Sie sind auf Seite 1von 84

REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-

IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE


PACKAGE-3 (LALGANJ-HANUMANHA)

EPC CONTRACTOR : DILIP BUILDCON LIMITED


PLOT NO. 5, INSIDE GOVIND NARYAN SINGH GATE
CHUNA BHATTI, KOLAR ROAD, BHOPAL - 462 016 (M.P.)

CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA


MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

AUTHORITY :
ENGINEER

PROOF : RESOTECH CONSULTANCY SERVICES PRIVATE LIMITED


CONSULTANT 58, SHRI MANGAL NAGAR, NEAR ELITE ANMOL,
BICHOLI HAPSI ROAD, INDORE, MADHYA PRADESH - 452 018

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE CH:
113+545 AND PROPOSED CH: 113+530

DESIGN NOTE: 18133-MJ-PS-DC-1141-06 (R0)


PAGES: 1 + 83 = 84

DATE REV DESCRIPTION DESIGNED CHECKED APPROVED

19-Mar-19 R0 FOR REVIEW RSS KJM DDP

DESIGN CONSULTANT:
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP- DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

CONTENT

1.0 Introduction

2.0 Analysis

3.0 Sectional Properties

4.0 Temperature Effect

5.0 Differential Shrinkage

6.0 Loss due to Slip & Friction

7.0 Prestressing Force after Slip & Friction

8.0 Loss Calculations at Midspan

9.0 Prestress Summary at Various Sections

10.0 Check for Ultimate Strength

11.0 Check for Shear (ULS)

12.0 Design of Longitudinal ( Interface ) Shear

13.0 Torsion Check

14.0 Design of End Block Region

15.0 Minimum Refinfocement ( Un tensioned )

16.0 Deflection Check

ANNEXURE : I : SUMMARY OF GRILLAGE ANALYSIS RESULTS

ANNEXURE : II : SHRINKAGE STRAIN CALCULATIONS

ANNEXURE : III : CREEP STRAIN CALCULATIONS

ANNEXURE : IV : LIFTING HOOK CALCULATIONS

ANNEXURE : V : GRILLAGE ANALYSIS DATA


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP- DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE DESIGNED CHECKED
Title : CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

1.0 INTRODUCTION

This design note pertains to longitudinal design of PSC Girder of30.800 m c/c of bearings.

The overall span between c/c of E.J to c/c pier is 32m. The effective span proposed is 30.8m.
The pre cast length of the PSC Girder is kept 31.7m and deck slab is projected beyond end face
of the girder at either end.

The superstructure is designed as per IRC 112 : 2011. The superstructure is checked for ULS &
SLS as per the code.
1.1 MATERIALS AND PERMISSIBLE STRESSES

I. GRADE OF CONCRETE :M 45 for PSC Girder & M 45 for RCC Deck Slab

II. PRESTRESSING STEEL :12.7mm DIA, 7 ply class II, low relaxation strands confirming to IS 14268

1.2 SYSTEM OF PRESTRESSING

The PSC Girder will be Pre-Cast, Post – Tensioned prestressed. Cables made of 19 strands
12.7mm dia (7 ply) grouped together around a spiral core and properly tied along the length by
galvanized binding wire, will be placed inside a HDPE corrugated sheathing of 95mm dia.
Stressing will be carried out from both ends simultaneously. Hence Anchor cones will be
provided at both ends.

1.3 STAGE OF PRESTRESSING

The stressing operation will be carried out in one stage only.

1.4 DESIGN ASPECTS

I. P.S.C. Sections Under Considerations From Centre Line of Bearing i.e. Support, Which are
checked.
0.0 L Section i.e. At Support

0.1 L Section i.e. 0.1 x 30.8 = 3.08 m.

0.2 L Section i.e. 0.2 x 30.8 = 6.16 m.

0.3 L Section i.e. 0.3 x 30.8 = 9.24 m.

0.4 L Section i.e. 0.4 x 30.8 = 12.32 m.

0.5 L Section i.e. 0.5 x 30.8 = 15.4 m.


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP- DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE DESIGNED CHECKED
Title : CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

II. The bending moments and shear forces due to Dead Load, Super Imposed Dead Load and
Live Loads have been worked out based on Grillage analysis, considering center to center of
bearing as span length. The analysis is carried out with STAAD Software.

III. The friction and wobble co-efficient (m and k) for prestressing strands considered in the design are :
m = 0.17 per radian and k = 0.002 per m [ Table 7.1, page 64, IRC 112:2011]
Type of Duct : HDPE Dia of Duct = 95 mm

IV. The creep co-efficient, shrinkage strain and relaxation are considered as per the
formulationsof IRC 112. The 'Ec' modulus of Elasticity of Concrete is modified by the ratio 1/(1
+ f) for creep and shrinkage calculations ( Cl. 7.8(4),page 61, IRC 112)

V. The SLS check is carried out as per IRC 112 for following load combinations.

Combination Factors
SLS DL SIDL LL C & S Prestress
Combination 1 1 1 1 1 0.9 As per Cl. 7.9.5, IRC 112
Combination 2 1 1 1 1 1.1

VI. Ultimate resistance of PSC Girder in flexure has been checked as per IRC :112-2011

VII. A maximum jacking force of 78.3% of UTS is applied to prestressing cables (Refer Cl. 7.9.2 of IRC:112).

VIII. Differential Temperature Effect:


Under combination of Loads with differential temp. effect, Live Load is considered as per
Table 3.3 of IRC:6-2016

IX. Modulus of Elasticity of concrete at earlyfage shall be considered as computed below.


[ Cl.6.4.2.5, Eq. 6.10, page 44, IRC-112,2011]

 f cm (t ) 
0. 3 fcm = fck + 10 [ Annexure: A2, Eq. A2-1,page 235 IRC-112,2011]
E cm (t ) =   E cm = 45 + 10
 cm 
f = 55.00 MPa

f cm (t ) =  cc (t ) f cm [ Eq. 6.2, page 39, IRC-112,2011]

    
0 .5
[ Eq. 6.3, page 39, IRC-112,2011]
   28  
 cc ( t ) = exp  S  1     t = 28 days
   tt  
   1   t1 = 1 day
= 1.000
0.3
fcm(t) = 55.000  f  [ Annexure: A2, Eq. A2-5,IRC-112,2011]
Ecm = 22 cm 
 12.5 
= 34.3 GPa
Ecm(t) = 34.313 GPa
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP- DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE DESIGNED CHECKED
Title : CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM
1.5 Effective Flange Width (Longitudinal Girder) (ref. Cl. 7.6.1.2 IRC:112-2011)

beff

beff1 beff2

b1 b2

bw

b
1.600 1.600 1.600 1.600

b eff
=  beff ,i  bw  b lo = Distance between points of zero
moments (can be taken as 0.7 x
with, b = 0.2 bi  0.1l o  0.2 l o effective span for continuous span)
eff ,i

 bi The effective width may be taken as


and beff ,i
constant for full span

a For, Longitudinal Internal Girder

bw = 0.300 m b1 = 1.450 m b2 = 1.450 m

lo = 30.800 m b = 3.200 m

beff,1 = 0 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,1 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff,2 = 0 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,2 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff = 1.450 + 1.450 + 0.300 ≤ 3.200

= 3.200 ≤ 3.200

beff = 3.200 m
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP- DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE DESIGNED CHECKED
Title : CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

b For, Longitudinal External Girder


bw = 0.300 m b1 = 1.450 m b2 = 1.450 m

lo = 30.800 m b = 3.200 m

beff,1 = 0 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,1 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff,2 = 0 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,2 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff = 1.450 + 1.450 + 0.300 ≤ 3.200

= 3.200 ≤ 3.200

beff = 3.200 m
1.6 PERMISSIBLE STRESS IN CONCRETE

a) Permissible Temporary Compressive stresses in Concrete[Cl.12.2.1,IRC-112,2011]


0.48fcj = 21.6 MPa = 2160 t/m² t/m²

b) Permissible Temporary Tensile stresses in Concrete [Cl.12.1(2),IRC-112,2011]


fctm = 0.259(fcj) 2/3
= 3.28 MPa = 327.67 t/m²

c) Permissible Compressive stresses in Concrete during Service


0.48fck = 21.60 MPa = 2160.00 t/m²

d) Permissible Tensile stresses in Concrete [Cl.12.1(2),IRC-112,2011]


fctm = 0.259(fck)2/3 = 3.28 MPa = 327.67 t/m²
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP- DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE DESIGNED CHECKED
Title : CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

2.0 Analysis

The anaysis is carried out using Grillage Analysis with STAAD Software. ( Refer Annexure-V)

Girder G4 carries maximum forces, hence in the present design, the PSC calculations are
presented for girder G4. it is proposed to adopt the same cable profile,prestressing details and
reinforcement details for the other girders.
The recapitulations of BM & SF due to DL,SIDl & LL is presented below.

RECAPITULATIONS OF B. M. & S. F. DUE TO DL

BENDING MOMENT SHEAR FORCE


SECTION DIFF DECK DIFF.
SELF WT. DECK DPH SIDL WC SELF WT. SIDL WC
SETTL + DPH SETTL

support 0.00 0.00 0.00 0.00 0.00 0.00 43.53 28.85 19.88 7.65 0.00
0.1L 114.88 84.91 2.04 57.90 23.24 0.00 31.91 22.63 14.48 6.01 0.00
0.2L 198.27 150.46 4.18 101.02 41.18 0.00 22.73 16.72 8.97 4.49 0.00
0.3L 256.68 197.25 6.83 127.42 54.33 0.00 15.19 10.81 3.16 2.96 0.00
0.4L 291.85 225.28 9.89 136.49 62.59 0.00 7.54 4.89 2.65 1.33 0.00
0.5L 303.47 234.66 13.25 127.73 66.06 0.00 0.00 3.47 3.06 0.92 0.00

RECAPITULATIONS OF B. M. & S. F. DUE TO LL Reduction Factor = 0.9


(3-LANE)
BENDING MOMENT SHEAR FORCE
SECTION 1L- 1L-CLA + 1L-CLA +
FPLL 1L-CL70R FPLL
CL70R 70R 70R

support 0.00 0.00 0.00 18.55 21.65 6.52


0.1L 58.41 69.17 17.64 17.64 19.63 4.89
0.2L 111.82 130.73 31.19 16.31 17.61 3.26
0.3L 161.06 179.08 39.76 15.29 15.05 1.53
0.4L 203.98 211.56 43.32 13.35 11.83 0.20
0.5L 239.45 237.25 41.39 13.76 11.10 1.02
3.0 SECTIONAL PROPERTY
3200 0
3200 (Transformed Width) SECTION 1-1
0 1000 0

225
0
150
64

Slab Concrete fcu = 45

Girder Concretefcu = 45

700
\ Modular Ratio= 34.3 / 34.3 = 1.000
2200

700

BEAM ALONE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.000 0.000 0.000 0.000000 0.000000 0.000000

2 2 x 0.000 x 0.000 0.000 0.000 0.000000 0.000000 0.000000

3 1 x 0.700 x 1.986 1.390 0.993 1.380469 0.027841 0.456935

4 2 x 0.15 x 0.064 0.010 2.029 0.019475 0.007675 0.000002

5 1 x 1.000 x 0.15 0.150 2.125 0.318750 0.147159 0.000281

6 1 x 0.7 x 0.064 0.045 2.018 0.090406 0.034968 0.000015

7 2 x 0.7 x 0.000 0.000 0.000 0.000000 0.000000 0.000000

TOTAL 1.5946 1.809100 0.217644 0.457234

1.8091 Ytbeam = 2.2 - 1.13


C.G. from Bottom = = 1.1345 m
1.5946 = 1.0655 m

M.I. = 0.21764 + 0.45723 = 0.6749 m

0.67488 0.67488
Zbot = = 0.5949 m3 Ztbeam = = 0.6334 m3
1.1345 1.07

Section AREA (m2) Yb (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 1.5946 1.1345 m 0.67488 0.5949 0.6334 -
COMPOSITE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.000 0.000 0.000 0.000000 0.000000 0.000000

2 2 x 0 x 0.000 0.000 0.000 0.000000 0.000000 0.000000

3 1 x 0.7 x 1.986 1.390 0.993 1.380469 0.358691 0.456935

4 2 x 0.15 x 0.064 0.010 2.029 0.019475 0.002673 0.000002

5 1 x 1 x 0.150 0.150 2.125 0.318750 0.058416 0.000281

6 1 x 0.7 x 0.064 0.045 2.018 0.090406 0.011977 0.000015

7 2 x 0.7 x 0.000 0.000 0.000 0.000000 0.000000 0.000000

8 1 x 3.200 x 0.225 0.720 2.313 1.665000 0.474201 0.003038

TOTAL 2.3146 3.474100 0.905958 0.460271

3.4741 Ytgir = 2.2 - 1.50 Ytslab = 2.425 - 1.50


C.G. from Bottom = = 1.5010 m
2.3146 = 0.6990 m = 0.9240 m

M.I. = 0.90596 + 0.46027 = 1.3662 m

1.3662 1.3662 1.3662


Zbgir = = 0.9102 m3 Ztgir = = 1.9544 m3 Ztslab = = 1.4785 m3
1.5010 0.6990 0.9240

Section AREA (m2) C. G. (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 1.5946 1.1345 0.6749 0.5949 0.6334 -
Composite Section 2.3146 1.5010 1.3662 0.9102 1.9544 1.4785

COMPOSITE Area of section above NA

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.x
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4

1 1 x 0.7 x 0.485 0.340 0.243 0.082346 0.224195

2 2 x 0.15 x 0.064 0.010 0.528 0.005066 0.006339

3 1 x 1 x 0.150 0.150 0.624 0.093607 0.099045

4 1 x 0.7 x 0.064 0.045 0.517 0.023164 0.029582

5 1 x 3.2 x 0.225 0.720 0.876 0.630396 0.475417

TOTAL 1.2639 0.6603 m 0.834578 0.834578


SECTIONAL PROPERTY
3200 0
3200 (Transformed Width) SECTION 2-2
0 1000 0

225
0
150
117

Slab Concrete fcu = 45

Girder Concretefcu = 45

500
\ Modular Ratio= 34.3 / 34.3 = 1.000
2200

75

300

700

BEAM ALONE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.300 0.210 0.150 0.031500 0.203547 0.001575

2 2 x 0.100 x 0.075 0.008 0.325 0.002438 0.004915 0.000002

3 1 x 0.500 x 1.559 0.779 1.154 0.899449 0.000303 0.157728

4 2 x 0.25 x 0.1165 0.029 2.011 0.058575 0.022383 0.000022

5 1 x 1.000 x 0.15 0.150 2.125 0.318750 0.147159 0.000281

6 1 x 0.5 x 0.1165 0.058 1.992 0.116019 0.042805 0.000066

7 2 x 0.5 x 0.075 0.038 0.338 0.012656 0.023821 0.000035

TOTAL 1.2716 1.439388 0.444934 0.159710

1.4394 Ytbeam = 2.2 - 1.13


C.G. from Bottom = = 1.1319 m
1.2716 = 1.0681 m

M.I. = 0.44493 + 0.15971 = 0.6046 m

0.60464 0.60464
Zbot = = 0.5342 m3 Ztbeam = = 0.5661 m3
1.1319 1.07

Section AREA (m2) Yb (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 1.2716 1.1319 m 0.60464 0.5342 0.5661 -
COMPOSITE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.300 0.210 0.150 0.031500 0.416744 0.001575

2 2 x 0.1 x 0.075 0.008 0.325 0.002438 0.011416 0.000002

3 1 x 0.5 x 1.559 0.779 1.154 0.899449 0.127483 0.157728

4 2 x 0.25 x 0.117 0.029 2.011 0.058575 0.005962 0.000022

5 1 x 1 x 0.150 0.150 2.125 0.318750 0.048101 0.000281

6 1 x 0.5 x 0.117 0.058 1.992 0.116019 0.010923 0.000066

7 2 x 0.5 x 0.075 0.038 0.338 0.012656 0.055927 0.000035

8 1 x 3.200 x 0.225 0.720 2.313 1.665000 0.409092 0.003038

TOTAL 1.9916 3.104388 1.085646 0.162747

3.1044 Ytgir = 2.2 - 1.56 Ytslab = 2.425 - 1.56


C.G. from Bottom = = 1.5587 m
1.9916 = 0.6413 m = 0.8663 m

M.I. = 1.08565 + 0.16275 = 1.2484 m

1.2484 1.2484 1.2484


Zbgir = = 0.8009 m3 Ztgir = = 1.9467 m3 Ztslab = = 1.4411 m3
1.5587 0.6413 0.8663

Section AREA (m2) C. G. (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 1.2716 1.1319 0.6046 0.5342 0.5661 -
Composite Section 1.9916 1.5587 1.2484 0.8009 1.9467 1.4411

COMPOSITE Area of section above NA

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.x
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4

1 1 x 0.5 x 0.375 0.187 0.187 0.035115 0.128508

2 2 x 0.25 x 0.117 0.029 0.452 0.013177 0.019973

3 1 x 1 x 0.150 0.150 0.566 0.084942 0.102867

4 1 x 0.5 x 0.117 0.058 0.433 0.025224 0.039947

5 1 x 3.2 x 0.225 0.720 0.870 0.626601 0.493763

TOTAL 1.1448 0.6858 m 0.785059 0.785059


SECTIONAL PROPERTY
3200 0
3200 (Transformed Width) SECTION 3-3
0 1000 0

225
0
150
150

Slab Concrete fcu = 45

Girder Concretefcu = 45

300
\ Modular Ratio= 34.3 / 34.3 = 1.000
2200

150

300

700

BEAM ALONE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.300 0.210 0.150 0.031500 0.203547 0.001575

2 2 x 0.200 x 0.150 0.030 0.350 0.010500 0.018464 0.000038

3 1 x 0.300 x 1.450 0.435 1.175 0.511125 0.000713 0.076216

4 2 x 0.35 x 0.15 0.053 2.000 0.105000 0.039326 0.000066

5 1 x 1.000 x 0.15 0.150 2.125 0.318750 0.147159 0.000281

6 1 x 0.3 x 0.15 0.045 1.975 0.088875 0.031789 0.000084

7 2 x 0.3 x 0.15 0.045 0.375 0.016875 0.025959 0.000169

TOTAL 0.9675 1.082625 0.466956 0.078428

1.0826 Ytbeam = 2.2 - 1.12


C.G. from Bottom = = 1.1190 m
0.9675 = 1.0810 m

M.I. = 0.46696 + 0.07843 = 0.5454 m

0.54538 0.54538
Zbot = = 0.4874 m3 Ztbeam = = 0.5045 m3
1.1190 1.08

Section AREA (m2) Yb (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 0.9675 1.1190 m 0.54538 0.4874 0.5045 -
COMPOSITE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.300 0.210 0.150 0.031500 0.458880 0.001575

2 2 x 0.2 x 0.150 0.030 0.350 0.010500 0.049016 0.000038

3 1 x 0.3 x 1.450 0.435 1.175 0.511125 0.089354 0.076216

4 2 x 0.35 x 0.150 0.053 2.000 0.105000 0.007256 0.000066

5 1 x 1 x 0.150 0.150 2.125 0.318750 0.037018 0.000281

6 1 x 0.3 x 0.150 0.045 1.975 0.088875 0.005411 0.000084

7 2 x 0.3 x 0.150 0.045 0.375 0.016875 0.070675 0.000169

8 1 x 3.200 x 0.225 0.720 2.313 1.665000 0.337130 0.003038

TOTAL 1.6875 2.747625 1.054740 0.081466

2.7476 Ytgir = 2.2 - 1.63 Ytslab = 2.425 - 1.63


C.G. from Bottom = = 1.6282 m
1.6875 = 0.5718 m = 0.7968 m

M.I. = 1.05474 + 0.08147 = 1.1362 m

1.1362 1.1362 1.1362


Zbgir = = 0.6978 m3 Ztgir = = 1.9871 m3 Ztslab = = 1.4260 m3
1.6282 0.5718 0.7968

Section AREA (m2) C. G. (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 0.9675 1.1190 0.5454 0.4874 0.5045 -
Composite Section 1.6875 1.6282 1.1362 0.6978 1.9871 1.4260

COMPOSITE Area of section above NA

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.x
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4

1 1 x 0.3 x 0.272 0.082 0.136 0.011079 0.056069

2 2 x 0.35 x 0.150 0.053 0.372 0.019518 0.036103

3 1 x 1 x 0.150 0.150 0.497 0.074517 0.103152

4 1 x 0.3 x 0.150 0.045 0.347 0.015605 0.030946

5 1 x 3.2 x 0.225 0.720 0.834 0.600680 0.495130

TOTAL 1.0490 0.6877 m 0.721399 0.721399


SECTIONAL PROPERTY
3200 0
3200 (Transformed Width) SECTION 4-4 to 6-
0 1000 0

225
0
150
150

Slab Concrete fcu = 45

Girder Concretefcu = 45

300
\ Modular Ratio= 34.3 / 34.3 = 1.000
2200

150

300

700.00

BEAM ALONE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.300 0.210 0.150 0.031500 0.203547 0.001575

2 2 x 0.200 x 0.150 0.030 0.350 0.010500 0.018464 0.000038

3 1 x 0.300 x 1.450 0.435 1.175 0.511125 0.000713 0.076216

4 2 x 0.35 x 0.15 0.053 2.000 0.105000 0.039326 0.000066

5 1 x 1.000 x 0.15 0.150 2.125 0.318750 0.147159 0.000281

6 1 x 0.3 x 0.15 0.045 1.975 0.088875 0.031789 0.000084

7 2 x 0.3 x 0.15 0.045 0.375 0.016875 0.025959 0.000169

TOTAL 0.9675 1.082625 0.466956 0.078428

1.0826 Ytbeam = 2.2 - 1.12


C.G. from Bottom = = 1.1190 m
0.9675 = 1.0810 m

M.I. = 0.46696 + 0.07843 = 0.5454 m

0.54538 0.54538
Zbot = = 0.4874 m3 Ztbeam = = 0.5045 m3
1.1190 1.08

Section AREA (m2) Yb (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 0.9675 1.1190 m 0.54538 0.4874 0.5045 -
COMPOSITE

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.(Yb-y)² M.I. (self)
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4 m4

1 1 x 0.7 x 0.300 0.210 0.150 0.031500 0.458880 0.001575

2 2 x 0.2 x 0.150 0.030 0.350 0.010500 0.049016 0.000038

3 1 x 0.3 x 1.450 0.435 1.175 0.511125 0.089354 0.076216

4 2 x 0.35 x 0.150 0.053 2.000 0.105000 0.007256 0.000066

5 1 x 1 x 0.150 0.150 2.125 0.318750 0.037018 0.000281

6 1 x 0.3 x 0.150 0.045 1.975 0.088875 0.005411 0.000084

7 2 x 0.3 x 0.150 0.045 0.375 0.016875 0.070675 0.000169

8 1 x 3.200 x 0.225 0.720 2.313 1.665000 0.337130 0.003038

TOTAL 1.6875 2.747625 1.054740 0.081466

2.7476 Ytgir = 2.2 - 1.63 Ytslab = 2.425 - 1.63


C.G. from Bottom = = 1.6282 m
1.6875 = 0.5718 m = 0.7968 m

M.I. = 1.05474 + 0.08147 = 1.1362 m

1.1362 1.1362 1.1362


Zbgir = = 0.6978 m3 Ztgir = = 1.9871 m3 Ztslab = = 1.4260 m3
1.6282 0.5718 0.7968

Section AREA (m2) C. G. (m) M. I. (m4) Zbot (m3) Ztbeam (m3) Ztslab (m3)
Beam Alone 0.9675 1.1190 0.5454 0.4874 0.5045 -
Composite Section 1.6875 1.6282 1.1362 0.6978 1.9871 1.4260

COMPOSITE Area of section above NA

C.G. FROM
DIMENSION OF ELEMENT AREA A.Yb A.x
SR. BOTTOM
NO.
A ( m²) Yb (m) m3 m4

1 1 x 0.3 x 0.272 0.082 0.136 0.011079 0.056069

2 2 x 0.35 x 0.150 0.053 0.372 0.019518 0.036103

3 1 x 1 x 0.150 0.150 0.497 0.074517 0.103152

4 1 x 0.3 x 0.150 0.045 0.347 0.015605 0.030946

5 1 x 3.2 x 0.225 0.720 0.834 0.600680 0.495130

TOTAL 1.0490 0.6877 m 0.721399 0.721399


POSITIVE TEMPERATURE EFFECT AT MIDSPAN

3.20 17.8 h1 = 0.3 * h = 0.30 * 2.425 = 0.73 m > 0.15m


so, 0.15 m
1.000 0.225 0.15 h2 = 0.3 * h = 0.3 * 2.425 = 0.7275m so, 0.25 m
0.150 > 0.1m & > 0.25m
4.0 0.08

0.7968
2.80 h3 = 0.3 * h = 0.30 * 2.425 = 0.73 m > 0.15m
so, 0.15 m
0.40

0.25
E = 343.13 t/cm² For Girder
0.300 = 343.13 t/cm² For Deck
2.425

2.200

1.6282
0.150
0
0

0.15
0.300 2.1
0.700

FORCE (ton) DIST. OF CG FROM N.A. MOMENT (t.m.)


