Sie sind auf Seite 1von 6

Rev

Project Construction of Sewage Treatmeny Plant of Capacity 375KLD


0
Doc., Designed Checked Approved
19-H20-STP-STR-01
Number VJ GJ DM
Title Structural Design Calculation of Underground STP tank
Design of Slab Panel @ 175.50m Level
Slab name : S1
Data:
Concrete M25 fck = 25 N/mm²
Steel Fe 500 fy = 500 N/mm²

Shorter Span Lx = 3.50 m


Longer Span Ly = 6.00 m
Assuming Depth of Slab D = 150 mm
Assuming Dia of reinf. = 10 mm
Clear Cover = 25 mm
Eff. Depth of Slab d = 120 mm
Eff.Shorter Span lx = 3.62 m
Eff. Longer Span ly = 6.12 m

Load Calculations:
Self weight of slab = 0.15 * 25 = 3.75 kN/m²
Finishing load-50thk. = 0.05 * 24 = 1.20 kN/m²
Live load = 0.75 kN/m²

Total load = 5.70 kN/m²


Load Factor = 1.50
Factored Load = 8.55 kN/m²

Span Ratio 4 ly/lx = 6.12 / 3.62


= 1.69

Bending Moment Calculation: 1


Support Condition 4 Two Adjacent edges Discontinuous
From IS 456-2000 Table 26 2 aNx = 0.082
aPx = 0.061
aNy = 0.047
aPy = 0.035
Shorter Span:
Negative Moment (Support) MNx = aNx x wu x lx²
= 0.082 x 8.55 x 3.62²
= 9.172 kN.m
Positive Moment (Mid span) MPx = aPx x wu x lx²
= 0.061 x 8.55 x 3.62²
= 6.872 kN.m
Longer Span :
Negative Moment (Support) MNy = aNy x wu x lx²
= 0.047 x 8.55 x 3.62²
= 5.266 kN.m
Positive Moment (Mid span) MPy = aPy x wu x lx²
Rev
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
0
Doc., Designed Checked Approved
19-H20-STP-STR-01
Number VJ GJ DM
Title Structural Design Calculation of Underground STP tank
= 0.035 x 8.55 x 3.62²
= 3.921 kN.m

Mu/ bd2 Values: Pt Values: ( as per SP:16)


Shorter Span
Support 0.64 0.12
Mid span 0.48 0.12
Longer Span
Support 0.37 0.12
Mid span 0.27 0.12

Reinforcement:
Required in Shorter Span Reinf Required Reinf Provided
Support 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c
Mid span 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c
Required in Longer Span
Support 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c
Mid span 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c

Check for Shear:


As per BS:8110 Shear coefficients
Max Shear coeff. for continuous edge in short directiongcx = 0.56

S.F for continuous edge in short direction Vcx = gcx * lx * W


Maximum Shear Force Vu = 0.56 x 3.620 x 8.55
= 17.421 kN
S.F for continuous edge in short direction Vu = 17.421 kN
Design Shear stress tv Vu/bd = 17421 / (1000 x 120)
= 0.145 N/mm²

Reinforcement provided in the slab is - 10Ø @ 200 mm c/c


% of reinforcement provided pt = 0.33
IS:456 Table 19
Allowable shear stress tc = 0.410 N/mm²
As per IS:456 cl. 40.2.1.1 k value for slab - 1.30

Design shear stress for concrete k x tc = 1.30 x 0.410


= 0.532 N/mm²

Actual Shear Stress < Design Shear Stress 0.145 < 0.532 SAFE

CHECK FOR DEFLECTION


Allowable span / depth Ratio l/d = 26
% of Tension reinforcement pt = 0.33
Corresponding Compression reinf. Bar dia = 10 mm
Rev
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
0
Doc., Designed Checked Approved
19-H20-STP-STR-01
Number VJ GJ DM
Title Structural Design Calculation of Underground STP tank
spacing = 150 mm
% of Compression reinforcement pc = 0.436
(Fig 4 & 5 IS 456 - 2000)
Modification factor for Tension reinf. F1 = 1.18
Modification factor for Comp. reinf. F2 = 1.10

