CICON is an importer, stockiest and distributor of general building materials and has beenn
established in Abu Dhabi since 1968 with a branch (office, stores & plant) in Dubai.
CICON is registered with Abu Dhabi Chamber of Commerce (Reg. No. 1137) and business
activities include the supply of:
CICON has factories in Mussafah for fabrication of welded wire mesh, cut and bent reinforcing
steel, pile cages, and epoxy-coated steel for construction industry in the U.A.E.
Since it was established, CICON has provided its customers with the highest quality of materials
and service at the most competitive rates. Today CICON has become the leader in this field and
achieved high reputation among the contractors, consultants and project managers in the U.A.E.
construction industry.
CICON, being an ISO 9001:2015 company, believes that the satisfaction of the customer is the
success of business and keen to provide continuous dedicated service to our customers.
Wire Mesh activity
`
We are taking into consideration the fact that recently, the tendency has been outlined for
using the ready-made constructions of bars by the contractors and it is connected with the
increase effectiveness of construction and its quick completion.
RAW MATERIALS
The basic raw materials are wire rods in coils and reinforcement bars. The raw materials are
supplied mainly from U.A.E., Qatar, Turkey and Saudi Arabia.
As a result of tremendous response from the market and the current achievements, CICON
decided to increase its contribution to the market by enhancing the existing production
capacity and adding new products in its list.
CICON offers the contractors a fast and efficient service in delivering steel. Through the factor
process, quality control procedures are rigorously monitored to ensure that processed steel
meet the site requirements.
Organizational Chart
`
CICON’s Quality Policy
ISO Certificates & other Company’s Licenses
CERTIFICATE
OF APPROVAL
Product Conformity Certification
This is to certify that
Cicon Building Materials
at its establishment at
Cicon Epoxy & Steel Cutting plant, Abu Dhabi
has satisfied the Authority that it operates a quality management system that complies with the
requirements of BS EN ISO 9001 and the relevant CARES Quality and Operations Assessment
Schedules. Where appropriate, and as listed below, it has further satisfied the Authority that it
manufactures and/or supplies products that conform with the stated product standards and is
entitled to use the CARES marks on its products using the processes and procedures registered
with the Authority.
Scope of certification:
Processing of steel reinforcement to BS 8666:2000 and BS 4466 and the stocking and
distribution of BS 4449, BS 4482 and BS 4483
Dextra Bartec standard mechanical couplers to CARES Appendix TA1-B: BS4449 B500B,
size range 12 to 40mm
This certificate remains the property of the Authority and is issued subject to the Regulations of
the Authority. This certificate is uncontrolled when printed. To check the validity of this certificate
please visit www.ukcares.com or contact us on +44 1732 450000.
CERTIFICATE NUMBER FIRST APPROVAL ISSUE DATE EXPIRY DATE
091003 October 2009 01 January 2019 31 December 2019
Lee Brankley,
Chief Executive Officer
The use of the Accreditation Mark indicates accreditation in respect of those activities covered by the accreditation certificate number 002.
UK Certification Authority for Reinforcing Steels, Pembroke House, 21 Pembroke Road, Sevenoaks, Kent, TN13 1XR, UK.
A Company Limited by Guarantee. Registered in England No. 1762448.
Cert. Ref: AllC112010 55201 265
CERTIFICATE
OF APPROVAL
Product Conformity Certification
This is to certify that
Cicon Building Materials
at its establishment at
Cicon Steel Bar Fabrication, Dubai
has satisfied the Authority that it operates a quality management system that complies with the
requirements of BS EN ISO 9001 and the relevant CARES Quality and Operations Assessment
Schedules. Where appropriate, and as listed below, it has further satisfied the Authority that it
manufactures and/or supplies products that conform with the stated product standards and is
entitled to use the CARES marks on its products using the processes and procedures registered
with the Authority.
