COVER SHEET

AJWA CITY CENTRE MALL, JAMSHEDPUR

POWER CABLE & WIRING SCHEDULE


AND BILL OF MATERIAL FOR CABLES AND WIRES

ECOGEN ENGINEERS PRIVATE LIMITED


PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: CABLE SCHEDULE Date: 29.06.2019
DOC NO: ECO.AJWA-CABLE SCHEDULE -001
CONSULTANT ECOGEN ENGINEERS PVT LTD

LENGTH CABLE SIZE (NO. CORES, SQ. NUMBER OF TOTAL LENGTH OF CABLE
SL NO. FROM TO
(METERS) MM) RUN (METERS)
200 KVA TRANSFORMER
1 MAIN DB 55 2RX4CX120 SQ.MM 2 110
INCOMER - 1
200 KVA TRANSFORMER
2 MAIN DB 55 2RX4CX120 SQ.MM 2 110
INCOMER - 2
GROUND FLOOR LIGHTING SUB DB -
3 MAIN DB 15 1RX4CX6 SQ.MM 1 15
1
GROUND FLOOR LIGHTING SUB DB -
4 MAIN DB 15 1RX4CX6 SQ.MM 1 15
2

5 MAIN DB FIRST FLOOR LIGHTING SUB DB -1 22 1RX4CX6 SQ.MM 1 22

6 MAIN DB FIRST FLOOR LIGHTING SUB DB -2 22 1RX4CX6 SQ.MM 1 22


SECOND FLOOR LIGHTING SUB DB -
7 MAIN DB 30 1RX4CX6 SQ.MM 1 30
1
SECOND FLOOR LIGHTING SUB DB -
8 MAIN DB 30 1RX4CX6 SQ.MM 1 30
2
THIRD FLOOR LIGHTING SUB DB 1
9 MAIN DB 40 1RX4CX6 SQ.MM 1 40
FOR FOOD COURT AREA
THIRD FLOOR LIGHTING SUB DB 2
10 MAIN DB 40 1RX4CX6 SQ.MM 1 40
FOR GYM AREA
THIRD FLOOR LIGHTING SUB DB 3
11 MAIN DB 40 1RX4CX6 SQ.MM 1 40
FOR GAME / KIDS ZONE
12 MAIN DB ESCALATOR PANEL - 1 20 1RX4CX6 SQ.MM 1 20
13 MAIN DB ESCALATOR PANEL - 2 30 1RX4CX6 SQ.MM 1 30
14 MAIN DB ESCALATOR PANEL - 3 40 1RX4CX6 SQ.MM 1 40
15 MAIN DB ELEVATOR PANEL - 1 30 1RX4CX6 SQ.MM 1 30
16 MAIN DB ELEVATOR PANEL - 2 30 1RX4CX6 SQ.MM 1 30
PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: CABLE SCHEDULE Date: 29.06.2019
DOC NO: ECO.AJWA-CABLE SCHEDULE -001
CONSULTANT ECOGEN ENGINEERS PVT LTD

LENGTH CABLE SIZE (NO. CORES, SQ. NUMBER OF TOTAL LENGTH OF CABLE
SL NO. FROM TO
(METERS) MM) RUN (METERS)
GROUND & FIRST FLOOR INDOOR
17 MAIN DB 20 1RX4CX10 SQ.MM 1 20
HVAC SUB DB 1
SECOND & THIRD FLOOR INDOOR
18 MAIN DB 30 1RX4CX10 SQ.MM 1 30
HVAC SUB DB 1
GROUND FLOOR HVAC OUTDOOR
19 MAIN DB 30 1RX3.5CX70 SQ.MM 1 30
MOTOR

FIRST FLOOR HVAC OUTDOOR


20 MAIN DB 35 1RX3.5CX70 SQ.MM 1 35
MOTOR
SECOND FLOOR HVAC OUTDOOR
21 MAIN DB 40 1RX3.5CX70 SQ.MM 1 40
MOTOR
THIRD FLOOR HVAC OUTDOOR
22 MAIN DB 40 1RX3.5CX70 SQ.MM 1 40
MOTOR

23 MAIN DB INCOMER 1 FOR EMG DB 10 2RX4CX120 SQ.MM 2 20

24 MAIN DB INCOMER 2 FOR EMG DB 10 2RX4CX120 SQ.MM 2 20

CABLE SPEC -
1) CONDUCTOR - ALUMINUM 3) ARMOURED
2) INSULATION - XLPE
PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: CABLE SCHEDULE Date: 29.06.2019
DOC NO: ECO.AJWA-CABLE SCHEDULE -001
CONSULTANT ECOGEN ENGINEERS PVT LTD

