Sie sind auf Seite 1von 61

AGENDA NOTES FOR 488th MEETING OF OPERATION & COORDINATION

SUB-COMMITTEE OF WRPC
TO BE HELD ON 17th OCTOBER 2016 AT BHOPAL

ITEM No. 1: CONFIRMATION OF THE MINUTES


Minutes of 487th meeting of Operation & Coordination Sub-Committee of WRPC held
on 16TH September 2016 at Ahmedabad were forwarded vide letter No.
WRPC/OPN/OCC-Minutes/2016-17/10360 dated 26.09.2016.

No comment has been received. Sub-Committee may confirm the same.

ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF


SEPTEMBER 2016.

2.1 Frequency Particulars

The average frequency during the month of September, 2016 was 50.00 Hz. The
maximum instantaneous frequency was 50.24 Hz at 18:01:20 hrs on 2nd September
16 while minimum instantaneous frequency was 49.67 Hz at 18:53:20 hrs on 19th
September 16. The frequency profile during September, 2016 was as under:

01st September 2016 to 30th September 2016 % time

IEGC band (49.9 < f < 50.05 Hz) 75.15

< 49.9 Hz 05.85

> 50.05 Hz 19.00

The frequency particulars is enclosed at Annex-2.1

The Sub-Committee may like to note.

2.2 INTER-REGIONAL EXCHANGES

There was a net inter-regional export of 5962.00 MUs by WR against net export
schedule of 5864.00 MUs.

The Sub-Committee may like to discuss.

488TH OCC AGENDA


2.3 Voltage Profile

Voltage profile at some of 765/400 kV sub-stations during the month of September


2016 furnished by WRLDC is enclosed at Annex-2.3.

The Sub-Committee may like to discuss.

2.4 U/F Relay Operations

As per WRLDC records during September 2016 the system frequency didn’t touch 49.2
Hz and no UFR operation has been reported by WRLDC.

The Sub-Committee may kindly note.

2.5 Power Cuts / Load Restrictions

Details of Power Cuts and Regulatory measures during September 2016 as furnished
by the state utilities are given in Annex. 2.5.
The Sub-Committee may note.

2.6 Details of Generating Units under Forced outages

Details of generating units under forced outages during September 2016 are given in
Annex-2.6.

The Sub-Committee may discuss.

2.7 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during September 2016 are
given in Annex-2.7

The Sub-Committee may discuss.

488TH OCC AGENDA


ITEM NO.3: OPERATIONAL PLANNING

3.1 Proposed Planned maintenance programme of generating units.

The maintenance programme of generating units for the months October 2016 &
November 2016 is given in Annex 3.1.

The Sub-Committee may discuss and finalize the outage schedule of generating
units for the above period.

3.2 OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS

Maintenance programme for transmission lines during the months October 2016 &
November 2016 is given in Annex 3.2.

The Sub-Committee may discuss and finalize the maintenance programme


proposed above.

3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – OCTOBER


2016 &– NOVEMBER 2016
Details of anticipated restricted & un-restricted demands for the months of OCTOBER
2016 &– NOVEMBER 2016 are given in Annex 3.3.
Constituents may furnish the anticipated station wise Availability & Energy for the
months of OCTOBER 2016 &– NOVEMBER 2016.
The Sub-Committee may like to note/update.

ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF AUGUST 2016

The details of actual generation, demand, drawl of power from grid; exchanges etc.
are given in the following Annexures:

Annex 4.1 - Actual Generation and Requirement for September 2016.

Annex 4.2 - Peak Demand: Schedule Vs Actual for September 2016.

Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2016.


Annex 4.7 – Details of level of Major Reservoirs in Western Region for September
2016.

The Sub-Committee may like to note.

488TH OCC AGENDA


ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month of
September 2016. However the details of minor incidences during the month received
from WRLDC are enclosed at Annexure-5.

The Sub-Committee may like to note/discuss.

ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system.

Constituents have furnished the status of healthiness of SER/DRs in their systems on


the dates below:
Sl No. Name of Date of Receipt
constituents
1 PGCIL,WRTS-I 04.10.2016
2 PGCIL,WRTS-II 04.10.2016
3 MPPTCL 16.09.2016
4 NTPC 03.10.2016
5 CSPTCL 03.10.2016
6 GETCO 05.09.2016
7 MSETCL 03.10.2016

The sub-Committee may like to note.

ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR


COMMISSIONING OF REACTORS, TRANSMISSION LINES AND
GENERATING UNITS IN WR.

7.1 Status of completion of ongoing Schemes for Commissioning of reactors in


2016-17.
S. 400 kV Size Implementin Expected commissioning
No. Sub/stn. (MVAR) g agency date
1 Nanded 125 MVAR MSETCL Dec – 2016

2 Sholapur 125 MVAR MSETCL Dec – 2016

3 Kolhapur 125 MVAR MSETCL Dec – 2016

4 Akola 125 MVAR MSETCL Dec – 2016

*5 Nagda 125 MVAR MPPTCL Commissioned and charged


on 09.08.2016

488TH OCC AGENDA


6 ISP 125 MVAR NHDC April– 2017 (Tendering
done)
7 Line reactor 50MVAR MPPTCL October 2016 (Expected)
at Nagda-ISP
line at Nagda
end
8 Satpura 50 MVAR MPPGCL Dec-2016

9 Khandwa 125MVAR PGCIL Commissioned on


01.04.2016
10 Vindhyachal 125MVAR NTPC Commissioned on
06.04.2016

*50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor after
commissioning of 125 MVAr reactor at Nagda.

Chief Engineer, SLDC Maharashtra informed during 32nd WRPC meeting :

a. Commissioning of 125MVAR shunt reactor at karad, Kolhapur, Solapur, by


MSETCL –Tender are floated for above 3 No substation.
b. Planning of additional shunt reactors in south Maharashtra – shunt reactors
are planned under phase- II by MSETCL. Proposed 125MVAR Bus reactors
are at following substations:-

400KV Substations:-

1. Chandrapur-II
2. Koradi-II
3. Khaparkheda
4. Bhusawal-II
5. Lonikand-II
6. Chakan
7. Kudus

Utilities are requested to ensure that reactors are installed and commissioned
according to the schedule agreed as above.

The WR utilities may intimate the current status on above.

488TH OCC AGENDA


7.2 STATUS OF COMPLETION OF 765/400 KV AND ABOVE ONGOING
TRANSMISSION SCHEMES BEING EXECUTED/IMPLEMENTED BY
TRANSMISSION AGENCIES.

The updated status on various ongoing transmission schemes for the year 2016-17
as per the current information available is as follows: -
S. Name of the Line Target Remarks
No. Completion
Date
POWERGRID
1 400 kV Navsari – Kudus D/C Line Dec -16 ROW/Forest problem
2 765 kV Wardha –Nizamabad- Dec -16
Hyderabad D/C

3 400 kV Aurangabad - Boisar line D/C Oct -16


line
4 765 kV Aurangabad (PG) - Padghe Dec -16
(PG) D/C

5 800kV Champa – Kurukshetra Bipole December -


16
6 LILO of both circuits of Aurangabad – Commissioned on 03.04.2016
Pune 400 kV D/c line at Pune 765/400
kV GIS

CHHATTISHGARH
1 400 kV DCDS Raipur(Raita)- Oct -16
Jagdalpur(DCDS)
2 LILO of 220 kV Raigarh-Budipadar at Oct -16 Under discussion with Orissa
400 kV PGCIL S/s Raigarh. Ideal and ERLDC, being taken up
charged on 11.8.2015 for no theft by WRPC
reason
GUJARAT
1 400 kV D/C Vadinar-Amreli line Dec -16
2 400kV APL-Hadala LILO to Halvad June -17
3 400 kV D/C Amreli-Kasor line(Part-1) Dec -16
4 400 kV Charanka- Veloda Dec -16
5 400kV Varsana-Halvad March -17
MADHYA PRADESH

MAHARASHTRA(STU)
1 400 kV Bableshwar-Kudus D/C Forest clearance awaited,
Oct -16 severe ROW problem
(Quad)

488TH OCC AGENDA


STERLITE (RPTCL)
1 Commissioned on
400 kV Sujalpur(PG)-RAPP(Kota)(IR
26.02.2016(But idle charged
by RTCL) from Sujalpur End as bays at
Rapp end are not ready)

The WR utilities may intimate the current status on above.

7.3 Commissioning of new Generating units in Western Region and the


capacity expected to be commissioned during the current year 2016-17.

The status regarding Generating units, commissioned /expected to be commissioned


during the current year 2016-17 according the available information is as below:

Name of the Power Projects Unit No. Capacity Date of Commissioning


(MW) /Schedule Date
GUJARAT

CHHATTISGARH
MARWA 2 500 COD on 00.00 hrs of
31.07.2016
MAHARASHTRA
CHANDRAPUR 8 500 Synchronized on 29.3.2015.
COD ON 04.06.2016
CHANDRAPUR 9 500 Commissioned on
21.03.2016. COD not yet
declared
KORADI 9 660 Synchronized on
21.01.2016. COD not yet
declared
KORADI 10 660 Synchronized on
01.07.2016. COD not yet
declared
MADHYA PRADESH

M/s Jhabua Power, Seoni 1 600 Synchronized on


23.02.2016
Cod on 03.05.2016
Essar Power MP Ltd(Mahan) 2 600 March -17

MB Power 2 600 Cod on 07.04.2016

CENTRAL SECTOR/IPP

488TH OCC AGENDA


GMR Chhattisgarh 2 685 Cod on 01.04.2016

KSK 3 600 Dec – 2016

KSK 4 600 March – 2017

RKM 3 360 Dec 2016

RKM 4 360 Dec 2016

TRN Energy 1 300 Cod on 19.08.2016

The WR utilities may intimate the current status on above.

ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO. 8.1: QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second quarter
(July 2016 to September 2016) for the year 2016-17.

The Sub-Committee may like to note and furnish details in respect of above.

ITEM NO. 8.2: STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR

Status of physical & cyber security in Power Sector for the Second quarter (July 2016
to September 2016) for the year 2016-17 have not been received from some of the
constituents.

The Sub-Committee may like to note and furnish details in respect of above.

ITEM NO. 8.3: READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC
FOR UPGRADATION OF EXISTING SCADA/EMS SYSTEM
A 20th PRM meeting to review progress of replacement/up gradation of SCADA/EMS
was held on 27th September, 2016 at Goa, wherein following status have been
noted:

488TH OCC AGENDA


1. All the utilities have signed ToC & project is closed on 30th September 2016.
2. M/s Alstom ensured that remaining punch points will be attended during
defect liability/AMC period by resident Engineer of Alstom on no cost basis.

The Sub-committee may like to note the same.

ITEM NO. 8.4 ELECTRICITY GENERATION TARGET FOR THE YEAR 2017-18:

Chief Engineer(OPM), CEA, New Delhi intimated vide letter dated 26.09.2016 and
28.09.2016(copy enclosed at annexure-8.4) that generation target for the year 2017-18
to be fixed up by MoP in consultation with CEA. The exercise is already started by
CEA. Therefore all the utilities are requested to send information on Email:
targetopmcea@gmail.com, sewak_sarita@nic.in, anilkawrani@nic.in & also send copy
to WRPC(email : operationwrpc@gmail.com ). Chief Engineer (Opm), CEA will be
making presentation on the above subject during the meeting. It is also requested to
bring the necessary information/data in 488th OCC meeting in following format :

State Energy Energy Requirement predicted % growth in


Name Requirement for 2017-18(MUs) Energy
during 2016- Requirements
17(MUs)
upto September
2016

All the constituents are requested to furnish the same in attached format.

ITEM NO. 8.5 FINALISATION OF ANNUAL MAITENANCE PROGRAM OF


GENERATING UNITS FOR THE YEAR 2017-18 IN WESTERN REGION:

A meeting on 20th October, 2016 at WRPC has already been proposed to finalize the
Annual outages plans for the WR Generators.
It is requested that all Generators in WR & SLDC’s may attain the same with
tentative Annual maintenance plan (unit wise)for the year 2017-18.

The Sub-committee may like to note the same.

488TH OCC AGENDA


ITEM NO. 9: WRLDC ITEMS

1. Enhancing reliability of power supply of Goa

AGM, WRLDC informed that power supply to Goa is met partly from Western Region
and partly from Southern Region. The drawal from WR is via 400/220 kV Mapusa
(POWERGRID) and through 220 kV lines drawing power via 400/220 kV Kolhapur
substation of MSETCL. Major issues affecting reliability of power to Goa are
tabulated below:

S
Inadequacy Constraints faced Desirable actions
No.
1 Non-availability Lack of situational Providing telemetry of all 220 kV
of telemetry of awareness at and 132 kV substations of Goa
tie lines WRLDC / SLDC on by GED
between Goa the network
and availability in Goa Redundancy of communication
Maharashtra. leads to poor channel
coordination during
Intermittent normal operation and Operation of real-time control
data from contingencies room in SLDC-Goa and round
several the clock manning of SLDC-Goa
Stations of Goa Incorrect computation
of drawal of
Maharashtra and Goa
in real-time leading to
incorrect operational
and scheduling
decisions
2 High Voltage In the absence of Switchable Shunt reactors to be
during adequate shunt installed at Kolhapur_MSETCL
monsoon and reactive
low demand compensation Switchable Shunt reactors to be
period in multiple EHV lines installed at Kolhapur_GIS and
Maharashtra have to be opened Mapusa by POWERGRID
and Goa leading to depletion
of network. There Switchable Shunt reactors to be
have been several installed in 220 kV substations of
events involving Goa
tripping of all tie lines
to Goa due to high
voltage / fault leading
to blackout.
3 Low Voltage In the absence of Shunt capacitor banks to be
during dry adequate shunt installed and their operation to be
season capacitor monitored by Goa
compensation the

488TH OCC AGENDA


voltage on LV side is
poor
4 Inadequate There have been Protection audit was carried out
Protection several events of by team comprising of SRLDC /
system at 220 undesirable tripping SRPC / KPTCL on 9-10 April
and 110 kV or delayed clearing of 2015. Protection audit was
substations in fault in Goa system carried out by a team comprising
Goa leading to partial or of MSETCL / GED / WRPC /
full blackout in Goa WRLDCrepresentative on 25-26
March 2016. The status of
progress in implementation of
recommendations to be
submitted by Goa Electricity
department.
4 Strengthening Protection system Committee comprising
of and line healthiness CEA/SRPC/SRLDC/ PGCIL
interconnection is not good and SRTS 2, KTTCL and GED visited
with Karnataka tripping has been the associated substation and
/ SR observed released a report. GED to update
the status of implementation.

2. Insecure evacuation of Koradi stage-II and IEPL

It has been observed that 2x660 MW unit 8 and 9 of Koradi-II as well as 2x270
MW units of IEPL are presently evacuating power under interim arrangement
through 400 kV Koradi-II – Wardha S/C and 400 kV Koradi-II- IEPL-Warora-
Wardha lines. In the event of tripping of 400 kV IEPL – Warora line the entire
generation of IEPL + Koradi-II would flow on 400 kV Koradi-II – Wardha S/C line.
Thus the system is N-1 insecure MSETCL to update the progress of envisaged
interconnection / evacuation scheme of Koradi-II / IEPL.

3. Telemetry of RES in Maharashtra

AGM, WRLDC informed that Maharashtra, Gujarat and Madhya Pradesh had a
signification generation from RES during the months of June-July and August.
The variable and intermittent generation from RES in the States has a significant
impact on the grid parameters as well on the drawal of the States from the grid.
High wind generation downstream of Karad, Kolhapur, Dhule in South
Maharashtra leads to reverse active/reactive power flow on the 400/220 kV ICTs
leading to very high voltage. Severe constraints are being experienced in
operational planning as well as during real-time in the absence of real-time
telemetry of RES in the Maharashtra. OCC may like to take update from

488TH OCC AGENDA


MSETCL and other States of WR regarding the status of real-time telemetry from
existing and the envisaged RES in their State.

4. Deployment of State Estimator module of EMS in SLDC and WRLDC

AGM, WRLDC informed that the Western Regional grid is a highly meshed
system that is operating in synchronism with the All India grid. The SCADA data
has inherent skewedness and errors which often become a constraint in real-time
operation. The State Estimator function in the EMS could be used for bad data
detection, consistent representation of the power system, Real-time Contingency
analysis and Security Enhancement. The function is becoming increasingly
relevant with growth in the size and complexity of the network.

SLDCs may update the status of deployment of State Estimator in their State.

5. High voltage in Madhya Pradesh

AGM, WRLDC informed that during the lean demand season severe high voltage
were faced in several Stations in Madhya Pradesh viz, Khandwa, Damoh, Katni,
Chegaon, Birsinghpur and Rajgarh. The voltage remained outside the IEGC
threshold of 420 kV for a significant time during the day/night.

SLDC Jabalpur / MPPTCL to update the following

a. Status of the envisaged 125 MVAR Bus Reactor ISP, 50 MVAr BR at


Satpura,
b. Status of commissioning of Line Reactor on Nagda-ISP line at Nagda end
c. Long-term measures being taken to ensure adequate shunt reactive
compensation at Birsinghpur, Damoh, Chegaon and Katni.

POWERGRID to update the expected restoration date of 80 MVAR LR of 400 kV


Khandwa-Seoni-2 at Khandwa end.

6. Restoration of elements under Prolonged outage

AGM, WRLDC informed that respective utilities to expedite the restoration of


following elements under prolonged outage:

488TH OCC AGENDA


S No. Out since

1 50 MVAR LR of 400 kV Kansari- 05.09.2016 GETCO


Bhinmal-1 at Kansari end

2 50 MVAR LR of 400 kV Parli-Lonikhand 30.10.2015 MSETCL


-2 at Parli end

3 80 MVAR LR of 400 kV Khandwa-Seoni- 30.07.2016 POWERGRID


2 at Khandwa end

4 50 MVAr LR of 400 kV Bilaspur – Essar 21.03.2016 POWERGRID


Mahan-1 (Future line)

5 50 MVAr LR of 400 kV Bilaspur – Essar 21.03.2016 POWERGRID


Mahan-2 (Future line)

6 TCSC of 400 kV Raipur-Raigarh –II 06.07.2016 POWERGRID

7 TCSC of 400 kV Raipur-Raigarh – I 08.07.2016 POWERGRID

8 Indore ICT-1 02.08.2015 MPPTCL

9 Bina ICT-1 15.10.2016 MPPTCL

As per the advise of CTU the FCS of 400 kV Raigarh-Raipur ckt-3 and 4 were
kept out of service since 28.07.2013 and 11.04.2015 due to the foreseen risk of
sub-synchronous resonance after LILO of the above lines at KSK and RKM. It is
envisaged the would be opened and the original configuration would be restored.
POWERGRID may update the healthiness of the above FSC so that they could
be taken in service when the Raigarh and Raipur lines are re-connected as per
original configuration.

7. Telemetry Issues

AGM, WRLDC informed that utilities to update the progress for ensuring reliable
telemetry from following stations:

S No. Station Issue Status reported in Status to be


last OCC updated by
1 400 kV Kala Intermittency connectivity through

488TH OCC AGENDA


400 kV Magarwada due to GPRS fiber optic is in
connectivity. progress and it
would be completed
Error in in next 1-2 month
drawal
computation
of DNH and
DD
2 400 kV Kolhapur Intermittency Data would be
GIS transmitted through
Error in leased line from
drawal Kolhapur to Mapusa POWERGRID
computation to WRLDC
of
Maharashtra

3 400 kV NTPC Data not Transducers to be


Korba available replaced.

Non-availability of
spares.
Alternate
arrangement being
done
4 Dhule ICT-1,2,3 Data not IEDs being
available configured and
5 Kolhapur ICT-3 Data not Data would be
available available in Sep
6 Padghe ICT-4 Data not end / Oct first week
available
7 Solapur ICT-2 Data not
available
8 Koyna Stage-1, Data not OPGW work in
2,3,4 available progress MSETCL
9 220 kV Nashik, Data not work in progress
Bhugaon, available
Tillari,
Mahalaxmi,
Borivali, Boiser-
MH, Vasai and
Shendra
10 400 kV Data work in progress
Bableshwar, Intermittent
Nagothane,
Ektuni, Dhule
11 400 kV connectivity
Chandrapur-II, through fiber optic
Lonikhand-II is in advanced
stage

488TH OCC AGENDA


8. Mock Black start Exercise
AGM, WRLDC informed that Mock Black Start exercise at Bango, Bargi,
Indirasagar and Omkareshwar HEP were scheduled in the month of September.
SLDC MP and Chattisgarh may like to update the status.

Other SLDCs to intimate the plans for Oct 2016.

9. Updating the document of Reactive Energy Resources and Recovery


Procedure of Western Region

AGM, WRLDC informed that The compilation on Reactive Energy Resources and
Recovery Procedure is due for updation this year. All entities to expedite sending
their inputs to WRLDC by 30 Oct 2016 so that draft could be discussed in the
next OCC meeting in November 2016.

10. Operation of hydro units in Pumped Storage Mode

Sh M.A.KP. Singh, Member (Power), NCA had stated in the last OCC meeting
the RBPH units are likely to be available for operation in pumped storage mode in
the next year. He mentioned that a draft procedure for scheduling and accounting
of energy in the PSP mode was circulated. Sh M.A.KP. Singh, Chief Engineer will
be invited to give a detail presentation on the draft procedure during 489th OCC
meeting.

SLDC Gujarat to update the status of healthiness of Kadana PSP. SLDC


Maharashtra to share the details of the envisaged PSP in Maharashtra.

The Sub- Committee may like to discuss/note the same.

ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING

487th OCC reviewed the meeting roaster and finalized sheet is enclosed at
Annexure-10. The 489th OCC meeting would be hosted by at DB Power. The
date & venue will be intimated by DB Power during the meeting.

*****************************

488TH OCC AGENDA


Anaulagnak 2.1

maah isatmbar 2016 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa


( piScama xao ~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )
FREQUENCY PARTICULARS DURING SEPTEMBER 2016
(AS PER FREQUENCY REPORT OF WRLDC)
1. INTEGRATED OVER AN-HOUR
ek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY 50.09 Hz. BETWEEN 300 Hrs & 400 Hrs Hrs. ON 01.09.2016
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY 49.85 Hz. BETWEEN 1400 Hrs & 1500 Hrs Hrs. ON 19.09.2016
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY 50.00 Hz.
AaOsat AavaRi%t
2. INSTANTANEOUS ta%kailak
2.1 MAXIMUM FREQUENCY 50.24 Hz. AT 18:01:20 Hrs. ON 02.09.2016
AiQaktma AavaRi%t

2.2 MINIMUM FREQUENCY 49.67 Hz. AT 18:53:20 hrs Hrs. ON 19.09.2016


nyaUnatma AavaRi%t

3. %AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2016 AUGUST 2016 JULY 2016
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz. 0.00 0.00 0.00
48.5 hT\ja ko naIcao
3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00
48.5 hT\ja AaOr 48.8 hT\ja ko baIca
3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00
48.8 hT\ja AaOr 49.2 hT\ja ko baIca
3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00
49.2 hT\ja AaOr 49.5 hT\ja ko baIca
3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.10 0.11 0.10
49.5 hT\ja AaOr 49.7 hT\ja ko baIca
3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 5.75 5.83 3.90
49.7 hT\ja AaOr 50.2 hT\ja ko baIca
3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 75.15 73.73 72.35
49.9 hT\ja AaOr 50.05 hT\ja ko baIca
3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 19.00 20.32 23.65
50.05 hT\ja AaOr 51.5 hT\ja ko baIca
3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00
51.5 hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI
ANNEXURE 2.3
2016
Voltage Profile during the month of Sep. 2016

भोपाल खंडवा इटारसी दमोह नागदा इंदौर रायपुर रायगढ़


Date Bhopal Khandwa Itarsi Damoh Nagda Gwalior Raipur Raigarh
Indorer
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 421 406 430 419 419 406 425 408 426 412 421 409 413 391 422 415 423 416
2 421 403 430 417 419 404 423 406 426 409 422 406 412 387 423 415 424 417
3 421 406 431 416 420 404 423 410 425 409 421 406 418 397 424 415 425 417
4 419 407 429 418 419 406 424 411 423 411 420 408 415 388 424 417 426 419
5 421 406 431 418 419 406 427 408 421 410 419 409 413 390 423 417 424 418
6 413 402 431 413 413 400 416 405 419 406 416 404 407 388 421 414 423 416
7 413 400 430 414 413 400 417 403 418 404 415 402 415 387 420 411 422 415
8 412 398 428 415 412 400 415 402 418 405 415 403 417 389 419 411 420 416
9 415 403 431 417 415 403 415 404 419 406 417 406 409 387 420 412 422 417
10 414 401 431 412 414 399 415 404 420 404 419 403 409 388 421 413 422 418
11 414 402 426 412 414 401 414 401 420 404 419 404 411 389 420 414 422 418
12 414 395 427 404 412 395 411 401 419 399 419 397 415 387 420 412 422 417
13 416 402 424 407 414 399 420 402 418 403 419 402 415 399 421 414 423 418
14 414 399 427 400 414 398 418 407 419 400 418 399 416 396 424 415 424 417
15 416 404 428 415 416 403 421 409 420 405 420 406 419 401 425 419 424 420
16 419 400 431 408 418 399 423 407 422 403 423 404 420 393 425 416 424 417
17 419 403 430 412 418 402 421 410 423 407 424 407 418 388 426 417 425 418
18 417 407 428 417 416 406 422 411 420 408 421 410 409 390 425 418 425 419
19 419 402 428 416 417 401 421 407 422 402 423 404 412 392 424 417 424 416
20 418 403 432 415 419 403 422 409 423 400 424 404 411 393 424 417 424 416
21 417 403 430 415 417 402 421 410 419 403 421 403 411 390 423 415 423 413
22 417 403 427 407 416 402 421 408 419 400 420 403 416 395 424 414 424 416
23 416 405 426 410 415 402 419 411 420 404 420 404 413 399 422 414 423 417
24 418 401 428 410 418 399 422 409 422 403 423 402 415 398 424 413 424 415
25 418 407 427 417 417 405 424 414 420 409 420 409 416 394 424 419 424 419
26 413 400 428 407 411 399 418 408 418 401 417 401 405 389 424 414 423 414
27 414 400 429 413 413 399 419 410 418 402 418 400 407 394 422 414 421 414
28 420 407 430 389 418 405 423 414 424 407 424 407 411 396 424 416 422 414
29 420 405 428 415 419 404 424 416 421 406 421 404 411 396 424 415 422 413
30 417 408 428 415 415 407 418 418 420 410 418 408 412 393 422 416 419 413
421 395 432 389 420 395 427 401 426 399 424 397 420 387 426 411 426 413
धुले बोईसर कलवा कराड़ असोज दे हगाम
Date Bhilai Wardha Dhule Parli Boisar Kalwa Karad Dehgam
Asoj
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 418 412 423 414 431 406 428 407 421 402 427 400 433 414 416 401 425 394
2 419 412 425 413 431 402 430 400 422 406 428 409 434 414 417 401 425 412
3 421 412 427 411 432 408 428 399 421 402 430 405 432 413 418 402 426 410
4 420 413 427 414 425 425 427 404 420 403 428 405 432 415 420 405 428 414
5 419 412 427 413 425 425 427 404 419 410 426 415 432 419 416 403 425 409
6 418 409 424 410 430 408 428 396 420 402 428 402 431 410 415 401 423 410
7 416 409 425 404 429 399 426 391 419 399 424 399 431 408 414 399 421 407
8 415 406 420 404 424 403 422 391 419 400 427 402 428 410 414 402 421 411
9 416 408 421 409 428 406 423 392 418 405 427 407 429 408 415 402 422 410
10 417 409 423 409 429 404 424 388 422 400 431 401 430 408 416 400 422 411
11 417 410 421 409 427 406 422 394 421 402 431 404 430 412 414 402 422 411
12 417 409 422 406 425 399 422 389 419 399 428 401 430 412 415 399 423 409
13 417 412 421 406 428 401 426 397 421 403 430 406 433 411 415 402 422 412
14 420 411 423 400 426 400 431 403 420 400 429 399 434 413 416 399 422 409
15 420 415 424 413 429 411 431 411 419 406 426 411 434 419 418 407 424 400
16 420 412 424 411 434 410 434 410 426 406 433 408 436 416 420 403 427 411
17 421 413 425 409 432 409 434 400 422 405 431 405 436 415 418 404 423 411
18 421 414 427 415 433 414 432 413 422 405 430 409 434 418 417 405 424 411
19 420 412 425 413 433 411 435 412 423 402 430 403 434 417 421 402 427 409
20 419 412 425 411 432 410 432 405 420 401 429 401 434 414 418 402 424 409
21 419 410 423 410 432 409 434 408 422 401 430 402 434 415 416 402 422 400
22 419 409 425 407 430 401 434 406 422 404 429 406 433 416 418 402 424 409
23 417 409 424 408 430 405 435 409 422 406 430 406 434 417 418 402 424 409
24 420 409 426 406 432 406 436 404 425 402 433 401 435 414 419 402 425 411
25 421 415 425 417 432 412 434 415 423 405 430 408 432 417 417 406 424 411
26 419 411 424 408 429 402 432 410 420 402 428 403 432 418 416 401 422 409
27 418 411 424 406 430 407 433 406 418 403 424 406 433 416 416 401 422 408
28 420 412 424 411 432 400 433 400 420 399 428 399 433 416 418 400 421 405
29 421 411 422 412 430 412 431 408 419 404 428 406 432 418 415 400 421 400
30 419 413 423 409 432 411 433 409 419 407 427 410 431 418 415 402 422 410
421 406 427 400 434 399 436 388 426 399 433 399 436 408 421 399 428 394
कासोर जेतपुर वापी सीपत बीना इंदौर
Date Kasor Jetpur Amreli Vapi Sipat Seoni Wardha Bina Indorer
400kV 400kV 400kV 400kV 765Kv 765Kv 765Kv 765Kv 765kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 421 411 414 404 419 411 419 396 774 762 796 773 801 771 801 770 792 768
2 421 410 414 391 421 407 420 396 775 760 796 771 796 768 801 763 786 761
3 420 410 411 387 417 407 415 393 775 758 798 774 802 765 801 767 793 761
4 419 409 400 389 419 409 414 395 773 762 795 774 804 773 799 767 789 765
5 418 409 398 387 417 400 413 400 774 763 796 774 805 767 801 765 786 769
6 418 408 407 389 420 400 416 395 769 758 789 765 800 762 782 758 776 756
7 417 407 413 390 418 406 415 394 768 757 790 762 804 757 785 760 779 754
8 417 409 416 393 423 400 412 393 765 758 784 761 794 750 784 762 779 755
9 418 409 411 388 416 400 414 396 768 759 788 768 797 768 788 763 783 760
10 419 409 407 388 415 400 414 393 767 759 789 766 801 767 787 764 784 756
11 417 409 406 383 414 394 413 395 768 758 786 768 798 767 790 760 783 758
12 418 408 407 380 414 386 414 393 768 756 789 757 806 760 782 755 789 743
13 420 409 405 382 415 392 415 397 767 757 785 761 798 764 786 763 791 754
14 419 408 407 390 416 401 415 393 769 758 790 764 802 770 786 764 783 750
15 420 412 409 391 417 401 417 397 772 763 793 773 802 769 793 771 786 761
16 422 409 408 397 417 400 421 398 770 758 793 771 799 768 794 758 792 756
17 420 409 410 397 416 404 416 399 773 761 793 765 798 760 793 765 792 760
18 420 412 413 400 418 406 416 399 775 763 795 773 805 773 792 765 787 769
19 422 409 417 400 420 392 417 396 771 759 791 768 800 773 790 757 791 757
20 420 408 412 401 417 406 414 393 773 760 793 769 802 765 791 761 792 759
21 419 410 410 399 418 400 414 394 770 759 789 766 795 764 788 760 788 760
22 420 408 411 401 418 409 416 396 771 760 790 763 802 756 793 761 777 757
23 420 408 411 402 416 407 418 399 771 759 788 763 799 760 787 769 785 759
24 421 408 413 401 419 406 421 398 774 759 792 762 801 762 792 763 789 754
25 419 411 410 402 416 406 417 397 777 764 795 777 804 774 796 769 787 767
26 418 406 411 401 416 406 414 395 769 757 787 763 799 764 781 759 779 752
27 418 408 411 399 416 406 411 395 768 757 788 760 800 754 787 762 788 748
28 419 409 409 400 413 400 413 393 772 760 791 769 803 765 795 773 798 768
29 418 409 409 399 415 405 411 396 770 756 790 767 792 767 797 772 791 757
30 418 409 408 398 415 406 414 400 768 758 790 767 800 760 791 772 785 766
422 406 417 380 423 386 421 393 777 756 798 757 806 750 801 755 798 743
सासन सतना तमनार कोटरा वडोदरा
Date Sasan Satna Tamnar Kotra Vadodara Durg Gwalior
765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Max Min Max Min Max Max Max Min Max Min Max Min Max Min

1 784 765 796 769 795 783 796 783 802 774 786 777 802 763
2 783 762 795 764 798 783 799 783 802 770 786 775 804 755
3 786 767 799 767 800 784 800 784 802 771 793 782 806 764
4 785 768 795 769 803 788 803 788 799 773 793 784 800 756
5 786 770 796 774 799 786 800 786 794 775 793 783 805 762
6 777 767 783 765 795 782 795 781 792 766 785 773 790 757
7 773 763 782 762 796 779 797 779 791 760 793 773 793 754
8 773 763 781 762 792 779 791 780 788 762 783 764 796 758
9 775 763 782 762 794 782 794 782 792 764 784 774 795 757
10 774 763 782 763 795 784 795 765 795 762 784 774 794 759
11 776 758 786 757 796 785 796 785 792 766 783 774 797 758
12 766 755 772 753 794 781 794 781 793 755 784 762 790 752
13 768 758 777 760 795 782 795 782 791 760 784 773 792 765
14 774 761 781 762 798 785 798 784 795 759 791 781 794 762
15 778 766 788 768 799 789 799 789 797 771 790 781 800 770
16 781 759 791 759 799 787 799 783 803 768 791 772 803 758
17 778 762 787 765 798 787 800 784 797 770 790 772 797 755
18 777 763 787 763 797 788 801 787 798 777 790 781 792 758
19 776 759 783 758 796 783 797 783 804 766 790 780 790 752
20 776 759 784 759 798 785 798 784 800 767 789 780 790 756
21 774 760 782 761 796 783 796 782 796 767 789 774 789 755
22 777 761 787 761 797 784 798 782 794 764 784 774 798 760
23 773 764 781 768 796 783 797 783 796 761 784 774 792 768
24 776 763 786 766 798 780 798 780 797 764 793 774 795 764
25 781 765 791 768 798 789 798 788 797 774 792 783 799 766
26 774 763 781 762 795 779 794 779 790 760 783 773 784 755
27 777 763 784 765 792 779 793 779 793 765 783 773 788 763
28 785 772 796 776 798 782 798 781 802 767 789 765 796 768
29 787 773 799 779 795 779 795 775 796 767 785 769 797 769
30 786 773 794 778 790 779 790 778 793 770 782 769 795 763
787 755 799 753 803 779 803 765 804 755 793 762 806 752
ANNEX -2.4
Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER- 2016
( Compiled from the data received from the constituents)
Sl. No Date Gujarat Chhattisgarh Madhya Pradesh Maharashtra
No. of Max Load Relief No. of Max Load Relief No. of Max Load Relief No. of Max Load Relief
Occasions at 49.2 Hz Occasions at 49.2 Hz Occasions at 49.2 Hz Occasions at 49.2 Hz
1 01-Sep-16 0 0 0 0 0 0 0 0
2 02-Sep-16 0 0 0 0 0 0 0 0
3 03-Sep-16 0 0 0 0 0 0 0 0
4 04-Sep-16 0 0 0 0 0 0 0 0
5 05-Sep-16 0 0 0 0 0 0 0 0
6 06-Sep-16 0 0 0 0 0 0 0 0
7 07-Sep-16 0 0 0 0 0 0 0 0
8 08-Sep-16 0 0 0 0 0 0 0 0
9 09-Sep-16 0 0 0 0 0 0 0 0
10 10-Sep-16 0 0 0 0 0 0 0 0
11 11-Sep-16 0 0 0 0 0 0 0 0
12 12-Sep-16 0 0 0 0 0 0 0 0
13 13-Sep-16 0 0 0 0 0 0 0 0
14 14-Sep-16 0 0 0 0 0 0 0 0
15 15-Sep-16 0 0 0 0 0 0 0 0
16 16-Sep-16 0 0 0 0 0 0 0 0
17 17-Sep-16 0 0 0 0 0 0 0 0
18 18-Sep-16 0 0 0 0 0 0 0
19 19-Sep-16 NIL NIL NIL NIL 0
20 20-Sep-16 0 0 0 0 0 0 0 0
21 21-Sep-16 0 0 0 0 0 0 0 0
22 22-Sep-16 0 0 0 0 0 0 0 0
23 23-Sep-16 0 0 0 0 0 0 0 0
24 24-Sep-16 0 0 0 0 0 0 0 0
25 25-Sep-16 0 0 0 0 0 0 0 0
26 26-Sep-16 0 0 0 0 0 0 0 0
27 27-Sep-16 0 0 0 0 0 0 0 0
28 28-Sep-16 0 0 0 0 0 0 0 0
29 29-Sep-16 0 0 0 0 0 0 0 0
30 30-Sep-16 0 0 0 0 0 0 0 0
Recommonded Load relief at
49.2 Hz / 49.0/48.8/48.6 Hz
1025 91 490 851
Annexure – 2.5

POWER CUT/RESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2016

k : gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM


1 Power Cut/ Restriction on Industries
a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.
b) All industries are required to keep their recess timings staggered.