320 x 15 x 12 x 10e-6 x [(17.8 + 4.00 ) / 2] x 343.13 0.797- [ ( 2 x 4.00 + 17.8 ) / ( 4.00 + 17.8 ) ] x 0.15 / 3
= 215.43 ton = 0.738 m 158.90 t.m.
320 x 7.5 x 12 x 10e-6 x [( 4 + 2.8 ) / 2] x 343.13 0.797- 0.15 - [ ( 2 x 2.8 + 4 ) / ( 4 + 2.8 ) ] x 0.075 / 3
= 33.60 ton = 0.611 m 20.55 t.m.
100 x 15 x 12 x 10e-6 x [(2.8 + 0 ) / 2] x 343.13 0.797- 0.225 - [ ( 2.8 + 2 x 0 ) / ( 2.8 + 0 ) ] x 0.15 / 3
= 8.65 ton = 0.522 m 4.51 t.m.
30 x 2.5 x 12 x 10e-6 x [(0.40 + 0 ) / 2] x 343.13 0.797- 0.375 - [ ( 0.40 + 2 x 0 ) / ( 0.40 + 0 ) ] x 0.025 / 3
= 0.06 ton = 0.413 m 0.03 t.m.
70 x 15 x 12 x 10e-6 x [(2.1 + 0 ) / 2] x 343.13 1.628- [ ( 2 x 0 + 2.1 ) / ( 0 + 2.1 ) ] x 0.15 / 3
= 4.54 ton = 1.578 m -7.16 t.m.
50 x 0 x 12 x 10e-6 x [(0 + 0 ) / 2] x 343.13 0
= 0.00 ton = 0.000 m 0.00 t.m.
Total Force = 262.28 ton Net Moment 176.82 t.m

STRESS AT TOP OF SLAB STRESS AT TOP OF GIRDER


-262.278 176.821 -262.278 176.821
= - + 120.00 x 10^-7 x 17.8 x 34,31,298 - + 120.00 x 10^-7 x 2.8 x 34,31,298
1.688 1.426 1.688 1.987
= -155.4 - 123.998 + 732.925 = -155.4 - 88.982 + 115.292
= 453.50 t/m2 = -129.11 t/m
2

STRESS AT BOTTOM OF GIRDER


-262.278 176.821
+ + 120.00 x 10^-7 x 2.1 x 34,31,298
1.688 0.698
= -155.4 + 253.390 + 86.469
= 184.43 t/m2
POSITIVE TEMPERATURE EFFECT AT SUPPORT

3.20 17.8 h1 = 0.3 * h = 0.30 * 2.425 = 0.73 m > 0.15m


so, 0.15 m
1.000 0.225 0.15 h2 = 0.3 * h = 0.3 * 2.425 = 0.7275m so, 0.25 m
0.150 > 0.1m & > 0.25m
4.0 0.08

0.9240
2.80 h3 = 0.3 * h = 0.30 * 2.425 = 0.73 m > 0.15m
so, 0.15 m
0.40

0.25
E = 343.13 t/cm² For Girder
0.700 = 343.13 t/cm² For Deck
2.425

2.200

1.5010
0.00
2.1
0

0.15
0.00 2.1
0.700
FORCE (ton) DIST. OF CG FROM N.A. MOMENT (t.m.)
320 x 15 x 12 x 10e-6 x [(17.8 + 4.00 ) / 2] x 343.13 0.924- [ ( 2 x 4.00 + 17.8 ) / ( 4.00 + 17.8 ) ] x 0.15 / 3
= 215.43 ton = 0.865 m 186.32 t.m.
320 x 7.5 x 12 x 10e-6 x [( 4 + 2.8 ) / 2] x 343.13 0.924- 0.15 - [ ( 2 x 2.8 + 4 ) / ( 4 + 2.8 ) ] x 0.075 / 3
= 33.60 ton = 0.739 m 24.82 t.m.
100.00 x 15 x 12 x 10e-6 x [(2.8 + 0 ) / 2] x 343.13 0.924- 0.225 - [ ( 2.8 + 2 x 0 ) / ( 2.8 + 0 ) ] x 0.15 / 3
= 8.65 ton = 0.649 m 5.61 t.m.
70 x 2.5 x 12 x 10e-6 x [(0.40 + 0 ) / 2] x 343.13 0.924- 0.375 - [ ( 0.40 + 2 x 0 ) / ( 0.40 + 0 ) ] x 0.025 / 3
= 0.14 ton = 0.541 m 0.08 t.m.
70 x 0 x 12 x 10e-6 x [(2.1 + 0 ) / 2] x 343.13 1.501- [ ( 2 x 0 + 2.1 ) / ( 0 + 2.1 ) ] x 0 / 3
= 0.00 ton = 1.501 m 0.00 t.m.
70 x 15 x 12 x 10e-6 x [(0 + 2.1 ) / 2] x 343.13 1.501 - 0- [ ( 2 x 0 + 2.1 ) / ( 2.1 + 0 ) ] x 0.15 / 3
= 4.54 ton = 1.451 m -6.59 t.m.
Total Force = 262.36 ton Net Moment 210.25 t.m
STRESS AT TOP OF SLAB STRESS AT TOP OF GIRDER
-262.361 210.246 -262.361 210.246
= - + 120.00 x 10^-7 x 17.8 x 34,31,298 - + 120.00 x 10^-7 x 2.8 x 34,31,298
2.315 1.479 2.315 1.954
= -113.4 - 142.200 + 732.925 = -113.4 - 107.575 + 115.292
= 477.38 t/m2 = -105.63 t/m
2

STRESS AT BOTTOM OF GIRDER


-262.361 210.246
+ + 120.00 x 10^-7 x 2.1 x 34,31,298
2.315 0.910
= -113.4 + 230.978 + 86.469
= 204.10 t/m2
REVERSE TEMPERATURE EFFECT AT MIDSPAN

3.20 10.6 h1&h4 = 0.2 * h = 0.20 * 2.425 = 0.49 m > 0.25m


so, 0.25 m
1.000 0.225 1.69 0.25 h2 & h3= 0.25 * h =0.25 * 2.425 = 0.61 m > 0.20m
so, 0.20 m
0.150
0.7 0.00 E = 343.13 t/cm² For Girder

0.7968
0.00 = 343.13 t/cm² For Deck

0.2
0.300
2.425

2.200

1.6282

0.20
0.150
0.8
-0.4

0.25
0.300 6.6
0.700

FORCE (ton) DIST. OF CG FROM N.A. MOMENT (t.m.)


320 x 22.5 x 12 x 10e-6 x [(10.6 + 1.69 ) / 2] x 343.13 0.797- [ ( 2 x 1.69 + 10.6 ) / ( 1.69 + 10.6 ) ] x 0.225 / 3
= 182.18 ton = 0.711 m 129.61 t.m.
100 x 2.5 x 12 x 10e-6 x [( 0.7 + 1.69 ) / 2] x 343.13 0.797- 0.225 - [ ( 2 x 0.7 + 1.69 ) / ( 0.7 + 1.69 ) ] x 0.025 / 3
= 1.23 ton = 0.561 m 0.69 t.m.
100 x 20 x 12 x 10e-6 x [(0.7 + 0 ) / 2] x 343.13 0.797- 0.25 - [ ( 0.7 + 2 x 0 ) / ( 0.7 + 0 ) ] x 0.2 / 3
= 2.02 ton = 0.480 m 0.97 t.m.
70 x 25 x 12 x 10e-6 x [(6.6 + 0.8 ) / 2] x 343.13 1.628- [ ( 2 x 0.8 + 6.6 ) / ( 0.8 + 6.6 ) ] x 0.25 / 3
= 24.68 ton = 1.536 m -37.90 t.m.
50 x 0 x 12 x 10e-6 x [(0 + 0 ) / 2] x 343.13 0
= 0.00 ton = 0.000 m 0.00 t.m.
50 x 20 x 12 x 10e-6 x [( 0.8 + 0 ) / 2] x 343.13 1.628- 0.25 - [ ( 2 x 0 + 0.8 ) / ( 0.8 + 0 ) ] x 0.2 / 3
= 2.31 ton = 1.312 m -3.02 t.m.
Total Force = 212.41 ton Net Moment 90.34 t.m
STRESS AT TOP OF SLAB STRESS AT TOP OF GIRDER
212.410 90.342 212.410 90.342
= + - 120.00 x 10^-7 x 10.6 x 34,31,298 + - 120.00 x 10^-7 x 1.69 x 34,31,298
1.688 1.426 1.688 1.987
= 125.9 + 63.354 - 436.461 = 125.9 + 45.463 - 69.587
2 2
= -247.235 t/m = 101.749 t/m

STRESS AT BOTTOM OF GIRDER


212.410 90.342
- - 120.00 x 10^-7 x 6.6 x 34,31,298
1.688 0.698
= 125.9 - 129.464 - 271.759
2
= -275.350 t/m
REVERSE TEMPERATURE EFFECT AT SUPPORT

3.20 10.6 h1&h4 = 0.2 * h = 0.20 * 2.425 = 0.49 m > 0.25m


so, 0.25 m
1.000 0.225 1.69 0.25 h2 & h3= 0.25 * h =0.25 * 2.425 = 0.61 m > 0.20m
so, 0.20 m
0.150
0.7 0.00 E = 343.13 t/cm² For Girder

0.9240
0.00 = 343.13 t/cm² For Deck

0.2
2.425

2.200

1.5010

0.20
0.8

0.25
6.6
0.700

FORCE (ton) DIST. OF CG FROM N.A. MOMENT (t.m.)


320.00 x 22.5 x 12 x 10e-6 x [(10.6 + 1.69 ) / 2] x 343.13 0.924- [ ( 2 x 1.69 + 10.6 ) / ( 1.69 + 10.6 ) ] x 0.225 / 3
= 182.18 ton = 0.839 m 152.80 t.m.
100 x 2.5 x 12 x 10e-6 x [( 0.7 + 1.69 ) / 2] x 343.13 0.924- 0.225 - [ ( 2 x 0.7 + 1.69 ) / ( 0.7 + 1.69 ) ] x 0.025 / 3
= 1.23 ton = 0.688 m 0.85 t.m.
100 x 20 x 12 x 10e-6 x [(0.7 + 0 ) / 2] x 343.13 0.924- 0.25 - [ ( 0.7 + 2 x 0 ) / ( 0.7 + 0 ) ] x 0.2 / 3
= 2.88 ton = 0.607 m 1.75 t.m.
70 x 25 x 12 x 10e-6 x [(6.6 + 0.8 ) / 2] x 343.13 1.501- [ ( 2 x 0.8 + 6.6 ) / ( 0.8 + 6.6 ) ] x 0.25 / 3
= 26.66 ton = 1.409 m -37.56 t.m.
70 x 20 x 12 x 10e-6 x [( 0.8 + 0 ) / 2] x 343.13 1.501- 0.25 - [ ( 2 x 0 + 0.8 ) / ( 0.8 + 0 ) ] x 0.2 / 3
= 2.31 ton = 1.184 m -2.73 t.m.
Total Force = 215.26 ton Net Moment 115.11 t.m
STRESS AT TOP OF SLAB STRESS AT TOP OF GIRDER
215.257 115.110 215.257 115.110
= + - 120.00 x 10^-7 x 10.6 x 34,31,298 + - 120.00 x 10^-7 x 1.69 x 34,31,298
2.315 1.479 2.315 1.954
= 93.0 + 77.855 - 436.461 = 93.0 + 58.898 - 69.587
2
= -265.607 t/m = 82.310 t/m2

STRESS AT BOTTOM OF GIRDER


215.257 115.110
- - 120.00 x 10^-7 x 6.6 x 34,31,298
2.315 0.910
= 93.0 - 126.461 - 271.759
2
= -305.220 t/m
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-
DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM
5.0 DIFFERENTIAL SHRINKAGE

At End Section :
A= 2.31 m² fck = M 45 Deck
yb = 1.50 m = M 45 Girder
Zbgirder = 0.91 m3
Ztgirder = 1.95 m3
Ztslab = 1.48 m3

Differential shrinkage strain, eDS = ( -96.31 x 10E-06 ) = -96 x 10e-6

N 2.313 m A

1.501 m

Modular Ratio = ( 33,541.02 ) / ( 33,541.02 )


= 1.000

Restraining Force = e DS x Ec x Aslab x f where, eDS = Diff. shrinkage strain


Ec = modu. of ela. of slab
f = creep reduction factor

= -96.31 x 34,312.98 x 100 x ( 3.2 x 0.225 ) x 0.36


= -85.647 t

Restraining Moment= Restraining Force x Eccentricity


= -85.647 x ( 2.3125 - 1.50 )
= -69.51 t.m

Internal Stresses:

Restraining Stresses= e DS x Ec xf = -96.31 x 10E-06 x 34,31,298.37 x 0.36


= -118.95 t/m²

Axial Release
Bottom of Slab = Restraining Force/ Area
= -85.647 / 2.31
= -37.00 t/m²

Top of Slab = -85.647/ (2.31/1.000)


= -37.00 t/m²
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-
DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

Moment Release
Top of Slab = M / Ztslab = -69.507 / ( 1.48 / 1.000 )
= -47.01 t/m²

Bottom of Slab = M / Zbslab = -69.507 / ( 1.95 / 1.000 )


= -35.56 t/m²

Top of Beam = M / Ztbeam = -69.507 / 1.95


= -35.56 t/m²

Bottom of Beam = M / Zbbeam = -69.507 / 0.91


= 76.36 t/m²

-119.0 -37.0 -47.0 -34.9

-35.6

-35.6 -46.4 72.6

- - =

-37.0 76.4 -39.4

Restrained Stresses Axial Release Moment Release Shrinkage Stresses


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-
DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

At Varying Section :
A= 1.99 m² fck = 45 Deck
yb = 1.56 m 45 Girder
Zbgirder = 0.80 m3
Ztgirder = 1.95 m3
Ztslab = 1.44 m3

Differential shrinkage strain, eDS = ( -96.31 x 10E-06 ) = -96 x 10e-6

N 2.313 m A

1.559 m

Modular Ratio = ( 33,541.02 ) / ( 33,541.02


= 1.000

Restraining Force = e DS x Ec x Aslab x f where, eDS = Diff. shrinkage strain


Ec = modu. of ela. of slab
f = creep reduction factor

= -96.31 x 34,312.98 x 100 x ( 3.2 x 0.225 ) x 0.36


= -85.647 t

Restraining Moment= Restraining Force x Eccentricity


= -85.647 x ( 2.3125 - 1.56 )
= -64.56 t.m

Internal Stresses:

Restraining Stresses= e DS x Ec xf = -96.31 x 10E-06 x 33,54,101.97 x 0.36


= -116.28 t/m²

Axial Release
Bottom of Slab = Restraining Force/ Area
= -85.647 / 1.99
= -43.00 t/m²

Top of Slab = -85.647/ (1.99/1.000)


= -43.00 t/m²
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-
DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

Moment Release
Top of Slab = M / Ztslab = -64.559 / ( 1.44 / 1.000 )
= -44.80 t/m²

Bottom of Slab = M / Zbslab = -64.559 / ( 0.97 / 1.000 )


= -33.16 t/m²

Top of Beam = M / Ztbeam = -64.559 / 0.97


= -33.16 t/m²

Bottom of Beam = M / Zbbeam = -64.559 / 0.40


= 80.61 t/m²

-116.3 -43.0 -44.8 -28.5

-33.2

-33.2 -40.1 76.2

- - =

-43.0 80.6 -37.6

Restrained Stresses Axial Release Moment Release Shrinkage Stresses


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-
DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

At Mid Section :
A= 1.69 m² fck = 45 Deck
yb = 1.63 m 45 Girder
Zbgirder = 0.70 m3
Ztgirder = 1.99 m3
Ztslab = 1.43 m3

Differential shrinkage strain, eDS = ( -96.31 x 10E-06 ) = -96 x 10e-6

N 2.313 m A

1.628 m

Modular Ratio = ( 33,541.02 ) / ( 33,541.02


= 1.000

Restraining Force = e DS x Ec x Aslab x f where, eDS = Diff. shrinkage strain


Ec = modu. of ela. of slab
f = creep reduction factor

= -96.31 x 34,312.98 x 100 x ( 3.2 x 0.225 ) x 0.36


= -85.647 t

Restraining Moment= Restraining Force x Eccentricity


= -85.647 x ( 2.3125 - 1.63 )
= -58.61 t.m

Internal Stresses:

Restraining Stresses= e DS x Ec xf = -96.31 x 10E-06 x 33,54,101.97 x 0.36


= -116.28 t/m²

Axial Release
Bottom of Slab = Restraining Force/ Area
= -85.647 / 1.69
= -50.75 t/m²

Top of Slab = -85.647/ (1.69/1.000)


= -50.75 t/m²
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-
DOCUMENT NO. DATE
Job : IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

Moment Release
Top of Slab = M / Ztslab = -58.607 / ( 1.43 / 1.000 )
= -41.10 t/m²

Bottom of Slab = M / Zbslab = -58.607 / ( 1.99 / 1.000 )


= -29.49 t/m²

Top of Beam = M / Ztbeam = -58.607 / 1.99


= -29.49 t/m²

Bottom of Beam = M / Zbbeam = -58.607 / 0.70


= 83.99 t/m²

-116.3 -50.8 -41.1 -24.4

-29.5

-29.5 -36.0 80.2

- - =

-50.8 84.0 -33.2

Restrained Stresses Axial Release Moment Release Shrinkage Stresses


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC
Job : MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

6.0 LOSSES DUE TO SLIP & FRICTION

DETAILS OF CABLE PROFILE


NO. OF
CABLE PARABOLIC
X1 X2 Yend Ymid Lend Lvar Lmid Zend Zmid STRAND
NO. LENGTH
S
1 3.00 12.70 0.50 0.13 3.25 2.30 10.15 0.00 -0.20 19 2.032

2 6.00 9.70 1.00 0.13 3.25 2.30 10.15 0.00 0.20 19 5.082

3 12.00 3.70 1.50 0.13 12.00 0.00 3.70 0.00 0.00 19 11.096

4 15.70 0.00 1.90 0.33 15.70 0.00 0.00 0.00 0.00 10 14.799

AVERAGE ECCENTRICITY OF CABLE GROUPS FROM BOTTOM

SAMPLE CALCULATION :

At 0.00 m from end of Girder,for cable:1


yb = ( 0.5 - 0.125 ) x ( 3 - 0 ) x ( 3 - 0 ) / ( 3² ) + 0.125 = 0.5000 mm

Section : 0.000 3.380 6.160 9.540 12.620 15.700


CABLE
Dist. From Bottom ( mm )
NO.
1 0.5000 0.1250 0.1250 0.1250 0.1250 0.1250
2 1.0000 0.2966 0.1250 0.1250 0.1250 0.1250
3 1.5000 0.8395 0.4529 0.1832 0.1250 0.1250
4 1.9000 1.2988 0.9089 0.5684 0.3859 0.3250