LENGTH CABLE SIZE (NO. CORES, SQ. NUMBER OF TOTAL LENGTH OF CABLE
SL NO. FROM TO
(METERS) MM) RUN (METERS)
1 EMERGENCY DB FIRE PUMP MOTOR - 1 30 1RX4CX6 SQ.MM 1 30
2 EMERGENCY DB WATER PUMP MOTOR - 1 30 1RX4CX4 SQ.MM 1 30
3 EMERGENCY DB WATER PUMP MOTOR - 2 30 1RX4CX4 SQ.MM 1 30
4 EMERGENCY DB ELEVATOR PANEL - 3 35 1RX4CX4 SQ.MM 1 35
5 EMERGENCY DB ELEVATOR PANEL - 4 35 1RX4CX4 SQ.MM 1 35
6 EMERGENCY DB COMMON AREA SUB DB 10 1RX4CX4 SQ.MM 1 10
7 EMERGENCY DB BASEMENT SUB DB 10 1RX4CX4 SQ.MM 1 10
8 EMERGENCY DB EXTERNAL LIGHTING SUB DB 10 1RX4CX4 SQ.MM 1 10
GROUND FLOOR EMERGENCY SUB
9 EMERGENCY DB 15 1RX4CX6 SQ.MM 1 15
DB

10 EMERGENCY DB FIRST FLOOR EMERGENCY SUB DB 22 1RX4CX6 SQ.MM 1 22

SECOND FLOOR EMERGENCY SUB


11 EMERGENCY DB 30 1RX4CX6 SQ.MM 1 30
DB

12 EMERGENCY DB THIRD FLOOR EMERGENCY SUB DB 37 1RX4CX6 SQ.MM 1 37

FOURTH FLOOR AC & LIGHTING


13 EMERGENCY DB 35 1RX4CX10 SQ.MM 1 35
SUB DB
FIFTH FLOOR AC & LIGHTING SUB
14 EMERGENCY DB 40 1RX4CX10 SQ.MM 1 40
DB
FOURTH FLOOR AC OUTDOOR
15 EMERGENCY DB 40 1RX3.5CX70 SQ.MM 1 40
MOTOR
16 EMERGENCY DB FIFTH FLOOR AC OUTDOOR MOTOR 40 1RX3.5CX70 SQ.MM 1 40

CABLE SPEC -
1) CONDUCTOR - ALUMINUM 3) ARMOURED
2) INSULATION - XLPE
PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: POWER CABLE BOM Date: 29.06.2019
DOC NO: ECO.AJWA-BOM -001
CONSULTANT ECOGEN ENGINEERS PVT LTD

SL NO. CABLE/ WIRE SIZE LENGTH IN METER SPECIFICATION

POWER CABLES
1 4CX4 SQ. MM 160
2 4CX6 SQ. MM 538 Powe cables shll be 1100V grade, AL
3 4CX10 SQ. MM 125 conductor, XLPE Insulation, Armoured.
IS 7098 shall be followed.
4 3.5CX70 SQ. MM 225
5 4CX120 SQ. MM 260
The advantages of XLPE Insulated cables in comparison to PVC insulated cables are as
under:
A. Technical Advantages :
1. Higher current rating, higher Short Circuit Rating Approx 1.2 times that of PVC.
2. Thermosetting in nature.
3. Higher insulation resistance – 1000 times more than PVC cables.
4. Higher resistance to moisture.
5. Better Resistance to surge currents.
6. Low Dielectric Losses.
7. Better resistance to chemicals.
8. Longer service life.
9. Comparatively higher cable operation temperature 90°C andshort circuit temperature 250°C.
B) Commercial Advantages:
1. Lower laying cost because of comparatively smaller diameter of cable and lighter
weight.
2. Lower installation charges as the diameter of cable is comparatively lesser with
smaller bending radius, requiring less space requirement for laying of cables.
3. One size lower cable can be used as compared to PVC insulated cable.
PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: CU WIRE SCHEDULE Date: 29.06.2019
DOC NO.: ECO.AJWA-CABLE SCHEDULE -001
ECOGEN ENGINEERS PVT LTD

