1. Up to 500KV Back-Energization 14 14 0 43 33
4. Up to First Synchronization 0 0 0 4 0
5. Up to Performance Test 4 0 4 4 0
MCC
Non-Process Process Non-Process Remark
Balance Submission Approval Submission Approval
36 6 5 15 14
4 0 0 0 0
4 0 0 0 0
4 0 0 0 0
I. Overall Status of Pre-Commissioing & Commissioning
Hydro Test IO Check Motor Solo-Run Test
Pressure (P : 112)
Total Done Bal. Total Done Bal. Total Done
2. Up to Initial Light Oil Firing (77) 574 0 574 6646 888 5758 95 29
5. Up to COD (4) 4 0 4 0 0 0 4 0
###
Motor Solo-Run Test Walk Down Punch Clear(A/B) MCC Run Test Commissioing
Bal. Total Done Bal. Total Done Bal. Total Done Bal. Total Done Bal. Total
0 14 14 0 372 372 0 14 13 1 69 0 69
10 17 1 16 40 8 32 17 0 17 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
4 4 0 4 345 1 344 4 0 4 4 0 4
MCC
주요현안
Bal.
14
40
4
###
Commissioing
Done Bal.
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
2 BAU-01 Earthing & Lightning System for WTB (for Equipment N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
Earthing & Lightning System NP - - -
Energization)
3 BAU-03 Earthing & Lightning System for CCB (for Equipment N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
Earthing & Lightning System NP - - -
Energization)
4 BTA-01 LV System DC 220V Batteries and Chargers (BTA10/20, BUA10/20) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
5 BTB-01 LV System DC 110V Batteries and Chargers (BTB10/20, BUB10/20) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
6 BTC-01 AC 230V UPS Batteries and Chargers (BTC10/20, N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
LV System NP - - -
BRB10/20)
8 BBA-02 MV System NSPB BBA01GS101 / BBA02GS101 / BB03GS101 NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
10 BFT-01 11KV/440V UNIT AUX. TR (BFT01/02), 415V BUS N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
LV System NP - - -
(BFA01/02)
11 BJA-01 LV System Water Treatment Building MCC (BJA15) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
12 SA0-01 HVAC System HVAC for Central Control Building NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) P 386.0 386.0 - 3/15 21/Apr 5 5 5 0 0 4/7 1 0 0
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump P 300.0 300.0 - 4/10 21/Apr 3 3 3 0 0 6/4 0 0 0
16 GC0-01 Water Treatment System Water Treatment System-01 P 1,560.1 1,560.1 - 3/14 07/Mar 70 70 70 0 0 4/7 8 6 6
17 GC0-02 Water Treatment System Water Treatment System-02 P 769.5 769.5 - 4/25 22/Apr 8 8 8 0 0 5/12 1 0 0
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank P 419.3 419.3 - 4/30 27/Apr 6 6 6 0 0 4/7 1 0 0
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) P - - - 8/15 3 3 3 0 0 8/12 0 0 0
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB P 249.0 249.0 - 3/14 18/Jan 1 1 1 0 0 4/7 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB P 112.5 112.5 - 3/14 15/Jan 1 1 1 0 0 4/7 0 0 0
24 SGA-01 Fire Fighting System Fire Fighting System for WTB P - - - 5/3 08/Jun 10 10 10 0 0 6/4 0 0 0
25 SGA-09 Fire Fighting System Fire Fighting System for CCB P - - - 4/14 17/Jun 4 4 4 0 0 6/2 0 0 0
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. P - - - 5/6 21/Jun 5 5 5 0 0 6/2 0 0 0
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building P - - - 7/15 1 1 1 0 0 0 0 0
28 BAT-01 HV System Generator Step-Up Transformer (BAT01) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
31 BBT-01 HV System Unit Transformer (27KV/11KV) (BBT01/02/03) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
32 CAA-01 HV System HV Switch Yard Interface Signals, Controls & Protection NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
33 CHA-01 HV System Cabinets for Generator and Transformer protection NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
36 BAC-01 Steam Turbine Generator System GCB System NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) NP - - - 0 0 0 0 0 0 0 0
39 UGD-01 Civil, Building & Structure Water Treatment Building NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
41 UGC-01 Civil, Building & Structure Demi. Water Storage Tank NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
43 UGG-01 Civil, Building & Structure Filtered Water Storage Tank NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
44 USG-01 Civil, Building & Structure Fire-Fighting Pump Shelter NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
45 UGD-02 Civil, Building & Structure Condensate Make Up Tank NP - - - N/A N/A 0 0 0 0 0 0 0 0
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) NP - - - N/A N/A 0 0 0 0 0 0 0 0
47 UQA-01 Civil, Building & Structure Cooling Water Pump Station NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
49 UBF-01 Civil, Building & Structure Generator Step-Up/Unit Transformer NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
50 UPC-01 Civil, Building & Structure CW Intake Shield Tunnel NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) NP - - - N/A N/A 0 0 0 0 0 0 0 0
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
54 SQ0-02 Road and Paving for WTB,(Chem.Storage Tank, F/F N/A N/A 0 0 0 0 0 0 0 0
Civil, Building & Structure NP - - -
Pump)Shelter,(Filtered, Demi, Service)Water Tank,CCB
56 BFA-01 Lighting System Lighting System for Water Treatment Building NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
57 BFA-02 Lighting System Lighting System for Central Control Building NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
58 UBA-03 Civil, Building & Structure PJFF/FGD/ASH Electrical Building NP - - - N/A N/A 0 0 0 0 0 0 0 0
60 BAU-02 Earthing & Lightning System for Other Buildings (for N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
Earthing & Lightning System NP - - -
Equipment Energization)
61 CBA-01 DCS DCS Control Cabinets Boiler/STG/BOP/Electrical-01 NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
62 CBA-02 DCS DCS Control Cabinets Boiler/STG/BOP/Electrical-02 NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
HVAC System NP - - -
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump P 1,146.8 1,121.5 25.3 9/20 29/Sep 7 6 6 0 1 NA 0 0 0
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP P 1,163.8 1,163.8 - 7/30 14/Jul 1 1 1 0 0 7/4 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD P 169.0 164.3 4.8 9/15 1 0 0 0 1 10/2 0 0 0
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) P 121.8 121.8 - 9/5 6 6 6 0 0 8/5 1 1 1
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) P 625.8 625.8 - 9/20 30/Sep 4 2 2 0 2 0 0 0
72 GM0-04 Waste Water Transfer System Others Sump Sys P 813.5 533.5 280.0 9/16 8 0 1 1 7 9/12 0 0 0
73 GM0-05 Waste Water Transfer System Oily Waste Water Sys P 1,280.5 1,179.3 101.3 9/16 14 6 6 0 8 9/12 0 0 0
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building P - - - 7/15 3 1 1 0 2 7/7 0 0 0
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys P 28.0 28.0 - 10/10 3 0 0 0 3 NA 0 0 0
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) P - - - 11/15 2 0 0 0 2 10/12 0 0 0
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) P - - - 10/15 24 0 0 0 24 10/12 0 0 0
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) P - - - 9/15 9 0 0 0 9 9/12 0 0 0
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) NP - - - N/A N/A 0 0 0 0 0 0 0 0
81 AYE-02 Fire Alarm System FA system for STG (LFAP #02) NP - - - N/A N/A 0 0 0 0 0 0 0 0
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) NP - - - N/A N/A 0 0 0 0 0 0 0 0
83 AYE-04 Fire Alarm System FA system for Boiler (LFAP #04) NP - - - N/A N/A 0 0 0 0 0 0 0 0
84 AYE-05 Fire Alarm System FA system for PJFF/FGD/ASH (LFAP #05) NP - - - N/A N/A 0 0 0 0 0 0 0 0
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) NP - - - N/A N/A 0 0 0 0 0 0 0 0
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) NP - - - N/A N/A 0 0 0 0 0 0 0 0
88 BFT-02 11KV/440V UNIT AUX. TR (BFT03/04), 415V BUS N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
LV System NP - - -
(BFA03/04)
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
89 BFT-03 11KV/440V UNIT AUX. TR (BFT05/06), 415V BUS N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
LV System NP - - -
(BFA05/06)
90 BFT-04 LV System 11KV/440V UNIT AUX. TR (BFT11/12), 415V BUS (BFA11) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
91 BFT-05 LV System 11KV/440V UNIT AUX. TR (BFT13), 415V BUS (BFA13) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
92 BFT-06 11KV/440V UNIT AUX. TR (BFT09/10), 415V BUS N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
LV System NP - - -
(BFA09/10)
94 FDN-01 Civil, Building & Structure Absorber Spray Pump NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
95 UVD-01 Civil, Building & Structure FGD Aeration Basin NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
96 UQW-01 Civil, Building & Structure Dischage Outfall NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
97 BFT-07 11KV/440V UNIT AUX. TR (BFT07/08), 415V BUS N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
LV System NP - - -
(BFA07/08)
99 BJA-04 415V Sub-BUS (BJA01) (내일 오후에 확정) (Battery Limit 추 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
LV System NP - - -
가)
100 BJA-05 LV System 415V Sub-BUS (BJA17/18) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
101 BJA-06 LV System 415V Sub-BUS (BJA13) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
102 BJA-07 LV System 415V Sub-BUS (BJA05) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
103 BJA-08 LV System 415V Sub-BUS (BJA07/09) NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
104 PAC-01 Circulating Water System Circulating Water System 01 P 1,678.0 1,678.0 - 8/3 28 28 28 0 0 0 0 0
105 PAC-02 Circulating Water System Circulating Water System 02 P 125.0 125.0 - 9/19 26/Sep 27 27 27 0 0 NA 0 0 0
106 PAC-03 Circulating Water System Circulating Water System 03 P 414.0 414.0 - 9/5 13/Sep 15 15 15 0 0 NA 0 0 0
107 PAA-01 Circulating Water System Intake Facility-01 P - - - 6/10 N/A 0 0 0 0 0 6/23 0 0 0
108 PAA-02 Circulating Water System Intake Facility-02 P 211.0 211.0 - 8/3 4 4 4 0 0 0 0 0
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 P 8,834.3 8,834.3 - 8/1 18 18 18 0 0 1 1 1
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 P 2,554.0 2,219.0 335.0 10/15 28 19 19 0 9 NA 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
111 QCH-01 Electro Chlorination System Electro Chlorination System-01 P 4,369.0 4,369.0 - 7/10 30/Jun 3 3 3 0 0 6/23 0 0 0
Electro Chlorination System-02 (Box-up 1ea, Reinstatment 1 Line
112 QCH-02 Electro Chlorination System Exception으로 진행, 자재 Shortage 5 ea for Instrument, 9 point P 2,481.5 2,479.5 2.0 9/5 16 16 16 0 0 Exception 2 0 1
due to not installed Instrument)
113 QEA-01 Compressed Air System Compressed Air System P 959.0 692.3 266.8 8/4 5 5 5 0 0 8/4 4 4 4
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) P 3,045.3 3,017.3 28.0 9/7 13/Sep 4 4 4 0 0 NA 0 0 0
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF P 4,657.5 4,650.0 7.5 9/20 26/Sep 1 0 0 0 1 NA 0 0 0
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, P 30.0 30.0 - 9/8 14/Sep 2 2 2 0 0 NA 0 0 0
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 P 41.3 41.3 - 2 0 0 0 2 0 0 0
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) P 1,306.3 1,300.5 5.8 9/25 2 0 0 0 2 NA 0 0 0
119 QEJ-03 Service Air Distribution System Distribution Sys for Others P 4,834.8 4,272.8 562.0 10/5 3 0 0 0 3 NA 0 0 0
120 LCA-02 Condensate System Condesate Storage & Transfer System-01 P 421.8 421.8 - 8/4 4 4 4 0 0 0 0 0
122 LCA-04 Condensate System Condesate Storage & Transfer System-02 P 247.5 239.5 8.0 9/20 24/Sep 3 2 3 1 0 NA 0 0 0
123 LCA-05 Condensate System Condensate System-02 P 1,371.3 218.0 1,153.3 10/10 11 5 5 0 6 NA 0 0 0
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System P 898.3 739.8 158.5 10/30 3 1 1 0 2 NA 0 0 0
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank P - - - 5 5 5 0 0 0 0 0
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) P - - - 7/26 0 0 0 0 0 8/12 0 0 0
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) P - - - 2 0 0 0 2 0 0 0
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템
127 HNC-02 Air & Gas System P - - - 1 0 0 0 1 0 0 0
분리 방안 강구)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) P 309.0 64.0 245.0 9/15 3 0 0 0 3 NA 2 0 0
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) P 941.5 941.5 - 9/23 26/Sep 7 7 7 0 0 9/23 1 0 0
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 P - - - 0 0 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
132 HHQ-01 LFO Firing System LFO Firing Air System P 9,960.3 7,986.5 1,973.8 10/5 3 0 0 0 3 0 0 0
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner P 1,760.4 1,310.1 450.3 10/5 1 0 0 0 1 0 0 0
134 HHF-01 LFO Firing System LFO Firing System P 1,120.0 1,064.3 55.8 10/5 1 0 0 0 1 0 0 0
135 HTO-01 FGD System FGD Absorber System (담당자와 협의 후 일정 확정) P - - - 9/16 1 0 0 0 1 9/12 0 0 0
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) P - - - 9/15 11 0 0 0 11 9/12 0 0 0
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) P 888.0 509.3 378.8 10/30 21 3 3 0 18 0 0 0
138 QC0-01 Chemical Dosing System Chemical Dosing System P 216.3 183.3 33.0 10/10 6 0 0 0 6 0 0 0
139 LDO-01 Condensate Polishing Plant Condensate Polishing Plant P 1,350.7 1,173.2 177.5 9/25 27/Sep 42 25 25 0 17 9/30 7 0 0
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, P - - - 10/15 0 0 0 0 0 0 0 0
LAC-02 & LAV-02)
145 XAW-01 Feed Water System BFPT Gland Steam System P 219.5 136.0 83.5 9/30 3 0 0 0 3 0 0 0
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System P 5,815.3 3,963.0 1,852.3 9/20 28/Sep 9 7 7 0 2 9/28 1 0 0
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) P 1,017.0 771.0 246.0 10/5 13 2 2 0 11 10/9 1 0 0
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System P 350.0 350.0 - 9/20 5 0 0 0 5 NA 0 0 0
149 MAX-01 Steam Turbine Generator System TBN Control Oil System P 889.5 880.5 9.0 9/25 6 0 0 0 6 NA 0 0 0
150 MAA-01 Steam Turbine Generator System TBN Steam System P 1,145.8 933.5 212.3 9/30 20 4 4 0 16 0 0 0
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System P 3,574.3 3,553.8 20.5 9/30 9 2 2 0 7 1 0 0
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System P 326.5 320.0 6.5 9/30 4 0 0 0 4 0 0 0
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) P 17,368.3 17,352.3 16.0 Done 1 1 1 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
154 HAG-01 Pressure System Boiler Recirculation Pump System P 1,863.5 1,745.0 118.5 10/10 5 3 3 0 2 0 0 0