Modified span/depth ratio = l/d x F1x F2


= 26x1.18x1.1
= 33.75

Actual span/depth ratio = 3620 / 120


= 30.17

Actual span/depth ratio < Modified span/depth ratio 30.17 < 33.75
Rev
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
0
Doc., Designed Checked Approved
19-H20-STP-STR-01
Number VJ GJ DM
Title Structural Design Calculation of Underground STP tank
Design of Slab Panel @ 175.50m Level
Slab name : S1
Data:
Concrete M25 fck = 25 N/mm²
Steel Fe 500 fy = 500 N/mm²

Shorter Span Lx = 3.50 m


Longer Span Ly = 3.70 m
Assuming Depth of Slab D = 150 mm
Assuming Dia of reinf. = 10 mm
Clear Cover = 25 mm
Eff. Depth of Slab d = 120 mm
Eff.Shorter Span lx = 3.62 m
Eff. Longer Span ly = 3.82 m

Load Calculations:
Self weight of slab = 0.15 * 25 = 3.75 kN/m²
Finishing load-50thk. = 0.05 * 24 = 1.20 kN/m²
Live load = 0.75 kN/m²

Total load = 5.70 kN/m²


Load Factor = 1.50
Factored Load = 8.55 kN/m²

Span Ratio 2 ly/lx = 3.82 / 3.62


= 1.06

Bending Moment Calculation: 1


Support Condition 2 One Short Edge Discontinuous
From IS 456-2000 Table 26 2 aNx = 0.040
aPx = 0.030
aNy = 0.037
aPy = 0.028
Shorter Span:
Negative Moment (Support) MNx = aNx x wu x lx²
= 0.040 x 8.55 x 3.62²
= 4.517 kN.m
Positive Moment (Mid span) MPx = aPx x wu x lx²
= 0.030 x 8.55 x 3.62²
= 3.385 kN.m
Longer Span :
Negative Moment (Support) MNy = aNy x wu x lx²
= 0.037 x 8.55 x 3.62²
= 4.146 kN.m
Positive Moment (Mid span) MPy = aPy x wu x lx²
Rev
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
0
Doc., Designed Checked Approved
19-H20-STP-STR-01
Number VJ GJ DM
Title Structural Design Calculation of Underground STP tank
= 0.028 x 8.55 x 3.62²
= 3.137 kN.m

Mu/ bd2 Values: Pt Values: ( as per SP:16)


Shorter Span
Support 0.31 0.12
Mid span 0.24 0.12
Longer Span
Support 0.29 0.12
Mid span 0.22 0.12

Reinforcement:
Required in Shorter Span Reinf Required Reinf Provided
Support 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c
Mid span 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c
Required in Longer Span
Support 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c
Mid span 10Ø @ 545mm c/c - 10 dia @ 200 mm c/c

Check for Shear:


As per BS:8110 Shear coefficients
Max Shear coeff. for continuous edge in short directiongcx = 0.38

S.F for continuous edge in short direction Vcx = gcx * lx * W


Maximum Shear Force Vu = 0.38 x 3.620 x 8.55
= 11.655 kN
S.F for continuous edge in short direction Vu = 11.655 kN
Design Shear stress tv Vu/bd = 11655 / (1000 x 120)
= 0.097 N/mm²

Reinforcement provided in the slab is - 10Ø @ 200 mm c/c


% of reinforcement provided pt = 0.33
IS:456 Table 19
Allowable shear stress tc = 0.410 N/mm²
As per IS:456 cl. 40.2.1.1 k value for slab - 1.30

Design shear stress for concrete k x tc = 1.30 x 0.410


= 0.532 N/mm²

Actual Shear Stress < Design Shear Stress 0.097 < 0.532 SAFE

CHECK FOR DEFLECTION


Allowable span / depth Ratio l/d = 26
% of Tension reinforcement pt = 0.33
Corresponding Compression reinf. Bar dia = 10 mm
spacing = 150 mm
Rev
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
0
Doc., Designed Checked Approved
19-H20-STP-STR-01
Number VJ GJ DM
Title Structural Design Calculation of Underground STP tank
% of Compression reinforcement pc = 0.436
(Fig 4 & 5 IS 456 - 2000)
Modification factor for Tension reinf. F1 = 1.18
Modification factor for Comp. reinf. F2 = 1.10

Modified span/depth ratio = l/d x F1x F2


= 26x1.18x1.1
= 33.75

Actual span/depth ratio = 3620 / 120


= 30.17

Actual span/depth ratio < Modified span/depth ratio 30.17 < 33.75