BILL OF QUANTITY

Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)

UNIT RATE TOTAL AMT.


ITEM DESCRIPTION QTY. UNIT KD. KD.

NOTE -1 All quantity mentioned in this bill of


quantity is approximately ±
NOTE – 2 Any extra amount will be without extra
cost

DIVISION (2)
SITE WORK

Excavation
Excavation in any material which may be
A encountered

Earth Work Excavation to receive foundation 450.00 CM 1.00 450.00


B Dispose off all excavated soil to an approved
dump

Filling
ripped and compacted native material. L.S L.S 1.00 1.00

C Backfill around footings and columns neck in

layers to required levels with approved imported 300.00 CM 1.00 300.00

material, all complete with necessary compaction


as called in specifications.

D
Protect excavated area agains termite attack 105.00 SM 1.00 105.00

through a ten year guaranteed system to the


Engineer's approval
E Design, errect a dewatering system, to the
approval of the Engineer, include for operation
180.00 MR 1.00 180.00
and maintenance. Remove dewatering system

after Engineer approval


F Conduct manual excavation to locate
underground services through out the project L.S L.S 1.00 1.00
area

Allow for works called for in the Spepcifications L.S L.S 1.00 1.00
G and drawings which may not been mentioned up.

TO SUMMARY KD 1,038.00

DAR AL-DABBOUS ENGINEERING CONSULTANTS III-4/CIV/1 ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫)ﻲﻟﺪﺒﻌﻟا ﻖيﺮﻃ‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)
UNIT RATE TOTAL AMT.
ITEM DESCRIPTION QTY. UNIT KD. KD.

DIVISON 3 - CONCRETE

Cast in place concrete


plain concrete grade K-300
Plain concrete using sulphate resisting cement,
including formwork and all other materials.
Vibrating curing etc. complete as per 18.00 CM 1.00 18.00

specification and drawings (minimum Thickness


A 20 cm ) Corrnt type-v

Reinforced concrete

Vibrated reinforced concrete grade K300 using


sulphate resisting cement filled into formwork
and tamped around reinforcement including all
formwork and reinforcement (fair finished on all
exposed faces). Vibrating curing roding,
finishing, 2 cont. of asphelt paint & memberane
production etc. complete as per specification and
drawings.
B RAFT Footing for tank minimum 40 cm thick 30.00 CM 1.00 30.00

C 10cm, thick singly reinforced ( 8Ø10/m\ ) in two


ways slab on grade over polyethylene sheet
0.5mm thick OVER AND ARROUND SEPTIC
TANK ( WIDHT 1 M ) WITH KERBSTONE BORDER 50.00 SM 1.00 50.00

AS SHOWN IN THE DRAWING&SPECS..ETC, UP


TO APPROVED BY ENGINEER

D 20cm. Thick double reinforced slab 15.00 CM 1.00 15.00

E R. Concrete wall 30 cm thick 66.00 CM 1.00 66.00

F
allow for works called for in the specifications
and Drawings which may not been mentioned up. L.S L.S 1.00 1.00

TO COLLECTION KD 180.00

DAR AL-DABBOUS ENGINEERING CONSULTANTS III-4/CIV/2 ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫)ﻲﻟﺪﺒﻌﻟا ﻖيﺮﻃ‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)

PAGE DESCRIPTION TOTA L PRICE.

NO. KD. FILS

COLLECTION
DIVISION 3 - CONCRETE

Page No. - 1 180.00

TO SUMMARY KD 180.00

DAR AL-DABBOUS ENGINEDAR AL-DABBOUS ENGINEERING CO ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫)ﻲﻟﺪﺒﻌﻟا ﻖيﺮﻃ‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)
UNIT RATE TOTAL AMT.
ITEM DESCRIPTION QTY. UNIT KD. KD.

DIVISON 5- Metal works

SUPPLY & INSTALL MEDIUM Duity Double seal


cover for opening's of septic tank as shown in
6.00 NO 1.00 6.00
the Design DWG … etc. up to approved by
A Engineer

TO COLLECTION KD 6.00

DAR AL-DABBOUS ENGINEERING CONSULTANTS III-4/CIV/4 ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫)ﻲﻟﺪﺒﻌﻟا ﻖيﺮﻃ‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)
PAGE UNIT RATE TOTAL AMT.
NO. DESCRIPTION QTY. UNIT KD. KD.

