Network & Technology Introduction

Part 2 (2016)

Leo-Geert van den Berg


Ziggo, December 2016
Content

1. Network & Technology high over

2. Access & Transport

3. Network Services

4. Integration Ziggo/ UPC (VC)

2
Main Focus Deck
CEO

Finance

Customers
Corporate Strategy & Network &
Legal HR Operations Commercial B2B
Affairs Integration Technology
(& IT)

Network & Technology

Architecture &
Technology Trends
Management
Assistent
Business
Management &
Planning

Construction
Network Access & Core
&
Services Transport Operations
Maintenance

3
Architecture | Operating Model Network & Technology
Value chain driven by design, build and run the Network. Supported by Business
Management & Planning and Architecture & Technology Trends.

Business Management & Planning

Design Build Run


Architec
ture &
Techno-
logy
Trends

Access
Monito-
& Network New Con- E2E
B2B ring & 2nd Line
Trans- Services Build struction Service
1st Line
port

4
Facts and en numbers network*

2 66 594
Master Regional Locale
head-ends Center Center
(super hub) (hubs)

12.031 38.500 km 70.000


Street cabinets Fiber cable Group
(optical amplifiers
Nodes)

370.000 410.000 7,1M


Finla km House
amplifiers coax cable Connections

* Based on numbers Q2 2016


5
Network & Technology designs, builds and manages the technology
Network & Technology
behind the services of Ziggo at optimum cost.
Architecture Engineering Construction B2B Operations BM&P
& & Networks
Technology Maintenance
Trends

Core businesses

Technical responsible for the performance (quality and availability) of the network / services of Ziggo.

To extend the network to meet the increasing demand for capacity.

Controlled implementation of change and innovation within the existing network.

New connections to realize the benefit of the residential and B2B market.

256 million in investments per year 640 employees

6
70.000
The coaxial cable causes an
group
natural reduction of the signal over
amplifiers
distance, also called attenuation.
Attenuation is compensated by use
Hoe brengen wij diensten naar de klant?
The two super headends ensure Conversion from optical to of group amplifiers
the supply of R / TV signal. electrical signals (telepower
added)
From here transport will take
place by coaxial cable. 370.000
From the group amplifier, the
final
coaxial cable goes to the final
amplifiers
amplifiers.

In a Regional Centre R / TV signals


are converted from MPEG code to
QAM modulation for digital
programs and PAL-B modulation for
analog TV programs and FM analog 370.000
radio programs. final
Then the cable runs to the house.
amplifiers

In an LC / HUB internet and 38.500 km


telephony signals are added for glasvezel
relevant neighborhood
kabel

7
Very important

Important

Key project N&T 2017 End date further into future

8
Content

1. Network & Technology high over

2. Access & Transport

3. Network Services

4. Integration Ziggo/ UPC (VC)

9
Access & Transport

Network & Technology

Architecture &
Technology Trends
Management
Assistent
Business Management &
Planning

Network Access & Construction & Core


Services Transport Maintenance Operations

10
Access & Transport
Departments & Scope

VP Network & Technology


MT Access & Transport
Ingmar Herberts
Entertainment
Data and RTV Network & transport Engineering
Voice

B2B
John Louwerse
HFC Architecture & Engineering
Jelle Duisterhout

Access Engineering
Director Access & Transport Gerwald Harmsen

Arjan Eeken Sites Electrical & Security


Access & Transport Sites Colling & Support
Gerard van Eijndhoven

Connectivity & Wifi


Antina Keizer
René Albers
Secretary
Capacity Planning

11
Capacity Planning
Business as Usual

Naam Rene Albers


Afdeling Capacity Planning
Datum November 14th 2016
Context Capacity Planning
Strategic, Tactical & Operational