2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit-


2. Power supply to Agricultural & Rural Sectors
a) 08 Hrs. power supply in staggered form in rotation of day & night is given to Ag. (However, in MGVCL
14 hrs. power supply to AG in Kheda & Anand district from 13th Apr'16 & 10 Hrs. AG supply in Vadodara
district from 27th Apr'16.) Single Phase supply given during rest of 16 Hrs by providing LSTC.
b) Jyotigram Yojana 24 hrs.

3 Anya jaanakarI
3. Any other information: NIL.
K : maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
power cut (MW) sao From tk To (MUs /day
(a) Power Restrictions(Evening SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
peak Hour) on non continuous
process HT/LT IndustriesM
(b) Baar inayamana Load Shedding SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
(c) Anya jaanakarI Other information
1.Weekly Off SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2.Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector: -
ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase 01.09.2016 30.09.2016
Supply(DLF)
23:36 22:44 23:17
2.1 Three-Phase 01.09.2016 30.09.2016 09:52 09:28 09:43
Supply(Irrigation)
2.1 Three-Phase 01.09.2016 30.09.2016 23:29 22:35 23:11
Supply(Mixed)
3 Anya jaanakarI
3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas
ivavarNa Details sao From tk To idnaaMk Aaosat p`itidna Average Supply
idnaaMk Date Date AapUit- GaMTo Hours per day
Max. Min. (Hrs) Average (Hrs)
(Hrs)
3.1 Commissionary H. Qtrs. 01.09.2016 30.09.2016 23:54 23:37 23:47
3.2 District Head Qtrs. 01.09.2016 30.09.2016 23:56 23:43 23:49
3.3 Tehsil Head Qtrs. 01.09.2016 30.09.2016 23:50 23:22 23:38

ga : maharaYT/ Maharashtra

1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
(MUs /day
power cut (MW) From To
(a) Power Cuts/Restriction on HT/ SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
LT Industries
(b) Load Shedding
@ 0-10 MW 00.00 24.00 @
From 01.09.16 to 30.09.16
0.0005MUs/day
(c) Any other information
1.Weekly Off
2. Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
Industrial Staggering LS
withdrawn from 03/02/2012

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector
ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date
Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.09.2016 30.09.2016 12:00 12:00 12:00
2.2 Single-Phase Supply 01.09.2016 30.09.2016 12:00 12:00 12:00

3 Anya jaanakarI Any other information:


There is no load shedding on industrial feeders in Maharashtra
Ga : C%tIsagaZ, Chhattisgarh:
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula
Quantum of power cut (MW) Restriction Time }jaa- kTaOtI
sao From tk Total
To Energy Cut
(MUs /day)
(A) Scheduled
(a) (i) Power Cuts/ 00.00(Av) - - -
Restriction on HT Industries
(ii) Power Cuts/Restriction
on LT Industries 00.00(Av) - - -
(iii) Power Cuts/Restriction
on Rural 00.00 (Av) - - -
(iv) Agriculture pump* 00.00 (Av) 00.00 00.00 0.00
(v)Urban/ Sub-Urban 00.00(Av) - - -
(iv)Town feeders(C-1to C-6) 00.00 (Av) - - -

(B) Un-Scheduled
(a) Load Shedding 1.Rural 67.13 MW(Av) For 44.53 Hrs. - - 0.095
2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
- -
0.004
3. Industries 38.30 (Av) For 3.00 Hrs.
Total Energy Cut/day 0.099
( b) Any other information 1day (In a week as per
1.Weekly Off/staggering of consumer’s option) 50MW(Av.) - - -
power supply

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector

ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.09.2016 to 30.09.2016, 6.00 18.00
Hrs (Power cut)
2.2 Single-Phase Supply - - - - -
2.3 Remarks/Note/ - - - - -
संलग्नक Annex-2.6
पावर ससस्टम ऑपरे शन कारपोरे शन सलसमटे ड
(पावरग्रिड की एक पूर्ण स्वामित्व वाली कंपनी)

पश्चिम क्षेत्रिय भार प्रेषण केन्द्र,मम्


ु बई
Power System Operation Corporation Ltd.
(A wholly owned subsidiary company of POWERGRID)
Western Regional Load Despatch Centre,Mumbai

अननवार्ण र्ुननट आऊटे ज का मितम्बर 2016 का ववस्ताररत ब्र्ौरा


Details of forced unit outages during the month of Sept. 2016

अनु युननट संघटक क्षमता सo सo कारण


क्रमांक Unit Constituent/IPP मेगावॉट From From Reason

Sl.No Cap.MW समय दिनांक समय दिनांक


Time Date Time Date
1. जीटीपीएस GTPS-1 GSECL 120 01:30 09-04-2016 17:54 08-09-2016 Long restoration period

2. जीटीपीएस GTPS-2 GSECL 120 01:30 09-04-2016 Still out Still out Long restoration period

3. पपपावाव Pipavav 1 GSECL 350 00:00 03-04-2015 10:48 21-09-2016 RSD

4. उकाई Ukai-2 GSECL 120 16:00 09-04-2016 Still out Still out Long restoration period

5. पपपावाव Pipavav 2 GSECL 350 00:30 29-04-2016 Still out Still out RSD

6. एसटीपीएस STPS 1 GSECL 120 19:30 01-05-2016 07:15 22-09-23016 Bottom ash problem

7. उकई Ukai 1 GSECL 120 03:18 07-05-2016 Still out Still out Excitation problem

8. एसटीपीएस STPS 2 GSECL 120 12:30 20-05-2016 01:20 13-09-2016 RSD

9. एसटीपीएस STPS 3 GSECL 250 18:42 21-05-2016 Still out Still out RSD

10. उतरणUTRAN STG II 1 GSECL 375 15:30 12-06-2016 18:14 27-09-2016 RSD

11. जीटीपीएस GTPS-3 GSECL 120 14:00 12-06-2016 05:26 13-09-2016 RSD

वानकबोरी Wanakbori 6
BTL/ RSD since
12. GSECL 210 15:13 23-06-2016 22:57 12-09-2016
19:00HRS/24-06-2016
वानकबोरी Wanakbori
Turbine main oil pump
13. 2 GSECL 210 07:37 25-06-2016 07:08 12-09-2016
problem
14. डीजीबीपी DGBP 2 GSECL 112 23:59 01-07-2016 07:06 26-09-2016 RSD

15. वानकबोरी Wanakbori 3 GSECL 210 14:30 07-07-2016 15:23 13-09-2016 RSD

16. वानकबोरी Wanakbori 4 GSECL 210 11:06 19-07-2016 05:00 10-09-2016 RSD-Low demand

17. वानकबोरी Wanakbori 1 GSECL 210 10:50 27-07-2016 02:52 08-09-2016 RSD

18. एसटीपीएस STPS 4 GSECL 250 07:52 28-07-2016 11:29 08-09-2016 RSD

19. वानकबोरी Wanakbori 5 GSECL 210 00:00 01-08-2016 06:21 12-09-2016 AOH/Unit already out

20. एएलटीपीएसALTPS 1 GSECL 125 00:36 04-08-2016 Still out Still out AOH

21. डीजीबीपी DGBP 1 GSECL 107 13:23 09-08-2016 06:07 07-09-2016 RSD

22. वानकबोरी Wanakbori 7 GSECL 210 05:54 11-08-2016 08:34 09-09-2016 RSD

23. उकई Ukai 5 GSECL 210 11:18 16-08-2016 02:37 10-09-2016 Governing system problem

24. जीटीपीएस GTPS 4 GSECL 120 11:33 22-08-2016 01:10 13-09-2016 RSD

25. जीपेक GPEC 1 GSECL 218 20:33 27-08-2016 19:02 07-09-2016 RSD
26. जीपेक GPEC 3 GSECL 218 19:45 28-08-2016 19:45 06-09-2016 RSD

27. एसएलपीपी SLPP 4 GSECL 125 16:44 31-08-2016 06:17 08-09-2016 RSD

28. जीपेक GPEC 2 GSECL 218 20:57 31-08-2016 18:29 07-09-2016 RSD

29. सज
ु न SUGEN 2 GSECL 382 00:23 04-09-2016 07:28 26-09-2016 RSD

30. उकई Ukai 3 GSECL 200 07:43 06-09-2016 05:25 09-09-2016 RSD

31. जीपेक GPEC 1 GSECL 218 16:19 08-09-2016 19:37 20-09-2016 RSD/Costly generation

32. जीपेक GPEC 3 GSECL 218 00:55 09-09-2016 10:04 12-09-2016 RSD/Costly generation

33. एसटीपीएस STPS 4 GSECL 250 02:08 09-09-2016 12:43 12-09-2016 RSD

34. जीपेक GPEC 2 GSECL 218 02:29 09-09-2016 07:32 12-09-2016 RSD

35. डीजीबीपी DGBP 1 GSECL 107 19:00 09-09-2016 14:00 12-09-2016 Costly generation

36. जीपेक GPEC 3 GSECL 218 20:14 12-09-2016 18:50 20-09-2016 RSD, Costly Generation

37. जीपेक GPEC 2 GSECL 218 22:08 12-09-2016 18:31 20-09-2016 RSD

38. ALTPS 1 GSECL 125 12:35 14-09-2016 21:02 17-09-2016 BTL

39. जीटीपीएस GTPS- 4 GSECL 210 11:11 16-09-2016 03:56 26-09-2016 RSD

40. डीजीबीपी DGBP 1 GSECL 107 23:55 16-09-2016 Still out Still out RSD

41. वानकबोरी Wanakbori 5 GSECL 210 23:59 16-09-2016 13:58 29-09-2016 RSD

42. उकई Ukai 3 GSECL 200 11:07 17-09-2016 23:51 27-09-2016 RSD.

43. वानकबोरी Wanakbori 6 GSECL 210 11:41 17-09-2016 12:17 30-09-2016 RSD

44. वानकबोरी Wanakbori 2 GSECL 210 10:12 18-09-2016 06:52 30-09-2016 RSD

45. वानकबोरी Wanakbori 1 GSECL 210 15:57 18-09-2016 04:45 21-09-2016 RSD

46. वानकबोरी Wanakbori 4 GSECL 210 00:36 19-09-2016 04:59 29-09-2016 RSD

47. वानकबोरी Wanakbori 3 GSECL 210 17:59 19-09-2016 03:35 01-10-2016 BTL

48. जीपेक GPEC 1 GSECL 218 20:21 20-09-2016 18:35 26-09-2016 RSD

49. जीपेक GPEC 3 GSECL 218 21:12 20-09-2016 04:47 26-09-2016 RSD Costly generation

50. जीपेक GPEC 2 GSECL 218 22:41 20-09-2016 18:39 26-09-2016 RSD

51. एसएलपीपी SLPP 3 GSECL 125 21:25 23-09-2016 08:08 28-09-2016 BTL

पपपावाव Pipavav-1
Failed to demonstrate DC/
52. GSECL 350 07:44 24-09-2016 Still out Still out
non-availability of gas
53. एसटीपीएस STPS 2 GSECL 120 13:05 24-09-2016 Still out Still out Bunker problem

54. जीटीपीएस GTPS- 5 GSECL 210 12:08 25-09-2016 08:06 03-10-2016 Air Pre-heater Problem

55. एसटीपीएस STPS 1 GSECL 120 18:00 26-09-2016 Still out Still out RSD

56. जीपेक GPEC 2 GSECL 218 20:15 26-09-2016 06:58 30-09-2016 RSD

57. जीपेक GPEC 3 GSECL 218 23:07 29-09-2016 Still out Still out RSD

58. उतरणUTRAN STG II 1 GSECL 375 19:28 30-09-2016 Still out Still out costly generation

59. जीपेक GPEC 1 GSECL 218 20:34 30-09-2016 Still out Still out RSD

िंरपुर
BTL/ Economic
60. Chandrapur-1 MAHAGENCO 210 7:15 28-08-2014 Still out Still out
shutdown.
61. परली Parli 6 MAHAGENCO 250 15:07 25-06-2015 Still out Still out Water shortage

62. कोराडी Koradi-6 MAHAGENCO 210 01:02 20-03-2015 Still out Still out Economic shutdown

63. परली Parli-3 MAHAGENCO 210 12:52 14.06.2015 Still out Still out Water shortage
64. परली Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Water shortage

65. परली Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Water shortage.

66. परली Parli 7 MAHAGENCO 250 12:07 08-07-2015 Still out Still out Water shortage

67. िंरपरु Chandrapur 2 MAHAGENCO 210 04:42 12-01-2016 Still out Still out BTL

68. डबल्यप
ू ीसीएल WPCL 1 MAHAGENCO 135 17:03 16-02-2016 Still out Still out Low Schedule

डबल्यप
ू ीसीएल WPCL 2
Change over against unit-3
69. MAHAGENCO 135 21:46 29-02-2016 Still out Still out
as per scheduled dispatch
उरण Uran 7
Generator bearing
70. MAHAGENCO 108 17:42 24-05-2016 10:23 28-09-2016
vibration high
71. भुसावल Bhusawal 2 MAHAGENCO 210 19:35 14-06-2016 Still out Still out BTL

72. भस
ु ावल Bhusawal 3 MAHAGENCO 210 21:57 08-07-2016 01:35 14-09-2016 ID fan problem

उरण Uran BO
Bearing pressure very
73. MAHAGENCO 120 07:57 14-08-2016 13:23 28-09-2016
high
उरण Uran 8
Bearing pressure very
74. MAHAGENCO 108 07:57 14-08-2016 Still out Still out
high
75. नाससक Nasik3 MAHAGENCO 210 21:45 28-08-2016 Still out Still out Zero schedule

76. िंरपुर Chandrapur 4 MAHAGENCO 210 12:04 03-09-2016 23:52 08-09-2016 BTL

भुसावल Bhusawal 4
No Schedule/RSD, Unit
77. MAHAGENCO 500 00:00 04-09-2016 04:58 08-09-2016
already out
78. कोराडी Koradi 5 MSETCL 200 00:21 05-09-2016 Still out Still out ID fan problem

79. कापरखेड़ाKhaparkheda1 MAHAGENCO 210 03:27 05-09-2016 21:01 09-09-2016 BTL

80. िंरपुर Chandrapur 8 MAHAGENCO 500 08:23 09-09-2016 19:27 13-09-2016 Drum level High

81. पायोनीर PIONEER- 1 MAHAGENCO 262 00:16 14-09-2016 Still out Still out No Schedule

82. पायोनीर PIONEER-GT-1 1 MAHAGENCO 127 00:20 14-09-2016 Still out Still out No Schedule

भुसावल Bhusawal 4
Zero schedule by
83. MAHAGENCO 500 23:59 15-09-2016 Still out Still out
MSEDCL
भुसावल Bhusawal 3
Zero schedule by
84. MAHAGENCO 210 00:02 16-09-2016 Still out Still out
MSEDCL
कोराडी Koradi 7
Zero schedule by
85. MAHAGENCO 210 00:06 16-09-2016 Still out Still out
MSEDCL
86. खापरखेड़ा Khaparkheda 1 MAHAGENCO 210 13:34 17-09-2016 Still out Still out Zero schedule

87. खापरखेड़ा Khaparkheda 2 MAHAGENCO 210 13:36 17-09-2016 Still out Still out Zero schedule

88. भुसावल Bhusawal 5 MAHAGENCO 500 13:51 17-09-2016 Still out Still out Zero schedule

89. खापरखेड़ा Khaparkheda 3 MAHAGENCO 210 20:39 17-09-2016 05:37 01-10-2016 Zero schedule

90. खापरखेड़ा Khaparkheda 4 MAHAGENCO 210 20:47 17-09-2016 Still out Still out Zero schedule

91. पारस Paras 3 MAHAGENCO 250 14:58 18-09-2016 01:15 23-09-2016 Air heater problem

92. िंरपुर Chandrapur 8 MAHAGENCO 500 18:43 19-09-2016 22:04 28-09-2016 BTL

93. िंरपुर Chandrapur 6 MAHAGENCO 500 22:37 19-09-2016 23:54 23-09-2016 BTL

94. खापरखेड़ा Khaparkheda 5 MAHAGENCO 500 20:48 22-09-2016 10:57 26-09-2016 BTL

95.
कोराडी MAHAGENCO 660 21:37 26-09-2016 14:57 02-10-2016 RSD
Koradi(MSEDCL) 8
96. डबल्यप
ू ीसीएल WPCL 4 MAHAGENCO 135 22:22 26-09-2016 07:01 30-09-2016 wet coal problem

97.
आरजीपीपीएल RGPPL 320 23:00 31-03-2014 Still out Still out
Dry preservation/Gas
RGPPL-1B shortage

98.
आरजीपीपीएल RGPPL 320 13:30 8-07-2014 Still out Still out Less requisition
RGPPL-1A

99.
आरजीपीपीएल RGPPL 230 17:24 16-08-2016 09:56 08-09-2016
Scheduled change over to
RGPPL 3A match running hours
100.
आरजीपीपीएल RGPPL 230 13:31 24-08-2016 20:03 26-09-2016
Switch over from unit 2A
RGPPL 2A to 2B.

101.
आरजीपीपीएल RGPPL 230 13:08 08-09-2016 14:45 24-09-2016
Scheduled change over to
RGPPL 2B match running hours

102.
आरजीपीपीएल RGPPL 230 20:47 24-09-2016 Still out Still out For changeover of unit
RGPPL 3A

103.
आरजीपीपीएल RGPPL 230 06:00 27-09-2016 09:33 01-10-2016 To attend leakage
RGPPL 2A
अमरावती टीपीपी RATTAN POWER
104. AMRAVATI 270 00:12 24-05-2016 Still out Still out No schedule
INDIA LTD
TPP(INDIABULL)-5
अमरावती टीपीपी RATTAN POWER
105. AMRAVATI 270 06:54 18-06-2016 13:52 09-09-2016 No Schedule
INDIA LTD
TPP(INDIABULL)-2
अमरावती टीपीपी RATTAN POWER Zero Schedule by
106. AMRAVATI 270 03:01 29-06-2016 Still out Still out
INDIA LTD DISCOM
TPP(INDIABULL)-3
अमरावती टीपीपी RATTAN POWER
107. AMRAVATI 270 10:11 30-06-2016 09:52 08-09-2016 No Schedule
INDIA LTD
TPP(INDIABULL)-4
अमरावती टीपीपी RATTAN POWER
108. AMRAVATI 270 18:38 01-07-2016 10:08 09-09-2016 No Schedule
INDIA LTD
TPP(INDIABULL)-1
अमरावती टीपीपी RATTAN POWER
109. AMRAVATI 270 00:03 12-09-2016 Still out Still out No Schedule
INDIA LTD
TPP(INDIABULL)-2
अमरावती टीपीपी RATTAN POWER
110. AMRAVATI 270 23:55 14-09-2016 Still out Still out No schedule.
INDIA LTD
TPP(INDIABULL)-1
अमरावती टीपीपी RATTAN POWER
111. AMRAVATI 270 18:09 15-09-2016 Still out Still out No Schedule
INDIA LTD
TPP(INDIABULL)-4

112.
एपीएमएल मुँि
ु रा Adani Power Ltd 330 15:25 25-08-2016 06:48 14-09-2016 RSD
APL Mundra 1
113. जेपी त्रबना JP BINA 2 MPPGCL 250 00:09 02-03-2016 18:44 17-09-2016 Low Schedule

114. सातपरु ा Satpura III 8 MPPGCL 210 10:45 04-05-2016 13:48 20-09-2016 RSD

115. सातपुरा Satpura III 9 MPPGCL 210 17:42 09-05-2016 18:06 24-09-2016 RSD

116.
एमबी पावर MPPGCL 600 20:12 16-05-2016 Still out Still out Flame failure.
MB Power 2
117. जेपी त्रबना JP BINA-1 MPPGCL 250 00:10 22-05-2016 03:03 20-09-2016 RSD

118.
एसजीटीपीएस MPPGCL 210 13:14 13-06-2016 08:14 26-09-2016 RSD
SGTPS 1

119.
एसजीटीपीएस MPPGCL 210 13:18 13-06-2016 00:55 12-09-2016 RSD
SGTPS 4
120. सातपुरा Satpura IV-10 MPPGCL 250 11:44 02-07-2016 21:50 28-09-2016 RSD

121. सातपुरा Satpura IV-11 MPPGCL 250 00:01 04-07-2016 16:48 10-09-2016 RSD

122. सातपुरा Satpura II 6 MPPGCL 200 06:30 03-08-2016 18:25 24-09-2016 RSD

123. अमरकंटकAmarkantak 5 MPPGCL 210 22:12 27-08-2016 08:52 09-09-2016 Taken out as RSD

124. सातपरु ा Satpura III 8 MPPGCL 210 10:45 04-05-2016 13:48 20-09-2016 RSD
125. ससंगाजी Singaji 1 MPPGCL 600 12:28 11-09-2016 Still out Still out RSD

126. ससंगाजी Singaji 2 MPPGCL 600 23:00 19-09-2016 Still out Still out Less demand

127. जेपी त्रबना JP BINA MPPGCL 250 00:26 26-09-2016 Still out Still out RSD

सातपुरा Satpura II 6
Control valve servo motor
128. MPPGCL 200 18:14 26-09-2016 22:05 30-09-2016
problem
129. जेपी त्रबना JP Bina 2 MPPGCL 250 00:19 26-09-2016 Still out Still out RSD

130. मारवा Marwa TPS 1 CSPGCL 500 19:42 02-05-2016 Still out Still out BTL

131. मारवा Marwa TPS 2 CSPGCL 500 15:28 06-09-2016 09:50 16-09-2016 BTL

132.
झाबव
ु ा पावर AVANTHA POWER 600 00:23 27-06-2016 Still out Still out RSD
Jhabua Power 1
133. वंिनाVANDANA -1 VANDANA 135 15:00 9-01-2015 Still out Still out BTL

जेपीएल JPL Stg-I 3


Desynchronized as per
134. JPL 250 23:00 03-05-2016 22:15 02-10-2016
schedule
135. जेपीएल JPL Stg-II 3 JPL 600 09:54 17-06-2016 Still out Still out Less schedule/RSD

जेपीएल JPL Stg-II 1


APH-A internal
136. JPL 600 14:01 01-09-2016 Still out Still out
inspection.
137. जेपीएल JPL Stg-I 4 JPL 250 00:00 02-09-2016 08:39 13-09-2016 Low schedule

138. एस्सार ESSAR(Mahan) I ESSAR 600 08:01 08-09-2016 13:11 11-09-2016 Due to GT 1 Tripping

139. ईपीजीएल EPGL 1 ESSAR 600 15:43 03-09-2016 11:48 08-09-2016 RSD

140. ईपीजीएल EPGL 2 ESSAR 600 22:30 14-09-2016 07:30 04-10-2016 Water shortage.

एस्सार ESSAR(Mahan) I
Coal feeding problem/
141. ESSAR 600 00:00 30-09-2016 07:27 05-10-2016
NO LTA/MTOA/STOA
142. धारीवाल Dhariwal-1 DHARIWAL 300 2:27 28-May-14 Still out Still out High vibration problem.

143. उनोसुजन UNOSUGEN- 1 TPGL 382 21:55 04-03-2016 Still out Still out RSD

डीजीईएन
Combustion chamber
144. DGEN-51 TPGL 400 07:41 31-03-2016 Still out Still out
pressure high
145. डीजीईएन DGEN-53 TPGL 400 21:44 31-03-2016 Still out Still out Low schedule

146. डीजीईएन DGEN-52 TPGL 400 23:58 31-03-2016 Still out Still out As per schedule

147. ट्रोम्बे Trombay 5 TPC 500 22:57 09-09-2016 00:06 12-09-2016 BTL

डीबीपावर
Re-heater protection
148. DB Power I DBPL 600 00:19 21-08-2016 13:10 31-08-2016
operated

149.
जीएमआर छत्तीशगड GCEL 685 23:56 27-05-2016 Still out Still out CW pump failure
GMR CHHATISGARH 1

150.
जीएमआर छत्तीशगड GCEL 685 01:10 02-08-2016 Still out Still out No Schedule
GMR CHHATISGARH 2
लॅ न्द्को
RSD as per requirement
151. Lanco 1 LANCO 300 01:18 20-08-2016 22:10 08-09-2016
of MPPMCL
152. ससान Sasan 5 SASAN 660 16:30 31-08-2016 19:34 09-09-2016 Loss of flame

153. ससान Sasan 4 SASAN 660 06:12 10-09-2016 23:37 20-09-2016 CW duct leakage

154. ससान Sasan 3 SASAN 660 12:10 26-09-2016 12:29 03-10-2016


Id fan b blade pitch and
lube oil system problem
155. ससान Sasan 6 SASAN 660 13:40 28-09-2016 07:07 04-10-2016
Unit h/t due to coal mill
problem
156. ससान Sasan 2 SASAN 660 20:19 28-09-2016 12:29 03-10-2016
Due to coal feeding
problem.
बालको BALCO-2
Flame failure due to mill
157. BALCO 300 22:40 01-09-2016 08:05 06-09-2016
problem.
158. बालको BALCO-4 BALCO 300 02:45 06-09-2016 08:45 14-09-2016 Due to Flame Failure
बालको BALCO-3
Rectification of mill
159. BALCO 300 14:11 14-09-2016 15:30 23-09-2016
problems.
160. बालको BALCO- 1 BALCO 300 00:49 17-09-2016 Still out Still out Problem in ESP

161.
टीआरएन एनश्जि ACBIL 300 16:37 17-09-2016 08:54 21-09-2016 Coal feeding problem
TRN Energy 1
162. MCCPL 1 ACBIL 300 01:30 27-09-2016 Still out Still out Ash handling problem

कॅप्स KAPS 2
Nuclear reactor side
163. NPCIL 220 14:09 01-07-2015 Still out Still out
problem
164. कॅप्स KAPS 1 NPCIL 220 08:52 11-03-2016 Still out Still out Reactor side problem

165. कावास Kawas GT 2A NTPC 106 16:32 29-06-2016 07:54 09-09-2016 Block change over

166. कावास Kawas GT 1B NTPC 106 21:18 02-07-2016 05:17 03-10-2016 Less schedule/ RSD

167. कावास Kawas ST 1C NTPC 106 16:55 12-07-2016 11:15 22-09-2016 RSD/Low Schedule

168. कावास Kawas GT 1A NTPC 106 17:01 12-07-2016 19:29 08-09-2016 RSD/Low Schedule

169. कावास Kawas ST 2C NTPC 106 11:16 29-07-2016 13:40 09-09-2016 RSD/Low Schedule

गांधार Gandhar GT ST 1
Turbine bearing temperature
170. NTPC 219 13:30 13-08-2016 21:10 07-09-2016
protection operated
171. मौिा Mouda 2 NTPC 500 00:00 25-08-2016 11:27 08-09-2016 RSD

172. गांधार Gandhar GT ST 2 NTPC 219 13:34 27-08-2016 05:16 03-10-2016 RSD

173. कावास Kawas 2B NTPC 106 13:44 27-08-2016 06:54 09-09-2016 RSD

174. वीएसटीपीएस VSTPS 1 NTPC 210 11:00 01-09-2016 13:24 07-09-2016 RSD

175. वीएसटीपीएस VSTPS 11 NTPC 500 08:40 02-09-2016 16:30 06-09-2016 RSD

176. वीएसटीपीएस VSTPS 6 NTPC 210 13:59 02-09-2016 23:02 07-09-2016 RSD

177. मौिा Mouda 1 NTPC 500 21:03 02-09-2016 01:18 09-09-2016 RSD

178. वीएसटीपीएस VSTPS 5 NTPC 210 02:30 03-09-2016 03:39 07-09-2016 RSD

179. कावास Kawas GT 1A NTPC 106 00:06 09-09-2016 05:35 22-09-2016 RSD

180. कावास Kawas GT 2B NTPC 106 07:31 09-09-2016 Still out Still out Combustion problem

181. गांधार Gandhar GT ST 3 NTPC 219 11:27 09-09-2016 Still out Still out NO Schedule/RSD

182. वीएसटीपीएस VSTPS 8 NTPC 500 14:48 13-09-2016 01:29 17-09-2016 BTL

183. मौिा Mouda 2 NTPC 500 00:29 16-09-2016 06:57 29-09-2016 RSD

184. कावास Kawas ST 2C NTPC 106 12:32 16-09-2016 Still out Still out RSD

185. कावास Kawas GT 2A NTPC 106 12:39 16-09-2016 Still out Still out RSD

186. मौिा Mouda 1 NTPC 500 03:25 17-09-2016 18:43 27-09-2016 RSD

187. वीएसटीपीएस VSTPS 3 NTPC 210 01:58 19-09-2016 07:39 22-09-2016 RSD

188. केएसटीपीएस KSTPS 5 NTPC 500 02:00 25-09-2016 09:37 28-09-2016 BTL

189. वीएसटीपीएस VSTPS 5 NTPC 210 02:02 25-09-2016 09:24 28-09-2016 RSD

Note: Units out for more than 72 hrs are only included.
संलग्नक Annex-2.7

पावर ससस्टम ऑपरे शन कारपोरे शन सलसमटे ड


(पावरग्रिड की एक पूर्ण स्वामित्व वाली कंपनी)

पश्चिम क्षेत्रिय भार प्रेषण केन्द्र,मम्


ु बई
Power System Operation Corporation Ltd.
(A wholly owned subsidiary company of POWERGRID)
Western Regional Load Despatch Centre,Mumbai

ननर्ोजजत र्ुननट आऊटे ज का मितम्बर 2016 का ववस्ताररत ब्र्ौरा


Details of planned unit outages during the month of Sept. 2016
अनु यनु नट संघटक क्षमता सo सo कारण
क्रमांक Unit Constituent/IPP मेगावॉट From From Reason

