Beruflich Dokumente
Kultur Dokumente
5. Question abt version management, 3 options had p.org in it, 4th had company code
(selected this, odd man out).
7. What are the valid ways in which you can prevent any invoice worth over 10,000 Euro to
be blocked for payment by an Invoice clerk (4-5 choice given)? answer user
authorization.
8. What does material type controls; one option was account determination which was
wrong?
9. What does document type control, one option was account assignment category which is
wrong.
10. How do you enter planned delivery (only) invoice, options were very confusing?
13. which application can be used when or for traveling( travel management)
14. From QI goods can be posted to: sampling, scrap ,post PI difference, two more options
16. gross posting is defined during invoice receipt, invoice realization, po, gr (confusing,
selected invoice receipt)
17. Difference b/w blanket and service po with regards to limits. Options services the limits
are entered in header, can select no limit for services.( the options were very confusing)
18. If ur using production planning or product costing accounting components, then valuation
area must be, plant level, company code etc.
19. How do you display invoice accounting document no, in MIRO? (user parameters)
20. For NETPL what do you consider changes in the total planning horizon, planning horizon
and two more options?
21. Question on services, options were there can be any number of service specification
level, for a service to be entered in service specification we must have service master
record, you can set up release procedure for service entry sheets and another 2 options.
22. question abt SLED, options mini shelf life must be entered in the po, total shelf must be
entered in PO, mini shelf life in VMR,
23. Planning file run on the basis of, order of low level code, no of days from the last
planning run, another two options
24. Question abt GR/IR clearing, options credit memo is created, used when GR is expected,
when IR is expected.
25. Source list can be maintained, manually, automatically, PIR, outline agreements, one
more option.
26. Question abt release procedure, one option was whether release procedure can be created
for RFQ, whether item level release can be done for PO.
27. One question on damage of goods during sto, options, send back to the issuing plant; can
be scrapped by the issuing plant. Can be scrapped by receiving plant, can be shared by
both the plants.
28. question abt transfer posting and stock transfer , in case of material to material transfer
base unit of measure must be same, in storage to stock storage transfer accounting doc is
generated in case of split valuation other 2 options.
a. Material level
a. Material level
a. G/L account
b. Valuation Class
c. Field Selection
d. User Department
7. Concept of Blanket Purchase Order.( all options were straight except one)
a. In Blanket PO GR is always non-valuated.(I know as there is no GR at all in Blanket PO, this option if
I say false then it means GR is valuated at times.)
d. ..
10. Screws have to be purchased using contract , the prices are different for different types, which
combination of Item Category and Doc type will you use to generate the Contract.
11. Which statements regarding the release(approval) of PR with Classifications are correct?
b. …
c. ..
d. ..
d. Value Contract
e. Distributed Contract
17. Initial Stock 0 , PO 50 pcs, 10 eur /pc MAP, GR 50 pcs , GI 10 pcs, IR 50 pcs @20euro/pc. What are
the account postings on IR?
18. On PO with order Ack, vendor replied that he can't supply the quantity in full also he can't supply at
the desired date, he could supply only a week later, how to handle this situation.
19. While entering GR you have forgotten the PO number , What will you do.
a. Enter * in PO number column enter all details system will suggest the PO doc.
c. You use the Auto PO generation on GR option then you will cancel the old PO with reference to the
auto PO.
d. …
20. How can you enter services performed in Service Entry Sheet.
a. Copy from PO
d. Manually
d. Is seen by MRP
23. If conditions are changed manually in PIR , What are the effects.
d. ..
e. ..
a. Company
b. Purchase Organisation
c. Storage Location
d. Plant
26. A stock material is to be procured for consumption hence a PO is raised with Account Assignment
K(cost center), What are the account postings on GR.
a. Field Selection
b. Item Category
c. Number Ranges
d. Account Assignment.
b. …
c. …
d. ..
( Characteristics of K)
a. Contract
c. Purchase Order
d. PIR
a. Re count
b. Post Count
d. Post Difference
Third batch :
a. CC
b. SLOC
c. Plant
d. PORG
4) Physical Inventory is maintained at which level :
a. Plant/SLOC
b. Material/Plant/PORG
c. MATERIAL/PLANT/SLOC/STOCK TYPE
d. Material/SLOC
5) What does the Material Type control :
a. Procurement Type
b. Views in Material Management
c. Assign of Accounting Category
d. Field selection
e. Stock and value maintenance req or not
6)one question on ‘Value string’, what is ‘value string’
7) Valuation class can be assigned to multiple account category reference, if the account
category allow (T / F)
a. GR
b. PO
c. planned order
d. contract.
