Sie sind auf Seite 1von 18

Main contractor Project no.

STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033


Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 1 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

BURIED FUEL TANK


OF KOC SMALL BOAT HARBOR PROJECT

DESIGN CALCULATION
FOR EXTERNAL SACP FOR BURIED FUEL TANKS

KUWAIT OIL COMPANY K.S.C.

A 06/07/2019 Olivér Mohácsi Chae Kyung Lim Heung Kyun Kim


Revision Date Prepared by Checked by Verified by Approved by
DYCE DYCE DYCE KOC
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 2 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

Table of Contents

1. Introduction ................................................................................................................................ 3
2. Abbreviations .............................................................................................................................. 3
3. Codes and Standards .................................................................................................................. 4
4. Structure Details ......................................................................................................................... 5
5. Scope of Work............................................................................................................................. 5
6. Soil Resistivity ............................................................................................................................. 5
7. Engineering Design ..................................................................................................................... 6
7.1. CP Current Density .................................................................................................................. 6
7.2. CP Design Life.......................................................................................................................... 6
7.3. Coating Breakdown................................................................................................................. 6
7.4. Electrical Isolation ................................................................................................................... 6
7.5. Anode Type ............................................................................................................................. 6
7.6. Design Calculations for SACP System ...................................................................................... 7
7.6.1. Area to Be Protected .......................................................................................................... 7
7.6.2. CP Current Requirement ..................................................................................................... 9
7.6.3. Anode Quantity Requirement by Weight ......................................................................... 10
7.6.4. Anode Quantity Requirement by Current ......................................................................... 12
7.6.5. Design Anode Quantity per Tank ...................................................................................... 15
8. Cathodic Protection Monitoring Facilities ................................................................................ 15
8.1. Test Station (STP) .................................................................................................................. 15
8.2. Junction Box (JB) ................................................................................................................... 16
9. Bill of Materials ......................................................................................................................... 16
10. List of Drawings..................................................................................................................... 17
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 3 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

1. Introduction
Dong Yang Corrosion Engineering Co. (DYCE) has been retained by STFA Deniz Insaati Insaat
Sanayi Ve Ticaret Anonim Sirketi (STFA) to revise the design, supply materials, supervise the
installation, test and commission the external sacrificial cathodic protection system for the
underground fuel tanks associated with the project “Small Boat Harbor Fuel System”.

This document outlines the detailed design, engineering & BOQ calculation for the external
sacrificial cathodic protection system for the underground fuel tanks associated with the subject
project.

2. Abbreviations
The following definitions and abbreviations has been used in this document:

CP : Cathodic Protection
SACP : Sacrificial Cathodic Protection
Mg : Magnesium
Cu/CuSO4 : Copper-Copper Sulfate
NACE : National Association of Corrosion Engineers
KOC : Kuwait Oil Company
AJB : Anode Junction Box
TP : Test Post
ASTM : American Standards for Testing Materials
DC : Direct Current
RE : Reference Electrode
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 4 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

3. Codes and Standards


This document is produced with reference to, and take into account the following documents and
standards:

Document no. Description


Standard test method for field measurement of soil resistivity
ASTM G57 – 06 (2012)
using the Wenner four-electrode method
BS 7361: Part 1 Code of practice for cathodic protection

ISBN: 978-0-88415-056-5 Handbook of cathodic corrosion protection (Third edition)

ISBN: 978-0-444-52788-2 Shreir's Corrosion


Construction Drawings for External SACP System for Buried Fuel
P-RFC19-KW-0009-CD
Tanks
366010033-14-MR-001 Material Data Sheets for External SACP for Buried Fuel Tanks

366010033-14-CS-001 Comparison sheet against Project Specification Section 16790

366010033-14-XX-001 CORRPRO statement of Compliance

Section 16790 Cathodic Protection System

AS-UFS-5001 Underground Fuel Tank. Capacity 25,000 USG


Control of External Corrosion on Underground or Submerged
NACE SP0169-2013
Metallic Piping Systems
Corrosion Control of Underground Storage Tank Systems by
NACE SP0285-2011-SG
Cathodic Protection
KOC Standard for External Cathodic Protection of Underground
KOC-L-015 Rev. 2
Steel Pipelines & Piping Networks
015-WH-1006 Cathodic Protection (CP) Design Requirements
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 5 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

4. Structure Details
Project tank details

Operating
Diameter Length T-T External Surface
Quantity Head Capacity Temperature
(m) (m) Coating (*)
(*)
1 Bumped 25000 3.35 12.0 High Performance 30°C

5. Scope of Work
The following activities are covered under the scope of work to be performed by DYCE:

• Revise the cathodic protection design calculation as per actual site conditions.
• Supply of additional materials.
• Revise the construction drawings.
• Supervision during installation.
• Testing & Commissioning of CP system.
• Preparation of as-built drawings.