WIRE SIZES
SL NO. FROM TO 4 SQ.MM 2.5 SQ.MM 1.5 SQ. MM 1 SQ, MM
(LENGTH IN MM) (LENGTH IN MM) (LENGTH IN MM) (LENGTH IN MM)
GF LIGHTING SUB DB-1 70 35
1 SHOP - S1
GF EMERGENCY DB 70 35
GF LIGHTING SUB DB-1 90 45
2 SHOP - S2
GF EMERGENCY DB 90 45
GF LIGHTING SUB DB-1 60 30
3 SHOP - S3
GF EMERGENCY DB 60 30
GF LIGHTING SUB DB-1 80 40
4 SHOP - S4
GF EMERGENCY DB 80 40
GF LIGHTING SUB DB-1 50 25
5 SHOP - S5
GF EMERGENCY DB 50 25
GF LIGHTING SUB DB-1 60 30
6 SHOP - S6
GF EMERGENCY DB 60 30
GF LIGHTING SUB DB-1 40 20
7 SHOP - S7
GF EMERGENCY DB 40 20
GF LIGHTING SUB DB-1 50 25
8 SHOP - S8
GF EMERGENCY DB 50 25
GF LIGHTING SUB DB-1 50 25
9 SHOP - S9
GF EMERGENCY DB 50 25
GF LIGHTING SUB DB-1 50 25
10 SHOP - S10
GF EMERGENCY DB 50 25
GF LIGHTING SUB DB-1 60 30
11 SHOP - S11
GF EMERGENCY DB 60 30
GF LIGHTING SUB DB-2 50 25
12 SHOP - S12
GF EMERGENCY DB 50 25
GF LIGHTING SUB DB-2 60 30
13 SHOP - S13
GF EMERGENCY DB 60 30
GF LIGHTING SUB DB-2 80 40
14 SHOP - S14
GF EMERGENCY DB 80 40
GF LIGHTING SUB DB-2 40 20
15 SHOP - S15
GF EMERGENCY DB 40 20
GF LIGHTING SUB DB-2 30 15
16 SHOP - S16
GF EMERGENCY DB 30 15
GF LIGHTING SUB DB-2 50 25
17 SHOP - S17
GF EMERGENCY DB 50 25
GF LIGHTING SUB DB-2 50 25
18 SHOP - S18
GF EMERGENCY DB 50 25
GF LIGHTING SUB DB-2 60 30
19 SHOP - S19
GF EMERGENCY DB 60 30
GF LIGHTING SUB DB-2 70 35
20 SHOP - S20
GF EMERGENCY DB 70 35
GF LIGHTING SUB DB-2 80 40
21 SHOP - S21
GF EMERGENCY DB 80 40
PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: CU WIRE SCHEDULE Date: 29.06.2019
DOC NO.: ECO.AJWA-CABLE SCHEDULE -001
ECOGEN ENGINEERS PVT LTD

WIRE SIZES
SL NO. FROM TO 4 SQ.MM 2.5 SQ.MM 1.5 SQ. MM 1 SQ, MM
(LENGTH IN MM) (LENGTH IN MM) (LENGTH IN MM) (LENGTH IN MM)
1F LIGHTING SUB DB-1 70 35
1 SHOP - S101
1F EMERGENCY DB 70 35
1F LIGHTING SUB DB-1 90 45
2 SHOP - S102
1F EMERGENCY DB 90 45
1F LIGHTING SUB DB-1 60 30
3 SHOP - S103
1F EMERGENCY DB 60 30
1F LIGHTING SUB DB-1 80 40
4 SHOP - S104
1F EMERGENCY DB 80 40
1F LIGHTING SUB DB-1 50 25
5 SHOP - S105
1F EMERGENCY DB 50 25
1F LIGHTING SUB DB-1 60 30
6 SHOP - S106
1F EMERGENCY DB 60 30
1F LIGHTING SUB DB-1 40 20
7 SHOP - S107
1F EMERGENCY DB 40 20
1F LIGHTING SUB DB-1 50 25
8 SHOP - S108
1F EMERGENCY DB 50 25
1F LIGHTING SUB DB-1 50 25
9 SHOP - S109
1F EMERGENCY DB 50 25
1F LIGHTING SUB DB-1 50 25
10 SHOP - S110
1F EMERGENCY DB 50 25
1F LIGHTING SUB DB-1 60 30
11 SHOP - S111
1F EMERGENCY DB 60 30
1F LIGHTING SUB DB-2 50 25
12 SHOP - S112
1F EMERGENCY DB 50 25
1F LIGHTING SUB DB-2 60 30
13 SHOP - S113
1F EMERGENCY DB 60 30
1F LIGHTING SUB DB-2 80 40
14 SHOP - S114
1F EMERGENCY DB 80 40
1F LIGHTING SUB DB-2 40 20
15 SHOP - S115
1F EMERGENCY DB 40 20
1F LIGHTING SUB DB-2 30 15
16 SHOP - S116
1F EMERGENCY DB 30 15
1F LIGHTING SUB DB-2 50 25
17 SHOP - S117
1F EMERGENCY DB 50 25
1F LIGHTING SUB DB-2 50 25
18 SHOP - S118
1F EMERGENCY DB 50 25
1F LIGHTING SUB DB-2 60 30
19 SHOP - S119
1F EMERGENCY DB 60 30
1F LIGHTING SUB DB-2 70 35
20 SHOP - S120
1F EMERGENCY DB 70 35
1F LIGHTING SUB DB-2 80 40
21 SHOP - S121
1F EMERGENCY DB 80 40
1F LIGHTING SUB DB-2 90 45
22 SHOP - S122
1F EMERGENCY DB 90 45
1F LIGHTING SUB DB-2 90 45
23 SHOP - S123
1F EMERGENCY DB 90 45
PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: CU WIRE SCHEDULE Date: 29.06.2019
DOC NO.: ECO.AJWA-CABLE SCHEDULE -001
ECOGEN ENGINEERS PVT LTD