Scope of certification:
Processing of steel reinforcement to BS 8666:2000 and BS 4466 and the stocking and
distribution of BS 4449, BS 4482 and BS 4483
Dextra Bartec standard mechanical couplers to CARES Appendix TA1-B: BS4449 460B, size
range 12 to 40mm
This certificate remains the property of the Authority and is issued subject to the Regulations of
the Authority. This certificate is uncontrolled when printed. To check the validity of this certificate
please visit www.ukcares.com or contact us on +44 1732 450000.
CERTIFICATE NUMBER FIRST APPROVAL ISSUE DATE EXPIRY DATE
091004 October 2009 01 January 2019 31 December 2019
Lee Brankley,
Chief Executive Officer
The use of the Accreditation Mark indicates accreditation in respect of those activities covered by the accreditation certificate number 002.
UK Certification Authority for Reinforcing Steels, Pembroke House, 21 Pembroke Road, Sevenoaks, Kent, TN13 1XR, UK.
A Company Limited by Guarantee. Registered in England No. 1762448.
Cert. Ref: AllC112010 55202 266
INDUSTRIAL LICENSE ﺭﺧﺼـــﺔ ﺻﻨـــﺎﻋﻴﺔ
License No IN-1001686 ﺭﻗــﻢ ﺍﻟﺮﺧﺼــﺔ
First Issue Date : 09/07/2008 : ﺗﺎﺭﻳﺦ ﺃﻭﻝ ﺇﺻﺪﺍﺭ Enviroment No. : 1672 : ﺍﻟﺮﻗﻢ ﺍﻟﺒﻴﺌﻲ
Issue Date : 09/07/2019 : ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ FCR No. : - : ﺍﻟﺴﺠﻞ ﺍﻟﻤﺮﻛﺰﻱ ﺍﻟﻤﻮﺣﺪ
Expiry Date : 08/07/2020 : ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ Trade Name No. : IN-1001686 : ﺭﻗﻢ ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ
١ ﻓﺮﻉ.ﻡ.ﻡ. ﻣﺼﻨﻊ ﺳﻴﻜﻮﻥ ﻟﻼﺑﻮﻛﺴﻲ ﻭﺗﻘﻄﻴﻊ ﺍﻟﺤﺪﻳﺪ ﺫ: ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ
Trade Name : Cicon Epoxy & Steel Cutting Plant L.L.C. Branch 1
Location : Abu Dhabi - Mussaffah - ICAD I - (12DR7) : ﻣﻮﻗﻊ ﺍﻟﻤﻨﺸﺄﺓ
Activities ﺍﻷﻧﺸــــﻄــﺔ
Activity ﺍﻟﻨﺸﺎﻁ #
1 Onshore and Offshore Oil and Gas Fields and Facilities ﺧﺪﻣﺎﺕ ﺣﻘﻮﻝ ﻭﻣﻨﺸﺄﺕ ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ ﺍﻟﺒﺮﻳﺔ ﻭﺍﻟﺒﺤﺮﻳﺔ 1
Services
2 Steel Bars Preparation ﺗﺠﻬﻴﺰ ﺍﻟﻘﻀﺒﺎﻥ ﺍﻟﺤﺪﻳﺪﻳﺔ 2
3 Metal Coating ﻃﻼﺀ ﺑﺎﻟﻤﻌﺎﺩﻥ 3
Products ﺍﻟﻤﻨﺘﺠﺎﺕ
Product ﺍﻟﻤﻨﺘﺞ #
1 Cut & Bend Steel Rebars ﺣﺪﻳﺪ ﺍﻟﺘﺴﻠﻴﺢ ﺍﻟﻤﻘﺼﻮﺹ ﻭﺍﻟﻤﺜﻨﻰ 1
2 Epoxy Coated Structural Steel Rebars ﺣﺪﻳﺪ ﺍﻟﺘﺴﻠﻴﺢ ﺍﻟﻤﻄﻠﻰ ﺑﺎﻹﻳﺒﻮﻛﺴﻰ 2
Note : This Document is Considered As Commercial Register ﺗﻌﺘﺒﺮ ﻫﺬﻩ ﺍﻟﻮﺛﻴﻘﺔ ﺑﻤﺜﺎﺑﺔ ﺳﺠﻞ ﺗﺠﺎﺭﻱ: ﻣﻼﺣﻈﺎﺕ
IN-1001686 - 23/06/2019
*IN-1001686*
https://ded.abudhabi.ae/ar ﺃﺑﻮﻇﺒﻲ- ﻟﻠﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﺍﻟﺘﻔﺎﺻﻴﻞ ﺍﻟﻤﺬﻛﻮﺭﺓ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﻳﺮﺟﻰ ﺯﻳﺎﺭﺓ ﻣﻮﻗﻊ ﺩﺍﺋﺮﺓ ﺍﻟﺘﻨﻤﻴﺔ ﺍﻻﻗﺘﺼﺎﺩﻳﺔ
To verify the details mentioned in the license, please visit DED - Abu Dhabi website https://ded.abudhabi.ae/en
DUBAI CENTRAL LABORATORY DEPARTMENT
PRODUCTS CONFORMITY ASSESSMENT SECTION
2. HAND TOOLS:
a) Personal made, modified or damaged tools are not allowed in the plant.
5. WORKING AT HEIGHT:
a) Anyone in position above 2meters high, (with no handrail in place) must wear adequate fall
protection, and be hooked off above.
b) There must be safe access / egress to all work locations, and a safe working platform in
position.
c) Never throw any material from height. FALLING OBJECTS CAN KILL
6. HOT WORK:
a) Gas cylinders (whether full or empty) must be upright and secured at all times.
b) Combustibles must be removed from the area.
c) The correct P.P.E. must always be worn.
d) The equipment must be in safe condition, with “Flash back arrester” and “Non-return valve” in
position, and hoses in good condition.
7. TEMPORARY ELECTRICS:
a) Junction boxes, cables, etc, must be in safe condition – WATERPROOF & NO TAPED JOINTS
b) Where possible cables to be off the ground
c) Earth leakage circuit breaker (ELCB) fitted
d) Hand grinders must have a “deadmans switch”
8. EXCAVATIONS:
a) Check for buried services (electric, gas, water, etc…)
b) Safe access / egress (proper steps, handrail, etc…)
c) No heavy plant, vehicles, or equipment allowed near the top edge.
9. LADDERS:
a) Not be “homemade” or damaged
`
11. HOUSEKEEPING:
a) A high standard or housekeeping must be maintained at all times.
b) Waste, redundant material, trip hazards etc, must be removed from plant immediately.
15. SECURITY:
a) Smoking in the plant is not allowed.
b) Anyone caught stealing, or causing property damage will be reported to the police.
c) Anyone caught fighting will be removed from the plant.
Process flow chart
`
From the wire drawing machine, we pass spools to the main welding head, which is
used as a long wire and cross wire to produce welded wire mesh.
After that goes to shearing machine for cutting wire mesh according to requirements.
PROCESS SEQUENCE
Before Drawing
After Drawing
`
Coiling
APPLICATION PROCESS –
a) Plain wire rod (AISI/SAE 1008) is received from Emirates Steel as per the
ordered quantity. Received wire rods are kept in store and is sent inside
the plant as required.
a) Again the cold drawn wire is rolled into coil. Few rolled coils are sent to the
welding machine and are placed in the longitudinal direction, the term is
known as long wire. Some coils are send to the straightening machine
where the coils are straighten and cut to the required length, the term is
known as cross wire.
b) The spools (LONG WIRE) are placed at the main head of the welding
machine while the cross wires are placed at machine perpendicular to
long wire.
c) Prior to placing long wire and cross wire, the machine shall be adjusted
to the requirements such as spacing, diameter, dimension of wire mesh
welding reqirements etc.
d) Process is carried out and welded wire mesh is obtained as per the
required dimensions.
e) The welded wire mesh now pass through a final quality control procedure
and checked for weight, diameter, length, spacing against BS 4483.