155 LAE-01 Pressure System Superheater Spray Water System P 860.0 850.0 10.0 Done 1 1 1 0 0 NA 0 0 0
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) P 9,421.3 9,421.3 - Done 1 1 1 0 0 0 0 0
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) P 12,217.0 12,213.0 4.0 Done 1 1 1 0 0 0 0 0
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) P 26,746.2 26,741.7 4.5 Done 1 1 1 0 0 0 0 0
159 HAN-01 Pressure System Boiler Drain System P 96.0 96.0 - 8/3 1 1 1 0 0 0 0 0
160 LBA-01 Steam System Main & RH Steam System P 8,832.3 8,329.8 502.5 10/20 17 4 4 0 13 0 0 0
161 LBF-01 Steam System HP/LP Bypass System (9월 5일 추가 협의) P 1,962.0 1,960.0 2.0 4 4 4 0 0 0 0 0
162 LBG-01 Steam System Auxiliary Steam System for main P 3,928.0 3,588.8 339.3 10/15 5 0 0 0 5 0 0 0
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up P 278.5 157.8 120.8 10/15 2 0 0 0 2 0 0 0
165 HAN-02 Steam System Safety Valve Exhaust Piping System P 10,562.8 9,020.8 1,542.0 10/30 3 0 0 0 3 0 0 0
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System P 28.5 28.5 - N/A N/A 5 5 5 0 0 0 0 0
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System NP - - - N/A N/A 0 0 0 0 0 0 0 0
168 SM0-01 Crane and Hoist Crane and Hoist NP - - - N/A N/A 0 0 0 0 0 0 0 0
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) NP 1,354.0 1,124.0 230.0 10/10 1 0 0 0 1 0 0 0
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank NP - - - N/A N/A 0 0 0 0 0 0 0 0
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank NP - - - N/A N/A 0 0 0 0 0 0 0 0
175 UBN-01 Civil, Building & Structure Emergency Diesel Generator NP - - - N/A N/A 0 0 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter NP - - - N/A N/A 0 0 0 0 0 0 0 0
177 TNK-02 Civil, Building & Structure Foam Tank NP - - - N/A N/A 0 0 0 0 0 0 0 0
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH NP - - - N/A N/A 0 0 0 0 0 0 0 0
179 UVB-01 Civil, Building & Structure CID Fan NP - - - N/A N/A 0 0 0 0 0 0 0 0
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP NP - - - N/A N/A 0 0 0 0 0 0 0 0
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter NP - - - N/A N/A 0 0 0 0 0 0 0 0
183 UMA-01 Civil, Building & Structure Steam Turbine Building NP - - - N/A N/A 0 0 0 0 0 0 0 0
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter NP - - - N/A N/A 0 0 0 0 0 0 0 0
185 STR-03 Civil, Building & Structure H2/CO2 Shelter NP - - - N/A N/A 0 0 0 0 0 0 0 0
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter NP - - - N/A N/A 0 0 0 0 0 0 0 0
187 UET-01 Civil, Building & Structure Fly Ash Silo NP - - - N/A N/A 0 0 0 0 0 0 0 0
188 UET-02 Civil, Building & Structure Bottom Ash Silo NP - - - N/A N/A 0 0 0 0 0 0 0 0
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower NP - - - N/A N/A 0 0 0 0 0 0 0 0
190 UST-01 Civil, Building & Structure Workshop & Store Building NP - - - N/A N/A 0 0 0 0 0 0 0 0
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower NP - - - N/A N/A 0 0 0 0 0 0 0 0
193 XAW-02 Feed Water System BFPT Steam System P 240.5 159.5 81.0 9/30 7 0 0 0 7 0 0 0
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) P 168.0 - 168.0 10/15 2 0 0 0 2 0 0 0
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02 P - - - 0 0 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism P 2,075.0 1,276.3 798.8 10/15 14 0 0 0 14 2 0 0
197 LAF-01 Feed Water System Reheater Spray Water System P 304.0 301.5 2.5 9/10 9/14 2 2 2 0 0 NA 0 0 0
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System P 481.0 481.0 - 9/15 7 6 6 0 1 10/9 0 0 0
199 MKG-01 Steam Turbine Generator System Generator H2 Control System P 629.2 623.2 6.0 9/15 13 11 11 0 2 10/9 0 0 0
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System P 59.0 - 59.0 10/30 1 0 0 0 1 10/28 0 0 0
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System P 209.0 - 209.0 10/30 2 0 0 0 2 10/28 0 0 0
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) P 557.5 446.3 111.3 10/15 2 1 1 0 1 10/9 0 0 0
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) P 8.3 8.3 - 9/30 1 1 1 0 0 10/9 0 0 0
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) P - - - 10/15 0 0 0 0 0 10/9 0 0 0
206 HFC-01 Coal Pulverising system Pulverized Coal Firing System P 924.0 609.5 314.5 10/25 2 0 0 0 2 12 0 0
207 HFW-01 Coal Pulverising system Pulverized Sealing Air System P 2,213.0 2,178.0 35.0 Done 2 0 0 0 2 NA 0 0 0
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system P - - - 9/13 12 0 0 0 12 NA 0 0 0
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) P 463.8 463.8 - 10/15 1 1 1 0 0 10/9 0 0 0
210 EDA-03 Emission Monitoring System CEMS NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
211 SQ0-03 Civil, Building & Structure Drainage for all others NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
212 SQ0-04 Civil, Building & Structure Road & Paving for all others NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
213 UZD-01 Civil, Building & Structure Parking Lot NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
215 MK0-01 Steam Turbine Generator System Generator NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
216 MKC-01 Steam Turbine Generator System Exciter System NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Dia-Inch Hydro Test Box-up
No. Sub-system System Description Sub-System Description Process
Total Done Remain Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum
218 UZK-01 Civil, Building & Structure Landscaping NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 P 7,382.8 6,620.8 762.0 10/10 15 0 0 0 15 10/7 0 0 0
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 P 2,078.3 1,812.0 266.3 10/20 11 0 0 0 11 10/18 0 0 0
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System P 5,894.0 5,321.0 573.0 10/10 51 0 0 0 51 10/7 2 0 0
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System P 2,392.5 1,787.8 604.8 10/10 30 10 10 0 20 10/7 1 0 0
224 SA0-05 HVAC System HVAC for Workshop Store Building NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
225 CYA-01 Communication System Telecommunication System NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
226 CYM-01 Communication System Paging System NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
227 CYP-01 Communication System CCTV System NP - - - N/A N/A 0 0 0 0 0 N/A N/A 0 0 0
228
229 Summary Status 245370.7 222442.5 22928.3 957 430 432 2 525 55 12 13
230
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
2 BAU-01 Earthing & Lightning System for WTB (for Equipment 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Earthing & Lightning System
Energization)
3 BAU-03 Earthing & Lightning System for CCB (for Equipment 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Earthing & Lightning System
Energization)
4 BTA-01 LV System DC 220V Batteries and Chargers (BTA10/20, BUA10/20) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
5 BTB-01 LV System DC 110V Batteries and Chargers (BTB10/20, BUB10/20) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
6 BTC-01 AC 230V UPS Batteries and Chargers (BTC10/20, 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
LV System
BRB10/20)
8 BBA-02 MV System NSPB BBA01GS101 / BBA02GS101 / BB03GS101 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
9 BBA-03 MV System NSPB for MV SWGR TIE(BB03GS201) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
10 BFT-01 11KV/440V UNIT AUX. TR (BFT01/02), 415V BUS 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
LV System
(BFA01/02)
11 BJA-01 LV System Water Treatment Building MCC (BJA15) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
12 SA0-01 HVAC System HVAC for Central Control Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) 0 1 4/7 5/17 5 5 5 0 0 4 4 4 0 0 4/17 5/19
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump 0 0 6/4 5/17 3 3 3 0 0 5 5 5 0 0 6/14
16 GC0-01 Water Treatment System Water Treatment System-01 0 2 4/7 3/29 70 70 70 0 0 176 176 176 0 0 4/17 5/19
17 GC0-02 Water Treatment System Water Treatment System-02 0 1 5/12 5/17 8 8 8 0 0 8 8 8 0 0 5/22 5/19
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank 0 1 4/7 5/17 6 6 6 0 0 4 4 4 0 0 4/17 5/18
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) 0 0 8/12 3 3 3 0 0 0 0 0 0 0 8/22
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB 0 0 4/7 3/24 1 1 1 0 0 11 11 11 0 0 4/17 N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB 0 0 4/7 3/24 1 1 1 0 0 4 4 4 0 0 4/17 N/A
24 SGA-01 Fire Fighting System Fire Fighting System for WTB 0 0 6/4 6/13 10 10 10 0 0 26 26 26 0 0 6/14
25 SGA-09 Fire Fighting System Fire Fighting System for CCB 0 0 6/2 6/24 4 4 4 0 0 40 40 40 0 0 6/12
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. 0 0 6/2 6/20 5 5 5 0 0 48 48 48 0 0 6/12
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building 0 0 1 1 1 0 0 0 0 0 0 0
31 BBT-01 HV System Unit Transformer (27KV/11KV) (BBT01/02/03) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
32 CAA-01 HV System HV Switch Yard Interface Signals, Controls & Protection 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0
33 CHA-01 HV System Cabinets for Generator and Transformer protection 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
34 SA0-06 HVAC System HVAC for boiler Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
35 SA0-07 HVAC System HVAC for Turbine Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
37 CPS-01 Cathodic Protection System (Service Water Tank, Demi Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Cathodic Protection System
Intake)
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0
39 UGD-01 Civil, Building & Structure Water Treatment Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
41 UGC-01 Civil, Building & Structure Demi. Water Storage Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
43 UGG-01 Civil, Building & Structure Filtered Water Storage Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
44 USG-01 Civil, Building & Structure Fire-Fighting Pump Shelter 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
45 UGD-02 Civil, Building & Structure Condensate Make Up Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
47 UQA-01 Civil, Building & Structure Cooling Water Pump Station 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
49 UBF-01 Civil, Building & Structure Generator Step-Up/Unit Transformer 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
50 UPC-01 Civil, Building & Structure CW Intake Shield Tunnel 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
53 SQ0-01 Drainage for WTB,(Chem.Storage Tank, F/F Pump)Shelter, 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Civil, Building & Structure
(Filtered, Demi, Service)Water Tank,CCB
54 SQ0-02 Road and Paving for WTB,(Chem.Storage Tank, F/F 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Civil, Building & Structure
Pump)Shelter,(Filtered, Demi, Service)Water Tank,CCB
55 STR-07 Civil, Building & Structure Piperack 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
56 BFA-01 Lighting System Lighting System for Water Treatment Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
57 BFA-02 Lighting System Lighting System for Central Control Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
58 UBA-03 Civil, Building & Structure PJFF/FGD/ASH Electrical Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
60 BAU-02 Earthing & Lightning System for Other Buildings (for 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Earthing & Lightning System
Equipment Energization)
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
HVAC System
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump 0 0 9/23 9/30 7 6 6 0 1 5 4 4 0 1 9/23
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP 0 0 7/4 1 1 1 0 0 0 0 0 0 0 7/14
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD 0 0 10/2 1 0 0 0 1 5 0 0 0 5 10/12
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) 0 0 9/5 6 6 6 0 0 2 2 2 0 0 9/5
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) 0 0 9/22 10/3 4 0 0 0 4 0 0 0 0 0 N/A
72 GM0-04 Waste Water Transfer System Others Sump Sys 0 0 9/12 8 0 0 0 8 21 0 0 0 21 9/22
73 GM0-05 Waste Water Transfer System Oily Waste Water Sys 0 0 9/12 14 4 4 0 10 24 0 0 0 24 9/22
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building 0 0 7/7 3 1 1 0 2 3 3 3 0 0 7/17
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys 0 0 10/12 3 0 0 0 3 5 0 0 0 5 10/12
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) 0 0 10/12 2 0 0 0 2 0 0 0 0 0 10/22
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) 0 0 10/12 24 0 0 0 24 6 5 5 0 1 10/22
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) 0 0 9/12 9 0 0 0 9 0 0 0 0 0 9/22
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
81 AYE-02 Fire Alarm System FA system for STG (LFAP #02) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
83 AYE-04 Fire Alarm System FA system for Boiler (LFAP #04) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
84 AYE-05 Fire Alarm System FA system for PJFF/FGD/ASH (LFAP #05) 0 0 N/A N/A 0 0 0 0 0 12 0 0 0 12 N/A N/A
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
87 EDA-01 Vibration Monitoring System VMS for CWP 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
88 BFT-02 11KV/440V UNIT AUX. TR (BFT03/04), 415V BUS 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
LV System
(BFA03/04)
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
89 BFT-03 11KV/440V UNIT AUX. TR (BFT05/06), 415V BUS 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
LV System
(BFA05/06)
90 BFT-04 LV System 11KV/440V UNIT AUX. TR (BFT11/12), 415V BUS (BFA11) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
91 BFT-05 LV System 11KV/440V UNIT AUX. TR (BFT13), 415V BUS (BFA13) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
92 BFT-06 11KV/440V UNIT AUX. TR (BFT09/10), 415V BUS 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 7/17
LV System
(BFA09/10)
94 FDN-01 Civil, Building & Structure Absorber Spray Pump 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
95 UVD-01 Civil, Building & Structure FGD Aeration Basin 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
96 UQW-01 Civil, Building & Structure Dischage Outfall 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
97 BFT-07 11KV/440V UNIT AUX. TR (BFT07/08), 415V BUS 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 8/15
LV System
(BFA07/08)
99 BJA-04 415V Sub-BUS (BJA01) (내일 오후에 확정) (Battery Limit 추 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 9/11
LV System
가)
