Issue 07
Date 2018-02-10
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulat ed by the contract made bet ween Huawei and
the customer. All or part of the products, services and featu res described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. E very effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, a nd
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: http://www.huawei.com
Email: support@huawei.com
Contents
1 Introduction.................................................................................................................................... 1
1.1 About This Document .......................................................................................................................................................1
1.1.1 Product Version ........................................................................................................................................................1
1.1.2 Organization .............................................................................................................................................................1
1.1.3 Change History ........................................................................................................................................................1
1.2 Definit ion of and Grounds for Acceptance....................................................................................................................2
1.3 Acceptance Process ...........................................................................................................................................................2
1.3.1 Factory Acceptance .................................................................................................................................................3
1.3.2 Acceptance Upon Arrival .......................................................................................................................................3
1.3.3 Installat ion Acceptance...........................................................................................................................................4
1.3.4 Preliminary Acceptance..........................................................................................................................................5
1.3.5 Trial Running ...........................................................................................................................................................5
1.3.6 Final Acceptance......................................................................................................................................................5
1 Introduction
1.1.2 Organization
This document describes contents related to engineering acceptance. The following table lists
the contents of this document.
Section… Describes…
Part 3 Appendixes The performance indexes of the product, recommended test meters,
and the signature list cover and acceptance item list for
confirmation
Acceptance is the activity that a contractor checks the deliverables using the process, method,
and standards provided by a customer, to complete the contract between the two parties.
Acceptance is involved in the entire process from bidding based on customers' requirements,
to contract negotiation, to project delivery, and to contract completion. Therefore, acceptance
is a key milestone for ensuring contract payment.
The acceptance process involves the procedures from commissioning during production to the
issuance of the acceptance certificate. Following figure shows the acceptance process.
Equipment installation
Installation acceptance
Preliminary acceptance
Trial running
Fianl acceptance
A factory test report is a certificate of equipment quality delivered with the equipment whose
functions and specifications are strictly tested by Huawei according to the requirements of the
quality control system.
on the delivery list. If necessary, a few packing cases can be opened to inspect whether the
goods in the packing cases conform to that on the packing list. After the inspection,
representatives of a customer and Huawei sign a delivery note.
Generally, a contract regulates that arrival payment is received according to the delivery note.
3 Cable routing (1) Routing and binding of internal fibers meet the
requirements.
(2) Routing and binding of communication cables meet
the requirements.
(3) Power wires and cables are neatly arranged.
4 Ground cable (1) The connection of the ground cable meets standards.
(2) Routing and binding of the ground cable meet the
requirements.
Conclusion:
Inspection date
2 Preliminary Acceptance
Basic package The basic package contains the Remote acceptance The price of the basic
items that can be accepted remotely Simple or cheap package is included in the
through simple or cheap meters. The meters quotation of engineering
items in the basic package are used services.
Ensuring basic
to ensure normal running of the
basic services and functions of the services and
equipment and network. functions
Basic Package
Items in the basic package are used to test the quality of manual commissioning part at project
delivery, and are accepted remotely through the network management system (NMS) or
central equipment room. Items in the basic package include power commissioning and control,
normal running of various hardware and software functions, and BER tests on end-to-end
services. The acceptance of these items ensures the quality and availability of the network that
is delivered to a customer.
Therefore, do not perform on-site tests on the items in extended packages A and B. If a
customer strongly requires that the items should be tested on site, you can do as follows:
Help the customer to recognize Huawei's quality control system and after-sales service.
Provide the customer with the factory acceptance report and entry test report on these
items.
Recommend the customer to accept these items independently.
Recommend the customer to pay for the on-site acceptance of these items.
If a customer strongly requires that items other than items in the basic package be tested,
help the customer to recognize the quality control system and after-sales service, provide
the customer with the factory report and entry test report on these items, or recommend
the customer to accept the additional items independently.
If the preceding recommendations cannot meet the customer's requirement, select fewer
items from extended packages A and B and recommend the customer to pay for the work
hours for accepting these items and usage of meters.
Engineers are recommended to fully understand the significance and methods of acceptance
and the functions of all acceptance items. To deliver projects with high efficiency and high
quality, engineers need to fully communicate with customers and prepare proper acceptance
standards based on this document.
Function
The Acceptance Manual Builder can be used to automatically generate operation guide
(typeset acceptance items), customer signature list, meter list, and acceptance and work hour
list. If a customer is not satisfied with the result, engineers can adjust (delete or add) the items
quickly and repeatedly through the Builder.
http://support.huawei.com/support/pages/editionctrl/catalog/ShowVersionDetail.do?actionFla
g=clickNode&node=000001443121&colID=ROOTENWEB|CO0000000174
The preliminary acceptance should be performed based on the plan and acceptance items in
this document. An application for preliminary acceptance must be submitted before the
preliminary acceptance.
If any item does not pass the preliminary acceptance, the item must be commiss ioned based
on actual conditions.
The final result of the preliminary acceptance must conform to the standard provided by a
customer. Both parties need to sign on the signature list of the acceptance items.
Prepare fiber cleaning box to clean connectors during the test of optical interface
characteristics, to ensure the accuracy of test data.
Do not look directly into the optical interface during the test, to prevent the laser beam from
damaging your eyes.
In the 24-hour BER test, ensure that the test is free from interference (including artific ial
factors and power failure) during the entire test process. If anomalies occur, record the
accurate time when the anomalies occur, or perform the test again.