6. Soil Resistivity
For a satisfactory cathodic protection system design, it is necessary to determine the resistivity of
the electrolyte (backfill). This resistivity is used to calculate anode to electrolyte resistance and thus
has an effect on the quantity of anodes. The resistivity is also an indication of the aggressiveness of
the environment.

As per project specifications cleaned washed sand shall be used as backfill for the underground fuel
storage tanks. The clean washed sand backfill material is generally characterized by a very high
resistivity. For contingency Soil resistivity value of 100 Ωm is considered for the design purposes.

Prior to backfilling a sample of sand shall be tested for contamination (chlorides, sulphates, etc.).
Proposed sand shall have a pH value between 6 and 11.5.
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 6 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design

7.1. CP Current Density


In accordance with clause 1.8 of Section 16790 of Project Specification, this design is based in a CP
Current Density of 20 mA/m2 for bare carbon steel at 30°C to protect cathodically coated fuel tanks.

Considering the operating temperature of the tanks (See above section 2.0), correcting the CP
Current Density stated above is not required.

7.2. CP Design Life


In accordance with clause 1.8 of Section 16790 of Project Specification, sacrificial anode cathodic
protection system shall be calculated on a 20 years design life.

7.3. Coating Breakdown


Coating breakdown regarding the deterioration of the buried tanks coating during the CP System
operating life is 10% according to clause 1.8 of Section 16790 of Project Specification.

7.4. Electrical Isolation


All the calculations herein are based on the electrical isolation of the new underground fuel tanks
from the aboveground piping and earthing system. Tank construction contractor is the responsible
for designing, supplying and installing the isolation kit, where applies. Surge arrestor for hazardous
are installation shall be provided to protect the performance of the isolation joint/flange.

7.5. Anode Type


Anode details for sacrificial CP system are listed below.

Packaged Packaged Magnesium Open Circuit


Magnesium
Diameter Length Weight Potential
Alloy
(mm) (mm) (kg) (V w.r.t. CSE)
250 1,000 14.5 High Potential -1.75
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 7 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System


The following sections include sample calculations used design of the cathodic protection system by
galvanic current for 4,000 US Gal. buried fuel tank. Results of all tanks are provided in dedicated
tables:

7.6.1. Area to Be Protected


Determination of fuel tank area to be protected cathodically begins with the calculation of the
external surface area in contact with the sand backfill. Below formula is an approximation to
calculate the area of bumped head vessels:

𝐴 " = 𝐴$ + 𝐴&

𝜋𝑂𝐷, 1 𝜀+1
𝐴 " = 𝜋 × 𝑂𝐷 × 𝑙 + × .1 + × ln 4 89
2 8𝜀 √3
1− 2

Where:

AT Surface area of the tank (m2)


AB Surface area of tank body (m2)
AH Surface are of the tank heads (m2)
OD Outer diameter of the tank (m)
l Length of the tank T-T (m)
ε Eccentricity of elliptical heads
z Inside head depth (0.22 m)
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 8 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.1. Area to Be Protected (continued)

4𝑧 ,
𝜀 = :1 −
𝑂𝐷,

4 × (0.22𝑚),
𝜀 = :1 −
(3.35𝑚),

Substituting data for 25,000 USG fuel tank dimensions (See Section 4):

𝜋 × (3.35), 1 1.987137
𝐴 " = 𝜋 × 3.35𝑚 × 12𝑚 + × .1 + × ln 4 89
2 7.85094 √3
1−
2
𝐴 " = 149.921𝑚, + 0.12𝑚,

𝐴 " = 150.04𝑚,

Area to be protected is the metal bare area exposed to the soil due to the coating deterioration
(Coating Breakdown):

𝐴E = 𝐴 " × 𝐶𝐵

Where:

AP Total area to be protected (m2)


AB Surface area of the fuel tank (m2)
AH Coating breakdown (decimal) (See Section 7.3)
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 9 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.1. Area to Be Protected (continued)

Substituting for buried tank:


10%
𝐴E = 150.04𝑚, ×
100

𝐴E = 15.004𝑚,
Considering that the fixing bolts of the tanks installed without insulation washer, the addition
surface area for the 16 bolts is 0.001 m2. Hence, the total area to be protected shall be considered
as 15.005 m2.