102 BJA-07 LV System 415V Sub-BUS (BJA05) 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
104 PAC-01 Circulating Water System Circulating Water System 01 0 0 8/21 28 28 28 0 0 96 89 89 0 7 8/28
105 PAC-02 Circulating Water System Circulating Water System 02 0 0 9/21 9/26 27 26 26 0 1 10/7 29 0 0 0 29 9/21 ?
106 PAC-03 Circulating Water System Circulating Water System 03 0 0 9/6 9/13 15 15 15 0 0 35 35 35 0 0 9/13
107 PAA-01 Circulating Water System Intake Facility-01 0 0 6/23 N/A 0 0 0 0 0 15 15 15 0 0 7/3
Exceptio
108 PAA-02 Circulating Water System Intake Facility-02 0 0 8/12 4 4 4 0 0 10 10 10 0 0 8/12 n
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 0 0 8/12 18 17 17 0 1 115 84 84 0 31 8/15
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 0 0 10/17 28 17 17 0 11 1 1 1 0 0 10/19
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
111 QCH-01 Electro Chlorination System Electro Chlorination System-01 0 0 6/23 7/1 3 3 3 0 0 0 0 0 0 0 7/3
Electro Chlorination System-02 (Box-up 1ea, Reinstatment 1 Line
112 QCH-02 Electro Chlorination System Exception으로 진행, 자재 Shortage 5 ea for Instrument, 9 point 1 1 9/6 16 15 15 0 1 45 41 41 0 4 9/6
due to not installed Instrument)
with
113 QEA-01 Compressed Air System Compressed Air System 0 0 8/5 5 5 5 0 0 115 115 115 0 0 8/24
vendor
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) 0 0 9/9 9/15 4 3 3 0 1 9/22 2 2 2 0 0 9/22 Exception
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF 0 0 9/22 9/28 1 0 0 0 1 0 0 0 0 0 NA
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, 0 0 9/10 9/15 2 0 2 2 0 0 0 0 0 0 NA
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 0 0 2 0 0 0 2 7 0 0 0 7
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) 0 0 9/30 2 0 0 0 2 2 0 0 0 2 9/30
119 QEJ-03 Service Air Distribution System Distribution Sys for Others 0 0 10/7 3 0 0 0 3 10/7 5 0 0 0 5 10/8
120 LCA-02 Condensate System Condesate Storage & Transfer System-01 0 0 9/2 4 4 4 0 0 6 6 6 0 0 9/5
122 LCA-04 Condensate System Condesate Storage & Transfer System-02 0 0 9/22 9/26 3 0 1 1 2 9/27 1 1 1 0 0 9/22 9/27
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System 0 0 11/2 3 0 0 0 3 11/2 3 0 0 0 3 11/2
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank 0 0 5 5 5 0 0 8 0 8 8 0
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) 0 0 8/12 0 0 0 0 0 399 6 6 0 393 8/22
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) 0 0 9/20 2 0 0 0 2 0 0 0 0 0 9/30
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템
127 HNC-02 Air & Gas System 0 0 10/10 1 0 0 0 1 0 0 0 0 0 10/10
분리 방안 강구)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) 0 2 9/17 3 0 0 0 3 27 0 0 0 27 9/20 9/30
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) 0 1 9/25 9/28 7 2 5 3 2 9/28 11 11 11 0 0 9/28
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 0 0 0 0 0 0 0 3 0 0 0 3
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
132 HHQ-01 LFO Firing System LFO Firing Air System 0 0 10/7 3 0 0 0 3 77 0 0 0 77 10/7
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner 0 0 10/7 1 0 0 0 1 130 0 0 0 130 10/7
134 HHF-01 LFO Firing System LFO Firing System 0 0 10/7 1 0 0 0 1 28 0 0 0 28 10/7
135 HTO-01 FGD System FGD Absorber System (담당자와 협의 후 일정 확정) 0 0 9/12 1 0 0 0 1 0 0 0 0 0 9/22
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) 0 0 9/12 11 0 0 0 11 0 0 0 0 0 9/22
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) 0 0 11/2 21 1 1 0 20 10/30 6 0 0 0 6 11/2
138 QC0-01 Chemical Dosing System Chemical Dosing System 0 0 10/12 6 0 0 0 6 10/12 30 0 0 0 30 10/12
139 LDO-01 Condensate Polishing Plant Condensate Polishing Plant 0 7 9/29 42 7 7 0 35 10/7 157 12 12 0 145 10/15
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, 0 0 0 0 0 0 0 0 0 0 0 0 NA
LAC-02 & LAV-02)
145 XAW-01 Feed Water System BFPT Gland Steam System 0 0 10/2 3 0 0 0 3 0 0 0 0 0 10/5
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System 0 1 9/29 9 0 0 0 9 110 0 0 0 110 9/28
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) 0 1 10/8 13 0 0 0 13 12 0 0 0 12 10/8
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System 0 0 9/22 5 0 0 0 5 0 0 0 0 0 10/15
149 MAX-01 Steam Turbine Generator System TBN Control Oil System 0 0 9/28 6 0 0 0 6 0 0 0 0 0 10/10
150 MAA-01 Steam Turbine Generator System TBN Steam System 0 0 10/2 20 0 0 0 20 0 0 0 0 0 10/10
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System 0 1 10/2 9 0 0 0 9 0 0 0 0 0 10/10
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System 0 0 10/2 4 0 0 0 4 0 0 0 0 0 10/5
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) 0 0 1 1 1 0 0 179 174 174 0 5 8/30
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
154 HAG-01 Pressure System Boiler Recirculation Pump System 0 0 10/12 5 1 1 0 4 33 1 1 0 32 10/15
155 LAE-01 Pressure System Superheater Spray Water System 0 0 1 1 1 0 0 9/23 9/28 12 6 6 0 6 9/28
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) 0 0 Exception 1 0 0 0 1 90 0 0 0 90 10/21
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) 0 0 Exception 1 0 0 0 1 105 0 0 0 105 10/21
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) 0 0 Exception 1 1 1 0 0 58 0 0 0 58 10/21
160 LBA-01 Steam System Main & RH Steam System 0 0 10/22 17 0 0 0 17 172 0 0 0 172 10/30
162 LBG-01 Steam System Auxiliary Steam System for main 0 0 10/18 5 0 0 0 5 33 0 0 0 33 10/18
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up 0 0 10/17 2 0 0 0 2 0 0 0 0 0
165 HAN-02 Steam System Safety Valve Exhaust Piping System 0 0 11/2 3 0 0 0 3 9 0 0 0 9 11/2
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System 0 0 5 5 5 0 0 6 0 6 6 0
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
168 SM0-01 Crane and Hoist Crane and Hoist 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) 0 0 10/15 1 0 0 0 1 0 0 0 0 0 N/A N/A
171 STR-04 Civil, Building & Structure N2 Shelter 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
173 UHN-01 Civil, Building & Structure Chimney 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
175 UBN-01 Civil, Building & Structure Emergency Diesel Generator 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
177 TNK-02 Civil, Building & Structure Foam Tank 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
179 UVB-01 Civil, Building & Structure CID Fan 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
182 UHA-01 Civil, Building & Structure Boiler 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
183 UMA-01 Civil, Building & Structure Steam Turbine Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
185 STR-03 Civil, Building & Structure H2/CO2 Shelter 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
187 UET-01 Civil, Building & Structure Fly Ash Silo 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
188 UET-02 Civil, Building & Structure Bottom Ash Silo 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
190 UST-01 Civil, Building & Structure Workshop & Store Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
193 XAW-02 Feed Water System BFPT Steam System 0 0 10/2 7 0 0 0 7 0 0 0 0 0 10/10
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) 0 0 10/17 2 0 0 0 2 23 0 0 0 23 10/20
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02 0 0 0 0 0 0 0 77 0 0 0 77
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism 0 2 10/17 14 0 0 0 14 0 0 0 0 0 10/30
197 LAF-01 Feed Water System Reheater Spray Water System 0 0 9/12 9/15 2 2 2 0 0 9/20 10 4 4 0 6 9/15 9/20
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System 0 0 10/9 7 0 0 0 7 0 0 0 0 0 10/7
199 MKG-01 Steam Turbine Generator System Generator H2 Control System 0 0 10/9 13 0 0 0 13 0 0 0 0 0 10/17
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System 0 0 10/28 1 0 0 0 1 0 0 0 0 0 11/7
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System 0 0 10/28 2 0 0 0 2 0 0 0 0 0 11/7
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) 0 0 10/9 2 0 0 0 2 105 0 0 0 105 10/19
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) 0 0 10/9 1 0 0 0 1 118 0 0 0 118 10/19
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) 0 0 10/9 0 0 0 0 0 53 0 0 0 53 10/19
206 HFC-01 Coal Pulverising system Pulverized Coal Firing System 0 12 10/27 2 0 0 0 2 511 0 0 0 511 10/27
207 HFW-01 Coal Pulverising system Pulverized Sealing Air System 0 0 9/8 2 0 0 0 2 67 26 26 0 41 9/20 9/30
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system 0 0 9/22 12 0 0 0 12 9/15 494 0 159 159 335 9/20 9/30
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) 0 0 10/9 1 0 0 0 1 158 0 0 0 158 10/19
211 SQ0-03 Civil, Building & Structure Drainage for all others 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
212 SQ0-04 Civil, Building & Structure Road & Paving for all others 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
213 UZD-01 Civil, Building & Structure Parking Lot 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
215 MK0-01 Steam Turbine Generator System Generator 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 11/2
216 MKC-01 Steam Turbine Generator System Exciter System 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 11/2
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Box-up Reinstatement Tag Item IO C
No. Sub-system System Description Sub-System Description
Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual
218 UZK-01 Civil, Building & Structure Landscaping 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 0 0 10/7 15 0 0 0 15 194 0 0 0 194 10/17
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 0 0 10/18 11 0 0 0 11 43 0 0 0 43 10/28
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System 0 2 10/7 51 0 0 0 51 157 0 0 0 157 10/17
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System 0 1 10/7 30 0 0 0 30 34 0 0 0 34 10/17
224 SA0-05 HVAC System HVAC for Workshop Store Building 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
225 CYA-01 Communication System Telecommunication System 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
226 CYM-01 Communication System Paging System 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
227 CYP-01 Communication System CCTV System 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 N/A N/A
228
229 Summary Status 1 42 957 319 325 6 632 5120 1094 1267 173 3853
230
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
2 BAU-01 Earthing & Lightning System for WTB (for Equipment 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Earthing & Lightning System
Energization)
3 BAU-03 Earthing & Lightning System for CCB (for Equipment 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Earthing & Lightning System
Energization)
4 BTA-01 LV System DC 220V Batteries and Chargers (BTA10/20, BUA10/20) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
5 BTB-01 LV System DC 110V Batteries and Chargers (BTB10/20, BUB10/20) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
6 BTC-01 AC 230V UPS Batteries and Chargers (BTC10/20, 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
LV System
BRB10/20)
8 BBA-02 MV System NSPB BBA01GS101 / BBA02GS101 / BB03GS101 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
9 BBA-03 MV System NSPB for MV SWGR TIE(BB03GS201) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
10 BFT-01 11KV/440V UNIT AUX. TR (BFT01/02), 415V BUS 27 0 0 0 27 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
LV System
(BFA01/02)
11 BJA-01 LV System Water Treatment Building MCC (BJA15) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
12 SA0-01 HVAC System HVAC for Central Control Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) 12 12 12 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump 23 23 23 0 0 6/14 2 2 2 0 0 6/21 2 2 2 0 0 0
16 GC0-01 Water Treatment System Water Treatment System-01 491 491 491 0 0 4/17 5/18 14 14 14 0 0 4/24 14 6 6 0 8 2
17 GC0-02 Water Treatment System Water Treatment System-02 12 12 12 0 0 5/22 5/18 2 2 2 0 0 5/29 2 0 0 0 2 2
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank 4 4 4 0 0 N/A N/A 0 0 0 0 0 4/24 0 0 0 0 0 1
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) 0 0 0 0 0 N/A N/A 0 0 0 0 0 8/29 0 0 0 0 0 0
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB 0 0 0 0 0 N/A N/A 0 0 0 0 0 4/24 N/A 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB 0 0 0 0 0 N/A N/A 0 0 0 0 0 4/24 N/A 0 0 0 0 0 0
24 SGA-01 Fire Fighting System Fire Fighting System for WTB 8 0 0 0 8 6/14 1 1 1 0 0 6/21 5 5 5 0 0 1
25 SGA-09 Fire Fighting System Fire Fighting System for CCB 32 0 0 0 32 N/A N/A 0 0 0 0 0 6/19 N/A 0 0 0 0 0 1
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. 28 0 0 0 28 N/A N/A 0 0 0 0 0 6/19 N/A 0 0 0 0 0 1
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 0
28 BAT-01 HV System Generator Step-Up Transformer (BAT01) 27 0 0 0 27 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
31 BBT-01 HV System Unit Transformer (27KV/11KV) (BBT01/02/03) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
32 CAA-01 HV System HV Switch Yard Interface Signals, Controls & Protection 7 0 0 0 7 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
33 CHA-01 HV System Cabinets for Generator and Transformer protection 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
34 SA0-06 HVAC System HVAC for boiler Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
35 SA0-07 HVAC System HVAC for Turbine Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
36 BAC-01 Steam Turbine Generator System GCB System 1 0 0 0 1 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
37 CPS-01 Cathodic Protection System (Service Water Tank, Demi Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Cathodic Protection System
Intake)
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) 11 0 0 0 11 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
39 UGD-01 Civil, Building & Structure Water Treatment Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
41 UGC-01 Civil, Building & Structure Demi. Water Storage Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
43 UGG-01 Civil, Building & Structure Filtered Water Storage Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
44 USG-01 Civil, Building & Structure Fire-Fighting Pump Shelter 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
45 UGD-02 Civil, Building & Structure Condensate Make Up Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
47 UQA-01 Civil, Building & Structure Cooling Water Pump Station 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
49 UBF-01 Civil, Building & Structure Generator Step-Up/Unit Transformer 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
50 UPC-01 Civil, Building & Structure CW Intake Shield Tunnel 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
53 SQ0-01 Drainage for WTB,(Chem.Storage Tank, F/F Pump)Shelter, 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Civil, Building & Structure
(Filtered, Demi, Service)Water Tank,CCB
54 SQ0-02 Road and Paving for WTB,(Chem.Storage Tank, F/F 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Civil, Building & Structure
Pump)Shelter,(Filtered, Demi, Service)Water Tank,CCB
55 STR-07 Civil, Building & Structure Piperack 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
56 BFA-01 Lighting System Lighting System for Water Treatment Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
57 BFA-02 Lighting System Lighting System for Central Control Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
58 UBA-03 Civil, Building & Structure PJFF/FGD/ASH Electrical Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
60 BAU-02 Earthing & Lightning System for Other Buildings (for 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Earthing & Lightning System
Equipment Energization)
61 CBA-01 DCS DCS Control Cabinets Boiler/STG/BOP/Electrical-01 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
62 CBA-02 DCS DCS Control Cabinets Boiler/STG/BOP/Electrical-02 222 0 7 7 215 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
HVAC System
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump 24 0 0 0 24 8/15 3 3 3 0 0 8/22 4 4 4 0 0 3
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP 0 0 0 0 0 N/A N/A 0 0 0 0 0 7/21 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD 13 0 0 0 13 10/12 0 0 0 0 0 10/19 0 0 0 0 0 3
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) 1 1 1 0 0 N/A N/A 0 0 0 0 0 8/22 N/A 0 0 0 0 0 0
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) 0 0 0 0 0 N/A N/A 0 0 0 0 0 NA 0 0 0 0 0 2
72 GM0-04 Waste Water Transfer System Others Sump Sys 42 0 5 5 37 9/22 16 0 0 0 16 9/29 18 0 0 0 18 5
