ID Task Task Name Duration Start Finish Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr

17 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018


Mode Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
1 Tender SURE 377 days Wed Mon
Majestic Stage 1 15-11-17 26-11-18
- Dhanavantri
Road, 6th Cross
Road, Movie
Land Opp. Road,
Yadhav Hostel
Road, Cross
2 Office Setup
3 Steel portable 15 days Wed Wed
barricades 15-11-17 29-11-17
4 Permissions
5 Test Pits And 6 days Fri 01-12-17 Wed
meetings with all 06-12-17
Agencies for
permission
6 Preparation for
EWE
7 Dismantling of 10 days Thu Sat 16-12-17
concrete 07-12-17
8 Dismantling 10 days Thu Sat 16-12-17
Kerb stone 07-12-17
9 Loading and 10 days Sat 09-12-17 Mon
Unloading 18-12-17
10 Haulage 10 days Sat 09-12-17 Mon 18-12-17
11 Removal of 10 days Mon Wed
Telephone / 18-12-17 27-12-17
Electric poles
12 Sewer Line Laying
13 EWE depth upto 330 m days Mon 18-12-17Tue 16-01-18
14 S&S 300mm dia 30 days Wed Thu
pipe 20-12-17 18-01-18
15 Water Line Laying
16 EWE depth upto 390 m days Fri 22-12-17 Wed 21-03-18
17 323.9 mm Dia 90 days Fri 22-12-17 Wed
ERW MS pipe 21-03-18
18 100mm dia 90 days Fri 22-12-17 Wed
Ductile Iron 21-03-18
19 MS Specials 90 days Fri 22-12-17 Wed 21-03-18
20 100 mm dia CI 90 days Fri 22-12-17 Wed
sluice valves 21-03-18
21 300mm dia CI 90 days Fri 22-12-17 Wed
sluice valves 21-03-18
22 25mm dia PVC 90 days Fri 22-12-17 Wed
ringtite pipe 21-03-18

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline


Project: Tender SURE Majestic Sta Split External Tasks Inactive Summary Manual Summary Progress
Date: Tue 17-07-18
Milestone External Milestone Manual Task Start-only Manual Progress
Summary Inactive Task Duration-only Finish-only

Page 1
ID Task Task Name Duration Start Finish Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018
Mode Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
23 32mm dia PVC 90 days Fri 22-12-17 Wed
ringtite pipe 21-03-18
24 50mm dia PVC 90 days Fri 22-12-17 Wed
ringtite pipe 21-03-18
25 Power line Laying
26 EWE depth upto 360 m days Mon 01-01-18Thu 01-03-18
27 200mm dia 60 days Mon Thu
HDPE pipes 01-01-18 01-03-18
28 OFC line Laying
29 EWE depth upto 360 m days Tue 16-01-18 Fri 16-03-18
30 110mm dia 60 days Tue Fri 16-03-18
HDPE pipes 16-01-18
31 SWD Line Laying
32 Cutting of Road 60 days Fri 05-01-18 Mon
Surface for 05-03-18
Pipeline.
33 EWE depth upto 360 m days Fri 05-01-18 Mon 05-03-18
34 600mm dia 60 days Fri 05-01-18 Mon
RCC pipe NP3 05-03-18
35 315mm outer 60 days Fri 05-01-18 Mon
dia UPVC pipes 05-03-18
36 Cross over lines
for Power & OFC
37 Cutting of Road 30 days Wed Thu
Surface for 07-03-18 05-04-18
Pipeline.
38 EWE depth upto 330 m days Wed 07-03-18Thu 05-04-18
39 Double row 30 days Wed Thu
RCC pipe duct, 07-03-18 05-04-18
300 mm dia,
40 Concrete M20 30 days Wed 07-03-18Thu 05-04-18
41 Providing & 30 days Wed Thu
laying of WMM 07-03-18 05-04-18
42 Chamber
Works for
Sewer, SWD,
Power, OFC &
43 water line upto 3120
EWE depth m days Fri 19-01-18 Fri 18-05-18
44 M15 with 120 days Mon Mon
40mm and 22-01-18 21-05-18
45 T.M.T steel 120 days Wed 24-01-18Wed 23-05-18
46 Concrete M25 120 days Mon Mon
with 20mm and 29-01-18 28-05-18
down size
47 Concrete M-30 60 days Wed 28-02-18Sat 28-04-18
48 Debries Removal
Task Project Summary Inactive Milestone Manual Summary Rollup Deadline
Project: Tender SURE Majestic Sta Split External Tasks Inactive Summary Manual Summary Progress
Date: Tue 17-07-18
Milestone External Milestone Manual Task Start-only Manual Progress
Summary Inactive Task Duration-only Finish-only