 End-to-end monitoring of capacity


improves efficiency
• Marketing Roadmap
 Capacityplanning takes place on • Stability


diferent levels
In cooperation with Ziggo Startegy
Strategic • Capacity Planning
• Innovation
we define the use of transportsteams
that we us for the different services.
 By combining the mid-term capacity • Efficient use of capacity
planning of the platforms we
optimise the cost of
Tactical • Overview over all platforms
• budget/network/planning
(combined)capacity.
Transport • Day tot day monitoring of
CMTS capacity on the platforms
VOD
Telephony
Operational • Trend analysis
• Expansion per platform
• Report to platform owners
 Day tot day capacity monitoring of
the platforms, sectors, nodes etc.
 We provide Capacity reports to
different departments and Business
customers (Voice/Internet/Video/…)

13
Context Capacity Planning
Capacity growth till 2022

Yearly Downstream growth-figure over the last 2 years and prognoses till 2022

14
TEAM Capacity Planning
Why we exist

WE are RESPONSIBLE for

- For the availability, continuity and quality of capacity of the Ziggo-products


(Residential/UPC-B).

WHAT we DO

- Cooperation with responsible departments in order to achieve an integral Capacity


plan and monitoring the Capacity on all platforms

HOW we DO it

- Relationships with our stakeholders are based on shared objectives


- We perform like Ziggo’s brand strategy: Simple, open and human
- We advertise our expertise and take on challenges that will serve Ziggo

15
TEAM Capacity Planning
Operating Model

Technologiep

Operational
Excellence

besturing
Innovatie

CTO BM
forecast

BM CTO
lan CTO

Budget
kaders

CAPEX
Sales

IPPO

CTO
CTO

Opdrachtgever CTO Project Opdrachtnemer


Management
Platform
opdracht PMO PMO
Acces programmamanager
• Lifecycle, performance,
verbetering correcties
Platform
Backbone opdracht ja
Extra
• Lifecycle, performance, Deelprojecten
besturing •
verbetering correcties Aansturing Bouw
nodig in •
Platform vorm van • Resourceaanvragen
Capacity Mng Voice opdracht
programma
engineering • Lifecycle, performance, manager
verbetering correcties Product-
Platform bouw
opdracht Oplevering
• Identificeren HFC
Nee
capaciteitsbehoefte • Lifecycle, performance,
• Integraal verbetering correcties
Capaciteitsplan Platform Business
opdracht Construction Leverstraat
• Aanvraag totaalbudget Video Support
• Lifecycle, performance, Partners
verbetering correcties • Aanmaken
Transport opdracht project in
CP/ERP • Executie en
• Lifecycle, performance, • Regelen oplevering
verbetering correcties resources, ook
Core opdracht Engineering,
Provisioning
• Lifecycle, performance, • Scoping en pre
verbetering correcties engineering
Operations
Voortgang en Project
Engineersafdelingen Oplevering naar OG CM Opdrachtnemer Field Operations
16
TEAM Capacity Planning
Interfaces

17
Responsibilities, activities & focus 2017
Responsibilities, activity & focus
1. Ziggo-Vodafone Network-Integration
• Organisation
• Integration Capacity plans/dashboards/reports
• Value Creation targets
• Support employees

2. Monitoring/Reporting of all our services


• Proactive and active monitoring/reporting of all capacity-platforms
• E2E Monthly Capacity dashboard

3. Clarification definition Services/KPI’s


• Internet, Video, Voice, B2B

4. Innovation with focus on


• CCAP
• Docsis 3.1
• Horizon/SmartRec/EOS
• Carrier Ethernet
• B2B-products

5. Forecasting-process
• Forecast-process Ziggo
18
HFC Architecture & Engineering
HFC Network, Cape Horn and Pro Active Maintenance (BUA)

Naam John Louwerse


Afdeling HFC Architecture & Engineering
Datum November 14th 2016
HFC network
Logical structure

20
20
HFC network
With key numbers
fUPC Homes Passed fZiggo

FRL: 193K NN: 850K

WN: 450K
FVL: 127K

NH: 786K
WZ: 1400K
GLD: 781K

ZH: 681K ZN: 900K

BRB: 325K

ZZ: 700K

Coax Coax Coax


Fiber
Fiber

Super Hubs Hubs and Fiber Nodes Group End Homes Docsis
ZIGGO

and Regional Local Centres Amplifiers Amplifiers Passed devices


Centres
49 584 19,1K 70K 365 K 7.1 M 4,7 M
In 12.2K cabinets

21
HFC network
Assigning bandwidth to services (FDM)

In total 92 8MHz slots can be assigned to a specific service.


