07/2019 : ‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‬ FCR No. : - : ‫ﺍﻟﺴﺠﻞ ﺍﻟﻤﺮﻛﺰﻱ ﺍﻟﻤﻮﺣﺪ‬
Expiry Date : 08/07/2020 : ‫ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ‬ Trade Name No. : IN-1001686 : ‫ﺭﻗﻢ ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ‬
١ ‫ ﻓﺮﻉ‬.‫ﻡ‬.‫ﻡ‬.‫ ﻣﺼﻨﻊ ﺳﻴﻜﻮﻥ ﻟﻼﺑﻮﻛﺴﻲ ﻭﺗﻘﻄﻴﻊ ﺍﻟﺤﺪﻳﺪ ﺫ‬: ‫ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ‬
Trade Name : Cicon Epoxy & Steel Cutting Plant L.L.C. Branch 1
Location : Abu Dhabi - Mussaffah - ICAD I - (12DR7) : ‫ﻣﻮﻗﻊ ﺍﻟﻤﻨﺸﺄﺓ‬

Owner(s) Partner(s) ‫ ﺍﻟﺸﺮﻛــــﺎﺀ‬/ ‫ﺍﺳﻢ ﺻﺎﺣﺐ ﺍﻟﻤﻨﺸﺄﺓ‬


‫ ﻧﺴﺒﺔ ﺍﻟﺸﺮﺍﻛﺔ‬Nationality ‫ ﺍﻟﺠﻨﺴﻴﺔ‬Partner Name ‫ﺍﺳﻢ ﺍﻟﺸﺮﻳــــﻚ‬ #
Share (%)
51.00 % United Arab Emirates ‫ ﺍﻹﻣﺎﺭﺍﺕ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﻤﺘﺤﺪﺓ‬Ahmed Ali Abdulla Alhashli ‫ﺍﺣﻤﺪ ﻋﻠﻲ ﻋﺒﺪﺍﻟﻠﻪ ﺍﻟﻬﺎﺷﻠﻲ‬ 1
49.00 % United Arab Emirates ‫ ﺍﻹﻣﺎﺭﺍﺕ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﻤﺘﺤﺪﺓ‬Cicon Building Materials ‫ﺳﻴﻜﻮﻥ ﻟﻤﻮﺍﺩ ﺍﻟﺒﻨﺎﺀ‬ 2

Activities ‫ﺍﻷﻧﺸــــﻄــﺔ‬
Activity ‫ﺍﻟﻨﺸﺎﻁ‬ #
1 Onshore and Offshore Oil and Gas Fields and Facilities ‫ﺧﺪﻣﺎﺕ ﺣﻘﻮﻝ ﻭﻣﻨﺸﺄﺕ ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ ﺍﻟﺒﺮﻳﺔ ﻭﺍﻟﺒﺤﺮﻳﺔ‬ 1
Services
2 Steel Bars Preparation ‫ﺗﺠﻬﻴﺰ ﺍﻟﻘﻀﺒﺎﻥ ﺍﻟﺤﺪﻳﺪﻳﺔ‬ 2
3 Metal Coating ‫ﻃﻼﺀ ﺑﺎﻟﻤﻌﺎﺩﻥ‬ 3

Products ‫ﺍﻟﻤﻨﺘﺠﺎﺕ‬
Product ‫ﺍﻟﻤﻨﺘﺞ‬ #
1 Cut & Bend Steel Rebars ‫ﺣﺪﻳﺪ ﺍﻟﺘﺴﻠﻴﺢ ﺍﻟﻤﻘﺼﻮﺹ ﻭﺍﻟﻤﺜﻨﻰ‬ 1
2 Epoxy Coated Structural Steel Rebars ‫ﺣﺪﻳﺪ ﺍﻟﺘﺴﻠﻴﺢ ﺍﻟﻤﻄﻠﻰ ﺑﺎﻹﻳﺒﻮﻛﺴﻰ‬ 2

Note : This Document is Considered As Commercial Register ‫ ﺗﻌﺘﺒﺮ ﻫﺬﻩ ﺍﻟﻮﺛﻴﻘﺔ ﺑﻤﺜﺎﺑﺔ ﺳﺠﻞ ﺗﺠﺎﺭﻱ‬: ‫ﻣﻼﺣﻈﺎﺕ‬
IN-1001686 - 23/06/2019