DIVISION 7 - THERMAL & MOISTURE


PROTECTION

Two coats of cold bitumen to concrete surface+ 2


layers coats of torbal 4mm thick with 6mm
protection layers for walls or 5 cm screed for
foundation in contact with solid as well as
external block work and reinforcement concrete
columns / shear walls

A RAFT Foundations 90.00 SM 1.00 90.00

B Walls 330.00 SM 1.00 330.00

C slabs 75.00 SM 1.00 75.00

D Sides of footing and concrete walls protected


with 6mm thick protection board. 300.00 SM 1.00 300.00

Membrane roofing
Composite roofing system
G Two coats of water proofing VANDEX
covering internal faces and top of foundations,
walls, bottom of slabs for
internal septic tank …. Etc. up to aprroved by
Engineer 390.00 SM 1.00 390.00

TO SUMMARY KD 1,185.00

DAR AL-DABBOUS ENGINEERING CONSULTANTS III-4/CIV/5 ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫)ﻲﻟﺪﺒﻌﻟا ﻖيﺮﻃ‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)
PAGE UNIT RATE TOTAL AMT.
NO. DESCRIPTION QTY. UNIT KD. KD.

DIVISION 9 - FINISHES
Lath and Plaster

A Internal Fair face finish for spetic tank 390.00 SM 1.00 390.00

External Painting

B 3 COATS EPOXY PAINTS WITH TROWLLED


SMOTH FINISH FOR P. Concrete flooring over
and arround septic tank… etc. up to approved
by Engineer 150.00 SM 1.00 150.00

Allow for works called for in the specifications


C and Drawings which may not been mentioned up. L.S L.S 1.00 1.00

TO COLLECTION KD 541.00

DAR AL-DABBOUS ENGINEERING CONSULTANTS III-4/CIV/6 ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫)ﻲﻟﺪﺒﻌﻟا ﻖيﺮﻃ‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)

PAGE TOTA L PRICE.


DESCRIPTION

NO. KD. FILS


COLLECTION

DIVISION 9 - FINISHES

Page No. - 10 541.00

TO SUMMARY KD 541.00

DAR AL-DABBOUS ENGINEERING CONSULTANTS III-4/CIV/7 ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫)ﻲﻟﺪﺒﻌﻟا ﻖيﺮﻃ‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)
UNIT RATE TOTAL AMT.
ITEM DESCRIPTION QTY. UNIT KD. KD.

DIVISION 10 - SPECIALITIES

IDENTIFICATION DEVICES

Supply and install identifying and directional


sinage as shown on drawings and as per
specifications.
I Room identification sign L.S L.S 1.00 1.00

TO SUMMARY KD 1.00

DAR AL-DABBOUS ENGINEERING CONSULTANTS III-4/CIV/8 ‫ﺔﯿﺟرﺎﺨﻟا قﺮ‬ ‫ ﻄﻟا ﺔعارزو يرو ﻞﯿﻤﺠﺗ عوﺮﺸﻣ‬ZONEA(‫ﻲﻟﺪﺒﻌﻟﻄﻟا ﺔعا‬
BILL OF QUANTITY
Employer :
The Publi c Authority for Agriculture Affairs and Fish Resources (PAAF)

Septic Ta nk for IRRIGATION PUMP HOUSE ( Zone A ) (CI VIL & FINISHES WORKS)

UNIT RATE TOTAL AMT.


ITEM DESCRIPTION QTY. UNIT

KD. KD.

SUMMARY OF HOLDING TANK FOR

IRRIGATION PUMP HOUSE

Division (2) - Site Work 1,038.00

Division (3) - Concrete 180.00

Division (5) - METAL WORKS 6.00

Division (7) - thermal & Moisture Protection 1,185.00

Division (9) - FINSHES 541.00


Division (10) - SPECIALIST 1.00

TO SUMMARY KD 2,951.00