FATIGUE AND STRESS CALCULATION OF TURBINE
MAIN SHAFT TRADUCIDO
(A7)
Marzo 2013
Beijing, China
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 2 页/共 9 页
Page: 2/9
Number of jets Z0 6
Maximal head Hmax 616.74m
Runner diameter D1 3349mm
Balance precision class of runner G G6.3
Speed of water leaving the injector C1 107.7m/s
Speed of runner at diameter (D1) U1 52.6m/s
This document contains proprietary information of Harbin Electric Machinery Co., Ltd.(HEC)and it can not be used in any way or
disclosed to others without the written permission of HEC.
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 3 页/共 9 页
Page: 3/9
When the output is 209.2MW or 192.85MW, all the six jets must be open. When six jets are
open, the theory hydraulic imbalance force is zero, but in fact it is a small value. In this report, we
choose the hydraulic imbalance force Fu2=F/2=325.33kN.
Then the total unbalanced force Fu= Fu1+ Fu2=330.3kN
Material and allowable stress of main shaft are shown in Table 1.
Table 1 Material and allowable stress of main shaft
Material property Allowable stress (MPa)
Material
UTS(MPa) YS(MPa) Tensile stress(YS/3) Shearing stress(YS/6)
In maximum output case (192.85MW), the allowable combination stress is 63.75MPa (YS/4);
in runaway case, the allowable combination stress is 170MPa (2YS/3); In maximum output
(transient) case (209.2MW), the allowable combination stress is 63.75MPa (YS/4). The maximum
output case (209.2MW) is short-term overload case, when the generator power factor is 1.
Main shaft is designed according to infinite life, and fatigue safety factor should be greater
than 1.5, according to experience of HEC.
3 Load calculation of main shaft in maximum output case (192.85MW)
When calculated the main shaft, the torque due to output power, the axial pull due to runner
gravity and bending of moment due to hydraulic imbalance force are considered. Three dangerous
section is calculated: the root of flange(A-A), supporting position of water guide bearing(C-C)and
the boss between flange and water guide bearing(B-B), the position of the three section is shown
in Fig.1.
This document contains proprietary information of Harbin Electric Machinery Co., Ltd.(HEC)and it can not be used in any way or
disclosed to others without the written permission of HEC.
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 4 页/共 9 页
Page: 4/9
M
2)Shearing stress max 1 : max 1
Wt1
D 3 d
Wt1 (1 4 ) =0.184 m 3 ,
16 D
max 1 =33.4MPa<42.5MPa
M W1
3)Bending stress w1 : w1 , M W 1 Fu L1
W1
D 3
W1 (1 4 )
32
w1 =1.63MPa
4)Combined stress 1 :
This document contains proprietary information of Harbin Electric Machinery Co., Ltd.(HEC)and it can not be used in any way or
disclosed to others without the written permission of HEC.
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 5 页/共 9 页
Page: 5/9
1
n1 =37.3>1.5
K w w1
'
max 1
Size coefficient: 0.57
Surface processing coefficient: 0.9
M
2)Shearing stress max 2 : max 2
Wt 2
D 3 d
Wt 2 (1 4 ) =0.184 m 3 ,
16 D
max 2 =33.4MPa<42.5MPa
3)Bending stress w 2 :
MW 2
w2 , M W 2 Fu ( L1 L 2)
W2
D 3
W2 (1 4 )
32
w 2 =2.87MPa
This document contains proprietary information of Harbin Electric Machinery Co., Ltd.(HEC)and it can not be used in any way or
disclosed to others without the written permission of HEC.
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 6 页/共 9 页
Page: 6/9
4)Combined stress 2 :
1
n1 =20>1.5
K w w 2
'
max 2
M D 3 d
2)Shearing stress max 3 : max 3 , Wt1 (1 4 ) =0.184 m 3 ,
Wt1 16 D
max 3 =33.4MPa<42.5MPa
This document contains proprietary information of Harbin Electric Machinery Co., Ltd.(HEC)and it can not be used in any way or
disclosed to others without the written permission of HEC.
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 7 页/共 9 页
Page: 7/9
MW3
3)Bending stress w3 : w3 , M W 1 Fu ( L1 l3 )
W3
D 3
W3 (1 4 )
32
w3 =9MPa
4)Combined stress:
3 ( max 3 w3 ) 2 3 2 max 3 =58.56MPa<63.75MPa
1
n1 =6.3>1.5
K w w3
'
max 3
Size coefficient 0.57
Surface processing coefficient 0.9
This document contains proprietary information of Harbin Electric Machinery Co., Ltd.(HEC)and it can not be used in any way or
disclosed to others without the written permission of HEC.
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 8 页/共 9 页
Page: 8/9
8 Conclusion
1) The fatigue safety factor at the root of flange (A-A) is 37.3. The fatigue safety factor at
boss (B-B) is 20. The fatigue safety factor at supporting position of water guide bearing
(C-C) is 6.3. Since all the safety factors above are greater than 1.5, fatigue strength has
enough safety margin.
2) The stress of main shaft is lower than allowable stress, which can meet the requirement.
9 Explanation
In HEC’s experience it is chosen 1.5 as the safety factor. In the power stations we have
applied 1.5 as the safety factor standard are Three Gorges Project(in China), Murum Hydraulic
Power station(in Malaysia), Daryan Dam and H.P.P Project(in Iran) and Pushihe pumped storage
power station(in China).
In the report, the least safety factor is 6.3, which is larger than 1.5.
This document contains proprietary information of Harbin Electric Machinery Co., Ltd.(HEC)and it can not be used in any way or
disclosed to others without the written permission of HEC.
SLJ-EGDECA-005
Fatigue and stress calculation of main shaft
第 9 页/共 9 页
Page: 9/9