*IN-1001686*

https://ded.abudhabi.ae/ar ‫ ﺃﺑﻮﻇﺒﻲ‬- ‫ﻟﻠﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﺍﻟﺘﻔﺎﺻﻴﻞ ﺍﻟﻤﺬﻛﻮﺭﺓ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﻳﺮﺟﻰ ﺯﻳﺎﺭﺓ ﻣﻮﻗﻊ ﺩﺍﺋﺮﺓ ﺍﻟﺘﻨﻤﻴﺔ ﺍﻻﻗﺘﺼﺎﺩﻳﺔ‬
To verify the details mentioned in the license, please visit DED - Abu Dhabi website https://ded.abudhabi.ae/en
DUBAI CENTRAL LABORATORY DEPARTMENT
PRODUCTS CONFORMITY ASSESSMENT SECTION

DM CIRCULARS NO. (159) 2007 AND (184) 2012


CERTIFICATE OF REGISTRATION

In compliance with the above DM Circulars for the Control of Steel


for Reinforcement of Concrete in the Emirate of Dubai, Dubai Central
Laboratory Department (DCLD) of Dubai Municipality, hereby issue
this registration certificate to:

CICON BUILDING MATERIALS


Al Mousa Tower 2 Office No. 2202
P.O. Box 3311 Dubai UAE

as a registered supplier of certified reinforcing steel from


approved manufacturer/s as per "List of Registered Manufacturers"
issued by Dubai Central Laboratory Department (www.dm.gov.ae).

ARIF HUSAIN AL MARZOOQI


Products Conformity Assessment Section Manager
DCLD, Dubai Municipality

Registration No. AP08100020 Current Issue Date: 22 Feb 2019


Valid Until: 21 Feb 2020 Original Issue Date: 22 Feb 2008

This is an electronic document.


F-IC-2038 R9
Health, Safety & Environment Plan
`

Basic Health, Safety Procedure & Environment


Plan
The following description gives a brief introduction to some of the basic safety procedure to be
observed strictly in Cicon Cut & Bend Plant:

1. PERSONAL PROTECTIVE EQUIPMENT (P.P.E.):


a) Appropriate P.P.E. must be provided to the labour to protect worker from any injury.
b) The worker must wear the appropriate P.P.E. at all times while at work.
c) The P.P.E. must not be abused, and if damaged, must be replaced at once.
d) The minimum requirement calls for head and feet protection at all times.

2. HAND TOOLS:
a) Personal made, modified or damaged tools are not allowed in the plant.

3. PLANT EQUIPMENT (P & E):


a) P & E must be technically inspected by an authorized person prior to operation.
b) P & E must only be operated by authorized personnel and must be regularly maintained

4. CRANES, RIGGING & LIFTING:


a) All cranes and other lifting equipments must be inspected by the authorized person prior to
operation.
b) All lifting equipments must be marked with the safe working load (S.W.L.)

5. WORKING AT HEIGHT:
a) Anyone in position above 2meters high, (with no handrail in place) must wear adequate fall
protection, and be hooked off above.
b) There must be safe access / egress to all work locations, and a safe working platform in
position.
c) Never throw any material from height. FALLING OBJECTS CAN KILL

6. HOT WORK:
a) Gas cylinders (whether full or empty) must be upright and secured at all times.
b) Combustibles must be removed from the area.
c) The correct P.P.E. must always be worn.
d) The equipment must be in safe condition, with “Flash back arrester” and “Non-return valve” in
position, and hoses in good condition.

7. TEMPORARY ELECTRICS:
a) Junction boxes, cables, etc, must be in safe condition – WATERPROOF & NO TAPED JOINTS
b) Where possible cables to be off the ground
c) Earth leakage circuit breaker (ELCB) fitted
d) Hand grinders must have a “deadmans switch”

8. EXCAVATIONS:
a) Check for buried services (electric, gas, water, etc…)
b) Safe access / egress (proper steps, handrail, etc…)
c) No heavy plant, vehicles, or equipment allowed near the top edge.

9. LADDERS:
a) Not be “homemade” or damaged
`

b) Extend approximate 1meter above landing point.


c) Be positioned at an angle of 4 out to 1 in.
d) Be secured at the top and bottom

10. MANUAL HANDLING:


a) Assess the load before you lift.
b) If the load is too heavy – GET HELP
c) For every lift bend your knees and keep your back straight
d) Hold the load close to you, and move your feet rather than twist your body
e) Put the load down with your knees bent and back straight.