WIRE SIZES
SL NO. FROM TO 4 SQ.MM 2.5 SQ.MM 1.5 SQ. MM 1 SQ, MM
(LENGTH IN MM) (LENGTH IN MM) (LENGTH IN MM) (LENGTH IN MM)
2F LIGHTING SUB DB-1 70 35
1 SHOP - S201
2F EMERGENCY DB 70 35
2F LIGHTING SUB DB-1 90 45
2 SHOP - S202
2F EMERGENCY DB 90 45
2F LIGHTING SUB DB-1 60 30
3 SHOP - S203
2F EMERGENCY DB 60 30
2F LIGHTING SUB DB-1 80 40
4 SHOP - S204
2F EMERGENCY DB 80 40
2F LIGHTING SUB DB-1 50 25
5 SHOP - S205
2F EMERGENCY DB 50 25
2F LIGHTING SUB DB-1 60 30
6 SHOP - S206
2F EMERGENCY DB 60 30
2F LIGHTING SUB DB-1 40 20
7 SHOP - S207
2F EMERGENCY DB 40 20
2F LIGHTING SUB DB-1 50 25
8 SHOP - S208
2F EMERGENCY DB 50 25
2F LIGHTING SUB DB-1 50 25
9 SHOP - S209
2F EMERGENCY DB 50 25
2F LIGHTING SUB DB-1 50 25
10 SHOP - S210
2F EMERGENCY DB 50 25
2F LIGHTING SUB DB-1 60 30
11 SHOP - S211
2F EMERGENCY DB 60 30
2F LIGHTING SUB DB-2 50 25
12 SHOP - S212
2F EMERGENCY DB 50 25
2F LIGHTING SUB DB-2 60 30
13 SHOP - S213
2F EMERGENCY DB 60 30
2F LIGHTING SUB DB-2 80 40
14 SHOP - S214
2F EMERGENCY DB 80 40
2F LIGHTING SUB DB-2 40 20
15 SHOP - S215
2F EMERGENCY DB 40 20
2F LIGHTING SUB DB-2 30 15
16 SHOP - S216
2F EMERGENCY DB 30 15
2F LIGHTING SUB DB-2 50 25
17 SHOP - S217
2F EMERGENCY DB 50 25
2F LIGHTING SUB DB-2 50 25
18 SHOP - S218
2F EMERGENCY DB 50 25
2F LIGHTING SUB DB-2 60 30
19 SHOP - S219
2F EMERGENCY DB 60 30
2F LIGHTING SUB DB-2 70 35
20 SHOP - S220
2F EMERGENCY DB 70 35
2F LIGHTING SUB DB-2 80 40
21 SHOP - S221
2F EMERGENCY DB 80 40
2F LIGHTING SUB DB-2 90 45
22 SHOP - S222
2F EMERGENCY DB 90 45
2F LIGHTING SUB DB-2 90 45
23 SHOP - S223
2F EMERGENCY DB 90 45

TOTAL LENGT OF WIRES (METERS) 480 4290 5595 1785


PROJECT: AJWA CITY CENTRE MALL, JAMSHEDPUR Rev - R0
DOC TITLE: CU WIRE CONSOLIDATED BOM Date: 29.06.2019
DOC NO: ECO.AJWA-BOM -001
CONSULTANT ECOGEN ENGINEERS PVT LTD

TENTATIVE LENGTH IN METER


(CONSOLIDATE)
SL NO. CABLE/ WIRE SIZE SPECIFICATION
SUB DB TO SHOPS AND WITHIN
SHOPS WIRING
LIGHTING WIRES
1 1 SQ, MM 2985
2 1.5 SQ. MM 6795 PVC Insulated, 1100V, flexible CU wires
3 2.5 SQ.MM 5490
4 4 SQ.MM 880

Basis of BOM:
1) For normal AC wiring of Shop no S1, S2, S101, S102, S201 & S202 -Phase and Neutral wire size is 4 sq. mm and
earthing wire size is 2.5 sq.mm.
2) For Emergency AC wiring of Shop no S1, S2, S101, S102, S201 & S202 -Phase and Neutral wire size is 2.5 sq.
mm and earthing wire size is 1.5 sq.mm.
3) For normal AC wiring of remaining shops -Phase and Neutral wire size is 2.5 sq. mm and earthing wire size is
1.5 sq.mm.
4) For Emergency AC wiring of remaining shops -Phase and Neutral wire size is 1.5 sq. mm and earthing wire size
is 1 sq.mm.