73 GM0-05 Waste Water Transfer System Oily Waste Water Sys 39 0 0 0 39 9/22 2 0 0 0 2 9/29 2 0 0 0 2 5
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building 16 0 0 0 16 N/A N/A 0 0 0 0 0 7/24 0 0 0 0 0 3
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys 16 0 0 0 16 10/10 7 0 0 0 7 10/12 7 0 0 0 7 5
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) 0 0 0 0 0 N/A N/A 0 0 0 0 0 10/29 0 0 0 0 0 2
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) 3 0 0 0 3 N/A N/A 0 0 0 0 0 10/29 0 0 0 0 0 3
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) 0 0 0 0 0 N/A N/A 0 0 0 0 0 9/29 0 0 0 0 0 2
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
81 AYE-02 Fire Alarm System FA system for STG (LFAP #02) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
83 AYE-04 Fire Alarm System FA system for Boiler (LFAP #04) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
84 AYE-05 Fire Alarm System FA system for PJFF/FGD/ASH (LFAP #05) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
87 EDA-01 Vibration Monitoring System VMS for CWP 5 5 5 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
88 BFT-02 11KV/440V UNIT AUX. TR (BFT03/04), 415V BUS 17 0 0 0 17 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
LV System
(BFA03/04)
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
89 BFT-03 11KV/440V UNIT AUX. TR (BFT05/06), 415V BUS 12 0 0 0 12 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
LV System
(BFA05/06)
90 BFT-04 LV System 11KV/440V UNIT AUX. TR (BFT11/12), 415V BUS (BFA11) 11 0 0 0 11 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
91 BFT-05 LV System 11KV/440V UNIT AUX. TR (BFT13), 415V BUS (BFA13) 3 0 0 0 3 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
92 BFT-06 11KV/440V UNIT AUX. TR (BFT09/10), 415V BUS 14 0 0 0 14 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
LV System
(BFA09/10)
94 FDN-01 Civil, Building & Structure Absorber Spray Pump 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
95 UVD-01 Civil, Building & Structure FGD Aeration Basin 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
96 UQW-01 Civil, Building & Structure Dischage Outfall 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
97 BFT-07 11KV/440V UNIT AUX. TR (BFT07/08), 415V BUS 20 20 20 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
LV System
(BFA07/08)
99 BJA-04 415V Sub-BUS (BJA01) (내일 오후에 확정) (Battery Limit 추 5 0 0 0 5 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
LV System
가)
100 BJA-05 LV System 415V Sub-BUS (BJA17/18) 15 0 0 0 15 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
101 BJA-06 LV System 415V Sub-BUS (BJA13) 5 0 0 0 5 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
102 BJA-07 LV System 415V Sub-BUS (BJA05) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
103 BJA-08 LV System 415V Sub-BUS (BJA07/09) 10 3 3 0 7 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
104 PAC-01 Circulating Water System Circulating Water System 01 256 231 231 0 25 8/16 CWP 5 5 5 0 0 8/27 5 5 5 0 0 1
105 PAC-02 Circulating Water System Circulating Water System 02 335 0 0 0 335 8/22 4 4 4 0 0 8/29 4 0 0 0 4 3
107 PAA-01 Circulating Water System Intake Facility-01 90 89 89 0 1 7/3 N/A 0 0 0 0 0 7/10 N/A 7 0 0 0 7 2
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 52 32 52 20 0 8/8 2 2 2 0 0 8/9 2 2 2 0 0 1
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 2 0 0 0 2 NA 0 0 0 0 0 0 0 0 0 0 3
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
111 QCH-01 Electro Chlorination System Electro Chlorination System-01 6 6 6 0 0 N/A N/A 0 0 0 0 0 7/10 0 0 0 0 0 0
Electro Chlorination System-02 (Box-up 1ea, Reinstatment 1 Line
112 QCH-02 Electro Chlorination System Exception으로 진행, 자재 Shortage 5 ea for Instrument, 9 point 179 168 168 0 11 8/8 8 8 8 0 0 9/5 8 8 8 0 0 3
due to not installed Instrument)
113 QEA-01 Compressed Air System Compressed Air System 162 0 0 0 162 N/A N/A 0 0 0 0 0 NA 0 0 0 0 0 1
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) 1 0 0 0 1 N/A N/A 0 0 0 0 0 NA NA 0 0 0 0 0 2
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF 0 0 0 0 0 N/A N/A 0 0 0 0 0 NA 0 0 0 0 0 2
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, 0 0 0 0 0 N/A N/A 0 0 0 0 0 NA 0 0 0 0 0 0
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) 1 0 0 0 1 N/A N/A 0 0 0 0 0 9/6 0 0 0 0 0 3
119 QEJ-03 Service Air Distribution System Distribution Sys for Others 1 0 0 0 1 N/A N/A 0 0 0 0 0 NA 0 0 0 0 0 3
120 LCA-02 Condensate System Condesate Storage & Transfer System-01 14 14 14 0 0 8/5 1 1 1 0 0 9/2 1 1 1 0 0 0
122 LCA-04 Condensate System Condesate Storage & Transfer System-02 1 0 1 1 0 N/A N/A 0 0 0 0 0 10/19 0 0 0 0 0 1
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System 0 0 0 0 0 N/A N/A 0 0 0 0 0 10/19 0 0 0 0 0 2
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) 558 0 4 4 554 8/22 6 0 0 0 6 8/29 12 0 0 0 12 3
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) 256 74 74 0 182 0 0 0 0 0 8/8 16 0 0 0 16 4
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템
127 HNC-02 Air & Gas System 83 12 12 0 71 0 0 0 0 0 10/29 12 0 0 0 12 4
분리 방안 강구)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) 67 11 11 0 56 9/9 4 4 4 0 0 9/16 12 0 0 0 12 5
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) 36 5 5 0 31 9/24 9/26 2 2 2 0 0 9/28 2 0 2 2 0 3
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
132 HHQ-01 LFO Firing System LFO Firing Air System 187 0 0 0 187 2 0 0 0 2 4 0 0 0 4 5
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner 486 0 0 0 486 N/A N/A 0 0 0 0 0 0 0 0 0 0 3
134 HHF-01 LFO Firing System LFO Firing System 474 0 0 0 474 N/A N/A 0 0 0 0 0 0 0 0 0 0 3
135 HTO-01 FGD System FGD Absorber System (담당자와 협의 후 일정 확정) 2 0 0 0 2 9/22 3 0 0 0 3 9/29 3 0 0 0 3 5
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) 4 0 0 0 4 9/22 8 0 0 0 8 9/29 10 0 0 0 10 5
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) 51 0 0 0 51 N/A N/A 0 0 0 0 0 10/29 0 0 0 0 0 3
138 QC0-01 Chemical Dosing System Chemical Dosing System 130 0 0 0 130 10/5 0 0 0 0 0 10/12 7 0 0 0 7 4
139 LDO-01 Condensate Polishing Plant Condensate Polishing Plant 421 0 0 0 421 8 0 0 0 8 12 0 0 0 12 6
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, 0 0 0 0 0 NA 0 0 0 0 0 2 0 0 0 2 1
LAC-02 & LAV-02)
145 XAW-01 Feed Water System BFPT Gland Steam System 0 0 0 0 0 N/A N/A 0 0 0 0 0 10/9 0 0 0 0 0 2
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System 0 0 0 0 0 9/17 0 0 0 0 0 9/24 9/29 5 5 5 0 0 3
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) 5 0 0 0 5 1 0 0 0 1 4 0 0 0 4 6
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System 0 0 0 0 0 N/A 0 0 0 0 0 NA 0 0 0 0 0 2
149 MAX-01 Steam Turbine Generator System TBN Control Oil System 0 0 0 0 0 10/5 3 0 0 0 3 10/10 3 0 0 0 3 4
150 MAA-01 Steam Turbine Generator System TBN Steam System 0 0 0 0 0 N/A N/A 0 0 0 0 0 10/14 0 0 0 0 0 2
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System 0 0 0 0 0 10/7 0 0 0 0 0 10/14 2 0 0 0 2 4
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System 60 30 30 0 30 N/A N/A 0 0 0 0 0 10/26 3 0 0 0 3 4
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) 90 22 22 0 68 N/A N/A 0 0 0 0 0 8/10 0 0 0 0 0 1
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
154 HAG-01 Pressure System Boiler Recirculation Pump System 88 0 0 0 88 N/A N/A 0 0 0 0 0 9/30 1 0 0 0 1 4
155 LAE-01 Pressure System Superheater Spray Water System 30 6 6 0 24 N/A N/A 0 0 0 0 0 8/29 0 0 0 0 0 1
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) 130 0 0 0 130 N/A N/A 0 0 0 0 0 9/30 0 0 0 0 0 2
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) 64 0 0 0 64 N/A N/A 0 0 0 0 0 9/30 0 0 0 0 0 2
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) 41 0 0 0 41 N/A N/A 0 0 0 0 0 9/30 0 0 0 0 0 1
159 HAN-01 Pressure System Boiler Drain System 0 0 0 0 0 N/A N/A 0 0 0 0 0 8/10 0 0 0 0 0 0
160 LBA-01 Steam System Main & RH Steam System 238 0 0 0 238 N/A N/A 0 0 0 0 0 10/29 0 0 0 0 0 3
161 LBF-01 Steam System HP/LP Bypass System (9월 5일 추가 협의) 107 0 1 1 106 N/A N/A 0 0 0 0 0 0 0 0 0 0 2
162 LBG-01 Steam System Auxiliary Steam System for main 29 0 0 0 29 N/A N/A 0 0 0 0 0 10/29 0 0 0 0 0 3
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up 0 0 0 0 0 N/A N/A 0 0 0 0 0 0 0 0 0 0 2
165 HAN-02 Steam System Safety Valve Exhaust Piping System 6 0 0 0 6 N/A N/A 0 0 0 0 0 10/3 0 0 0 0 0 3
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System 24 0 0 0 24 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System 7 0 0 0 7 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
168 SM0-01 Crane and Hoist Crane and Hoist 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 2
171 STR-04 Civil, Building & Structure N2 Shelter 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
173 UHN-01 Civil, Building & Structure Chimney 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
175 UBN-01 Civil, Building & Structure Emergency Diesel Generator 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
177 TNK-02 Civil, Building & Structure Foam Tank 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
179 UVB-01 Civil, Building & Structure CID Fan 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
182 UHA-01 Civil, Building & Structure Boiler 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
183 UMA-01 Civil, Building & Structure Steam Turbine Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
185 STR-03 Civil, Building & Structure H2/CO2 Shelter 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
187 UET-01 Civil, Building & Structure Fly Ash Silo 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
188 UET-02 Civil, Building & Structure Bottom Ash Silo 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
190 UST-01 Civil, Building & Structure Workshop & Store Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
193 XAW-02 Feed Water System BFPT Steam System 0 0 0 0 0 N/A N/A 0 0 0 0 0 9/9 0 0 0 0 0 2
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) 12 0 0 0 12 N/A N/A 0 0 0 0 0 9/9 0 0 0 0 0 3
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism 0 0 0 0 0 9/2 4 0 0 0 4 9/9 4 0 0 0 4 5
197 LAF-01 Feed Water System Reheater Spray Water System 42 2 2 0 40 N/A N/A 0 0 0 0 0 NA 0 0 0 0 0 1
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System 0 0 0 0 0 N/A N/A 0 0 0 0 0 10/26 1 0 0 0 1 3
199 MKG-01 Steam Turbine Generator System Generator H2 Control System 0 0 0 0 0 N/A N/A 0 0 0 0 0 10/26 0 0 0 0 0 2
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System 0 0 0 0 0 N/A N/A 0 0 0 0 0 11/14 0 0 0 0 0 2
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System 0 0 0 0 0 N/A N/A 0 0 0 0 0 11/14 0 0 0 0 0 2
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) 328 0 0 0 328 10/19 0 0 0 0 0 10/26 34 0 0 0 34 4
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) 399 0 0 0 399 10/19 0 0 0 0 0 10/26 37 0 0 0 37 3
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) 66 0 0 0 66 10/19 6 0 0 0 6 10/26 12 0 0 0 12 3
206 HFC-01 Coal Pulverising system Pulverized Coal Firing System 820 51 63 12 757 NA 0 0 0 0 0 26 0 0 0 26 5
207 HFW-01 Coal Pulverising system Pulverized Sealing Air System 109 27 27 0 82 9/14 2 0 2 2 0 9/16 6 0 0 0 6 4
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system 432 92 92 0 340 N/A N/A 0 0 0 0 0 NA 0 0 0 0 0 3
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) 213 0 0 0 213 10/19 0 0 0 0 0 10/26 18 0 0 0 18 3
210 EDA-03 Emission Monitoring System CEMS 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
211 SQ0-03 Civil, Building & Structure Drainage for all others 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
212 SQ0-04 Civil, Building & Structure Road & Paving for all others 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
213 UZD-01 Civil, Building & Structure Parking Lot 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
215 MK0-01 Steam Turbine Generator System Generator 9 0 0 0 9 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
216 MKC-01 Steam Turbine Generator System Exciter System 1 0 0 0 1 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 1
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
IO Check Motor Solo Run Final Alignment Bal.
No. Sub-system System Description Sub-System Description
Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Target Actual Total Prev Accum Today Bal. Disc
218 UZK-01 Civil, Building & Structure Landscaping 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 306 0 0 0 306 N/A N/A 0 0 0 0 0 10/24 0 0 0 0 0 3
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 36 0 0 0 36 N/A N/A 0 0 0 0 0 11/4 0 0 0 0 0 3
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System 305 0 0 0 305 10/17 4 0 0 0 4 10/24 4 0 0 0 4 6
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System 64 0 0 0 64 N/A N/A 0 0 0 0 0 10/24 0 0 0 0 0 4
224 SA0-05 HVAC System HVAC for Workshop Store Building 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
225 CYA-01 Communication System Telecommunication System 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
226 CYM-01 Communication System Paging System 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
227 CYP-01 Communication System CCTV System 0 0 0 0 0 N/A N/A 0 0 0 0 0 N/A N/A 0 0 0 0 0 0
228
229 Summary Status 10953 1622 1679 57 9274 132 50 52 2 80 417 48 50 2 367 294
2 BAU-01 Earthing & Lightning System for WTB (for Equipment 0 4/25 5/10 4/30
Earthing & Lightning System
Energization)
3 BAU-03 Earthing & Lightning System for CCB (for Equipment 0 6/20 6/20 6/25
Earthing & Lightning System
Energization)
4 BTA-01 LV System DC 220V Batteries and Chargers (BTA10/20, BUA10/20) 0 6/21 6/21 6/26
5 BTB-01 LV System DC 110V Batteries and Chargers (BTB10/20, BUB10/20) 0 6/21 6/21 6/26
6 BTC-01 AC 230V UPS Batteries and Chargers (BTC10/20, 0 6/21 6/21 6/26
LV System
BRB10/20)
9 BBA-03 MV System NSPB for MV SWGR TIE(BB03GS201) 0 11/10 11/22 11/22 11/15
10 BFT-01 11KV/440V UNIT AUX. TR (BFT01/02), 415V BUS 27 6/20 6/20 6/25
LV System
(BFA01/02)
11 BJA-01 LV System Water Treatment Building MCC (BJA15) 0 5/10 5/10 5/15
12 SA0-01 HVAC System HVAC for Central Control Building 0 6/20 6/20 6/25
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment 0 4/25 5/10 4/30
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) 1 4/25 5/10 4/30
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump 0 6/22 6/23 6/27
16 GC0-01 Water Treatment System Water Treatment System-01 10 4/25 5/10 4/30
17 GC0-02 Water Treatment System Water Treatment System-02 3 5/30 5/10 6/4
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank 1 4/25 5/10 4/30
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) 0 8/30 9/1 9/4
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB 0 4/25 5/10 4/30
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB 0 4/25 5/10 4/30
24 SGA-01 Fire Fighting System Fire Fighting System for WTB 8 6/22 6/23 6/27
25 SGA-09 Fire Fighting System Fire Fighting System for CCB 32 6/20 6/20 6/25
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. 28 6/20 6/20 6/25
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building 0 8/31 9/2 9/5
32 CAA-01 HV System HV Switch Yard Interface Signals, Controls & Protection 7 6/20 6/20 6/25
33 CHA-01 HV System Cabinets for Generator and Transformer protection 0 6/20 6/20 6/25
34 SA0-06 HVAC System HVAC for boiler Building 0 9/1 9/26 9/26 10/28 9/6
35 SA0-07 HVAC System HVAC for Turbine Building 0 9/1 9/20 9/20 10/28 9/6
36 BAC-01 Steam Turbine Generator System GCB System 1 6/20 6/20 6/25
37 CPS-01 Cathodic Protection System (Service Water Tank, Demi Tank 0 8/15 8/16 8/20
Cathodic Protection System
Intake)
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) 11 12/15 12/15 12/15 12/20
39 UGD-01 Civil, Building & Structure Water Treatment Building 0 4/25 5/10 4/30
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank 0 4/25 5/10 4/30
41 UGC-01 Civil, Building & Structure Demi. Water Storage Tank 0 4/25 5/10 4/30
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT 0 4/25 5/10 4/30
43 UGG-01 Civil, Building & Structure Filtered Water Storage Tank 0 4/25 5/10 4/30
44 USG-01 Civil, Building & Structure Fire-Fighting Pump Shelter 0 6/22 6/23 6/27
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
45 UGD-02 Civil, Building & Structure Condensate Make Up Tank 0 7/19 7/22 7/24
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) 0 9/10 9/28 9/28 9/28 9/28 9/28 9/28 9/15
47 UQA-01 Civil, Building & Structure Cooling Water Pump Station 0 6/3 6/3 6/8
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower 0 6/20 6/20 6/25
49 UBF-01 Civil, Building & Structure Generator Step-Up/Unit Transformer 0 6/20 6/20 6/25