Sl.No Cap.MW समय दिनांक समय दिनांक


Time Date Time Date

1.
ट्रोम्बे TPC 500 00:00 06-03-2016 Still out Still out AOH
TROMBAY 6

2.
एसएलपीपी GSECL 125 00:39 27-08-2016 08:28 12-09-2016 AOH
SLPP 2

3.
एसएलपीपी GSECL 125 01:38 11-09-2016 21:43 02-10-2016 AOH
SLPP 4
4. उरण Uran 6 MAHAGENCO 108 23:42 18-09-2016 14:54 25-09-2016 AOH

5.
वीएसटीपीएस NTPC 500 00:00 06-07-2016 21:06 05-09-2016 AOH
VSTPS 8
6. वीएसटीपीएस
NTPC 500 01:11 18-09-2016 Still out Still out AOH
VSTPS 9
ANNEXURE 3.1
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2016 AND NOVEMBER 2016

S. No. Unit No. Capacity Outage as per Annual Reason


Maintenance Plan
(MW) From To
1 GUVNL
1.1 WTPS 1 210 1-Nov-16 29-Jan-17 R & M work (ESP and C&I work)
1.2 SUGEN 20 382.5 7-Nov-16 13-Nov-16 Minor inspection+AOH
1.3 AECO F 121 30-Oct-16 8-Nov-16 Boiler maintenance work

2 MPPGCL

NIL

3 CSPGCL
3.1 Korba West 3 500 15/11/16 24/12/2016 AOH

4 MSPGCL

NIL

5 Central Sector
5.1 KORBA U#6 14-May-01 28-Nov-16 17-Dec-16 AOH
5.2 CGPL 30 800 12.10.16 19.10.16 Boiler statutory Hydrotest
5.3 CGPL 10 800 05.11.16 25.11.16 Turbine control valve overhauling due to control valve stuck up
issue
ANNEXURE 3.2
Outage Planning of Transmission elements during the Duration 20.10.2016 to 19.11.2016
SN KV Element Name (as per Element List) From To Basis Reason System Agency Type
Date Time Date Time
1 400KV / 132KV
ICT-1 AT MOUDA 17-Oct-16 9:00 19-Oct-16 18:00 Cont. Annual maintenance NTPC NTPC
2 400 400 KV BUS COUPLER # 2 18-Oct-16 9:00 19-Oct-16 18:00 Continuous BAY EQUIPMENT MAINTENANCE AND TESTING. NTPC NTPC
3 400 Chorania-Amreli line 19-Oct-16 8:00 19-Oct-16 18:00 Daily Maintenance work GETCO GETCO For information. Code will be issued
4 400 400Kv PUNE(GIS)-PUNE(TALEGOAN)_1 & 2 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML/WRTS-I WRTS-I C
5 400 400kV WARDHA-MAUDA I & II 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work & PID Testing . A/R to be kept in NonWRTS-I auto mode WRTS-I C
6 765 765kV SEONI-WARDHA I 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode. For WRTS-I
installation
WRTS-I
of 48 OPGW
C cable at repeater station.
7 400 AURANGABAD(MSETCL)-PUNE(GIS) I & II 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML/WRTS-I WRTS-I C
8 400 Korba - Birsingpur 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTS-I WRTS-I C
9 765 Seoni-Bina 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTS-II WRTS-I C
10 400 Solapur-Kolhapur-1&2 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML WRTS-I C
11 400 Solapur-Parli-1&2 20-Oct-16 6:00 19-Nov-16 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML WRTS-I C
12 132 D/C Gangapur - Vaijapur 20-Oct-16 8:00 21-Oct-16 18:00 Conti. Stringing of upcoming 400KV D/C Aurangabad - Boisar Transmission
MSETCL WRTS-I Line AP 37/0
C TO AP 38/0) over D/C Gangap
13 765 BILASPUR2_MAIN_BAY_716 at Seoni 20-Oct-16 8:00 20-Oct-16 18:00 Daily For AMP works at Seoni WRTS-I WRTS-I R
14 765 WARDHA_2 (Main Bay-712) at Aurangabad 20-Oct-16 9:00 20-Oct-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
15 400 400KV Bus-1 at Bhatapara S/s 20-Oct-16 9:00 20-Oct-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
16 765 BUS REACTOR_765kV_240MVAR_DURG PS 20-Oct-16 9:00 22-Oct-16 18:00 Conti. For shifting/ erection of under construction 765kv Durg-Wardha
WRTS-I# 3 WRTS-I
line ReactorCto its foundation at Durg PS.
17 400 400KV RAIPUR-RAIGARH II 20-Oct-16 9:00 20-Oct-16 18:00 Daily For Isolator maintenance of TCSC 2 at Raipur WRTS-I WRTS-I R
18 400 400kV Bus-1 at Bhilai CSPTCL 20-Oct-16 9:00 4-Nov-16 18:00 Daily Retrofitting of pantograph isolators at Bhilai CSPTCL CSPTCL WRTS-I R
19 400 Talegaon (Pune)- Kalwa Line 20-Oct-16 9:00 20-Oct-16 18:00 Daily To Place the Earthwire in place of removed earthwire MSETCL WRTS-I C
20 400 400kV BHADRAVATI-PARLI I 20-Oct-16 9:00 21-Oct-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.BVT-Parli-1
WRTS-I C will be out of service during
21 400 400kV WARDHA-PARLI I & II LINE 20-Oct-16 9:30 19-Nov-16 18:00 Daily Auto Recloser of Wardha-Parli # 1 & 2 to be kept in non AutoWRTS-IModeWRTS-I
for ONLINECOPGW works.
22 400 BUS REACTOR TIE bay (411) at Kolhapur(GIS) 20-Oct-16 10:00 20-Oct-16 18:00 Daily For AMP works at Kolhapur(GIS) WRTS-I WRTS-I R
23 400 400kV PARLI(PG)-PARLI(MSETCL) II 20-Oct-16 11:00 20-Oct-16 14:00 Daily For collection of CT Oil Sample (DGA Test) at MSETCL end WRTS-I WRTS-I R
24 400 400KV S/S INDORE- 315 MVA (BHEL)400/220 KV X-MER-III 9:00
20-Oct-16 21-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
25 400 400 KV BHOPAL -BDTCL CKT - I 20-Oct-16 9:00 20-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
26 400 400 KV NAGDA- INDORE CkT 20-Oct-16 9:00 20-Oct-16 18:00 daily FOR TIGHTENING OF JUMPER CONE & ARCHING HORN MPPTCL
& OTHER MPPTCLMAINTENANCE
R WORK
27 400KV Karad - Kolhapur-1 20-Oct-16 6:00 20-Oct-16 18:00 Daily OPGW Work MSETCL MSETCL
28 400KV New Koyna -Karad -1 20-Oct-16 6:00 20-Oct-16 18:00 Daily OPGW Work MSETCL MSETCL
29 400KV Warora - Tiroda ckt - 1 @ Warora 20-Oct-16 8:00 20-Oct-16 17:00 Daily DCRM of main & tie CB at 400 KV S/st. Warora MSETCL MSETCL
30 400KV New Koyna-Dabhol-Ckt-2 @ N.Koyna 20-Oct-16 8:00 20-Oct-16 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
31 400KV 501 MVA ICT I @ Jejuri 20-Oct-16 09:30 20-Oct-16 17:30 Daily Annual testing and maint work MSETCL MSETCL 400/220 kv 501 MVA ICT II will take
32 400KV TBC BAY with 50 MVAr Bus Reactor at 400 kV Khadka
20-Oct-16 7:00 20-Oct-16 19:00 Daily 1. 400 kV TBC Bus 1 Isolator Non-opening problem to beMSETCL attended with
MSETCLthe help of HLU, BHUSAWAL. 2. Quarter
33 400/220 kV
500 MVA ICT-II @ Nanded 20-Oct-16 10:00 20-Oct-16 17:00 Daily To attend 500 MVA 400/220 kV VIJAY make ICT-II LV MSETCL B-Phase Isolator
MSETCL Hot Spot of 81°C and RRS control cabli
34 400/220 315 MVA ICT 2 @ Talandge(Kolhapur) 20-Oct-16 10:00 21-Oct-16 20:00 Daily Retrofitting work of Differential Relay & Qurterly Maint.Work
MSETCL MSETCL Load manage on 315 MVA ICT -1 &
35 400 KV Karad - JAIGAD -II @ Karad 20-Oct-16 10:00 20-Oct-16 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
36 400kV Parli-Lonikand II Ckt-I 20-Oct-16 9:00 20-Oct-16 17:00 Daily Outage required for quarterly maintenance work MSETCL MSETCL
37 400 KV Kalwa -Padghe-1 20-Oct-16 10:00 27-Oct-16 17:00 Continuous Dismantling & erection of 2 nos. of towers & stringing between
MSETCL location
MSETCL1110 - 1112 S/C Twin conductor .
38 400KV Lonikand I -Lonikand II Interconnector I @ Lonikand I
20-Oct-16 9:00 20-Oct-16 17:00 Daily Qurterly Maint.Work MSETCL MSETCL
39 400KV Koyna Stg -IV -Jejuri 20-Oct-16 8:00 27-Oct-16 17:00 Daily For replacement of disc insulators at various location under LE Scheme
MSETCL MSETCL
40 400 kV 400 kV DGEN BUS TRANSFER BAY (BAY 414) 20/10/2016 8:00 20/10/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPL kV breakerTPL testing. C
41 765 765KV Gwalior-Jaipur#2 Line reactor at Gwalior (Switchable)
20/Oct/16 10:00 20/Oct/16 18:00 Daily AMP and RTV Coating WORKS for switchable LR of Jaipur-2- PGCILLineWR-IIwill be in service
C without LR.
42 220 Vapi-Magarwada-1 20/Oct/16 9:00 20/Oct/16 12:00 Daily Testing of Auto reclose relay PGCIL WR-II R
43 400 Bus Bar # 2 alongwith 400kV Sami # 2 Line at Dehgam
20/Oct/16 9:00 20/Oct/16 18:00 Daily Busbar stability works PGCIL WR-II C
44 765 Gwalior-3 Line Reactor Switchable 20/Oct/16 9:30 30/Oct/16 18:00 contin For replacement work of Raector CB MB PGCIL WR-II C
45 400 Bina-Shujalpur line ckt 1&2 20/Oct/16 9:00 10/Nov/16 17:00 Daily Online PID testing to identify defective insulator string. A/R
PGCIL
selectorWR-II
of both circuits
R to be kept in non auto during P
46 220 Kawas-Dastan Ckt 1 & 2 20/Oct/16 8:00 19/Nov/16 18:00 Daily Online permit for OPGW work PGCIL WR-II C
47 220 Kawas-Haldarwa Ckt 1 & 2 20/Oct/16 8:00 19/Nov/16 18:00 Daily Online permit for OPGW work PGCIL WR-II C
48 220 Kawas-Vav Ckt 1 & 2 20/Oct/16 8:00 19/Nov/16 18:00 Daily Online permit for OPGW work PGCIL WR-II C
49 220 Transfer Bus at Damoh 20/Oct/16 9:00 20/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL (ExtensionWR-II
of 400/220KV
C Damoh Sub-station Work exec
50 400 Bina#1 Tie Bay(402) at Shujalpur 20/Oct/16 10:00 20/Oct/16 18:00 Daily For AMP works PGCIL WR-II R
51 400 Dhule-1main bay AMP(407) at Khandwa ss 20/Oct/16 9:30 20/Oct/16 17:30 Daily Bay AMP PGCIL WR-II R
52 220 220KV Bus 1 at Bhachau 20/Oct/16 9:00 20/Oct/16 18:00 Daily Cleaning and Greasing of balance BPI PGCIL WR-II R
53 400 ICT#1 (bay 405, 208) at Magarwada 20/Oct/16 8:00 20/Oct/16 18:00 Daily Application of RTV coating PGCIL WR-II R
54 765 765 kV V'chal-Satna Line#1 20/Oct/16 9:00 22/Oct/16 18:00 Daily RTV Coating on Line reactro Bushings PGCIL WR-II R
55 400 RAJGARH-NAGDA # 1 MAIN BAY (407) AT RAJGARH 20/Oct/16
SUBSTATION
10:00 20/Oct/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
56 220 Dahanu-Ghodbunder Line-I 20/Oct/16 7:00 23/Oct/16 18:00 Continous Power Line Crossing for Stringing work of Navasari Boisar Reliance
line (AP 339/0-339A/0)
Reliance C Through hot line, A/R of all lines
57 220 Dahanu-Ghodbunder Line-II 20/Oct/16 7:00 23/Oct/16 18:00 Continous Power Line Crossing for Stringing work of Navasari Boisar Reliance
line (AP 339/0-339A/0)
Reliance C Through hot line, A/R of all lines
58 220 Dahanu-Versova 20/Oct/16 7:00 23/Oct/16 18:00 Continous Power Line Crossing for Stringing work of Navasari Boisar Reliance
line (AP 339A/0-340/0)
Reliance C Through hot line, A/R of all lines
59 220 Dahanu-Boisar 20/Oct/16 7:00 23/Oct/16 18:00 Continous Power Line Crossing for Stringing work of Navasari Boisar Reliance
line (AP 339A/0-340/0)
Reliance C Through hot line, A/R of all lines
60 400 125 MVAR BUS REACTOR at Pirana 20/Oct/16 9:00 20/Oct/16 15:00 DAILY AMP WORK PGCIL WR-II R
61 765 Bus Reactor main bay 710 At Vindhyachal Pooling20/Oct/16
Station 9:00 21/Oct/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCIL by M/sWR-II
alstom C
62 765 766 KV S/C Indore -Bhopal line 20/Oct/16 10:00 20/Oct/16 18:00 daily For RTV coating in 765 KV trench make bushings of Bhopal PGCIL LR at Indore
WR-II PS C
63 765 765kV Bina # 1 Line Reactor at Jabalpur Pooling 20/Oct/16
Station 10:00 22/Oct/16 17:00 Daily RTV Coating on 765kV Bushing. Bine # 1 line will be in service
PGCIL withoutWRTS-II
line reactor.
C RTV Coating on 765kV Bushi
64 765 Sasan - Satna Ckt-I 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
65 765 Satna - Gwalior Ckt-I 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
66 400 Vapi - Kala Ckt-I&2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
67 400 Navsari - Magarwada # I,2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
68 400 Kala -Magarwada #1,2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
69 220 Vav - Navsari #1,2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
70 400 Vindhyachal Pooling - SASAN UMPP #1 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
71 220 Chhegeon – Khandwa # 1,2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
72 220 Barwatha –Chhegeon (MPPTCL) # 1,2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
73 220 Seoni- Seoni ( MPPTCL) 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
74 400 Korba-Birsingpur Ckt # 1,2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
75 400 Sasan - Vindhyachal Pooling Ckt-1 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
76 400 Mundra-Jetpur Ckt 1&2 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
77 220 Vapi- Magarwada 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
78 220 Vapi-Kharadpara 20/Oct/16 6:00 19/Nov/16 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept PGCIL
in non auto
WR-II
mode C
79 400 Ukai-Navsari line 20/Oct/16 9:00 20/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
80 400 Bina-Shujalpur line ckt 1&2 20/Oct/16 8:00 19/Nov/16 18:00 Daily Online permint for PID testing of insulator strings. A/R forPGCIL
both ciruicts
WR-II
to be kept
C into non auto mode during PID t
81 400 Itarsi - Khandwa ckt. 1&2 20/Oct/16 8:00 19/Nov/16 18:00 Daily Online permint for PID testing of insulator strings. A/R forPGCIL
both ciruicts
WR-II
to be kept
C into non auto mode during PID t
82 400 Khandwa - Dhule 1&2 20/Oct/16 8:00 19/Nov/16 18:00 Daily Online permint for PID testing of insulator strings. A/R forPGCIL
both ciruicts
WR-II
to be kept
C into non auto mode during PID t
83 765 Durg-Wardha line -I 20-Oct-16 9:00 20-Oct-16 18:00 Daily Basis WAVE TRAP RPLMENT AT WARDHA PGCIL WRTS-I
84 400KV / 132KV
ICT-2 AT MOUDA 20-Oct-16 9:00 22-Oct-16 18:00 Cont. Annual maintenace NTPC NTPC
85 220KV Kawas-VAV#1 20-Oct-16 8AM 20-Oct-16 18PM Cont. For attending hot spot as per IRT. NTPC NTPC
86 765/400 SIPAT-RANCHI-1 LINE S/D 20-Oct-16 7:30 21-Oct-16 19:00 Continous Annual Preventive maintenance NTPC NTPC
87 400 400/220 KV 315 MVA ICT-3 Main Bay (ICT will remain
20-Oct-16
off) 9.30 20-Oct-16 17.00 Daily Maintenance & Testing Work GETCO GETCO For information. Code will be issued
88 400 Jetpur-Mundra Line-1 20-Oct-16 8:00 20-Oct-16 18:00 Daily To attend 400KV Mundra-1 Lne B-ph Bus-2 PG Isolator and GETCO CT hot GETCO
point attending work at Jetpur
89 400 400 KV Main Bus-2 Jetpur 20-Oct-16 8:00 20-Oct-16 18:00 Daily To attend 400KV Mundra-1 Lne B-ph Bus-2 PG Isolator and GETCO CT hot GETCO
point attending
All elements
work at Jetpur
will remain on 400 KV
90 400 EMCO -BHADRAWATI LINE 1 20-Oct-16 9:00 22-Oct-16 18:00 Daily Line maintenance GWEL GWEL
91 400 MCCPL Main Bay (416) at Bilaspur PS. 21-Oct-16 9:00 21-Oct-16 18:00 Daily For AMP Works (CB Timings/DCRM,CRM , CT Cap & tanWRTS-I delta meas.)
WRTS-I R
92 765 Durg line, Main Bay at Champa 21-Oct-16 9:00 22-Oct-16 18:00 Daily For AMP work at Champa WRTS-I WRTS-I R
93 400 400 KV BUS2_KOTRA PS 21-Oct-16 9:00 21-Oct-16 18:00 Daily For AMP works at Kotra PS WRTS-I WRTS-I R
94 400 400Kv AURANGABAD(MSETCL)-PUNE(GIS) I 21-Oct-16 9:00 21-Oct-16 14:00 Daily For warranty testing of Line Reactor at Pune (GIS). Line will
WRTS-I
be out/Reliance
of
WRTS-I
service during
R taking OUT & IN Line reactor
95 400 125 MVAR Bus Reactor Main Bay at Raipur 21-Oct-16 9:00 21-Oct-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
96 400 SOLAPUR_400KV_BUS_2 21-Oct-16 9:00 21-Oct-16 20:00 Daily ERECTION AND COMMISSIONING WORKS OF 400KVWRTS-I NTPC#3 &WRTS-I4 at Solapur.
C
97 400 Talegaon(Pune)- Lonikand Line 21-Oct-16 9:00 21-Oct-16 18:00 Daily To Place the Earthwire in place of removed earthwire MSETCL WRTS-I C
98 765 Bus Reactor # 2 Tie Bay 711 Bay at Wardha 21-Oct-16 9:00 21-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
99 400 Raipur-3 Main Bay (413 bay) at Bhadrawati 21-Oct-16 9:00 21-Oct-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
100 765 BUS REACTOR_765kV_240MVAR_TAMNAR PS21-Oct-16 10:00 21-Oct-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
101 400 400kV LARA(NTPC)-KOTRA PS I 21-Oct-16 11:00 21-Oct-16 12:00 Daily For PMU installation works at Kotra PS WRTS-I WRTS-I C
102 400 400KV S/S JULWANIA- 315 MVA (CGL)400/220 21-Oct-16
KV X-MER-I 9:00 22-Oct-16 17:00 daily FOR POST MANSOON MAINTENANCE WORK MPPTCL MPPTCL R
103 400 400 KV BINA -JPBPSCL LINE 21-Oct-16 9:00 22-Oct-16 18:00 daily FOR POST MANSOON MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
104 400KV Main Bay 410 of Akola -Bhusawal Line Akola 21-Oct-16 10:00 21-Oct-16 17:00 Daily Quarterly Bay Maintenance and Testing Work MSETCL MSETCL 400 kV Akola-Bhusawal line will be
105 400KV 408-Bay (Tie Bay of Akola-1 Line-1 and RPL Line-1) 21-Oct-16
at Akola -II8:00
Substation
21-Oct-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
106 400/220/33kV
315MVA ICT - 1 @ Waluj 21-Oct-16 10:00 21-Oct-16 17:00 Daily Quarterly maintenance MSETCL MSETCL
107 400KV IEPL-Warora @ Warora 21-Oct-16 8:00 21-Oct-16 17:00 Daily DCRM of tie CB & maintainacnce of 89 LB Isolator & forMSETCLLine Signature
MSETCL Analysis at 400KV Warora S/s
108 400KV Bus Coupler Bay @ Chandrapur I 21-Oct-16 8:00 22-Oct-16 18:00 Daily Attending the 10 Nos. critical Hot spot and replacement of MSETCL
Knee Joint.
MSETCL

109 400KV Tie Bay (402) of ICT-1 & Line-1 at Koradi III Sub Station
21-Oct-16 8:00 21-Oct-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL

110 400KV Khadka-Koradi line 21-Oct-16 7:00 21-Oct-16 17:00 Daily Quarterly Maintenance work /Diagnostic Testing work MSETCL MSETCL
111 400KV Parli-Solapur 21-Oct-16 10:00 21-Oct-16 16:00 Daily line signature analysis. MSETCL MSETCL
112 400KV Koradi -Bhusawal 21-Oct-16 8:00 21-Oct-16 Daily Tan of CT, Reactor, bushing & routine maintenance workMSETCL
at both ends
MSETCL
113 400 KV NewKoyna- Stage IV Ckt 2. 21-Oct-16 8:00 22-Oct-16 18:00 Daily cold line washing of insulators. MSETCL MSETCL
114 400 kV 400kV DGEN BUS COUPLER BAY (BAY 413) & 21/10/2016
BUS A Outage7:00 21/10/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPLkV breakerTPL testing. C
115 765 765KV Gwalior-Jaipur#2 Line ( Main and Tie bay 21/Oct/16
should kept open)
9:00 21/Oct/16 18:00 Daily Spare reactor integration balance work (in last shut downPGCIL
spare reactor
WR-IIintegration
C with R-ph only completed) and
116 400 417 Tie bay of kala-2 line at Vapi 21/Oct/16 9:00 10/Nov/16 18:00 coti Bay extention work. Dismentaling of BPI and construction PGCIL
of CT foundation
WR-II andC erection of CT work
117 400 Gandhar # 1 Tie Bay (Bay No - 402) at Dehgam 21/Oct/16 9:00 21/Oct/16 18:00 Daily Bay AMP works PGCIL WR-II R
118 400 Gandhar-Navsari 21/Oct/16 8:00 21/Oct/16 18:00 Daily S/D for Stringing work of 400kV D/C Kakrapar-Navsari b/w PGCIL
28/0 & 29/0
WR-II C
119 400 UKAI-Navsari 21/Oct/16 8:00 21/Oct/16 18:00 Daily S/D for Stringing work of 400kV D/C Kakrapar-Navsari b/w PGCIL
28/0 & 29/0
WR-II C
120 220 BUS-I at Damoh 21/Oct/16 9:00 21/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
121 400 400 KV Bina-Shujalpur # 1 Tr. Line 21/Oct/16 10:00 21/Oct/16 18:00 Daily For attending shutdown nature defects in transmission line
PGCIL WR-II R
122 400 Bina#2 Main Bay(406) at Shujalpur 21/Oct/16 10:00 21/Oct/16 18:00 Daily For AMP works PGCIL WR-II R
123 400 ICT-1main bay AMP(409) at Khandwa ss 21/Oct/16 9:30 21/Oct/16 17:30 Daily Bay AMP PGCIL WR-II R
124 220 220KV Bus 2 at Bachau 21/Oct/16 9:00 21/Oct/16 18:00 Daily Cleaning and Greasing of balance BPI PGCIL WR-II R
125 400 400kV Kala - Magarwada #1 (Bay 408) at Magarwada
21/Oct/16 8:00 21/Oct/16 18:00 Daily Application of RTV coating on equip. PGCIL WR-II R
126 400 RAJGARH- NAGDA # 1 & ICT# 1 TIE BAY (408) 21/Oct/16
AT RAJGARH10:00SUBSTATION
21/Oct/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
127 220 Bay no-202 Main Bay of 220kv Boisar-Boisar-III 21/Oct/16 9:00 21/Oct/16 18:00 Daily AMP PGCIL WR-II R
128 220 220KV BAY-203 (ICT-2 BAY) at Pirana 21/Oct/16 10:00 21/Oct/16 17:00 DAILY AMP WORK PGCIL WR-II R
129 765 765 KV Vadodara line reactor at indore SS 21/Oct/16 10:00 23/Oct/16 18:00 daily For RTV coating on R, Y, B phase reactor Bushings of Vadodara
PGCIL LRWR-II at Indore PS.
C Lline will be taken into service w
130 400 Gandhar-Navsari-2 line 21/Oct/16 9:00 21/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
131 400 400KV ICT#2 AT GANDHAR 21-Oct-16 8:00 26-Oct-16 18:00 Cont. Annual bay maintenance and protection checking NTPC NTPC
132 220KV Kawas-HAL#1 21-Oct-16 8AM 21-Oct-16 18PM Cont. For attending hot spot as per IRT. NTPC NTPC
133 400 KORBA TBC-1 21-Oct-16 08:30 hrs22-Oct-16 17:30 Hrs.
Continuous400KV CT Replacement NTPC NTPC
134 400 400/220 KV 315 MVA ICT-3 TIE Bay (ICT will remain
21-Oct-16
in service)9.30 21-Oct-16 17.00 Daily Maintenance work GETCO GETCO
135 400 Asoj - SSP 21-Oct-16 8:00 22-Oct-16 18:00 ContinuousIsolator replacement work at Asoj end GETCO GETCO The auto reclose of 400 KV SSP -K
136 400 Main Bus- 1 Asoj 21-Oct-16 8:00 21-Oct-16 18:00 Daily Isolator maintenance work GETCO GETCO All elements will remain on 400 KV
137 400 Chorania-Asoj-1 line 21-Oct-16 8:00 21-Oct-16 18:00 Daily Bay equipment testing and maintenance work GETCO GETCO
138 400 Jindal # 4 & AT#1 (408) Tie Bay at Tamnar PS 22-Oct-16 8:00 22-Oct-16 20:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
139 400 400 KV MAIN BAY_KOTRA_RAIGARH_I_KOTRA22-Oct-16 PS 9:00 22-Oct-16 18:00 Daily For AMP works at Kotra PS WRTS-I WRTS-I R
140 400 ICT2_315MVA (Main Bay-404) at Aurangabad 22-Oct-16 9:00 22-Oct-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
141 400 400Kv AURANGABAD(MSETCL)-PUNE(GIS) II 22-Oct-16 9:00 22-Oct-16 14:00 Daily For warranty testing of Line Reactor at Pune (GIS). Line will
WRTS-I
be out/Reliance
of
WRTS-I
service during
R taking OUT & IN Line reactor
142 400 BUS REACTOR_400kV_125MVAR_RAIPUR 22-Oct-16 9:00 22-Oct-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
143 400 SOLAPUR_400KV_BUS_1 22-Oct-16 9:00 22-Oct-16 20:00 Daily ERECTION AND COMMISSIONING WORKS OF 400KVWRTS-I NTPC#3 &WRTS-I4 at Solapur.
C
144 400 400kV DHARIWAL TPP-PARLI II 22-Oct-16 9:00 23-Oct-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.400kV
WRTS-I C DHARIWAL TPP-PARLI II will be
145 765 Bus Reactor # 2 Main Bay 712 Bay at Wardha 22-Oct-16 9:00 22-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
146 400 400kV WARDHA-PARLI I & II 22-Oct-16 9:00 23-Oct-16 18:00 Daily Powerline crossing works of 765kV D/C Hyderabad-Wardha WRTS-I
between WRTS-I
tower location
C Nos 49/0 & 50/0 (400KV D/C
147 400 Parli-1 Main Bay (419 bay) at Bhadrawati 22-Oct-16 9:00 22-Oct-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
148 400 400kV RANCHI-SIPAT II 22-Oct-16 10:00 22-Oct-16 12:00 Daily DGA sampling of line reactor bushing at Sipat WRTS-I/NTPC WRTS-I R
149 400 Talegaon (Pune)- Chakan Line 22-Oct-16 10:00 22-Oct-16 14:00 Daily To repalce the connecctor between IPS Tube & Isolator MSETCL
401 89B at WRTS-I
Pune(talegoan)
C
150 400 400kV LARA(NTPC)-KOTRA PS II 22-Oct-16 11:00 22-Oct-16 12:00 Daily For PMU installation works at Kotra PS WRTS-I WRTS-I C
151 765/400kV
765/400kV ICT at Akola - II Substation 22-Oct-16 8:00 22-Oct-16 18:00 Daily Erection of Bushing in spare repaired transformer MEGPTCLMEGPTCL
152 400/220kV
315 MVA ICT-III at 400kV Khadka 22-Oct-16 7:00 22-Oct-16 17:00 Daily For replacement of 220 KV R & B ph CT having higher CMSETCL
& TAN DELTA.MSETCL 2. Quarterly Maintenance work /Diagnos
153 400 KV Bus Reactor@ Talandge 22-Oct-16 9:00 22-Oct-16 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
154 765 765kV Gwalior-Bina#3 Line 22/Oct/16 10:00 22/Oct/16 18:00 Daily To attend theft tower members above above waist level to PGCIL
avoild tower
WR-IIfailure. Cshut down required due to heavy in
155 400 Gandhar # 2 Main Bay (Bay No - 404) at Dehgam22/Oct/16 9:00 22/Oct/16 18:00 Daily Bay AMP works PGCIL WR-II R
156 400 315MVA 400/220kV ICT#1 At Itarsi 22/Oct/16 9:00 22/Oct/16 14:00 Daily AMP works PGCIL WR-II R
157 765 Seoni Line reactor at Bina 22/Oct/16 9:30 22/Oct/16 13:00 Daily For taking of spare reactor into service bus-1 side. PGCIL WR-II C
158 220 BUS-II at Damoh 22/Oct/16 9:00 22/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
159 400 400 KV Bina-Shujalpur # 2 Tr. Line 22/Oct/16 10:00 22/Oct/16 18:00 Daily For attending shutdown nature defects in transmission line
PGCIL WR-II R
160 400 Bus Reactor -2 main bay AMP (410) at Khandwa 22/Oct/16
ss 9:30 22/Oct/16 17:30 Daily Bay AMP PGCIL WR-II R
161 220 Bay 208 220KV Charadova 1 at Bhachau SS 22/Oct/16 9:00 22/Oct/16 18:00 Daily AMP of Circuit breaker PGCIL WR-II R
162 400 400kV Navsari - Magarwada #1 (Bay 402) at Magarwada
22/Oct/16 8:00 22/Oct/16 18:00 Daily Application of RTV coating on equip. PGCIL WR-II R
163 400 ICT# 1 MAIN BAY (409) AT RAJGARH SUBSTATION 22/Oct/16 10:00 22/Oct/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
164 220 BayNo-205 Main Bay of Transfer Bus 22/Oct/16 9:00 22/Oct/16 18:00 Daily AMP PGCIL WR-II R
165 220 TRANSFER BUS at Pirana 22/Oct/16 10:00 22/Oct/16 14:00 DAILY AMP WORK PGCIL WR-II R
166 765 Bus Reactor Tie bay 711 At Vindhyachal Pooling22/Oct/16
Station 9:00 22/Oct/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCIL by M/sWR-II
alstom C
167 400 Sasan - Vindhyachal Pooling Ckt-1 22/Oct/16 9:00 22/Oct/16 15:00 Daily Outage required for diamond formation through 400kV SasanPGCIL Vindhyachal
WR-II pooling C ckt-1 and 765kV Sasan-Vindhy
168 765 Sasan- Vindhyachal Pooling 22/Oct/16 9:00 22/Oct/16 15:00 Daily Outage required for diamond formation through 400kV SasanPGCIL Vindhyachal
WR-II pooling C ckt-1 and 765kV Sasan-Vindhy
169 400 Magarwada-Navsari-1 line 22/Oct/16 9:00 22/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
170 400 400 KV Raita-Khedamara (Circuit II) Line. 22-Oct-16 9:00 22-Oct-16 16:00 Daily Basis 400KV Raita (Raipur)-Jagdalpur Line (U/C), Between Locations
CSPTCL - Dead
CSPTCL
End to AP 1/0.
171 400 KV NewKoyna Stage IV Ckt 1. 23-Oct-16 8:00 24-Oct-16 18:00 Daily cold line washing of insulators. MSETCL MSETCL
172 400 J P NIGRI-SATNA-1 23-Oct-16 9AM 23-Oct-16 5PM Daily Fixing and Tightening of Jumper Nut & Bolts,Arcing HornJP & Conductor
NIGRIEJP Repairing
NIGRIE
173 400 414 -Bhopal 2 Tie & 415-Furture ICT bay at Damoh23/Oct/16 9:00 23/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
174 400 Sasan - Vindhyachal Pooling Ckt-1 23/Oct/16 9:00 23/Oct/16 15:00 Daily Outage required for diamond formation through 400kV Sasan PGCIL Vindhyachal
WR-II pooling
C ckt-1 and 765kV Sasan-Satna
175 765 Sasan - Satna Ckt-I 23/Oct/16 9:00 23/Oct/16 15:00 Daily Outage required for diamond formation through 400kV Sasan PGCIL Vindhyachal
WR-II pooling
C ckt-1 and 765kV Sasan-Satna
176 400 765 Kv SOLAPUR-PUNE(GIS) 24-Oct-16 8:00 24-Oct-16 18:00 Daily For line AMP work by Pune (TLM) WRTS-I WRTS-I R
177 765 765/400KV AT2_MAIN_BAY_715 at Seoni 24-Oct-16 8:00 24-Oct-16 18:00 Daily For AMP works at Seoni WRTS-I WRTS-I R
178 400 Jindal # 3 & AT#2 (411) Tie Bay at Tamnar PS 24-Oct-16 8:00 24-Oct-16 20:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
179 400 AKOLA(MSETCL) I (Main Bay-415) at Aurangabad 24-Oct-16 9:00 24-Oct-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
180 765 Tie Bay BUS REACTOR # 1 (811) at Durg PS 24-Oct-16 9:00 24-Oct-16 18:00 Daily For AMP work at Durg PS. WRTS-I WRTS-I R
181 765 765 KV MAIN BAY_ICT4_765/400kv_KOTRA PS24-Oct-16 9:00 24-Oct-16 18:00 Daily For AMP works at Kotra PS WRTS-I WRTS-I R
182 765 SWITCHABLE LR_765kV_SOLAPUR_PUNE(GIS) 24-Oct-16 9:00 24-Oct-16 17:00 Daily For AMP work at Pune (GIS). 765kV Pune GIS-Solapur Line WRTS-I
will be WRTS-I
remain in service.
R
183 400 400 KV Bus Coupler 1 bay (40152) at Raipur SS 24-Oct-16 9:00 24-Oct-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
184 400 415_MAIN BAY_KOLHAPUR#1 at SOLAPUR 24-Oct-16 9:00 25-Oct-16 18:00 Conti. AMP WORKS and For SF6 lekage rectification works at Solapur.
WRTS-I WRTS-I R
185 400 400kv Bus - I at Pune (Talegoan) 24-Oct-16 9:00 24-Oct-16 18:00 Daily For jumper tighting of bus Isolator at Pune(talegoan) MSETCL WRTS-I R
186 400 400kV BHADRAVATI-DHARIWAL TPP II 24-Oct-16 9:00 24-Oct-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.BVT-Dhariwal-2
WRTS-I C will be out of service du
187 765 Abad # 4 Main Bay 722 Bay at Wardha 24-Oct-16 9:00 24-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
188 400 400KV BALCO 01 Main Bay (415) AT DHARAMJAYGARH 24-Oct-16 (KORBA)
10:00 SS24-Oct-16 12:00 Daily Replacement of faulty limit switches &aux. switches in SIEMENS
WRTS-I make WRTS-I
CB R
189 765 ICT1_765/400kv_KOTRA PS 24-Oct-16 10:00 24-Oct-16 14:00 Daily CSD COMMISSIONING TRIALS at Kotra PS WRTS-I WRTS-I C
190 400 400kV AURANGABAD (PG) -AKOLA I 24-Oct-16 10:00 24-Oct-16 18:00 Daily For Auto recloser testing & AMP works t Akola (MSETCL)W RTS-I /MSETCL WRTS-I /MSETCL
R
191 400 400kV DB POWER - KOTRA PS I 24-Oct-16 11:00 24-Oct-16 12:00 Daily For PMU installation works at Kotra PS DB POWER W RTS-I C
192 400 400KV BALCO 02 Main Bay (418) AT DHARAMJAYGARH 24-Oct-16(KORBA)
14:00SS24-Oct-16 16:00 Daily Replacement of faulty limit switches &aux. switches in SIEMENS
WRTS-I make WRTS-I
CB R
193 400 400 KV INDORE- ISP CkT-I 24-Oct-16 9:00 24-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
194 220 220 KV PANDHURNA - KAMLESHWAR CKT 24-Oct-16 9:00 24-Oct-16 18:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
195 400 KV Kolhapur-Solapur(PGCIL) ckt-1 24-Oct-16 8:00 24-Oct-16 18:00 ContinuousFor making LILO arrangement at Loc.No.428 of 400 KV Kolhapur-Solapur(PGCIL)
MSETCL MSETCL Monday line for
is stragering
400 KV Alkud
day Substatio
for Kolha
196 400 KV 400 KV Wardha-Koradi-2 24-Oct-16 9:00 24-Oct-16 18:00 Daily Capacitance and Tan Delta of line CVT and Cap of Main MSETCL
CB at PGCIL MSETCL
DEOLI S/st
197 400 KV 409-Bay (Main Bay of Akola-I Line-1) at Akola -II24-Oct-16 8:00 24-Oct-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
198 400 KV Main Bay (403) of Line-1 at Koradi III 24-Oct-16 8:00 24-Oct-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
199 400 KV Station Transformer -1 _APML Tiroda plant 24-Oct-16 9:00 25-Oct-16 18:00 ContineousBay Equipment maintenance & Transformer Testing APML APML
200 400 kV Akola- Bhusawal Line 24-Oct-16 12:00 29-Oct-16 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R
MSETCL
shall be kept
MSETCL
in non 400
autokV mode.
Koradi- Bhusawal, 400 kV A
201 400 kV 400kV Dhule - SSNNL line Ckt-I & II 24-Oct-16 9:00 25-Oct-16 17:00 daily PID testing MSETCL MSETCL
202 400/220KV
315MVA , ICT-I at Karad 24-Oct-16 9:00 24-Oct-16 19:00 Daily Quarterly. Maint. Work MSETCL MSETCL
203 400 kV 400kV DGEN BUS COUPLER BAY (BAY 413) & 24/10/2016BUS B Outage8:00 24/10/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPL kV breakerTPLtesting. C
204 400 400 kV Limbdi-2 breaker at Mundra (413 52) 24/Oct/16 9:00 24/Oct/16 20:00 Daily Breaker PM and testing CGPL CGPL
205 765 765 KV Satna Line -1 Reactor 24-Oct-16 9:00 25-Oct-16 18:00 Daily For LA Replacement, Isolator alignment, and Equipment SASANtesting RELIANCE
206 765 765kV Bus-1 at Gwalior 24/Oct/16 10:00 24/Oct/16 18:00 Daily AMP WORKS and to attain S&S Isolator PGCIL WR-II R
207 400 BUS-1 at Vapi 24/Oct/16 8:00 24/Oct/16 20:00 Daily Replacment of 6 nos. Hivelum Isolator Arms (407-89A) with PGCIL
modified WR-II
design in R
Boisar Main Bay
208 400 Nagda # 1 Main Bay (Bay No - 429) at Dehgam 24/Oct/16 9:00 24/Oct/16 18:00 Daily Bay AMP works PGCIL WR-II R
209 400 Itarsi-Jabalpur#2 Line 24/Oct/16 9:00 24/Oct/16 9:15 Daily Line to be H/T for taking-out of Reactor for replacement ofPGCIL
Tan-DeltaWR-II
Point of RR& B-Phases.
210 765 Gwalior-2 line Reactor at Bina 24/Oct/16 9:30 24/Oct/16 18:00 Daily For taking of Y phase reactor into service. PGCIL WR-II C
211 220 Kawas-Haldarwa Ckt 2 24/Oct/16 8:00 25/Oct/16 18:00 CONTINUEs/d for OPGW WORK as E/W not available in some sections. PGCIL WR-II C
212 400 BUS-2 at Damoh 24/Oct/16 9:00 24/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
213 400 400 KV Shujalpur-Nagda#1 L/R at Nagda S/S (Switchable)
24/Oct/16 10:00 24/Oct/16 18:00 Daily For AMP and taking oil samples of BHEL bushings. PGCIL WR-II R
214 400 Mundra-Mansar line with Mundra-Limbadi in non 24/Oct/16
auto reclose mode
8:00 24/Oct/16 18:00 Daily for attending hot spot & open line spacer dampers PGCIL WR-II R
215 400 Itarsi-1 main bay (413) AMP at Khandwa ss 24/Oct/16 9:30 24/Oct/16 17:30 Daily Bay AMP PGCIL WR-II R
216 400 400KV Bus 1 at Bachau 24/Oct/16 9:00 24/Oct/16 18:00 Daily Cleaning and Greasing of balance BPI PGCIL WR-II R
217 400 400kV Navsari - Magarwada #2 (Bay 407) at Magarwada
24/Oct/16 8:00 24/Oct/16 18:00 Daily Application of RTV coating on equip. PGCIL WR-II R
218 765 765 kV V'chal-Satna Line# 2 24/Oct/16 9:00 26/Oct/16 18:00 Daily RTV Coating on Line reactro Bushings PGCIL WR-II R
219 400 400 KV Jabalpur-tarsI # 4 24/Oct/16 10:00 24/Oct/16 14:00 Daily For AMP of terminal equipments PGCIL WR-II R
220 400 RAJGARH-NAGDA # 2 MAIN BAY (410) AT RAJGARH 24/Oct/16
SUBSTATION
10:00 24/Oct/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
221 220 220KV BAY-205 (BUS COUPLER BAY) at Pirana24/Oct/16 10:00 24/Oct/16 17:00 DAILY AMP WORK PGCIL WR-II R
222 765 Bus Reactor At Vindhyachal Pooling Station 24/Oct/16 9:00 25/Oct/16 17:00 Daily Fine tuning of CSD relay by M/s alstom at vindhyachal psPGCIL WR-II C
223 765 765kV JBP PS - Dharmjaygarh # 2 Line along with 24/Oct/16
reactor at Jabalpur
10:00 Pooling
26/Oct/16
Station17:00 Daily RTV Coating on 765kV Bushing. RTV Coating on 765kVPGCIL Bushing toWRTS-II
minimize the
C chances of flash over.
224 400 Magarwada-Navsari-2 line 24/Oct/16 9:00 24/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
225 400 Korba-Mahan Line 24-Oct-16 08:30 hrs26-Oct-16 17:30 Hrs.
Continuous400KV CT Replacement NTPC NTPC
226 400 500 MVA, 400/220 KV ICT No. 2 Asoj 24-Oct-16 8:00 24-Oct-16 18:00 Daily Maintenance work GETCO GETCO
227 400 Chorania - Vadavi 2 24-Oct-16 8:00 24-Oct-16 18:00 Daily Maintenance work GETCO GETCO
228 400 EMCO -BHADRAWATI LINE 2 24-Oct-16 9:00 26-Oct-16 18:00 Daily Line maintenance GWEL GWEL
229 765 SWITCHABLE LR_765kV_SEONI 2_BILASPUR 25-Oct-16 8:00 25-Oct-16 18:00 Daily For change over of spare with Rph unit to ensure healthiness
WRTS-I
at Bilaspur.
WRTS-I Line will
C remain in service.
230 400 400Kv PARLI-PUNE(GIS)_2 25-Oct-16 8:00 25-Oct-16 18:00 Daily For line AMP work by Pune (TLM) WRTS-I /Reliance
WRTS-I R
231 400 AT#2 (412) Main Bay at Tamnar PS 25-Oct-16 8:00 25-Oct-16 20:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
232 765 765kV AURANGABAD(PG)-SOLAPUR I 25-Oct-16 8:00 25-Oct-16 18:00 Daily For line & warranty test, AMP Works. WRTS-I WRTS-I R
233 765 Kotra line, Tie Bay at Champa 25-Oct-16 9:00 26-Oct-16 18:00 Daily For AMP work at Champa WRTS-I WRTS-I R
234 765 765 KV MAIN BAY_ICT4_765/400kv_KOTRA PS25-Oct-16 9:00 25-Oct-16 18:00 Daily For AMP works at Kotra PS WRTS-I WRTS-I R
235 400 400kV RAIPUR-RAIGARH I 25-Oct-16 9:00 25-Oct-16 18:00 Daily For Isolator maintenance of TCSC 1 at Raipur WRTS-I WRTS-I R
236 400 400Kv PUNE(GIS)-PUNE(TALEGOAN)_2 25-Oct-16 9:00 25-Oct-16 18:00 Daily For jumper tighting of line Isolator at Pune(talegoan) WRTS-I WRTS-I R
237 400 400KV side of 765 KV ICT # 3 Main Bay 410 at Wardha
25-Oct-16 9:00 25-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
238 400 Raipur-1 Main Bay (410 bay) at Bhadrawati 25-Oct-16 9:00 25-Oct-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
239 400 400KV ICT-01 Main Bay (421) AT DHARAMJAYGARH(KORBA)
25-Oct-16 10:00
SS 25-Oct-16 12:00 Daily Replacement of faulty limit switches &aux. switches in SIEMENS
WRTS-I make WRTS-I
CB R
240 765 ICT3_765/400kv_KOTRA PS 25-Oct-16 10:00 25-Oct-16 14:00 Daily CSD COMMISSIONING TRIALS at Kotra PS WRTS-I WRTS-I C
241 400 400kV DB POWER - KOTRA PS II 25-Oct-16 11:00 25-Oct-16 12:00 Daily For PMU installation works at Kotra PS DB POWER W RTS-I C
242 400 400KV ICT-02 Main Bay (424) AT DHARAMJAYGARH(KORBA)
25-Oct-16 14:00
SS 25-Oct-16 16:00 Daily Replacement of faulty limit switches &aux. switches in SIEMENS
WRTS-I make WRTS-I
CB R
243 400 400KV S/S JULWANIA - 50MVAR BUS REACTOR. 25-Oct-16 9:00 25-Oct-16 17:00 daily FOR POST MANSOON MAINTENANCE WORK MPPTCL MPPTCL R
244 400 400 KV INDORE- ISP CkT-II 25-Oct-16 9:00 25-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
245 400 400 KV BHOPAL -BDTCL CKT - II 25-Oct-16 9:00 25-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
246 220 220 KV MALANPUR - GWL( PG) CKT - I 25-Oct-16 9:00 25-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
247 400KV 410-Bay (Main Bay of RPL Line-2) at Akola -II Substation
25-Oct-16 8:00 25-Oct-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
248 400 KV Dabhol Newkoyna Line-1. 25-Oct-16 8:00 26-Oct-16 18:00 Daily cold line washing of insulators. MSETCL MSETCL
249 400/220kV
315MVA, ICT 2 @ Kharghar 25-Oct-16 8:00 25-Oct-16 18:00 Daily Maintenance work MSETCL MSETCL
250 400 kV 400kV DGEN Navsari Line 1 (BAY 406) 25/10/2016 8:00 25/10/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPL kV breakerTPL
testing. C
251 400 400 kV Bus Reactor breaker at Mundra (418 52) 25/Oct/16 9:00 25/Oct/16 20:00 Daily Breaker PM and testing CGPL CGPL
252 765 765 KV Gwalior-Agra-1 line  25/Oct/16 10:00 25/Oct/16 17:00 Daily For attending IPS tube to  LA connectors & droppers (linePGCIL
to IPS tube)
WR-II
in R , Y R
and B phases.
253 765 703 Bay (Main bay of 765kV Bus reactor) at Gwalior
25/Oct/16 10:00 25/Oct/16 18:00 Daily AMP WORKS PGCIL WR-II R
254 400 BUS-1 at Vapi 25/Oct/16 8:00 25/Oct/16 20:00 Daily Replacment of 6 nos. Hivelum Isolator Arms (410-89A) with PGCIL
modifiedWR-II
design in C
Sugen Main Bay
255 400 SOJA/Ranchodpura # 2 Tie (Bay No - 414) at Dehgam
25/Oct/16 9:00 25/Oct/16 18:00 Daily Bay AMP works GETCO WR-II R
256 400 Bus Coupler (402 bay) at Kala 25/Oct/16 10:00 25/Oct/16 14:00 Daily AMP of GIS CB PGCIL WR-II R
257 765 Bina-Indore line with Reactor 25/Oct/16 10:00 25/Oct/16 16:00 Daily For Hot Spot in Line Jumper and Spare Reactor Switching PGCIL WR-II R
258 400 DGEN-NAVSARI CKT 1 25/Oct/16 8:00 27/Oct/16 18:00 CONTINUEErection work of 32/0 of 400kV KAPP-Navsari line. Outage Torrent
requiredWR-II
due to heavy
C induction.
259 220 Kawas-Haldarwa Ckt 1 25/Oct/16 8:00 25/Oct/16 18:00 Daily S/D for OPGW laying work loc 12-13 as e/w not present.PGCIL WR-II C
260 220 Kim-L&T 25/Oct/16 8:00 25/Oct/16 18:00 Daily S/D for OPGW laying work loc 12-13 as e/w not present.GETCO WR-II C
261 220 Kim-GSEC 25/Oct/16 8:00 25/Oct/16 18:00 Daily S/D for OPGW laying work loc 12-13 as e/w not present.GETCO WR-II C
262 220 Transfer Bus at Damoh 25/Oct/16 9:00 25/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
263 400 400 KV Shujalpur-Nagda#2 L/R at Nagda S/S (Switchable)
25/Oct/16 10:00 25/Oct/16 18:00 Daily For AMP and taking oil samples of BHEL bushings. PGCIL WR-II C
264 765 Sasan-Satna # 2 25/Oct/16 11:00 20/Jan/15 17:00 Daily for mounting and fixing earth wire on Peak PGCIL WR-II
265 400 Mundra-Limbadi with Mundra-Mansar in non auto25/Oct/16
reclose mode8:00 25/Oct/16 18:00 Daily for attending hot spot & open line spacer dampers PGCIL WR-II R
266 400 Itarsi-1 & ICT-2 tie bay (414) AMP at Khandwa ss25/Oct/16 9:30 25/Oct/16 17:30 Daily Bay AMP PGCIL WR-II R
267 400 400KV Bus 2 at Bachau 25/Oct/16 9:00 25/Oct/16 18:00 Daily Cleaning and Greasing of balance BPI PGCIL WR-II R
268 400 400kV Kala - Magarwada #2 (Bay 403) at Magarwada25/Oct/16 8:00 25/Oct/16 18:00 Daily Application of RTV coating on equip. PGCIL WR-II R
269 400 400 KV Jabalpur-Itarsi # 2 Line 25/Oct/16 10:00 25/Oct/16 14:00 Daily For AMP of terminal equipments PGCIL WR-II R
270 400 RAJGARH- NAGDA # 2 & ICT# 2 TIE BAY (411) 25/Oct/16
AT RAJGARH10:00
SUBSTATION
25/Oct/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
271 400 400kv Tarapur-Boisar -1 25/Oct/16 7:00 26/Oct/16 18:00 Continous Stringing work of power line crossing of Navasari Boisar Line
PGCIL(AP 345-346)
WR-II Through
R hot line, A/R of both ckts
272 400 400kv Tarapur-Boisar -2 25/Oct/16 7:00 26/Oct/16 18:00 Continous Stringing work of power line crossing of Navasari Boisar Line
PGCIL(AP 345-346)
WR-II Through
R hot line, A/R of both ckts
273 400 Tarpur-Padghe Line-1 25/Oct/16 7:00 26/Oct/16 18:00 Continous Power Line Crossing of D/C line for stringing work of Navasari-Boisar
PGCIL WR-II Line (AP C344 and AP 345)- M/C portions
274 400 Tarpur-Padghe Line-2 25/Oct/16 7:00 26/Oct/16 18:00 Continous Power Line Crossing of D/C line for stringing work of Navasari-Boisar
PGCIL WR-II Line (AP C344 and AP 345)- M/C portions
275 220 220KV BUS-I at Pirana 25/Oct/16 10:00 25/Oct/16 18:00 DAILY AMP WORK PGCIL WR-II R
276 400 Vapi- Boisar S/C line 25/Oct/16 9:00 27/Oct/16 18:00 Daily Replacement of all porcelain disc insulator strings with composite
PGCIL polymer
WR-II insulators
C in entire line to prevent line tr
277 765 766 KV S/C Indore -Bina line 25/Oct/16 10:00 27/Oct/16 11:00 daily For RTV coating in 765 KV trench make bushings of BinaPGCIL LR at Indore
WR-II
PS. LineCwill be charged without LR
278 220 Kawas Navsari -1 line 25/Oct/16 9:00 25/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
279 400 Dehgam (PG) - Wanakbori line 25-Oct-16 8:00 26-Oct-16 18:00 Daily Maintenance work GETCO GETCO
280 400 315 MVA, 400/220 KV ICT No. 3 Asoj 25-Oct-16 8:00 25-Oct-16 18:00 Daily Maintenance work GETCO GETCO
281 400 Bus -1 Chorania 25-Oct-16 8:00 25-Oct-16 18:00 Daily Maintenance work GETCO GETCO All elements will be on bus - 1
282 400 400Kv PARLI-PUNE(GIS)_1 26-Oct-16 8:00 26-Oct-16 18:00 Daily For line AMP work by Pune (TLM) WRTS-I /Reliance
WRTS-I R
283 765 765/400KV AT3_MAIN_BAY_718 at Seoni 26-Oct-16 8:00 26-Oct-16 18:00 Daily For AMP works at Seoni WRTS-I WRTS-I R
284 765 765kV AURANGABAD(PG)-SOLAPUR II 26-Oct-16 8:00 26-Oct-16 18:00 Daily For line & warranty test, AMP Works. WRTS-I WRTS-I R
285 400 AKOLA(MSETCL)-2 (Tie Bay-417) at Aurangabad 26-Oct-16 9:00 26-Oct-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
286 400 400kV ICT-II Main Bay (406) at Bhatapara S/s. 26-Oct-16 9:00 26-Oct-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
287 765 Main Bay BUS REACTOR # 1 (812) at Durg PS 26-Oct-16 9:00 26-Oct-16 18:00 Daily For AMP work at Durg PS. WRTS-I WRTS-I R
288 765 765kV D'JAIGARH-RANCHI I 26-Oct-16 9:00 27-Oct-16 16:00 Daily Realignment of Main CB interrupter WRTS-I WRTS-I R
289 400 400Kv PUNE(GIS)-PUNE(TALEGOAN)_1 26-Oct-16 9:00 26-Oct-16 13:00 Daily For AMP work at Pune (GIS) WRTS-I WRTS-I R
290 400 400kV RAIPUR-SIPAT III 26-Oct-16 9:00 26-Oct-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
291 400 407_MAIN BAY_ICT#2 at SOLAPUR 26-Oct-16 9:00 27-Oct-16 18:00 Conti. For SF6 lekage rectification works at Solapur. WRTS-I WRTS-I R
292 400 ICT2_400/220kv_PUNE 26-Oct-16 9:00 26-Oct-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
293 400 400kV BHADRAVATI-PARLI I 26-Oct-16 9:00 27-Oct-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.400kV
WRTS-I C DHARIWAL TPP-PARLI II will be
294 400 400 KV Raipur # 2 Tie Bay 411 at Wardha 26-Oct-16 9:00 26-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
295 400 BUS REACTOR_125MVAR_AT_KOLHAPUR(GIS) 26-Oct-16 10:00 26-Oct-16 18:00 Daily For AMP works at Kolhapur(GIS) WRTS-I WRTS-I R
296 400 400KV Parli-Solapur- #2 Line 26-Oct-16 10:00 26-Oct-16 18:00 Daily For AMP works of line terminating equipments at Parli Reliance WRTS-I R
297 765 Kotra # 1 (704) Main Bay at Tamnar PS 26-Oct-16 10:00 26-Oct-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
298 220 220 KV MALANPUR - GWL( PG) CKT - II 26-Oct-16 9:00 26-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
299 400KV 411-Bay (Tie Bay of Akola-1 Line-2 and RPL Line-2)
26-Oct-16
at Akola -II8:00
Substation
26-Oct-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
300 400KV Main Bay of Tiroda Warora line 1 at Warora Substation
26-Oct-16 8:00 26-Oct-16 18:00 Daily Annual Maintenance of bays equipment APML APML
301 400kV Bus coupler @ 400kV NewKoyna 26-Oct-16 8:00 26-Oct-16 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
302 400Kv 400 kV Main Bay 413 of 400 kV Akola-Nandgaonpeth 26-Oct-16
Line at 400kV
10:00 Akola
26-Oct-16 17:00 Daily Quarterly Bay Maintenance and Testing Work MSETCL MSETCL 400 kV Akola-Nandgaon line will b