11. HOUSEKEEPING:
a) A high standard or housekeeping must be maintained at all times.
b) Waste, redundant material, trip hazards etc, must be removed from plant immediately.

12. SAFETY WORK METHOD STATEMENTS:


a) For work that has a medium to high risk of an accident, a Safety Work Method Statement must
be completed, and approved prior to commencement of work.
b) Good planning will reduce the risks of an accident, and ensure efficient progress.

13. HEALTH & HYGIENE:


a) Adequate facilities must be provided in the plant, and must be maintained in good order
b) Waste food, drink cans, bottles, etc.. must be disposed of in appropriate waste containers
c) Symptoms of illness must be reported to the First Aid / Medical Centre as soon as possible.

14. ACCIDENTS & EMERGENCIES:


a) All accidents must be reported to the concerned personnel (personal injury, property damage
or dangerous occurrence).
b) All injured personnel must report to the authorized personnel (with the form filled-up by the
foreman)
c) In the event of an emergency, it must be reported immediately to the Administration Dept.)

15. SECURITY:
a) Smoking in the plant is not allowed.
b) Anyone caught stealing, or causing property damage will be reported to the police.
c) Anyone caught fighting will be removed from the plant.
Process flow chart
`

PROCESS FLOW CHART


We use wire rod in coils  wire drawing machine  to mare rep formation and to
increase the tensile strength  then pass to straightening machine, which cut the bar
according to required diameter, which is using as cross wire  then bring cross wire to
the welding head.

From the wire drawing machine, we pass spools to the main welding head, which is
used as a long wire and cross wire to produce welded wire mesh.

After that goes to shearing machine for cutting wire mesh according to requirements.

The stacking and loading for final destination.

PROCESS SEQUENCE

Before Drawing

After Drawing
`

Coiling

Straightening – Cross Wire

Welding Machine- Wire mesh


`
METHOD STATEMENT WIREMESH

APPLICATION PROCESS –

Production sequence is divided into three steps.

1. Receiving of plain wire rod from Emirates Steel.


2. Manufacturing of cold reduced ribbed wire.
3. Manufacturing of wire fabric from cold reduced.

Step 1- Receiving of plain wire rod from Emirates Steel-

a) Plain wire rod (AISI/SAE 1008) is received from Emirates Steel as per the
ordered quantity. Received wire rods are kept in store and is sent inside
the plant as required.

Step 2- Manufacturing of cold reduced ribbed wire-

a) According to the diameter requirement the plain wire rod is checked


and desired rods are shifted inside the plant.
b) The coil is then placed into the wire drawing machine for drawing process.
Drawing of the wire is done through cold reduction. Cast numbers are
noted and then the tag is removed from the coil.
c) Rib formation is done which increases the strength of the wire. In this
process larger plain rod is reduced into smaller ribbed rod satisfying all the
standards (BS 4482).
Step 3- Manufacturing wire fabric from cold reduced steel-

a) Again the cold drawn wire is rolled into coil. Few rolled coils are sent to the
welding machine and are placed in the longitudinal direction, the term is
known as long wire. Some coils are send to the straightening machine
where the coils are straighten and cut to the required length, the term is
known as cross wire.
b) The spools (LONG WIRE) are placed at the main head of the welding
machine while the cross wires are placed at machine perpendicular to
long wire.
c) Prior to placing long wire and cross wire, the machine shall be adjusted
to the requirements such as spacing, diameter, dimension of wire mesh
welding reqirements etc.
d) Process is carried out and welded wire mesh is obtained as per the
required dimensions.
e) The welded wire mesh now pass through a final quality control procedure
and checked for weight, diameter, length, spacing against BS 4483.
STEP 4- Bundling and delivery-
a) After manufacturing wire mesh fabric has to be bundled, tagged for tracebility
and delivered to site. Fabricated wire mesh is stored inside the factory.
In case, if it is stored outside then it shall be covered properly.
b) Along with each delivery, delivery note and MTC Certificate are attached.
PRODUCTION FLOW CHART – WIRE MESH
Document Reference : FC/ WM/001 Rev: 0
Date: 06. 05.2015
START

PLAIN ROD ARE


PURCHASED FROM M/S.
CHECKING FOR PLAIN WIRE ROD EMIRTAES STEEL
IN COIL IN REFERENCE TO SATISFYING AISI/ SAE
DIAMETER REQUIREMENT GRADE 1008