Page 2
ID Task Task Name Duration Start Finish Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018
Mode Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
49 Removal of 180 days Sat 02-12-17 Wed
unserviceable 30-05-18
50 180 days Sat 02-12-17 Wed
30-05-18
51 Haulage 180 days Sat 02-12-17 Wed 30-05-18
52 Surface Making
for Footpath
53 Compaction of 25 days Tue Fri 22-06-18
ground with 29-05-18
power roller.
54 Filling using 25 days Mon Thu
approved M - 02-07-18 26-07-18
sand
55 Surface Making
for White
Topping Road
56 Milling depth 30 days Mon Tue
of 55 mm 02-07-18 31-07-18
57 Scarifying 30 days Mon Tue
bituminous 02-07-18 31-07-18
58 Scarifying 30 days Mon Tue
kankar/gravel/metal 02-07-18 31-07-18
crust upto
150mm thick
59 EWE by 30 days Mon Tue
mechanical 02-07-18 31-07-18
60 Construction of 30 days Mon Tue
granular 02-07-18 31-07-18
61 Providing & 30 days Mon Tue
laying of WMM 09-07-18 07-08-18
62 Compaction of 30 days Mon Tue
ground with 09-07-18 07-08-18
power roller.
63 Providing and 10 days Wed Fri 17-08-18
applying 08-08-18
primer coat
with S.S.
64 Providing and 10 days Wed Fri 17-08-18
laying 08-08-18
bituminous
65 Road Laying
66 White Topping 30 days Thu Fri 17-08-18
M-40 grade 19-07-18
pavement
67 White Topping 30 days Fri 20-07-18 Sat 18-08-18
Groove Cutting

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline


Project: Tender SURE Majestic Sta Split External Tasks Inactive Summary Manual Summary Progress
Date: Tue 17-07-18
Milestone External Milestone Manual Task Start-only Manual Progress
Summary Inactive Task Duration-only Finish-only

Page 3
ID Task Task Name Duration Start Finish Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018
Mode Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
68 Laying of Kerb
69 M15 with 30 days Wed Thu
40mm and 08-08-18 06-09-18
70 PCC 1:3:6 with 30 days Mon Tue
20mm and 13-08-18 11-09-18
down size
71 Kerb stones of 60 days Sat 18-08-18 Tue
M20 with 16-10-18
150X275X450mm
72 Finishing of
Footpath With
foundation
work for Street
Lights and
Property Edge
73 line
63 mm dia 30 days Fri 07-09-18 Sat 06-10-18
HDPE pipes
74 EWE by 30 days Wed Thu
manual means 12-09-18 11-10-18
depth upto 3 m
75 T.M.T steel 30 days Mon Tue
reinforcement 17-09-18 16-10-18
for R.C.C work
76 Concrete M20 30 days Sat 22-09-18 Sun
with 20mm and 21-10-18
down size
77 Heavy duty 30 days Thu Fri 26-10-18
cobble stones 27-09-18
78 Vitrified glazed 15 days Tue Tue
tilesof size 600 02-10-18 16-10-18
x 600 x 10mm
79 Finishing works
and Fixtures
80 Supply 30 days Sat 27-10-18 Sun
,Fabrication, 25-11-18
Painting and
Fixing of Mild
steel
81 Mild Steel 30 days Sat 27-10-18 Sun
Angle Iron 25-11-18
82 Cast Iron items 30 days Sat 27-10-18 Sun 25-11-18
83 RCC Precast 30 days Sat 27-10-18 Sun
slab of 100mm 25-11-18
84 Supplying and 30 days Sat 27-10-18 Sun
Fixing of 25-11-18
Garbage bins