Section : 0.000 3.380 6.160 9.540 12.620 15.700

STAGE Dist. From Bottom ( mm )

I 1.134 0.551 0.335 0.208 0.164 0.155


ALL 1.134 0.551 0.335 0.208 0.164 0.155

PRESTRESSING FORCE

Breaking Strength of Strand ( U.T.S.=) 183710 N

Breaking Stress ( U. T. S. ) = 183710 / ( 9.81 x 98.8 ) = 189.54 kg/mm²

Max. Jack Pressure< 90% of 0.10% Proof Stress [ Cl. 7.9.2,page 61 ,IRC : 112 - 2011 ]

0.10% Proof Stress = 0.87 x U.T.S. = 0.87 x 189.54 [ Fig6.3, IRC : 112 - 2011 ]
= 164.90 kg/mm²
Max. Jack Pressure= 0.90 x 0.87 U.T.S. = 0.783 U.T.S.
= 0.90 x 164.90 = 148.41 kg/mm²

Jack Pressure Adopted= 148.00 kg/mm²


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC
Job : MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

LOSS DUE TO FRICTION [ IRC : 112 - 2011, Cl. 7.9.3.2 (2) & Table - 7.1 ]

Wobble Co-efficient ( k ) = 0.0020 F = ekL + m* ( qv² + qh² )

STRESS = JACKING STRESS/F


( m ) = 0.1700
Co- efficient of Friction

Dist.
STRESS
SECTION From kL qv qh kL + m* ( qv² + qh² ) F
(Kg/mm2)
End

CABLE - 1 0.1854
1-1 0.00 0.0000 0.0000 0.0000 0.0000 1.0000 148.00
2-2 3.38 0.0068 0.1854 0.0870 0.0416 1.0424 141.97
3-3 6.16 0.0123 0.1854 0.0870 0.0471 1.0483 141.19
4-4 9.54 0.0191 0.1854 0.0870 0.0539 1.0554 140.24
5-5 12.62 0.0252 0.1854 0.0870 0.0600 1.0619 139.37
6-6 15.70 0.0314 0.1854 0.0870 0.0662 1.0684 138.52

CABLE - 2 0.2450
1-1 0.00 0.0000 0.0000 0.0000 0.0000 1.0000 148.00
2-2 3.38 0.0068 0.1183 -0.0870 0.0317 1.0322 143.38
3-3 6.16 0.0123 0.2450 -0.0870 0.0565 1.0581 139.87
4-4 9.54 0.0191 0.2450 -0.0870 0.0633 1.0653 138.93
5-5 12.62 0.0252 0.2450 -0.0870 0.0694 1.0719 138.07
6-6 15.70 0.0314 0.2450 -0.0870 0.0756 1.0785 137.22

CABLE - 3 0.2085
1-1 0.00 0.0000 0.0000 0.0000 0.0000 1.0000 148.00
2-2 3.38 0.0068 0.0453 0.0000 0.0145 1.0146 145.87
3-3 6.16 0.0123 0.0974 0.0000 0.0289 1.0293 143.79
4-4 9.54 0.0191 0.1615 0.0000 0.0465 1.0476 141.27
5-5 12.62 0.0252 0.2085 0.0000 0.0607 1.0626 139.29
6-6 15.70 0.0314 0.2085 0.0000 0.0668 1.0691 138.43

CABLE - 4 0.1864
1-1 0.00 0.0000 0.0000 0.0000 0.0000 1.0000 148.00
2-2 3.38 0.0068 0.0303 0.0000 0.0119 1.0120 146.25
3-3 6.16 0.0123 0.0651 0.0000 0.0234 1.0237 144.58
4-4 9.54 0.0191 0.1079 0.0000 0.0374 1.0381 142.56
5-5 12.62 0.0252 0.1471 0.0000 0.0502 1.0515 140.75
6-6 15.70 0.0314 0.1864 0.0000 0.0631 1.0651 138.95
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

CALCULATION OF AREA OF STRESS DIAGRAM BEFORE AND AFTER SLIP

CABLE - 1

Dist. = 15.70 m Stress Stress


Dist. Area before slip
Ydist. = 0.98 m after after Slip
SECTION From
Friction area1 area2 Loss
End
Loss
kg/mm2 kg/mm2 kg/mm2
0.00 138.52 137.54 End 0.00 148.00 0.00 0.00 127.07
0.00 1-1 0.00 148.00 10.18 15.00 127.07
2-2 3.38 141.97 1.09 10.15 133.10
Find D Find Y 3-3 6.16 141.19 1.61 9.13 133.88
4-4 9.54 140.24 1.33 5.66 134.84
5-5 12.62 139.37 1.32 3.03 135.70
6-6 15.70 138.52 136.55
Area of Stress Diagram = 117.00 kg/mm²

Cable Elongation :

E = 1.95E+05 N/mm²

Grip Length = 0 mm Jacking Stress = 1480.00 N/mm²


Elongation for grip length 0 x 1480
= = 0.00 mm
within jack 1.95E+05
Cable Stress Total
Average Length of Elongation
Cable at a point Elongation at
Stress : P Cable: (mm)
No. before slip each end
(Kg/mm2) L(mm) (P x L)/E
(Kg/mm2) (mm)
148.00
148.00 0 0.00
148.00
144.99 3380 25.13
141.97
141.58 2780 20.18
141.19
1 113.73
140.71 3380 24.39
140.24
139.81 3080 22.08
139.37
138.95 3080 21.95
138.52
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

Before Slip

150.00 After Slip

148.00 148.00
145.00
141.97 141.19
140.00 140.24 139.37 138.52
STRESS ( kg/mm2)

135.70 136.55
135.00 134.84
133.10 133.88
130.00
127.07 127.07
125.00

120.00

115.00

110.00
1.00 2.00 3.00 4.00 5.00 6.00 7.00

DISTANCE (m)
SLIP LOSS DIAGRAM FOR CABLE : 1

Dist.
Before
From After Slip
Slip
End

0.00 148.00 127.07


0.00 148.00 127.07
3.38 141.97 133.10
6.16 141.19 133.88
9.54 140.24 134.84
12.62 139.37 135.70
15.70 138.52 136.55
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

CABLE - 2

Dist. = 15.70 m Stress Stress


Dist. Area before slip
Ydist. = 0.32 m after after Slip
SECTION From
Friction area1 area2 Loss
End
Loss
kg/mm2 kg/mm2 kg/mm2
0.00 137.22 136.90 End 0.00 148.00 0.00 0.00 125.80
0.00 1-1 0.00 148.00 7.81 21.90 125.80
2-2 3.38 143.38 4.88 8.25 130.42
Find D Find Y 3-3 6.16 139.87 1.59 6.84 133.93
4-4 9.54 138.93 1.31 3.61 134.88
5-5 12.62 138.07 1.31 1.00 135.73
6-6 15.70 137.22 136.58
Area of Stress Diagram = 117.00 kg/mm²

Cable Elongation :

E = 1.95E+05 N/mm²

Grip Length = 0 mm Jacking Stress = 1480.0 N/mm²

Elongation for grip length 0 x 1480


= = 0.00 mm
within jack 1.95E+05
Cable Stress Total
Average Length of Elongation
Cable at a point Elongation at
Stress : P Cable: (mm)
No. before slip each end
(Kg/mm2) L(mm) (P x L)/E
(Kg/mm2) (mm)
148.00
148.00 0 0.00
148.00
145.69 3380 25.25
143.38
141.62 2780 20.19
2 139.87 113.22
139.40 3380 24.16
138.93
138.50 3080 21.88
138.07
137.65 3080 21.74
137.22
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

Before Slip
150.00
After Slip
148.00 148.00
145.00
143.38
140.00 139.87
138.93 138.07
STRESS ( kg/mm2)

137.22
136.58
135.00 134.88 135.73
133.93

130.00 130.42

125.00 125.80 125.80

120.00

115.00

110.00
1.00 2.00 3.00 4.00 5.00 6.00 7.00

DISTANCE (m)
SLIP LOSS DIAGRAM FOR CABLE : 2

Dist.
Before
From After Slip
Slip
End

0.00 148.00 125.80


0.00 148.00 125.80
3.38 143.38 130.42
6.16 139.87 133.93
9.54 138.93 134.88
12.62 138.07 135.73
15.70 137.22 136.58
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

CABLE -3

Dist. = 13.54 m Between Section 5 - 5 & 6 - 6 Stress Stress


Dist. Area before slip
Ydist. = after after Slip
SECTION From
Friction area1 area2 Loss
End
Loss
kg/mm2 kg/mm2 kg/mm2
0.00 139.03 139.03 139.03 End 0.00 148.00 0.00 0.00 130.06
0.00 1-1 0.00 148.00 3.59 23.13 130.06
2-2 3.38 145.87 2.90 13.22 132.19
Find D Find Y 3-3 6.16 143.79 4.25 7.56 134.28
4-4 9.54 141.27 3.05 0.78 136.79
5-5 12.62 139.29 0.00 0.00 138.78
6-6 15.70 138.43 138.43
Area of Stress Diagram = 117.00 kg/mm²

Cable Elongation :

E = 1.95E+05 N/mm²

Grip Length = 0 mm Jacking Stress = 1480.0 N/mm²

Elongation for grip length 0 x 1480


= = 0.00 mm
within jack 1.95E+05
Cable Stress Total
Average Length of Elongation
Cable at a point Elongation at
Stress : P Cable: (mm)
No. before slip each end
(Kg/mm2) L(mm) (P x L)/E
(Kg/mm2) (mm)
148.00
148.00 0 0.00
148.00
146.94 3380 25.47
145.87
144.83 2780 20.65
3 143.79 114.91
142.53 3380 24.70
141.27
140.28 3080 22.16
139.29
138.86 3080 21.93
138.43
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

Before Slip

150.00 After Slip

148.00 148.00
145.00 145.87
143.79
141.27
140.00
139.29
138.78 138.43
STRESS ( kg/mm2)

136.79
135.00
134.28
132.19
130.00 130.06 130.06

125.00

120.00

115.00

110.00
1.00 2.00 3.00 4.00 5.00 6.00 7.00

DISTANCE (m)
SLIP LOSS DIAGRAM FOR CABLE : 3

Dist.
Before
From After Slip
Slip
End

0.00 148.00 130.06


0.00 148.00 130.06
3.38 145.87 132.19
6.16 143.79 134.28
9.54 141.27 136.79
12.62 139.29 138.78
15.70 138.43 138.43
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

CABLE -4

Dist. = 14.20 m Between Section 5 - 5 & 6 - 6 Stress Stress


Dist. Area before slip
Ydist. = after after Slip
SECTION From
Friction area1 area2 Loss
End
Loss
kg/mm2 kg/mm2 kg/mm2
0.00 139.83 139.83 139.83 End 0.00 148.00 0.00 0.00 131.65
0.00 1-1 0.00 148.00 2.96 21.71 131.65
2-2 3.38 146.25 2.32 13.21 133.40
Find D Find Y 3-3 6.16 144.58 3.40 9.26 135.07
4-4 9.54 142.56 2.80 2.84 137.09
5-5 12.62 140.75 0.00 0.00 138.90
6-6 15.70 138.95 138.95
Area of Stress Diagram = 117.00 kg/mm²

Cable Elongation :

E = 1.95E+05 N/mm²

Grip Length = 0 mm Jacking Stress = 1480.00 N/mm²

Elongation for grip length 0 x 1480


= = 0.00 mm
within jack 1.95E+05
Cable Stress Total
Average Length of Elongation
Cable at a point Elongation at
Stress : P Cable: (mm)
No. before slip each end
(Kg/mm2) L(mm) (P x L)/E
(Kg/mm2) (mm)
148.00
148.00 0 0.00
148.00
147.12 3380 25.50
146.25
145.41 2780 20.73
4 144.58 115.58
143.57 3380 24.89
142.56
141.66 3080 22.37
140.75
139.85 3080 22.09
138.95
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
PACKAGE-3 (LALGANJ-HANUMANHA)

Dist. From End

150.00 Before Slip

148.00 148.00 After Slip


146.25
145.00 144.58
142.56
140.00 140.75
138.90 138.95
STRESS ( kg/mm2)

137.09
135.00 135.07
133.40
131.65 131.65
130.00

125.00

120.00

115.00

110.00
1.00 2.00 3.00 4.00 5.00 6.00 7.00

DISTANCE (m)
SLIP LOSS DIAGRAM FOR CABLE : 4

Dist.
Before
From After Slip
Slip
End

0.00 148.00 131.65


0.00 148.00 131.65
3.38 146.25 133.40
6.16 144.58 135.07
9.54 142.56 137.09
12.62 140.75 138.90
15.70 138.95 138.95
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB DOCUMENT NO. DATE
Job : FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

7.0 PRESTRESSING FORCE AFTER SLIP & FRICTION

Section : 1 - 1

Cable q Cosq Sinq Prestress P.Cosq P.Sinq


Cable 1 0.1854 0.9829 0.1843 238.54 234.45 43.96
Cable 2 0.2450 0.9701 0.2425 236.15 229.10 57.28
Cable 3 0.2085 0.9783 0.2070 244.16 238.87 50.53
Cable 4 0.1864 0.9827 0.1854 130.07 127.82 24.11
T O T A L A T S E C T I O N 1 - 1 ( Ton ) 830.24 175.88

Section : 2 - 2

Cable q Cosq Sinq Prestress P.Cosq P.Sinq


Cable 1 0.0000 1.0000 0.0000 249.85 249.85 0.00
Cable 2 0.1267 0.9920 0.1263 244.83 242.87 30.93
Cable 3 0.1632 0.9867 0.1624 248.15 244.85 40.31
Cable 4 0.1562 0.9878 0.1555 131.80 130.20 20.50
T O T A L A T S E C T I O N 2 - 2 ( Ton ) 867.77 91.74

Section : 3 - 3

Cable q Cosq Sinq Prestress P.Cosq P.Sinq


Cable 1 0.0000 1.0000 0.0000 251.33 251.33 0.00
Cable 2 0.0000 1.0000 0.0000 251.42 251.42 0.00
Cable 3 0.1111 0.9938 0.1108 252.06 250.51 27.94
Cable 4 0.1213 0.9927 0.1210 133.45 132.47 16.15
T O T A L A T S E C T I O N 3 - 3 ( Ton ) 885.73 44.09

Section : 4 - 4

Cable q Cosq Sinq Prestress P.Cosq P.Sinq


Cable 1 0.0000 1.0000 0.0000 253.11 253.11 0.00
Cable 2 0.0000 1.0000 0.0000 253.19 253.19 0.00
Cable 3 0.0469 0.9989 0.0469 256.79 256.51 12.05
Cable 4 0.0786 0.9969 0.0785 135.44 135.02 10.63
T O T A L A T S E C T I O N 4 - 4 ( Ton ) 897.83 22.68
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB DOCUMENT NO. DATE
Job : FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

Section : 5 - 5

Cable q Cosq Sinq Prestress P.Cosq P.Sinq


Cable 1 0.0000 1.0000 0.0000 254.73 254.73 0.00
Cable 2 0.0000 1.0000 0.0000 254.79 254.79 0.00
Cable 3 0.0000 1.0000 0.0000 260.51 260.51 0.00
Cable 4 0.0393 0.9992 0.0393 137.24 137.13 5.40
T O T A L A T S E C T I O N 5 - 5 ( Ton ) 907.16 5.40

Section : 6 - 6

Cable q Cosq Sinq Prestress P.Cosq P.Sinq


Cable 1 0.0000 1.0000 0.0000 256.34 256.34 0.00
Cable 2 0.0000 1.0000 0.0000 256.38 256.38 0.00
Cable 3 0.0000 1.0000 0.0000 259.86 259.86 0.00
Cable 4 0.0000 1.0000 0.0000 137.28 137.28 0.00
T O T A L A T S E C T I O N 6 - 6 ( Ton ) 909.87 0.00
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

8.0 LOSS CALCULATIONS AT MID SPAN

At Section 6 -6 ( 15.7 m )

Losses due to : 1 ] Elastic Shortening


2 ] Relaxation of Steel
3 ] Creep & Shrinkage

PRESTRESSING FORCE AFTER FRICTION & SLIP LOSS

Cable No. Description Force


1 136.55 x 98.8 x cos ( 0 ) x 19 / 1000 256.34 Ton
2 136.58 x 98.8 x cos ( 0 ) x 19 / 1000 256.38 Ton
3 138.43 x 98.8 x cos ( 0 ) x 19 / 1000 259.86 Ton
4 138.95 x 98.8 x cos ( 0 ) x 10 / 1000 137.28 Ton
T O T A L 909.87 Ton

C. G. of Cables = 0.1549 m

C. G. of Girder Section = 1.1190 m

Eccentricity = 1.1190 - 0.1549 = 0.9641 m

Stress @ C. G. of Cables

P P.eC . eC M girder . eC
=  
A I I

Where, P = Total Prestressing Force


A = C/S area of Girder
ec = Eccentricity of Cables
I = M. I. of Girder
Mgirder = B. M. due to self wt. of Girder

909.87 909.87 x 0.9641 x 0.9641 303.47 x 0.9641


= + -
0.9675 0.5454 0.5454

= 940.43 + 1550.80 - 536.48

= 1954.75 t/m² Avg Stress = 1494.97 t/m²

LOSS DUE TO ELASTIC SHORTENING 57 0 0 FALSE 57

Strength of Concrete at the time of Prestressing


= 1 x 450 = 450.00 kg/cm²

Ec = 34313.0 N/mm² [ Refer computations at Preamble]

Loss = 1,494.97 x 0.5 x 1.95 x 10**5 x 98.8 x 67 x 10**-6 / 34,312.98


= 28.12 Ton
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
Net Prestressing Force = 909.87 - 28.12

= 881.75 Ton

LOSS DUE TO RELAXATION OF STEEL

AVERAGE STRESS IN CABLES IMMEDIATELY AFTER ANCHORING

= 881.75 / ( 98.8 x 67 )

= 0.1332 t/mm² = 133.20 kg/mm²

U. T. S. = 183710 / ( 9.81 x 98.8 ) = 189.54 kg/mm²

Ratio = 133.20 / 189.54 = 0.703

Using Low Relaxation Strands

at 0.703 fp Loss at 1000 hrs. ( Table-6.2, IRC-112,2011) = 2.920 %

Total relaxation Loss =881.75 x 2.920 / 100 = 25.75 Ton

As per Table-6.3, IRC-112,2011,

th th
Loss between28 day & 56 day,

= ( 100 - [ ( 100 - 90 ) / 21 ] * [ 42 - 28 ] ) * 2.920 / 100

= 2.725 %

Relaxation Loss = 881.75 x 2.725 / 100

= 24.03 Ton

th th
Loss between56 day & 90 day,
( A2.11, IRC-112,2011)
where, t = Relax. Loss at time 't' in hours = 2160
k
 t 
r t = r1000   r1000 = Relax. Loss at 1000 hrs. = 2.920 %
1000 
k = log(r1000/r100) = 0.143

= 3.260 %
th

Loss between 56 th
day & 90 day, = 3.26 - 2.73 = 0.535 %

Relaxation Loss = 881.75 x 0.535 / 100

= 4.71 Ton

th
Relaxation Loss beyond 90 day ( 3 times the 1000 hour value )

= 25.75 x 3 - 24.03- 4.71

= 48.49 Ton
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19

th th
LOSS DUE TO CREEP & SHRINKAGE [ between28 day & 56 day ]

Stress @ C. G. of Cables

P P.eC . eC M girder . eC
=  
A I I

Where, P = Total Prestressing Force


A = C/S area of Girder
ec = Eccentricity of Cables

I = M. I. of Girder
Mgirder = B. M. due to self wt. of Girder

881.75 881.75 x 0.9641 x 0.9641 303.47 x 0.9641


= + -
0.9675 0.5454 0.5454

= 911.37 + 1502.87 - 536.48

= 1877.76 t/m² = 18.78 MPa

Shrinkage Strain between 28 day & 56 day [Refer Annexure-II]

= 27.73 x 10**-6

Loss due to Shrinkage


= 27.731 x 10**-6 x 67 x 98.8 x 1.95 x 10**5

= 35796 N = 3.58 Ton

Loss due to Creep [Refer Annexure-III]

= F1 x f x Es/ Ec x Area of cable

= 18.78 x 0.65 x 1.95 x 10**5 / 34,312.98 x 67 x 98.8

= 455674 N = 45.57 Ton

Net Prestressing Force= 881.75 - 24.03 - 3.58 - 45.57 [ deduct relax. + creep + shrinkage ]
= 808.57 Ton
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19

COMPOSITE SECTION
C.G. of Composite Section= 1.6282 m

C. G. of Cables = 0.1549 m

Eccentricity = 1.6282 - 0.1549 = 1.4734 m

th th
LOSS DUE TO CREEP & SHRINKAGE [ between56 day & 90 day ]

Stress @ C. G. of Cables

P P.eC . eC M girder . eC M slab . eC


=   
A I I I

Where, P = Total Prestressing Force


A = C/S area of Girder
ec = Eccentricity of Cables
I = M. I. of Girder
Mgirder = B. M. due to self wt. of Girder
Mslab = B. M. due to wt. of Slab+diaph.