STEP 1
MANUFACTURING COLD PLACING COIL FOR DRAWING AT
WIRE DRAWING MACHINE
REDUCED RIBBED WIRE [FOR COLD REDUCTION]
ROD SATISFYING (CAST NUMBERS ARE NOTED AND
REMOVED FROM COIL)
BS 4449/ BS 4482
AT
(FROM PLAIN ROD SATISFYING
DRAWING
AISI /SAE 1008) MARE REP FORMATION MACHINE
&
INCREASE IN STRENGTH.
[LARGER PLAIN ROD (AISI/SAE GRADE1008) IS REDUCED TO
SMALLER RIBBED ROD SATISFYING BS4449]
(NOTE: THE TAG WITH HEAT NUMBER SHALL BE TIED IN THE
COIL AFTER REDUCTION)

FEW COILS ARE PLACED IN THE


AT STRAIGHTENING MACHINE
LONGITUDINAL DIRECTION OF
THE COIL WIRES ARE STRAIGHTEN
WELDING MACHINE.
AND CUT TO THE REQUIRED LENGTH
AS REQUIRED AGAIN COLD DRAWN STEEL IS [LATER THE TERM WILL BE USED
ROLLED INTO COIL AS LONG WIRE]
[THE TERM USED AS CROSS WIRE]
(SATISFYING BS 4449)
(NOTE: TAG WITH HEAT NUMBER
(NOTE: TAG WITH HEAT NUMBER
SHALL BE AVAILABLE FOR
SHALL BE AVAILABLE FOR
TRACEABILITY)
TRACEABILITY)
THE HEAT NUMBER USED FOR BOTH CROSS WIRE
AND LOND WIRE ARE NOTED FOR TRACAEBILITY

AT WELDING MACHINE
AT THE SPOOLS (FOR LONG WIRE)
STRAIGHTENING ARE PLACED AT MAIN HEAD OF
MACHINE THE WELDING MACHINE.
CROSS WIRE ARE PLACED AT
MACHINE TOP PERPENDICULAR
TO LONG WIRE.

PRIOR TO PLACING LONG WIRE AT


AND CROSS WIRE, THE MACHINE WELDING

STEP 2 SHALL BE ADJUSTED TO THE MACHINE/ SHEAR


REQUIREMENTS SUCH AS LINE MACHINE
SPACING, DIAMETER, DIMENSION
OF WIRE MESH, WELDING
REQUIREMENTS ETC,.
MANUFACTURING WIRE
FABRIC SATISFYING THE SHEAR MACHINE CUT THE WIRE MESH
BS 4483 TO THE REQUIRED DIMENSION.
(FROM COLD REDUCED STEEL
SHORT WIRE IN THE MESH ARE TERMED AS CROSS
SATISFYING BS 4449/ BS 4482) WIRE AND THE WIRE IN OTHER DIRECTION ARE
TERMED AS LONG WIRE.

[ DIMENSIONS OF WELDED WIRE MESH ARE


CHECKED FOR VERIFICATION]

(SATISFYING BS 4483)

PLACING FINISHED WELDED WIRE


MESH AT LOADING AREA

WELDED WIRE MESH ARE


LOADED IN TRAILER

END
Steel proposed
MILL TEST CERTIFICATES
Test reports
Other projects approvals
Digitally signed by
Volker Seewoster
Date: 2018.05.29
13:57:58 +04'00'
List of previous projects
`

