Sie sind auf Seite 1von 3

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2019'
Institute Name: National Institute of Technology Tiruchirappalli [IR-E-U-0467]

Sanctioned (Approved) Intake


Academic Year 2017-18 2016-17 2015-16 2014-15 2013-14 2012-13

UG [4 Years Program(s)] 884 884 884 884 - -

PG [2 Year Program(s)] 582 554 - - - -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [4 Years 2668 692 3360 1428 1494 438 218 1604 0 1064 34 724
Program(s)]

PG [2 Year 758 169 927 92 831 4 344 583 172 755 0 0


Program(s)]

Placement & Higher Studies

UG [4 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2012-13 890 844 2013-14 0 2015-16 831 581 650000(SIX LAKH 92


FIFTY THOUSAND
ONLY)

2013-14 865 826 2014-15 0 2016-17 815 555 653000(SIX LAKH 125
FIFTY THREE
THOUSAND ONLY)

2014-15 884 862 2015-16 0 2017-18 836 583 750000(SEVEN LAKH 165
FIFTY THOUSAND)

PG [2 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2014-15 524 476 2015-16 454 271 536500(FIVE LAKH 10


THIRTY SIX
THOUSAND AND
FIVE HUNDRED ONL)
2015-16 524 474 2016-17 433 317 575000(FIVE LAKH 9
SEVENTY FIVE
THOUSAND ONLY)

2016-17 554 443 2017-18 418 372 600000(SIX LAKH 20


ONLY)

Ph.D Student Details


Ph.D (Student pursuing doctoral program till 2017-18; Students admitted in the academic year 2018-19 should not be entered here.)

Total Students

Full Time 568

Part Time 380

No. of Ph.D students graduated (including Integrated Ph.D)

2017-18 2016-17 2015-16

Full Time 63 67 39

Part Time 18 18 15

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 10621455 (ONE CRORE SIX LAKH TWENTY ONE 23089739 (TWO CRORE THIRTY LAKH EIGHTY NINE 22461489 (TWO CRORE TWENTY FOUR LAKH SIXTY ONE
THOUSAND FOUR HUNDRED AND FIFTY FIVE ONLY) THOUSAND SEVEN HUNDRED AND THIRTY NINE ONLY) THOUSAND FOUR HUNDRED AND EIGHTY NINE ONY)

New Equipment for Laboratories 1030523657 (ONE HUNDRED AND THREE CRORE FIVE 70725877 (SEVEN CRORE SEVEN LAKH TWENTY FIVE 31036233 (THREE CRORE TEN LAKH THIRTY SIX
LAKH TWENTY THREE THOUSAND SIX HUNDRED AND THOUSAND EIGHT HUNDRED AND SEVENTY SEVEN THOUSAND TWO HUNDRED AND THIRTY THREE ONLY)
FIFTY SEVEN ONLY) ONLY)

Engineering Workshops 0 (ZERO) 0 (ZERO) 0 (ZERO)

Other expenditure on creation of Capital Assets (excluding 41204812 (FOUR CRORE TWELVE LAKH FOUR THOUSAND 159001199 (FIFTEEN CRORE NINETY LAKH ONE 186872835 (EIGHTEEN CRORE SIXTY EIGHT LAKH
expenditure on Land and Building) EIGHT HUNDRED AND TWELVE ONLY) THOUSAND ONE HUNDRED AND NINETY NINE ONLY) SEVENTY TWO THOUSAND EIGHT HUNDRED AND THIRTY
FIVE ONLY)

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 997612432 (NINETY NINE CRORE SEVENTY SIX LAKH 807719201 (EIGHTY CRORE SEVENTY SEVEN LAKH 774856219 (SEVENTY SEVEN CRORE FORTY EIGHT LAKH
TWELVE THOUSAND FOUR HUNDRED AND THIRTY TWO NINETEEN THOUSAND TWO HUNDRED AND ONE ONLY) FIFTY SIX THOUSAND TWO HUNDRED AND NINETEEN
ONLY) ONLY)

Maintenance of Academic Infrastructure or consumables, 481521200 (FORTY EIGHT CRORE FIFTEEN LAKH 453647624 (FORTY FIVE CRORE THIRTY SIX LAKH FORTY 441851375 (FORTY FOUR CRORE EIGHTEEN LAKH FIFTY
other running expenditures etc.(excluding maintenance of TWENTY ONE THOUSAND AND TWO HUNDRED ONLY) SEVEN THOUSAND SIX HUNDRED AND TWENTY FOUR ONE THOUSAND THREE HUNDRED AND SEVENTY FIVE
hostels and allied services) ONLY) ONLY)

Seminars/Conferences/Workshops 1189997 (ELEVEN LAKH EIGHTY NINE THOUSAND NINE 1001296 (TEN LAKH ONE THOUSAND TWO HUNDRED AND 2980056 (TWENTY NINE LAKH EIGHTY THOUSAND AND
HUNDRED AND NINETY SEVEN ONLY) NINETY SIX ONLY) FIFTY SIX ONLY)
PCS Facilities: Facilities of physically challenged students
1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

Das könnte Ihnen auch gefallen