303 400kV Dhule- SSNNL Ckt-I 26-Oct-16 9:00 26-Oct-16 17:00 Daily Cut point tightening at various locations MSETCL MSETCL
304 400 kV 400kV DGEN 52 GT BAY(BAY 407) 26/10/2016 8:00 26/10/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPLkV breakerTPL
testing. C
305 400 400 kV Jetpur 2 - GT40 tie breaker at Mundra (42026/Oct/16
52) 9:00 26/Oct/16 20:00 Daily Breaker PM and testing CGPL CGPL
306 765 765kV Bus Reactor at Gwalior 26/Oct/16 10:00 26/Oct/16 18:00 Daily AMP WORKS and RTV Coating PGCIL WR-II R
307 400 Vapi-Boisar 26/Oct/16 7:00 26/Oct/16 20:00 Daily Replacment of 18 nos Hivelum Isolator Arms (407-89B, 408-89A,407-89L)
PGCIL WR-II withRmodified design in Sugen Main Ba
308 400 SOJA Main Bay (Bay No - 413) at Dehgam 26/Oct/16 9:00 26/Oct/16 18:00 Daily Bay AMP works GETCO WR-II R
309 400 Itarsi-Jabalpur#3 26/Oct/16 9:00 26/Oct/16 16:00 Daily ONLINE permit for Retrofitting of ETI-21 PLCC & NSD-61PGCIL
ProtectionWR-II
Coupler with
R ETL-41 PLCC and NSD-50 Prot
310 220 Bus Coupler (205 bay) at Kala 26/Oct/16 10:00 26/Oct/16 14:00 Daily AMP of GIS CB PGCIL WR-II R
311 765 Jabalpur#2 main bay at Bina 26/Oct/16 9:30 26/Oct/16 18:00 Daily AMPWORKS PGCIL WR-II R
312 220 BUS-I at Damoh 26/Oct/16 9:00 26/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
313 400 Bhachau-Ranchodpura ckt-1 with Bhachau-Ranchodpura
26/Oct/16ckt-2 in
8:00
non auto
26/Oct/16
reclose mode
18:00 Daily for attending hot spot & open line spacer dampers PGCIL WR-II R
314 400 Rajgarh-1 Main bay (416) AMP at Khandwa ss 26/Oct/16 9:30 26/Oct/16 17:30 Daily Bay AMP PGCIL WR-II R
315 400 Bay 401 400KV Bhachau-Mundra Ckt 2 Main Bay26/Oct/16
at Bhachau SS 9:00 26/Oct/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
316 400 ICT#2 (Bay 409, 210) at Magarwada 26/Oct/16 8:00 26/Oct/16 18:00 Daily Application of RTV coating on equip. PGCIL WR-II R
317 400 400 KV V-J # 4 Main Bay 407 at Jabalpur SS 26/Oct/16 10:00 26/Oct/16 17:00 Daily For AMP of Bay Equipments PGCIL WR-II R
318 220 220KV BUS-II at Pirana 26/Oct/16 10:00 26/Oct/16 18:00 DAILY AMP WORK PGCIL WR-II R
319 765 Line Reactor 708 LR At Vindhyachal Pooling Station
26/Oct/16 9:00 27/Oct/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCILby M/sWR-II
alstom C
320 220 Kawas Navsari -2 line 26/Oct/16 9:00 26/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
321 400 Main Bus No.2 Kansari 26-Oct-16 8:00 26-Oct-16 18:00 Daily Busbar maintenance work GETCO GETCO
322 400 Chorania-Asoj-2 Line 26-Oct-16 8:00 26-Oct-16 18:00 Daily Maintenance work GETCO GETCO
323 220 Bhabhleshwar –Alephata S/C Line & Bhabhleshwar 27-Oct-16
–Ranjangaon6:00S/C 28-Oct-16
Line 18:00 Conti. Powerline crossing works of 765kV D/C Aurangabad-Padghe MSETCL
betweenWRTS-I
tower location
C Nos 223/0 & 224/0. Both 220
324 400 200kV Suhela#1 Bay (206) at Bhatapara S/s. 27-Oct-16 9:00 27-Oct-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
325 220 220 kv Raipur Doma line 27-Oct-16 9:00 27-Oct-16 18:00 Daily AMP work at Raipur CSPTCL WRTS-I R
326 400 BUS REACTOR_400kV_50MVAR_PUNE 27-Oct-16 9:00 27-Oct-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
327 400 400 KV Raipur # 2 Main Bay 412 at Wardha 27-Oct-16 9:00 27-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
328 400 400kV Main Bus-1 at Bhadrawati 27-Oct-16 9:00 27-Oct-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
329 400 Dhariwal Main Bay-410 at Parli 27-Oct-16 10:00 27-Oct-16 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
330 765 Kotra # 1 & AT#2 (705) Tie Bay at Tamnar PS 27-Oct-16 10:00 27-Oct-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
331 220 220 KV MAHALGAON(GWL) - GWL( PG) CKT - 27-Oct-16 I 9:00 27-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
332 400KV Tie Bay of Tiroda Warora line 1 at Warora Substation
27-Oct-16 8:00 27-Oct-16 18:00 Daily Annual Maintenance of bays equipment APML APML
333 400KV Station Transformer -2 _APML Tiroda 27-Oct-16 9:00 27-Oct-16 18:00 Daily Bay Equipment maintenance . APML APML
334 400KV 412-Bay (Main Bay of Akola-I Line-2) at Akola -II27-Oct-16
Substation 8:00 27-Oct-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
335 400KV (406 CB)Bus CB of Koyna stage IV line 27-Oct-16 9:30 27-Oct-16 17:30 Daily Annual testing and maint work MSETCL MSETCL Koyna st IV line will remain connec
336 400kV Bus coupler bay @ Parli. 27-Oct-16 9:00 27-Oct-16 18:00 Daily Outage required for quarterly maintenance work MSETCL MSETCL
337 400KV Bus- Coupler @ Lonikand I 27-Oct-16 9:00 27-Oct-16 15:00 Daily NA MSETCL MSETCL
338 400 400 kV GT40 breaker at Mundra (421 52) 27/Oct/16 9:00 27/Oct/16 20:00 Daily Breaker PM and testing CGPL CGPL
339 400 Vapi-Sugen 27/Oct/16 7:00 27/Oct/16 20:00 Daily Replacment of 18 nos Hivelum Isolator Arms (410-89B, 411-89A,410-89L)
PGCIL WR-II withRmodified design in Sugen Main Ba
340 400 Itarsi-Jabalpur#4 27/Oct/16 9:00 27/Oct/16 16:00 Daily ONLINE permit for Retrofitting of ETI-21 PLCC & NSD-61PGCIL
ProtectionWR-II
Coupler with
R ETL-41 PLCC and NSD-50 Prot
341 400 Indore#2 Main Bay at Itarsi 27/Oct/16 9:00 27/Oct/16 16:00 Daily Bays AMP works PGCIL WR-II R
342 220 Kala-Kharadpada-1 (204 bay) at Kala 27/Oct/16 10:00 27/Oct/16 16:00 Daily AMP of GIS CB PGCIL WR-II R
343 765 Jabalpur-2 & Gwalior-3 tie bay at Bina 27/Oct/16 9:30 27/Oct/16 18:00 Daily AMPWORKS PGCIL WR-II R
344 220 Mota-Ukai Ckt 1 & 2 27/Oct/16 8:00 27/Oct/16 18:00 Daily Stringing work of 08/0 & 09/0 of 400kV KAPP-Navsari lineGETCO WR-II C
345 220 BUS-II at Damoh 27/Oct/16 9:00 27/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
346 765 Sasan-Satna # 1 27/Oct/16 11:00 20/Jan/15 17:00 Daily for mounting and fixing earth wire on Peak PGCIL WRTS-II
347 400 Bhachau-Ranchodpura ckt-2 with Bhachau-Ranchodpura
27/Oct/16ckt-1 in
8:00
non auto
27/Oct/16
reclose mode
18:00 Daily for attending hot spot & open line spacer dampers PGCIL WR-II R
348 400 Bay 402 400KV Bhachau-Mundra Ckt 2 Tie Bay at 27/Oct/16
Bhachau SS09:00 27/Oct/16 17:00 Daily AMP of Bay Equipments PGCIL WR-II R
349 400 400kV Bus#1 at Magarwada 27/Oct/16 10:00 27/Oct/16 16:00 Daily AMP of Bus#1 & VT, Reduction of induction in Bus CouplerPGCIL WR-II R
350 400 Bus Coupler (Bay 404) at Magarwada 27/Oct/16 10:00 27/Oct/16 16:00 Daily AMP of Bus Coupler PGCIL WR-II R
351 400 400KV 50MVAR Bus Reactor Main Bay (407bay) 27/Oct/16
at Satna SS 9:00 27/Oct/16 18:00 Daily For AMP work PGCIL WR-II R
352 400 400 KV J-I # 1 Main Bay 416 at Jabalpur SS 27/Oct/16 10:00 27/Oct/16 17:00 Daily For AMP of Bay Equipments PGCIL WR-II R
353 220 Tarapur-Boisar S/C Line 27/Oct/16 7:00 28/Oct/16 18:00 Continous Power Line Crossing for Stringing work of Navasari BoisarPGCIL
line (For WR-II
346-347 )- M/C
R portions.
354 765 765kV JBP PS - Dharmjaygarh # 1 Line along with 27/Oct/16
reactor at Jabalpur
10:00 Pooling
29/Oct/16
Station17:00 Daily RTV Coating on 765kV Bushing. RTV Coating on 765kV PGCIL Bushing toWRTS-II
minimize the
C chances of flash over.
355 220 Navsari-Navsari-1 line 27/Oct/16 9:00 27/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
356 400 Bus Reactor TIE Bay 27-Oct-16 8:00 27-Oct-16 0:00 Daily Maintenance work GETCO GETCO
357 400 Chorania-Mundra Line 27-Oct-16 8:00 27-Oct-16 18:00 Daily Bay equipment maintenance work PGCIL GETCO
358 220 D/C Jalna – Waluj Transmission Line 28-Oct-16 8:00 29-Oct-16 18:00 Conti. Stringing of 765KV D/C Aurangabad – Padge Transmission MSETCL
Line WRTS-I C
359 400 AKOLA(MSETCL)-2 (Main Bay-418) at Aurangabad 28-Oct-16 9:00 28-Oct-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
360 400 200kV Suhela#2 Bay (207) at Bhatapara S/s. 28-Oct-16 9:00 28-Oct-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
361 400 400KV RAIPUR-WARDHA I 28-Oct-16 9:00 28-Oct-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
362 400 412_MAIN BAY_KARAD LINE at SOLAPUR 28-Oct-16 9:00 29-Oct-16 18:00 Conti. For SF6 lekage rectification works at Solapur. WRTS-I WRTS-I R
363 400 SWITCHABLE LR_400kV_PUNE(GIS) 1_PUNE 28-Oct-16 9:00 28-Oct-16 18:00 Daily For AMP works switchable Reactor at Pune (Talegoan). LineWRTS-I
will remain
WRTS-I
in service.
R
364 400 400kV DHARIWAL TPP-PARLI II 28-Oct-16 9:00 29-Oct-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.400kV
WRTS-I C DHARIWAL TPP-PARLI II will be
365 400 400 KV Raipur # 1 Tie Bay 414 at Wardha 28-Oct-16 9:00 28-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
366 400 Pune-1 Main Bay-403 at Parli 28-Oct-16 10:00 28-Oct-16 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
367 765 Kotra # 1 & AT#2 (705) Tie Bay at Tamnar PS 28-Oct-16 10:00 28-Oct-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
368 400 400 KV TRANSFER BUS COUPLER AT 400 KV S/S 28-Oct-16
JULWANIA 9:00 28-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
369 220 220 KV MAHALGAON(GWL) - GWL( PG) CKT - 28-Oct-16II 9:00 28-Oct-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
370 400kV TBC at 400kV Dhule Substation 28-Oct-16 10:00 28-Oct-16 15:00 Daily Routine maintenace MSETCL MSETCL
371 400kV Deepnagar-Aurangabd Ckt 28-Oct-16 9:00 28-Oct-16 17:00 Daily Quarterly Maintenance work /Diagnostic Testing work MSETCL MSETCL
372 400 Itarsi-Jabalpur#2 28/Oct/16 9:00 28/Oct/16 16:00 Daily ONLINE permit for Retrofitting of ETI-21 PLCC & NSD-61PGCIL
ProtectionWR-II
Coupler with
R ETL-41 PLCC and NSD-50 Prot
373 400 Indore#2 Tie Bay at Itarsi 28/Oct/16 9:00 28/Oct/16 16:00 Daily Bays AMP works PGCIL WR-II R
374 220 Kala-Kharadpada-2 (207 bay) at Kala 28/Oct/16 10:00 28/Oct/16 16:00 Daily AMP of GIS CB PGCIL WR-II R
375 765 Bus reactor-1 main bay at Bina 28/Oct/16 9:30 28/Oct/16 18:00 Daily AMPWORKS PGCIL WR-II R
376 400 414 -Bhopal 2 Tie & 415-Furture ICT bay at Damoh28/Oct/16 9:00 28/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
377 400 Mundra-Jetpur ckt-1 with Mundra-Jetpur-2 in non 28/Oct/16
auto reclose mode 8:00 28/Oct/16 18:00 Daily for attending hot spot & open line spacer dampers PGCIL WR-II R
378 400 Bay 404 400KV Bhachau-Mundra Ckt 1 Main Bay28/Oct/16
at Bhachau SS 09:00 28/Oct/16 18:00 Daily AMP of Bay Equipments PGCIL WRTS-II R
379 400 400KV Satna Bina Line#2 Main Bay (410bay) at Satna
28/Oct/16
SS 9:00 28/Oct/16 18:00 Daily For AMP work PGCIL WR-II R
380 400 Magarwada- Kala ckt-1 28/Oct/16 9:00 28/Oct/16 18:00 Daily Jumper checking work & Tiegtening work PGCIL WR-II R
381 765 SATNA-II Line Tie bay 708 At Vindhyachal Pooling
28/Oct/16
Station 9:00 29/Oct/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCILby M/sWR-II
alstom C
382 220 Navsari-Navsari-2 line 28/Oct/16 9:00 28/Oct/16 18:00 Daily RTV silicon coating on switchyard insulators PGCIL WR-II R
383 400 BUS-A & Buscopler bay Vadavi 28-Oct-16 8:00 28-Oct-16 18:00 Daily Bay equipment maintenance work GETCO GETCO All elements will be on Bus - B.
384 400 Bus-2 Amreli 28-Oct-16 8:00 28-Oct-16 17:00 Daily Maintenance work GETCO GETCO All elements will be on Bus - 1
385 400 Zanor line Main Bay at Kosamba ( Kosamba - Jhanor
28-Oct-16
line will remain
8:00 out)
28-Oct-16 0:00 Daily Maintenance and testing work GETCO GETCO 400 KV Kosamba - Jhanor line will
386 400 ICT2_1500MVA (Main Bay-425) at Aurangabad 29-Oct-16 9:00 29-Oct-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
387 400 200kV Suhela#3 Bay (202) at Bhatapara S/s. 29-Oct-16 9:00 29-Oct-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
388 400 400 KV Raipur # 1 Main Bay 415 at Wardha 29-Oct-16 9:00 29-Oct-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
389 400KV Kalwa -Talegaon Line @Kalwa 29-Oct-16 9:00 29-Oct-16 17:00 Daily Load will be shared by other 4000kV Lines MSETCL MSETCL
390 400 BUS-2 at Damoh 29/Oct/16 9:00 29/Oct/16 18:00 Daily For connection of jumper between existing & new systemPGCIL WR-II C
391 400 Mundra-Jetpur ckt-2 with Mundra-Jetpur-1 in non 29/Oct/16
auto reclose mode 8:00 29/Oct/16 18:00 Daily for attending hot spot & open line spacer dampers PGCIL WR-II R
392 400 400KV Satna Bina Line#1 Tie Bay (414bay) at Satna
29/Oct/16
SS 9:00 29/Oct/16 18:00 Daily For AMP work PGCIL WR-II R
393 220 Tarapur-Boisar (MESTCL Khairapada) Line 29/Oct/16 7:00 30/Oct/16 18:00 ContinuousPower Line Crossing of D/C line for stringing work of Navasari-Boisar
MESTCL MESTCL Line (AP C350-351/0)- M/C portions
394 220 Tarapur Borivali (MESTCL) 29/Oct/16 7:00 30/Oct/16 18:00 ContinuousPower Line Crossing of D/C line for stringing work of Navasari-Boisar
MESTCL MESTCL Line (AP C350-351/0)- M/C portions
395 400 Magarwada- Kala ckt-2 29/Oct/16 9:00 29/Oct/16 18:00 Daily Jumper checking work & Tiegtening work PGCIL WR-II R
396 400 Bus-1 Amreli 29-Oct-16 8:00 29-Oct-16 17:00 Daily Maintenance work GETCO GETCO All elements will be on Bus - 2
397 400 ICT2_1500MVA (Tie Bay-426) at Aurangabad 31-Oct-16 9:00 31-Oct-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
398 400 200kV Transfer bus coupler Bay (201) at Bhatapara
31-Oct-16
S/s. 9:00 31-Oct-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
399 765 765 KV TIE BAY_ICT1 AT KOTRA PS 31-Oct-16 9:00 1-Nov-16 18:00 Daily For AMP works at Kotra PS WRTS-I WRTS-I R
400 400 400 KV NAGDA- ISP CkT 31-Oct-16 9:00 31-Oct-16 18:00 daily FOR TIGHTENING OF JUMPER CONE & ARCHING HORN MPPTCL
& OTHERMPPTCL
MAINTENANCE
R WORK
401 400 kV 400kV Dhule - SSNNL line Ckt-I & II 31-Oct-16 9:00 01-Nov-16 17:00 daily PID testing MSETCL MSETCL
402 765 Vchal - SATNA-II Line 31/Oct/16 9:00 31/Oct/16 17:00 Daily Fine tuning of CSD relay by M/s alstom at vindhyachal psPGCIL
through Main
WR-IIand TieCat Vchal PS
403 765 765kV Bus Reactor # 1 at Jabalpur Pooling Station
31/Oct/16 10:00 02/Nov/16 17:00 Daily RTV Coating on 765kV Bushing. RTV Coating on 765kVPGCIL Bushing toWRTS-II
minimize the
C chances of flash over.
404 500KV Chandrapur -Padge HVDC Transmission Line 1-Nov-16 8:00 2-Nov-16 18:00 Conti. Stringing of 765KV D/C Aurangabad – Padge Transmission MSETCL
Line WRTS-I C
405 765 SWITCHABLE LR_JHARSUGUDA1_D'JAIGARH1-Nov-16 9:00 1-Nov-16 18:00 Daily For AMP WORKS at D'jaigarh WRTS-I WRTS-I R
406 400 BOISAR 2 (Main Bay-427) at Aurangabad 1-Nov-16 9:00 1-Nov-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
407 400 400kV Korba Tie bay (402) at Bhatapara S/s. 1-Nov-16 9:00 1-Nov-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
408 400 423_TIE BAY_765KV ICT#1 at SOLAPUR 1-Nov-16 9:00 1-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
409 400 SWITCHABLE LR_400kV_PUNE(GIS) 2_PUNE 1-Nov-16 9:00 1-Nov-16 18:00 Daily For AMP works switchable Reactor at Pune (Talegoan). LineWRTS-I
will remain
WRTS-I
in service.
R
410 400 400 KV Wardha Koradi # 2 Main Bay 413 at Wardha 1-Nov-16 9:00 1-Nov-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
411 400 Parli-1 (MSETCL) Tie Bay (414) at Parli 1-Nov-16 10:00 1-Nov-16 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
412 400 400 KV BUS TIE AT 400 KV S/S JULWANIA 01-Nov-16 9:00 01-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
413 220 Transfer Bus Bay at Itarsi 01/Nov/16 9:00 01/Nov/16 16:00 Daily Bays AMP works PGCIL WR-II R
414 400 Bay 405 400KV Bhachau-Mundra Ckt 1 & ICT 2 Tie 01/Nov/16
Bay at Bhachau
9:00 SS 01/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
415 765 1500 MVA ICT#1 at Vindhyachal PS 01/Nov/16 9:00 01/Nov/16 17:00 Daily RTCC COMMISIONING works PGCIL WR-II C
416 132 S/C Canpack -Gangapur 2-Nov-16 8:00 3-Nov-16 18:00 Conti. Stringing of 400KV D/C Aurangabad - Boisar Transmission MSETCL
Line (Aurangabad
WRTS-I -Gangapur)
C
417 400 400kV BHADRAVATI-PARLI I 2-Nov-16 9:00 3-Nov-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.BVT-Parli-1
WRTS-I C will be out of service during
418 400 ICT1_1500MVA (Main Bay-428) at Aurangabad 2-Nov-16 9:00 2-Nov-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
419 400 400kV ICT-I Main Bay (401) at Bhatapara S/s. 2-Nov-16 9:00 2-Nov-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
420 765 765KV JABALPUR 02 TIE BAY(705) AT DHARAMJAYGARH 2-Nov-16 (KORBA)
9:00 SS 3-Nov-16 18:00 Daily For AMP WORKS at D'jaigarh WRTS-I WRTS-I R
421 400 423_MAIN BAY_400KV NTPC#2 at SOLAPUR 2-Nov-16 9:00 2-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
422 400 SWITCHABLE LR_400kV_PUNE(GIS) 3_PUNE 2-Nov-16 9:00 2-Nov-16 18:00 Daily For AMP works switchable Reactor at Pune (Talegoan). LineWRTS-Iwill remain
WRTS-I
in service.
R
423 400 KV Wardha-Akola Tie Bay 417 at Wardha 2-Nov-16 9:00 2-Nov-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
424 HVDC HVDC CWD DIA 10 Q51 Bay at Bhadrawati 2-Nov-16 9:00 2-Nov-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
425 400 Wardha -1 Main Bay (401) at Parli 2-Nov-16 10:00 2-Nov-16 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
426 400 400KV S/S BHOPL- 315 MVA (BHEL)400/220 KV02-Nov-16
X-MER-III 9:00 04-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
427 400kV 80 MVAR Reactor -2 @ Babhaleshwar 2-Nov-16 9:00 2-Nov-16 17:00 Daily Bay Maintenance work. Relay / CB / CT Testing MSETCL MSETCL 400kV 80MVAR Reactor I will be in
428 400/220kV
501MVA ICT 2 @ Lamboti (Solapur) 2-Nov-16 10:00 2-Nov-16 18:00 Daily Quarterly Maintenance Work MSETCL MSETCL Load may be managed on ICT-I
429 765 705 Bay (Tie Bay of 765kV ICT-1 & Jaipur#1 Line)02/Nov/16
at Gwalior 10:00 03/Nov/16 18:00 Daily AMP work PGCIL WR-II R
430 220 Itarsi Bay at Itarsi 02/Nov/16 9:00 02/Nov/16 16:00 Daily Bays AMP works PGCIL WR-II R
431 400 Sugen-Vapi S/C 02/Nov/16 07:00 02/Nov/16 20:00 Daily S/D for Stringing work of 400kV D/C Kakrapar-Navsari b/w PGCIL
21/0 & 22/0WR-II C
432 400 Bay 406 400KV ICT-2 Main Bay at Bhachau SS 02/Nov/16 9:00 02/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
433 400 400KV JP Nigri-Satna Line#1 Main Bay (402bay) 02/Nov/16
at Satna SS 9:00 02/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
434 400 315 MVA ICT-I 02/Nov/16 9:00 02/Nov/16 18:00 Daily AMP PGCIL WR-II R
435 765 1500 MVA ICT#2 at Vindhyachal PS 02/Nov/16 9:00 03/Nov/16 17:00 Daily PRD REPLACEMENT&RTCC checking works PGCIL WR-II C
436 400 BUS-1 & ICT-3 at Navsai s/s 02/Nov/16 9:00 03/Nov/16 18:00 ContinuousBUS extension work of new kapp bays PGCIL WR-II C
437 400 Kudgi-1 Main Bay at Kolhapur(GIS) 3-Nov-16 8:00 3-Nov-16 18:00 Daily Bay outage required for AMP Work at Kolhapur (GIS). WRTS-I WRTS-I R
438 765 WARDHA2_TIE_BAY_723 at Seoni 3-Nov-16 8:00 4-Nov-16 18:00 Conti. For AMP works at Seoni WRTS-I WRTS-I R
439 400 ICT1_1500MVA (Tie Bay-429) at Aurangabad 3-Nov-16 9:00 3-Nov-16 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
440 400 400KV RAIPUR-KSK IV 3-Nov-16 9:00 3-Nov-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
441 400 429_TIE BAY_765KV ICT#2 at SOLAPUR 3-Nov-16 9:00 3-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
442 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 3-Nov-16 9:00 3-Nov-16 18:00 Daily For AMP works switchable Reactor at Pune (Talegoan). LineWRTS-Iwill remain
WRTS-I
in service.
R
443 400 400 KV ICT # 2 Main Bay 424 at Wardha 3-Nov-16 9:00 3-Nov-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
444 400 Pune-1 Tie Bay (402) at Parli 3-Nov-16 10:00 3-Nov-16 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
445 765 AT#2 (706) Main Bay at Tamnar PS 3-Nov-16 10:00 3-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
446 400 400 KV NAGDA - RAJGARH CkT-I 03-Nov-16 9:00 03-Nov-16 18:00 daily FOR RECTIFICATION OF DEFECTS OBSERVED DURING MPPTCL
ROUTINE MPPTCL
PATROLLING
R ATTEND THE DAMPER AR
447 220 220 KV ANOOPUR - KOTMIKALA CKT - I 03-Nov-16 10:00 03-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
448 400KV 400kV BUS 1 at APML Tiroda 03-Nov-16 7:00 03-Nov-16 23:00 Daily Bus Equipment maintenance . APML APML
449 400KV Jejuri - Lonikand line 3-Nov-16 9:30 3-Nov-16 17:30 Daily Replacement of CVT, annual testing and maint work MSETCL MSETCL Jejuri-Koyna st IV will take partial lo
450 400kV Parli-Nanded(Kumbhargaon) 3-Nov-16 9:00 3-Nov-16 18:00 Daily Outage required for quarterly maintenance work MSETCL MSETCL
451 400kV Bus Coupler @ Talandge 3-Nov-16 9:00 3-Nov-16 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
452 400KV Koyna Stg -IV -Jejuri 3-Nov-16 8:00 17-Nov-16 18:00 Daily For replacement of disc insulators at various location under LE Scheme
MSETCL MSETCL
453 400 Dehgam - Sami # 1 03/Nov/16 9:00 03/Nov/16 18:00 Daily AMP Works Adani WR-II R
454 220 Hoshangabad Bay at Itarsi 03/Nov/16 9:00 03/Nov/16 16:00 Daily AMP works PGCIL WR-II R
455 765 Seoni Line reactor at Bina 03/Nov/16 9:30 03/Nov/16 11:30 Daily For taking of spare reactor out of service bus-1 side. PGCIL WR-II C
456 400 Bay 407 400KV Bhachau-R'Pura-1 Main Bay at Bhachau
03/Nov/16
SS 9:00 03/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
457 400 400KV side Main Bay of 765KV ICT#1 (403bay) at 03/Nov/16
Satna SS 9:00 03/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
458 400 315 MVA ICT-II 03/Nov/16 9:00 03/Nov/16 18:00 Daily AMP PGCIL WR-II R
459 765 Bay 707, main bay for 765 KV, BR#I at Indore PS 03/Nov/16 10:00 04/Nov/16 18:00 Daily For Bay AMP PGCIL WR-II R
460 765 765kV Bus Reactor # 2 at Jabalpur Pooling Station
03/Nov/16 10:00 04/Nov/16 17:00 Daily RTV Coating on 765kV Bushing. RTV Coating on 765kVPGCIL Bushing toWRTS-II
minimize the
C chances of flash over.
461 220KV Kawas-HAL#2 3-Nov-16 8AM 3-Nov-16 16PM Cont. For relay testing. NTPC NTPC
462 400 Zanor line TIE Bay 03-Nov-16 8:00 03-Nov-16 0:00 Daily Maintenance and testing work GETCO GETCO 400 KV Kosamba - Jhanor line will
463 400 Kudgi-2 Main Bay at Kolhapur(GIS) 4-Nov-16 8:00 4-Nov-16 18:00 Daily Bay outage required for AMP Work at Kolhapur (GIS). WRTS-I WRTS-I R
464 400 400kV DHARIWAL TPP-PARLI II 4-Nov-16 9:00 5-Nov-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.400kV
WRTS-I C DHARIWAL TPP-PARLI II will be
465 765 765 KV ICT-1 Main Bay at Champa 4-Nov-16 9:00 5-Nov-16 18:00 Daily For AMP work at Champa WRTS-I WRTS-I R
466 765 765KV JABALPUR 02 MAIN BAY(706) AT DHARAMJAYGARH4-Nov-16 (KORBA)
9:00 5-Nov-16
SS 18:00 Daily For AMP WORKS at D'jaigarh WRTS-I WRTS-I R
467 765 SWITCHABLE LR_765kV_DURG 1_KOTRA PS 4-Nov-16 9:00 4-Nov-16 18:00 Daily For NGR BY PASS BREAKER TERMINATION works at Kotra WRTS-I PS WRTS-I C
468 400 400 kv Raipur- NSPCL Ckt # 2 4-Nov-16 9:00 4-Nov-16 18:00 Daily AMP work at Raipur NSPCL WRTS-I R
469 400 428_MAIN BAY_765KV ICT#2 at SOLAPUR 4-Nov-16 9:00 4-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
470 400 Bus Reactor Main Bay(415) at Pune (Talegoan) 4-Nov-16 9:00 4-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
471 400 400 KV Wardha-Mauda # 2 Tie Bay at Wardha 4-Nov-16 9:00 4-Nov-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
472 765 AT#2 (706) Main Bay at Tamnar PS 4-Nov-16 10:00 4-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
473 400 400 KV NAGDA - RAJGARH CkT-II 04-Nov-16 9:00 04-Nov-16 18:00 daily FOR RECTIFICATION OF DEFECTS OBSERVED DURING MPPTCL
ROUTINEMPPTCLPATROLLING
R ATTEND THE DAMPER AR
474 400KV Babhaleshwar-Aurangabad @Babhaleshwar 4-Nov-16 9:00 4-Nov-16 17:00 Daily Bay Maintenance work. Relay / CB / CT Testing MSETCL MSETCL 400kV Bhusawal, Dhule I, Dhule II,
475 400/220/33kV
315MVA ICT - 2 @ Waluj 4-Nov-16 10:00 4-Nov-16 17:00 Daily Quarterly maintenance MSETCL MSETCL
476 400Kv Tie Bay 406 of 400 kV Akola-Aurangabad Line at4-Nov-16
400kV Akola 10:00 4-Nov-16 17:00 Daily Quarterly Bay Maintenance and Testing Work 400 kV Akola-A'bad Ckt 02 will be i
477 400 400 kV Jetpur 1 tie breaker at Mundra (423 52) 4/Nov/16 9:00 4/Nov/16 20:00 Daily Line Isolator Modification, breaker PM and testing PGCIL CGPL
478 765 716 Bay (Main bay of Satna#2 Line) at Gwalior 04/Nov/16 10:00 05/Nov/16 18:00 Daily AMP WORKs PGCIL WR-II R
479 400 Dehgam - Sami # 2 04/Nov/16 9:00 04/Nov/16 18:00 Daily AMP Works Adani WR-II R
480 220 Bus#1 at Itarsi 04/Nov/16 9:00 04/Nov/16 16:00 Daily AMP works PGCIL WR-II R
481 765 Jabalpur-Bina#1 Line With Reactor 04/Nov/16 9:30 04/Nov/16 18:00 Daily For taking of spare reactor into service bus-1 side. PGCIL WR-II C
482 220 Mota-Ambheta Ckt 1 & 2 04/Nov/16 8:00 04/Nov/16 18:00 Daily S/D for Stringing work of 400kV D/C Kakrapar-Navsari b/w GETCO
23/1 & 24/0
WR-II C
483 400 Bay 408 400KV R'Pura-1 & ICT 1Tie Bay at Bhachau 04/Nov/16
SS 9:00 04/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
484 400 400KV JP Nigri-Satna Line#2 Main Bay (404bay) 04/Nov/16
at Satna SS 9:00 04/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
485 400 ICT# 2 MAIN BAY (412) AT RAJGARH SUBSTATION 04/Nov/16 10:00 04/Nov/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
486 400 500 MVA ICT-III 04/Nov/16 9:00 04/Nov/16 18:00 Daily AMP PGCIL WR-II R
487 765 Vchal - SATNA 1 LR at Vindhyachal 04/Nov/16 9:00 04/Nov/16 17:00 Daily BUSHING OIL SAMPLING & CHANGING OF FAULTY PT-100 PGCILCENSOR WR-II R
488 400 400KV Vandana-Birsinghpur Line Reactor at Birsinghpur
04/Nov/16 9:00 11/Nov/16 18:00 ContinuousCarry out the Filtration work to resolve the DGA ViolationPGCIL from 50MVArWRTS-II
Line Reactor
R of 400KV Vandana-Birsinghp
489 400 BUS-2 & ICT-3 at Navsai s/s 04/Nov/16 9:00 05/Oct/16 18:00 ContinuousBUS extension work of new kapp bays PGCIL WR-II C
490 400 400 KV Khedamara -II (Bay No 417) at 400 KV S/s 4-Nov-16
Raita. 8:00 4-Nov-16 17:00 Daily Basis Scheduled Maint.Reactor, Breaker, CT, Isolator, L.A etc.CSPTCL CSPTCL
491 220kV Kawas-Dastan#2 4-Nov-16 8AM 4-Nov-16 18PM Cont. For bay maintenance & testing. NTPC NTPC
492 400 Korba Bhatapara LINE 4-Nov-16 08:30 hrs4-Nov-16 17:30 Hrs.
ContinuousHot spot attending & Main-1 testing NTPC NTPC
493 400 Bus-A bay Kosamba 04-Nov-16 8:00 04-Nov-16 0:00 Daily Maintenance and testing work GETCO GETCO
494 132 D/C Chittegaon – Paithan Transmission Line 5-Nov-16 8:00 6-Nov-16 18:00 Conti. Stringing of 765KV D/C Aurangabad – Padge Transmission MSETCL
Line WRTS-I C
495 765 765 KV MAIN BAY_DURG_II AT KOTRA PS 5-Nov-16 9:00 5-Nov-16 18:00 Daily For AMP works at Kotra PS. 2 days outage (5/11 & 7/11)WRTS-Irequired onWRTS-I
daily basis.
R
496 220 202_MAIN BAY_400KV ICT#2_at SOLAPUR 5-Nov-16 9:00 5-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
497 400 ICT3 Main Bay(418) at Pune (Talegoan) 5-Nov-16 9:00 5-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
498 400 400 KV Wardha-Mauda # 1 Tie Bay at Wardha 5-Nov-16 9:00 5-Nov-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
499 HVDC HVDC CWD DIA 10 Q50 Bay at Bhadrawati 5-Nov-16 9:00 5-Nov-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
500 765 Bus Reactor (707) Main Bay at Tamnar PS 5-Nov-16 10:00 5-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
501 400/220kV315 MVA ICT-II @ Babhaleshwar 5-Nov-16 9:00 5-Nov-16 17:00 Daily Bay Maintenance work. Relay / CB / CT Testing MSETCL MSETCL 315 MVA ICT-I and 500 MVA ICT-I
502 400 400 kV Jetpur-1 breaker at Mundra (422 52) 5/Nov/16 9:00 5/Nov/16 20:00 Daily Line Isolator Modification, breaker PM and testing PGCIL CGPL
503 220 Bus#2 at Itarsi 05/Nov/16 9:00 05/Nov/16 16:00 Daily AMP works PGCIL WR-II R
504 765 Indore line Switchable Reactor only at Bina 05/Nov/16 9:30 05/Nov/16 11:30 Daily For taking of spare reactor out of service bus-2 side. PGCIL WR-II R