808.57 808.57 x 0.9641 x 1.4734 303.47 x 1.4734


= + -
0.9675 0.5454 0.5454

( 234.66 + 13.25 ) x 1.4734


-
0.5454
= 835.73 + 2106.05 - 819.83 - 669.74
= 1452.21 t/m² = 14.52 MPa

Shrinkage Strain between 56 day & 90 day [Refer Annexure-II]


= 24.78 x 10**-6

Loss due to Shrinkage


= 24.780 x 10**-6 x 67 x 98.8 x 1.95 x 10**5
= 31987 N = 3.20 Ton

Loss due to Creep [Refer Annexure-II]

= F1 x f x Es/ Ec x Area of cable

= 14.522 x 0.16 x 1.95 x 10**5 / 34,312.98 x 67 x 98.8

= 89504 N = 8.95 Ton

Net Prestressing Force= 808.57 - 3.20 - 8.95 - 4.71


[ deduct relax. + creep + shrinkage ]
= 791.71 Ton
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
th
LOSS DUE TO CREEP & SHRINKAGE [ beyond 90 day ]

Stress @ C. G. of Cables

P P.e . e M girder. eC ( Mslab  Mdhp  Msidl )


=  C C 
A I I I

Where, P = Total Prestressing Force


A = C/S area of Girder
ec = Eccentricity of Cables
I = M. I. of Girder
Mgirder = B. M. due to self wt. of Girder
Mslab = B. M. due to wt. of Slab
Mdph = B. M. due to wt. of diaphragm
Msidl = B. M. due to wt. of SIDL

791.71 791.71 x 0.9641 x 1.4734 303.47 x 1.4734


= + -
0.9675 0.5454 0.5454

( 234.66 + 13.25 ) x 1.4734 207 x 1.4734


- -
0.5454 1.1362

= 818.30 + 2062.13 - 819.83 - 669.74 - 268.43

= 1122.43 t/m² = 11.22 MPa

Shrinkage Strain beyond 90 day [Refer Annexure-I]


= 209.19 x 10**-6

Loss due to Shrinkage


= 209.195 x 10**-6 x 67 x 98.8 x 1.95 x 10**5

= 270033 N = 27.00 Ton

Loss due to Creep [Refer Annexure-II]

= F1 x f x Es/ Ec,eff x Area of cable

= 11.224 x 0.97 x 1.95 x 10**5 / 34,312.98 x 67 x 98.8

= 409241 N = 40.92 Ton

Net Prestressing Force= 791.71 - 27.00 - 40.92 - 48.49


[ deduct relax. + creep + shrinkage ]
= 675.29 Ton

Total Loss of Prestress= 28.12 + 24.03 + 4.71 + 48.49 + 3.58 + 45.57 + 3.20 + 8.95 + 27.00 + 40.92
= 234.58 Ton

% Loss = 234.58 x 100 / 909.87 = 25.78 %

Net Prestress Force = 909.87 - 234.58 = 675.29 Ton


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM

9.0 PRESTRESS SUMMARY AT VARIOUS SECTION

Material properties of Prestressed Concrete Material properties of Strands


Concrete strength at transfer 45 N/mm2 Elastic Modulus of steel 195000 N/mm
2
Do Not Delete
Final Concrete strength 45 N/mm2 Breaking load 183.7 kN 1314.3
2
Area of Strand 98.8 mm
COMBINATION 1

SLS FACTORS
DL 1 SIDL 1 LL 1 DIFF. TEMP. 0.6 DIFF. SETTLE 1 PRESTRESS 0.9

PERMISSIBLE STRESSES IN CONCRETE


STAGE COMP. STRESSESTENSILE STRESSES
AFTER 28 DAYS 2160.00 t/m² 327.67 t/m²
AFTER 56 DAYS 2160.00 t/m² 327.67 t/m²

Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
Girder CG from Bottom 1.1190 1.1190 1.1190 1.1190 1.1319 1.1345
Section Prop.

Area of Girder 0.9675 0.9675 0.9675 0.9675 1.2716 1.5946


MI of Girder 0.5454 0.5454 0.5454 0.5454 0.6046 0.6749
Section Modulus Zb ( mm3) 0.4874 0.4874 0.4874 0.4874 0.5342 0.5949
3
Section Modulus Zt ( mm ) 0.5045 0.5045 0.5045 0.5045 0.5661 0.6334
Nos of Strands 67 67 67 67 67 67
Strand
details

Centroid of strands from beam soffit (m) 0.155 0.164 0.208 0.335 0.551 1.134
Eccentricity: Beam alone (m) 0.9641 0.9551 0.9113 0.7840 0.5805 0.0002
S Prestress Force, P (t) 818.9 816.4 808.0 797.2 781.0 747.2
Moment due to Self Wt. (t-m) 303.47 291.85 256.68 198.27 114.88 0.00
Shortening

Stress @ CG of Cables (t/m²) 1705.6 1698.3 1636.7 1437.3 939.1 468.6


Elastic

Elastic Shortening Loss (t) 24.72 24.72 24.72 24.72 24.72 24.72
Elastic Shortening Loss (%) 3.02 3.03 3.06 3.10 3.17 3.31
Net Prestressing Force (t) 794.16 791.73 783.33 772.44 756.27 722.50
Ave. Stress in cables ( kg/mm²) 119.97 119.60 118.33 116.69 114.25 109.15
Ratio = Ave. Stress/UTS 0.633 0.631 0.624 0.616 0.603 0.576
1000Hr (%) 1.66 1.64 1.55 1.45 1.28 0.95
Relaxation of Steel

Relaxation Loss (t) 13.20 12.97 12.17 11.17 9.71 6.85


Loss betn 28 day & 56 day ( % ) 1.55 1.53 1.45 1.35 1.20 0.88
Loss betn 28 day & 56 day ( t) 12.318 12.101 11.361 10.421 9.066 6.392
Loss betn 56 day & 90 day ( % ) 1.86 1.83 1.73 1.61 1.43 1.06
Loss betn 56 day & 90 day ( t) 2.416 2.374 2.229 2.044 1.778 1.254
Loss beyond 90 day ( t) 24.86 24.42 22.93 21.03 18.30 12.90
Total Loss at Transfer (%) 4.57 4.56 4.51 4.45 4.36 4.19
Net Prestress Force (t) 781.8 779.6 772.0 762.0 747.2 716.1
Stress @ CG of Cables (t/m²) 1637.9 1631.4 1573.5 1383.9 905.9 453.1
Creep & Shrinkage

Shrinkage Strain ( 10-6) 27.731 27.731 27.731 27.731 27.731 27.731


Shrinkage Loss (t) 3.58 3.58 3.58 3.58 3.58 3.58
Creep Co-efficient 0.645 0.645 0.645 0.645 0.645 0.645
Creep Loss (t) 39.7 39.6 38.2 33.6 22.0 11.0
Net Prestress Force (t) 738.5 740.0 733.8 728.4 725.2 705.1
Total Gradual Loss-I (t) 55.6 55.3 53.1 47.6 34.6 21.0
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
COMPOSITE SECTION
Composite CG from Bottom 1.6282 1.6282 1.6282 1.6282 1.5587 1.5010
Section Properties

Composite Section Area 1.6875 1.6875 1.6875 1.6875 1.9916 2.3146


MI of Composite Section 1.1362 1.1362 1.1362 1.1362 1.2484 1.3662
3
Section Modulus Zb ( mm ) 0.6978 0.6978 0.6978 0.6978 0.8009 0.9102
3
Section Modulus Ztg ( mm ) 1.9871 1.9871 1.9871 1.9871 1.9467 1.9544
Section Modulus Zts ( mm3) 1.4260 1.4260 1.4260 1.4260 1.4411 1.4785
Eccentricity: Beam + Slab (m) 1.4734 1.4643 1.4205 1.2932 1.0073 0.3666
Moment due to Deck Slab (t-
234.66 225.28 197.25 150.46 84.91 0.00
Moment

m)
(t-m)

Moment due to SIDL (t-m) 207.00 211.60 192.62 150.44 85.79 0.00
Moment due to Diaphragm (t-
13.25 9.89 6.83 4.18 2.04 0.00
m)
Stress @ CG of Cables (t/m²) 1197.3 1247.5 1300.0 1270.2 935.4 442.3
Creep & Shrinkage

Shrinkage Strain ( 10-6) 24.780 24.780 24.780 24.780 24.780 24.780


Shrinkage Loss (t) 3.20 3.20 3.20 3.20 3.20 3.20
Creep Co-efficient 0.164 0.164 0.164 0.164 0.164 0.164
Creep Loss (t) 7.4 7.7 8.0 7.8 5.8 2.7
Net Prestress Force (t) 725.5 726.8 720.3 715.4 714.5 697.9
Stress @ CG of Cables (t/m²) 881.6 927.1 1013.4 1061.2 847.3 437.8
Creep & Shrinkage

Shrinkage Strain ( 10-6) 209.195 209.195 209.195 209.195 209.195 209.195


(long term)

Shrinkage Loss (t) 27.00 27.00 27.00 27.00 27.00 27.00


Creep Co-efficient 0.969 0.969 0.969 0.969 0.969 0.969
Creep Loss (t) 32.1 33.8 36.9 38.7 30.9 16.0
Net Prestress Force (t) 641.5 641.5 633.5 628.6 638.3 642.1
Total Gradual Loss-II (t) 13.0 13.3 13.4 13.1 10.7 7.2
Total Gradual Loss-III (t) 84.0 85.2 86.9 86.7 76.2 55.9

STRESS AT TRANSFER
s due to
Stresse

stop of beam (t/m²) 601.51 578.48 508.77 392.99 202.93 0.00


DL

sbottom of beam (t/m²) -622.64 -598.80 -526.64 -406.80 -215.06 0.00


stop of beam (t/m²) -696.82 -680.44 -605.28 -401.95 -180.72 452.88
ses Prestr
Stres

lative due
Cumu ses

ess
to

sbottom of beam (t/m²) 2391.82 2369.74 2274.29 2040.89 1416.53 453.32


stop of beam (t/m²) -95.31 -101.96 -96.52 -8.96 22.21 452.88
Stres

sbottom of beam (t/m²) 1769.18 1770.94 1747.64 1634.09 1201.47 453.32


STRESS AFTER GRADUAL LOSS-I( at 56 th day)
stop of beam (t/m²) 48.83 47.50 41.05 24.76 8.27 -13.14
Loss-I
Stres

due
ses

to

sbottom of beam (t/m²) -167.59 -165.43 -154.24 -125.72 -64.86 -13.16


stop of beam (t/m²) -46.49 -54.46 -55.47 15.80 30.49 439.73
Cumul

Stress
ative

es

sbottom of beam (t/m²) 1601.59 1605.51 1593.40 1508.37 1136.61 440.16


STRESS AFTER DECK & DIAPHRAGM
stop of slab (t/m²) - - - - - -
Stresses

Deck,Dp
due to

stop of beam (t/m²) 491.38 466.13 404.51 306.51 153.59 0.00


h

sbottom of beam (t/m²) -508.65 -482.51 -418.72 -317.28 -162.78 0.00


stop of slab (t/m²) - - - - - -
Cumulati

Stresses

stop of beam (t/m²) 444.89 411.67 349.04 322.32 184.08 439.73


ve

sbottom of beam (t/m²) 1092.94 1123.00 1174.68 1191.09 973.83 440.16


STRESS AFTER GRADUAL LOSS-II( at 90 th day)
stop of beam (t/m²) 11.40 11.40 10.39 6.80 2.57 -4.50
Loss-
Stres