7.6.2. CP Current Requirement


The following formula is used to determine the total cathodic protection current required protecting
temporary the total surface of the tank:
𝐼J × 𝐴E
𝐼J = K M
1,000
Where:

It Total CP current requirement (Amps)


it Current Density (mA/m2). (See Section 7.1)
AP Total surface area of the tank (m2)

Substituting for buried tank:


𝑚𝐴
20 , × 15.005𝑚,
𝐼J = N 𝑚 O
1,000

𝐼J = 0.300 Amps, say 300 mA


Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 10 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.2. CP Current Requirement (continued)


The following table summarize the area to be protected and the CP current requirement for the fuel
tanks.

Length External Area to Be CP


Diameter
Capacity T-T Area Protected Current
(m)
(m) (m2) (m2) (mA)
25000 US Gal. 3.35 12.0 150.05 15.0 300

7.6.3. Anode Quantity Requirement by Weight


The minimum number of anodes is calculated based on the consumption rate of the magnesium as
follows:
𝐶" × 𝐼QRS × 𝐷TUVR
𝑊QRS =
𝑓X × 𝑒𝑓𝑓
Where:

Wreq Required anode weight (kg)


CT Magnesium consumption rate (3.98 kg/A-year)
DLife CP design life (years) (See Section 7.2)
fu Utilization factor (decimal) 85%
eff Magnesium anode efficiency (decimal) 50%
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 11 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.3. Anode Quantity Requirement by Weight (continued)


Substituting the data:
𝑘𝑔
3.98 𝐴 − 𝑦𝑒𝑎𝑟 × 0.300 𝐴𝑚𝑝𝑠 × 20 𝑦𝑒𝑎𝑟𝑠
𝑊QRS =
0.85 × 0.5
𝑊QRS = 56.188 𝑘𝑔

Then, the minimum anode quantity based on the weight requirement is calculated as follows:

𝑊QRS
𝑁d =
𝑊d
Where:

Na Anode quantity by weight requirement (ea.)


Wreq Required anode weight (kg)
Wa Magnesium anode weight (kg) (See Section 7.5)

Substituting the data:


56.188𝑘𝑔
𝑁d =
14.5𝑘𝑔
𝑁d = 3.875ea., say 4 anodes
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 12 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.3. Anode Quantity Requirement by Weight (continued)


The following table summarize the number of anodes to be installed to meet the total anode weight
required per tank.

Area to Be CP Weight Anode Anode Per


Capacity Protected Current Required Weight Tank
(m2) (mA) (kg) (kg) (nos.)
25000 US Gal. 15 300 56.188 14.5 4

7.6.4. Anode Quantity Requirement by Current


The minimum number of anodes is calculated based on the electrical resistance-to-earth of the
buried anode arrangement because of the proximity each other. The following formula is used to
estimate the resistance to earth of vertical anodes parallel arrangement. Anode length and anode
diameter corresponding to the dimension of the packaged anode:
𝜌 8𝐿
𝑅f = × ln K − 1M
2𝜋𝐿 𝑑
Where:

RV Vertical anode bed resistance (Ohms)


ρ Soil resistivity (Ohm-m) (See Section 6)
L Anode length (m) (See Section 7.5)
D Anode diameter (m) (See Section 7.5)
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 13 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.4. Anode Quantity Requirement by Current (continued)



100Ω𝑚 8 × 1𝑚
𝑅f = × ln K − 1M
2𝜋 × 1𝑚 0.25𝑚
𝑅f = 54.69 Ω

Output current of the anode is calculated considering the polarized potential criterion and the open
circuit potential value for the magnesium anode as follows:
𝐸lE − 𝐸ml
𝐼d =
𝑅f
Where:

Ia Anode current output (Amps)


ECP Polarized potential criterion (V w.r.t CSE) (-850 mV as per KOC-L-015)
EOC Magnesium anode open circuit potential (V w.r.t. CSE) (See Section 7.5)
Rh Vertical anode bed resistance (Ohms)

Substituting the data:


−0.85𝑉 − (−1.75𝑉)
𝐼d =
54.69Ω

𝐼d = 0.01646 Amps, say 16.7 mA


Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 14 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.4. Anode Quantity Requirement by Current (continued)


Then, the minimum anode quantity based on the current requirement is calculated as follows:
𝐼QRS
𝑁d =
𝐼d
Where:

Na Anode quantity by current requirement (ea.)