STEP 4- Bundling and delivery-
a) After manufacturing wire mesh fabric has to be bundled, tagged for tracebility
and delivered to site. Fabricated wire mesh is stored inside the factory.
In case, if it is stored outside then it shall be covered properly.
b) Along with each delivery, delivery note and MTC Certificate are attached.
PRODUCTION FLOW CHART – WIRE MESH
Document Reference : FC/ WM/001 Rev: 0
Date: 06. 05.2015
START
STEP 1
MANUFACTURING COLD PLACING COIL FOR DRAWING AT
WIRE DRAWING MACHINE
REDUCED RIBBED WIRE [FOR COLD REDUCTION]
ROD SATISFYING (CAST NUMBERS ARE NOTED AND
REMOVED FROM COIL)
BS 4449/ BS 4482
AT
(FROM PLAIN ROD SATISFYING
DRAWING
AISI /SAE 1008) MARE REP FORMATION MACHINE
&
INCREASE IN STRENGTH.
[LARGER PLAIN ROD (AISI/SAE GRADE1008) IS REDUCED TO
SMALLER RIBBED ROD SATISFYING BS4449]
(NOTE: THE TAG WITH HEAT NUMBER SHALL BE TIED IN THE
COIL AFTER REDUCTION)
AT WELDING MACHINE
AT THE SPOOLS (FOR LONG WIRE)
STRAIGHTENING ARE PLACED AT MAIN HEAD OF
MACHINE THE WELDING MACHINE.
CROSS WIRE ARE PLACED AT
MACHINE TOP PERPENDICULAR
TO LONG WIRE.
(SATISFYING BS 4483)
END
Steel proposed
MILL TEST CERTIFICATES
Test reports
Other projects approvals
Digitally signed by
Volker Seewoster
Date: 2018.05.29
13:57:58 +04'00'