Currently fUPC: 30PAL, 40DTV, 6VOD and 16HSD.
22
HFC network
Architecture steps
Centralized narrowcast configuration

DTV linear 862MHz 862MHz


ATV BC
FM analogue analogue

DATA 862MHz
VOD NC
voice analogue

De-centralized narrowcast configuration

DTV linear 862MHz 862MHz


ATV BC
FM analogue analogue

DATA
NC VOD
IP (digital) EQ voice

De-centralized configuration with full-band generation at hub

1218MHz

analogue

DTV linear
VOD
BC+ NC DATA
IP (digital) EQ voice

23
Cape Horn
Summary

 Cape Horn prepares for Docsis 3.1 replacing all passive and active HFC equipment in the
network and introducing a new level flow

 Cape Horn is Ziggo’s main HFC program, delivering multiple goals including more short
term goals like network stability and quality replacing EOL equipment and reducing calls
and truckrolls (currently approx. 25-30% in the targeted area’s ) but also more long term
goals like tomorrows capacity needs.
 With multiple scenarios on downstream capacity the upstream capacity will become Ziggo’s
first real bottleneck when going to higher product definitions.
 Upstream peek speeds of 100Mbps require OFDM TDM on a 65MHz network and upstream
peek speeds of 200Mbps require a bigger (then 65MHz) upstream spectrum.

 Ziggo’s upstream speed roadmap states a 200Mbps product in 2021.


 To enable the product roadmap the Cape Horn spectrum upgrade program needs to
complete the upgrade to a 204MHz upstream network by 2020.

24
Cape Horn
Frequency spectrum

‘70 I FM III

‘80 I FM III IV / V

Max speed: 40Mbps

‘90 - today R FM III Hyper IV / V

50/65 - 85 862

Cape Horn (start)


R FM Expansion

1218

Cape Horn (final)


R Expansion

204 - 258 1218

25
Pro Active Maintenance
Maintenance

Corrective Maintenance
Customer service effecting issues
Daily planning base

Pro-active Maintenance (Headroom)


Non-customer service effecting issues
Improving area’s with reduced performance before it impacts customers
Create performance / stability to increase capacity
Aims to reduce (over time) corrective maintenance
Necessary to keep performance levels at an acceptable standard non–Cape Horn area’s
Weekly- monthly planning base

Preventive Maintenance
Periodic checking and re-aligning of the optical network
Non-customer effecting
Yearly planning base

26
Pro Active Maintenance
Key maintenance definitions

27
Pro Active Maintenance
Creation of performance resilience

operation
Performance

Design

Normal
specs
“Headroo
m”

Proactive
Not
service
Proactive:
impact yet
preventing
impact
Ops spec 2
Service

Corrective
Corrective:
impact
fixing impact
Considere
d “Out of
service”

Time
Proactive maintenance:
• Keeps the network healthy by creating performance resilience: “headroom”
• Keeping/bringing back the performance at the level “as designed”
• Enabling the highest possible capacity and avoiding/limiting corrective maintenance
events 28
Pro Active Maintenance
Simplified (maintenance) org
1 pool of
technicians

PAD-desk

NOC

29
Pro Active Maintenance
Proactive Maintenance process

• Goal: preventing servicer impact because of HFC performance degradation


• Focus: HFC degradation, no/not significant service impact
• Process: Event based, weekly analyses and fix cycle
• Planning: Filtering and setting priorities aligned within Framework
• Bringing performance back to capable level (“as build”)