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline


Project: Tender SURE Majestic Sta Split External Tasks Inactive Summary Manual Summary Progress
Date: Tue 17-07-18
Milestone External Milestone Manual Task Start-only Manual Progress
Summary Inactive Task Duration-only Finish-only

Page 4
ID Task Task Name Duration Start Finish Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018
Mode Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
85 Painting two 30 days Sat 27-10-18 Sun
coats with 25-11-18
synthetic
86 Sign Board Works
87 Pavement 30 days Sat 27-10-18 Sun
markers made 25-11-18
of
polycarbonate
and ABS
(Acrylonitrile
Butadiene
88 Road Marking 30 days Sat 27-10-18 Sun
with Hot 25-11-18
Applied
Thermoplastic
Compound for
89 600 MM 30 days Sat 27-10-18 Sun
Circle-TYPE XI 25-11-18
retro-reflective
signboards
90 900mm 30 days Sat 27-10-18 Sun
Equilateral 25-11-18
Triangle-TYPE
XI
retro-reflective
91 600 x 30 days Sat 27-10-18 Sun
800mm-TYPE 25-11-18
XI
retro-reflective
92 Retro-Reflective 30 days Sat 27-10-18 Sun
Road name sign 25-11-18
Board Single
Arrow size
1.98x0.9m
93 Retro-Reflective 30 days Sat 27-10-18 Sun
Road name sign 25-11-18
Board Double
Arrow size
1.98x0.9m
94 Street Light & 1 day? Tue Tue
Electrical Works 19-06-18 19-06-18
95 Supplying of 30 days Sat 27-10-18 Sun
(LED) Street 25-11-18
96 Swaged tubular 30 days Sat 27-10-18 Sun
pole of height 9 25-11-18
Mtr

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline


Project: Tender SURE Majestic Sta Split External Tasks Inactive Summary Manual Summary Progress
Date: Tue 17-07-18
Milestone External Milestone Manual Task Start-only Manual Progress
Summary Inactive Task Duration-only Finish-only

Page 5
ID Task Task Name Duration Start Finish Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018
Mode Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
97 Fixing LED 30 days Sat 27-10-18 Sun
floodlight 25-11-18
fitting over
98 Supplying and 30 days Sat 27-10-18 Sun
Fixing 40mm 25-11-18
dia class A GI
pipe bracket up
to 2.7 meters
long terminated
with a reducing
collar of
99 Supplying of 30 days Sat 27-10-18 Sun
1.1 KV LT UG 25-11-18
100 Labour charges 30 days Sat 27-10-18 Sun
for laying of 1.1 25-11-18
KV class UG
101 Digging of 30 days Sat 27-10-18 Sun
trench of 0.6, 25-11-18
deep and 0.5 m
102 Supplying and 30 days Sat 27-10-18 Sun
fixing of class A 25-11-18
(medium duty)
GI pipe
103 Supplying and 30 days Sat 27-10-18 Sun
making straight 25-11-18
through cable
joint with
expocy resin
104 PVC conduit 30 days Sat 27-10-18 Sun
pipe 25mm dia 25-11-18
2mm thick
105 Wiring for 30 days Sat 27-10-18 Sun
lighting/power 25-11-18
circuit
106 Supplying, 30 days Sat 27-10-18 Sun
fixing, wiring, 25-11-18
earth electrode
for grounding
conduits, I.C.
cutouts
107 Supplying and 30 days Sat 27-10-18 Sun
fixing 25-11-18
Microprocessor
based
Electronic timer

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline


Project: Tender SURE Majestic Sta Split External Tasks Inactive Summary Manual Summary Progress
Date: Tue 17-07-18
Milestone External Milestone Manual Task Start-only Manual Progress
Summary Inactive Task Duration-only Finish-only

Page 6