9) when a transaction in which Discount amount has to be taken care off, at what stage it is
recorded:
a. at the time of PO
b. at the time of GR
10) A material is procured against a PO, the PO quantity is 100 pcs at the price of 10 Euro, there
is no no stock in the SLOC, and the valuation is done on MAP basis. 50 pcs are received against
GR, the vendor has raised Invoice for 50 pcs @ 20 Euro. What are the postings
12) The following settings are to be done for setting Invoice planning :
15. we generally do not expect any Accounting Document generation for Physical stock transfer
(T / F)
b. Reservation
17. The valuation category and value type are created globally and assigned locally (T/F).
a. GR
b. GI
c.PI
d. PO
a. PR
b. Outline Agreement
c. PO
d. Production Order
21. If a vendor rises an invoice whose amount is in excess to the actual material delivered what
can be done?
22. You don’t have info about PO number, you have to accept a GR, what will you do :
b. Create a GR with ‘PO Unknown’ and search the PO number from the search feature
23. PO with GR Quantity between Under and Over delivery tolerance are automatically
approved. (T/F).
24. How and when can you select the ‘Delivery Complete Indicator’.
a. Invoice Document
b. Material Doc
c. Accounting Doc
26. For order quantity more than over delivery quantity, an error message will be generated
with out fail.
b. SLED in PO
d. SLED at GR.
28. How can you create a material from plant 1000 , in plant 2000 , with the same mtl code.
a. Production Order
b. To scrap
d. MRP Run
30. A question on the total process of ‘Dynamic Availability Check’ process. All 5 choises on the
various parts of the process.
31. What are the things which cannot be done through Mass Maintenance (select the one
correct answer):
a. changes in PO
a. GR will be posted
34. The Material Number can be made upto 40 characters with simple customisation. (T / F)
36. An authorised person can release only few line items from a PR to procurement of some
urgent required material.
c.central contract
d. firm contract
e. distributed contract
39. A company want to buy some screws of different types under a contract what types of
contract will suit. The price of each type of screws is different:
45. One question on release status and PR release interlock. All four choices scenarios of PR
release.
46. If a PR is released under classification, will the conditions defined for ‘without classification’
remain as it is (T / F)
47. A material which is valuated and a stock item can be issued against
a. Asset
b. Project
c. sub contract
d. cost centre
48. what are the valid ways in which you can prevent any invoice worth over 10,000 Euro to be
blocked for payment by an Invoice clerk (4-5 choice given).
49. one question on how & where tax calculation are done.
a. when the vendor over invoiced and you don’t expect another Invoice / Credit Memo
b. when the vendor over invoiced and you don’t expect another GR.
54. when a Quotation is rejected in the system, what can happens next :
57. In a po different line items can be assigned different Account Assignment codes.
58. A single PO can be used for procuring both ‘stock items’ and ‘consumables’.
59. The info structure in the LIS can be changed by clients as per their requirement.
61. In a plant there is a material for which always 1 pc must be there in stock. If one pc is
consumed, another pc should be available immediately compulsorily. How do you ensure this :
a. consumption based planning with safety stock 1
63. At the time of GR entry of a consumable what all accounts will be posed
a. consumption Account
b. stock account
c.GR / IR account
d.vendor account
e.cost centre
65. Material management, Sales and dist, CRM can be done from which SAP mobile application
68. How can you add new icons in the Application tool bar in SAP.
a. 8
b. 10
c. 6
d.12
a. radio button
b. check box
c.input field
b. Operation
c. Maintenance
d. upgradation
a. Implemantation roadmap
b. Solution Roadmap
c. service Roadmap
d. update Roadmap
e. Configuration Manager
a. phases
b. steps
c. scenarios
74. A full question on ‘Field selection keys’ , ‘groups’ and the interconnections in material
master.
77. A material has to be procured for consumption hence a PO is raised with Account
Assignment K(cost center). What are the at the time of GR.
a. Contract
b. Scheduling Agreement
c. Purchase Order
d. PIR
a. Material level
b. Material/Stock type/plant Level
c. Material/Sloc level/Stock type/ special stock.
12. what is the search criteria did you apply if you want to find invoices that were not yet invoiced