Ireq Requirement CP current (mA)
Ia Vertical anode bed output current (mA)

Substituting the data:


300𝑚𝐴
𝑁d =
16.7𝑚𝐴
𝑁d = 17.97 ea., say 18 anodes

The following table summarize the number of anodes to be installed to meet the total anode weight
required per tank.

CP Current Anode
Anode Per Vessel
Capacity Requirement Weight
(nos.)
(mA) (kg)
25000 US Gal. 300 14.5 18
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 15 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

7. Engineering Design (continued)

7.6. Design Calculations for SACP System (continued)

7.6.5. Design Anode Quantity per Tank


Based on the results above and considering that the pre-packaged HO alloy magnesium anodes will
be connected to the underground fuel tanks at the permanent test stations cable leads, the total
design anode quantity for the permanent CP system is summarized in the following table:

Total
Length Anode Anode
Diameter Anode
Qty. Capacity T-T per Tank Weight
(m) Quantity
(m) (nos.) (kg)
(nos.)
16 25000 US Gal. 3.35 12.0 18 288 14.5

Magnesium anodes shall be installed vertically and spaced as per above table at each tank location.
Anode lead cab les shall arrive to a junction boxes consisting of a copper bar and shunt to provide
electrical connection to the buried tank.

8. Cathodic Protection Monitoring Facilities

8.1. Test Station (STP)


One (1) test station per tank to monitor tank-to-soil potentials in order to assess the performance
of the CP system shall be installed connecting two (2) test lead cables (10mm2, XLPE/PVC insulation)
to each fuel tank using thermite welding or welded pad; and terminated a permanent reference
electrode (Cu/CuSO4) lead cable (10AWG, XLPE/PVC or HMWPE insulation).

Test station shall be fabricated in GRP material, IP55 rated, and supp lied with terminals to connect
tank monitoring cables and reference electrode lead cable. Test station shall be provided with a 3"
G.I. conduit.
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 16 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

8. Cathodic Protection Monitoring Facilities (continued)

8.2. Junction Box (JB)


A GRP junction box (IP65 rated) shall be provided to connect the magnesium anode arrangement to
the tank. Junction box consists of one (1) copper conductor bar for connection of one (1) cable
(16mm2, XLPE/PVC insulation) coming from the tank and 10mm2, XLPE/PVC cable tails coming from
the anodes through shunts.

9. Bill of Materials

Item Description Unit Quantity

Packaged Magnesium Anodes, HP Alloy, 14.5kg net


1 ea. 288
w/20 meters of 10mm2 XLPE/PVC red cable
Test Station for potential measuring. GPR IP 55 rated,
2 provided with 3 terminals. G.I. conduit post mounted ea. 16
(3-inch diameter x 1.5m long)
Junction Boxes for SACP connection. GPR IP 65 rated.
3 provided with copper bus bar and shunts. G.I. frame ea. 16
mounted.
Permanent Reference Electrodes. Copper/Copper
4 Sulfate (Soil Application) w/ Cable 10AWG, XLPE/PVC or ea. 16
HMWPE insulation x 15 m long.
CP Cable. Single core, 7 strands, copper with XLPE/PVC
5
insulation
5.1 10mm2 m 520
2
5.2 16mm m 260
6 lnterqard 821 (for Encapsulation) kg 15
7 Tank Negative cable connections lot 1
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 17 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