due
Cumul ses

to

II

sbottom of beam (t/m²) -39.14 -39.69 -39.02 -34.54 -20.12 -4.50


stop of beam (t/m²) 456.30 423.07 359.43 329.12 186.65 435.23
Stress
ative

es

sbottom of beam (t/m²) 1053.80 1083.31 1135.66 1156.55 953.71 435.66


```
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
STRESS AT SERVICE
stop of slab (t/m²) 145.16 148.39 135.08 105.50 59.53 0.00
Cumulati Stresses
due to
SIDL

stop of beam (t/m²) 104.17 106.48 96.93 75.71 44.07 0.00


sbottom of beam (t/m²) -296.64 -303.23 -276.03 -215.59 -107.12 0.00
stop of slab (t/m²) 145.16 148.39 135.08 105.50 59.53 0.00
Stresses

stop of beam (t/m²) 560.47 529.55 456.36 404.82 230.72 435.23


ve

sbottom of beam (t/m²) 757.16 780.08 859.63 940.96 846.59 435.66


STRESS AFTER GRADUAL LOSS-III
stop of slab (t/m²) 37.02 37.01 35.06 27.26 15.00 -10.28
Stresses

Gradual
Loss-III
due to

stop of beam (t/m²) 12.51 12.30 10.62 5.05 1.17 -13.66


sbottom of beam (t/m²) -227.15 -229.35 -228.35 -212.12 -134.08 -46.64
stop of slab (t/m²) 182.18 185.40 170.14 132.76 74.53 -10.28
Cumulati due to Cumulati

Stresses Shrinkag Stresses

stop of beam (t/m²) 572.97 541.85 466.98 409.87 231.88 421.58


ve

sbottom of beam (t/m²) 530.01 550.73 631.28 728.85 712.52 389.02


stop of slab (t/m²) -24.43 -24.43 -24.43 -24.43 -28.48 -34.94
Stresses

Diff.

stop of beam (t/m²) 80.25 80.25 80.25 80.25 76.17 72.57


e

sbottom of beam (t/m²) -33.23 -33.23 -33.23 -33.23 -37.60 -39.36


stop of slab (t/m²) 157.75 160.97 145.71 108.33 46.05 -45.22
stop of beam (t/m²) 653.22 622.10 547.23 490.12 308.05 494.15
ve

sbottom of beam (t/m²) 496.78 517.50 598.05 695.62 674.91 349.67


FINAL STRESS
Moment due to LL (t-m) 280.84 254.88 218.84 161.93 86.81 0.00
stop of slab (t/m²) 196.94 178.74 153.46 113.56 60.24 0.00
Stresses Live Load
Cumulati Stresses
due to

stop of beam (t/m²) 141.33 128.26 110.13 81.49 44.59 0.00


sbottom of beam (t/m²) -402.45 -365.25 -313.61 -232.05 -108.39 0.00
stop of slab (t/m²) 354.69 339.71 299.18 221.88 106.29 -45.22
stop of beam (t/m²) 794.55 750.36 657.36 571.61 352.64 494.15
ve

sbottom of beam (t/m²) 94.32 152.25 284.44 463.57 566.52 349.67

DIFFERENTIAL TEMPERATURE STRESSES ( WITHWITHOUT


LL) DIFFERENTIAL SETTLEMENT
Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
stop of slab (t/m²) 272.10 272.10 272.10 286.43 286.43 286.43
Stresses
due to Cumulati due to

temp. Stresses temp.

stop of beam (t/m²)


+ve

diff.

-77.47 -77.47 -77.47 -63.38 -63.38 -63.38


sbottom of beam (t/m²) 110.66 110.66 110.66 122.46 122.46 122.46
stop of slab (t/m²) 626.80 611.81 571.28 508.31 392.72 241.20
stop of beam (t/m²) 717.08 672.89 579.89 508.23 289.26 430.77
ve

sbottom of beam (t/m²) 204.99 262.91 395.10 586.02 688.98 472.12


stop of slab (t/m²) -148.34 -148.34 -148.34 -159.36 -159.36 -159.36
Stresses

stop of beam (t/m²)


diff.

61.05 61.05 61.05 49.39 49.39 49.39


-ve

sbottom of beam (t/m²) -165.21 -165.21 -165.21 -183.13 -183.13 -183.13


stop of slab (t/m²) 206.35 191.37 150.84 62.52 -53.07 -204.59
Cumulati

Stresses

stop of beam (t/m²) 855.60 811.41 718.41 620.99 402.03 543.53


ve

sbottom of beam (t/m²) -70.88 -12.96 119.23 280.43 383.39 166.53


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE CH: DESIGNED CHECKED
Title : 113+545 AND PROPOSED CH: 113+530 RSS KJM

9.0 PRESTRESS SUMMARY AT VARIOUS SECTION

Material properties of Prestressed Concrete Material properties of Strands


Concrete strength at transfer 45 N/mm2 Elastic Modulus of steel 195000 N/mm
2
Do Not Delete
Final Concrete strength 45 N/mm2 Breaking load 183.7 kN 1675.7
2
Area of Strand 98.8 mm
COMBINATION 2

SLS FACTORS
DL 1 SIDL 1 LL 1 DIFF. TEMP. 0.6 DIFF. SETTLE 1 PRESTRESS 1.1

PERMISSIBLE STRESSES IN CONCRETE


STAGE COMP. STRESSESTENSILE STRESSES
AFTER 28 DAYS 2160.00 t/m² 327.67 t/m²
AFTER 56 DAYS 2160.00 t/m² 327.67 t/m²

Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
Girder CG from Bottom 1.1190 1.1190 1.1190 1.1190 1.1319 1.1345
Section Prop.

Area of Girder 0.9675 0.9675 0.9675 0.9675 1.2716 1.5946


MI of Girder 0.5454 0.5454 0.5454 0.5454 0.6046 0.6749
3
Section Modulus Zb ( mm ) 0.4874 0.4874 0.4874 0.4874 0.5342 0.5949
Section Modulus Zt ( mm3) 0.5045 0.5045 0.5045 0.5045 0.5661 0.6334
Nos of Strands 67 67 67 67 67 67
Strand
details

Centroid of strands from beam soffit (m) 0.155 0.164 0.208 0.335 0.551 1.134
Eccentricity: Beam alone (m) 0.9641 0.9551 0.9113 0.7840 0.5805 0.0002
S Prestress Force, P (t) 1000.9 997.9 987.6 974.3 954.5 913.3
Moment due to Self Wt. (t-m) 303.47 291.85 256.68 198.27 114.88 0.00
Shortening

Stress @ CG of Cables (t/m²) 2203.9 2189.2 2095.8 1820.1 1172.3 572.7


Elastic

Elastic Shortening Loss (t) 31.52 31.52 31.52 31.52 31.52 31.52
Elastic Shortening Loss (%) 3.15 3.16 3.19 3.23 3.30 3.45
Net Prestressing Force (t) 969.33 966.36 956.10 942.78 923.02 881.75
Ave. Stress in cables ( kg/mm²) 146.43 145.99 144.43 142.42 139.44 133.20
Ratio = Ave. Stress/UTS 0.773 0.770 0.762 0.751 0.736 0.703
1000Hr (%) 3.95 3.90 3.74 3.53 3.21 2.56
Relaxation of Steel

Relaxation Loss (t) 38.30 37.73 35.76 33.26 29.66 22.53


Loss betn 28 day & 56 day ( % ) 3.69 3.64 3.49 3.29 3.00 2.38
Loss betn 28 day & 56 day ( t) 35.748 35.211 33.377 31.045 27.681 21.029
Loss betn 56 day & 90 day ( % ) 4.41 4.36 4.18 3.94 3.59 2.85
Loss betn 56 day & 90 day ( t) 7.012 6.907 6.547 6.090 5.430 4.125
Loss beyond 90 day ( t) 72.14 71.06 67.36 62.65 55.86 42.44
Total Loss at Transfer (%) 6.84 6.80 6.68 6.53 6.30 5.84
Net Prestress Force (t) 933.6 931.2 922.7 911.7 895.3 860.7
Stress @ CG of Cables (t/m²) 2117.6 2104.0 2015.2 1752.0 1129.9 553.0
Creep & Shrinkage

-6
Shrinkage Strain ( 10 ) 27.731 27.731 27.731 27.731 27.731 27.731
Shrinkage Loss (t) 3.58 3.58 3.58 3.58 3.58 3.58
Creep Co-efficient 0.645 0.645 0.645 0.645 0.645 0.645
Creep Loss (t) 51.4 51.1 48.9 42.5 27.4 13.4
Net Prestress Force (t) 878.6 880.1 873.8 869.2 867.9 847.3
Total Gradual Loss-I (t) 90.7 89.8 85.9 77.1 58.7 38.0
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE CH: DESIGNED CHECKED
Title : 113+545 AND PROPOSED CH: 113+530 RSS KJM

Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
COMPOSITE SECTION
Composite CG from Bottom 1.6282 1.6282 1.6282 1.6282 1.5587 1.5010
Section Properties

Composite Section Area 1.6875 1.6875 1.6875 1.6875 1.9916 2.3146


MI of Composite Section 1.1362 1.1362 1.1362 1.1362 1.2484 1.3662
Section Modulus Zb ( mm3) 0.6978 0.6978 0.6978 0.6978 0.8009 0.9102
Section Modulus Ztg ( mm3) 1.9871 1.9871 1.9871 1.9871 1.9467 1.9544
3
Section Modulus Zts ( mm ) 1.4260 1.4260 1.4260 1.4260 1.4411 1.4785
Eccentricity: Beam + Slab (m) 1.4734 1.4643 1.4205 1.2932 1.0073 0.3666
Moment due to Deck Slab (t-
234.66 225.28 197.25 150.46 84.91 0.00
Moment

m)
(t-m)

Moment due to SIDL (t-m) 207.00 211.60 192.62 150.44 85.79 0.00
Moment due to Diaphragm (t-
13.25 9.89 6.83 4.18 2.04 0.00
m)
Stress @ CG of Cables (t/m²) 1707.1 1751.4 1777.2 1677.5 1185.6 531.4
Creep & Shrinkage

Shrinkage Strain ( 10-6) 24.780 24.780 24.780 24.780 24.780 24.780


Shrinkage Loss (t) 3.20 3.20 3.20 3.20 3.20 3.20
Creep Co-efficient 0.164 0.164 0.164 0.164 0.164 0.164
Creep Loss (t) 10.5 10.8 11.0 10.3 7.3 3.3
Net Prestress Force (t) 857.9 859.2 853.1 849.6 852.0 836.7
Stress @ CG of Cables (t/m²) 1363.2 1403.5 1465.8 1449.5 1088.4 524.8
Creep & Shrinkage

-6
Shrinkage Strain ( 10 ) 209.195 209.195 209.195 209.195 209.195 209.195
(long term)

Shrinkage Loss (t) 27.00 27.00 27.00 27.00 27.00 27.00


Creep Co-efficient 0.969 0.969 0.969 0.969 0.969 0.969
Creep Loss (t) 49.7 51.2 53.4 52.8 39.7 19.1
Net Prestress Force (t) 709.0 710.0 705.3 707.1 729.4 748.1
Total Gradual Loss-II (t) 20.7 20.9 20.7 19.6 15.9 10.6
Total Gradual Loss-III (t) 148.8 149.2 147.8 142.5 122.5 88.6

STRESS AT TRANSFER
stop of beam (t/m²) 601.51 578.48 508.77 392.99 202.93 0.00
ses Prestr to DL
Cumu ses Stres

due
ses

sbottom of beam (t/m²) -622.64 -598.80 -526.64 -406.80 -215.06 0.00


stop of beam (t/m²) -850.53 -830.52 -738.78 -490.59 -220.56 552.70
Stres

lative due

ess
to

sbottom of beam (t/m²) 2919.41 2892.45 2775.90 2490.98 1728.87 553.24


stop of beam (t/m²) -249.02 -252.05 -230.02 -97.60 -17.63 552.70
Stres

sbottom of beam (t/m²) 2296.76 2293.65 2249.26 2084.18 1513.81 553.24


STRESS AFTER GRADUAL LOSS-I( at 56 th day)
stop of beam (t/m²) 79.60 77.22 66.34 40.14 14.02 -23.84
Loss-I
Stres

due
ses

to

sbottom of beam (t/m²) -273.21 -268.92 -249.28 -203.81 -109.91 -23.86


stop of beam (t/m²) -169.42 -174.83 -163.67 -57.46 -3.61 528.86
Cumul

Stress
ative

es

sbottom of beam (t/m²) 2023.55 2024.72 1999.97 1880.37 1403.90 529.38


STRESS AFTER DECK & DIAPHRAGM
stop of slab (t/m²) - - - - - -
Stresses

Deck,Dp
due to

stop of beam (t/m²) 491.38 466.13 404.51 306.51 153.59 0.00


h

sbottom of beam (t/m²) -508.65 -482.51 -418.72 -317.28 -162.78 0.00


stop of slab (t/m²) - - - - - -
Cumulati

Stresses

stop of beam (t/m²) 321.96 291.30 240.83 249.05 149.98 528.86


ve

sbottom of beam (t/m²) 1514.90 1542.21 1581.25 1563.08 1241.12 529.38


STRESS AFTER GRADUAL LOSS-II( at 90 th day)
stop of beam (t/m²) 18.19 17.96 15.99 10.21 3.81 -6.64
Loss-
Stres

due
Cumul ses

to

II

sbottom of beam (t/m²) -62.44 -62.56 -60.10 -51.86 -29.85 -6.65


stop of beam (t/m²) 340.15 309.27 256.83 259.27 153.79 522.22
Stress
ative

es

sbottom of beam (t/m²) 1452.46 1479.66 1521.16 1511.23 1211.27 522.73


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT SCHEDULE CH: DESIGNED CHECKED
Title : 113+545 AND PROPOSED CH: 113+530 RSS KJM

Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
STRESS AT SERVICE
stop of slab (t/m²) 145.16 148.39 135.08 105.50 59.53 0.00
Cumulati Stresses
due to
SIDL

stop of beam (t/m²) 104.17 106.48 96.93 75.71 44.07 0.00


sbottom of beam (t/m²) -296.64 -303.23 -276.03 -215.59 -107.12 0.00
stop of slab (t/m²) 145.16 148.39 135.08 105.50 59.53 0.00
Stresses

stop of beam (t/m²) 444.32 415.75 353.76 334.97 197.86 522.22


ve

sbottom of beam (t/m²) 1155.83 1176.43 1245.13 1295.64 1104.16 522.73


STRESS AFTER GRADUAL LOSS-III
stop of slab (t/m²) 65.59 64.81 59.65 44.79 24.12 -16.30
Stresses

Gradual
Loss-III
due to

stop of beam (t/m²) 22.16 21.53 18.07 8.29 1.88 -21.65


sbottom of beam (t/m²) -402.49 -401.59 -388.48 -348.54 -215.66 -73.94
stop of slab (t/m²) 210.75 213.19 194.73 150.29 83.65 -16.30
Cumulati due to Cumulati

Stresses Shrinkag Stresses

stop of beam (t/m²) 466.48 437.28 371.83 343.27 199.73 500.57


ve

sbottom of beam (t/m²) 753.34 774.84 856.65 947.10 888.50 448.79


stop of slab (t/m²) -24.43 -24.43 -24.43 -24.43 -28.48 -34.94
Stresses

Diff.

stop of beam (t/m²) 80.25 80.25 80.25 80.25 76.17 72.57


e

sbottom of beam (t/m²) -33.23 -33.23 -33.23 -33.23 -37.60 -39.36


stop of slab (t/m²) 186.32 188.77 170.30 125.86 55.18 -51.25
stop of beam (t/m²) 546.72 517.53 452.08 423.51 275.90 573.13
ve

sbottom of beam (t/m²) 720.11 741.60 823.42 913.87 850.90 409.43


FINAL STRESS
Moment due to LL (t-m) 280.84 254.88 218.84 161.93 86.81 0.00
stop of slab (t/m²) 196.94 178.74 153.46 113.56 60.24 0.00
Stresses Live Load
Cumulati Stresses
due to

stop of beam (t/m²) 141.33 128.26 110.13 81.49 44.59 0.00


sbottom of beam (t/m²) -402.45 -365.25 -313.61 -232.05 -108.39 0.00
stop of slab (t/m²) 383.26 367.51 323.77 239.42 115.42 -51.25
stop of beam (t/m²) 688.05 645.79 562.21 505.00 320.49 573.13
ve

sbottom of beam (t/m²) 317.65 376.35 509.81 681.82 742.51 409.43

DIFFERENTIAL TEMPERATURE STRESSES ( WITHWITHOUT


LL) DIFFERENTIAL SETTLEMENT
Section From Support Mid Span 0.4L 0.3L 0.2L 0.1L Support
stop of slab (t/m²) 272.10 272.10 272.10 286.43 286.43 286.43
Stresses
due to Cumulati due to

temp. Stresses temp.

stop of beam (t/m²)


+ve

diff.

-77.47 -77.47 -77.47 -63.38 -63.38 -63.38


sbottom of beam (t/m²) 110.66 110.66 110.66 122.46 122.46 122.46
stop of slab (t/m²) 655.37 639.61 595.87 525.84 401.84 235.18
stop of beam (t/m²) 610.58 568.33 484.74 441.62 257.11 509.75
ve

sbottom of beam (t/m²) 428.31 487.01 620.47 804.27 864.97 531.89


stop of slab (t/m²) -148.34 -148.34 -148.34 -159.36 -159.36 -159.36
Stresses

stop of beam (t/m²)


diff.

61.05 61.05 61.05 49.39 49.39 49.39


-ve

sbottom of beam (t/m²) -165.21 -165.21 -165.21 -183.13 -183.13 -183.13


stop of slab (t/m²) 234.92 219.16 175.43 80.05 -43.95 -210.61
Cumulati

Stresses

stop of beam (t/m²) 749.10 706.84 623.26 554.39 369.88 622.52


ve

sbottom of beam (t/m²) 152.44 211.14 344.60 498.68 559.38 226.30


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM
10 CHECK FOR ULTIMATE STRENGTH

In the present calculation of the ultimate moment capacity of the composite


section, the pre-strain in the concrete, due to the prestress is ignored.

The pre-strain in the strand is determined for the condition after all losses have
occurred.

The strain in the diagram are the additional strains due to loads. Hence the pre-
strain has to be added to the strand strain at each level to obtain the total strain.

The strain at the top of the slab is taken as 0.0035, the failure strain of concrete.
Ultimate failure is by crushing of the concrete, not by yielding of the strands.
Stress

IRC:112-2011
Figure 6.3
1407 0.87fp/gm = 0.87 * 1,859.41 / 1.15 = 1406.69 N/mm²

113.18

1294 0.8fp/gm = 1293.50 N/mm²

Strain
3

8
58

66

29
00

00

01
0.

0.

0.

Prestrain in strands,

e pc = Pf / E s As e pd = f pd / E s

= 675.29 / ( 195000 x 4 x 98.8 ) = 1,406.69 / 195000

= 0.00876 = 0.00721
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

Try neutral axis = 0.190 m from top of section # NA


GE 0.0035

Strain in strands, compatible with failure strain


of 0.0035 in concrete at top of section :

e1 = 0.00876 + ( 2.110 / 0.190 ) x 0.0035

= 0.04772 > 0.00721

0.190 m
e2 = 0.00876 + ( 2.110 / 0.190 ) x 0.0035

= 0.04772 > 0.00721

e3 = 0.00876 + ( 2.110 / 0.190 ) x 0.0035

= 0.04772 > 0.00721

e4 = 0.00876 + ( 1.910 / 0.190 ) x 0.0035

1.755
= 0.04402 > 0.00721

1.755
e5 = 0.00876 + ( 1.755 / 0.190 ) x 0.0035
9

= 0.04116 > 0.00721

1.755
8

1.755
1.755
1.910
2.110
2.110
2.110
7

Stresses from stress / strain curve are :

s1 = 1,406.69 = 1406.69 N/mm²


s2 = 1,406.69 = 1406.69 N/mm²
s3 = 1,406.69 = 1406.69 N/mm²
s4 = [ ( 0.04402 - 0.00663 ) / ( 0.01298 - 0.00663 ) ] x 113.18 + 1,293.50 = 1960.11 N/mm²

Forces:
T1 = 19 x 98.8 x 1,406.69 /1000 = 2640.63 kN
T2 = 19 x 98.8 x 1,406.69/1000 = 2640.63 kN \ ST = 9858.48 kN
T3 = 19 x 98.8 x 1,406.69/1000 = 2640.63 kN
T4 = 10 x 98.8 x 1,960.11/1000 = 1936.59 kN
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-06 (R0) 19.3.19

Concrete Stresses & Forces :


1. Rectangular Part of stress block in top slab
3.200 m 0.446 fcu
= 3/7 x 0.1896 = 0.0813 m

0.225
1.000 2. Parabolic Part of stress block in top slab

= 0.189619596224083
= 0.1084
- 0.0813
m

-0.035 m
3. Parabolic Part of stress block in top flange of girder

= 0.1896 - 0.225= 0.0000 m

Strain at bottom of Slab =0.0035 x ( 1 - 0.225 / 0.1896= )-0.00065

  e 
2

Correspondinng stress at bottom of slab f c = f cd 1  1   
cb
  ec  
 
= 0.446 x 45 [ 1 - ( 1 - -0.00065/ 0.002 )² ]
= 0.00 MPa

C1 = 0.446 x 45 x 1000 x 3.2 x 0.0813 = 5219.2 kN

C2 = 0.00 x 1000 x 3.2 x 0.1084 + 2/3 ( 0.446 x 45 - 0.00 ) x 1000 x 3.2 x 0.1084

= 0.0 kN + 4639.3 kN = 4639.3 kN

C3 = 2/3 x 0.00 x 1000 x 1 x 0.0000 = 0.0 kN

\ SC = 5,219.2 + 4,639.3 + 0.0 = 9858.5 kN \ ST = SC

Taking moments of all forces about neutral axis :

MT = ( 2,640.63 x 2.110 ) + ( 2,640.63 x 2.110 ) + ( 2,640.63 x 2.110 )

+ ( 1,936.59 x 1.910 ) + ( 0.00 x 1.755 ) + ( 0.00 x 1.755 )


+ ( 0.00 x 1.755 ) + ( 0.00 x 1.755 ) + ( 0.00 x 1.755 )
+ ( 0.00 x 0.000 ) + ( 0.00 x 0.000 ) + ( 0.00 x 0.000 )

= 20417.84 kN.m
MC = ( 5,219.20 x 0.149 ) + ( 0.00 x 0.054 )+ ( 4,639.29 x 0.068 ) + ( 0.00 x 0.000 )
= 1869.36 kN.m

\ Ultimate Moment of Resistance = 20,417.84 + 1,869.36 = 22287.20 kN.m


Max. ULS Moment

= [ 303.47 x 1.35 + 234.66 x 1.35 + 13.25 x 1.35 + 127.73 x 1.35 + 79.27 x 1.75 + 280.84 x 1.5 ] x 10
= 15615.86 kN.m < 22287.20 kN.m O.K.
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA)
06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM
11 C H E C K F O R S H E A R ( ULS )

Grade of Concrete = M 45 Grade of Shear r/f = Fe 500


f ctk .05
Permissible Tensile stress = f ctd = = 1.53 MPa f ctk ;0.05 = 0.7 ( f ck  10) acw = 1
[ Eq.A2-3, IRC:112-2011]
1.5

af ck 0.67 x 45
Design Concrete Strength = f cd = = = 20.10 MPa
gm 1.5
[ Fig.6.5, IRC:112-2011]

Strength Reduction Factor =  f  45


 1 = = 0.61 ck  = 0.6 1 - = 0.513 MPa
[ Eq.10.6, IRC:112-2011]
 310  310

For Cracked Section :


200 3 1
K =1  2.0 = 1.3 Eq. 10.2 min = 0.031K 2
f ck 2 = 0.307 Eq. 10.3
d

Sample Calculations at Support section :


Shear Forces at Support Sectional Properties
Factors V Total V Girder Composite
(Ton) (Ton) Area (m²) 1.5946 2.3146
Self Weight of Girder 1.35 44 58.8 CG from bottom (m) 1.1345 1.5010
DL due to Slab+dph 1.35 29 38.9 eccentricity of cable (m) 0.0002 0.3666
SIDL 1.35 20 26.8 Zt (m3) 0.6334 1.4785
WC 1.75 6 10.5 Zb (m3) 0.5949 0.9102
Live Load 1.5 25 37.6 MI (m4) 0.6749 1.3662
Total Ult. Shear 172.7

Prestress After immediate losses = 8473.04 kN Prestress After all losses = 8367.05 kN