against PO
a. ALV grid view
b. Selection parameter
c. SAP LIST view
d. scope of list
13. At which area the indicator for Automatic PO generation should be activated
a. MMR
b. VMR
c. Info record
d. PO
14. Scaling conditions can be maintained in
a) Contract
b) Scheduling agreement
c) PIR
d) Purchasing Order
15. If conditions are changed manually in PIR, What are the effects.
a. Prices in the already generated PO changes automatically
b. These conditions are suggested for the next PO
16. MRP Areas can be
17. a)Plant b)Storage location c)Subcontractor d) Consignment
18. Maximum Transactions you can do in SAP at same time
a) 12 b) 4 c) 6
19. We can issue material against
a.Profit center
b. Against reservation
c. Cost center
d. Asset
20. How labels for IM material is prepaired in IM
21. Phase in PI
a. Count
b. Re-count
c. Post difference
d. Document generate & posting difference
22. In which of transfer postings account document generate
a. SLOC – SLOC
b. Plant – Plant
c. Co-code – Co-code
d. Material – Material
23. If material is received in GR-Blocked stock what are the effects
a. Po history updated (Y)
b. Material update at plat level (Y)
c. Material update at SLOC
d. Account Document generate
24. Organizational levels for PORG at cross co-code in which he has to purchase for several
plants
a. Assign to each plant separately
b. Assign to each Co-code separately
c. Assign to one Co-code
25. Valuation can be defined at which level
a. Plant
b. Co-code
26. Material Type directly controls
a. G/L account
b. Valuation Class
c. Field Selection
d. User Department
27. While entering GR you have forgotten the PO number , What will you do.
a. Enter * in PO number column enter all details system will suggest the PO doc.
b. Use the Search option to search for the po number to continue.
c. You use the Auto PO generation on GR option then you will cancel the old PO with
reference to the auto PO.
d. …
28. conditions are changed manually in PIR , What are the effects.
a. Prices in the already generated PO changes automatically
b. These conditions are suggested for the next PO
c. A mail is sent to the person in Purchasing grp.
d. ..
e. ..
29. GR/IR maintenance to be done only when.
30. When u don’t expect any GR/ Credit Memo.
31. Question on Material type UNBW.
32. How is Base quantity in Quota arrangement calculated.
Through Percentage
33. Question on Material Number.
34. Question on Exchange Rate. Where is done in PO/IR.what are its effect?
35. Credit Memo effects GR/IR Account or not?
Fifth batch ;
A) Invoicing: (Total 13 Questions)
1) what is the search criteria did you apply if you want to find invoices that were not yet
invoiced against PO
a. ALV grid view
b. Selection parameter
c. SAP LIST view
4) Which statement are true regarding entry of Services in Service entry Sheet
a. We can copy it from PO
b. We cannot input unplanned services
c. Limits in services are not for unplanned services
5) PIR can be maintained for
a. Consignment
b. Subcontract
c. Standard
6) At which area the indicator for Automatic PO generation should be activated
a. MMR
b. VMR
c. Info record
d. PO
7) If we want to buy material for material group what type of contract you choose
8) Can we include delivery lines in purchasing document which of the followings
a. PO standard
b. Contract
c. SA
d. Service PO
9) Scaling conditions can be maintained in
a) Contract
b) Scheduling agreement
c) PIR
d) Purchase order
10) PIR can be maintained
a. PO
b. SA
c. Contract
d. Quotation
e. manually
f. PR
11) Source list can be maintained
a. Manually
b. Automatically
c. SL
d. PO
12) How Quota Base Quantity calculated
a. individual calculation
b. Collective calculation
13) How source is assign in Automatic PO generation
a. MRP
b. Source assign manually
c. Regular vendor
d. Fixed vendor
14) If conditions are changed manually in PIR, What are the effects.
a. Prices in the already generated PO changes automatically
b. These conditions are suggested for the next PO
c. A mail is sent to the person in purchasing group.
1) Effects of GR
a) Material document b) Accounting document c)GR slip d)PO history updated
i) What is SAP?
There was not an option as Systems Application in Product and Data processing
Option like
If 50% chances that the invoice will get block with value x. what is chances the invoice with
value <x will get block ?
Product A has gross price : Rs.1000 and have below calculation schema. What is
effective price of Product A?
Phase
A Gross Price
B Discount on Gross 20%
C Tax/Surcharge on Gross price 10%
Net Price
D Freight Rs. 2000
Ans: 3 Indicators were listed (deletion status, Count & Posting status)
C) xxx
- General Data
Ans : False
I) Planned Order
II) PR
- Service conditions
- Plant
- HDRO
( In fact this is an indirect question with the above meaning. Question words and
options are not exactly same as above. Only key words are quota maintenance, plant,
vendor, Oun Ag, PIR)
22. Threshold Value (10000 with 50%. Invoice with 15000, what’s the
probability of invoice block?)
23. PR can be released by (2 answers are correct)
Manually individual, Manually Collective, While PO creation automatic, ……..
24. Vendor invoice is more than actual. Without blocking, want to enter
the invoice. What to do? (2 correct answers)
(a) Partial Reduction: vendor error,
(b) Customize in that Vendor Master for tolerance limit to reduce
automatically,
(c) Park and save,
(d) ……….
25. By automatic PO creation by assigned PR, what other docs can be
created? (Contract Rel order, SA lines, Service order, …..)
26. MRP area can be of (3 answers are correct)
Plant MRP area, St. Loc. MRP Area, Subcontractor MRP area, Consignment MRP area
27. How Terms of payment is determined for invoices without PO
(a) From co. code data of Vendor
(b) From last PO
(c) From PIR if it’s valid
(d) ………..