LIST OF PROJECTS
COMPANIES / PROJECTS BEING SUPPLIED WITH WELDED WIRE MESH

S# COMPANY PROJECT
1 ABDELILADI ENGG & CONT. CO. (ABCO) AL QUOZE COMPLEX
2 ABU DHABI PRECAST FACTORY STORE IN MUSSAFAH
3 ABWAB AK QALAAH ENGG. CONT.
4 ADVANCED PIPES & CAST CO.
5 AL AIN GENERAL CONT. CO. J00646 JABAL AL DHANNA
6 AL FALAQ EST.
7 AL FARA'A GENERAL CONT. CO. DEV. OF SHK. MOHD BIN ZAYED CITY
8 AL FARA'A GENERAL CONT. CO. WEST WING EXP. - AL JIMI MALL (AL AIN)
9 AL FUTTAIM CARILLION NAPTHA HYDROTREATER REFORMER
10 AL HABTOOR ENGINEERING
11 AL JABER TRANS. & GEN. CONT. L.L.C VICTORIA HEIGHTS HOUSING
12 AL SHAFAR GENERAL CONT. (ASGC)
13 AL SHUJAA BUILDING CONT.
14 ALMATEN BLDG CONT. LLC
15 AMANA STEEL BLDGS. CONT. DMC IN PORT RASHID
16 ARAB KOREAN GEN. CONT. (GENCO) AL AIN ROAD PROJECT
17 ARABIAN CHOICE GEN. TRADING
18 ARABTEC CONSTRUCTION ARABTEC PRECAST DIVISION
19 ARABTEC CONSTRUCTION 594 VILLAS - ARABIAN RANCHES
20 ARABTEC CONSTRUCTION DUBAI PEARL TOWERS A6 & A7
21 ARABTEC CONSTRUCTION 544 VILLAS - AL WARQAH
22 ARABTEC CONSTRUCTION DIFC - TRUCK TUNNEL
23 ARABTEC CONSTRUCTION DIFC - GATE VILLAGE
24 ARABTEC CONSTRUCTION 558 VILLAS - DUBAI LAND
25 ARC CONSTRUCTION
26 AUSCOR CONSTRUCTIONS
27 BAHWAN BLDG MATERIALS
28 CAPRIOLE CONSTRUCTION CO. G+2 LABOUR ACCOMODATION
29 CAPRIOLE CONSTRUCTION CO. WAREHOUSE, STORAGE & OFFICES
30 CODE CONTRACTING CO. SECOND SCHOOL, AL AIN
31 CONCRETE TECHNOLOGY
32 DUBAI CONTRACTING CO. WORLD TRADE CENTER RESIDENCE
33 DUBAI CONTRACTING CO. STAFF ACCOMODATION AT MUHAISANAH
34 DUTCO BALFOUR BEATTY DUBAI MALL PROJECT
35 EMIRATES BELBADI CO. ONE @ BUSINESS BAY
36 ENGINEERING BLDG MATERIAL CO.
37 ENGINEERING CONTRACTING CO. EMIRATES CATERING FACILITY
38 EURO ASIA BLDG MATERIALS
39 FORCE 10 UAE LTD
40 GULF ERECTION CO. GAMCO PTS BUILDING
41 HADEED EMIRATES CONT. LLC
42 HYUNDAI ENG'G. & CONST. CO.
43 INTERNATIONAL MECH. & ELECT. CO. 373U
44 JT METRO JV
45 MCM GROUP ABU DHABI LLC EMIRATES POST OFFICE BUILDING
46 MEMANA GEN. CONT. & MAINT. LLC
47 METALLIC CONST. & IND. CO.(SOCOMET) AL HAFFA FACTORY
48 MUSHRIF NATIONAL CONST. DIAMOND FACTORY
49 NATIONAL BLDG MAT. TRADING CO. STORE IN MUSSAFAH
50 NUROL LLC AD 0414
51 ODERCO PETROLEUM, LLC
52 SATMA INTERNATIONAL
53 ZUBLIN CIVIL ENGINEERING CONT. TANK DYKES
54 SHAPOORJI PALLONJI MIDEAST L.L.C KING'S COLLEGE HOSPITAL, DUBAI
55 SHAPOORJI PALLONJI MIDEAST L.L.C IMPERIAL AVENUE-RESIDENCIAL & COMMERCIAL TOWER, DUBAI
56 ARABTECH CONSTRUCTION L.L.C 5153328 - DUBAI SOUTH MALL, DUBAI
57 FRONTIER WORK ORG. CIVIL CONS. L.L.C CONST. OF BUILDINGS & FACILITIES AT BARAKAH CAMP PH 1 & 2
58 CHICAGO MAINT. & CONST. CO. L.L.C G+3 GEMS FOUNDER SCHOOL PL.NO : 2623026
59 ARABTECH CONSTRUCTION L.L.C 2015-213 FUJ Cons. & Infra. Of 1100 UAE Nationals Hosing Units
60 MINISTRY OF PRESIDENTIAL AFFAIRS Development of Moh. Bin Zayed City, Fujairaj, PH-1
61 HASIM CONT. & GEN. MAINT. CO. L.L.C. Residential Building at ADNEC Capital center, Sector w-59/1,pl-C4
62 ARABTECH CONSTRUCTION L.L.C Pr. 5155099-AKOYA Oxygen Villa 692 Cluster R
63 SHAPOORJI PALLONJI MIDEAST L.L.C 5148376 – NAKHEEL GATE WAY TOWERS
64 ARABIAN CONSTRUCTION CO. W.L.L JEBEL ALI REFINERY EXPANSION PROJECT