1 132 kv Malikpur T-1 (10/16 MVA, 132/11 KV) 0.03 0.03 0.02
T-2 (16/ 20 MVA, 132/ 33 KV) 0.03 0.02 0.03
T-3 (16/ 20 MVA, 132/11 KV) 0.03 0.02 0.02
T-4 (20/25 MVA, 132/33 KV) 0.02 0.03 0.03
2 132 KV Ismailabad T-1 (10/16 MVA, 132/11 KV) 0.04 0.05 0.06
T-2 (10/16 MVA, 132/11 KV) 0.03 0.05 0.04
T-3 (20/25 MVA, 132/33 KV) 0.07 0.01 0.07
3 132 KV Bhore T-1 (10/16 MVA, 132/11 KV) 0.07 0.06 0.07
T-2 (20/25 MVA, 132/33 KV) 0.07 0.08 0.07
T-3 (20/25 MVA, 132/33 KV) 0.06 0.07 0.06
T-4 (10/16 MVA, 132/11 KV) 0.05 0.06 0.06
4 220 KV Pehowa T-1 (100 MVA, 220/132 KV) 0.24 0.39
T-2 (100 MVA, 220/132 KV) 0.27 0.41
T-3 (10/16 MVA, 132/11 KV) 0.32 0.6 0.45
T-4 (10/16 MVA, 132/11 KV) 0.4 0.6 0.5
T-5 (10/16 MVA, 132/33 KV) 0.4 0.7 0.6
T-6 (10/16 MVA, 132/33 KV) 0.2 0.5 0.4
T-7 (14.6/20 MVA, 132/33 KV) 0.3 0.54 0.4
T-8 (40/50MVA, 132/33 KV) 0.3 0.6 0.5
T-9 (100 MVA, 220/132 KV) 0.32 0.37
5 132 KV Bodhni T-1 (12.5 MVA, 132/33 KVA) 0.04 0.03 _
T-2 (20/25 MVA, 132/33 KV) 0.04 0.04 _
6 132 KV Bhusthla T-1 (20/25 MVA, 132/33 KV) 0.01/0.02 0.02 0.01
T-2 (20/25 MVA, 132/33 KV) 0.01/0.02 0.02 0.01
7 132 KV Dhand T-1 (10/16 MVA, 132/11 KV) 0.04/0.02 0.02 0.03
T-2 (16/ 20 MVA, 132/11 KV) 0.02/0.03 0.04 0.02
T-3 (16/ 20 MVA, 132/ 33 KV) 0.02/0.03 0.04 0.03
T-4 (40/50 MVA, 132/33 KV) 0.02/0.03 0.03 0.03
8 132 KV Adhon T-1 (20/25 MVA, 132/33 KV) 0.02/0.01 0.01 0.01
T-2 (40/50 MVA, 132/33 KV) 0.02/0.01 0.01 0.01
T-3 (20/25 MVA, 132/33 KV) 0.02 0.02 0.02
9 132 KV Kirmich T-1 (20/25 MVA, 132/33 KV) 0.02 0.03 0.07
T-3 (40/50 MVA, 132/33 KV) 0.02 0.05 0.03
10 66 KV Pilpi T-1 (16/ 20 MVA, 66/11 LV) 0.02 0.03 0.04
T-2 (16/ 20 MVA, 66/11 LV) 0.03 0.02 0.03
11 132 KV Pipli T-1 (10/16 MVA, 132/11 KV) 0.03 0.02 0.01
T-2 (40/50 MVA, 132/33 KV) 0.02 0.03 0.05
T-3 (16/20 MVA, 132/33 KV) 0.04 0.06 0.05
12 132 KV Lukhi T-1 (20/25 MVA, 132/33 KV) 0.2/0.02 0.09 0.04
T-2 (20/25 MVA, 132/33 KV) 0.02/0.03 0.02 0.02
13 220 KV Dhurala T-1 (100 MVA, 220/132 KV) 1.01/0.02 0.01
T-2 (100 MVA, 220/132 KV) 0.02/0.03 0.02
T-3 (10/16 MVA, 132/11 KV) 0.03/0.02 0.01 0.01
CAPACITOR BANK STATUS OF S/Stns.
Capacity lying
S. Capactior installed
Name of S/Stn. Name of T/F Voltage level of capacitor bank (No. defactive (No.
No. KVAR = MVAR) Capacity in
KVAR = MVAR)
operation Make of
(No. KVAR = capacitor
MVAR) banks.
1 132 kv Malikpur T-1 (10/16 MVA, 132/11 KV) 11KV 6 NIL 6 Universal
T-2 (16/ 20 MVA, 132/ 33 KV) 33KV 7.2 NIL 7.2 Universal
11KV M/S Shreem
capactior Pvt.
T-3 (16/ 20 MVA, 132/11 KV) 6 NIL 6 Ltd.