High level process Key performance indicators:


– Upstream SNR (64QAM)
Hotspot
Trouble – %Alarms per Home Passed
Performance filters &
shootin
Evaluati – %(S)DMH
analyses prioritie on
g & Fix
s Key statistics, per week
(fUPC):
Cost To Serve
– Analyzing 5000 alarms and
Trends and hotspots
Capacity upgrades 35000 upstream interfaces
Kaap Hoorn
Known issues – Resulting in 90 hotspots
– Solved by 20 technicians
– Managed by 1.5 FTE

30
Pro Active Maintenance
Examples of headroom fixes in the field

31
Content

1. Network & Technology high over

2. Access & Transport

3. Network Services

4. Integration Ziggo/ UPC (VC)

32
Network Services

Network & Technology

Architecture &
Technology Trends
Management
Assistant
Business Management &
Planning

Network Access & Construction & Core


Services Transport Maintenance Operations

33
Mission & Scope
Characteristics and drivers for a successful Network Services

Verantwoordelijk voor de engineering, levering, stabiliteit en capaciteits planning van alle diensten en platformen die
klant georiënteerd zijn (i.e. Set-Top-boxen, Video, apps, in-home)
Harmoniseren van bestaande platformen en verbeteren van de algemene kwaliteit in parallel met het succesvol
implementeren van een aantal belangrijke roadmap initiatieven in nauwe samenwerking met Liberty Global en
Marketing, Products & Innovation (MPI)

Director Network
Services

Manager Video Manager In Home Manager Voice Manager Manager Manager Test
Manager Apps
Engineering Engineering Engineering B2B Network Systems Facilities

B2B Solution
Master Engineer Master Engineer Master Engineer Master Engineer Master Engineer
Architect

Technical
Expert Engineer Expert Engineer Expert Engineer Expert Engineer Expert Engineer
Delivery Manager

B2B Service &


Engineer Engineer Engineer Engineer Performance Engineer
Manager

34
Video
Business as Usual

Naam Marc Miessen


Afdeling Video Engineering
Datum November 14th 2016
Video
Broadcast digital & analogue

National headend

IP core

7 regional 28 regional
headends headends
Former UPC-footprint Former Ziggo-footprint
D4A 100% HD Legacy STB SD/HD CI
Pace, Cisco, Humax, Samsung, Cisco 1 mln
Thomson 1 mln 2 mln
1 mln 36
Video
DTV essentials

• DTV diensten:
- SD kanalen, MPEG2 encodering, circa 6 Mbps, #180 live
- HD kanalen, MPEG4 encodering, circa 12 Mbps, #55 live
- Radio, EPG, CPE software, Apps zoals rode knop, etc.

• Technisch:
- 39 landelijke transportstromen QAM256 = 40 x 50 Mbps = 2 Gbps DTV naar elk huis
- regionale omroepen: TV West, RTV Utrecht etc. in landelijke transportstromen
- 1 locale transportstroom met locale omroepen: TV Ridderkerk, Ermelo etc.
- 35 regionale rasters: vaste homing frequentie, DTV is vulmiddel rond analoog
- variatie in bronsignalen vereist transrating om overflow in TS te voorkomen
- Statmux van HD kanalen bespaart bandbreedte en geeft goede kwaliteit “5x12=50”

• Interferentie:
- steeds meer “stoorzenders” in de ether
- oplossing meestal in huis (bekabeling, splitters, etc), optimalisering = impact beperking

37
Video
Lineair TV service implementation

38
Video
Video on Demand & Replay

Back Office Horizon & D4A

Back Office
Ziggo Legacy
CDN
8 regional
B1 pumps

QAMs QAMs

Former UPC-footprint Former Ziggo-footprint


D4A 100% HD Legacy STB SD/HD CI
Pace, Cisco, Thomson Humax, Samsung, Cisco 120k
1 mln 1 mln
1 mln 39
Video
CDN CBR playout (actuals hidden)

