1 Installation of New 4MTPA New Hot Strip Mill (Pkg.IV). BMB KX/
BKS/
MS

01.04.18

31.03.19
Routine
2 Construction of 2 nos of 220kV Bays at Tarkera Grid S/s for BMB KX/

01.04.18 01.04.18 01.04.18 01.04.18 01.04.18 01.04.18 01.04.18

31.03.19 31.03.19 31.03.19 31.03.19 31.03.19 31.03.19 31.03.19


Routine
providing power to New HSM.

3 Rerouting of Electrical cables to facilitate Road/ Rail connectivity to BMB KX/

Special
New HSM with existing Plant (Pkg.II-E)

4 Installation of new 33kV GIS at LBSS-1 Substation. BMB KX/

Special
5 Illumination through 30Mtrs height High mast lighting system at BMB KX/

Special
New HSM Area.

6 Periphery Illumination system for New Plate Mill Area with 15 nos. BMB

Special
of HM lighting & Watch Tower illumination.

7 Installation of Street Lighting System for few roads in Modernisation BMB

Special
Area.

8 Diversion of 132KV MSDS-III to II Line near MSDS-III to facilitate BMB


Special

construction of Electrified Railway Track.


9 MV Distribution Sub-station with Interplant cabling & SCADA (Pkg. BMB KX/

01.04.18 01.04.18 01.04.18 01.04.18 01.04.18 01.04.18

31.03.19 31.03.19 31.03.19 31.03.19 31.03.19 31.03.19


Routine Routine Routine Routine Routine Routine
073).

10 Installation of New HT S/s Building at TPH(Pkg.121). BMB KX/

11 Augmentation of Power Supply System in view of RSP Expansion BMB KX/


(Pkg. 087).

12 HT/LT S/S for Lime Plant, CED, Propane Plant with inter plant BMB KX/
cabling & Mis Electrical works(Pkg 073A).

13 Construction Power supply System for RSP Expansion BMB


/Maintenance of CSS at New Plate Mill & New HSM area.

14 Maintenance of LT installations and A/C units for Offices under ED BMB


(Projects).
ACTIVITIES Final Year Review

# Completion of balance engineering drawings. Engineering for jobs completed. Supply of equipment
# Supervision of erection of electrical & Electrics equipments, cable completed.
laying and other associated jobs.
# Testing & Commissioning of Electrical equipments & Electrics. Erection of equipments for 33KV GIS, 6.6KV AIS at DC
# Supervision of construction of Tr. Line Towers & Stringing of ECR, Main mill ECR, RHF ECR & WTP Ecr completed.
220kV lines conductors.

Supervision of erection of Bay structures & equipments.


Commissioning of Electrical equipments, Control & Relay panels for
2nos. of 220kV Bays at Tarkera Grid S/s. PAC, CC of Pkg.

Tendering. Contract Finalisation. Supply & Laying of cables.


Rerouting of power cables & associated jobs. PAC & CC for Pkg.

PAC, CC & PG of 33kV GIS at LBSS-1 Substation. Project


Closure.

Erection & Commissioning of 10 nos. of 30Mtrs height High mast &


light fittings. Laying of LT cables. Illumination of 9 nos. of Watch
Towers & Gate illumination at New HSM project site.

PAC, CC of Pkg.

Commissioning of 172 nos. of Street light poles with LED light


fittings around BF-V & SMS-II roads. Supervision of Laying of LT
cables, Installation & Commissioning of Feeder Pillars.

Issue of CC & FAC.


Completion of balance jobs for TPH like Shifting of existing loads to
new panels. Commissioning of 2nd 8MVA Transformer and issue of
PG. Project Closure.

Finalisation of Chage order & issue of PG. Project Closure

Issue of PGTC & FAC.

Issue of PGTC & FAC.

Operation & maintenance of CSS units to give uninterrupted power


supply to all package under RSP Expansion, New Plate Mill & New
HSM area.

Maintenance of 02 nos. of CSS units. Maintenance of Electrical


installations & Maintenance of A/C for Offices under ED (Projects)
START
TYPE
SL

END
KPA Group Weightage
NO

01.04.18

31.03.19
Routine
Installation of New 4MTPA New Hot
1 KX 15
Strip Mill (Pkg.IV).

01.04.18

31.03.19
Special

Installation of new 33kV GIS at LBSS-


2 KX 8
1 Substation.
01.04.18

31.03.19

Construction of 2 nos of 220kV Bays


Routine

3 at Tarkera Grid S/s for providing power KX 8


to New HSM.
01.04.18

31.03.19

Illumination through 30Mtrs height


Special

4 High mast lighting system at New KX 5


HSM Area.
01.04.18 01.04.18 01.04.18 01.04.18

31.03.19 31.03.19 31.03.19 31.03.19


MV Distribution Sub-station with

Routine
5 Interplant cabling & SCADA (Pkg. KX 5
073).