50 UPC-01 Civil, Building & Structure CW Intake Shield Tunnel 0 6/3 6/3 6/8
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) 0 9/30 9/28 9/28 9/28 9/28 9/28 10/5
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. 0 6/20 6/20 6/25
53 SQ0-01 Drainage for WTB,(Chem.Storage Tank, F/F Pump)Shelter, 0 12/16 12/16 12/16 12/21
Civil, Building & Structure
(Filtered, Demi, Service)Water Tank,CCB
54 SQ0-02 Road and Paving for WTB,(Chem.Storage Tank, F/F 0 3/30 3/30 3/30 4/4
Civil, Building & Structure
Pump)Shelter,(Filtered, Demi, Service)Water Tank,CCB
55 STR-07 Civil, Building & Structure Piperack 0 11/30 12/5 12/5 12/5
56 BFA-01 Lighting System Lighting System for Water Treatment Building 0 6/22 6/23 6/27
57 BFA-02 Lighting System Lighting System for Central Control Building 0 6/20 6/20 6/25
58 UBA-03 Civil, Building & Structure PJFF/FGD/ASH Electrical Building 0 9/30 10/12 10/12 10/5
60 BAU-02 Earthing & Lightning System for Other Buildings (for 0 9/10 12/5 12/5 9/15
Earthing & Lightning System
Equipment Energization)
62 CBA-02 DCS DCS Control Cabinets Boiler/STG/BOP/Electrical-02 215 11/30 12/9 12/9 12/5
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP 0 6/22 6/23 6/27
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal 0 9/30 10/17 10/17 10/5
HVAC System
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump 27 8/23 9/26 9/26 10/4 8/28
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP 0 7/22 7/25 7/27
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD 20 10/20 11/10 11/10 10/25
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) 0 8/25 9/7 9/7 8/30
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) 6 8/25 9/27 9/27 9/27 10/4 8/30
72 GM0-04 Waste Water Transfer System Others Sump Sys 107 10/30 10/31 10/31 11/4
73 GM0-05 Waste Water Transfer System Oily Waste Water Sys 85 10/30 10/31 10/31 11/4
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building 20 7/25 7/26 7/26 7/30
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys 41 9/30 10/17 10/17 10/5
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) 4 10/30 10/28 10/28 11/4
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) 52 10/30 10/28 10/28 11/4
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) 18 9/30 10/26 10/26 10/5
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) 0 8/30 9/20 9/20 9/20 9/4
81 AYE-02 Fire Alarm System FA system for STG (LFAP #02) 0 10/30 11/17 11/17 11/4
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) 0 9/30 9/29 9/29 9/29 9/30 9/30 10/5
83 AYE-04 Fire Alarm System FA system for Boiler (LFAP #04) 0 10/30 11/17 11/17 11/4
84 AYE-05 Fire Alarm System FA system for PJFF/FGD/ASH (LFAP #05) 12 10/15 10/17 10/17 10/20
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) 0 8/30 9/29 9/29 9/29 9/29 9/4
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) 0 10/30 11/17 11/17 11/4
87 EDA-01 Vibration Monitoring System VMS for CWP 0 9/7 9/20 9/20 10/6 9/12
88 BFT-02 11KV/440V UNIT AUX. TR (BFT03/04), 415V BUS 17 6/20 6/20 6/25
LV System
(BFA03/04)
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
89 BFT-03 11KV/440V UNIT AUX. TR (BFT05/06), 415V BUS 12 6/20 6/20 6/25
LV System
(BFA05/06)
90 BFT-04 LV System 11KV/440V UNIT AUX. TR (BFT11/12), 415V BUS (BFA11) 11 6/20 6/20 6/25
91 BFT-05 LV System 11KV/440V UNIT AUX. TR (BFT13), 415V BUS (BFA13) 3 6/20 6/20 6/25
92 BFT-06 11KV/440V UNIT AUX. TR (BFT09/10), 415V BUS 14 7/25 7/26 7/30
LV System
(BFA09/10)
94 FDN-01 Civil, Building & Structure Absorber Spray Pump 0 6/22 6/23 6/27
95 UVD-01 Civil, Building & Structure FGD Aeration Basin 0 8/12 8/12 8/17
96 UQW-01 Civil, Building & Structure Dischage Outfall 0 7/19 7/22 7/24
97 BFT-07 11KV/440V UNIT AUX. TR (BFT07/08), 415V BUS 0 8/29 8/29 9/3
LV System
(BFA07/08)
99 BJA-04 415V Sub-BUS (BJA01) (내일 오후에 확정) (Battery Limit 추 5 9/19 9/19 9/19 9/30 9/30 9/30 9/24
LV System
가)
100 BJA-05 LV System 415V Sub-BUS (BJA17/18) 15 10/20 10/19 10/19 10/25
101 BJA-06 LV System 415V Sub-BUS (BJA13) 5 10/30 10/24 10/24 11/4
102 BJA-07 LV System 415V Sub-BUS (BJA05) 0 11/3 11/3 11/3 11/8
103 BJA-08 LV System 415V Sub-BUS (BJA07/09) 7 11/4 11/4 11/4 11/9
104 PAC-01 Circulating Water System Circulating Water System 01 32 8/29 8/30 9/3
105 PAC-02 Circulating Water System Circulating Water System 02 369 8/30 9/23 9/23 9/28 9/28 10/11 9/4
106 PAC-03 Circulating Water System Circulating Water System 03 24 8/30 9/15 9/15 9/15 9/4
107 PAA-01 Circulating Water System Intake Facility-01 8 7/11 7/11 7/16
108 PAA-02 Circulating Water System Intake Facility-02 0 8/26 8/26 8/31
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 32 8/16 8/18 8/21
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 22 8/27 9/30 9/30 10/21 9/1
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
111 QCH-01 Electro Chlorination System Electro Chlorination System-01 0 7/11 7/11 7/16
Electro Chlorination System-02 (Box-up 1ea, Reinstatment 1 Line
112 QCH-02 Electro Chlorination System Exception으로 진행, 자재 Shortage 5 ea for Instrument, 9 point 17 8/17 9/9 9/13 9/13 8/22
due to not installed Instrument)
113 QEA-01 Compressed Air System Compressed Air System 162 8/26 8/26 8/31
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) 2 8/30 9/13 9/15 9/23 9/28 9/28 or 29 9/28 9/4
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF 2 9/5 9/23 9/23 9/30 9/30 ? 9/10
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, 0 9/20 9/15 9/15 9/15 9/25
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 11 10/12 1/4
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) 7 9/7 10/4 10/4 9/12
119 QEJ-03 Service Air Distribution System Distribution Sys for Others 12 9/22 10/12 10/12 9/27
120 LCA-02 Condensate System Condesate Storage & Transfer System-01 0 8/29 9/6 9/6 9/3
122 LCA-04 Condensate System Condesate Storage & Transfer System-02 2 10/20 9/28 9/28 9/28 9/28 9/30 10/25
123 LCA-05 Condensate System Condensate System-02 21 10/30 10/19 10/19 11/4
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System 8 10/20 11/4 11/4 10/25
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank 0 9/28
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) 965 8/30 10/31 10/31 9/4
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) 202 9/30 10/3 10/3 10/5
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템
127 HNC-02 Air & Gas System 85 10/30 10/12 10/12 11/4
분리 방안 강구)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) 103 9/20 9/22 10/3 9/25
129 RJC-01 Dust Removal System Pulse Jet Fabric Filter 4 8/30 10/17 10/17 9/4
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) 34 10/25 9/28 9/28 9/29 9/29 9/29 10/30
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 3 11/10 1/4
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
132 HHQ-01 LFO Firing System LFO Firing Air System 276 8/30 10/13 10/13 9/4
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner 618 8/30 10/13 10/13 9/4
134 HHF-01 LFO Firing System LFO Firing System 504 8/30 10/13 10/13 9/4
135 HTO-01 FGD System FGD Absorber System (담당자와 협의 후 일정 확정) 10 9/30 10/27 10/27 10/5
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) 44 9/30 10/27 10/27 10/5
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) 95 10/30 11/4 11/4 11/4
138 QC0-01 Chemical Dosing System Chemical Dosing System 179 10/30 10/18 10/18 11/4
139 LDO-01 Condensate Polishing Plant Condensate Polishing Plant 645 9/20 9/29 9/29 10/18 9/25
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, 2 9/27 10/20 10/20 10/2
LAC-02 & LAV-02)
145 XAW-01 Feed Water System BFPT Gland Steam System 6 10/10 10/10 10/10 10/15
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System 122 9/25 9/30 9/30 ? 9/30
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) 47 9/25 10/11 10/11 9/30
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System 10 9/25 10/20 10/20 9/30
149 MAX-01 Steam Turbine Generator System TBN Control Oil System 18 9/25 10/14 10/14 9/30
150 MAA-01 Steam Turbine Generator System TBN Steam System 36 10/15 10/14 10/14 10/20
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System 19 10/15 10/19 10/19 10/20
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System 41 10/27 10/10 10/10 11/1
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) 73 9/2 9/5 9/5 9/7
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
154 HAG-01 Pressure System Boiler Recirculation Pump System 127 10/1 10/18 10/18 10/6
155 LAE-01 Pressure System Superheater Spray Water System 30 8/30 9/21 9/21 9/26 9/29 9/30 9/4
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) 221 10/1 10/25 10/25 10/6
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) 170 10/1 10/25 10/25 10/6
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) 99 10/1 10/25 10/25 10/6
159 HAN-01 Pressure System Boiler Drain System 0 9/2 9/5 9/5 9/7
160 LBA-01 Steam System Main & RH Steam System 440 10/30 11/3 11/3 11/4
161 LBF-01 Steam System HP/LP Bypass System (9월 5일 추가 협의) 110 9/30 10/11 10/11 10/5
162 LBG-01 Steam System Auxiliary Steam System for main 72 10/30 10/21 10/21 11/4
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up 4 10/30 10/21 10/21 11/4
165 HAN-02 Steam System Safety Valve Exhaust Piping System 21 10/4 11/4 11/4 10/9
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System 0 9/30 9/29 9/29 9/29 9/29 9/29 10/5
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System 0 10/4 10/4 10/4 10/9
168 SM0-01 Crane and Hoist Crane and Hoist 0 10/27 10/27 10/27 11/1
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) 2 10/27 11/26 11/26 11/1
171 STR-04 Civil, Building & Structure N2 Shelter 0 8/30 9/21 9/21 9/23 10/19 9/4
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank 0 9/9 9/8 9/8 9/14
173 UHN-01 Civil, Building & Structure Chimney 0 9/30 10/19 10/19 10/5
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank 0 9/17 9/23 9/23 9/29 9/29 9/29 9/22
175 UBN-01 Civil, Building & Structure Emergency Diesel Generator 0 10/4 9/8 9/8 10/9
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter 0 9/15 9/15 9/15 9/15 9/20
177 TNK-02 Civil, Building & Structure Foam Tank 0 9/30 9/29 9/29 9/29 9/29 9/29 10/5
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH 0 9/30 10/27 10/27 10/5
179 UVB-01 Civil, Building & Structure CID Fan 0 9/30 9/8 9/8 10/5
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP 0 9/26 9/8 9/8 10/1
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter 0 9/30 10/17 10/17 10/5
182 UHA-01 Civil, Building & Structure Boiler 0 10/30 11/18 11/18 11/4
183 UMA-01 Civil, Building & Structure Steam Turbine Building 0 10/27 11/24 11/24 11/1
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter 0 10/27 10/21 10/21 11/1
185 STR-03 Civil, Building & Structure H2/CO2 Shelter 0 10/27 10/21 10/21 11/1
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter 0 10/27 11/23 11/23 11/1
187 UET-01 Civil, Building & Structure Fly Ash Silo 0 10/27 11/23 11/23 11/1
188 UET-02 Civil, Building & Structure Bottom Ash Silo 0 10/27 11/23 11/23 11/1
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower 0 10/27 11/23 11/23 11/1
190 UST-01 Civil, Building & Structure Workshop & Store Building 0 10/27 10/26 10/26 11/1
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower 0 10/27 11/29 11/29 11/1
193 XAW-02 Feed Water System BFPT Steam System 14 9/10 10/17 10/17 9/15
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) 39 9/10 10/25 10/25 9/15
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02 77 11/15 1/4
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism 38 9/10 11/3 11/3 9/15
197 LAF-01 Feed Water System Reheater Spray Water System 46 8/30 9/19 9/19 9/22 9/22 9/4
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System 9 10/27 11/15 11/15 11/1
199 MKG-01 Steam Turbine Generator System Generator H2 Control System 15 10/27 11/15 11/15 11/1
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System 2 11/15 11/15 11/15 11/20
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System 4 11/15 11/15 11/15 11/20
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) 470 10/27 11/23 11/23 11/1
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) 555 10/27 11/23 11/23 11/1
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) 137 10/27 11/23 11/23 11/1
206 HFC-01 Coal Pulverising system Pulverized Coal Firing System 1310 9/20 10/28 10/28 9/25
207 HFW-01 Coal Pulverising system Pulverized Sealing Air System 133 9/20 9/22 10/3 9/25
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system 699 9/17 9/22 10/3 9/22
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) 390 10/27 11/29 11/29 11/1
210 EDA-03 Emission Monitoring System CEMS 0 10/27 10/26 10/26 11/1
211 SQ0-03 Civil, Building & Structure Drainage for all others 0 12/16 12/16 12/16 12/21
212 SQ0-04 Civil, Building & Structure Road & Paving for all others 0 3/15 3/15 3/15 3/20
213 UZD-01 Civil, Building & Structure Parking Lot 0 3/15 3/15 3/15 3/20
215 MK0-01 Steam Turbine Generator System Generator 9 11/10 11/22 11/22 11/15
216 MKC-01 Steam Turbine Generator System Exciter System 1 11/10 11/22 11/22 11/15
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area 0 3/15 3/15 3/15 3/20
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. Check List Walk Down MC P/L Clear (A o
No. Sub-system System Description Sub-System Description
Item Required Date 1ST Target 2nd Target 3nd Target 4th Target 5th Target 6th Target 7th Target Actual Issued Target Actual
218 UZK-01 Civil, Building & Structure Landscaping 0 3/15 3/15 3/15 3/20
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 530 11/30 11/30 11/30 12/5
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 101 11/30 11/30 11/30 12/5
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System 574 11/30 11/30 11/30 12/5
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System 149 11/30 11/30 11/30 12/5
224 SA0-05 HVAC System HVAC for Workshop Store Building 0 11/10 11/10 11/10 11/15
225 CYA-01 Communication System Telecommunication System 0 11/10 11/16 11/16 11/15
226 CYM-01 Communication System Paging System 0 11/10 11/16 11/16 11/15
227 CYP-01 Communication System CCTV System 0 11/10 11/16 11/16 11/15
228
230
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
2 BAU-01 Earthing & Lightning System for WTB (for Equipment 5 5 0 0 0 0 5/7 5/27 5/31
Earthing & Lightning System
Energization)
3 BAU-03 Earthing & Lightning System for CCB (for Equipment 0 0 0 1 1 0 7/2 6/27 6/30
Earthing & Lightning System
Energization)
4 BTA-01 LV System DC 220V Batteries and Chargers (BTA10/20, BUA10/20) 0 0 0 3 3 0 7/3 6/27 6/30
5 BTB-01 LV System DC 110V Batteries and Chargers (BTB10/20, BUB10/20) 0 0 0 3 3 0 7/3 6/27 6/30
6 BTC-01 AC 230V UPS Batteries and Chargers (BTC10/20, 0 0 0 5 5 0 7/3 6/27 6/30
LV System
BRB10/20)
10 BFT-01 11KV/440V UNIT AUX. TR (BFT01/02), 415V BUS 0 0 0 4 4 0 7/2 6/27 6/30
LV System
(BFA01/02)
11 BJA-01 LV System Water Treatment Building MCC (BJA15) 2 2 0 0 0 0 5/22 6/2 6/6
12 SA0-01 HVAC System HVAC for Central Control Building 0 0 0 26 26 0 7/2 7/1
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment 4 4 0 4 4 0 5/7 5/27
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) 5 5 0 22 22 0 5/7 5/27 5/31
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump 4 4 0 28 28 0 7/4 7/11 7/14
16 GC0-01 Water Treatment System Water Treatment System-01 7 7 0 143 143 0 5/7 5/27 5/31
17 GC0-02 Water Treatment System Water Treatment System-02 0 0 0 14 14 0 6/11 5/27 5/31
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank 18 18 0 27 27 0 5/7 5/27 5/31
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) 0 0 0 0 0 0 9/4
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB 0 0 0 1 1 0 5/7 5/27 5/31
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB 0 0 0 4 4 0 5/7 5/27 5/31
24 SGA-01 Fire Fighting System Fire Fighting System for WTB 8 8 0 32 32 0 7/4 7/11 7/14
25 SGA-09 Fire Fighting System Fire Fighting System for CCB 6 6 0 8 8 0 7/2 6/30 7/12
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. 10 10 0 2 2 0 7/2 6/30 7/12
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building 0 0 0 0 0 0 9/4 9/23 9/27
32 CAA-01 HV System HV Switch Yard Interface Signals, Controls & Protection 0 0 0 3 3 0 7/2 6/27 6/30
33 CHA-01 HV System Cabinets for Generator and Transformer protection 0 0 0 4 4 0 7/2 6/27 6/30
36 BAC-01 Steam Turbine Generator System GCB System 0 0 0 0 0 0 7/2 6/27 6/30
37 CPS-01 Cathodic Protection System (Service Water Tank, Demi Tank 1 1 0 11 11 0 8/27 8/24 9/6
Cathodic Protection System
Intake)
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) 0 0 0 0 0 0 ?