11KV M/S Shreem
capactior Pvt.
2 132 KV Ismailabad T-1 (10/16 MVA, 132/11 KV) 30X200=6 NIL 30X200=6 Ltd.
11KV M/S Shreem
capactior Pvt.
T-2 (10/16 MVA, 132/11 KV) 9 7.2 Ltd.
T-3 (20/25 MVA, 132/33 KV) 33 KV 14.4 NIL 14.4 _
3 132 KV Bhore T-1 (10/16 MVA, 132/11 KV) 11KV 6.3 NIL 6.3 MAHAN
T-2 (20/25 MVA, 132/33 KV) 33KV 36x200=7.2 NIL 36x200=7.2 SHREEM
T-3 (20/25 MVA, 132/33 KV) 33KV 36x200=7.2 NIL 36x200=7.2 SHREEM
T-4 (10/16 MVA, 132/11 KV) 11 kV 30x200=6 NIL 30x200=6 ABB Ltd.
4 220 KV Pehowa T-3 (10/16 MVA, 132/11 KV) 11 kV 30x200=6 NIL 30x200=6 _
T-4 (10/16 MVA, 132/11 KV) 11 kV 30x200=6 NIL 30x200=6 _
T-5 (10/16 MVA, 132/33 KV) 33 KV 30x200=6 NIL 30x200=6 _
T-6 (10/16 MVA, 132/33 KV) 33 KV Not Installed
T-7 (14.6/20 MVA, 132/33 KV) 33 KV 7.2 NIL 7.2
T-8 (40/50MVA, 132/33 KV) Not Installed
33 KV M/S Shreem
T-1 (12.5 MVA, 132/33 KVA) capactior Pvt.
5 132 KV Bodhni 7.2 NIL 7.2 Ltd.
33 KV M/S Shreem
T-2 (20/25 MVA, 132/33 KV) capactior Pvt.
7.2 NIL 7.2 Ltd.
33 KV M/S Shreem
capactior Pvt.
6 132 KV Bhusthla T-1 (20/25 MVA, 132/33 KV) 7.2 NIL 7.2 Ltd.
33 KV M/S Shreem
capactior Pvt.
T-2 (20/25 MVA, 132/33 KV) 7.2 NIL 7.2 Ltd.
7 132 KV Dhand T-1 (10/16 MVA, 132/11 KV) 11 kV 6 NIL 6 ABB Ltd.
T-2 (16/ 20 MVA, 132/11 KV) 11 kV 6 NIL 6 ABB Ltd.
T-3 (16/ 20 MVA, 132/ 33 KV) Not Installed
T-4 (40/50 MVA, 132/33 KV) Not Installed
M/S Shreem
capactior Pvt.
8 132 KV Adhon T-1 (20/25 MVA, 132/33 KV) 33 KV 7.2 NIL 7.2 Ltd.
M/S Shreem
T-2 (40/50 MVA, 132/33 KV) 7.2 7.2 capactior Pvt.
33 KV NIL
Ltd.
T-3 (20/25 MVA, 132/33 KV) 33 KV 14.4 NIL 14.4 SHREEM
M/S Shreem
capactior Pvt.
9 132 KV Kirmich T-1 (20/25 MVA, 132/33 KV) 33 KV 7.2 NIL 7.2 Ltd.
T-3 (40/50 MVA, 132/33 KV) Not Installed
M/S Shreem
capactior Pvt.
Ltd.& AB
10 66 KV Pilpi T-1 (16/ 20 MVA, 66/11 LV) 11 kV 6 NIL 6 Swidon
T-2 (16/ 20 MVA, 66/11 LV) 11 kV 3 NIL 3
11 132 KV Pipli T-1 (10/16 MVA, 132/11 KV) 11KV 6 NIL 6 Unistar
33KV Unistar
T-2 (40/50 MVA, 132/33 KV) 7.2 7.2
NIL
T-3 (16/20 MVA, 132/33 KV) 33KV 7.2 NIL 7.2 Unistar
33 KV M/S Shreem
capactior Pvt.
12 132 KV Lukhi T-1 (20/25 MVA, 132/33 KV) 7.2 NIL 7.2 Ltd.
33 KV M/S Shreem
capactior Pvt.
T-2 (20/25 MVA, 132/33 KV) 7.2 NIL 7.2 Ltd.
13 220 KV Dhurala T-3 (10/16 MVA, 132/11 KV) Not Installed
Working Remarks if not working with reason
status
ON
ON
ON
ON
ON
OK
20 MVAR to be installed by Power Grid
mobile capacitor bank.
ON
ON
ON
ON
ON
ON
ON
Capacity of capacitor bank has not been
ON provided as per rated capacity of T/F.
ON
ON
ON
ON
OK
ON
Capacitor bank has not been provided due
to less load. Load observed= 03 Amp (132
kv side)