List of previous projects
`
LIST OF PROJECTS
COMPANIES / PROJECTS BEING SUPPLIED WITH WELDED WIRE MESH
S# COMPANY PROJECT
1 ABDELILADI ENGG & CONT. CO. (ABCO) AL QUOZE COMPLEX
2 ABU DHABI PRECAST FACTORY STORE IN MUSSAFAH
3 ABWAB AK QALAAH ENGG. CONT.
4 ADVANCED PIPES & CAST CO.
5 AL AIN GENERAL CONT. CO. J00646 JABAL AL DHANNA
6 AL FALAQ EST.
7 AL FARA'A GENERAL CONT. CO. DEV. OF SHK. MOHD BIN ZAYED CITY
8 AL FARA'A GENERAL CONT. CO. WEST WING EXP. - AL JIMI MALL (AL AIN)
9 AL FUTTAIM CARILLION NAPTHA HYDROTREATER REFORMER
10 AL HABTOOR ENGINEERING
11 AL JABER TRANS. & GEN. CONT. L.L.C VICTORIA HEIGHTS HOUSING
12 AL SHAFAR GENERAL CONT. (ASGC)
13 AL SHUJAA BUILDING CONT.
14 ALMATEN BLDG CONT. LLC
15 AMANA STEEL BLDGS. CONT. DMC IN PORT RASHID
16 ARAB KOREAN GEN. CONT. (GENCO) AL AIN ROAD PROJECT
17 ARABIAN CHOICE GEN. TRADING
18 ARABTEC CONSTRUCTION ARABTEC PRECAST DIVISION
19 ARABTEC CONSTRUCTION 594 VILLAS - ARABIAN RANCHES
20 ARABTEC CONSTRUCTION DUBAI PEARL TOWERS A6 & A7
21 ARABTEC CONSTRUCTION 544 VILLAS - AL WARQAH
22 ARABTEC CONSTRUCTION DIFC - TRUCK TUNNEL
23 ARABTEC CONSTRUCTION DIFC - GATE VILLAGE
24 ARABTEC CONSTRUCTION 558 VILLAS - DUBAI LAND
25 ARC CONSTRUCTION
26 AUSCOR CONSTRUCTIONS
27 BAHWAN BLDG MATERIALS
28 CAPRIOLE CONSTRUCTION CO. G+2 LABOUR ACCOMODATION
29 CAPRIOLE CONSTRUCTION CO. WAREHOUSE, STORAGE & OFFICES
30 CODE CONTRACTING CO. SECOND SCHOOL, AL AIN
31 CONCRETE TECHNOLOGY
32 DUBAI CONTRACTING CO. WORLD TRADE CENTER RESIDENCE
33 DUBAI CONTRACTING CO. STAFF ACCOMODATION AT MUHAISANAH
34 DUTCO BALFOUR BEATTY DUBAI MALL PROJECT
35 EMIRATES BELBADI CO. ONE @ BUSINESS BAY
36 ENGINEERING BLDG MATERIAL CO.
37 ENGINEERING CONTRACTING CO. EMIRATES CATERING FACILITY
38 EURO ASIA BLDG MATERIALS
39 FORCE 10 UAE LTD
40 GULF ERECTION CO. GAMCO PTS BUILDING
41 HADEED EMIRATES CONT. LLC
42 HYUNDAI ENG'G. & CONST. CO.
43 INTERNATIONAL MECH. & ELECT. CO. 373U
44 JT METRO JV
45 MCM GROUP ABU DHABI LLC EMIRATES POST OFFICE BUILDING
46 MEMANA GEN. CONT. & MAINT. LLC
47 METALLIC CONST. & IND. CO.(SOCOMET) AL HAFFA FACTORY
48 MUSHRIF NATIONAL CONST. DIAMOND FACTORY
49 NATIONAL BLDG MAT. TRADING CO. STORE IN MUSSAFAH
50 NUROL LLC AD 0414
51 ODERCO PETROLEUM, LLC
52 SATMA INTERNATIONAL
53 ZUBLIN CIVIL ENGINEERING CONT. TANK DYKES
54 SHAPOORJI PALLONJI MIDEAST L.L.C KING'S COLLEGE HOSPITAL, DUBAI
55 SHAPOORJI PALLONJI MIDEAST L.L.C IMPERIAL AVENUE-RESIDENCIAL & COMMERCIAL TOWER, DUBAI
56 ARABTECH CONSTRUCTION L.L.C 5153328 - DUBAI SOUTH MALL, DUBAI
57 FRONTIER WORK ORG. CIVIL CONS. L.L.C CONST. OF BUILDINGS & FACILITIES AT BARAKAH CAMP PH 1 & 2
58 CHICAGO MAINT. & CONST. CO. L.L.C G+3 GEMS FOUNDER SCHOOL PL.NO : 2623026
59 ARABTECH CONSTRUCTION L.L.C 2015-213 FUJ Cons. & Infra. Of 1100 UAE Nationals Hosing Units
60 MINISTRY OF PRESIDENTIAL AFFAIRS Development of Moh. Bin Zayed City, Fujairaj, PH-1
61 HASIM CONT. & GEN. MAINT. CO. L.L.C. Residential Building at ADNEC Capital center, Sector w-59/1,pl-C4
62 ARABTECH CONSTRUCTION L.L.C Pr. 5155099-AKOYA Oxygen Villa 692 Cluster R
63 SHAPOORJI PALLONJI MIDEAST L.L.C 5148376 – NAKHEEL GATE WAY TOWERS
64 ARABIAN CONSTRUCTION CO. W.L.L JEBEL ALI REFINERY EXPANSION PROJECT