505 765 Bus reactor#1 at Bina 05/Nov/16 9:30 05/Nov/16 18:00 Daily RTV Coating on HV bushing in R phase PGCIL WR-II R
506 400 Rajgarh-1 & B/R-1 tie bay (417) AMP at Khandwa05/Nov/16
ss 9:30 05/Nov/16 17:30 Daily Bay AMP PGCIL WR-II R
507 400 400KVICT#2 Main Bay (406Bay) at Satna SS 05/Nov/16 9:00 05/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
508 400 RAJGARH-KASOR # 1 MAIN BAY (413) AT RAJGARH 05/Nov/16
SUBSTATION
10:00 05/Nov/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
509 765 ICT-I Tie bay 702 at Vindhyachal Pooling Station05/Nov/16 9:00 05/Nov/16 15:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCILby M/sWR-II
alstom C
510 765 765kV JBP PS - Dharmjaygarh # 3 Line along with 05/Nov/16
reactor at Jabalpur
10:00 Pooling
07/Nov/16
Station17:00 Daily RTV Coating on 765kV Bushing. RTV Coating on 765kVPGCIL Bushing toWRTS-II
minimize theC chances of flash over.
511 765 SWITCHABLE LR_765kV_SEONI 1_BILASPUR 6-Nov-16 8:00 6-Nov-16 18:00 Daily For change over of spare with phase unit to ensure healthiness
WRTS-Iat Bilaspur.
WRTS-I Line C will remain in service.
512 400 400kV BHADRAVATI-PARLI I 6-Nov-16 9:00 7-Nov-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.BVT-Parli-1
WRTS-I C will be out of service during
513 400 KV 400 KV KALWA -Padgha I @at Both S/stns. 06-Nov-16 9:00 06-Nov-16 17:00 ONE DAY ROUTINE MAINTENANCE AND TESTING WORK( As per plan 2016 -17)
514 400 J P NIGRI-SATNA-2 06-Nov-16 9AM 06-Nov-16 5PM Daily Fixing and Tightening of Jumper Nut & Bolts,Arcing Horns JP&NIGRIEJP
ConductorNIGRIE
Repairing
515 400 BUS REACTOR_400kV_125MVAR_SEONI 7-Nov-16 8:00 7-Nov-16 18:00 Daily For AMP works of Reactor bay (422R) at Seoni WRTS-I WRTS-I R
516 400 400kV Raipur Main Bay (404) at Bhatapara S/s. 7-Nov-16 9:00 7-Nov-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
517 765 765KV JABALPUR 01 TIE BAY(708) AT DHARAMJAYGARH 7-Nov-16 (KORBA)
9:00 SS 8-Nov-16 18:00 Daily For AMP WORKS at D'jaigarh WRTS-I WRTS-I R
518 765 765 KV MAIN BAY_DURG_II AT KOTRA PS 7-Nov-16 9:00 7-Nov-16 18:00 Daily For AMP works at Kotra PS. 2 days outage (5/11 & 7/11)WRTS-Irequired onWRTS-I
daily basis.
R
519 400 400KV RAIPUR-WARDHA II 7-Nov-16 9:00 7-Nov-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
520 220 203_MAIN BAY_400KV ICT#2_ at SOLAPUR 7-Nov-16 9:00 7-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
521 400 PUNE(GIS)-III 409 Main Bay at Pune (Talegoan) 7-Nov-16 9:00 7-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
522 400 400kV BHILAI-KORADI 7-Nov-16 9:00 8-Nov-16 18:00 Conti. Line CT Replacement works under R&M at Koradi MSETCL. WRTS-I /MSETCL
WRTS-I /MSETCL C
523 765/400 ICT1_765/400kv_AURANGABAD 7-Nov-16 10:00 9-Nov-16 14:00 Daily For RTV coating on HV Bushings at Aurangabad .RTV coating WRTS-I of bushing
WRTS-I takenRup under system improvement to
524 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 7-Nov-16 10:00 8-Nov-16 10:00 Conti. For shifting/ erection of under construction 765kv Durg-Wardha
WRTS-I# 3 WRTS-I
line ReactorCto its foundation at Durg PS.
525 765 Bus Reactor (707) Main Bay at Tamnar PS 7-Nov-16 10:00 7-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
526 220 220 KV ANOOPUR - KOTMIKALA CKT - I I 07-Nov-16 10:00 07-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
527 765 KV 701-Bay (Main Bay of ICT) at Akola -II Substation7-Nov-16 8:00 7-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
528 400KV Main Bay (404) of ICT-2 at Koradi III Sub Station.7-Nov-16 8:00 7-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
529 400kV 315MVA ICT-2 @ 400kV NewKoyna 07-Nov-16 8:00 07-Nov-16 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
530 400 kV Akola- Nandgaonpeth Line 07-Nov-16 12:00 12-Nov-16 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R
MSETCL
shall be kept
MSETCL in non 400
autokVmode.
Koradi- Bhusawal, 400 kV A
531 400 kV 400kV Dhule - SSNNL line Ckt-I & II 07-Nov-16 9:00 08-Nov-16 17:00 daily PID testing MSETCL MSETCL
532 400/220kV105MVA Spare ICT - I @ Parli 7-Nov-16 9:00 7-Nov-16 18:00 Daily Outage required for quarterly maintenance work MSETCL MSETCL
533 400/220kV
501MVA ICT 3 @ Talandge(Kolhapur) 7-Nov-16 9:00 7-Nov-16 18:00 Daily Qurterly Maint.Work MSETCL MSETCL Load manage on 315 MVA ICT -1 &
534 400/220KV
315MVA , ICT-II at Karad 7-Nov-16 9:00 7-Nov-16 19:00 Daily Annual Maint. work MSETCL MSETCL
535 400 kV 400kV DGEN 53 GT BAY(BAY 410) 07/11/2016 8:00 07/11/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPLkV breakerTPL
testing. C
536 400 CGPL -Limdi Line-1 along with Limbdi-1 breaker (416
7/Nov/16
52) and tie9:00
breaker7/Nov/16
of Limbdi-1 20:00
and Bus Daily
Reactor (417
Line
52)Isolator Modification, breaker PM and testing PGCIL CGPL
537 765 765 KV Satna Line -2 Reactor 7-Nov-16 9:00 8-Nov-16 18:00 Daily For CB MB lifting, Isolator alignment, and Equipment testing
SASAN RELIANCE
538 765 715 Bay ( Main Bay of Bina#2 Line) 07/Nov/16 10:00 08/Nov/16 18:00 Daily AMP WORKS PGCIL WR-II R
539 220 BUS-1 at Vapi 07/Nov/16 9:00 07/Nov/16 18:00 Daily AMP of BUS-1 PGCIL WR-II R
540 220 Kawas-Navsari#1 07/Nov/16 9:00 07/Nov/16 15:00 Daily Jumper tightening work on Multi Ckt Towers, simultaneous PGCIL
S/D required
WR-II C
541 220 Navsari-Navsar#2 07/Nov/16 9:00 07/Nov/16 15:00 Daily Jumper tightening work on Multi Ckt Towers, simultaneous PGCIL
S/D required
WR-II C
542 220 Transfer Bus at Itarsi 07/Nov/16 9:00 07/Nov/16 16:00 Daily AMP works PGCIL WR-II R
543 765 Bus reactor#1 at Bina 07/Nov/16 9:30 07/Nov/16 18:00 Daily RTV Coating on HV bushing in Y phase PGCIL WR-II R
544 765 Bus reactor-1 & Gwalior-1 tie bay at Bina 07/Nov/16 9:30 07/Nov/16 18:00 Daily AMPWORKS PGCIL WR-II R
545 220 Nepanagar line Terminal Equipment AMP work at07/Nov/16
Khandwa ss 9:30 07/Nov/16 13:30 Daily Line Terminal Equipment AMP work MPPTCL WR-II R
546 400 Bay 409 400KV ICT-1 Main Bay at Bhachau SS 07/Nov/16 9:00 07/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
547 765 765KV ICT#2 Tie Bay (705 Bay) at Satna SS 07/Nov/16 9:00 07/Nov/16 18:00 Daily For AMP work & Inspection of Isolators PGCIL WR-II R
548 400 400 KV J-I # 1 Tie Bay 417 at Jabalpur SS 07/Nov/16 10:00 07/Nov/16 17:00 Daily For AMP of Bay Equipments PGCIL WR-II R
549 400 80 Mvar Bus Reactor-I 07/Nov/16 9:00 07/Nov/16 18:00 Daily AMP PGCIL WR-II R
550 400 ICT-I main bay 403 at Vindhyachal Pooling Station07/Nov/16 9:00 07/Nov/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCILby M/sWR-II
alstom C
551 765 Bay 714, tie bay for 765 KV, vodara line at Indore07/Nov/16
PS 10:00 08/Nov/16 18:00 Daily For Bay AMP PGCIL WR-II R
552 765 765kV Jabalpur-Bina III 7/Nov/16 9:00 7/Nov/16 19:00 Daily For repairing of Damaged Conductor and fixing of loose spacers
JTCL STERLITE R
553 400 400KV ICT#1 AT GANDHAR 7-Nov-16 8:00 12-Nov-16 18:00 Cont. Annual bay maintenance and protection checking NTPC NTPC
554 400 KORBA Bus-1 7-Nov-16 08:30 hrs9-Nov-16 17:30 Hrs.
Continuous400KV CVT Replacement NTPC NTPC
555 400 KORBA Tie Transformer-1 7-Nov-16 08:30 hrs9-Nov-16 17:30 Hrs.
ContinuousTrf PM & its Mulsifire line Painting NTPC NTPC
556 765 Sipat-2 Tie bay (711) at Bilaspur SS 8-Nov-16 8:00 8-Nov-16 18:00 Daily For AMP Works (CB Timings/DCRM,CRM , CT Cap & tanWRTS-I delta meas.)
WRTS-I R
557 400 400kV DHARIWAL TPP-PARLI II 8-Nov-16 9:00 9-Nov-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.400kV
WRTS-I C DHARIWAL TPP-PARLI II will be
558 765 765 KV BUS-1 at Champa 8-Nov-16 9:00 9-Nov-16 18:00 Daily For AMP work at Champa WRTS-I WRTS-I R
559 765 765 KV TIE BAY_DURG_II AT KOTRA PS 8-Nov-16 9:00 9-Nov-16 18:00 Daily For AMP works at Kotra PS WRTS-I WRTS-I R
560 400 400 kv NSPCL 1 Main Bay at Raipur SS 8-Nov-16 9:00 8-Nov-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
561 765 SWITCHABLE LR_765kV_WARDHA 1_SEONI 8-Nov-16 9:00 10-Nov-16 18:00 Daily For RTV coating on HV Bushings at Seoni.RTV coating ofWRTS-I
bushing taken
WRTS-Iup under
R system improvement to avoid f
562 220 206 Bay (Bus Coupler Bay) at Pune (Talegoan) 8-Nov-16 9:00 8-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
563 HVDC HVDC CWD DIA 10 Q52 Bay at Bhadrawati 8-Nov-16 9:00 8-Nov-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
564 400 KOLHAPUR (MSETCL)-1 Main bay (407) at Kolhapur(GIS)
8-Nov-16 10:00 8-Nov-16 18:00 Daily Bay outage required for AMP Work at Kolhapur (GIS). WRTS-I WRTS-I R
565 400 BUS REACTOR_400kV_125MVAR_PARLI 8-Nov-16 10:00 9-Nov-16 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
566 400 RAIPUR-2 MAIN BAY (407) at Raigarh 8-Nov-16 10:00 8-Nov-16 18:00 Daily For AMP work at Raigarh WRTS-I WRTS-I R
567 765 Bus Reactor & AT#3 (708) Tie Bay at Tamnar PS8-Nov-16 10:00 8-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
568 400 400KV S/S BHOPAL - 400 BHOPL BUS REACTOR- 08-Nov-16
I 9:00 08-Nov-16 17:00 daily FOR POST MANSOON MAINTENANCE WORK MPPTCL MPPTCL R
569 220 220 KV MALANPUR - AURAIYA CKT 08-Nov-16 9:00 08-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
570 400 kV 400kV DGEN Navsari Line 2 (BAY 405) 08/11/2016 8:00 08/11/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPLkV breakerTPL
testing. C
571 400 CGPL -Limdi Line-1 along with Limbdi-1 breaker (416
8/Nov/16
52) and tie9:00
breaker8/Nov/16
of Limbdi-1 20:00
and Bus Daily
Reactor (417
Line
52)Isolator Modification, breaker PM and testing PGCIL CGPL
572 220 BUS-2 at Vapi 08/Nov/16 9:00 08/Nov/16 18:00 Daily AMP of BUS-2 PGCIL WR-II R
573 220 Kawas-Navsari#2 08/Nov/16 9:00 08/Nov/16 15:00 Daily Jumper tightening work on Multi Ckt Towers, simultaneous PGCIL
S/D required
WR-II C
574 220 Navsari-Navsar#1 08/Nov/16 9:00 08/Nov/16 15:00 Daily Jumper tightening work on Multi Ckt Towers, simultaneous PGCIL
S/D required
WR-II C
575 220 Dehgam-Ranasen # 1 Main Bay (Bay No-207) at 08/Nov/16
Deham 9:00 08/Nov/16 18:00 Daily Bay AMP works PGCIL WR-II R
576 765 Bus reactor#1 at Bina 08/Nov/16 9:30 08/Nov/16 18:00 Daily RTV Coating on HV bushing in B phase PGCIL WR-II R
577 765 Gwalior-1 main bay at Bina 08/Nov/16 9:30 08/Nov/16 18:00 Daily AMPWORKS PGCIL WR-II R
578 220 Kakrapar-Vav Ckt 1 & 2 08/Nov/16 8:00 09/Nov/16 18:00 Daily S/D for Stringing work of 400kV D/C Kakrapar-Navsari b/w PGCIL
6/0 & 7/0WR-II C
579 400 400 KV Shujalpur-Nagda # 1 Tr. Line 08/Nov/16 10:00 08/Nov/16 18:00 Daily For attending shutdown nature defects in transmission line
PGCIL WR-II C
580 220 Chhegaon-1 line Terminal Equipment AMP work at 08/Nov/16
Khandwa ss9:30 08/Nov/16 13:30 Daily Line Terminal Equipment AMP work MPPTCL WR-II R
581 400 Bay 410 400KV Bhachau-R'Pura-2 Main Bay at Bhachau08/Nov/16 SS 9:00 08/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
582 765 765KV Sasan-Satna Line#1 at Satna SS 08/Nov/16 9:00 08/Nov/16 18:00 Daily For AMP work & Inspection of Isolators PGCIL WR-II R
583 400 400 KV J-I # 3 Main Bay 413 at Jabalpur SS 08/Nov/16 10:00 08/Nov/16 17:00 Daily For AMP of Bay Equipments PGCIL WR-II R
584 400 RAJGARH-KASOR # 1 & BUS REACTOR TIE BAY 08/Nov/16
(414) AT RAJGARH
10:00 08/Nov/16
SUBSTATION 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
585 400 80 Mvar Bus Reactor-I 08/Nov/16 9:00 08/Nov/16 18:00 Daily AMP PGCIL WR-II R
586 400 ICT-I Tie bay 402 at Vindhyachal Pooling Station08/Nov/16 9:00 08/Nov/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCILby M/sWR-II
alstom C
587 400 VINDHYACHAL-SATNA LINE # 3 8-Nov-16 9:00 9-Nov-16 18:00 Continuous BAY EQUIPMENT MAINTENANCE AND TESTING. NTPC NTPC
588 765/400 SIPAT ICT-2 TRANSFORMER S/D 8-Nov-16 7:30 10-Nov-16 19:00 Continous Annual Preventive maintenance NTPC NTPC
589 400 Bus-B bay Kosamba 08-Nov-16 8:00 08-Nov-16 0:00 Daily Maintenance and testing work GETCO GETCO
590 400 400/220 KV 315 MVA ICT-1 Jetpur 08-Nov-16 8:00 08-Nov-16 18:00 Daily Maintenance work GETCO GETCO
591 400 Wanakbori - Soja line 08-Nov-16 8:00 10-Nov-16 18:00 Daily PMM Work GETCO GETCO
592 400 Dehgam - Vadavi line No. 1 08-Nov-16 8:00 09-Nov-16 18:00 Daily Bay maintenance work GETCO GETCO
593 400 Kasor - GPEC 08-Nov-16 8:00 09-Nov-16 18:00 Daily Bay equipment and testing work GETCO GETCO
594 400 400/220 KV 500MVA ICT No-3 Chorania 08-Nov-16 8:00 08-Nov-16 18:00 Daily Testing and maintenance work GETCO GETCO
595 400 765/400KV AT2_MAIN_BAY_419 at Seoni 9-Nov-16 8:00 9-Nov-16 18:00 Daily For AMP works at Seoni WRTS-I WRTS-I R
596 400 400kV Raipur Tie Bay (405) at Bhatapara S/s. 9-Nov-16 9:00 9-Nov-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
597 765 765KV JABALPUR 01 MAIN BAY(709)AT DHARAMJAYGARH9-Nov-16 (KORBA)
9:00 10-Nov-16
SS 18:00 Daily For AMP WORKS at D'jaigarh WRTS-I WRTS-I R
598 400 400 kv ICT 3 Main bay at Raipur SS 9-Nov-16 9:00 9-Nov-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
599 400 400KV KARAD REACTOR__80MVAR_SOLAPUR9-Nov-16 9:00 9-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
600 220 ICT # 2 Bay (205) at Pune (Talegoan) 9-Nov-16 9:00 9-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
601 400 400kV KORADI-SATPURA 9-Nov-16 9:00 9-Nov-16 18:00 Daily Line CT Replacement works under R&M at Koradi MSETCL. WRTS-I /MSETCL
WRTS-I /MSETCL
C
602 765 765 KV Bus # 2 at Wardha 9-Nov-16 9:00 10-Nov-16 18:00 Conti. Bus Extension work for up-coimng 765 KV Durg 3 & 4 line WRTS-I
at Wardha.
WRTS-I R
603 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) 9-Nov-16
II 10:00 9-Nov-16 18:00 Daily Line & Bay outage required for AMP Work at Kolhapur (GIS).
WRTS-I WRTS-I R
604 400 KOLHAPUR (MSETCL)-2, Main bay (410) at Kolhapur(GIS)
9-Nov-16 10:00 9-Nov-16 18:00 Daily Bay outage required for AMP Work at Kolhapur (GIS). WRTS-I WRTS-I R
605 400 Bus Reactor-II Main Bay (416) at Parli 9-Nov-16 10:00 9-Nov-16 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
606 400 RAIPUR-2 Tie Bay (408) at Raigarh 9-Nov-16 10:00 9-Nov-16 18:00 Daily For AMP work at Raigarh WRTS-I WRTS-I R
607 765 Bus Reactor & AT#3 (708) Tie Bay at Tamnar PS9-Nov-16 10:00 9-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
608 400 400KV S/S BHOPAL - 400 BHOPL BUS REACTOR- 09-Nov-16
II 9:00 09-Nov-16 17:00 daily FOR POST MANSOON MAINTENANCE WORK MPPTCL MPPTCL R
609 220 220 KV MEHGAON - AURAIYA CKT 09-Nov-16 9:00 09-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
610 400kv Chandrapur2-Dhariwal ckt 1 (Main bay 407 & Tie 09-Nov-16
bay 408) 9:00 09-Nov-16 18:00 Daily Diagnostic Testing & allied Bay Maintenance work MSETCL MSETCL
611 765 KV 702-Bay (Tie Bay of ICT and Bus Reactor) at Akola9-Nov-16
-II Substation
8:00 9-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
612 400KV Tie Bay (405) of ICT-2 & Line-2 at Koradi III Sub Station
09-Nov-16 8:00 09-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
613 400kV NewKoyna-Jaigad -Ckt-2 09-Nov-16 8:00 09-Nov-16 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
614 400kV Koradi-2 Tie bay 415 Circuit Breaker at 400 KV Khaperkheda
09-Nov-16 S/stn 10:00 09-Nov-16 14:00 Daily DCRM, CRM and timing of CB. MSETCL MSETCL Line will be in service through Main
615 400Kv Tie Bay 409 of Akola-Bhusawal & Akola-Wardha09-Nov-16
I line Akola 10:00 09-Nov-16 17:00 Daily Quarterly Bay Maintenance and Testing Work MSETCL MSETCL 400 kV Akola-Bhusawal line and 4
616 400 kV 400kV DGEN 51 GT BAY(BAY 404) 09/11/2016 8:00 09/11/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPLkV breakerTPLtesting. C
617 765 715LRB ( Bina#2 Line Reactor Bay) at Gwalior 09/Nov/16 10:00 09/Nov/16 18:00 Daily AMP WORKS PGCIL WR-II R
618 220 TBC at Vapi 09/Nov/16 9:00 09/Nov/16 18:00 Daily AMP of TBC PGCIL WR-II R
619 220 Dehgam-Ranasen # 1 Main Bay (Bay No-208) at 09/Nov/16
Dehgam 9:00 09/Nov/16 18:00 Daily Bay AMP works PGCIL WR-II R
620 765 Spare reactor bus-1 at Bina 09/Nov/16 9:30 09/Nov/16 18:00 Daily RTV Coating on HV bushing PGCIL WR-II R
621 765 Seoni main bay at Bina 09/Nov/16 9:30 09/Nov/16 18:00 Daily AMPWORKS PGCIL WR-II R
622 400 400 KV Shujalpur-Nagda # 2 Tr. Line 09/Nov/16 10:00 09/Nov/16 18:00 Daily For attending shutdown nature defects in transmission line
PGCIL WR-II C
623 220 Chhegaon-2 line Terminal Equipment AMP work at 09/Nov/16
Khandwa ss9:30 09/Nov/16 13:30 Daily Line Terminal Equipment AMP work MPPTCL WR-II R
624 400 Bay 411 400KV R'Pura-2 & BR 1Tie Bay at Bhachau09/Nov/16
SS 9:00 09/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
625 765 765KV ICT#2 at Satna SS 09/Nov/16 9:00 09/Nov/16 18:00 Daily For AMP work & Inspection of Isolators PGCIL WR-II R
626 400 400 KV J-I # 4 Main Bay 412 at Jabalpur SS 09/Nov/16 10:00 09/Nov/16 17:00 Daily For AMP of Bay Equipments PGCIL WR-II R
627 400 BUS REACTOR MAIN BAY (415) AT RAJGARH SUBSTATION
09/Nov/16 10:00 09/Nov/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
628 765 1500 MVA ICT#1 at Vindhyachal PS 09/Nov/16 9:00 10/Nov/16 17:00 Daily Fine tuning of CSD relay by M/s alstom at vindhyachal psPGCIL WR-II C
629 765 Bay 715, main bay for 765 KV, vadodara line at09/Nov/16
Indore PS 10:00 10/Nov/16 18:00 Daily For Bay AMP PGCIL WR-II R
630 765 765kV JBP PS - Dharmjaygarh # 4 Line along with09/Nov/16
reactor at Jabalpur
10:00 Pooling
11/Nov/16
Station17:00 Daily RTV Coating on 765kV Bushing. RTV Coating on 765kV PGCIL Bushing toWRTS-II
minimize theC chances of flash over.
631 400 400/220 KV 315 MVA ICT-2 Jetpur 09-Nov-16 8:00 09-Nov-16 18:00 Daily Testing and maintenance work GETCO GETCO
632 400 SSP - Rajgarh - 1 09-Nov-16 8:00 10-Nov-16 18:00 Daily Maintenance work GETCO GETCO The autoreclosere of 400 KV SSP-
633 765 SWITCHABLE LR_765kV_DURG 2_KOTRA PS 10-Nov-16 9:00 10-Nov-16 18:00 Daily For NGR BY PASS BREAKER TERMINATION works at Kotra WRTS-IPS WRTS-I C
634 400 400 kv NSPCL 1 Tie Bay at Raipur SS 10-Nov-16 9:00 10-Nov-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
635 765 705_TIE BAY_765KV ICT#2_ at SOLAPUR 10-Nov-16 9:00 10-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
636 220 220KV Bus # 1 at Pune (Talegoan) 10-Nov-16 9:00 10-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
637 HVDC HVDC CWD DIA 20 Q51 Bay at Bhadrawati 10-Nov-16 9:00 10-Nov-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
638 765/400 ICT2_765/400kv_AURANGABAD 10-Nov-16 10:00 12-Nov-16 14:00 Daily For RTV coating on HV Bushings at Aurangabad .RTV coatingWRTS-Iof bushing
WRTS-I takenRup under system improvement to
639 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 10-Nov-16 10:00 12-Nov-16 18:00 Conti. For Bushing erection of under construction 765kv Durg-Wardha
WRTS-I# 3WRTS-I
line ReactorC to adjoining phase at Durg PS.
640 400 ICT-2 MAIN BAY (409) at Raigarh 10-Nov-16 10:00 10-Nov-16 18:00 Daily For AMP work at Raigarh WRTS-I WRTS-I R
641 400 400 KV BUS-I at Tamnar PS 10-Nov-16 10:00 10-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
642 400/220/33KV
315MVA ICT-II @ Chandrapur I 10-Nov-16 8:00 10-Nov-16 18:00 Daily Numerical Differtial Relay & Back Up Relay Testing work.MSETCL MSETCL
643 400/220kV501 MVA ICT II @ Jejuri 10-Nov-16 9:30 10-Nov-16 17:30 Daily Annual testing and maint work MSETCL MSETCL 400/220 kv 501 MVA ICT I will take
644 400 kV 400/220 KV 501 MVA ICT-I @ Lonikand II 10-Nov-16 09:00 10-Nov-16 18:00 Daily Half yearly maintenance & diagnostic testing MSETCL MSETCL Total Load can be managed by 400
645 400kV STATION TRANSFORMER-1 TIE BAY 423 at Koradi 10-Nov-162 10:00 10-Nov-16 16:00 Daily DCRM OF STATION TRANSFORMER-1 TIE BREAKER MSETCL 423-Q52 MSETCL DIGNOSTIC TESTING
646 400kV Chandrapur II – Nanded (Kumbhargaon) 10-Nov-16 9:00 10-Nov-16 18:00 Daily Line signature work and tightening of hardware at variousMSETCL
locations MSETCL
647 400kV Parli-Lonikand Ckt-II @Parli 10-Nov-16 9:00 10-Nov-16 18:00 Daily Outage required for quarterly maintenance work MSETCL MSETCL
648 400/220kVSpare ICT @ Talandge (Kolhapur) 10-Nov-16 9:00 10-Nov-16 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
649 400 KV Karad - JAIGAD @ Karad 10-Nov-16 10:00 10-Nov-16 17:00 Daily Annual Maint. work MSETCL MSETCL
650 400 kV 400kV DGEN ICT-1 (BAY 408) 10/11/2016 8:00 10/11/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPLkV breakerTPLtesting. C
651 400 400kV Mundra-Bhachau-2 line along with Bhacahu-2
10/Nov/16
breaker (425
9:0052) and
10/Nov/16
tie breaker20:00
of Bhachau-2
Daily (426 Aattending
52) hotspot in breaker connection and breaker PM CGPL
and testing
CGPL
652 220 208 Bay ( Bus Coupler bay) at Gwalior 10/Nov/16 10:00 10/Nov/16 18:00 Daily AMP WORKS PGCIL WR-II R
653 765 Jabalpur#2 Line reactor at Bina 10/Nov/16 9:30 10/Nov/16 18:00 Daily RTV Coating on HV bushing in R phase PGCIL WR-II R
654 765 Seoni & ICT-1 tie bay at Bina 10/Nov/16 9:30 10/Nov/16 18:00 Daily AMPWORKS PGCIL WR-II R
655 400 Betul-2 main bay (428) at Khandwa ss 10/Nov/16 9:30 10/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
656 400 Bay 412 400KV 63MVAr BR-1 Main Bay at Bhachau 10/Nov/16
SS 9:00 10/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
657 765 765KV Sasan-Satna Line#2 at Satna SS 10/Nov/16 9:00 10/Nov/16 18:00 Daily For AMP work & checking & taking Spare Reactor into service
PGCIL WR-II R
658 400 400 KV J-I # 4 Tie Bay 411 at Jabalpur SS 10/Nov/16 10:00 10/Nov/16 17:00 Daily For AMP of Bay Equipments PGCIL WR-II R
659 400 RAJGARH-KASOR # 2 MAIN BAY (416) AT RAJGARH 10/Nov/16
SUBSTATION
10:00 10/Nov/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
660 400 Chorania-Kasor Line 10-Nov-16 8:00 10-Nov-16 18:00 Daily Maintenance work GETCO GETCO
661 400 Dehgam - Vadavi - 2 10-Nov-16 8:00 11-Nov-16 18:00 Daily Bay maintenance work GETCO GETCO
662 400 Chorania - Mansar line bay at Chorania 10-Nov-16 8:00 10-Nov-16 13:00 Daily Maintenance work PGCIL GETCO
663 220 Kalwa-Ghatghar D/C Line 11-Nov-16 6:00 12-Nov-16 18:00 Conti. Powerline crossing works of 765kV D/C Aurangabad-Padghe MSETCLbetween
WRTS-I
tower location
C Nos 343/0 & 344/0
664 400 BUS_REACTOR1_MAIN_BAY_422 at Seoni 11-Nov-16 8:00 11-Nov-16 18:00 Daily For AMP works at Seoni WRTS-I WRTS-I R
665 400 400kV BHADRAVATI-PARLI I 11-Nov-16 9:00 12-Nov-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.BVT-Parli-1
WRTS-I C will be out of service during
666 765 765KVBUS REACTOR 01 MAIN BAY(707)AT DHARAMJAYGARH
11-Nov-16 9:00
(KORBA)
11-Nov-16
SS 18:00 Daily For AMP WORKS at D'jaigarh WRTS-I WRTS-I R
667 765 706_MAIN BAY_765KV ICT#2_ at SOLAPUR 11-Nov-16 9:00 11-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
668 765 SWITCHABLE LR_765kV_A'BAD 2_WARDHA 11-Nov-16 9:00 11-Nov-16 18:00 Daily AMP work at Wardha. ( Line will be in service) WRTS-I WRTS-I R
669 765 BUS REACTOR_765kV_330MVAR_WARDHA 11-Nov-16 9:00 12-Nov-16 18:00 Conti. Isolator erection work for spare unit at Wardha. WRTS-I WRTS-I C
670 400 RAIPUR-1 TIE BAY (411) at Raigarh 11-Nov-16 10:00 11-Nov-16 18:00 Daily For AMP work at Raigarh WRTS-I WRTS-I R
671 400 400 KV BHOPAL- ITARSI CkT-I 11-Nov-16 9:00 11-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
672 220 220 KV RAJGARH (PG) - DHAR CKT 11-Nov-16 9:00 11-Nov-16 16:00 daily FOR TIGHTENING OF JUMPER CONE & ARCHING HORN MPPTCL
& OTHERMPPTCL
MAINTENANCE
R WORK
673 400kV Babhaleshwar-Padghe ckt -2 @Babhaleshwar 11-Nov-16 9:00 11-Nov-16 17:00 Daily Bay Maintenance work. Relay / CB / CT Testing MSETCL MSETCL 400kV BBLR-Padghe-I will be in se
674 400KV Main Bay (406) of Line-2 at Koradi III Sub Station.11-Nov-16 8:00 11-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
675 765 KV 703-Bay (Main Bay of Bus Reactor) at Akola -II S/Stn,
11-Nov-16 8:00 11-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
676 400 KV Karad -SOLAPUR PGCIL @ Karad 11-Nov-16 10:00 11-Nov-16 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
677 400KV A Bus with BC @ Kharghar 11-Nov-16 8:00 11-Nov-16 18:00 Daily Maintenance work MSETCL MSETCL
678 400 kV 400kV DGEN ICT-2 (BAY 409) 11/11/2016 7:00 11/11/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPLkV breakerTPL
testing. C
679 400 400kV Mundra-Bhachau-2 line along with Bhacahu-2
11/Nov/16
breaker (425
9:0052) and
11/Nov/16
tie breaker20:00
of Bhachau-2
Daily (426 CVT
52) secondary connection tightness and 401 isolator hotCGPL
spot attending
CGPL
680 220 Kakrapar-Vapi#1 11/Nov/16 8:00 12/Nov/16 18:00 Daily Replcaement of Porclein Insulators with CLR Polymer insulators
PGCIL in WR-II
balance portion
C of line to prevent line tripping d
681 400 Betul-2 & Seoni-2 tie bay (429) at Khandwa ss 11/Nov/16 9:30 11/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
682 400 Bay 413 400KV Bhachau-Varsana-2 Main Bay at 11/Nov/16
Bhachau SS 9:00 11/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
683 220 220kV Magarwada - Magarwada #1 (Bay 211) at 11/Nov/16
Magarwada 8:00 11/Nov/16 18:00 Daily AMP of Line Bay PGCIL WR-II R
684 400 400KV ICT#1 Tie Bay (408Bay) at Satna SS 11/Nov/16 9:00 11/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
685 400 RAJGARH-KASOR # 2 & FUTURE TIE BAY (417)11/Nov/16AT RAJGARH 10:00
SUBSTATION
11/Nov/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
686 765 ICT-2 main bay 706 at Vindhyachal Pooling Station
11/Nov/16 9:00 12/Nov/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCILby M/sWR-II
alstom C
687 765 Bay 710, main bay for 765 KV,Bhopal-Indore line11/Nov/16
at Indore PS10:00 12/Nov/16 18:00 Daily For Bay AMP PGCIL WR-II R
688 400 400 KV Raita-Marwa II (Bay No.415) at 400 KV S/s
11-Nov-16
Raita. 8:00 11-Nov-16 17:00 Daily Basis Scheduled Maint.Reactor, Breaker, CT, Isolator, L.A etc.CSPTCL CSPTCL
689 400 Soja - Kansari 11-Nov-16 8:00 12-Nov-16 18:00 Daily Bay equipment and maintenance work GETCO GETCO
690 400 SSP - Rajgarh - 2 11-Nov-16 8:00 12-Nov-16 18:00 Daily Maintenance work PGCIL GETCO The auto reclosere of 400 KV SSP-
691 765 765KV BUS REACTOR 02 MAIN BAY (710) AT DHARAMJAYGARH
12-Nov-16 9:00 (KORBA)
12-Nov-16
SS 18:00 Daily For AMP WORKS at D'jaigarh WRTS-I WRTS-I R
692 765 712R_PUNE REACTOR BAY_ at SOLAPUR 12-Nov-16 9:00 12-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
693 765 SWITCHABLE LR_765kV_A'BAD 1_WARDHA 12-Nov-16 9:00 12-Nov-16 18:00 Daily AMP work at Wardha. ( Line will be in service) WRTS-I WRTS-I R
694 400 400kV WARDHA-AKOLA I & II 12-Nov-16 9:00 13-Nov-16 18:00 Daily Powerline crossing works of 765kV D/C Hyderabad-Wardha WRTS-I
between WRTS-I
tower location
C Nos 47/0 & 58/0 (400KV D/C
695 HVDC HVDC CWD DIA 20 Q50 Bay at Bhadrawati 12-Nov-16 9:00 12-Nov-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
696 400 400 KV BUS-I at Tamnar PS 12-Nov-16 10:00 12-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
697 400/220kV167MVA spare unit @ Babhaleshwar 12-Nov-16 9:00 12-Nov-16 17:00 Daily Bay Maintenance work. Relay / CB / CT Testing MSETCL MSETCL NA
698 220kV PGCIL- Badnera line @ Badnera 12-Nov-16 9:00 12-Nov-16 17:00 Daily 1) Tan delta measurement of CT ,CC, 2) CRM of CB, 3) MSETCL
Wave trapMSETCL
maintenance work4) Rouitine maintenance wo
699 400/132 KV200 MVA ICT-I at 400kV Khadka 12-Nov-16 7:00 12-Nov-16 17:00 Daily Quarterly Maintenance work /Diagnostic Testing work MSETCL MSETCL
700 400 400 kV GT10 tie breaker at Mundra (402 52) 12/Nov/16 9:00 12/Nov/16 20:00 Daily Breaker PM and testing CGPL CGPL