39 UGD-01 Civil, Building & Structure Water Treatment Building 16 16 0 14 14 0 5/7 5/27 5/31
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank 0 0 0 6 6 0 5/7 5/27 5/31
41 UGC-01 Civil, Building & Structure Demi. Water Storage Tank 0 0 0 18 18 0 5/7 5/27 5/31
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT 2 2 0 0 0 0 5/7 5/27 5/31
43 UGG-01 Civil, Building & Structure Filtered Water Storage Tank 0 0 0 2 2 0 5/7 5/27 5/31
44 USG-01 Civil, Building & Structure Fire-Fighting Pump Shelter 0 0 0 2 2 0 7/4 7/11 7/14
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
45 UGD-02 Civil, Building & Structure Condensate Make Up Tank 0 0 0 0 0 0 7/31 8/1 8/5
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) 0 0 0 0 0 0 9/22
47 UQA-01 Civil, Building & Structure Cooling Water Pump Station 20 20 0 0 0 0 6/15 7/1 7/14
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower 0 0 0 1 1 0 7/2 6/27 6/30
49 UBF-01 Civil, Building & Structure Generator Step-Up/Unit Transformer 0 0 0 0 0 0 7/2 6/27 6/30
50 UPC-01 Civil, Building & Structure CW Intake Shield Tunnel 0 0 0 0 0 0 6/15 7/11 7/14
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) 0 0 0 0 0 0 10/12
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. 0 0 0 0 0 0 7/2 6/27 6/30
56 BFA-01 Lighting System Lighting System for Water Treatment Building 0 0 0 2 2 0 7/4 7/11
57 BFA-02 Lighting System Lighting System for Central Control Building 0 0 0 0 0 0 7/2 6/27 6/30
60 BAU-02 Earthing & Lightning System for Other Buildings (for 0 0 0 0 0 0 9/22
Earthing & Lightning System
Equipment Energization)
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP 0 0 0 0 0 0 7/4 8/12 8/18
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal 0 0 0 0 0 0 10/12
HVAC System
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump 30 0 30 44 19 25 9/6
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP 4 4 0 11 11 0 8/3 8/4 8/5
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD 6 0 6 4 0 4 11/1
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) 13 12 1 11 11 0 11/1
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) 13 0 13 43 10 33 9/6
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building 18 18 0 0 0 0 8/6 8/25 9/6
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys 11 0 11 15 0 15 #VALUE!
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) 0 0 0 0 0 0 11/11
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) 0 0 0 0 0 0 11/11
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) 0 0 0 0 0 0 10/12
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) 0 0 0 1 0 1 9/11
81 AYE-02 Fire Alarm System FA system for STG (LFAP #02) 0 0 0 0 0 0 11/11
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) 0 0 0 0 0 0 9/11
83 AYE-04 Fire Alarm System FA system for Boiler (LFAP #04) 0 0 0 0 0 0 11/11
84 AYE-05 Fire Alarm System FA system for PJFF/FGD/ASH (LFAP #05) 0 0 0 0 0 0 10/27
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) 0 0 0 0 0 0 9/11
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) 0 0 0 0 0 0 11/11
88 BFT-02 11KV/440V UNIT AUX. TR (BFT03/04), 415V BUS 0 0 0 2 2 0 7/2 6/27 6/30
LV System
(BFA03/04)
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
89 BFT-03 11KV/440V UNIT AUX. TR (BFT05/06), 415V BUS 0 0 0 0 0 0 7/2 6/27 6/30
LV System
(BFA05/06)
90 BFT-04 LV System 11KV/440V UNIT AUX. TR (BFT11/12), 415V BUS (BFA11) 0 0 0 0 0 0 7/2 6/27 6/30
91 BFT-05 LV System 11KV/440V UNIT AUX. TR (BFT13), 415V BUS (BFA13) 0 0 0 0 0 0 7/2 6/27 6/30
92 BFT-06 11KV/440V UNIT AUX. TR (BFT09/10), 415V BUS 0 0 0 22 22 0 8/6 8/1 8/5
LV System
(BFA09/10)
94 FDN-01 Civil, Building & Structure Absorber Spray Pump 0 0 0 0 0 0 7/4 7/1 9/8
95 UVD-01 Civil, Building & Structure FGD Aeration Basin 10 10 0 0 0 0 8/22 8/24 9/8
96 UQW-01 Civil, Building & Structure Dischage Outfall 0 0 0 0 0 0 7/31 8/10 8/11
97 BFT-07 11KV/440V UNIT AUX. TR (BFT07/08), 415V BUS 0 0 0 2 2 0 9/4 9/5 9/7
LV System
(BFA07/08)
99 BJA-04 415V Sub-BUS (BJA01) (내일 오후에 확정) (Battery Limit 추 0 0 0 0 0 0 10/1
LV System
가)
104 PAC-01 Circulating Water System Circulating Water System 01 117 115 2 104 104 0 9/10 9/19 9/19
107 PAA-01 Circulating Water System Intake Facility-01 108 108 0 14 14 0 7/23 7/14 7/15
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 80 78 2 215 202 13 8/22
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 11 8 3 18 11 7 9/8
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
111 QCH-01 Electro Chlorination System Electro Chlorination System-01 16 16 0 17 17 0 7/23 7/14 7/15
Electro Chlorination System-02 (Box-up 1ea, Reinstatment 1 Line
112 QCH-02 Electro Chlorination System Exception으로 진행, 자재 Shortage 5 ea for Instrument, 9 point 32 30 2 94 69 25 8/24
due to not installed Instrument)
113 QEA-01 Compressed Air System Compressed Air System 32 30 2 54 51 3 8/24
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) 86 86 0 159 152 7 9/6
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF 0 0 0 0 0 0 9/17
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, 2 2 0 3 3 0 10/2
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 0 0 0 0 0 0 10/2
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) 30 0 30 18 0 18 9/19
119 QEJ-03 Service Air Distribution System Distribution Sys for Others 7 0 7 0 0 0 10/4
120 LCA-02 Condensate System Condesate Storage & Transfer System-01 21 21 0 34 34 0 8/24
122 LCA-04 Condensate System Condesate Storage & Transfer System-02 5 5 0 14 4 10 11/1
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System 30 0 30 15 0 15 11/1
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank 0 0 0 0 0 0
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) 0 0 0 0 0 0 9/11
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) 0 0 0 0 0 0 10/12
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템
127 HNC-02 Air & Gas System 0 0 0 0 0 0 11/11
분리 방안 강구)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) 0 0 0 1 0 1 10/2
129 RJC-01 Dust Removal System Pulse Jet Fabric Filter 0 0 0 0 0 0 9/11
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) 12 12 0 32 26 6 11/6
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 0 0 0 0 0 0 11/6
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
132 HHQ-01 LFO Firing System LFO Firing Air System 0 0 0 0 0 0 9/11
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner 0 0 0 0 0 0 9/11
135 HTO-01 FGD System FGD Absorber System (담당자와 협의 후 일정 확정) 0 0 0 0 0 0 10/12
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) 0 0 0 0 0 0 10/12
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) 12 0 12 16 0 16 11/11
139 LDO-01 Condensate Polishing Plant Condensate Polishing Plant 107 59 48 163 26 137 10/2
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, 0 0 0 0 0 0 10/9
LAC-02 & LAV-02)
145 XAW-01 Feed Water System BFPT Gland Steam System 0 0 0 0 0 0 10/22
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System 0 0 0 0 0 0 10/7
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) 26 2 24 10 1 9 10/7
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System 0 0 0 0 0 0 10/7
149 MAX-01 Steam Turbine Generator System TBN Control Oil System 0 0 0 0 0 0 10/7
150 MAA-01 Steam Turbine Generator System TBN Steam System 0 0 0 3 0 3 10/27
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System 0 0 0 6 1 5 10/27
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System 14 0 14 2 0 2 11/8
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) 14 5 9 8 6 2 9/14
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) 0 0 0 0 0 0 10/13
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) 0 0 0 4 4 0 10/13
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) 0 0 0 11 9 2 10/13
160 LBA-01 Steam System Main & RH Steam System 106 0 106 129 4 125 11/11
161 LBF-01 Steam System HP/LP Bypass System (9월 5일 추가 협의) 0 0 0 2 0 2 10/12
162 LBG-01 Steam System Auxiliary Steam System for main 105 0 105 5 0 5 11/11
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up 0 0 0 0 0 0 11/11
165 HAN-02 Steam System Safety Valve Exhaust Piping System 0 0 0 0 0 0 10/16
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System 0 0 0 5 5 0 9/11
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System 0 0 0 0 0 0 10/16
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) 0 0 0 0 0 0 11/8
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank 0 0 0 0 0 0 9/21 9/23
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank 0 0 0 0 0 0 9/29
175 UBN-01 Civil, Building & Structure Emergency Diesel Generator 0 0 0 0 0 0 10/16 9/23 9/27
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter 0 0 0 0 0 0 9/27
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH 0 0 0 0 0 0 10/12
179 UVB-01 Civil, Building & Structure CID Fan 0 0 0 0 0 0 10/12 9/23 9/27
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP 0 0 0 0 0 0 10/8
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter 0 0 0 0 0 0 10/12
183 UMA-01 Civil, Building & Structure Steam Turbine Building 0 0 0 0 0 0 11/8
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter 0 0 0 0 0 0 11/8
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter 0 0 0 0 0 0 11/8
187 UET-01 Civil, Building & Structure Fly Ash Silo 0 0 0 0 0 0 11/8
188 UET-02 Civil, Building & Structure Bottom Ash Silo 0 0 0 0 0 0 11/8
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower 0 0 0 0 0 0 11/8
190 UST-01 Civil, Building & Structure Workshop & Store Building 0 0 0 0 0 0 11/8
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower 0 0 0 0 0 0 11/8
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) 0 0 0 0 0 0 9/22
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02 0 0 0 0 0 0 9/22
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism 0 0 0 0 0 0 9/22
197 LAF-01 Feed Water System Reheater Spray Water System 3 2 1 15 4 11 9/11
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System 0 0 0 0 0 0 11/8
199 MKG-01 Steam Turbine Generator System Generator H2 Control System 0 0 0 0 0 0 11/8
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System 0 0 0 0 0 0 11/27
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System 0 0 0 0 0 0 11/27
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) 0 0 0 7 2 5 11/8
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) 0 0 0 1 0 1 11/8
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) 0 0 0 0 0 0 11/8
206 HFC-01 Coal Pulverising system Pulverized Coal Firing System 0 0 0 0 0 0 10/2
207 HFW-01 Coal Pulverising system Pulverized Sealing Air System 0 0 0 0 0 0 10/2
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system 0 0 0 0 0 0 9/29
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) 0 0 0 14 0 14 11/8
211 SQ0-03 Civil, Building & Structure Drainage for all others 0 0 0 0 0 0 12/28
212 SQ0-04 Civil, Building & Structure Road & Paving for all others 0 0 0 0 0 0 3/27
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area 0 0 0 0 0 0 3/27
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
MC P/L Clear (A only) B punch MCC
No. Sub-system System Description Sub-System Description
Total Done Bal. Total Done Bal. Target Submission Actual
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 107 0 107 11 0 11 11/6
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 34 0 34 9 0 9 11/17
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System 96 0 96 32 0 32 11/6
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System 30 1 29 26 0 26 11/6
224 SA0-05 HVAC System HVAC for Workshop Store Building 0 0 0 0 0 0 11/22
228
229 Summary Status 2108 900 1208 2390 1559 831 219 66 61
2 BAU-01 Earthing & Lightning System for WTB (for Equipment N/A
Earthing & Lightning System
Energization)
3 BAU-03 Earthing & Lightning System for CCB (for Equipment N/A
Earthing & Lightning System
Energization)
12 SA0-01 HVAC System HVAC for Central Control Building Reject (OS-DS-T-0363)
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment Reject (OS-DS-T-0282)
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) N/A
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump N/A
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank N/A
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) N/A
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB N/A
24 SGA-01 Fire Fighting System Fire Fighting System for WTB N/A
25 SGA-09 Fire Fighting System Fire Fighting System for CCB N/A
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. N/A
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building N/A
32 CAA-01 HV System HV Switch Yard Interface Signals, Controls & Protection N/A
37 CPS-01 Cathodic Protection System (Service Water Tank, Demi Tank N/A
Cathodic Protection System
Intake)
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) N/A
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank N/A
41 UGC-01 Civil, Building & Structure Demi. Water Storage Tank N/A
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT N/A
43 UGG-01 Civil, Building & Structure Filtered Water Storage Tank N/A
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) N/A
47 UQA-01 Civil, Building & Structure Cooling Water Pump Station N/A
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower N/A
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) OK
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. N/A
56 BFA-01 Lighting System Lighting System for Water Treatment Building Reject (OS-DS-T-0364)
57 BFA-02 Lighting System Lighting System for Central Control Building N/A
60 BAU-02 Earthing & Lightning System for Other Buildings (for N/A
Earthing & Lightning System
Equipment Energization)
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP N/A
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal N/A
HVAC System
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump N/A
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD N/A
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) N/A
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) N/A
72 GM0-04 Waste Water Transfer System Others Sump Sys DI 물량 및 Hydro Test 날짜 재조정 필요함
73 GM0-05 Waste Water Transfer System Oily Waste Water Sys GM0-03에서 분리 (New)
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building N/A
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys DI 물량 및 Hydro Test 날짜 재조정 필요함
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) 기존 WD Schedule 유지
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) 기존 WD Schedule 유지
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) N/A
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) Item List
81 AYE-02 Fire Alarm System FA system for STG (LFAP #02) N/A
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) Item List
83 AYE-04 Fire Alarm System FA system for Boiler (LFAP #04) N/A
84 AYE-05 Fire Alarm System FA system for PJFF/FGD/ASH (LFAP #05) N/A
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) Item List
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) N/A
90 BFT-04 LV System 11KV/440V UNIT AUX. TR (BFT11/12), 415V BUS (BFA11) N/A