40
Video
OTT

- 90
channels
- HD/SD
- SVOD
- Replay
Former UPC-footprint Former Ziggo-footprint

TV Française
IOS, Android, (Windows, HTML5)
2 mln downloads
100k concurrent streams in peak 41
Voice
Business as Usual

Naam Henk Tromp


Afdeling Voice Engineering
Datum November 14th 2016
Fixed Voice Network
Topology
High level network topology nZiggo / combined fUPC and fZiggo

43
Fixed Voice Network
Topology
Network topology fZiggo
Ziggo Telecom Application Cloud (Z-TAC)
Managmnt

Site 1 Site 2 SIP NNI


Network-

SIP-I
SIP/SIP-I
SS7/MAP
SIGTRAN
H.248
OSS BSS EMS OSS BSS EMS ENUM/
Redirect Query
SDH / IP Backbone
Wholesale
Transit/

ZIPX A-net PRI PSTN A-net PSTN B-net ZIPX B-net PRI
Media Gateway

PRI GW C7 GW C7 GW PRI GW
Multimedia Core Network

SIP STP hiS700 STP SIP


REDIRECT REDIRECT

NetNumber IP STP IP STP NetNumber


(MCN)

CRS CRS

Transit SBC Transit SBC


HiE9200 HiE9200
IBCF IBCF
Service Application Layer
(SAL)

Transcoder TAS / AS TAS / AS NGIN / AS/ V-mail C20 NSN Transcoder TAS / AS TAS / AS NGIN / AS/ V-mail NSN TDM TDM
PortaOne Broadworks SCP / MRF PortaOne Broadworks SCP / MRF

Access SBC Access SBC


P-CSCF P-CSCF
Oracle (ex-
AmcePacket)

Site 1 Site 2 TDM Sites

RAN RAN
Fibre CMTS
Fibre

CMTS
HFC
Acces

IP CPE HFC IP CPE

eMTA eMTA
ISDN eMTA ISDN eMTA
POTS POTS

BAPP BAPP

44
Fixed Voice Network
Topology
Network topology fUPC

45
Fixed Voice Network
Capacity available (and used) and how it can be increased
fZiggo

46
Fixed Voice Network
Capacity available (and used) and how it can be increased
fUPC

47
Fixed Voice Network
Redundancy

 All Network elements are local redundant/High Available.


 fZiggo switches and SBC clusters are also geo-redundant
 No critical Single-Points-of-Failure within the core voice network

48
Content

1. Network & Technology high over

2. Access & Transport

3. Network Services

4. Integration Ziggo/ UPC (VC)

49
Value Creation
Overview
Key Initiatives Short description

FTE savings & Business Improvement by consolidation 3 NOC’s into one.


N&T02 NOC Consolidation

FTE savings & Business Improvement by moving BHP lab to LG and implementing best practices for lab testing.
N&T03 Lab Test & Certification

FTE savings & Business Improvement due to one central mobile core and migrating employees and customers.
N&T04 Mobile

Business Improvement due to interconnection and phase out NSN contract. Migration of Voice platforms.
N&T05 Other (B2B) Voice

N&T06 Single UI vendor Business Improvement due to reducing cost by having one single user interface development stream.

N&T07 DTV Harmonization Business Improvement by integrate Ziggo’s Acquisition, Video back-end and Streaming platforms into Liberty’s,

Construction FTE savings & Business Improvement due harmonization of all build activities.
N&T08 organization & process

CMTS Capacity Business Improvement by future proof its broadband infrastructure and manage capacity more efficient.
N&T09 Alignment

Business Improvement through interconnect between networks will save annual transit costs.
N&T10 Aorta Interconnect

FTE Reduction Network FTE savings due to harmonizing two companies into one and thereby reaching synergies in FTE’s.
N&T11 & Technology