701 220 Dehgam - Dehgam # 1 12/Nov/16 9:00 12/Nov/16 18:00 Daily Bay AMP works GETCO WR-II R
702 765 Jabalpur#2 Line reactor at Bina 12/Nov/16 9:30 12/Nov/16 18:00 Daily RTV Coating on HV bushing in B phase PGCIL WR-II R
703 765 Jabalpur-Bina 1 Line With Reactor 12/Nov/16 9:30 12/Nov/16 11:30 Daily For taking of spare reactor out of service bus-1 side. PGCIL WR-II R
704 400 Seoni-2 main bay (430) at Khandwa ss 12/Nov/16 9:30 12/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
705 400 Bay 414 400KV Bhachau-Varsana-2 & Eassar-1 Tie 12/Nov/16
Bay at Bhachau
9:00 SS12/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
706 220 220kV Magarwada - Magarwada #2 (Bay 206) at 12/Nov/16
Magarwada 8:00 12/Nov/16 18:00 Daily AMP of Line Bay PGCIL WR-II R
707 400 400KV ICT#1 Main Bay (409Bay) at Satna SS 12/Nov/16 9:00 12/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
708 765 765kV Bus # 2 at Jabalpur Pooling Station 12/Nov/16 10:00 12/Nov/16 18:00 Daily 765kV Bus Isolators Earth Switch Erection / Alignment problem
PGCIL WRTS-II C
709 400 400/220 KV 500MVA ICT No-2 Chorania 12-Nov-16 8:00 12-Nov-16 13:00 Daily Testing work GETCO GETCO
710 220 D/C Bableshwar – Ahmednagar 13-Nov-16 8:00 14-Nov-16 18:00 Conti. Stringing of 765KV D/C Aurangabad – Padge Transmission MSETCL
Line WRTS-I C
711 400 400kV DHARIWAL TPP-PARLI II 13-Nov-16 9:00 14-Nov-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.400kV
WRTS-I C DHARIWAL TPP-PARLI II will be
712 400 KV 400 KV Main Bus -I & Bus coupler @Kalwa 13-Nov-16 9:00 13-Nov-16 17:00 ONE DAY ROUTINE MAINTENANCE AND TESTING WORK
713 400 J P NIGRI-SATNA-1 13-Nov-16 9AM 13-Nov-16 5PM Daily Fixing and Tightening of Jumper Nut & Bolts,Arcing Horns JP&NIGRIEJP
ConductorNIGRIE
Repairing
714 220 Kakrapar-Vapi#2 13/Nov/16 8:00 14/Nov/16 18:00 Daily Replcaement of Porclein Insulators with CLR Polymer insulators
PGCIL in WR-IIbalance portion
C of line to prevent line tripping d
715 220 220kV Bus#2 at Magarwada 13/Nov/16 10:00 13/Nov/16 16:00 Daily AMP of Bus#1 & VT, Reduction of induction in Bus Coupler PGCIL WR-II R
716 220 220kV bus Coupler ( Bay 209) at Magarwada 13/Nov/16 10:00 13/Nov/16 16:00 Daily AMP of Bus Coupler PGCIL WR-II R
717 765 SWITCHABLE LR_765kV_PADGHE1_AURANGABAD 14-Nov-16 8:00 16-Nov-16 18:00 Daily For RTV coating on HV Bushings at Aurangabad . Reactor WRTS-I
used in A'bad-Solapur
WRTS-I R line. Only Recator is taken out; l
718 132 D/C Ranwad – Lasalgoan and Ozar - Chandwad 14-Nov-16
Transmission 8:00
line 15-Nov-16 18:00 Conti. Stringing of upcoming 400KV D/C Aurangabad - Boisar Transmission
MSETCL WRTS-I Line AP APC 115/0 TO AP 116/0) over D/C G
719 220 Ponda line Bay (202) at Mapusa 14-Nov-16 9:00 17-Nov-16 18:00 Conti. CB Overhauling works at Mapusa.Line will be in service through
WRTS-1transferWRTS-Ibay R
720 400 400 KV Wardha 1 Main Bay at Raipur SS 14-Nov-16 9:00 14-Nov-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
721 765 SWITCHABLE LR_765kV_WARDHA 2_SEONI 14-Nov-16 9:00 16-Nov-16 18:00 Daily For RTV coating on HV Bushings at Seoni.RTV coating ofWRTS-I bushing taken
WRTS-Iup under
R system improvement to avoid f
722 765 713R_RAICHUR#2 REACTOR BAY_ at SOLAPUR 14-Nov-16 9:00 14-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
723 400 400 KV BUS-II at Tamnar PS 14-Nov-16 10:00 15-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
724 400kV Talegaon - Padghe @Padgha 14-Nov-16 8:00 14-Nov-16 18:00 Daily Routine R&M work and Dignostic Testing work. MSETCL MSETCL
725 765 KV 704-Bay (Main Bay of Ektuni Line-1) at Akola -II S/Stn,
14-Nov-16 8:00 14-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
726 400KV Tie Bay (408) of Line-3 at Koradi III Sub Station. 14-Nov-16 8:00 14-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
727 400 kV Koradi- Bhusawal Line 14-Nov-16 12:00 19-Nov-16 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R
MSETCL
shall be kept
MSETCL
in non 400
autokVmode.
Akola- Bhusawal, 400 kV A
728 400 kV 400kV Dhule - SSNNL line Ckt-I & II 14-Nov-16 9:00 15-Nov-16 17:00 daily PID testing MSETCL MSETCL
729 400/220kV
315 MVA ICT 1 @ Talandge (Kolhapur) 14-Nov-16 9:00 14-Nov-16 18:00 Daily Qurterly Maint.Work MSETCL MSETCL Load manage on 315 MVA ICT -2 &
730 400 kV 400kV DGEN ICT-3 (BAY 411) 14/11/2016 8:00 14/11/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPL kV breakerTPL testing. C
731 400 400kV Main Bus-II Outage at CGPL 14/Nov/16 9:00 14/Nov/16 20:00 Daily Breaker PM and testing CGPL CGPL
732 400 315 MVA ICT-2 at Gwalior 14/Nov/16 10:00 14/Nov/16 13:00 Daily To attained current ubalancing problem in 408 bay by Carrying
PGCILout CRM WR-IIof issolator
R
733 220 Dehgam - Dehgam # 2 14/Nov/16 9:00 14/Nov/16 18:00 Daily Bay AMP works GETCO WR-II R
734 765 Gwalior#3 Line reactor at Bina 14/Nov/16 9:30 14/Nov/16 18:00 Daily RTV Coating on HV bushing in R phase. Line will be taken PGCIL
into service
WR-II
withoutRLR within 30 minutes
735 765 Jabalpur-Bina 2 Line With Reactor 14/Nov/16 9:30 14/Nov/16 18:00 Daily For taking of spare reactor into service bus-1 side. PGCIL WR-II R
736 400 400KV Satna-Bina Line#2 Tie Bay (411Bay) at Satna14/Nov/16
SS 9:00 14/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
737 400 400kv Tarapur-Boisar -1 14/Nov/16 7:00 15/Nov/16 18:00 Continous Power Line Crossing for Stringing work of Aurangabad- Boisar PGCIL line (AP
WR-II
03-04) Through
R hot line, A/R of all Ckts sho
738 400 400kv Tarapur-Boisar -2 14/Nov/16 7:00 15/Nov/16 18:00 Continous Power Line Crossing for Stringing work of Aurangabad- Boisar PGCIL line (AP
WR-II
03-04) Through
R hot line, A/R of all Ckts sho
739 400 400KV Boisar-vapi Line 14/Nov/16 7:00 15/Nov/16 18:00 Continous Power Line Crossing for Stringing work of Aurangabad- Boisar PGCIL line (AP
WR-II
03-04) Through
R hot line, A/R of all Ckts sho
740 400 400kv Boisar-Padghe Line 14/Nov/16 7:00 15/Nov/16 18:00 Continous Power Line Crossing for Stringing work of Aurangabad- Boisar PGCIL line (AP
WR-II
03-04) Through
R hot line, A/R of all Ckts sho
741 220 Tarapur-Boisar S/C Line 14/Nov/16 7:00 15/Nov/16 18:00 ContinuousPower Line Crossing for Stringing work of Aurangabad- Boisar PGCIL line (AP02-03)-
WR-II D/C
R portions.
742 400 Indore -Asoj Ckt #II 14/Nov/16 10:00 14/Nov/16 12:00 Daily For taking out LR for replacement of neutral bushing andPGCIL
NGR bushing. WR-IILine will
R be charged without line reactor.
743 400 400 KV Korba West (Bay No 404) at 400 KV S/s Raita.
14-Nov-16 8:00 14-Nov-16 17:00 Daily Basis Scheduled Maint.Reactor, Breaker, CT, Isolator, L.A etc.CSPTCL CSPTCL
744 400 400KV GANDHAR-Dehgam-1 14-Nov-16 8:00 15-Nov-16 18:00 Cont. Annual bay maintenance and protection checking NTPC NTPC
745 400 SSNL-Dhule-1 (Daily) 14-Nov-16 8:00 15-Nov-16 18:00 Daily Maintenance work PGCIL GETCO The autoreclosere of 400 KV SSP-
746 400 Dehgam (PG) - Soja line 14-Nov-16 8:00 16-Nov-16 18:00 Daily Maintenance work GETCO GETCO
747 400 765/400kv AT3_TIE_BAY_429 at Seoni 15-Nov-16 8:00 15-Nov-16 18:00 Daily For Replacerment of CT in Yphat Seoni WRTS-I WRTS-I R
748 400 400kV BHADRAVATI-PARLI I 15-Nov-16 9:00 16-Nov-16 18:00 Daily Replacement of Porcelain Insulators with Glass in N.H./Railway
WRTS-ICrossings.BVT-Parli-1
WRTS-I C will be out of service during
749 765 765kV DURG PS- CHAMPA_1 15-Nov-16 9:00 15-Nov-16 18:00 Daily Line with Reactor outage required for NGR bypass & CSD WRTS-I
commissioning
WRTS-I works
C at Durg PS..
750 765 716R_RAICHUR#1 REACTOR BAY at SOLAPUR15-Nov-16 9:00 15-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
751 220 220KV Bus # 2 at Pune (Talegoan) 15-Nov-16 9:00 15-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
752 400 400 KV Bus # 1 at Wardha 15-Nov-16 9:00 16-Nov-16 18:00 Conti. Bus Extension work for upcoming 400 KV A''bad ckt 1 &2WRTS-I lines at Wardha.
WRTS-I C
753 HVDC HVDC CWD DIA 20 Q52 Bay at Bhadrawati 15-Nov-16 9:00 15-Nov-16 17:00 Daily AMP work at Bhadrawati WRTS-I WRTS-I R
754 400 400 KV BHOPAL- ITARSI CkT-II 15-Nov-16 9:00 15-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
755 400 400 KV SARNI- SEONI S/C LINE 15-Nov-16 9:00 15-Nov-16 18:00 daily FOR RECTIFICATION OF DEFECTS OBSERVED DURING MPPTCL
ROUTINE MPPTCL
PATROLLING
R ATTEND THE DAMPER AR
756 400 400 KV RAJGARH - SSP CkT-I 15-Nov-16 9:00 15-Nov-16 18:00 daily FOR RECTIFICATION OF DEFECTS OBSERVED DURING MPPTCL
ROUTINE MPPTCL
PATROLLING
R ATTEND THE DAMPER AR
757 220 220 KV BINA (PG)- SHIVPURI CKT 15-Nov-16 9:00 16-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
758 220 220 KV ANOOPUR - KOTMIKALA CKT - I 15-Nov-16 10:00 15-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
759 400kV 400kV BUS 2 at APML Tiroda 15-Nov-16 7:00 15-Nov-16 23:00 Daily Bus Equipment maintenance . APML APML
760 765 KV 765/400kV ICT at Akola - II S/Stn, 15-Nov-16 8:00 15-Nov-16 18:00 Daily Changeover of repaired B Phase ICT with the spare phase MEGPTCLMEGPTCL
of ICT
761 400kV 315MVA ICT-1 @ 400kV NewKoyna 15-Nov-16 8:00 15-Nov-16 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
762 400kV Station 5A bay 416 Circuit Breaker at 400 KV Khaperkheda
15-Nov-16 S/stn.
10:00 15-Nov-16 14:00 Daily DCRM, CRM and timing of CB. MSETCL MSETCL Line will be in service through Tie C
763 400kV MAIN BAY NO 421 & TIE BAY 420 of ICT-2 @ Koradi 15-Nov-16
II s/s 10:00 15-Nov-16 18:00 Daily TAN DELTA MEASIREMENT OF ICT 2 BUSHING MSETCL MSETCL DIGNOSTIC TESTING
764 400 kV 400kV DGEN Reactor (BAY 401) 15/11/2016 8:00 15/11/2016 18:00 Daily Isolator and Earth Switch Current measurement and 400 TPL kV breakerTPL testing. C
765 400 400kV Bus-1 at Gwalior 15/Nov/16 10:00 15/Nov/16 18:00 Daily AMP WORKS PGCIL WR-II R
766 220 Kakrapar-Vav#1 15/Nov/16 8:00 15/Nov/16 18:00 Daily Replcaement of Porclein Insulators with CLR Polymer insulators
PGCIL in WR-IIbalance portion
C of line to prevent line tripping d
767 220 Bus Bar # 1 at Dehgam 15/Nov/16 9:00 15/Nov/16 18:00 Daily AMP works PGCIL WR-II R
768 765 Gwalior#3 Line reactor at Bina 15/Nov/16 9:30 15/Nov/16 18:00 Daily RTV Coating on HV bushing in Y phase. Line will be taken PGCIL
into service
WR-II
without RLR within 30 minutes.
769 765 Satna-2 main bay at Bina 15/Nov/16 9:30 15/Nov/16 18:00 Daily AMPWORKS PGCIL WR-II R
770 400 DGEN-NAVSARI CKT 1 & 2 15/Nov/16 8:00 15/Nov/16 18:00 Daily Stringing work of 32/0 & 33/0 of 400kV KAPP-Navsari lineTorrent WR-II C
771 400 Nagda#2 Tie Bay(408) at Shujalpur 15/Nov/16 10:00 15/Nov/16 18:00 Daily For AMP works PGCIL WR-II C
772 400 Betul-1 main bay (424) at Khandwa ss 15/Nov/16 9:30 15/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
773 400 Bay 415 400KV Bhachau-Essar-1 Main Bay at Bhachau
15/Nov/16
SS 9:00 15/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
774 400 400KV V'chal Satna Line#2 Main Bay (412Bay) at15/Nov/16
Satna SS 9:00 15/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
775 400 RAJGARH-SSP # 1 MAIN BAY (401) AT RAJGARH 15/Nov/16
SUBSTATION 10:00 15/Nov/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
776 765 ICT-2 Tie bay 705 at Vindhyachal Pooling Station
15/Nov/16 9:00 16/Oct/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCIL by M/sWR-II
alstom C
777 400 125 MVAR Bus reactor #II at Indore SS 15/Nov/16 10:00 15/Nov/16 14:00 Daily For taking oil sample from 400KV, Bphase bushing and measurement
PGCIL WR-II
of tan delta
R at variable frequency.
778 765 765kV Bus # 1 at Jabalpur Pooling Station 15/Nov/16 10:00 15/Nov/16 18:00 Daily 765kV Bus Isolators Earth Switch Erection / Alignment problem
PGCIL WRTS-II C
779 400/132 SIPAT IBT-1 (Transformer)S/D 15-Nov-16 7:30 17-Nov-16 19:00 Continous Annual Preventive maintenance NTPC NTPC
780 400 400/220 KV 500 MVA ICT-4 Jetpur 15-Nov-16 8:00 15-Nov-16 18:00 Daily Testing and maintenace work GETCO GETCO
781 400 Asoj - Wanakbori 15-Nov-16 8:00 15-Nov-16 18:00 Daily Maintenance work GETCO GETCO
782 220 Vapi- TAPS (Daily) 15-Nov-16 0:00 16-Nov-16 0:00 Daily Maintenance work GETCO GETCO
783 765 BUS REACTOR_765kV_240MVAR_BILASPUR 16-Nov-16 8:00 16-Nov-16 18:00 Daily For change over of spare with phase unit to ensure healthiness
WRTS-Iat Bilaspur.
WRTS-I C
784 765 ICT1_765/400kv_DURG PS 16-Nov-16 9:00 16-Nov-16 18:00 Daily For CSD commissioning in ICT-1 Tie Bay at Durg PS. WRTS-I WRTS-I C
785 220 220 kv ICT # 3 Bay(20952) at Raipur SS 16-Nov-16 9:00 16-Nov-16 18:00 Daily AMP work at Raipur WRTS-I WRTS-I R
786 400 410_MAIN BAY_ICT#1 at SOLAPUR 16-Nov-16 9:00 16-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
787 400 ICT2 Main Bay(412) at Pune (Talegoan) 16-Nov-16 9:00 16-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
788 400 400kV RAIPUR-WARDHA I 16-Nov-16 9:00 16-Nov-16 18:00 Daily Reactor AMP work at Wardha WRTS-I WRTS-I R
789 765 765 KV BUS-I at Tamnar PS 16-Nov-16 10:00 17-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
790 400 400 KV RAJGARH - SSP CkT-II 16-Nov-16 9:00 16-Nov-16 18:00 daily FOR RECTIFICATION OF DEFECTS OBSERVED DURING MPPTCLROUTINEMPPTCL
PATROLLING
R ATTEND THE DAMPER AR
791 400 400 KV BHOPAL- BINA CkT-I 16-Nov-16 9:00 16-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
792 400KV 400KV KORADI-BHUSAWAL 16-Nov-16 8:00 16-Nov-16 17:00 Daily BROKEN DISC REPLACEMENT, FIXINF COND VIBRATION MSETCL DAMPERMSETCL& E/W DAMPERS ,COPPER BONDS ON
793 400kv Chandrapur2-Dhariwal ckt 2 (Main bay 410 & Tie 16-Nov-16
bay 411) 9:00 16-Nov-16 18:00 Daily Diagnostic Testing & allied Bay Maintenance work MSETCL MSETCL
794 765 KV 705-Bay (Tie Bay of Ektuni Line-1 & Koradi-III Line-1)
16-Nov-16
at Akola8:00
-II Substation
16-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
795 400 KV Main Bay (409) of Line-3 at Koradi III Sub Station.16-Nov-16 8:00 16-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
796 400 KV Station 5B bay 419 Circuit Breaker @Khaperkheda 16-Nov-16 8:00 16-Nov-16 17:00 Daily line maint. works such as Line Signature by Tuarus Kit ,Faulty
MSETCL discMSETCL
strings replacement, Fixing of Spacers, Damp
797 400/220/33kV
315MVA ICT @ Akola 16-Nov-16 10:00 16-Nov-16 14:00 Daily DCRM, CRM and timing of CB. MSETCL MSETCL 220 kV Apatapa S/s will be fed from
798 400 KV Main Bus I (401-52,405-52 CB & its allied equipment)
16-Nov-16
@ Lamboti9:00
(Solapur)
16-Nov-16 18:00 Daily Quarterly Maintenance and Testing Work MSETCL MSETCL Load may be managed on Main Bu
799 765 718 Bay (Main Bay of Bina#3 ) at Gwlior 16/Nov/16 10:00 17/Nov/16 18:00 Daily AMP WORKS PGCIL WR-II R
800 220 Kakrapar-Vav#2 16/Nov/16 8:00 16/Nov/16 18:00 Daily Replcaement of Porclein Insulators with CLR Polymer insulators
PGCIL in WR-II
balance portion
C of line to prevent line tripping d
801 220 Bus Bar # 2 at Dehgam 16/Nov/16 9:00 16/Nov/16 18:00 Daily AMP works PGCIL WR-II R
802 765 Gwalior#3 Line reactor at Bina 16/Nov/16 9:30 16/Nov/16 18:00 Daily RTV Coating on HV bushing in B phase. Line will be taken PGCIL
into service
WR-IIwithoutRLR within 30 minutes.
803 765 Indore & Satna-1 tie bay at Bina 16/Nov/16 9:30 16/Nov/16 18:00 Daily AMPWORKS PGCIL WR-II R
804 400 400 KV BUS # 1 at Shujalpur 16/Nov/16 10:00 16/Nov/16 18:00 Daily For AMP works PGCIL WR-II C
805 400 Indore-2 main bay (401) at Khandwa ss 16/Nov/16 9:30 16/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
806 400 Bay 416 400KV Bhachau-Varsana-1 Main Bay at 16/Nov/16
Bhachau SS 9:00 16/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
807 400 400KV Satna Bina Line#1 Main Bay (413Bay) at Satna
16/Nov/16
SS 9:00 16/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
808 400 400KV V'chal Satna Line#1 Main Bay (415Bay) at16/Nov/16
Satna SS 9:00 16/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
809 400 RAJGARH- SSP # 1 & RAJGARH- KHANDWA # 16/Nov/16 1 TIE BAY (402)
10:00
AT RAJGARH
16/Nov/16SUBSTATION
17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
810 400 400KV, Pithumpur ckt #I main bay(Bay 401) at Indore
16/Nov/16
PS 10:00 17/Nov/16 18:00 conti For rarresting SF6 gas leakages in 401 bay CB PGCIL WR-II R
811 400 400KV Bus # 1 at Jabalpur Pooling Station 16/Nov/16 9:00 16/Nov/16 18:00 Daily AMP works. PGCIL WRTS-II R
812 765 765kV JBP PS - Dharmjaygarh # 1 Main Bay (81016/Nov/16
Bay) at Jabalpur
9:00Pooling
16/Nov/16
Station 18:00 Daily AMP works. PGCIL WRTS-II R
813 400 400KV GANDHAR-GPEC 16-Nov-16 8:00 17-Nov-16 18:00 Cont. Annual bay maintenance and protection checking NTPC NTPC
814 400 Kasor -SSP (Daily) 16-Nov-16 8:00 17-Nov-16 18:00 Daily Maintenance work GETCO GETCO The autoreclosere of 400 KV SSP-
815 400 APL - Varsana Line 1 16-Nov-16 8:00 16-Nov-16 18:00 Daily Maintenance work GETCO GETCO As per Annual Planning
816 400 Chorania-Amreli Line 16-Nov-16 8:00 16-Nov-16 18:00 Daily Maintenance work GETCO GETCO
817 765 SWITCHABLE LR_765kV_PADGHE2_AURANGABAD 17-Nov-16 8:00 19-Nov-16 18:00 Daily For RTV coating on HV Bushings at Aurangabad . Reactor WRTS-I
used in A'bad-Solapur
WRTS-I R line. Only Recator is taken out; l
818 400 400kV RAIPUR-WARDHA I & 400kV RAIPUR-WARDHA 17-Nov-16II 8:00 18-Nov-16 19:00 Conti. For crossing of under construction 765 Kv Durg -WardhaWRTS-I
# 3 & 4 line.
WRTS-I C
819 765 765/400kv AT1_MAIN_BAY_712 at Seoni 17-Nov-16 8:00 17-Nov-16 18:00 Daily For AMP works at Seoni WRTS-I WRTS-I R
820 400 200kV Buscoupler Bay (204) at Bhatapara S/s. 17-Nov-16 9:00 17-Nov-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
821 765 765KV DURG PS - D'JAIGARH 17-Nov-16 9:00 19-Nov-16 18:00 Daily Line with Reactor outage required for NGR bypass & CSD WRTS-I
commissioning
WRTS-I works
C at Durg PS..
822 400 411_TIE BAY_ICT#1-KARAD at SOLAPUR 17-Nov-16 9:00 17-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
823 400 PUNE(GIS)-III Tie Bay ( 408)at Pune (Talegoan) 17-Nov-16 9:00 17-Nov-16 18:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
824 400 400 KV Bus # 2 at Wardha 17-Nov-16 9:00 18-Nov-16 18:00 Conti. Bus Extension work for upcoming 400 KV A''bad ckt 1 &2WRTS-I
lines at Wardha.
WRTS-I C
825 400 400kV RAIPUR-WARDHA II 17-Nov-16 9:00 17-Nov-16 18:00 Daily Reactor AMP work at Wardha WRTS-I WRTS-I R
826 400 400 KV SEONI-BHILAI LINE 17-Nov-16 9:00 17-Nov-16 18:00 daily FOR RECTIFICATION OF DEFECTS OBSERVED DURING MPPTCLROUTINEMPPTCL
PATROLLING
R ATTEND THE DAMPER AR
827 400/220kV167 MVA Spare ICT @ Jejuri 17-Nov-16 10:00 16-Nov-16 18:00 Daily Quarterly maintenance work MSETCL MSETCL Single phase spare ict
828 400 kV Lonikand II - Parli ckt -2 17-Nov-16 9:30 17-Nov-16 17:30 Daily Annual testing and maint work MSETCL MSETCL Load can be managed on 400 Para
829 400/220kV500MVA ICT-III @ Parli 17-Nov-16 09:00 17-Nov-16 18:00 Daily Half yearly maintenance & diagnostic testing MSETCL MSETCL
830 400 400 kV GT10 breaker at Mundra (403 52) 17/Nov/16 9:00 17/Nov/16 20:00 Daily Breaker PM and testing CGPL CGPL
831 220 Kakrapar-Halderwa#1 17/Nov/16 8:00 17/Nov/16 18:00 Daily Replcaement of Porclein Insulators with CLR Polymer insulators
PGCIL in WR-II
balance portion
C of line to prevent line tripping d
832 220 Transfer Bus at Dehgam 17/Nov/16 9:00 17/Nov/16 18:00 Daily AMP works PGCIL WR-II R
833 765 Indore Line reactor at Bina 17/Nov/16 9:30 17/Nov/16 18:00 Daily RTV Coating on HV bushing in R phase. Line will be takenPGCIL
into service
WR-II withoutRLR within 30 minutes
834 765 Indore main bay at Bina 17/Nov/16 9:30 17/Nov/16 18:00 Daily AMPWORKS PGCIL WR-II R
835 400 Indore-2 & Future tie bay (402) at Khandwa ss 17/Nov/16 9:30 17/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
836 400 Bay 417 400KV Bhachau-Varsana-1 & Eassar-2 Tie 17/Nov/16
Bay at Bhachau
9:00 SS17/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
837 400 400KV Satna Bina Line#4 Main Bay (416Bay) at Satna
17/Nov/16
SS 9:00 17/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
838 400 RAJGARH- KHANDWA # 1 MAIN BAY (403) AT RAJGARH 17/Nov/16 SUBSTATION
10:00 17/Nov/16 17:00 DAILY Annual Maintenance of CB and CT PGCIL WR-II R
839 220 220KV BAY-209 (TBC BAY) at Pirana 17/Nov/16 10:00 17/Nov/16 17:00 DAILY AMP WORK PGCIL WR-II R
840 765 ICT-2 main bay 406 at Vindhyachal Pooling Station
17/Nov/16 9:00 17/Nov/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCIL by M/sWR-II
alstom C
841 400 400KV Bus # 2 at Jabalpur Pooling Station 17/Nov/16 9:00 17/Nov/16 18:00 Daily AMP works. PGCIL WRTS-II R
842 765 765kV JBP PS - Bina # 2 Line Main Bay (818 Bay) 17/Nov/16
at Jabalpur Pooling
9:00 Station
17/Nov/16 18:00 Daily AMP works. PGCIL WRTS-II R
843 400 APL - Varsana Line 2 17-Nov-16 8:00 17-Nov-16 18:00 Daily Maintenance work GETCO GETCO
844 400 Bhachau - Vadavi - 2 17-Nov-16 8:00 17-Nov-16 18:00 Daily Bay maintenance work PGCIL GETCO
845 400 Chorania-Hadala Line 17-Nov-16 8:00 17-Nov-16 18:00 Daily Line PMM work GETCO GETCO
846 100 & 220
100kV Padghe –Shahpur-1&2 Line & 220kv Padghe-Jindal-Nasik
18-Nov-16 6:00
D/C Line
19-Nov-16 18:00 Conti. Powerline crossing works of 765kV D/C Aurangabad-Padghe MSETCL between
WRTS-I
tower location
C Nos 354/0 & 355/0.Both 100
847 765 SEONI - BINA LINE 18-Nov-16 8:00 19-Nov-16 18:00 Daily Replacement of quad conductors in line equipments withWRTS-II WRTS-II
twin conductors R
at seoni
848 400 400kV Korba Main bay (403) at Bhatapara S/s. 18-Nov-16 9:00 18-Nov-16 18:00 Daily For AMP Works at Bhatapara WRTS-I WRTS-I R
849 220 Amona line Bay (203) at Mapusa 18-Nov-16 9:00 22-Nov-16 18:00 Conti. CB Overhauling works at Mapusa.Line will be in service through
WRTS-1transfer
WRTS-I bay R
850 400 422_MAIN BAY_765KV ICT#1_ at SOLAPUR 18-Nov-16 9:00 18-Nov-16 18:00 Daily For AMP works at Solapur. WRTS-I WRTS-I R
851 220 Transfer Bus at Pune (Talegoan) 18-Nov-16 9:00 18-Nov-16 12:00 Daily For AMP works at Pune (Talegoan) WRTS-I WRTS-I R
852 765 765kV Aurangabad # 3 719 Bay at Wardha 18-Nov-16 9:00 18-Nov-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R
853 765 765 KV BUS-II at Tamnar PS 18-Nov-16 10:00 19-Nov-16 18:00 Daily For AMP works at Tamnar WRTS-I WRTS-I R
854 400 400 KV BHOPAL- BINA CkT-II 18-Nov-16 9:00 18-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
855 220 220 KV ANOOPUR - KOTMIKALA CKT - I I 18-Nov-16 10:00 18-Nov-16 17:00 daily FOR SCHEDULED MAINTENANCE & TESTING WORK MPPTCL MPPTCL R
856 765 KV 706-Bay (Main Bay of Koradi-III Line-1) at Akola 18-Nov-16
-II Substation 9:00 17-Nov-16 18:00 Daily Outage required for quarterly maintenance work MSETCL MSETCL
857 400KV Tie Bay (411) of Line-4 at Koradi III Sub Station. 18-Nov-16 8:00 18-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
858 400KV Main BAY (403) of 400kV side of ICT at APML Tiroda 18-Nov-16
Plant 8:00 18-Nov-16 18:00 Daily Annual Maintenance of bays equipment MEGPTCLMEGPTCL
859 400 400 kV GT20 tie breaker at Mundra (408 52) 18/Nov/16 9:00 18/Nov/16 20:00 Daily Breaker PM and testing CGPL CGPL
860 765 765kV Bina - Gwalior #1 Line 18/Nov/16 10:00 18/Nov/16 13:00 Daily To attained current ubalancing problem in 712 bay by Carrying
PGCILout CRMWR-IIof issolator
C at Gwalior
861 220 Kakrapar-Halderwa#2 18/Nov/16 8:00 18/Nov/16 18:00 Daily Replcaement of Porclein Insulators with CLR Polymer insulators
PGCIL in WR-II
balance portion
C of line to prevent line tripping d
862 400 Bus Bar # 1 at Dehgam 18/Nov/16 9:00 18/Nov/16 18:00 Daily AMP works PGCIL WR-II R
863 765 Indore Line reactor at Bina 18/Nov/16 9:30 18/Nov/16 18:00 Daily RTV Coating on HV bushing in Y phase. Line will be takenPGCIL
into service
WR-IIwithout R
LR within 30 minutes.
864 400 B/R#1(63 MVAR) Main Bay(409) at Shujalpur 18/Nov/16 10:00 18/Nov/16 18:00 Daily For AMP works PGCIL WR-II C
865 400 Indore-1 main bay (406) at Khandwa ss 18/Nov/16 9:30 18/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
866 400 Bay 418 400KV Bhachau-Essar-2 Main Bay at Bhachau18/Nov/16
SS 9:00 18/Nov/16 18:00 Daily AMP of Bay Equipments PGCIL WR-II R
867 400 400KV Satna Bina Line#4 Tie Bay (417Bay) at Satna18/Nov/16
SS 9:00 18/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
868 765 ICT-2 Tie bay 405 at Vindhyachal Pooling Station18/Nov/16 9:00 18/Nov/16 17:00 Daily Detail Breaker operation checks for Fine tuning of CSD relay
PGCIL by M/sWR-II
alstom C
869 400 400KV, Pithumpur ckt #II main bay(Bay 404) at Indore
18/Nov/16
PS 10:00 19/Nov/16 18:00 conti For rarresting SF6 gas leakages in 404 bay CB PGCIL WR-II R
870 765 765kV ICT # 1 Main Bay (803 Bay) at Jabalpur Pooling
18/Nov/16
Station 10:00 18/Nov/16 18:00 Daily AMP works. PGCIL WRTS-II R
871 400 SSNL-Dhule-2 (Daily) 18-Nov-16 8:00 19-Nov-16 18:00 Daily Maintenance work PGCIL GETCO The autoreclosere of 400 KV SSP-
872 400 APL - Varsana Line 3 18-Nov-16 8:00 18-Nov-16 18:00 Daily PMM Work GETCO GETCO
873 400 Chorania-Asoj line No. 1 (Daily) 18-Nov-16 8:00 19-Nov-16 18:00 Daily Line PMM work GETCO GETCO
874 400 ICT-1 Main bay (401) at Bilaspur PS. 19-Nov-16 9:00 19-Nov-16 18:00 Daily For attending the CB NRV problem at Bilaspur. WRTS-I WRTS-I R
875 220 220 KV RAJGARH (PG) - PITHAMPUR CKT -II 19-Nov-16 9:00 19-Nov-16 16:00 daily FOR TIGHTENING OF JUMPER CONE & ARCHING HORN MPPTCL& OTHER
MPPTCL
MAINTENANCE
R WORK
876 400KV Main BAY (406) of 400kV Tirora- Warora Line -1 at 19-Nov-16
APML Tiroda 9:00
plant 18-Nov-16 18:00 Daily Bay Equipment maintenance . ATIL ATIL
877 400KV Khadka Deepnagar -1 19-Nov-16 9:00 19-Nov-16 17:00 Daily Quarterly Maintenance work /Diagnostic Testing work at 400kV
MSETCL Khadka
MSETCL& Deepnagar end.
878 400 400 kV GT20 breaker at Mundra (409 52) 19/Nov/16 9:00 19/Nov/16 20:00 Daily Breaker PM and testing CGPL CGPL
879 765 765kV Bina - Gwalior # 2 19/Nov/16 10:00 19/Nov/16 13:00 Daily To attained current ubalancing problem in 714 bay by Carrying
PGCILout CRMWR-IIof issolator
C at Gwalior
880 220 Kakrapar-Vapi#1 19/Nov/16 8:00 19/Nov/16 18:00 Daily Replcaement of Porclein Insulators with CLR Polymer insulators
PGCIL in WR-II
balance portion
C of line to prevent line tripping d
881 765 Indore Line reactor at Bina 19/Nov/16 9:30 19/Nov/16 18:00 Daily RTV Coating on HV bushing in B phase. Line will be takenPGCIL
into service
WR-IIwithoutRLR within 30 minutes.
882 765 Jabalpur-Bina 2 Line With Reactor 19/Nov/16 9:30 19/Nov/16 11:30 Daily For taking of spare reactor out of service bus-1 side. PGCIL WR-II R
883 400 Indore-1 & Future tie bay (405) at Khandwa ss 19/Nov/16 9:30 19/Nov/16 17:30 Daily BCU commissioning work for NTAMC PGCIL WR-II R
884 400 400KV V'chal Satna Line#4 Main Bay (418Bay) at19/Nov/16
Satna SS 9:00 19/Nov/16 18:00 Daily For AMP work PGCIL WR-II R
885 765 1500 MVA ICT# 2 at Vindhyachal PS 19/Nov/16 9:00 19/Nov/16 17:00 Daily Fine tuning of CSD relay by M/s alstom at vindhyachal psPGCIL WR-II C
886 765 765kV JBP PS - Bina # 1 Line along with reactor (Terminal
19/Nov/16Equipments)
9:00 19/Nov/16
at Jabalpur Pooling
18:00 Station.
Daily AMP works. PGCIL WRTS-II R
887 400 Bhachau - Vadavi - 1 19-Nov-16 8:00 19-Nov-16 18:00 Daily Bay maintenance work PGCIL GETCO
888 400 J P NIGRI-SATNA-2 19-Nov-16 9AM 19-Nov-16 5PM Daily Fixing and Tightening of Jumper Nut & Bolts,Arcing HornsJP&NIGRIEJP
ConductorNIGRIE
Repairing
Anaulagnak 3.3