91 BFT-05 LV System 11KV/440V UNIT AUX. TR (BFT13), 415V BUS (BFA13) N/A
99 BJA-04 415V Sub-BUS (BJA01) (내일 오후에 확정) (Battery Limit 추 N/A
LV System
가)
108 PAA-02 Circulating Water System Intake Facility-02 I/O RFI 25 or 26th August 진행
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 30개 완료 되었으나 문서 작업은 끝나지 않아 따로 표시 하였습니다
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) N/A
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF N/A
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, N/A
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 N/A
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) N/A
119 QEJ-03 Service Air Distribution System Distribution Sys for Others N/A
120 LCA-02 Condensate System Condesate Storage & Transfer System-01 Walk Down 일정 8/30일 예정
122 LCA-04 Condensate System Condesate Storage & Transfer System-02 N/A
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System N/A
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) N/A
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) 16-10-05 Oil Flushing 착수 예정 / 약 30일 소요 예정
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템 16-11-05 Oil Flushing 착수 예정 / 약 30일 소요 예정
127 HNC-02 Air & Gas System
분리 방안 강구) (기존 WD Schedule 유지)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) 16-09-30 Oil Flushing 착수 예정 / 약 20일 소요 예정
129 RJC-01 Dust Removal System Pulse Jet Fabric Filter N/A
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) 기존 WD Schedule 유지
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 기존 WD Schedule 유지
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
132 HHQ-01 LFO Firing System LFO Firing Air System N/A
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner N/A
135 HTO-01 FGD System FGD Absorber System (담당자와 협의 후 일정 확정) N/A
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) N/A
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) N/A
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, N/A
LAC-02 & LAV-02)
145 XAW-01 Feed Water System BFPT Gland Steam System N/A
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System N/A
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) N/A
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System N/A
149 MAX-01 Steam Turbine Generator System TBN Control Oil System N/A
150 MAA-01 Steam Turbine Generator System TBN Steam System N/A
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System N/A
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System N/A
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) N/A
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) N/A
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) N/A
161 LBF-01 Steam System HP/LP Bypass System (9월 5일 추가 협의) N/A
162 LBG-01 Steam System Auxiliary Steam System for main N/A
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up N/A
165 HAN-02 Steam System Safety Valve Exhaust Piping System N/A
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System N/A
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System N/A
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) N/A
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank N/A
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank N/A
175 UBN-01 Civil, Building & Structure Emergency Diesel Generator N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter N/A
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH N/A
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP N/A
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter N/A
183 UMA-01 Civil, Building & Structure Steam Turbine Building N/A
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter N/A
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter N/A
187 UET-01 Civil, Building & Structure Fly Ash Silo N/A
188 UET-02 Civil, Building & Structure Bottom Ash Silo N/A
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower N/A
190 UST-01 Civil, Building & Structure Workshop & Store Building N/A
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower N/A
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) N/A
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism N/A
197 LAF-01 Feed Water System Reheater Spray Water System N/A
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System N/A
199 MKG-01 Steam Turbine Generator System Generator H2 Control System N/A
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System N/A
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System N/A
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) 10월 (1pkg) 일정확인요망(물량확인)
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) 10월 (1pkg) 일정확인요망(물량확인)
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) N/A
206 HFC-01 Coal Pulverising system Pulverized Coal Firing System N/A
207 HFW-01 Coal Pulverising system Pulverized Sealing Air System N/A
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system '16-09-05 Oil Flushing 착수 예정 / 약 30일 소요 예정
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) N/A
211 SQ0-03 Civil, Building & Structure Drainage for all others N/A
212 SQ0-04 Civil, Building & Structure Road & Paving for all others N/A
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area N/A
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT 42642Updated : -409dd mmm yyyy
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 N/A
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 N/A
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System N/A
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System N/A
224 SA0-05 HVAC System HVAC for Workshop Store Building N/A
228
230
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment 0 0 4 4 0 4 2 2
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) 0 0 22 22 0 35 3 32
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump 2 3 28 28 0 31 8 23
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank 0 0 27 27 0 55 1 54
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) 0 0 0 0 0 4 0 4
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB 0 0 1 1 0 3 0 3
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB 0 0 4 4 0 0 0 0
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. 0 0 2 2 0 8 0 8
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building 1 1 0 0 0 8 0 8
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) 0 0 0 0 0 0 0 0
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank 0 0 6 6 0 24 2 22
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT 0 0 0 0 0 10 4 6
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) 0 0 0 0 0 0 0 0
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower 0 0 1 1 0 1 0 1
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) 0 0 0 0 0 0 0 0
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. 0 0 0 0 0 6 6 0
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP 0 0 0 0 0 8 8 0
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal 0 0 0 0 0 0 0 0
HVAC System
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump 2 4 44 19 25 20 0 20
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP 0 0 11 11 0 101 0 101
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD 1 2 4 0 4 5 0 5
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) 0 0 11 11 0 27 9 18
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) 0 0 43 10 33 14 0 14
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building 1 3 0 0 0 4 0 4
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys 2 2 15 0 15 20 0 20
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) 0 0 0 0 0 0 0 0
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) 0 0 0 0 0 0 0 0
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) 0 0 0 0 0 0 0 0
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) 0 0 1 0 1 3 0 3
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) 0 0 0 0 0 0 0 0
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) 0 0 0 0 0 0 0 0
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) 0 0 0 0 0 0 0 0
104 PAC-01 Circulating Water System Circulating Water System 01 2 27 104 104 0 192 3 189
106 PAC-03 Circulating Water System Circulating Water System 03 #N/A #N/A 43 43 0 55 1 54
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 2 4 215 202 13 309 9 300
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 0 0 18 11 7 22 1 21
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) 0 0 159 152 7 164 2 162
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF 0 0 0 0 0 0 0 0
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, 0 0 3 3 0 5 1 4
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 #N/A #N/A 0 0 0 0 0 0
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) 0 0 18 0 18 26 0 26
119 QEJ-03 Service Air Distribution System Distribution Sys for Others 0 0 0 0 0 0 0 0
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System 0 0 15 0 15 25 0 25
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank 0 0 0 0 0 0 0 0
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) 2 25 0 0 0 0 0 0
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) 1 12 0 0 0 0 0 0
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템
127 HNC-02 Air & Gas System 1 4 0 0 0 0 0 0
분리 방안 강구)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) 2 24 1 0 1 1 0 1
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) 1 2 32 26 6 34 1 33
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 #N/A #N/A 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner 0 0 0 0 0 0 0 0
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) 1 11 0 0 0 0 0 0
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) 1 8 16 0 16 0 0 0
139 LDO-01 Condensate Polishing Plant Condensate Polishing Plant 2 13 163 26 137 144 12 132
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, 1 2 0 0 0 0 0 0
LAC-02 & LAV-02)
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System 1 8 0 0 0 0 0 0
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) 1 2 10 1 9 1 0 1
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System 1 5 0 0 0 0 0 0
149 MAX-01 Steam Turbine Generator System TBN Control Oil System 1 5 0 0 0 0 0 0
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System 1 2 6 1 5 0 0 0
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System 1 6 2 0 2 0 0 0
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) 0 0 8 6 2 23 0 23
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) 1 8 0 0 0 0 0 0
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) 0 0 4 4 0 2 0 2
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) 0 0 11 9 2 2 0 2
160 LBA-01 Steam System Main & RH Steam System 1 14 129 4 125 50 0 50
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up 0 0 0 0 0 0 0 0
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System 1 3 5 5 0 0 0 0
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System 1 3 0 0 0 0 0 0
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) 0 0 0 0 0 0 0 0
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank 0 0 0 0 0 14 2 12
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank 0 0 0 0 0 11 0 11
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter 0 0 0 0 0 13 4 9
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH 0 0 0 0 0 4 4 0
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP 0 0 0 0 0 11 4 7
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter 0 0 0 0 0 4 4 0
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter 0 0 0 0 0 10 0 10
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter 0 0 0 0 0 4 4 0
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower 0 0 0 0 0 0 0 0
190 UST-01 Civil, Building & Structure Workshop & Store Building 0 0 0 0 0 0 0 0
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower 0 0 0 0 0 0 0 0
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) 0 0 0 0 0 0 0 0
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02 0 0 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism 1 12 0 0 0 0 0 0
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System 1 2 0 0 0 0 0 0
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System 0 0 0 0 0 0 0 0
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System 0 0 0 0 0 0 0 0
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) 2 22 7 2 5 9 0 9
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) 1 20 1 0 1 2 0 2
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) 1 6 0 0 0 0 0 0
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system 1 30 0 0 0 0 0 0
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) 1 15 14 0 14 7 0 7
211 SQ0-03 Civil, Building & Structure Drainage for all others 0 0 0 0 0 0 0 0
212 SQ0-04 Civil, Building & Structure Road & Paving for all others 0 0 0 0 0 0 0 0
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area 0 0 0 0 0 0 0 0
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT
Bal. CC Notice CC P/L Clear (B only) CC Approved C punch
No. Sub-system System Description Sub-System Description
Disc. Item Remaining Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal.
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 0 0 11 0 11 27 0 27
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 0 0 9 0 9 11 0 11
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System 1 4 32 0 32 87 0 87
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System 1 11 26 0 26 56 0 56
228
229 Summary Status #N/A #N/A 0 0 0 0 0 2390 1559 831 0 0 3821 604 3217
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
2 BAU-01 Earthing & Lightning System for WTB (for Equipment 0 0 0 5 5 0 MCC
Earthing & Lightning System
Energization)
3 BAU-03 Earthing & Lightning System for CCB (for Equipment 0 0 0 3 1 2 MCC
Earthing & Lightning System
Energization)
13 SA0-02 HVAC System HVAC for Local Control Building for Water Treatment 0 0 0 12 10 2 Submission
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System from Manjung 4&5
14 GAF-01 Common Plant Raw Water System (including GAF-02) 0 0 0 62 30 32 MCC
Service & Fire Water Storage & Transfer Syst Service & Fire Water Storage & Transfer System for Service Water
15 GAF-02 Pump 0 0 0 63 40 23 MCC
16 GC0-01 Water Treatment System Water Treatment System-01 1 0 1 176 150 26 MCC
18 GHC-01 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Tank 0 0 0 100 46 54 MCC
Fire Fighting Sys-08 (Coal Conveyor & Tripper Gallery & Dust
19 SGA-08 Fire Fighting System Collector) 0 0 0 4 0 4 Walk Down
22 QFB-01 Compressed Air System Instrument Air Distribution System for WTB 0 0 0 4 1 3 MCC
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
23 QEJ-01 Compressed Air System Service Air Distribution System for WTB 0 0 0 4 4 0 MCC
24 SGA-01 Fire Fighting System Fire Fighting System for WTB 0 0 0 102 40 62 MCC
25 SGA-09 Fire Fighting System Fire Fighting System for CCB 0 0 0 14 14 0 MCC
26 SGA-02 Fire Fighting System Fire Fighting System for Generator Step-Up Tr & Unit Tr. 0 0 0 20 12 8 MCC
27 SGA-04 Fire Fighting System Fire Fighting System for FGD/PJFF/Ash Electrical Building 0 0 0 8 0 8 MCC