Prestress loss on composite section = 105.99 kN

Average Compressive Stress =P/A - DP/Ac= 8,473.04 / 1.5946 - 105.99 / 2.3146= 5267.79 kN/m²

Top fibre stress due to Prestress

P P.e DP.ec 8473.04 8,473.04 x 0.0002 105.99 x 0.3666


=   = - + = 5.34 MPa
A Zt Z ct 1.5946 0.6334 1.4785

Bottom fibre stress due to Prestress

P P.e DP.eb 8473.04 8,473.04 x 0.0002 105.99 x 0.3666


=   = + - = 5.27 MPa
A Zb Z cb 1.5946 0.5949 0.9102

As applied moment at Support section is zero,

Resultant stress due to prestress and applied moment = 5.27 MPa > 1.53 MPa
permiss. Tensile Stress
Hence Section is Un cracked

Vertical component of Prestress Force= 1611.32 kN


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA)
06 (R0)
19.3.19

Net Ultimate Shear Force =1,726.81 - 1,611.32 = 115.49 kN

S = Ax = First Moment of the area above CG about CG= 0.8346 m3

Width of web = 700 - [ 0.5 x 95 x 1 ] bw = 652.50 mm

Ibw 1.3662 x 652.5


= = 1.068 m²
S 0.8346

1.529² + ( 5.27 x 1.529 ) = 3223.89 kN/m²


f ctd2  s cp . f ctd =

I .bw
Shear Capacity = f ctd2  s cp . f ctd = 3443.64 kN > 115.49 kN
[ Eq.10.4, IRC:112-2011] S
Shear Reinforcement is not required

= 8367.0 kN
Total Tensile Force due to Prestress
GET NA
Concrete Stresses & Forces : Try neutral axis = 0.161 m from top of section
1. Rectangular Part of stress block in top slab
3.200 m 0.446 fcu
0.225 = 3/7 x 0.161 = 0.0690 m

1.000 2. Parabolic Part of stress block in top slab


-0.064 m

= 0.161 - 0.0690 = 0.0920 m

3. Parabolic Part of stress block in top


flange of girder
= 0.161 - 0.225 = 0.0000 m

Strain at bottom of Slab = 0.0035 x ( 1 - 0.225 / 0.161 ) = -0.001393339


e cb    
2

Correspondinng stress at bottom of slabf c = f cd 1  1  e  
 c 
 
= 0.446 x 45 [ 1 - ( 1 - -0.00139/ 0.002 )² ]

= 0.00 MPa

C1 = 0.446 x 45 x 1000 x 3.2 x 0.0690 = 4429.6 kN

C2 = 0.00 x 1000 x 3.2 x 0.0920 + 2/3 ( 0.446 x 45 - 0.00 ) x 1000 x 3.2 x 0.0920

= 0.0 kN + 3937.4 kN = 3937.4 kN

C3 = 2/3 x 0.00 x 1000 x 1 x 0.0000 = 0.0 kN

\ SC = 4,429.6 + 3,937.4 + 0.0 = 8367.0 kN \ ST = SC

\ Lever Arm (z)= 2.425 - 1.1343 - 0.16/2 = 1.2102 m


Moment of Resistance = 8,367.05 x 1.2102 = 10125.84 kN.m
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA)
06 (R0)
19.3.19

Max. Shear Resistance : [Cl. 10.3.3.2, IRC:112-2011]

VRd . max = a cw .bw .z. 1 .


f cd 20.10 taking q = 45 ˚
=1 x 652.5 x 1,210 x 0.513 x
cot q  tan q  1.000 + 1.000

[ Eq.10.8, IRC:112-2011] = 4070.4 kN > 115.5 kN Actual shear force

Calculation of shear reinforcement [Cl. 10.3.3.2, IRC:112-2011]

Asw Asw 115.5 x 1000


VRD.s = z. f ywd . cot q = = 0.219 mm²/mm
s s 1,210.2 x 0.87 x 500 x 1.00

[ Eq.10.7, IRC:112-2011]

Asw 0.072 f ck 0.072 x 45 x 652.5


Minimum Shear Reinforcement : = bw = = 0.630 mm²/mm
s f yk 500
[ Eq.10.20, IRC:112-2011]

Hence, Provide 4 Legged 12 mm dia stirrup at a spacing of 200 mm c/c ( 2.26 mm²/mm )
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA)
06 (R0)
19.3.19

Design for Ultimate Shear Force at various sections

Section Distance from


0M 3.38 M 6.16 M 9.54 M 12.62 M 15.7 M
Support
VDL (kN) 435.27 319.06 227.32 151.89 75.43 0
VSL (kN) 288.48 226.30 167.18 108.05 48.93 34.66
VSIDL (kN) 198.78 144.75 89.70 31.60 26.50 30.58
VWC (kN) 60.14 44.85 29.56 13.25 9.17 0.00
VLL (kN) 250.76 225.28 195.72 168.20 135.58 147.81
Shear Force (kN) 1726.81 1348.06 998.98 669.06 423.09 309.79
Width of Web (mm) 652.5 452.5 252.5 252.5 252.5 252.5
Prestress after all losses
6801.17 6631.26 6428.12 6411.93 6454.17 6445.80
:P (kN)
Cable eccentricity -Girder
0.0002 0.5805 0.7840 0.9113 0.9551 0.9641
section (m)
Cable eccentricity -
0.3666 1.0073 1.2932 1.4205 1.4643 1.4734
composite section (m)
Area of Section:Girder
1.5946 1.2716 0.9675 0.9675 0.9675 0.9675
(m²)
Area of Section :
2.3146 1.9916 1.6875 1.6875 1.6875 1.6875
Composite(m²)
MI of Comp. Sect. (m4) 1.3662 1.2484 1.1362 1.1362 1.1362 1.1362
Avg Comp. stress:P/A
4.27 5.21 6.64 6.63 6.67 6.66
(MPa)
Zt (m3) 0.6334 0.5661 0.5045 0.5045 0.5045 0.5045
Girder Alone
Zb (m3) 0.5949 0.5342 0.4874 0.4874 0.4874 0.4874
Composite Ztc (m3) 1.4785 1.4411 1.4260 1.4260 1.4260 1.4260
section Zbc (m3) 0.9102 0.8009 0.6978 0.6978 0.6978 0.6978
Top Fibre Stresses due to
Prestress:P/A - Pe/Zt 4.26 -1.58 -3.34 -4.95 -5.55 -5.66
+DP/Ztc (MPa)
Bottom Fibre Stresses
due to Prestress:P/A + 4.27 12.42 16.98 18.62 19.32 19.41
Pe/Zb (MPa) : scp
scp = min( scp,0.2fcd) 4.02 4.02 4.02 4.02 4.02 4.02

Ultimate Moment (t.m) 0.00 492.32 875.33 1148.52 1309.26 1373.67


Stress at bottom due to
0.00 6.15 12.54 16.46 18.76 19.69
moment (MPa)
Resultant Stress at bottom
due to P & Applied M 4.02 -2.13 -8.52 -12.44 -14.74 -15.67
(MPa)
Comparing with Allow.
Un Cracked Cracked Cracked Cracked Cracked Cracked
Tensile stress
Vertical compo. of P (kN) 1611.32 818.81 384.46 195.91 46.47 0.00

Net ULT. Shear : VED(kN) 115.49 1348.06 998.98 669.06 423.09 309.79
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA)
06 (R0)
19.3.19

Section Distance from


0M 3.38 M 6.16 M 9.54 M 12.62 M 15.7 M
Support
θ 45.0 45.0 45.0 45.0 45.0 45.0

S = A¯x = moment of area


0.83 0.79 0.72 0.72 0.72 0.72
above CG about CG(m3)

I.bw/S (m²) 1.07 0.72 0.40 0.40 0.40 0.40


2
f ctd  s cp . f ctd
2976.62 - - - - -
in kN/m²
I .bw 2
f ctd  s cp . f ctd
S
3179.51 - - - - -
Shear Capacity for un
cracked (kN)
Shear Capacity for
_ 1170.68 781.82 780.31 784.24 783.46
cracked (kN)
Not Not Not Not
Shear R/f Required Required
Required Required Required Required
NA From Top (m) 0.161 0.161 0.161 0.161 0.161 0.161

Compressive Force (kN) 8367 8367 8367 8367 8367 8367

αcw 1.00 1.00 1.00 1.00 1.00 1.00


z 1.21 1.79 2.01 2.14 2.18 2.19
Max. allowable shear
4070 4182 2616 2781 2838 2850
force(kN)
Section Size OK OK OK OK OK OK
Asw/S - 1.728 1.143 - - -
Min. Asw/S 0.63 0.44 0.24 0.24 0.24 0.24
Bar dia 12 12 12 12 12 12 12
No. of Legs 4 2 2 2 2 2 2
Spacing 200 200 200 200 200 200
Asw/S pro 2.261 2.261 1.130 1.130 1.130 1.130
STATUS Safe Safe Check R/F Safe Safe Safe
Add. Tensile Force:
DFtd = 0.5VEd cot q  cot a  57.75 674.03 499.49 334.53 211.54 154.89

Spare M.R Available, kN.m* 10125.84 9633.52 9250.52 8977.32 8816.59 8752.17
Spare Force at section, kN 8367.05 5372.65 4603.31 4201.20 4043.20 3997.01
STATUS Safe Safe Safe Safe Safe Safe

* MR at support being the least value is considered conservatively


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-
06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM
12 DESIGN OF LONGITUDINAL (INTERFACE) SHEAR
This section contains the check for Interface shear developed at the junction between Precast
girders and cast-in-situ concrete. The check is performed as per Section 10.3.4 of IRC:112-2011.

The Interface Shear stress should satisfy the following condition:


VEdi  VRdi VEdi = Interface Shear stress
VRdi = Resisting capacity at the section

VEd
VEdi = 
zbi

 = Ratio of the Longi. Force in the new concrete and the total Longi. Force
Ved = Transverse shear force
z = Lever Arm bi = width of the interface

VRdi = m s n  r f yd m sin a  cos a  0.5 f cd [ Eq.10.21, IRC:112-2011]

where, m = 0.6 2

r = As/Ai As = Area of r/f crossing the Joint


Ai = Interface area of the Joint

Design for Interface Shear near support

VSIDL = 199 x 1.35 = 268.35 kN z = 1290.7 mm bi = 1000.0 mm


VWC = 76.5 x 1.75 = 133.79 kN = 0.31
β = ( 198.776758409786 + 250.764525993884 ) / ( 1050.96839
VLL = 251 x 1.5 = 376.15 kN but taken = 1
VEd = 778.29 kN fyd = 0.87fyk = 435.00 MPa
fcd = 0.67fck/1.5= 20.10 MPa

v= 0.51 MPa
778.29
VEdi = 1 x = 0.60 MPa
1290.67 x 1000

As = 2262 mm² (provide 2 Legged 12 dia 100 c/c) Spare r/f from vertical shear
Aj = 1000000 mm² ρ = As/Aj = 0 = 1632 mm²

VRdi = minimum of 0.004 x 435.00 [ 0.6 sin 90 + cos90 ] & 0.5 x 0.51 x 20.10
= 1.02 MPa & 5.15 MPa
= 1.02 MPa
msn is neglected
conservatively in calculation
Since Vedi < VRdi Section is Safe of VRdi
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-1141-
06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

Design for Ultimate Shear at various sections

Section
Distance
0M 3.38 M 6.16 M 9.54 M 12.62 M 15.7 M
from
Support
VSIDL (kN) 198.8 198.8 144.8 89.7 31.6 26.5
VWC (kN) 76.5 60.1 44.9 29.6 13.3 9.2
VLL (kN) 250.8 225.3 195.7 168.2 135.6 147.8
VEd (kN) 778.3 711.5 567.5 425.1 269.2 273.5

bi 1000 1000 1000 1000 1000 1000

z (m) 1.291 1.874 2.090 2.217 2.261 2.270


Aj (mm²) 1000000 1000000 1000000 1000000 1000000 1000000
Spare r/f from
vertical shear 1630.50 1823.69 886.49 886.49 886.49 886.49
(mm²)
Bar Dia 12 12 12 12 12 12
No of legs 2 2 2 2 2 2
Spacing 100 100 100 100 100 100
r = As/Aj 0.0039 0.0041 0.0031 0.0031 0.0031 0.0031
β 1.000
vEdi ( Mpa) 0.603 0.380 0.272 0.192 0.119 0.120
vRdi (Mpa) 1.02 0.59 0.59 0.59 0.59 0.59
As,pro (mm²) 2261.95 2261.95 2261.95 2261.95 2261.95 2261.95
Min. Area
=0.15% 1500
(mm²)
OK OK OK OK OK OK
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA)
06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530
RSS KJM
3200

214 225
13 C H E C K F O R TORSION ( ULS) @ End section

Grade of Concrete = M-45 Grade of R/f = Fe-500 955

Design Torsional Moment T=ed 172.9 kN.m

1986
700
The angle of inclination of concrete strut q= 45 °

0
STEP- II : Compute Torsion shared by verious component of the Beam 0

Deck Slab Ixx = k . Bmax . bmin3 = 0.5 x 0.32 x 3200 x 225 3


= 5.81E+09 mm4

Top Flange Ixx = k . Bmax . bmin3 = 1 x 0.286 x 955 x 214 3


= 2.68E+09 mm4

Web Ixx = k . Bmax . bmin3 = 1 x 0.259 x 1986 x 700 3


= 1.77E+11 mm4

Bott. Flange Ixx = k . Bmax . bmin3 = 1 x 0.000 x 0 x 0 3


= 0.00E+00 mm4
S 1.85E+11 mm4
The torsion will be shared as follows:

Deck Slab TEd = 5.42 kN.m Top Flange TEd = 2.50 kN.m

Web TEd = 164.93 kN.m Bott. Flange TEd = 0.00 kN.m

Top Flange

A 955 x 214
Thickness of the box section ( t ) = =
u 2 ( 955 + 214 )

= 87.4 mm < 116.0 mm take 116.0 mm

Area within centreline ( Ak) = ( 955 - 116.0 ) x ( 214 - 116.0 )

= 82222.0 mm²

STEP- III : Check adequacy of the concrete section

TRd . max = 2 a cw f cd t ef .i Ak sin q cos q = 2 x 0.513 x 20.07 x 116.0 x 82,222.0 x sin45 x cos45

= 98.18 kN.m < 2.50 kN.m


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-1141-
PACKAGE-3 (LALGANJ-HANUMANHA)
06 (R0)
19.3.19

STEP- V : Compute the trans. Reinforcement required to resist Torsion

Asw TEd 2.50 x 1.00E+06


= =
82222 x 435 x 1
= 0.035 mm²/mm
s 2 Ak f yd cot q 2x

STEP- VII : Additional Longitudianl Reinforcement Required

TEd u k 2.50 x 1.00E+06 2338 10 dia @ 200 mm


Asl = cot q = x 1.00
2 Ak f yd 2x 82222 x 435 x
12 dia 12 No.s
= 81.74 mm²

Provide 12 mm dia bars 12 No.s ( 1357 mm²/m )

Top Flange Web Bott. Flange


TEd 2.50 kN.m 165 kN.m 0 kN.m
A 204370 1390200 0
u 2338 5372 0
t = A/u 112.0 258.8 0.0
Ak 85986 762070 0
TRd,max 99.14 2030.11 0.00
Asw/s 0.033 0.25 0.00
10 dia- 200 c/c 12 dia- 100 c/c 12 dia- 100 c/c

Asw/s provd. 0.79 2.26 2.26


Asl/s 78 1336 0
12 dia- 12 no.s 12 dia- 36 no.s 10 dia-

Asl/s provd. 1357.17 4071.50 0.00

STEP- VI : Compute total trans. Reinforcement required to resist Shear + Torsion in Web

= 630.30 + 2x 248.76 = 1127.83mm²/m

Provide 4 Legged 12 mm dia stirrup at a spacing of 200 mm c/c ( 2262 mm²/m )

STEP- III : Check adequacy of the concrete section

TRd . max = 2 a cw f cd t ef .i Ak sin q cos q = 2 x 0.513 x 20.07 x 258.8 x 7,62,070.3 x sin45 x cos45

= 2030.11 kN.m > 164.93 kN.m

TEd VEd 164.93 115.49


 = + = 0.11 < 1 Hence O.K.
2030.11 4070.44
TRd . max VRd . max
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

14.0 DESIGN OF END BLOCK

14.1 CALCULATIONS OF SPALLING R/F BEHIND ANCHORAGE : ( As per Annex J of EC2-2)


& Cl. 13.5.1.1, IRC 112)
CABLE NO.- 1

Using DYNAMIC Prestressing System,

Grade of Concrete = M45

Fcj = 1 x 450 = 450.00 kg/cm²

For, 19 T 13 strand, Anchorage Bearing Plate Size = 245 mm x 245 mm

width of Prism = 400 mm

Side of End Block = 2Ypo = 245 mm

Side of Loaded Area= 2Yo = 400 mm

From Table 13.1, IRC : 112 - 2011 Ypo

Ypo
Y 122.50
for po = = 0.613
Yo 200.00
Ypo Ypo

Fbst
= 0.155
Pk
Yo Yo
Max. Prestressing Force @ anchorage / cable

Pk = 148 x 98.8 x 19 x 10^-3 Fbst

= 277.83 Ton

Fbst = 0.155 x 277.83


Pk
= 43.06 Ton

Reinforcement :

= 43.06 x 10^3 / 0.87 x 4150 0.2Yo

2Yo
= 11.93 cm²

Provide 12 mm dia mesh - 4 Legged 3 Nos. [ 13.57 cm² ]


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB FOR DOCUMENT NO. DATE
Job : VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
PACKAGE-3 (LALGANJ-HANUMANHA) 18133-MJ-PS-DC-
1141-06 (R0)
19.3.19

14.2 CALCULATIONS OF STRESS BEHIND ANCHORAGE : ( As per Annex J of EC2-2)

C x C' = Bearing area of anchorage = 400 mm 400 mm = 160000 mm²

Pmax = = 204.71 Ton ( for Cable 1, as having least


Max. force applied to the cable
concrete area)
s1 = Pmax/(C x C') = 12.79 MPa

Permissible Compressive stress behind anchorage


= 0.6 x fck(cyl)
= 0.60 x 36 = 21.60 MPa
> 12.79 MPa
O.K.

14.3 CALCULATIONS OF BURSTING R/F

Pmax = = 277.83 Ton


Max. force applied to the cable

fyk = 500 MPa fyd = 0.87 x 500 = 435 MPa

As = 0.19 x 2778.26 x 103/ 435 x 1.1 = 1335 mm²

Strickly, a check of crack width would be necessary. To avoid such checks, stress in r/f can
be restrictired to 250 MPa.

As = 0.19 x 2778.26 x 103/ 250 x 1.1 = 2323 mm²

Spiral R/f provided as per catalogue of M/s Dynamic Prestress for 19T13 cable

= 1x 16 dia 12 turns = 2413 mm² O.K.

16.4 CALCULATIONS OF CONCENTRATED FORCE RESISTANCE

Acl
Frdu = Aco fcd ≤ 3 fcd Aco
Aco

fcd = 30.00 MPa


Aco = 60025 mm2
Acl = 60025 mm2
Frdu = 1800750 MPa ≤ 5402250 MPa O.K.
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER
DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC
Job : MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA) 1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM
15.0 MINIMUM R E I N F O R C E M E N T ( AT MID SECTION )

[ As per IRC-112, Cl.16.5.4(2) Maximum


]: spacing of reinforcement = 200 mm

The quantity of untensioned steel required for are calculated as per Cl. 16.5.4 ( 4 ) of I.R.C.-
112-2011 . As.sur =0.01 Act.ext

1450
(a) Web perimeter= 1450 mm each face

Ast = 40 x 1450 x 0.01 = 580 mm² 300

Vertical r/f:
Provide 12 dia 1 L stirrups at 200 mm c/c ( Ast provided=565 mm² )

Hori.r/f:

Provide 12 dia 9 Nos ( Ast provided=1018 mm² ) Total = 1583 mm² )

(b) TOP FLANGE perimeter= 300 mm 1000

150
Ast = 40 x 300 x 0.01 = 120 mm²
150

Orthogonal r/f: 300

Provide 12 dia 1 L stirrups at 100 mm c/c ( Ast provided=1131 mm² )

Parallel r/f:

Provide 12 dia 12 Nos ( Ast provided=1357 mm² ) Total = 2488 mm² )

300
(c) BOTTOM BULB perimeter= 1600 mm 150

Ast = 1600 x 40 x 0.01 = 640 mm²


300

700

Orthogonal r/f:
Provide 10 dia 2 L stirrups at 200 mm c/c ( Ast provided=785 mm² )

Parallel r/f:

Provide 12 dia 4 Nos ( Ast provided=905 mm² )


+ 12 dia 4 Nos
Total = 1690 mm² )
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER
DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC
Job : MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA) 1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

Transvers R/f :
[ As per IS-1343-2014, Cl.18.6.3.2 ] :
Maximum spacing of reinforcement = 200 mm

0.2% of sectional area of web in plan for HYSD r/f.

0.2
x 300 x 1000 = 600 mm²
100

Provide 12 dia 2 L stirrups at 200 mm c/c ( Ast provided=1131 mm² )

Longitudinal R/f :
[ As per IS-1343-2014, Cl.18.6.3.3 ] :
Maximum spacing of reinforcement = 200 mm

0.15% of total concrete area for HYSD r/f, with minimum amount of 0.05% in webs on each
face.

0.05 ( Ast provided=1018 mm² )


x 2200 x 300 = 330 mm²
100 each face

0.15
x 967500 = 1451 mm²
100

Provide 12 dia 12 Nos Top Flange ( Ast provided=1357 mm² )


Provide 12 dia 8 Nos Bottom Flange ( Ast provided=905 mm² )
Total = 4298 mm² )
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER
DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
1141-06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC
DESIGNED CHECKED
Title : GIRDER AT SCHEDULE CH: 113+545 AND
RSS KJM
PROPOSED CH: 113+530
M I N I M U M R E I N F O R C E M E N T ( AT VARYING SECTION )

[ As per IRC-112, Cl.16.5.4(2) ] Maximum


: spacing of reinforcement = 200 mm

The quantity of untensioned steel required for are calculated as per Cl. 16.5.4 ( 4 ) of I.R.C.-
112-2011 . As.sur =0.01 Act.ext

1559
(a) Web perimeter= 1559 mm each face

Ast = 40 x 1558.5 x 0.01 = 623 mm² 500

Vertical r/f:
Provide 12 dia 1 L stirrups at 200 mm c/c ( Ast provided=565 mm² )

Hori.r/f:

Provide 12 dia 9 Nos ( Ast provided=1018 mm² ) Total = 1583 mm² )

(b) TOP FLANGE perimeter= 267 mm 1000

150
Ast = 40 x 266.5 x 0.01 = 107 mm²
117

Orthogonal r/f: 500

Provide 12 dia 1 L stirrups at 100 mm c/c ( Ast provided=1131 mm² )

Parallel r/f:

Provide 12 dia 12 Nos ( Ast provided=1357 mm² ) Total = 2488 mm² )

(c) BOTTOM BULB perimeter= 1450 mm 500


75

Ast = 1450 x 40 x 0.01 = 580 mm²


300

700

Orthogonal r/f:
Provide 10 dia 2 L stirrups at 200 mm c/c ( Ast provided=785 mm² )

Parallel r/f:

Provide 12 dia 4 Nos ( Ast provided=905 mm² )


+ 12 dia 4 Nos
Total = 1690 mm² )
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER
DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA) 1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC
DESIGNED CHECKED
Title : GIRDER AT SCHEDULE CH: 113+545 AND
RSS KJM
PROPOSED CH: 113+530

Transvers R/f :
[ As per IS-1343-2014, Cl.18.6.3.2 ] :
Maximum spacing of reinforcement = 200 mm

0.2% of sectional area of web in plan for HYSD r/f.

0.2
x 500 x 1000 = 1000 mm²
100

Provide 12 dia 2 L stirrups at 200 mm c/c ( Ast provided=1131 mm² )

Longitudinal R/f :
[ As per IS-1343-2014, Cl.18.6.3.3 ] :
Maximum spacing of reinforcement = 200 mm

0.15% of total concrete area for HYSD r/f, with minimum amount of 0.05% in webs on each
face.

0.05 ( Ast provided=1018 mm² )


x 2200 x 500 = 550 mm²
100 each face

0.15
x 1271625 = 1907 mm²
100

Provide 12 dia 12 Nos Top Flange ( Ast provided=1357 mm² )


Provide 12 dia 8 Nos Bottom Flange ( Ast provided=905 mm² )
Total = 4298 mm² )
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER
DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA) 19.3.19
1141-06 (R0)
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC
DESIGNED CHECKED
Title : GIRDER AT SCHEDULE CH: 113+545 AND PROPOSED
RSS KJM
CH: 113+530
M I N I M U M R E I N F O R C E M E N T ( AT SUPPORT SECTION )

[ As per IRC-112, Cl.16.5.4(2) Maximum


]: spacing of reinforcement = 200 mm

The quantity of untensioned steel required for are calculated as per Cl. 16.5.4 ( 4 ) of I.R.C.-
112-2011 . As.sur =0.01 Act.ext

1986
(a) Web perimeter= 1986 mm each face

Ast = 40 x 1986 x 0.01 = 794 mm² 700

Vertical r/f:
Provide 12 dia 2 L stirrups at 200 mm c/c ( Ast provided=1131 mm² )

Hori.r/f:

Provide 12 dia 18 Nos ( Ast provided=2036 mm² ) Total = 3167 mm² )


REHABILITATION AND UPGRADATION OF NH STRETCH UNDER
DOCUMENT NO. DATE
NHDP-IVB FOR VARANASI-HANUMANHA SECTION OF NH-7 ON
Job : EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA) 1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC
DESIGNED CHECKED
Title : GIRDER AT SCHEDULE CH: 113+545 AND PROPOSED
RSS KJM
CH: 113+530

Transvers R/f :
[ As per IS-1343-2014, Cl.18.6.3.2 ] :
Maximum spacing of reinforcement = 200 mm

0.2% of sectional area of web in plan for HYSD r/f.

0.2
x 700 x 1000 = 1400 mm²
100

Provide 12 dia 4 L stirrups at 200 mm c/c ( Ast provided=2262 mm² )

Longitudinal R/f :
[ As per IS-1343-2014, Cl.18.6.3.3 ] :
Maximum spacing of reinforcement = 200 mm

0.15% of total concrete area for HYSD r/f, with minimum amount of 0.05% in webs on each
face.

0.05 12 dia 18 Nos


x 2200 x 700 = 770 mm²
100 ( Ast provided=2036 mm² )

0.15
x 1594600 = 2392 mm²
100

Provide 12 dia 12 Nos Top Flange ( Ast provided=1357 mm² )


Provide 12 dia 8 Nos Bottom Flange ( Ast provided=905 mm² )
Total = 4298 mm² )
16.0 DEFLECTION DUE TO DEAD LOAD & SIDL

SECTION MOMENT
M.I. (m4) E ( t/m2 ) EI ( t-m2 ) M/EI REACTION
(m) (t.m) [Cl. 10.3.3.2, IRC:112-2011]
0.000 0.00 1.3662 1.28E+06 1.76E+06 0.00E+00 3.03E-04 for Creep effect,

3.380 287.62 1.2484 1.28E+06 1.60E+06 1.79E-04 7.29E-04 Ec,eff = Ecm/(1+f(a,t0))

6.160 503.34 1.1362 1.28E+06 1.46E+06 3.45E-04 1.34E-03 fa,t0) = 1.67

9.540 653.37 1.1362 1.28E+06 1.46E+06 4.48E-04 1.47E-03 Ecm= 34.31 GPa

12.620 738.61 1.1362 1.28E+06 1.46E+06 5.06E-04 1.58E-03 Ec,eff = 12.85 GPa

15.700 758.37 1.1362 1.28E+06 1.46E+06 5.20E-04 = 1284596 t-m²


Total Reaction 5.42E-03

5.20E-04 [Cl. 12.4.2(3), IRC:112-2011]


5.06E-04 for Shrinkage effect,
4.48E-04 1/rcs = ecs ae S/I
3.45E-04 ecs = 321.4 x10-6 (Ref. Annexure - II)

1.79E-04 S = 0.006 m3
0.00E+00 I = 1.136 m4
ae = 15.18
1/rcs= 2.74E-08
3.380 2.780 3.380 3.080 3.080 Deflection due to shrinkage = 0.125 * curvature x L²

Deflection = moment of M/EI diagram @ midspan = = 3.25 mm

= [ 0.005419 * 15.7 ] - [ 0.000000 * 3.38 * ( 15.7 - 3.38/2 ) ]

- [ 0.5 * ( 0.000179 - 0.000000 ) * 3.38 * ( 15.7 - (2/3)* 3.38 ) ]

- [ 0.000179 * 2.78 * ( 15.7 - 3.38 - 2.78/2 ) ]

- [ 0.5* ( 0.000345 - 0.000179 ) * 2.78 * ( 15.7 - 3.38 - (2/3) * 2.78 ) ]

- [ 0.000345 * 3.38 * ( 3.08 + 3.08 + 3.38 /2 ) ] - [ 0.5 * ( 0.000448- 0.000345 ) * 3.38 * ( 3.38 /3 + 3.08 + 3.08 ) ]

- [ 0.000448 * 3.08 * ( 3.08/2 + 3.08 ) ] - [ 0.5* ( 0.000506 - 0.000448 ) * 3.08 * ( 3.08 + 3.08/3 ) ]

- [ 0.000506 * 3.08 * 3.08/2 ] - [ 0.5* ( 0.000520 - 0.000506 )* 3.08 * 3.08/3 ]

= 0.05357241 m

= 56.82 mm ( Downward ) including shrinkage deflection


DEFLECTION DUE TO PRESTRESS

SECTION Net Prest. Addi. Loss Eccentricity Moment =


Net force (t) M.I. (m4) E ( t/m2 ) EI ( t-m2 ) M/EI Reaction
(m) force (t) (t) (m) Pxe

0.000 697.93 0.00 697.93 0.0002 0.13 0.6749 1.28E+06 8.67E+05 1.52E-07 9.03E-04

3.380 714.48 0.00 714.48 0.5805 414.73 0.6046 1.28E+06 7.77E+05 5.34E-04 1.85E-03

6.160 715.36 0.00 715.36 0.7840 560.84 0.5454 1.28E+06 7.01E+05 8.01E-04 2.94E-03

9.540 720.34 0.00 720.34 0.9113 656.45 0.5454 1.28E+06 7.01E+05 9.37E-04 2.97E-03

12.620 726.78 0.00 726.78 0.9551 694.11 0.5454 1.28E+06 7.01E+05 9.91E-04 3.06E-03

15.700 725.52 0.00 725.52 0.9641 699.50 0.5454 1.28E+06 7.01E+05 9.98E-04
Total Reaction 1.17E-02

9.98E-04
9.91E-04
9.37E-04
8.01E-04

5.34E-04
1.52E-07

3.380 2.780 3.380 3.080 3.080

Deflection = moment of M/EI diagram @ midspan =


= [ 0.011726 * 15.7 ] - [ 0.000000 * 3.38 * ( 15.7 - 3.38/2 ) ] - [ 0.5 * ( 0.000534 - 0.000000 ) * 3.38 * ( 15.7 - (2/3)* 3.38 ) ]
- [ 0.000534 * 2.78 * ( 15.7 - 3.38 - 2.78/2 ) ] - [ 0.5* ( 0.000801 - 0.000534 ) * 2.78 * ( 15.7 - 3.38 - (2/3) * 2.78 ) ]
- [ 0.000801 * 3.38 * ( 3.08 + 3.08 + 3.38 /2 ) ] - [ 0.5 * ( 0.000937- 0.000801 ) * 3.38 * ( 3.38 /3 + 3.08 + 3.08 ) ]
- [ 0.000448 * 3.08 * ( 3.08/2 + 3.08 ) ] - [ 0.5* ( 0.000506 - 0.000448 ) * 3.08 * ( 3.08 + 3.08/3 ) ]
- [ 0.000506 * 3.08 * 3.08/2 ] - [ 0.5* ( 0.000520 - 0.000506 )* 3.08 * 3.08/3 ]
= 0.11055229 m
= 110.55 mm ( Upward ) Net deflection = 56.82 - 110.55
= -53.73 mm ( Upward )
DEFLECTION DUE TO LIVE LOAD

SECTION MOMENT
M.I. (m4) E ( t/m2 ) EI ( t-m2 ) M/EI REACTION
(m) (t.m)

0.000 0.00 1.3662 3.43E+06 4.69E+06 0.00E+00 1.73E-05

3.380 43.81 1.2484 3.43E+06 4.28E+06 1.02E-05 4.41E-05

6.160 83.87 1.1362 3.43E+06 3.90E+06 2.15E-05 8.87E-05

9.540 120.80 1.1362 3.43E+06 3.90E+06 3.10E-05 1.08E-04

12.620 152.98 1.1362 3.43E+06 3.90E+06 3.92E-05 1.31E-04

15.700 179.59 1.1362 3.43E+06 3.90E+06 4.61E-05


Total Reaction 3.90E-04

4.61E-05
3.92E-05
3.10E-05
2.15E-05

1.02E-05
0.00E+00

3.380 2.780 3.380 3.080 3.080

Deflection = moment of M/EI diagram @ midspan =

= [ 0.000390 * 15.7 ] - [ 0.000000 * 3.38 * ( 15.7 - 3.38/2 ) ]

- [ 0.5 * ( 0.000010 - 0.000000 ) * 3.38 * ( 15.7 - (2/3)* 3.38 ) ]

- [ 0.000010 * 2.78 * ( 15.7 - 3.38 - 2.78/2 ) ]

- [ 0.5* ( 0.000022 - 0.000010 ) * 2.78 * ( 15.7 - 3.38 - (2/3) * 2.78 ) ]

- [ 0.000022 * 3.38 * ( 3.08 + 3.08 + 3.38 /2 ) ] - [ 0.5 * ( 0.000031- 0.000022 ) * 3.38 * ( 3.38 /3 + 3.08 + 3.08 ) ]

- [ 0.000031 * 3.08 * ( 3.08/2 + 3.08 ) ] - [ 0.5* ( 0.000039 - 0.000031 ) * 3.08 * ( 3.08 + 3.08/3 ) ]

- [ 0.000039 * 3.08 * 3.08/2 ] - [ 0.5* ( 0.000046 - 0.000039 )* 3.08 * 3.08/3 ]

= 0.00403242 m

= 4.03 mm ( Downward ) < 38.50 mm L/800 [Cl. 12.4.1(2), page 131, IRC:112-2011]
MOMENT
(kN-m) Annexure-I
STAGE - I
DL GIRDER-1 GIRDER-2 GIRDER-3 GIRDER-4 GIRDER-5
Load 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800
SW -4 1127 1945 2518 2863 2977 2863 2518 1945 1127 4 -4 1127 1945 2518 2863 2977 2863 2518 1945 1127 4 -4 1127 1945 2518 2863 2977 2863 2518 1945 1127 4 -4 1127 1945 2518 2863 2977 2863 2518 1945 1127 4 -4 1127 1945 2518 2863 2977 2863 2518 1945 1127 4
DS -2 797 1418 1862 2128 2216 2128 1862 1418 796 2 0 724 1287 1689 1930 2010 1930 1689 1287 724 0 -6 809 1442 1895 2167 2257 2167 1895 1442 809 6 2 681 1210 1587 1814 1889 1814 1587 1210 681 -2 4 833 1476 1935 2210 2302 2210 1935 1476 833 -4
DIA 1 19 41 67 97 130 97 67 41 19 -1 -2 91 179 261 339 412 339 261 179 91 2 1 60 122 186 253 322 253 186 122 60 -1 -2 91 179 261 339 410 339 261 179 92 2 -1 20 41 67 97 130 97 67 41 20 1
STAGE - II
SIDL+WC & FPLL
SIDL_FP -5 259 438 528 524 428 524 529 441 262 5 13 99 182 266 358 456 358 265 179 95 -13 12 126 231 325 410 486 409 323 228 123 -12 16 231 427 602 763 911 762 601 424 227 -16 -19 568 991 1250 1339 1253 1341 1255 997 576 19
WC_FP 1 246 440 582 672 711 672 582 440 246 -1 -2 260 463 605 687 709 687 605 463 261 2 -2 260 463 604 684 703 684 604 463 261 2 -1 246 438 574 655 679 655 574 438 246 1 4 228 404 533 614 648 614 532 404 227 -4
FPLL 2 -10 -25 -41 -58 -76 -58 -41 -25 -11 -2 1 2 3 2 2 1 2 2 3 2 -1 2 27 50 70 90 107 89 70 49 26 -2 4 68 128 182 233 281 233 182 127 67 -4 -8 173 306 390 425 406 425 392 308 176 8
LL
(w/O Impact Factor)
[3L:A]-L -60 1021 1882 2483 2819 2869 2656 2262 1686 929 46 -59 955 1716 2195 2425 2378 2270 1985 1512 850 61 -65 846 1465 1812 1916 1780 1764 1595 1246 713 63 -15 383 721 976 1140 1210 1087 908 667 365 18 29 151 248 319 374 418 373 314 240 141 -29
[3L:A]-R 26 338 623 873 1082 1261 1071 854 608 327 -25 -56 731 1279 1605 1731 1645 1600 1424 1099 624 54 -64 890 1558 1940 2068 1958 1917 1717 1330 755 63 -65 864 1518 1901 2051 1954 1903 1694 1309 744 58 35 566 1076 1477 1743 1901 1679 1378 1003 550 -29
[1L:A]+[1L:70R]_L -48 1181 2142 2813 3188 3409 3075 2558 1884 1031 44 -71 1161 1983 2508 2722 2574 2833 2708 2223 1346 78 -28 613 1120 1509 1771 1911 1833 1595 1239 703 24 12 214 415 613 811 1013 811 611 415 213 -14 30 63 73 63 48 -75 49 63 70 55 -30
[1L:A]+[1L:70R]_R 30 207 359 483 586 671 583 478 352 198 -31 13 379 731 1063 1371 1656 1389 1100 766 395 -14 -75 1081 1781 2199 2262 2005 2340 2331 1950 1213 84 -52 981 1660 2055 2255 2221 2255 2059 1631 936 51 42 672 1270 1740 2055 2305 1990 1601 1139 608 -27
[1L:70R]_L -53 1001 1797 2386 2780 2902 2793 2437 1898 1092 58 -48 830 1440 1838 1988 1890 1995 1850 1517 903 53 18 269 516 751 978 1204 976 747 514 268 -19 7 89 168 242 313 380 313 241 166 88 -7 20 -14 -65 -132 -212 -299 -214 -136 -70 -20 -20
[1L:70R]_R 21 72 104 116 113 98 111 112 98 65 -21 9 175 344 512 682 855 681 511 343 174 -9 -17 475 865 1154 1343 1432 1349 1175 907 508 16 -74 1016 1652 1982 1950 1608 1958 1997 1705 1073 87 21 511 978 1408 1783 2094 1788 1432 997 510 -25
(with I.F. = 1.12 )
(with C.F. = 1.00 )
[3L:A]-L -67 1146 2112 2786 3163 3219 2980 2538 1892 1042 52 -66 1072 1925 2463 2721 2668 2547 2227 1696 954 68 -73 949 1644 2033 2150 1997 1979 1790 1398 800 71 -17 430 809 1095 1279 1358 1220 1019 748 410 20 33 169 278 358 420 469 419 352 269 158 -33
[3L:A]-R 29 379 699 980 1214 1415 1202 958 682 367 -28 -63 820 1435 1801 1942 1846 1795 1598 1233 700 61 -72 999 1748 2177 2320 2197 2151 1926 1492 847 71 -73 969 1703 2133 2301 2192 2135 1901 1469 835 65 39 635 1207 1657 1956 2133 1884 1546 1125 617 -33
[1L:A]+[1L:70R]_L -54 1325 2403 3156 3577 3825 3450 2870 2114 1157 49 -80 1303 2225 2814 3054 2888 3179 3038 2494 1510 88 -31 688 1257 1693 1987 2144 2057 1790 1390 789 27 13 240 466 688 910 1137 910 686 466 239 -16 34 71 82 71 54 -84 55 71 79 62 -34
[1L:A]+[1L:70R]_R 34 232 403 542 657 753 654 536 395 222 -35 15 425 820 1193 1538 1858 1558 1234 859 443 -16 -84 1213 1998 2467 2538 2250 2625 2615 2188 1361 94 -58 1101 1863 2306 2530 2492 2530 2310 1830 1050 57 47 754 1425 1952 2306 2586 2233 1796 1278 682 -30
[1L:70R]_L -59 1123 2016 2677 3119 3256 3134 2734 2130 1225 65 -54 931 1616 2062 2231 2121 2238 2076 1702 1013 59 20 302 579 843 1097 1351 1095 838 577 301 -21 8 100 188 272 351 426 351 270 186 99 -8 22 -16 -73 -148 -238 -335 -240 -153 -79 -22 -22
[1L:70R]_R 24 81 117 130 127 110 125 126 110 73 -24 10 196 386 574 765 959 764 573 385 195 -10 -19 533 971 1295 1507 1607 1514 1318 1018 570 18 -83 1140 1854 2224 2188 1804 2197 2241 1913 1204 98 24 573 1097 1580 2001 2349 2006 1607 1119 572 -28
Max. 2L-LL -59 1123 2016 2677 3119 3256 3134 2734 2130 1225 65 -54 931 1616 2062 2231 2121 2238 2076 1702 1013 59 20 533 971 1295 1507 1607 1514 1318 1018 570 -21 -83 1140 1854 2224 2188 1804 2197 2241 1913 1204 98 24 573 1097 1580 2001 2349 2006 1607 1119 572 -28
Max. 3L-LL -67 1325 2403 3156 3577 3825 3450 2870 2114 1157 52 -80 1303 2225 2814 3054 2888 3179 3038 2494 1510 88 -84 1213 1998 2467 2538 2250 2625 2615 2188 1361 94 -73 1101 1863 2306 2530 2492 2530 2310 1830 1050 65 47 754 1425 1952 2306 2586 2233 1796 1278 682 -34
2L-Lane -66 3561 6273 8193 9345 9642 9360 8251 6390 3664 72 -48 3234 5675 7403 8410 8686 8417 7416 5758 3313 53 23 2942 5224 6893 7974 8459 7979 6914 5267 2976 -24 -68 3584 6181 7948 8855 8951 8863 7964 6236 3644 83 0 3522 6260 8273 9549 10065 9556 8306 6290 3531 -4
3-Lane -68 3631 6420 8357 9445 9828 9331 8100 6162 3480 53 -66 3475 6061 7874 8928 9164 9040 8075 6301 3659 73 -73 3501 6051 7819 8751 8877 8828 7950 6218 3631 82 -51 3435 6003 7799 8944 9390 8943 7802 5970 3385 44 18 3628 6445 8450 9623 10044 9560 8316 6321 3573 -6

SHEAR FORCE
(kN)
STAGE - I
DL GIRDER-1 GIRDER-2 GIRDER-3 GIRDER-4 GIRDER-5
Load 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800
SW -427 -313 -223 -149 -74 0 74 149 223 313 -427 -427 -313 -223 -149 -74 0 74 149 223 313 -427 -427 -313 -223 -149 -74 0 74 149 223 313 -427 -427 -313 -223 -149 -74 0 74 149 223 313 -427 -427 -313 -223 -149 -74 0 74 149 223 313 -427
DS -264 -207 -149 -91 -34 24 82 139 197 254 -264 -235 -183 -131 -78 -26 26 78 131 183 235 -235 -265 -206 -147 -88 -29 29 88 147 206 265 -265 -231 -182 -133 -84 -34 15 64 113 162 211 -231 -276 -215 -156 -96 -37 23 83 142 202 262 -276
DIA -6 -7 -8 -10 -11 11 10 8 7 6 -6 -30 -28 -27 -25 -24 24 25 27 28 30 -30 -19 -20 -21 -22 -22 22 22 21 20 19 -19 -30 -28 -27 -25 -23 23 25 27 28 30 -30 -7 -7 -8 -10 -11 11 10 8 7 7 -7
STAGE - II
SIDL+WC & FPLL
SIDL_FP -87 -59 -29 1 31 -31 -1 29 59 87 -87 -27 -26 -27 -30 -32 32 30 27 26 27 -27 -36 -33 -30 -27 -25 25 27 30 33 36 -36 -69 -63 -56 -52 -48 48 52 56 63 69 -69 -195 -142 -88 -31 26 -30 27 84 137 191 -195
WC_FP -81 -65 -48 -31 -14 11 28 44 61 78 -81 -85 -66 -46 -27 -7 7 27 46 66 85 -85 -85 -66 -46 -26 -6 6 26 46 66 85 -85 -84 -66 -48 -30 -12 4 23 41 59 77 -84 -75 -59 -44 -29 -13 9 24 39 55 70 -75
FPLL 4 5 5 6 6 -6 -6 -5 -5 -4 4 0 0 0 0 0 0 0 0 0 0 0 -8 -7 -7 -6 -6 6 6 7 7 8 -8 -20 -19 -18 -17 -16 16 17 18 19 20 -20 -64 -48 -32 -15 2 -10 7 24 40 56 -64
LL
(w/O Impact Factor)
[3L:A]-L -333 -291 -246 -198 -147 111 161 212 260 306 -308 -313 -261 -210 -161 -112 90 132 180 228 278 -278 -280 -223 -172 -123 82 -115 102 143 187 235 -235 -123 -110 -95 -80 -63 47 66 84 102 118 -118 -37 -29 -21 -17 -14 14 17 22 29 37 -37
[3L:A]-R -99 -91 -80 -71 -61 62 70 79 90 98 -98 -243 -196 -155 -115 -76 -89 95 130 166 206 -206 -295 -238 -184 -135 -91 -113 112 154 200 250 -250 -296 -243 -195 -148 -104 -114 112 155 198 246 -273 -178 -160 -142 -121 -95 78 103 129 154 174 -174
[1L:A]+[1L:70R]_L -385 -335 -285 -231 -173 162 211 257 299 339 -340 -390 -299 -221 156 248 -193 195 274 354 447 -447 -199 -174 -147 -121 -95 103 132 164 197 228 -228 -66 -65 -64 -65 -66 66 65 64 65 67 -67 -8 3 10 16 20 -19 -15 -10 4 9 -9
[1L:A]+[1L:70R]_R -55 -47 -38 -32 -28 27 32 38 47 55 -55 -121 -116 -110 -106 -101 97 106 113 120 126 -126 -367 -275 -197 167 262 -221 168 240 315 407 -407 -364 -298 -235 -176 -121 -164 146 190 242 305 -343 -210 -191 -171 -146 -115 108 133 159 179 193 -193
[1L:70R]_L -334 -285 -239 -192 -145 173 220 267 312 362 -362 -275 -221 -166 -116 154 -133 142 191 243 298 -298 -83 -79 -76 -74 -74 74 74 76 79 83 -83 -26 -25 -24 -23 -22 22 23 24 25 26 -26 13 18 23 27 28 -28 -27 -23 -18 -13 13
[1L:70R]_R -14 -9 -2 2 5 -5 -2 2 9 14 -14 -55 -55 -55 -55 -56 57 56 54 55 55 -55 -154 -134 -111 -90 -72 83 100 121 144 165 -165 -375 -280 -197 158 246 -257 -164 203 275 357 -387 -162 -154 -143 -134 -117 120 139 150 158 162 -162
(with I.F. = 1.12 )
(with C.F. = 1.00 )
[3L:A]-L -374 -327 -276 -222 -165 125 181 238 292 343 -346 -351 -293 -236 -181 -126 101 148 202 256 312 -312 -314 -250 -193 -138 92 -129 114 160 210 264 -264 -138 -123 -107 -90 -71 53 74 94 114 132 -132 -42 -33 -24 -19 -16 16 19 25 33 42 -42
[3L:A]-R -111 -102 -90 -80 -68 70 79 89 101 110 -110 -273 -220 -174 -129 -85 -100 107 146 186 231 -231 -331 -267 -206 -151 -102 -127 126 173 224 281 -281 -332 -273 -219 -166 -117 -128 126 174 222 276 -306 -200 -180 -159 -136 -107 88 116 145 173 195 -195
[1L:A]+[1L:70R]_L -432 -376 -320 -259 -194 182 237 288 335 380 -381 -438 -335 -248 175 278 -217 219 307 397 502 -502 -223 -195 -165 -136 -107 116 148 184 221 256 -256 -74 -73 -72 -73 -74 74 73 72 73 75 -75 -9 3 11 18 22 -21 -17 -11 4 10 -10
[1L:A]+[1L:70R]_R -62 -53 -43 -36 -31 30 36 43 53 62 -62 -136 -130 -123 -119 -113 109 119 127 135 141 -141 -412 -309 -221 187 294 -248 188 269 353 457 -457 -408 -334 -264 -197 -136 -184 164 213 272 342 -385 -236 -214 -192 -164 -129 121 149 178 201 217 -217
[1L:70R]_L -375 -320 -268 -215 -163 194 247 300 350 406 -406 -309 -248 -186 -130 173 -149 159 214 273 334 -334 -93 -89 -85 -83 -83 83 83 85 89 93 -93 -29 -28 -27 -26 -25 25 26 27 28 29 -29 15 20 26 30 31 -31 -30 -26 -20 -15 15
[1L:70R]_R -16 -10 -2 2 6 -6 -2 2 10 16 -16 -62 -62 -62 -62 -63 64 63 61 62 62 -62 -173 -150 -125 -101 -81 93 112 136 162 185 -185 -421 -314 -221 177 276 -288 -184 228 309 401 -434 -182 -173 -160 -150 -131 135 156 168 177 182 -182
Max. 2L-LL -375 -320 -268 -215 -163 194 247 300 350 406 -406 -309 -248 -186 -130 173 -149 159 214 273 334 -334 -173 -150 -125 -101 -83 93 112 136 162 185 -185 -421 -314 -221 177 276 -288 -184 228 309 401 -434 -182 -173 -160 -150 -131 135 156 168 177 182 -182
