0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
32 Ansichten1 Seite
The Municipality of Dasol in Pangasinan Province proposes a project to improve a 132 linear meter drainage canal in Tambobong. The project will install concrete-hollow block walls and a concrete floor for the canal at an estimated total cost of 100,000 Philippine pesos. Funds will come from the local barangay. Completion within 14 days will require two masons and four laborers using common masonry tools. Materials like cement, sand, gravel, blocks, rebar, and wire will cost 73,400 pesos while labor for the two masons and four laborers will cost 26,600 pesos.
The Municipality of Dasol in Pangasinan Province proposes a project to improve a 132 linear meter drainage canal in Tambobong. The project will install concrete-hollow block walls and a concrete floor for the canal at an estimated total cost of 100,000 Philippine pesos. Funds will come from the local barangay. Completion within 14 days will require two masons and four laborers using common masonry tools. Materials like cement, sand, gravel, blocks, rebar, and wire will cost 73,400 pesos while labor for the two masons and four laborers will cost 26,600 pesos.
The Municipality of Dasol in Pangasinan Province proposes a project to improve a 132 linear meter drainage canal in Tambobong. The project will install concrete-hollow block walls and a concrete floor for the canal at an estimated total cost of 100,000 Philippine pesos. Funds will come from the local barangay. Completion within 14 days will require two masons and four laborers using common masonry tools. Materials like cement, sand, gravel, blocks, rebar, and wire will cost 73,400 pesos while labor for the two masons and four laborers will cost 26,600 pesos.
PROJECT PROGRAM OF WORK DATE: June 15, 2015 NAME OF PROJECT: Improvement of Drainage Canal LOCATION: Tambobong, Dasol, Pangasinan PROJECT DESCRIPTION OF WORK: 1.) Installation of CHB canal wall and concrete flooring = 132 l.m. TOTAL COST OF PROJECT: P 100,000.00 SOURCE OF FUND : Barangay Fund NUMBER OF DAYS TO COMPLETE : 14 calendar days PERSONNEL REQUIRED : Mason and Laborer EQUIPMENT TO BE USED : Masonry Tools BREAKDOWN OF ESTIMATED EXPENDITURE Materials Qty. Unit Description Unit-Cost Sub-Total 85.00 bags Portland Cement 250.00 21,250.00 6.00 cu.m. Screened Sand 880.00 5,280.00 5.00 cu.m. G-1 Gravel 892.00 4,460.00 1,650.00 pcs 4" Concrete Hollow Blocks 14.00 23,100.00 134.00 pcs 10mm Ø x 6m RSB 140.00 18,760.00 5.00 kgs. G-16 Tie Wire 110.00 550.00 MATERIALS COST P 73,400.00 Labor Man. No. of Days Personnel Required Rate/Day Sub-Total 2.00 14.00 Mason 450.00 12,600.00 4.00 14.00 Laborer 250.00 14,000.00 LABOR COST P 26,600.00