32 CAA-01 HV System HV Switch Yard Interface Signals, Controls & Protection 0 0 0 6 6 0 MCC
37 CPS-01 Cathodic Protection System (Service Water Tank, Demi Tank 0 0 0 20 18 2 MCC
Cathodic Protection System
Intake)
38 CPS-02 Cathodic Protection System Cathodic Protection System (CST, LFO Tank, CW Pipeline) 0 0 0 0 0 0 Const
39 UGD-01 Civil, Building & Structure Water Treatment Building 12 2 10 164 68 96 MCC
40 UGA-01 Civil, Building & Structure Combined Service & Fire Water Storage Tank 0 0 0 30 8 22 MCC
41 UGC-01 Civil, Building & Structure Demi. Water Storage Tank 2 0 2 58 20 38 MCC
42 STR-01 Civil, Building & Structure Chemical Storage Tank Shelter for WT 0 0 0 12 6 6 MCC
43 UGG-01 Civil, Building & Structure Filtered Water Storage Tank 0 0 0 32 2 30 MCC
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
46 UBA-02 Civil, Building & Structure CWP Electrical & ECP Building (Battery Limit 수정) 0 0 0 0 0 0 Walk Down
47 UQA-01 Civil, Building & Structure Cooling Water Pump Station 0 0 0 62 62 0 MCC
48 AIS-01 Civil, Building & Structure 500KV AIS & Transmission Tower 0 0 0 2 1 1 MCC
51 UBA-01 Civil, Building & Structure Central Control Building (Elevator, Battery Limit 수정) 0 0 0 0 0 0 Const
52 UZJ-01 Civil, Building & Structure Gate & Fence for for Generator Step-Up Tr & Unit Tr. 0 0 0 6 6 0 MCC
56 BFA-01 Lighting System Lighting System for Water Treatment Building 0 0 0 40 2 38 Submission
57 BFA-02 Lighting System Lighting System for Central Control Building 0 0 0 12 0 12 MCC
60 BAU-02 Earthing & Lightning System for Other Buildings (for 0 0 0 0 0 0 Const
Earthing & Lightning System
Equipment Energization)
63 SA0-03 HVAC System HVAC for Local Control Building for CWP Electrical / ECP 0 0 0 8 8 0 MCC
64 SA0-04 HVAC for Local Control Building for PJFF/ ASH/FGD, Coal 0 0 0 0 0 0 Const
HVAC System
Tripper
65 GHC-02 Make-Up Demineralizer System Make-Up Demineralizer System for Demi-Water Transfer Pump 0 0 0 94 19 75 Const
66 GAC-01 Service Water System Service Water System for Distribution to ECP, CWP 0 0 0 116 15 101 MCC
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
68 GAC-03 Service Water System Service Water System for Distribution to Ash, FGD 0 0 0 15 0 15 Const
70 LCA-01 Condensate System Condesate Storage & Transfer System (Tank Only) 0 0 0 51 32 19 Walk Down
71 GKB-02 Portable Water System (일정확인) Potable Water System for Distribution to Others (Including CCB) 0 0 0 70 10 60 Const
73 GM0-05 Waste Water Transfer System Oily Waste Water Sys 0 0 0 97 23 74 Const
74 SGA-03 Fire Fighting System Fire Fighting System for CWP & ECP Building 0 0 0 22 18 4 MCC
75 GM0-02 Waste Water Transfer System TBN Chemical/APH Collection/CWP Sump Sys 0 0 0 46 0 46 Const
76 SGA-05 Fire Fighting System Fire Fighting System for Turbine Building (CPP, Chemical Dosing) 0 0 0 0 0 0 Const
77 SGA-06 Fire Fighting System Fire Fighting System for All Others (Silo, Worksop & Store Building) 0 0 0 0 0 0 Const
78 SGA-07 Fire Fighting System Fire Fighting Sys-07 (Steam Turbine Building) 0 0 0 0 0 0 Const
80 AYE-01 Fire Alarm System FA system for CCB (MFAP & LFAP #01) 0 0 0 4 0 4 Walk Down
81 AYE-02 Fire Alarm System FA system for STG (LFAP #02) 0 0 0 0 0 0 Const
82 AYE-03 Fire Alarm System FA system for CWP (LFAP #03) (Battery Limit 수정) 0 0 0 0 0 0 Const
83 AYE-04 Fire Alarm System FA system for Boiler (LFAP #04) 0 0 0 0 0 0 Const
84 AYE-05 Fire Alarm System FA system for PJFF/FGD/ASH (LFAP #05) 0 0 0 0 0 0 Const
85 AYE-06 Fire Alarm System FA system for WT (LFAP #08) (Battery Limit 수정) 0 0 0 0 0 0 Const
86 AYE-07 Fire Alarm System FA system for Overall connection (with mimic in guard house) 0 0 0 0 0 0 Const
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
90 BFT-04 LV System 11KV/440V UNIT AUX. TR (BFT11/12), 415V BUS (BFA11) 0 0 0 0 0 0 MCC
91 BFT-05 LV System 11KV/440V UNIT AUX. TR (BFT13), 415V BUS (BFA13) 0 0 0 9 0 9 MCC
99 BJA-04 415V Sub-BUS (BJA01) (내일 오후에 확정) (Battery Limit 추 0 0 0 0 0 0 Const
LV System
가)
104 PAC-01 Circulating Water System Circulating Water System 01 0 0 0 413 222 191 MCC
105 PAC-02 Circulating Water System Circulating Water System 02 0 0 0 150 98 52 Const
106 PAC-03 Circulating Water System Circulating Water System 03 0 0 0 115 61 54 Walk Down
107 PAA-01 Circulating Water System Intake Facility-01 0 0 0 205 135 70 MCC
108 PAA-02 Circulating Water System Intake Facility-02 0 0 0 132 98 34 Walk Down
109 PGB-01 Closed Cooling Water System Closed Cooling Water System 01 0 0 0 604 289 315 Walk Down
110 PGB-02 Closed Cooling Water System Closed Cooling Water System 02 0 0 0 51 20 31 Const
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
114 QFB-02 Instrument Air Distribution System Distribution Sys for TBN,BOP Area (9/14 Hydro Test 완료) 0 0 0 409 240 169 Walk Down
115 QFB-03 Instrument Air Distribution System Distribution Sys for BLR,FGD,PJFF 0 0 0 0 0 0 Const
116 QFB-04 Instrument Air Distribution System Distribution Sys for Others (WTS Exception, H/T Package 분리, 0 0 0 10 6 4 Walk Down
QFB-05)
117 QFB-05 Instrument Air Distribution System Distribution Sys for Others -02 0 0 0 0 0 0 Const
118 QEJ-02 Service Air Distribution System Distribution Sys for BLR,FGD,PJFF (차주 9월 12일에 재협의) 0 0 0 74 0 74 Const
119 QEJ-03 Service Air Distribution System Distribution Sys for Others 0 0 0 7 0 7 Const
120 LCA-02 Condensate System Condesate Storage & Transfer System-01 0 0 0 114 60 54 Walk Down
122 LCA-04 Condensate System Condesate Storage & Transfer System-02 0 0 0 26 9 17 Const
124 GJA-01 N2 Service Gas Supply System N2 Service Gas Supply System 0 0 0 70 0 70 Const
SGA-10 Fire Fighting System Fuel Oil Pump Shelter And Light Fuel Oil Tank 0 0 0 0 0 0
125 HLA-01 Air & Gas System Air & Gas System (조정 필요) 0 0 0 0 0 0 Const
126 HNC-01 Air & Gas System CIDF, PAF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성) 0 0 0 0 0 0 Const
FDF Lube Oil & HPU Sys (9월 8일 까지 Test Package 작성, 시스템
127 HNC-02 Air & Gas System 0 0 0 0 0 0 Const
분리 방안 강구)
128 HLD-01 Air & Gas System Air Preheater (Mark-up P&ID 확인 후 9월 5일 재 협의) 0 0 0 2 0 2 Const
129 RJC-01 Dust Removal System Pulse Jet Fabric Filter 0 0 0 0 0 0 Const
130 EGD-01 LFO Firing System LFO Pump & EDG Oil Fill System (System 분리 By 시운전) 0 0 0 78 39 39 Const
131 EGD-02 LFO Firing System LFO Pump & EDG Oil Fill System-02 0 0 0 0 0 0 Const
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
132 HHQ-01 LFO Firing System LFO Firing Air System 0 0 0 0 0 0 Const
133 HJA-01 LFO Firing System LFO Firing Air System Around Burner 0 0 0 0 0 0 Const
135 HTO-01 FGD System FGD Absorber System (담당자와 협의 후 일정 확정) 0 0 0 0 0 0 Const
136 HTG-01 FGD System FGD Aeration & GGH System (담당자와 협의 후 일정 확정) 0 0 0 0 0 0 Const
137 QUC-01 Sampling & Analysis System(SWAS) Sampling & Analysis System(SWAS) 0 0 0 28 0 28 Const
139 LDO-01 Condensate Polishing Plant Condensate Polishing Plant 0 0 0 414 97 317 Const
144 LAV-01 Feed Water System BFPM Hydraulic Coupling (Test Package 정리 필요, 9월 5일까지, 0 0 0 0 0 0 Const
LAC-02 & LAV-02)
145 XAW-01 Feed Water System BFPT Gland Steam System 0 0 0 0 0 0 Const
146 MAV-01 Steam Turbine Generator System TBN & Generator Lube Oil System 0 0 0 0 0 0 Const
147 MAV-02 Steam Turbine Generator System TBN Clean & Dirty Oil System (9월 5일 재 협의) 0 0 0 37 3 34 Const
148 MKW-01 Steam Turbine Generator System Generator Seal Oil System 0 0 0 0 0 0 Const
149 MAX-01 Steam Turbine Generator System TBN Control Oil System 0 0 0 0 0 0 Const
150 MAA-01 Steam Turbine Generator System TBN Steam System 0 0 0 3 0 3 Const
151 MAW-01 Steam Turbine Generator System TBN Gland Seal Steam System 0 0 0 6 1 5 Const
152 MAJ-01 Steam Turbine Generator System Condensate Air Removal(Vac-Up) System 0 0 0 16 0 16 Const
153 HAD-01 Pressure System Boiler Water System (Exception 2ea, Expansion Joint) 0 0 0 45 11 34 Walk Down
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
156 HAH-01 Pressure System Boiler Steam System (Steam Blowing due to Steam Blowing) 0 0 0 0 0 0 Const
157 HAH-02 Pressure System Superheater System (Steam Blowing due to Steam Blowing) 0 0 0 6 4 2 Const
158 HAJ-01 Pressure System Reheater System (Steam Blowing due to Steam Blowing) 0 0 0 13 9 4 Const
160 LBA-01 Steam System Main & RH Steam System 2 0 2 287 4 283 Const
161 LBF-01 Steam System HP/LP Bypass System (9월 5일 추가 협의) 0 0 0 2 0 2 Const
162 LBG-01 Steam System Auxiliary Steam System for main 0 0 0 159 0 159 Const
164 LBG-03 Steam System Auxiliary Steam System for FGD GGH Back-Up 0 0 0 0 0 0 Const
165 HAN-02 Steam System Safety Valve Exhaust Piping System 0 0 0 0 0 0 Const
166 HTQ-01 FGD System (확인 필요) Sea Water Discharge Sampling System 0 0 0 5 5 0 Const
167 BM0-01 Emergency Diesel Generator System Emergency Diesel Generator System 0 0 0 0 0 0 Const
170 GU0-01 Rain Water collection and drainage syst Rain Water System (Boiler) 0 0 0 0 0 0 Const
172 TNK-01 Civil, Building & Structure Cean/Dirty Oil Storage Tank 0 0 0 14 2 12 Submission
174 UEJ-01 Civil, Building & Structure Light Fuel Oil Storage Tank 0 0 0 11 0 11 Const
175 UBN-01 Civil, Building & Structure Emergency Diesel Generator 0 0 0 6 2 4 MCC
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
176 STR-05 Civil, Building & Structure Fuel Oil Pump Shelter 0 0 0 13 4 9 Walk Down
178 UVE-01 Civil, Building & Structure FGD Absorber & GGH 0 0 0 4 4 0 Const
180 STR-06 Civil, Building & Structure Chemical Storage Tank Shelter for CPP 0 0 0 11 4 7 Walk Down
181 UHQ-01 Civil, Building & Structure Pulse Jet Fabric Filter 0 0 0 4 4 0 Const
183 UMA-01 Civil, Building & Structure Steam Turbine Building 0 0 0 30 30 0 Const
184 STR-02 Civil, Building & Structure CO2 Storage Tank Shelter 0 0 0 10 0 10 Const
186 UEU-01 Civil, Building & Structure Fly Ash Vacuum Pump Shelter 0 0 0 4 4 0 Const
187 UET-01 Civil, Building & Structure Fly Ash Silo 0 0 0 14 14 0 Const
188 UET-02 Civil, Building & Structure Bottom Ash Silo 0 0 0 0 0 0 Const
189 UEU-02 Civil, Building & Structure Ash Conveyor Transfer Tower 0 0 0 0 0 0 Const
190 UST-01 Civil, Building & Structure Workshop & Store Building 0 0 0 0 0 0 Const
191 UED-01 Civil, Building & Structure Coal Conveyer & Transfer Tower 0 0 0 0 0 0 Const
194 LAC-02 Feed Water System BFPT Main & Booster Pump System (System 분리 by 시운전) 0 0 0 0 0 0 Const
195 LAC-04 Feed Water System BFPT Main & Booster Pump System-02 0 0 0 0 0 0 Const
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
196 LAV-02 Feed Water System BFPT Oil System & Control Mechanism 0 0 0 0 0 0 Const
197 LAF-01 Feed Water System Reheater Spray Water System 0 0 0 63 6 57 Walk Down
198 MKF-01 Steam Turbine Generator System Stator Cooling Water System 0 0 0 0 0 0 Const
199 MKG-01 Steam Turbine Generator System Generator H2 Control System 0 0 0 0 0 0 Const
200 QJA-01 Steam Turbine Generator System CO2 Service Gas Supply System 0 0 0 0 0 0 Const
201 QJA-02 Steam Turbine Generator System H2 Service Gas Supply System 0 0 0 0 0 0 Const
203 ETA-01 Ash Handling System Bottom Ash Handling System (담당자랑 협의 후 일정 확인) 0 0 0 16 2 14 Const
204 ETG-01 Ash Handling System Fly Ash Handling System (담당자랑 협의 후 일정 확인) 0 0 0 3 0 3 Const
205 ETK-01 Ash Handling System Ash Disposal System (담당자랑 협의 후 일정 확인) 0 0 0 0 0 0 Const
206 HFC-01 Coal Pulverising system Pulverized Coal Firing System 0 0 0 0 0 0 Const
207 HFW-01 Coal Pulverising system Pulverized Sealing Air System 0 0 0 0 0 0 Const
Pulverizer Loading Unit & Lube Oil System (Test Package 9 월 10일
208 HFD-01 Coal Pulverising system 0 0 0 0 0 0 Const
까지 작성, 토목 작업 선행 , Interface Meeting에 상정)
209 EAC-01 Coal Handling System Coal Handling System (담당자랑 협의 후 일정 확인) 0 0 0 21 0 21 Const
211 SQ0-03 Civil, Building & Structure Drainage for all others 0 0 0 0 0 0 Const
212 SQ0-04 Civil, Building & Structure Road & Paving for all others 0 0 0 0 0 0 Const
217 UZJ-02 Civil, Building & Structure Gate & Fence for M5 Area 0 0 0 0 0 0 Const
Process Sub-System Schedule
PROJECT : Malaysia Fast Track 3A PROJECT ###
D punch Total
No. Sub-system System Description Sub-System Description Problem Area State
Total Done Bal. Total Done Bal.
220 LBQ-01 Feed Water Heater System Feed Water Heater Extraction System -01 0 0 0 145 0 145 Const
221 LBQ-02 Feed Water Heater System Feed Water Heater Extraction System -02 0 0 0 54 0 54 Const
222 LCH-01 Feed Water Heater System Feed Water Heater Drain System 0 0 0 215 0 215 Const
223 LAD-01 Feed Water Heater System Feed Water Heater Vent System 0 0 0 112 1 111 Const
224 SA0-05 HVAC System HVAC for Workshop Store Building 0 0 0 0 0 0 Const
228
PROJECT : SABUCO BUTANOL AND SYNGAS PROJECT 42642Updated : -409dd mmm yyyy
Comp. CC Notice Punch Cat. A CC Approved Punch Cat. B MC Notice Punch Cat. C MC Approved Cat. D Total
No. Sub-system Sub-Sytem Description Date Probem Area
Target Actual Issued Target Actual Total Done Bal. Target Actual Issued Target Actual Total Done Bal. Target Actual Issued Target Actual Total Done Bal. Target Actual Total Done Bal. Total Done Bal.
1 21-ST1-101 Piperack (01, 02) 28-Sep 12-Jan 12-Jan 1-Oct 12-Nov 12-Nov 0 0 0 14-Jan 14-Jan 14-Jan 30-Apr 0 0 0 12-Jan 12-Jan 14-Jan 0 0 0 28-Jan 14-Jan 0 0 0 0 0 0
2 20-ST-101 Piperack (01, 02, 03, 04) 10-Jan 31-Jan 1-Feb 2-Dec 24-Jan 24-Jan 0 0 0 3-Feb 2-Feb 2-Feb 30-Apr 0 0 0 20-May 17-May 0 0 0 30-May 0 0 0 0 0 0
3 20-ST-102 Equipment Structure (A, B, TSA, Reactor) 20-Jan 31-Jan 31-Jan 19-Oct 29-Jan 29-Jan 0 0 0 3-Feb 1-Feb 1-Feb 30-Apr 0 0 0 15-May 17-May 20-May 0 0 0 25-May 0 0 0 0 0 0
4 21-ST2-101 Piperack 01 27-Jan 15-Feb 19-Feb 12-Feb 19-Feb 19-Feb 0 0 0 18-Feb 22-Feb 22-Feb 30-Apr 0 0 0 25-Apr 19-Feb 21-Feb 0 0 0 5-May 30-Jun 0 0 0 0 0 0
5 21-ST2-102 Equipment Structure C 23-Jan 15-Feb 19-Feb 18-Feb 31-Dec 31-Dec 0 0 0 23-Feb 22-Feb 22-Feb 30-Apr 0 0 0 30-Apr 10-Apr 12-Apr 0 0 0 10-May 3-May 0 0 0 0 0 0
6 21-ST1-102 Equipment Structure (BuOH, OXO) 25-Jan 15-Feb 2-Mar 23-Feb 3-Mar 3-Mar 0 0 0 30-Apr 28-May 11-Jun 0 0 0 20-May 0 0 0 30-May 0 0 0 0 0 0
7 21-ST1-103 Compressor Shelter 6-Jun 30-Apr 10-Jun 9-Jun 9-Jun 9-Jun 0 0 0 10-May 16-Jun 30-Jun 0 0 0 30-May 0 0 0 9-Jun 0 0 0 0 0 0
8 20-ST-103 Compressor Shelter 10-Jun 30-Apr 2-Jul 16-Jun 30-Jun 16-Jun 0 0 0 10-May 7-Jul 21-Jul 0 0 0 30-May 0 0 0 9-Jun 0 0 0 0 0 0
9 21-ST2-103 Misc. Supports, Platform & Tank Dike Wall 30-Apr 0 0 0 10-May 0 0 0 30-May 0 0 0 9-Jun 0 0 0 0 0 0
10 21-ST2-301 Fire fighting Equipment 10-May 29-Jun 8-Jul 22-Jul 8-Jul 0 0 0 20-May 8-Jul - - - 0 0 0 9-Jun 0 0 0 19-Jun 0 0 0 0 0 0
11 21-ST1-104 Misc. Supports & Platform 15-May 0 0 0 25-May 0 0 0 14-Jun 0 0 0 24-Jun 0 0 0 0 0 0
12 20-ST-301 Fire fighting Equipment 15-May 29-Jun 8-Jul 22-Jul 8-Jul 0 0 0 25-May 8-Jul - - - 0 0 0 14-Jun 0 0 0 24-Jun 0 0 0 0 0 0
13 21-ST1-301 Fire fighting Equipment 15-May 29-Jun 8-Jul 22-Jul 8-Jul 0 0 0 25-May 8-Jul - - - 0 0 0 14-Jun 0 0 0 24-Jun 0 0 0 0 0 0
14 20-ST-104 Misc. Supports & Platform 5-Jul 30-May 7-Jul 0 0 0 9-Jun 0 0 0 29-Jun 0 0 0 9-Jul 0 0 0 0 0 0
14 Summary 9 14 12 11 11 11 0 0 0 14 8 8 8 0 0 0 0 14 5 4 0 0 0 0 0 14 3 0 0 0 0 0 0