Sie sind auf Seite 1von 1

TABLE OF CONTENTS

SHEET CONTENTS SET NO. SHT. NO.


COVER SHEET

GENERAL DRAWINGS

TABLE OF CONTENTS A - 01 01

MAP OF THE PHILIPPINES VICINITY MAP A - 02 02

GENERAL NOTES SYMBOLS & LEGENDS ABBREVIATIONS FOR


A - 03 03
ROAD CHAINAGE & APPROACHES
GENERAL NOTES, SYMBOLS & LEGENDS, ABBREVIATIONS FOR HIGHWAY A - 04 04

ROAD CHAINAGE & SECTIONS


SUMMARY OF QUANTITIES B-01 05

BRIDGE PLAN - STA. 35+819.54 - STA. 36+184.81 B-02 06

BRIDGE PROFILE - STA. 35+819.54 - STA. 36+184.81 B-03 07

BRIDGE ROAD CROSS-SECTIONS - STA. 35+819.54 TO STA. 35+900 B-04 08

BRIDGE ROAD CROSS-SECTIONS - STA. 35+920 TO STA. 36+100.00 B-05 09

BRIDGE ROAD CROSS SECTIONS - STA. 36+120.00 TO STA. 36+184.81 B-06 10

TYPICAL ROAD SECTIONS FOR CUT AND FILL B-07 11

TYPICAL ROADWAY SECTIONS (SUPERELEVATED & NORMAL) B-08 12


PAVEMENT DESIGN PARAMETERS

TYPICAL FLEX BEAM GUARDRAIL DETAILS B-09 13

TYPICAL ROAD SIGN AND PAVEMENT MARKINGS B-10 14

CONCRETE SLAB MEDIAN AND CONCRETE CURB DETAILS B-11 15


NOTE:

CONCRETE PAVEMENT DETAILS (1 OF 2) B-12 16 PURSUANT TO ITEM 5 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULES
AND REG ULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED
GOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNS
B-13 17 UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF
CONCRETE PAVEMENT DETAILS (2 OF 2) THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING
OFFICIALS.

THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE FAILURE
OF THE FACILITIES/STRUCTURES DUE TO FAULTY DESIGN EXCEPT FOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

ABDULLAH N. MAMBUAY
PROJECT MANAGER

PREPARED : PROJECT AND LOCATION : SHEET CONTENTS : CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

HOMER P. PABUSTAN
SR. HIGHWAY ENGR. KAY TIALO BRIDGE
SUBMITTED :
CRISTO, SAN JOSE REPUBLIC OF THE PHILIPPINES DINA LANE O. SAGUN DANILO L. BALISI GIL R. VILLANUEVA, CESO III LEA N. DELFINADO, CESO IV GILBERTO S. REYES EMIL K. SADAIN, CESO I
A 01
DEL MONTE, BULACAN TABLE OF CONTENTS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROJECT MANAGER CHIEF HIGHWAY DIVISION - BOD PROJECT DIRECTOR
BMC - UPMO
OFFICER IN CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR
TECHNICAL SERVICES
UNDERSECRETARY FOR
UPMO OPERATIONS AND
01 46
ENGINEERING SERVICES ABDULLAH N. MAMBUAY (REVISED) BMC-UPMO DATE : DATE : DATE : DATE : DATE : DATE :
TECHNICAL SERVICES
PROJECT MANAGER

Das könnte Ihnen auch gefallen