construction methodologies and measures under the specific contract has addressed the relevant

identified hazards and to identify additional hazards related to architectural/ civil design,
construction and maintenance.

Contents:

The fundamental information to be provided in the Civil DSS shall include but not limited to the
following:

a) An executive summary report highlighting the major areas of concerns and status of
findings

b) A brief description of the project which include the following information:


 Brief description of the contract and its scope (no. and description of stations,
tunnel/ viaduct/ at grade trackway/ vehicular viaduct/ underground roads,
bridges across rivers and alignment
 The existing environment (focusing on adjacent buildings/ structures of
concerns, traffic conditions, utilities, waterways, etc)
 Brief details of integration with other development
 Brief descriptions on the proposed construction methods; cut and cover and
bored tunnels;
 Detailed Geotechnical Condition; and
 Details of key milestone and implementation schedule

c) Hazard and Risk Management process inclusive of:


 A description on the roles and responsibilities in the reviewing and acceptance
of the mitigation measures; and
 The risk assessment matrix

Soil Profile

- Show profile and x-section


- Highlight areas of soft soil
- Highlight soil type interface
- Indicate extent of support and criteria for termination
-