10. List of Drawings

Item
Drawing no. Drawing title
no.
Sample Drawing of CP System General Arrangement Drawing
1 366010033-14-DRW-001-01 for North Harbor Building (FT) Underground Fuel Tanks Fuel
System
Sample Drawing of CP System General Arrangement Drawing
2 366010033-14-DRW-001-02 for North Harbor Building (FT) Underground Fuel Storage Tank
Section & Details
Sample Drawing of CP System General Arrangement Drawing
3 366010033-14-DRW-001-03 for North Harbor Building (FT) Underground Fuel Storage Tank
Typical Magnesium Anode Details
Sample Drawing of CP System General Arrangement Drawing
4 366010033-14-DRW-001-04 for North Harbor Building (FT) Underground Fuel Storage
Tanks Anode Junction Box Details
Sample Drawing of CP System General Arrangement Drawing
5 366010033-14-DRW-001-05 for North Harbor Building (FT) Underground Fuel Storage
Tanks Anode Test Station Details
Sample Drawing of CP System General Arrangement Drawing
6 366010033-14-DRW-005-01 for North Harbor Building (P) Substation & Generator – ‘PA’
Ground Floor Plan – Fuel System
Sample Drawing of CP System General Arrangement Drawing
7 366010033-14-DRW-005-02 for North Harbor Building (P) Substation & Generator – ‘PA’
Underground Fuel Storage Tank & Sections
Sample Drawing of CP System General Arrangement Drawing
8 366010033-14-DRW-005-03 for North Harbor Building (P) Substation & Generator – ‘PA’
Typical Magnesium Anode Details
Arrangement Drawing for North Harbor Building (P) Substation
9 366010033-14-DRW-005-04
& Generator – ‘PA’ Anode Junction Box Details
Arrangement Drawing for North Harbor Building (P) Substation
10 366010033-14-DRW-005-05
& Generator – ‘PA’ Test Station Details
Sample Drawing of CP System General Arrangement Drawing
11 366010033-14-DRW-004-01 for North Harbor Building (P) Substation & Generator – ‘PB’
Ground Floor Plan – Fuel System
Sample Drawing of CP System General Arrangement Drawing
12 366010033-14-DRW-004-02 for North Harbor Building (P) Substation & Generator – ‘PB’
Underground Fuel Storage Tank & Sections
Sample Drawing of CP System General Arrangement Drawing
13 366010033-14-DRW-004-03 for North Harbor Building (P) Substation & Generator – ‘PB’
Typical Magnesium Anode Details
Arrangement Drawing for North Harbor Building (P) Substation
14 366010033-14-DRW-004-04
& Generator – ‘PB’ Anode Junction Box Details
Arrangement Drawing for North Harbor Building (P) Substation
15 366010033-14-DRW-004-05
& Generator – ‘PB’ Test Station Details
Sample Drawing of CP System General Arrangement Drawing
16 366010033-14-DRW-003-01 for North Harbor Building (UB) - Ground Floor Plan – Fuel
System
Main contractor Project no.
STFA DENIZ INSAATI INSAAT SAN. VE TIC. A.S. 366010033
Cathodic protection vendor KOC document no.
DONG YANG CORROSION ENGINEERING CO.
Project Rev. Page
SMALL BOAT HARBOR FUEL SYSTEM A 18 OF 18
Document title Document no.
P-RFC19-KW-0008-DC-
DESIGN CALCULATION FOR EXTERNAL SACP SYSTEM FOR BURIED FUEL TANKS
1_TANK.DOCX

10. List of Drawings (continued)

Item
Drawing no. Drawing title
no.
Sample Drawing of CP System General Arrangement Drawing
17 366010033-14-DRW-003-02 for North Harbor Building (UB) Utility Building Fuel System
Underground Fuel Storage Tank & Sections
Sample Drawing of CP System General Arrangement Drawing
18 366010033-14-DRW-003-03 for North Harbor Building (UB) Utility Building Fuel System
Typical Magnesium Anode Details
Sample Drawing of CP System General Arrangement Drawing
19 366010033-14-DRW-003-04 for North Harbor Building (UB) Utility Building Fuel System
Anode Junction Box Details
Sample Drawing of CP System General Arrangement Drawing
20 366010033-14-DRW-003-05 for North Harbor Building (UB) Utility Building Fuel System Test
Station Details
Sample Drawing of CP System General Arrangement Drawing
21 366010033-14-DRW-002-01 for North Harbor Building (FT) Underground Fuel Tanks Fuel
System
Sample Drawing of CP System General Arrangement Drawing
22 366010033-14-DRW-002-02 for North Harbor Building (FT) Underground Fuel Storage Tank
Section & Details
Sample Drawing of CP System General Arrangement Drawing
23 366010033-14-DRW-002-03 for North Harbor Building (FT) Underground Fuel Storage Tank
Typical Magnesium Anode Details
Sample Drawing of CP System General Arrangement Drawing
24 366010033-14-DRW-002-04 for North Harbor Building (FT) Underground Fuel Storage Tank
Anode Junction Box Details
Sample Drawing of CP System General Arrangement Drawing
25 366010033-14-DRW-002-05 for North Harbor Building (FT) Underground Fuel Storage Tank
Test Station Details