A@TUbar 2016 AaOr navambar 2016 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2016 AND NOVEMBER 2016

maaMga }jaa- kI AavaSyakta


rajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)
A@TUbar 2016 navambar 2016 A@TUbar 2016 navambar 2016
OCTOBER 2016 NOVEMBER 2016 OCTOBER 2016 NOVEMBER 2016

1 gaujarat GUJARAT

saIimat RESTRICTED 14800 14100 9140 8400


AsaIimat UNRESTRICTED 14840 14140 9150 8450

2 maQya p`doSa MADHYA PRADESH

saIimat RESTRICTED 8700 8500 5500 5500


AsaIimat UNRESTRICTED 8700 8500 5500 5400

3 C<aIsagaZ, CHHATISGARH

saIimat RESTRICTED 3921 3564 2184 1776


AsaIimat UNRESTRICTED 3921 3564 2184 1776

4 maharaYT/ MAHARASHTRA

saIimat RESTRICTED 21250 21150 14200 14350


AsaIimat UNRESTRICTED 21350 22200 14300 14400

5 gaaovaa GOA

saIimat RESTRICTED 545 535 390 395


AsaIimat UNRESTRICTED 550 540 400 410

6 dmana dIva DD

saIimat RESTRICTED 355 350 215 210


AsaIimat UNRESTRICTED 360 355 220 210

7 DI ena eca DNH

saIimat RESTRICTED 755 760 495 500


AsaIimat UNRESTRICTED 765 760 505 510

8 piScama xao~ WESTERN REGION

saIimat RESTRICTED 50200 50100 31800 30900


AsaIimat UNRESTRICTED 50700 50250 31400 31100
Anaulagnak 4.1
maah isatmbar 2016 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata
ACTUAL GENERATION & AVALABILITY FOR SEPTEMBER 2016
Schedule yaaojanaa Actual vaastivak
k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO
1. ]k[- Ukai - 1 5.77 75
]k[- Ukai - 2 4.26 75
]k[- Ukai - 3 5.86 75
]k[- Ukai - 4 3.75 75
]k[- Ukai (Total) 42 150 19.63 150 0.000
2. ]k[- ela baI saI eca Ukai LBCH - 1 0.62 3
]k[- ela baI saI eca Ukai LBCH - 2 1.17 3
]k[- ela baI saI eca Ukai LBCH (Total) 2 3 1.79 4 0.022
3. kDanaa Kadana - 1 22.38 60 0.000
kDanaa Kadana - 2 18.31 60 0.000
kDanaa Kadana - 3 23.39 60
kDanaa Kadana - 4 30.70 60 0.080
kDanaa Kadana (Total) 16 120 4.93 60 0.080
4. pnama PANAM & Madhuban Dam 1 & 2 0 0 4.12 7 0.036
6. kula jalaIya TOTAL(H) 60 273 30.48 225 0.335
tapIya THERMAL
1 TaoronT pavar ilaimaToD yauinaT saI 42 60 0.00 0 0.060
2 TaoronT pavar ilaimaToD yauinaT DI 85 120 79.24 124 7.273
3 TaoronT pavar ilaimaToD yauinaT [- 0 0 69.77 124 6.169
4 TaoronT pavar ilaimaToD yauinaT ef 74 121 85.49 123 7.440
5 TaoronT pavar ilaimaToD yauinaT jaI TI 1 0.00 0
6 TaoronT pavar ilaimaToD yauinaT jaI TI 2 0 0 0.00 0
7 TaoronT pavar ilaimaToD yauinaT esa TI jaI 0.00 0
8 Qauvarna tapIya Dhuvaran - 5 0 0 0.00 0 0.000
9 Qauvarna tapIya Dhuvaran - 6 0 0 0.00 0 0.000
10 Qauvarna tapIya Dhuvaran - GT 1 0.00 0 0.885
11 Qauvarna tapIya Dhuvaran - GT 2 0 0 0.00 0 0.607
12 Qauvarna tapIya Dhuvaran - STG 12.15 98
13 ]ka[- yauinaT 1 Ukai -1 70 100 0.00 0 0.189
14 ]ka[- yauinaT 2 Ukai -2 70 100 0.00 0 0.056
15 ]ka[- yauinaT 3 Ukai -3 36 200 67.02 201 6.637
16 ]ka[- yauinaT 4 Ukai -4 140 200 85.21 202 8.492
17 ]ka[- yauinaT 5 Ukai -5 19 50 90.71 214 7.999
18 ]ka[- yauinaT 6 Ukai -6 306.35 507 19.840
19 gaaMQaInagar 1 Gandhinagar - 1 70 100 0.00 0 0.092
20 gaaMQaInagar 2 Gandhinagar - 2 70 100 0.00 0 0.053
21 gaaMQaInagar 3 Gandhinagar - 3 136 210 65.23 214 6.992
22 gaaMQaInagar 4 Gandhinagar - 4 145 210 34.07 212 4.465
23 gaaMQaInagar 5 Gandhinagar - 5 37 210 106.40 211 10.727
24 vaNakbaaorI 1 Wanakbori - 1 0 0 83.37 206 0.000
25 vaaNakbaaOrI 2 Wanakbori - 2 145 210 26.21 210
26 vaaNakbaaOrI 3 Wanakbori - 3 145 210 23.72 201
27 vaaNakbaaOrI 4 Wanakbori - 4 89 150 42.83 210
28 vaaNakbaaOrI 5 Wanakbori - 5 145 210 24.33 208
29 vaaNakbaaOrI 6 Wanakbori - 6 145 210 19.62 210
30 vaaNakbaaOrI 7 Wanakbori - 7 145 210 93.08 212
31 ]%trna Utran GT 1 0 0 0.00 0 0.000
32 ]%trna Utran GT 2 0 0 0.00 0 0.000
33 ]%trna UTRAN - GT- 3 0 0 0.00 0 0.000
34 ]%trna UTRAN - GT-4 0 0 0.49 197 0.342
35 ]%trna UTRAN - STG-I 0 0 0.00 0 0.620
36 ]%trna UTRAN - STG-II 0 0 0.00 0 0.000

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
37 isa@ka Sikka - 1 70 110 8.54 90 1.407
38 isa@ka Sikka - 2 70 110 104.35 329 12.868
39 kcC ilagnaa[-T Kutch Lignite - 1 45 70 21.68 70 9.623
40 kcC ilagnaa[-T Kutch Lignite - 2 45 70 18.39 70
41 kcC ilagnaa[-T Kutch Lignite - 3 47 75 27.23 76
42 kcC ilagnaa[-T Kutch Lignite - 4 0 0 5.38 71 1.406
43 saUrt ilagnaa[-T Surat Lignite - 1 75.94 130 7.880
173 240
44 saUrt ilagnaa[-T Surat Lignite - 2 44.74 127 4.997
45 saUrt ilagnaa[-T Surat Lignite - 3 62.87 125 6.177
46 saUrt ilagnaa[-T Surat Lignite - 4 7.03 123 1.256
47 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1 63.19 106 9.623
60 100
48 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2 62.69 95
49 jaI Aa[- pI saI ela GIPCL GT - 1 5.66 31 0.000
50 jaI Aa[- pI saI ela GIPCL GT - 2 18.29 32
95 140
51 jaI Aa[- pI saI ela GIPCL GT - 3 14.56 33
52 jaI Aa[- pI saI ela GIPCL ST - 1 20.92 33
53 jaI Aa[- pI saI ela GIPCL GT - 4 0.00 0 0.000
95 140
54 jaI Aa[- pI saI ela GIPCL ST - 2 0.00 0
55 [- esa esa e Aar ESSAR GT - 1 0.00 0 0.000
56 [- esa esa e Aar ESSAR GT - 2 0.00 0
350 480
57 [- esa esa e Aar ESSAR GT - 3 0.00 0
58 [- esa esa e Aar ESSAR STG 0.00 0
59 jaI pI [- saI GPEC GT - 1 5.67 147 0.114
60 jaI pI [- saI GPEC GT - 2 8.80 151 0.250
430 600
61 jaI pI [- saI GPEC GT - 3 11.57 145 0.240
62 jaI pI [- saI GPEC STG 5.65 150
63 jaI esa [- jaI GSEG GT - 1 0.00 0 0.000
64 jaI esa [- jaI GSEG GT - 2 90 150 0.00 0
65 jaI esa [- jaI GSEG STG 57.26 352
66 Sugen (GT 1 + GT 2) 0 0 224.59 361 10.945
67 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 3477.09 4829

kula tapIya Total (T) 5277 7992 5952.97 11285 437.568


kula jalaIya+tapIya Total (H+T) 6130 9359 5983.44 11877 437.903
ivaMD [najaI- Wind Energy 772.06
kula jalaIya+tapIya+hvaa Total (H+T+Wind) 6755.50 13065
ivainamaya Exchanges (+) 2536.52
saIimat }jaa- maaMga Restricted Energy Req. 9140 9292.02
K (B) MADHYA PRADESH maQya p`doSa
jalaIya HYDRO
1 cambala pir Chambal Pr.(50%share) 50 114 23.31 191
1.1 gaaMQaI saagar Gandhi Sagar 13.00 111 0.090
1.2 raNaa p`tap sagar R.P.Sagar 19.06 172 0.030
1.3 javaahr sagar Jawahar Sagar 14.56 99 0.020
2 ponca Pench 40 75 85.13 165 0.070
3 baargaI Bargi 50 90 61.34 93 0.060
4 baargaI Bargi (LBCH) 0.01 0
5 banasaagar Toansa Bansagar-1 (Tons) 130 315 178.63 232 0.440
6 banasaagar Bansagar-2 (Deolondh) 0 0 32.00 63
7 banasaagar Bansagar-3 (Silpara) 30 60 10.01 32 0.020
8 banasaagar Bansagar-4 (Zinaha) 0 0 10.98 22 0.040
9 maoDIKoDa Medikheda 30 60 14.13 63
10 ibarisaMGapur Birsingpur 15 20 10.18 20 0.030
11 Tavaa Tawa 0 0 0.00 0
12 rajaGaaT Rajghat 20 30 0.00 0 0.040
13 Omkareshwar 210 360 133.21 430 0.534
14 [Midra saagar Indira Sagar 610 990 311.44 1035 0.963
kula jalaIya TOTAL(H) MPPGCL 1185 2114 785.24 2466 1.374

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSna ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
tapIya THERMAL
1 AmarkMTk II AMK II Unit -1 0.00 0 9.480
61 82
2 AmarkMTk II AMK II Unit -2 0.00 0
3 AmarkMTk III AMK III Unit -5 0 0 92.98 224 0
4 satpura I Satpura-I(60%Share) 50 67 0.00 0 0.000
5 satpura II Satpura-II Unit 6 6.56 180 5.390
128 163
6 satpura II Satpura-II Unit 7 39.89 190
7 satpura II Satpura-II Unit 8 38.77 187 6.880
122 163
8 satpura II Satpura-II Unit 9 20.71 197
9 satpura III Satpura-III Unit 10 7.88 188 12.200
10 satpura III Satpura-III Unit 11 16.12 173 12.370
11 esajaITIpIesa 1 SGTPS Unit - 1 16.12 173 12.370
142 191
12 esajaITIpIesa 2 SGTPS Unit - 2 108.83 206
13 esajaITIpIesa 3 SGTPS Unit - 3 104.89 198 18.810
144 194
14 esajaITIpIesa 4 SGTPS Unit - 4 72.22 194
15 esajaITIpIesa 5 SGTPS Unit - 5 291 390 328.50 508
16 SSTPS 88.90 609 10.050
kula tapIya Total (T) 1057 1409 1094.13 2349 93.590
kula jalaIya+tapIya Total (H+T) 2572 4036 1879.37 4912 94.964
Injection from WIND 560.08 0
kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 2439.45 4912
ivainamaya Exchanges (+) 3063.18
saIimat }jaa- maaMga Rest. En. Req. 4900 5502.63
ga (C) CHHATTISGARH C<aIsagaZ,
jalaIya HYDRO
1 hsadova baaMgaao Hasdeo Bango 55 120 46.54 120 0.080
2 Gangrel 6 19 6.67 10 0.060
3 Mini Micro KWB 1.10 7
kula jalaIya TOTAL(H) CSEB 61 139 54.31 137 0.150
tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 30 50 27.64 43 11.340
2 kaorbaa (pU) Korba (E) Unit-2 30 50 27.64 44
3 kaorbaa (pU) Korba (E) Unit-3 30 50 27.64 42
4 kaorbaa (pU) Korba (E) Unit-4 30 50 27.84 45
5 kaorbaa (pU) Korba (E) Unit -5 71 120 36.85 120 13.540
6 kaorbaa (pU) Korba (E) Unit -6 71 120 66.82 120
7 kaorbaa (p) Korba (W) Unit -1 125 210 116.93 210 0.000
8 kaorbaa (p) Korba (W) Unit -2 125 210 116.93 210
9 kaorbaa (p) Korba (W) Unit -3 125 210 116.93 210 25.340
10 kaorbaa (p) Korba (W) Unit -4 125 210 116.93 210
11 KORBA(EB) Extn - 1 0 250 174.59 254 13.820
12 KORBA(EB) Extn - 2 149 250 169.29 253 13.600
kula tapIya Total (T) 1229.74 1993 115.866
13 baalakao sao Aayaat BALCO Import 0.00 0
14 ijandla sao Aayaat JINDAL Import 0.00 0
kula tapIya Total (T+IPP) 911 1780 1229.74 1993
kula jalaIya+tapIya Total (H+T) 966 1900 1284.05 2130 116.016
ivainamaya Exchanges (+) 804.42 0
saIimat }jaa- maaMga Rest. En. Req. 2184 2088.47 2130
Ga (D) MAHARASHTRA maharaYT/
jalaIya HYDRO
1 kaoyanaa 1AaOr 2 Koyna 1 & 2 74 300 89.99 590 1.960
2 kaoyanaa III Koyna III 49 150 41.66 240
3 kaoyanaa IV Koyna IV 165 600 42.40 1005
4 kaoyanaa DIpIeca Koyna DPH 10 20 14.51 37
5 TaTa jalaIya TATA Hydro 120 444 153.44 459 4.070
6 vaOtrNaa Vaitarna 3 60 5.18 61
7 eladarI Eldari 5 10 0.00 0
8 BaTgar AaOr vaIr Bhatgar & Vir 3 5 0.00 4
9 pOzana Paithan 0 0 1.93 32
10 itlaarI Tillari 0 0 9.46 63
11 BaIra Tola rosa Bhira Tail Race 9 80 13.51 81
12 GaTGar Ghatghar 37 250 22.21 255
13 Anya CaoTo jalaIya Small Hydro (others) 32 47 19.26 0
kula jalaIya TOTAL(H) 506 1966 436.56 459 6.030

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
tapIya THERMAL
3 naaisak 3 Nasik Unit -3 105 140 0.00 0
4 naaisak 4 Nasik Unit -4 85 115 123.97 205
5 naaisak 5 Nasik Unit -5 133 180 124.01 203
6 T/ambao 4 Trombay Unit -4 0 0 0.00 0
7 T/ambao 5 Trombay Unit -5 250 500 228.33 489
8 T/ambao 6 Trombay Unit -6 130 500 0.00 0
9 T/ambao 8 Trombay Unit -8 0 0 154.07 250
10 T/ambao 7A gaOsa Trombay -7A (Gas) 79.95 128 3.256
0 0
11 T/ambao 7ba Trombay -7B (WHR) 47.20 71
12 kaoraD,I 5 Koradi Unit -5 65 85 10.83 145
13 kaoraD,I 6 Koradi Unit -6 75 100 0.00 0
14 kaoraD,I 7 Koradi Unit -7 75 100 325.53 835
15 Bausaavala 2 Bhusawal Unit -2 110 150 0.00 0
16 Bausaavala 3 Bhusawal Unit -3 100 135 6.80 165
17 Bausaavala 4 Bhusawal Unit -4 250 335 93.04 510
18 Bausaavala 4 Bhusawal Unit -5 0 0 136.14 510
19 parlaI 3 Parli Unit -3 0 0 0.00 0
20 parlaI 4 Parli Unit -4 0 0 0.00 0
21 parlaI 5 Parli Unit -5 0 0 0.00 0
22 parlaI 6 Parli Unit -6 155 210 0.00 0
23 parlaI 7 Parli Unit -7 40 55 0.00 0
24 KaprKoD,a 1 Khaperkheda Unit -1 80 110 45.01 195
25 KaprKoD,a 2 Khaperkheda Unit -2 100 135 62.12 175
26 KaprKoD,a 3 Khaperkheda Unit -3 350 470 70.68 198
27 KaprKoD,a 4 Khaperkheda Unit -4 68.43 192
28 KaprKoD,a 5 Khaperkheda Unit -5 135 180 260.02 508
30 parsa Paras-3 135 180 133.32 259
31 parsa Paras-4 200 430 144.11 263
32 ]rna Uran (Gas) 200 430 221.72 454
33 ]rna Uran (WHR) 100 220 0.00 0 5.592
34 caMd`pur 1 Chandrapur Unit -1 100 135 0.00 0
35 caMd`pur 2 Chandrapur Unit -2 100 135 0.00 200
36 caMd`pur 3 Chandrapur Unit -3 90 120 125.47 189
37 caMd`pur 4 Chandrapur Unit - 4 70 95 105.04 430
38 caMd`pur 5 Chandrapur Unit -5 80 110 264.81 455
39 caMd`pur 6 Chandrapur Unit -6 190 255 239.12 954
40 caMd`pur 7 Chandrapur Unit -7 150 200 419.56 0
41 DhaNaU 1 Dahanu Unit-1 154.27 250 14.688
372 500
42 DhaNaU 2 Dahanu Unit-2 152.80 250 14.688
43 CPP 0.00 0.00 3069.41 4263.07
44 RGPPL Share 200 300 0.00 0
kula tapIya Total (T) 6290 9090 6865.76 10585 273.446
MAH. Wind + Solar Generation 641.34 0
kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 7943.66 12113 317.700
ivainamaya
TOTAL (H+T) Exchanges (+) 3421.52
saIimat }jaa- maaMga Rest. En. Req. 14400 11365.17
ca (E) gaaovaa GOA
Aa[- pI pI irlaayaMsa IPP Reliance 17.68 30
ivainamaya Exchanges 420.73
saIimat }jaa- maaMga Rest. En. Req. 370 535 442.23 468
C (F) dmana AaOr dIva DAMAN & DIU 210.71 338
ja (G) dadra nagar hvaolaI DNH 521.79 787
kula DD &DNH (T) 133 242 732.49 1124

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
(H) koMd`Iya xao~ Central Sector
1. ena pI saI N.P.C.
1.1 tara`pur 1 TAPS Unit -1 80 160 115.52 160 10.140
1.2 tara`pur 2 TAPS Unit -2 80 160 117.68 160
1.3 tara`pur 3 TAPS Unit -3 300 480 384.91 541 70.460
1.4 tara`pur 4 TAPS Unit -4 300 480 377.00 537
1.5 kakrapr 1 KAPS Unit -1 125 200 0.00 541 3.537
1.6 kakrapr 2 KAPS Unit -2 125 200 0.00 537
kula ena pI saI NPC Total 1010 1680 995.10 2476
2. ena TI pI saI N.T.P.C.
2.1 kaorbaa esaTIpIesa 1 KSTPS Unit-1 137.33 202
2.2 kaorbaa esaTIpIesa 2 KSTPS Unit-2 136.31 205
2.3 kaorbaa esaTIpIesa 3 KSTPS Unit-3 125.54 200
2.4 kaorbaa esaTIpIesa 4 KSTPS Unit-4 337.39 504
2.5 kaorbaa esaTIpIesa 5 KSTPS Unit-5 293.56 505
2.6 kaorbaa esaTIpIesa 6 KSTPS Unit-6 331.70 506
2.7 kaorbaa esaTIpIesa 7 KSTPS Unit-7 328.04 508
kula kaorbaa KSTPS Total 1510 2600 1689.86 2640 96.084
2.7 ivanQa esaTIpIesa 1 VSTPS Unit-1 90.23 155
2.8 ivanQa esaTIpIesa 2 VSTPS Unit-2 119.85 206
2.9 ivanQa esaTIpIesa 3 VSTPS Unit-3 98.90 165
2.10 ivanQa esaTIpIesa 4 VSTPS Unit-4 111.50 203
2.11 ivanQa esaTIpIesa 5 VSTPS Unit-5 80.41 160
2.12 ivanQa esaTIpIesa 6 VSTPS Unit-6 95.23 156
2.13 ivanQa esaTIpIesa 7 VSTPS Unit-7 276.11 505
2.14 ivanQa esaTIpIesa 8 VSTPS Unit-8 207.53 508
2.15 ivanQa esaTIpIesa 9 VSTPS Unit-9 176.79 500
2.16 ivanQa esaTIpIesa 10 VSTPS Unit-10 313.85 506
2.17 ivanQa esaTIpIesa 11 VSTPS Unit-11 238.00 503
kula ivanQayaacala VSTPS Total 2294 4260 2399.82 #REF! 182.22
3.1 saIpt -1 -SIPAT-1 428.19 660.00
3.2 saIpt -2 -SIPAT-2 460.58 665.00
3.3 saIpt -3 -SIPAT-3 455.17 670.00
3.4 saIpt -4 -SIPAT-4 346.87 505.00
3.5 saIpt -5 SIPAT-5 348.12 506.00
kula saIpt -SIPAT TOTAL 2038.93 3006.00 105.98
4.1 kvaasa gaOsa 1e Kawas GT-1A 19.72 100
4.2 kvaasa gaOsa 1baI Kawas GT-1B 0.00 0
4.3 kvaasa esaTI 1saI Kawas ST-1C 9.10 55
4.4 kvaasa gaOsa 2e Kawas GT-2A 0.05 85
4.5 kvaasa gaOsa 2baI Kawas GT-2B 7.47 102
4.6 kvaasa esaTI 2saI Kawas ST-2C 36.34 60
kula kvaasa KGPS Total 193 630 72.68 402 1.563
5.1 gaMQaar gaOsa 1 Gandhar GT-1 64.58 145
5.2 gaMQaar gaOsa 2 Gandhar GT-2 0.00 0
5.3 gaMQaar gaOsa 3 Gandhar GT-3 20.94 110
5.4 gaMQaar esaTI 4 Gandhar ST-4 39.27 149
kula gaMQaar GGPS Total 80 630 124.79 404 4.700
6.1 maaOda 1 Mauda -1 110.12 500 0.000
6.2 maaOda 2 Mauda -2 78.74 495 0.000
kula maaOda MAUDA Total 186 500 188.86 995 19.982
6.1 RGPPL Block I 0.00 0
6.2 RGPPL Block II 88.87 440
6.3 RGPPL Block III 293.26 425
RGPPL TOTAL 540 750 382.13 525 10.700
7.1 esa esa pI SSP RBPH - 1 70.86 194
7.2 esa esa pI SSP RBPH - 2 75.42 193
7.3 esa esa pI SSP RBPH - 3 51.08 194
7.4 esa esa pI SSP RBPH - 4 64.51 192
7.5 esa esa pI SSP RBPH - 5 59.46 191
7.6 esa esa pI SSP RBPH - 6 65.53 192
7.7 esa esa pI SSP CHPH - 1 20.81 40
7.8 esa esa pI SSP CHPH - 2 16.28 40
7.9 esa esa pI SSP CHPH - 3 20.95 43
7.10 esa esa pI SSP CHPH - 4 24.27 41
7.11 esa esa pI SSP CHPH - 5 12.70 40
kula esa esa pI SSP Total 580 900 481.88 1360 4.819
8.1 kula poMca Pench Total 40 75 85.13 165 0.070
8.2 Jindal Injection 345.69 0
8.3 Amarkantak Lanco 252.65 0

(I) piScamaI xao~ WESTERN REGION


ga`aosa ]%padna Gross generation 27134.84
(J) ]plabQata Availability 26468.73
naoT ivainamaya Net Exchanges (+) -5854.61
]plabQa }jaa- Energy Availability 32800 20614.13
maah isatmbar 2016 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 4.2
PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2016 ANNEX-4.2

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRi<a


Apoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 15002 - - - 15002 29.09.2016 1500 50.00
saIimat Restricted 14800
AsaIimat Unrestricted 14840 15002 0 0.00 0 15002 29.09.2016 1500 50
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 9242 9242 02.09.2016 0400 50.04
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 8094 - - - 8094 12.09.2016 1915 49.94
saIimat Restricted 7800
AsaIimat Unrestricted 7800 8094 0 17 0 8111 12.09.2016 1915 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 5085 5085 02.09.16 1600
C<aIsagaZ, CHHATTISGARH
pMjaIkRt Registered 3637 3637 23.09.2016 1900 49.97
saIimat Restricted 3921
AsaIimat Unrestricted 3921 3637 0 4 0 3641 23.09.2016 1900 49.97
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 2437 2437 17.09.16 1600 50.01
maharaYT/ MAHARASHTRA
pMjaIkRt Registered 20714 - - - 20714 12.09.2016 2000 49.99
saIimat Restricted 19600
AsaIimat Unrestricted 19650 20714 0 7 0 20721 12.09.2016 2000 49.99
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 11857 11857 24.09.16 0400 49.98
gaaovaa *GOA
pMjaIkRt Registered 535 468 - - 468 16.09.2016 2000 49.98
AsaIimat Unrestricted 535 468 0 0.33 - 468 16.09.2016 2000 49.98
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 759 - - 759 27.09.2016 0800 49.96
AsaIimat Unrestricted 759 0 0 - 759 27.09.2016 0800 49.96
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 328 - - 328 20.09.2016 1000 49.98
AsaIimat Unrestricted 328 0 0 - 328 20.09.2016 1000 49.98
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 773 - - 773 29.09.2016 1200 50.00
AsaIimat Unrestricted 773 0 0 - 773 29.09.2016 1200 50.00
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 47681 - - - 47681 12.09.2016 1900 49.94
saIimat Restricted 49800
AsaIimat Unrestricted 50500 47681 0 100 0 47781 12.09.2016 1900 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 33676 33676 19.09.2016 0400
NOTE: LS = Load Shedding
PC/RM = Power Cuts/Regulatory Measures
FC = Frequency Correction
Registered = Actual Demand Met
Restricted = Registered + LS + FC
Unrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering.
ANNEXURE 4.3
2016
Sep-16
अनु. . समांतर/ PARALLEL / RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 612:17:00

1 HVDC back-to back link(WR-NR)-Pole 2 720:00:00

2 HVDC back-to back link(WR-SR) NA


टाई लाईन TIE LINE
1
765 -I 765kV Seoni to Wardha-I 720:00:00

2
765 -II 765kV Seoni to Wardha-II 720:00:00

3
765 -I 765kV Seoni to Bilaspur-I 720:00:00

4
765 -II 765kV Seoni to Bilaspur-II 720:00:00

5
765 -I 765kV Durg to Wardha I 714:12:00

6
765 -II 765kV Durg to Wardha II 720:00:00

7
400 400kV Bhilai to Koradi 683:01:00
400
8 400kV Bhilai to Bhadravati 720:00:00

9
400 -I 400kV Raipur to Bhadravati-I 720:00:00

10
400 –II 400kV Raipur to Bhadravati-II 720:00:00

11
400 –III 400kV Raipur to Bhadravati-III 720:00:00

12
400 केवी सातपुरा से कोराडी 400kV Satpura to Koradi 717:24:00

13
400 केवी खंडवा से धुले-I 400kV Khandwa-Dhule-I 715:51:00

14
400 केवी खंडवा से धुले-II 400kV Khandwa-Dhule-II 720:00:00

15
400 केवी इंदौर से असोज-I 400kV Indore to Asoj-I 720:00:00

16
400 केवी इंदौर से असोज-II 400kV Indore to Asoj-II 720:00:00

17
400 केवी इंदौर से असोज-III 400kV Indore to Asoj-III 720:00:00

18
400 -I(GIS) 400kV Kolhapur-Mapusa-I(GIS) 5056:20:00

19
400 -II(GIS) 400kV Kolhapur-Mapusa-II(GIS) 266:25:00

20
400 केवी वापी से बोईसर 400kV Vapi-Boisar 720:00:00

21
400 केवी रायगढ़ से आयबीईयूएल 400kV Raigarh to IBEUL 639:45:00

22
400 400kV Raigarh to Sterlight 714:14:00

23
400 400kV Sterlight to Rouerkela 714:36:00

24
400 केवी रायगढ़ से झरसुगुड़ा 400kV Raigarh to Jharsuguda 720:00:00

25
400 केवी नागदा से दे हगाम-I 400kV Nagda to Dehgam 720:00:00

26
400 केवी नागदा से दे हगाम-II 400kV Nagda to Dehgam 720:00:00

27
400 –I 400kV Raipur to Wardha-I 718:04:00

28
400 –II 400kV Raipur to Wardha-II 700:38:00

29
400 –I 400kV Wardha to Mouda-II 710:46:00

30
400 –II 400kV Wardha to Mouda-II 713:34:00

31
220 -III 220kV K(E) to Budhipadar-III 718:42:00

भार , WRLDC, Mumbai


Anaulagnak 4.7
Annex-4.7
maah isatmbar 2016 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2016

ivavarNa Particulars ena eca DI saI


gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
kmaaMk NHDC

[Midra saagar
Sl. No. ]ka[- Ukai gaaMQaIsaagar Gandhisagar Indira Sagar kaoyanaa Koyna

1 Levels in Mtrs. str maITr maoM

1.1 maah ko AMt maoM 103.32 399.63 262.05 659.16


At the end of the month

1.2 ipClao vaYa- [sa maah ko Anau$p AaMkD,oM


102.31 399.26 260.78 652.58
Corresponding Figure of the
month Last Year
ANNEXURE -5
Grid Disturbance Report
Details of Grid Disturbance (GD) during the Month of (September 2016), in _Western_Region
Category of Grid Time and Date of Loss of generation / loss of load
Time and Date of
Sl No. Disturbance Affected Area occurrence of Grid Duration during the Grid Disturbance Brief details of the event ( pre fault and post fault system conditions)
Restoration
( GD-I to GD-V) Disturbance (MW)
Tripping of
Load Loss: NIL, Generation Loss: 1. 400 kV JP Nigrie-Satna-1
1 GI-2 Nigrie 02-09-16, 16:03:00 02-09-16, 16:03:00 0:00
1051 MW 2. 400 kV JP Nigrie-Satna-2
due to Y-Ph-E Fault.
Tripping of
1. 400 kV Amerli-Chornia S/C
Load Loss: NIL, Generation Loss: 2. 400 kV Amerli-Jetpur-2
2 GI-2 Amerli 05-09-16, 09:22:00 05-09-16, 09:58:00 0:26
NIL 3. 400/220 kV ICT-3
4. 400 kV Bus-I
due to Bus Bar protection operation at Amerli
Tripping of
1. 400 kV Satpura-Itarsi-1
Load Loss: NIL, Generation Loss:
3 GI-2 Satpura 06-09-16, 16:59:00 06-09-16, 19:15:00 2:16 2. 400 kV Satpura-Koradi-1
NIL
3. 400 kV Bus-2
due to Bus Bar protection operation at Satpura
Tripping of
1. 220 kV Shivpuri-Sabalgarh-1 & 2
2. 220 kV Shivpuri-Bina(PG)
Load Loss: NIL, Generation Loss:
4 GD-1 Shivpuri 06-09-16, 21:17:00 06-09-16, 22:33:00 1:16 3. 220 kV Shivpuri-Bina(MP)
NIL
4. Seopur Kalan-Sawai Madhopur(Khandar)-S/C
5. Seopur Kalan(MP)-Sabalgarh(MP)-2
due to Bus Bar protection operation and Blackout at Shivpuri
Tripping of
Load Loss:NIL , Generation Loss: 1. 220 kV Mehlgaon-Malanpur-1
5 GI-1 Mehlgaon 14-09-16, 16:56:00 14-09-16, 17:53:00 0:57
NIL 2. 220 kV Mehlgaon-Auriya
due to Bus Bar protection operation at Mehlgaon
Tripping of
1. 400 kV Kholapur-Mapusa-1
2. 400 kV Kholapur-Khudgi-1 & 2
3. 400 kV Kholapur-Khoalpur (GIS)-1 & 2
4. 400 kV Kholapur-Karad-I
5. 400/220 kV Kholapur ICT-1, 2 & 3
Load Loss: 150 MW , Generation
6 GD-1 Kholapur, Goa 17-09-16, 03:43:00 17-09-16, 04:01:00 0:18 6. 400/220 kV Mapusa ICT-1,2 & 3
Loss: NIL
7. 220 kV Mapusa-Amona S/C
8. 220 kV Mapusa-Tivim-1 & 2
9. 220 kV Mapusa-Ponda-I
10. 220 kV Mahalaxmi-Amona-I
11. 220 kV Tillari-Amona
due to Bus Bar protection operation at Kholapur
Tripping of
1. 400 kV CGPL-Jetpur-1
2. 400 kV Jetpur-Amerli-1
7 GI-2 Jetpur 18-09-16, 03:04:00 18-09-16, 04:25:00 1:21 Load Loss:NIL, Generation Loss: NIL
3. 400/220 kV ICT-1 & 4
4. 400 kV Bus-1
due to Bus Bar protection operation at Jetpur
Tripping of
1. 220 kV Kakrapar-Haldarawa-1 & 2
2. 220 kV Haldarwa-Jhanor-2
3. 220 kV Haldarwa-Jagdiya-1
8 GD-1 Haldarwa 24-09-16, 06:22:00 21-09-16, 07:22:00 1:00 Load Loss:NIL, Generation Loss: NIL 4. 220 kV Haldarwa-Wagara-1
5. 220 kV Kawas-Haldarwa-1
6. 220/132 kV ICT-2 & 3
7. 220 kV Bus-2
due to Bus Bar potection operation at Haldarwa
Tripping of
1. 400 kV Padghe-Nagothane-2
9 GI-2 Nagothane 24-09-16, 06:22:00 30-09-16, 18:40:00 0:37 Load Loss:NIL, Generation Loss: NIL 2. 400 kV Dhabol-Nagothane-1
3. 400 kV Bus-2
due to Bus Bar potection operation at Nagothane
ANNEXURE 10

SR NO UTILITIES OCC NO. MONTH STATUS REMARK


HELD ON 08.02.2016 AT NTPC
1 NTPC VINDHYACHAL 480 Feb-16 VINDHYACHAL
HELD ON 11.03.2016 AT
2 PGCIL RAIPUR 481 Mar-16 PGCIL RAIPUR
HELD ON 12.04.2016 AT
3 WRPC 482 Apr-16 WRPC MUMBAI
HELD ON 12.05.2016 AT MB
4 M B POWER 483 May-16 POWER
HELD ON 14.06.2016 AT
RAIPUR BY GMR
5 GMR CHHATTISHGARH 484 Jun-16 CHHATTISGARH
HELD ON 15.07.2016 AT
BILASPUR BY KSK MAHANADI
6 KSK 485 Jul-16 CHHATTISGARH
HELD ON 17.08.2016 AT
VARANASHI BY JAYPEE
7 JAYPEE NIGRIE STPP 486 Aug-16 NIGRI(JNSTPS)
HELD ON 16.09.2016 AT
8 APL 487 Sep-16 AHMEDABAD
9 WRTS-II 488 Oct-16 TO BE HELD ON 17.10.2016
10 D B POWER 489 Nov-16
11 NTPC, Mauda 490 Dec-16
12 RELIANCE TRANSMISSION 491 Jan-17
13 NCA 492 Feb-17
14 TORRENT POWER 493 Mar-17
15 DNH 494 Apr-17
16 KWPCL 495 May-17
17 RELIANCE INFRA 496 Jun-17
18 SUGEN (TPL) 497 Jul-17
19 NHDC 498 Aug-17
20 CHHATTISHGARH 499 Sep-17
21 DD 500 Oct-17
22 GUJARAT 501 Nov-17
23 RGPPL 502 Dec-17
24 MAHARASHTRA 503 Jan-18
25 JPL 504 Feb-18
26 WRTS-I 505 Mar-18
27 RKM POWER GEN 506 Apr-18
28 TAPS-1&2 507 May-18
29 NTPC Gandhar/Kawas 508 Jun-18
30 RELIANCE SASAN 509 Jul-18
31 MADHYA PRADESH 510 Aug-18
32 ESSAR TRANSMISSION 511 Sep-18
33 BDTCL/JBTCL 512 Oct-18
34 NTPC VINDHYACHAL 513 Nov-18
35 NTPC KORBA 514 Dec-18
36 TATA POWER 515 Jan-19
37 ADANI POWER(TIRODA) 516 Feb-19
38 NTPC SIPAT, CG 517 Mar-19
39 TAPS-3&4 518 Apr-19
40 CGPL 519 May-19
41 RATTAN INDIA POWER LTD 520 Jun-19

Das könnte Ihnen auch gefallen