Max. 3L-LL -432 -376 -320 -259 -194 182 237 288 335 380 -381 -438 -335 -248 -181 278 -217 219 307 397 502 -502 -412 -309 -221 187 294 -248 188 269 353 457 -457 -408 -334 -264 -197 -136 -184 164 213 272 342 -385 -236 -214 -192 -164 -129 121 149 178 201 217 -217
2L-Lane 1236 966 720 489 259 203 434 664 892 1140 1267 1113 864 640 439 10 60 393 594 799 1024 1138 1013 795 599 419 245 181 355 536 717 911 1025 1282 985 726 180 69 182 71 632 863 1121 1295 1226 957 711 480 238 138 381 614 841 1081 1226
3-Lane 1250 984 740 507 271 173 400 624 844 1076 1204 1198 918 677 472 87 106 431 657 883 1141 1255 1211 923 673 149 103 135 413 642 873 1137 1251 1229 972 742 535 329 60 402 596 798 1028 1207 1256 977 724 477 223 112 359 607 845 1094 1239

TORSION
(Kn-m)
STAGE - I
DL GIRDER-1 GIRDER-2 GIRDER-3 GIRDER-4 GIRDER-5
Load 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800 0.000 3.080 6.160 9.240 12.320 15.400 18.480 21.560 24.640 27.720 30.800
SW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DS -7 -7 -5 -3 -1 1 3 5 7 7 -7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -14 -11 -8 -5 -2 2 5 8 11 14 -14 9 8 6 4 1 -1 -4 -6 -8 -9 9
DIA -8 -5 -1 2 5 -5 -2 1 5 8 -8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 -1 1 7 4 1 -2 -4 4 2 -1 -4 -7 7
STAGE - II
SIDL+WC & FPLL
SIDL_FP -88 -52 -23 3 31 -31 -3 23 52 88 -88 -8 -6 -5 -4 -4 4 4 5 6 8 -8 27 20 13 9 6 -6 -9 -13 -20 -27 27 72 53 33 21 11 -11 -21 -33 -53 -72 72 125 86 49 19 -10 10 -19 -49 -86 -125 125
WC_FP 5 3 2 0 -1 1 0 -2 -3 -5 5 1 1 0 0 0 0 0 0 -1 -1 1 -2 -1 -1 -1 -1 1 1 1 1 2 -2 -10 -6 -3 -1 2 -2 1 3 6 10 -10 -4 -4 -3 -2 -2 2 2 3 4 4 -4
FPLL 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 -1 -1 1 10 7 4 2 0 0 -2 -4 -7 -10 10 34 25 16 8 0 0 -8 -16 -25 -34 34 51 39 26 15 4 -4 -15 -26 -39 -51 51
LL
(w/O Impact Factor)
[3L:A]-L -49 -41 -33 -25 -14 13 20 28 39 49 -49 -59 -46 -31 -21 -12 12 20 30 46 60 -60 -85 -64 -41 -27 -16 16 26 40 62 84 -84 -122 -92 -60 -37 -17 -15 29 52 85 119 -119 -75 -62 -46 -36 -29 28 36 47 61 74 -74
[3L:A]-R 71 57 40 27 19 -17 -26 -38 -54 -69 69 74 54 34 20 11 -9 -18 -31 -51 -71 71 21 15 11 9 8 -6 -8 -10 -15 -20 20 -38 -26 -15 -9 8 -12 8 13 21 31 -31 -67 -50 -32 -19 18 -25 15 25 40 56 -56
[1L:A]+[1L:70R]_L -73 -61 -45 -31 -19 34 37 36 46 51 -51 -103 -78 -50 -32 -28 37 38 43 65 87 -87 -159 -118 -76 -45 44 -34 53 86 140 193 -193 -112 -85 -57 -38 -26 25 38 56 86 114 -114 -81 -67 -51 -39 -30 30 39 51 67 80 -80
[1L:A]+[1L:70R]_R 80 67 51 39 30 -30 -39 -51 -67 -80 80 112 83 53 34 22 -21 -34 -57 -93 -125 125 72 54 33 20 13 -12 -21 -36 -60 -82 82 -83 -50 -24 24 42 -45 -30 24 44 71 -71 -76 -52 -31 -17 19 -31 18 25 37 52 -52
[1L:70R]_L -67 -54 -39 -60 -92 93 59 42 57 70 -70 -175 -127 -79 -43 50 -45 54 88 138 189 -189 -104 -77 -51 -34 -23 24 33 50 78 105 -105 -76 -58 -39 -26 -17 17 26 39 58 76 -76 -52 -43 -33 -25 -20 20 25 33 43 52 -52
[1L:70R]_R 57 48 36 28 21 -21 -28 -36 -48 -57 57 78 58 39 26 17 -17 -26 -39 -59 -78 78 127 89 52 28 -40 36 -35 -57 -96 -136 136 -52 -20 20 30 45 -46 -27 -17 -20 49 -49 -50 -29 -8 19 32 -31 -18 10 29 51 -51
(with I.F. = 1.12 )
(with C.F. = 1.00 )
[3L:A]-L -55 -46 -37 -28 -16 15 22 31 44 55 -55 -66 -52 -35 -24 -13 13 22 34 52 67 -67 -95 -72 -46 -30 -18 18 29 45 70 94 -94 -137 -103 -67 -42 -19 -17 33 58 95 134 -134 -84 -70 -52 -40 -33 31 40 53 68 83 -83
[3L:A]-R 80 64 45 30 21 -19 -29 -43 -61 -77 77 83 61 38 22 12 -10 -20 -35 -57 -80 80 24 17 12 10 9 -7 -9 -11 -17 -22 22 -43 -29 -17 -10 9 -13 9 15 24 35 -35 -75 -56 -36 -21 20 -28 17 28 45 63 -63
[1L:A]+[1L:70R]_L -82 -68 -50 -35 -21 38 42 40 52 57 -57 -116 -88 -56 -36 -31 42 43 48 73 98 -98 -178 -132 -85 -50 49 -38 59 96 157 217 -217 -126 -95 -64 -43 -29 28 43 63 96 128 -128 -91 -75 -57 -44 -34 34 44 57 75 90 -90
[1L:A]+[1L:70R]_R 90 75 57 44 34 -34 -44 -57 -75 -90 90 126 93 59 38 25 -24 -38 -64 -104 -140 140 81 61 37 22 15 -13 -24 -40 -67 -92 92 -93 -56 -27 27 47 -50 -34 27 49 80 -80 -85 -58 -35 -19 21 -35 20 28 42 58 -58
[1L:70R]_L -75 -61 -44 -67 -103 104 66 47 64 79 -79 -196 -142 -89 -48 56 -50 61 99 155 212 -212 -117 -86 -57 -38 -26 27 37 56 88 118 -118 -85 -65 -44 -29 -19 19 29 44 65 85 -85 -58 -48 -37 -28 -22 22 28 37 48 58 -58
[1L:70R]_R 64 54 40 31 24 -24 -31 -40 -54 -64 64 88 65 44 29 19 -19 -29 -44 -66 -88 88 142 100 58 31 -45 40 -39 -64 -108 -153 153 -58 -22 22 34 50 -52 -30 -19 -22 55 -55 -56 -33 -9 21 36 -35 -20 11 33 57 -57
Max. 2L-LL -75 -61 -44 -67 -103 104 66 47 64 79 -79 -196 -142 -89 -48 56 -50 61 99 155 212 -212 142 100 58 -38 -45 40 -39 -64 -108 -153 153 -85 -65 -44 34 50 -52 -30 44 65 85 -85 -58 -48 -37 -28 36 -35 28 37 48 58 -58
Max. 3L-LL 90 75 57 44 34 38 -44 -57 -75 -90 90 126 93 59 38 -31 42 43 -64 -104 -140 140 -178 -132 -85 -50 49 -38 59 96 157 217 -217 -137 -103 -67 -43 47 -50 43 63 96 134 -134 -91 -75 -57 -44 -34 -35 44 57 75 90 -90
2L-Lane -173 -122 -71 -65 -69 70 64 74 125 177 -177 -202 -146 -94 -52 52 -46 65 104 159 218 -218 177 126 74 -28 -40 35 -49 -80 -134 -188 188 -2 -4 -6 57 61 -63 -53 6 4 2 -2 130 85 42 6 25 -24 -6 -42 -85 -130 130
3-Lane -17 7 24 41 64 0 -41 -24 -7 17 -17 107 80 49 30 -32 41 42 -53 -90 -120 120 -126 -93 -61 -35 49 -39 44 71 115 160 -160 -40 -32 -23 -15 53 -56 15 19 26 37 -37 106 65 28 -5 -41 -20 5 -28 -65 -107 107
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB DOCUMENT NO. DATE
Job : FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM
ANNEXURE : II
SHRINKAGE STRAIN

Total Shrinkage strain= ecs = ecd + eca [ Cl. 6.4.2.6, Eq.6.11, p-44, IRC :112,2011 ]

Autogenous Shrinkage

Autogenous Shrinkage Strain =eca = 65.00 x10-6 Grade of Concrete = M 45

Table 6.6, IRC :112-2011


Grade of Concrete 30.00 35.00 40.00 45.00 50.00 55.00 60.00 65.00
Autogenous Shrinkage
35.00 45.00 55.00 65.00 75.00 85.00 95.00 105.00
strain eca x 10-6

Autogenous Shrinkage with timee ca (t ) =  as (t ) e ca Days as Res. Auto. Sh. Str.
28 0.653 22.56 x 10-6
where  as (t ) =1 exp( 0.2 t ) = 56 0.776 14.55 x 10-6
90 0.850 9.75 x 10-6

eca(t) between 28 - 56 days = 8.01 x 10-6


between 56 - 90 days = 4.80 x 10-6
between 90 - ∞ days = 9.75 x 10-6

Drying Shrinkage

Final drying Shrinkage Strain = ecd,a = kh x ecd

h0 = notional size of cross section (mm)= 2Ac/u

where, Ac = concrete c/s area = 1687500 mm²


u = perimeter of exposed part of c/s= 9000.00 mm h0 = 375.00 mm

Table 6.7, IRC :112-2011 ecd(t) x10-6 Table 6.7, IRC :112-2011
fck RH =20 RH =50 RH =80 h0 in mm kh RH = 65
25 620 535 300 100 1.00 kh = 0.73
50 480 420 240 200 0.85 ecd = 350.68 x10-6
75 380 330 190 300 0.75
95 300 260 150 400 0.73
500 0.70

Final drying Shrinkage Strain = ecd,a = 256.44 x10-6

Drying Shrinkage Strain with time = e cd (t ) =  ds (t , t s ) k h e cd [ Cl. 6.4.2.6, Eq.6.14, p-46


, IRC :112,2011 ]
t  t s 
 dst ,t  =
s
t  t s   0.04 h03 ts = age of concrete in days at beginning of drying shrinkage
= 7 days
t = age of concrete in days at the time considered
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB DOCUMENT NO. DATE
Job : FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM

Days ds(t,ts) ecd(t) x 105 Res. Drying. Sh. Str.


28 0.0674 17.29 239.15 x 10-6
56 0.1443 37.01 219.42 x 10-6
90 0.2222 56.99 199.45 x 10-6
∞ 1 256.44 0.00 x 10-6

ecd(t) between 28 - 56 days = 19.73 x 10-6


between 56 - 90 days = 19.98 x 10-6
between 90 - ∞ days = 199.45 x 10-6

ecs
TOTAL SHRINKAGE STRAIN

-6
between 28 - 56 days = 8.01 x10-6 + 19.73 x10-6 = 27.731 x10
-6
between 56 - 90 days = 4.80 x10-6 + 19.98 x10 =
-6
24.780 x10
between 90 - ∞ days = 9.75 x10-6 + 199.45 x10 = 209.195 x10-6
-6

-6 -6
Total Shrinkage Strain ecs = ecd + eca = ( 65.00 + 256.44 ) x10 = 321.44 x10

DIFFERENTIAL SHRINKAGE STRAIN


a) Shrinkage Strain in Girder at infinite time

Autogenous Shrinkage Strain =eca = 65.00 x10-6


Final drying Shrinkage Strain = ecd,a = kh x ecd

h0 = notional size of cross section (mm)= 2Ac/u

where, Ac = concrete c/s area = 967500 mm²


u = perimeter of exposed part of c/s= 9000.00 mm h0 = 215.00 mm
RH = 65 kh = 0.84 ecd = 252.00 x10-6

Final drying Shrinkage Strain = ecd,a = 210.42 x10-6


-6
Total Shrinkage Strain ecs = ecd + eca = 275.42 x10

b) Shrinkage Strain in Girder at the time the slab is cast t = 56 days (it is conservatively assumed that
the girder will be 56 days old at
Autogenous Shrinkage with timee ca (t ) =  as (t ) e ca the time of casting of deck)

where  as (t ) =1 exp( 0.2 t ) = 0.776 at 56 days

eca(t) = 50.45 x10-6


Drying Shrinkage Strain with time = e cd (t ) =  ds (t , t s ) k h e cd [ Cl. 6.4.2.6, Eq.6.14, p-46
, IRC :112,2011 ]

t  t s  ts = age of concrete in days at beginning of drying shrinkage


 dst ,t  = = 7 days
s
t  t s   0.04 h3
0 t = age of concrete in days at the time considered
= 56 days
 dst ,t s  = 0.2798
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB DOCUMENT NO. DATE
Job : FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE 18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title :
 AND PROPOSED CH: 113+530
SCHEDULE CH: 113+545
ds t ,t s  RSS KJM

ecd(t) = 58.88 x10-6


-6
ecs = 50.45 x10-6 + 58.88 x10-6 = 109.332 x10 at 56 days

c) Shrinkage Strain in Slab at infinite time

Autogenous Shrinkage Strain =eca = 65.00 x10-6 for M- 45

Final drying Shrinkage Strain = ecd,a = kh x ecd

h0 = notional size of cross section (mm)= 2Ac/u

where, Ac = concrete c/s area = 720000 mm²


u = perimeter of exposed part of c/s= 5400.00 mm h0 = 266.67 mm

RH = 65 kh = 0.78 ecd = 252.00 x10-6

Final dyring Shrinkage Strain = ecd,a = 197.40 x10-6


-6
Total Shrinkage Strain ecs = ecd + eca = 262.40 x10

Differentail Shrinkage Strain Desh= esh,s,a - ( esh,b,a - esh,b,t)

= 262.40 - ( 275.42 - 109.33 )


-6
= 96.31 x10
REHABILITATION AND UPGRADATION OF NH STRETCH UNDER NHDP-IVB DOCUMENT NO. DATE
Job : FOR VARANASI-HANUMANHA SECTION OF NH-7 ON EPC MODE
18133-MJ-PS-DC-
PACKAGE-3 (LALGANJ-HANUMANHA)
1141-06 (R0)
19.3.19
DESIGN CALCULATIONS FOR 30m (EJ TO EJ) PSC GIRDER AT DESIGNED CHECKED
Title : SCHEDULE CH: 113+545 AND PROPOSED CH: 113+530 RSS KJM
ANNEXURE : III

CREEP STRAIN

Creep with time = f (t , t 0 ) =  (t , t 0 ) f (, t 0 ) [ Cl. 6.4.2.7, Eq.6.16, p-47, IRC :112,2011 ]
0.3
 t  t0 
where,  (t , t 0 ) =  
  H  (t  t 0 

where t is the age of concrete in days at the time considered


= 90 days
t0 is the age of concrete in days at time of loading = 28 days

  RH  
18

 H =1.51  1.2   h0  250 1500 for f cm  45


  RH 0  
  RH  
18

1.51  1.2   h0  250a 1500a for f cm  45


  RH 0  

where, RH = Relative Humidity expressed as percent= 65 %


RH0 = 100 %

0 .5 fcm = fck + 10 = 55
 45 
a=  = 0.905
 f cm 

H = 794.22 h0 = 215.00 mm

(t,t0)= 0.455 f(a,t0) = 1.67 (Table 6.9,page 47, IRC:112,2011)

Hence, f(t,t0) = 1.67 x 0.455 = 0.76

Value of Ec to be used = Ecm/(1 + f) [ Cl. 7.8(4), p-61, IRC :112,2011 ]

= 34 /( 1 + 0.76 ) = 19315.63 MPa


Days (t,t0) f(t,t0)
28 0.00 0.000
56 0.36 0.606
90 0.45 0.760
∞ 1.00 1.671

CREEP CO-EFFICIENT AS PER ANNEX A2 OF IRC :112

fRH = 1.438 f0 = fRH x (fcm) x (t0) Days (t,t0) f(t,t0)


(fcm) = 2.532 28 0.00 0.000
(t0) = 0.488 f(t,t0) = 1.778 56 0.36 0.645
90 0.45 0.809
∞ 1.00 1.778
Lifting Hook Design ANNEXURE : IV

Lifting Hook Material : Strands


Grade of Concrete : M 45
Grade of Steel : Fe 1423
150

2000
2200
200

Total Dead Weight of the Girder : 892 kN


Number of Lifting Hooks, n : 4
Total Dead Weight carried by Each Lifting Hook : 223 kN
Diameter of Lifting Hook, D : 12.7 mm
Total Anchorage Length of Lifting Hook, L : 4000 mm

Tensile Stress in a Lifting Hook, σst as per IRC 112:2011 = 0.87 × 𝑓𝑦


= 1238.0 N/mm²

Bond Stress of a Lifting Hook, fbd As per IRC 112: 2011 = 3.400 N/mm²

𝜋 × 𝑓𝑏𝑑 × 𝐷 × 𝐿
Anchorage Capacity of a Hook Anchor =
1000
= 543 kN > 223 kN SAFE

𝑛 × 𝜋 × 𝐷2 × 𝜎𝑠𝑡
Tension Capacity of a Hook Anchor =
4 × 1000
= 489 kN > 223 kN SAFE
ANNEXURE-V
GRILLAGE ANALYSIS DATA

1.0 INTRODUCTION
This report pertains to grillage analysis of the PSC I-Girder type Superstructure. The overall
carriageway is 16.0m. The over all carriageway consists of 13.0m clear carriageway and 0.5m
crash barrier on either side & 1.5m footpath & 0.5m Parapet on one side. The overall span
between expansion joint is 32.0m having c/c bearing distance of 30.8m.

28.80 m

Internal Pier

2.0 MATERIAL DATA


Grade of Concrete for PSC Girder = M45
Modulus of elasticity of concrete (Eb) = 34000 N/mm2 (Table 6.5, IRC 112:2011)
Grade of Concrete for Deck slab/Diaphragm = M45
Modulus of elasticity of concrete (Es) = 34000 N/mm2 (Table 6.5, IRC 112:2011)
Grade of Reinforcement Steel = Fe500

3.0 GENERAL DATA


Total Carriageway = 16 m
Clear Carriageway = 13 m
Width of Footpath on one side = 1.500 m
Crash Barrier at either side = 0.50 m
Railing on one side = 0.50 m
Overall depth of superstructure (with deck slab) = 2.425 m
Wearing coat thickness = 0.065 m
Transverse Slope = 2.5 %
C/C Exp. Joint = 32.00 m
C/C Bearings = 30.80 m
No of Longitudinal Girders = 5.00 Nos
Nos of Diaphragms (i/c External and Internal) = 3.00 Nos
C/C spacing of Longitudinal Girders ( trans. dirn.)= 3.20 m

4.0 DESIGN DATA


Density of Fresh Reinforced concrete, RCC = 26.00 kN/m3
Density of Hardened Reinforced concrete, RCC = 25.00 kN/m3
Density of Wearing Coat = 22.00 kN/m3
Density of STEEL = 78.50 kN/m3

5.0 GEOMETRICAL DATA AND GRILLAGE IDEALIZATION :


i Diaphragm

Dim
Part
m
A C A 1.900
B 0.300
C 1.900
D 0.400

D
B
Intermediate
End Diaphragm
Diaphragm
ANNEXURE-V
GRILLAGE ANALYSIS DATA

ii Internal Longitudinal Girder Cross Section :

B C
Mid End Var.
D Part
m m m
L A 0.000 0.000 0.000
M
B 1.600 1.600 1.600
C 1.600 1.600 1.600
E
D 0.225 0.225 0.225
E 0.150 0.064 0.107
F F 1.450 1.986 1.568
G 0.150 0.000 0.075
avg H 0.200 0.000 0.100
G
I 0.300 0.700 0.500
J 0.700 0.700 0.700
H I H K 0.300 0.000 0.300
L 0.150 0.150 0.150
M 1.000 1.000 1.000
K
Total
2.425 2.425 2.425
Ht
J

iii External Longitudinal Girder Cross Section :

B C

D Mid End Var.


Part
m m m
M L A 0.000 0.000 0.000
B 1.600 1.600 1.600
E C 1.600 1.600 1.600
D 0.225 0.225 0.225
E 0.150 0.064 0.107
F
F 1.450 1.986 1.568
G 0.150 0.000 0.075
G avg H 0.200 0.000 0.100
I 0.300 0.700 0.500
J 0.700 0.700 0.700
H I H
K 0.300 0.000 0.300
L 0.150 0.150 0.150
K M 1.000 1.000 1.000
Total
2.425 2.425 2.425
J Ht
ANNEXURE-V
GRILLAGE ANALYSIS DATA

iv Effective Flange Width (Longitudinal Girder) (ref. Cl. 7.6.1.2 IRC:112-2011)

beff

beff1 beff2

b1 b2

bw
b
1.600 1.600 1.600 1.600

lo = Distance between points of zero


moments (can be taken as 0.7 x
with, effective span for continuous span)

The effective width may be taken as


and
constant for full span

a For, Longitudinal Internal Girder

bw= 0.300 m
b1= 1.450 m
b2= 1.450 m
lo= 30.800 m
b = 3.200 m

beff,1 = 0.2 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,1 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff,2 = 0.2 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,2 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff = 1.450 + 1.450 + 0.300 ≤ 3.200

= 3.200 ≤ 3.200

beff = 3.200 m
ANNEXURE-V
GRILLAGE ANALYSIS DATA

b For, Longitudinal External Girder


bw = 0.300 m
b1 = 1.450 m
b2 = 1.450 m
lo = 30.800 m
b = 3.200 m

beff,1 = 0.2 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,1 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff,2 = 0.2 x 1.45 + 0.1 x 30.80 ≤ 0.2 x 30.80 ≤ 1.450

beff,2 = 3.37 ≤ 6.16 ≤ 1.450

= 1.450 m

beff = 1.450 + 1.450 + 0.300 ≤ 3.200

= 3.200 ≤ 3.200

beff = 3.200 m

vii Grillage Idealization :


0.000

0.000

0.000

0.000

0.000

3.200 3.200 3.200 3.200

S2 S1 S1 S1 S2

G1 G2 G3 G4

Typical Cross Section


bearing
C/L of

1 2
3
0.700

0.300

3
0.450 2.050 3.000 10.350
1 2

Typical details of web widening


ANNEXURE-V
GRILLAGE ANALYSIS DATA

viii Impact Factor (Clause 208.2 & 208.3 of IRC 6 : 2014)

For Both Span


4.5 4.5
Class A = = 1.12
6 + L 6 + 30.80

Class From
= = 1.12
70RW Fig. 5

6.0 STAGES OF ANALYSIS

Analysis stages are similar to that of construction stages as provided in Design Basis Report.

a Stage - 1 : Erection of Precast Girder in position over temporary support

Analysis parameters
Loads Considered : Self Weight of PSC Girder, Deck Slab & Diaphragm
Support Type : Simply Support

b Stage - 2 : Composite action of Girder, Diaphragms & Deck Slab

Analysis parameters
Loads Considered : Self Weight of Diaphragms, Deck Slab, Wearing Coat & Crash Barrier
Live Loads
Support Type : Simply Support
ANNEXURE-V
GRILLAGE ANALYSIS DATA

7.0 STAAD-Pro Property Defination :

Using USER TABLE function in Staad-Pro Member Property of any Geometry can be defined
To include Flexural and Torsional Stiffness of Section User Table Function is Good option for
any type of Geometry. Here From below Format we can get co-ordinate of All End, Mid and
Varying Girder.

0 0 STAAD INPUTS
15 14 Node X Y
0.225 1 -0.5 2.2
16 1 1 m 12 13 2 -0.5 2.05
0.15
2 11 3 -0.15 1.9
0.15 4 -0.15 0.45
3 10 5 -0.35 0.3
6 -0.35 0
0.3 m 7 0.35 0
1.45
8 0.35 0.3
9 0.15 0.45
4 9 10 0.15 1.9
5 8 0.15 11 0.5 2.05
0.7 m 12 0.5 2.2
0.3
6 7 13 0 2.2
14 0 2.425
15 0 2.425
Total Depth 2.425 m 16 0 2.2
Typical Left Mid Section Girder
ANNEXURE-V
GRILLAGE ANALYSIS DATA

8.0 STAAD-Pro Grillage Model