Procurement savings leverage higher volumes of HFC and CMTS activities. Create better conditions with vendors
N&T12 Procurement

(Procurement) savings apart from the already existing VC’s


N&T13 Other Value Creation

Total N&T

50
Value Creation Network & Technology
2015/16 Overview (1/3) Update: 2016-10-01

Q1 2015 Q2 2015 Q3 2015 Q4 2015 Q1 2016 Q2 2016 Q3 2016 Q4 2016

2015 VC Target: 0,8M CAPEX, 1,9M OPEX 2016 VC Target: 2,7M CAPEX, 3,0M OPEX
N&T-01|
Consolidate Security Transition Plan
Security (Dependent on Security Transition Plan made by Finance and LGI Security)
Functions
People Synergies People Synergies

Phase 3
Expertdesk -> USMS
N&T-02 | Ticketing Ticketing
NOC USMS interface USMS
HFC Docsis Monitoring
Consolidation implemented Phase 3
SAM Dataminer Consolidation
First delivery
Spectrum
Netcool -> Spectrum

People Synergies – SAM implementation after Q1 2017

NT03 |
Lab Test & Lab UTR to Kabelweg
Certification Labs requirements ready for Labs RWK/Limmel to
Kabelweg Kabelweg
People Synergies People Synergies

NT04 |
Re-use Core Network
Mobile
Decision for hard Hard migration Teleena on hold till end
migration 2017
People Synergies
Migrate Ziggo Employees Migrate UPC Employees
Migrate ES/ZN Employees

RBD Milestone VC Milestone RM 2015 VC Milestone (line) VC Milestone RM 2016 = Saving at risk = Savings fully achieved
51
Value Creation Network & Technology
2015/16 Overview (2/3) Update : 2016-10-01

Q1 2015 Q2 2015 Q3 2015 Q4 2015 Q1 2016 Q2 2016 Q3 2016 Q4 2016

VC151: SIP on BroadWorks


N&T-05 | (new modem – CPE saving)
Other (B2B) Voice NGV: phase-out VC 153: Direct NGV: Phase NGV: VC153: SIP
Class 5 connectivity phase-out -out phase-out interconnect
Voice fZiggo/ Class 4 Bapp Class 4 fUPC/KPN
fUPC HIS HiE

N&T-06 |
Single UI vendor
Phase-out fZiggo TV app Termination Cisco contract for fZiggo CPE

N&T-07 |
DTV B1 Streamer replacement PoC Alcatel Lucent Terminate licences
Harmonization Multiplexing harmonization
Phase out Media gateway
Network IP capacity 107
Harmonization increase
Phase-out Sataboys

N&T-08 |
Construction
organization and Connect phase 3
Connect phase 1
process and 2 People Synergies

N&T-09 |
CMTS Capacity
Alignment KPI’s on CMTS Capacity
downstream Alignment KPI’s
Sam Knows box replacement

RBD Milestone VC Milestone RM 2015 VC Milestone (line) VC Milestone RM 2016 = Saving at risk = Savings fully achieved
52
Value Creation Network & Technology
2015/16 Overview (3/3) Update : 2016-10-01

Q1 2015 Q2 2015 Q3 2015 Q4 2015 Q1 2016 Q2 2016 Q3 2016 Q4 2016

NT10|
Aorta Capacity Ziggo transit Implemen Start cancel transit Cancel transit
Interconnect Upgrade contracts t contracts contracts
Plans information capacity (incl (incl
upgrades decommissioning) decommissioning)
Roll out NA4 takes 2,5 year’s – no consequence for saving

NT11|
FTE Reduction
Network &
Technology People Synergies People Synergies

NT12|
Procurement Contracted Labour
CMTS Pricebook Harmonization Leverage higher volume HFC
Continuous Procurement Savings Continuous Procurement Savings

RBD Milestone VC Milestone RM 2015 VC Milestone (line) VC Milestone RM 2016 = Saving at risk = Savings fully achieved
53