Sie sind auf Seite 1von 1

PROJECT: LIGHTNING PROTECTION DESIGN CALCULATION DOC NO.

:
PROJECT NO.: [As per IEC-62305-2006] DATE:

INPUT
RA = Component related to injury to living beings caused by touch and step voltages in the zones up to 3 m outside the structure PA = Probability of injury to living beings due to flash on structure (Table B.1-IEC 62305-2)
due to flashes directly to the structure = Nd*Pa*ra*Lt
RB = Component related to physical damage caused by dangerous sparking inside the structure due to flashes directly to the PB = Probability of injury of physical damage due to flash on structure (Table B.2-IEC62305-2)
structure = Nd*Pb*rp*hz*rf*Lf
RC = Component related to failure of internal systems caused by LEMP due to flashes directly to the structure = Nd*Pc*Lo PC = Probability of failure of internal service due to flash on structure (Table B.3-IEC 62305-2)

Ng = Lightning ground flash density per sq. km per year = 0.1*Td. Td = 60 , Number of thunderstorm days per year (World map of Lt = Loss (Loss of Human Life (L1)) due to injury by touch & step voltages (Table C.1-IEC 62305-
isokeraunic level) [To be revised based on project location] 2)
Ad = Collection area of the structure in sq.m = LxW + 6xHx(W+L) + 9x3.1416xH^2 [For rectangular structure] Lf = Loss (Loss of Human Life (L1), Loss of Service to the Public (L2)) due to physical damage
For Stack and Silos the Collection area sq.mm = 3.1416x(Dia./2+3H)^2 (Table C.1& C.6-IEC 62305-2)
[Refer clause-A.2.1 of IEC-62305-2 for collection area of complex structures]
Cd = Location factor of the structure (as per table A2 of IEC: 62305-2) Lo = Loss (Loss of Human Life (L1), Loss of Service to the Public (L2)) due to failure of internal
system (Table C.1& C.6-IEC 62305-2)
Nd = Number of dangerous events for a structure = Ng*Ad*Cd*10^-06 ra/ ru = Factor reducing loss of human life (L1) depends on type of soil/ floor (Table C.2 -IEC 62305-
2)
R1 = Risk of loss of human life (L1) = Ra + Rb rp = Factor reducing loss of physical damage depends on provision taken to reduce the
consequences of fire (Table C.3-IEC 62305-2)

R2 = Risk of loss of services to the public (L2) = Rb + Rc rf = Factor reducing loss of physical damage depends on risk of fire of the structures (Table C.4-
IEC 62305-2)

hz = Factor increasing loss of physical damage in presence of special hazard (Table C.5 -IEC
62305-2)

TABLE -1: SUMMARY OF LPS REQUIREMENT FOR VARIOUS BUILDING / STRUCTURE / EQUIPMENT
Building /
Structure / Dimension in meters Lf Lo RB RC
Sr. Description of Building / Structure /
Equipment Ng Ad Cd PA PB PC Lt ra/ru rp rf hz Nd RA R1 (L1) R2 (L2) RT (L1) RT (L2) LPS Requirement Remarks
No. Equipment
no. as per
L W H L1 L2 L1 L2 L1 L2 L1 L2
plot plan
1 78 Boiler Building 40.70 40.00 81.40 6 228387 0.50 0.010 0.001 0.01 1E-04 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 6.85E-01 6.85E-09 3.43E-07 6.85E-08 N.A 3.43E-06 3.49432E-07 3.49E-06 1.00E-05 1.00E-03 No Protection Required Refer Note-1,3
2 79 Turbine Building 91.00 41.50 37.00 6 71899 0.50 0.010 0.001 0.01 1E-04 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 2.16E-01 2.16E-09 1.08E-07 2.16E-08 N.A 1.08E-06 1.10006E-07 1.10E-06 1.00E-05 1.00E-03 No Protection Required Refer Note-1,3
3 80 Control Room, Electrical Room 56.00 21.00 21.15 6 23595 0.25 0.010 1 1 1E-04 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 3.54E-02 3.54E-10 1.77E-05 3.54E-06 N.A 3.54E-05 1.76967E-05 3.89E-05 1.00E-05 1.00E-03 Protection required Refer Note-1,2
5 83 ESP 78.65 38.40 28.70 6 46466 0.50 0.010 0.001 0.01 0.01 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 1.39E-01 1.39E-07 6.97E-08 1.39E-08 N.A 6.97E-07 2.09095E-07 7.11E-07 1.00E-05 1.00E-03 No Protection Required Refer Note-3
6 85 Stack - 5.50 153.45 6 673753 0.50 0.010 1 1 0.01 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 2.02E+00 2.02126E-06 1.01E-03 2.02E-04 N.A 2.02E-03 0.00101265 2.22E-03 1.00E-05 1.00E-03 Protection required
7 22 Sludge Pump House 4.00 4.50 4.00 6 674 0.50 0.010 1 1 0.01 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 2.02E-03 2.02317E-09 1.01E-06 2.02E-07 N.A 2.02E-06 1.01361E-06 2.23E-06 1.00E-05 1.00E-03 No Protection Required

TABLE-2: SUMMARY OF VARIOUS BUILDING / STRUCTURE / EQUIPMENT AFTER PROVIDING LIGHTNING PROTECTION SYSTEM
Building /
Structure / Dimension in meters Lf Lo RB RC RT
Sr. Description of Building / Structure /
Equipment Ng Ad Cd PA PB PC Lt ra/ru rp rf hz Nd RA R1 (L1) R2 (L2) Class of LPS Provided Remarks
No. Equipment
no. as per
L W H L1 L2 L1 L2 L1 L2 L1 L2 L1 L2
plot plan
1 80 Control Room, Electrical Room 100 40 4.5 4 8353 0.25 0.01 0.05 0.02 1E-04 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 8.35E-03 8.35E-11 2.09E-07 4.18E-08 N.A 1.67E-07 2.08897E-07 2.09E-07 1.00E-05 1.00E-03 No Protection Required Refer Note-1,2
2 86 Bottom Ash Silo - 10 27.0 6 23235 0.50 0.01 0.05 0.02 0.01 0.1 0.01 N.A. 0.001 0.01 0.5 0.01 2 6.97E-02 6.97058E-08 1.743E-06 3.49E-07 N.A 1.39E-06 1.81235E-06 1.74E-06 1.00E-05 1.00E-03 No Protection Required

TABLE-3: LIST OF METALLIC STRUCTURES


Building /
Structure /
Sr. Description of Building / Structure /
Equipment
No. Equipment
no. as per
plot plan
1 81,135 Transformers
2 83 ESP
3 88 Coal Cvonveyor
4 94 Crusher & Screening Station
5 117,125 All Tanks
6 99 Transfer Tower
7 104 Pipe Rack

Notes:
1 Above calculation is based on IEC-62305-2006.
2 Loss factor (Lt) is taken as 0.0001 considering the persons are inside the Bldg.
3 For the Structures surrounded by higher objects or trees Location Factor (C d ) is taken as 0.25
4 For Metallic Structures, Probaility factors P b , P c is considered as 0.001 & 0.005 repectively.

[Building name, their dimensions, various factors considered in above calculations are only indicative and shown for understanding purpose. The same has been highlighted in red text above.]

PAGE 1 OF 1

Das könnte Ihnen auch gefallen