Routine Routine
Installation of New HT S/s Building at
6 KX 5
TPH(Pkg.121).

Augmentation of Power Supply


7 System in view of RSP Expansion KX 5
(Pkg. 087).

HT/LT S/S for Lime Plant, CED,

Routine
8 Propane Plant with inter plant cabling KX 4
& Mis Electrical works(Pkg 073A).

Rerouting of Electrical cables to

01.04.18

31.03.19
Special
facilitate Road/ Rail connectivity to
9 KX 5
New HSM with existing Plant (Pkg.II-
E)
Mid Year
ACTIVITIES
Review

# Completion of balance engineering drawings.


# Supervision of erection of electrical & Electrics
equipments, cable laying and other associated jobs.
# Testing & Commissioning of Electrical equipments &
Electrics.
# Supervision of construction of Tr. Line Towers &
Stringing of 220kV lines conductors.

PAC, CC & PG of 33kV GIS at LBSS-1 Substation.


Project Closure.

Supervision of erection of Bay structures & equipments.


Commissioning of Electrical equipments, Control &
Relay panels for 2nos. of 220kV Bays at Tarkera Grid
S/s. PAC, CC of Pkg.

Erection & Commissioning of 10 nos. of 30Mtrs height


High mast & light fittings. Laying of LT cables.
Illumination of 9 nos. of Watch Towers & Gate
illumination at New HSM project site.
Completion of balance jobs for TPH like Shifting of
existing loads to new panels. Commissioning of 2nd
8MVA Transformer and issue of PG. Project Closure.

Finalisation of Chage order & issue of PG. Project


Closure

Issue of PGTC & FAC.

Issue of PGTC & FAC.

Tendering. Contract Finalisation. Supply & Laying of


cables. Rerouting of power cables & associated jobs.
PAC & CC for Pkg.
Final Year Review

Engineering for jobs completed. Supply of equipment


completed.
Erection of equipments for 33KV GIS, 6.6KV AIS at DC ECR,
Main mill ECR, RHF ECR & WTP Ecr completed.
Engineering & drawing approval completed. Supply of
equipment completed.

Erection:
Erection of equipments for 33kV GIS, 6.6kV AIS at DC ECR,
Main mill ECR, RHF ECR & WTP ECR, MWP ECR: SSL ECR
completed. 222Nos of Transformers, 222Nos of Isolators,
222Nos of Panels, 222Nos of Motors completed.

Testing commissioning:
Testing completed and following equipments charged.
1. 33kV GIS of MSDS-VII on
2. LT systems like LT PCC, Battery & battery charger, CMCC
of MSDS-VII on
3. 25MVA TR-1 &2 and DC PCC-1 &2 of DC ECR on
4. 6.6kV HT panel of DC ECR on .,
5. DC PCC-1 &2 of DC ECR on ….

Testing completed for following equipments.


Main Mill ECR: 6.6kV HT panel for RM, FM & Descaler. LT
PCC,
WTP ECR: 6.6kV HT panel, LT PCC,
MWP ECR: 6.6kV HT panel, LT PCC,
SSL ECR: 6.6kV HT panel, LT PCC,
RHF ECR: 6.6kV HT panel, LT PCC,

Tr. Line:
17 nos of founsdation work completed. 17 nos of Tower
erection completed.
Stringing
PAC, CCof& 4PG
span conductor
of 33kV GIS at LBSS-1 Substation. Project
Closure.

Supervision of erection of Bay structures & equipments.


Commissioning of Electrical equipments, Control & Relay
panels for 2nos. of 220kV Bays at Tarkera Grid S/s. PAC, CC
of Pkg.
Erection of Control & Relay panels, Bay structures &
equipments completed. Erection of 20 nos of CT, PT, Breakers
and LAs completed. Stringing of conductor for 2nos bay
completed.

Erection & Commissioning of 10 nos. of 30Mtrs height High


mast & light fittings. Laying of LT cables. Illumination of 9 nos.
of Watch Towers & Gate illumination at New HSM project site.
Completion of balance jobs for TPH like Shifting of existing
loads to new panels. Commissioning of 2nd 8MVA
Transformer and issue of PG. Project Closure.

Finalisation of Chage order & issue of PG. Project Closure

Issue of PGTC & FAC.

Issue of PGTC & FAC.

Tendering. Contract Finalisation. Supply & Laying of cables.


Rerouting of power cables & associated jobs. PAC & CC for
Pkg.

Das könnte Ihnen auch gefallen