Sie sind auf Seite 1von 5

Kampus Dipatiukur

Gd. Rektoran Baru Lt.1, phone. 022-2503271 ext. 126


Kampus Jatinangor
Development Center of Information System and Technology for Education Management Gd. Pusat Administrasi (BAU) Lt. 2, phone. 022-76927397
NETWORK MAINTENANCE FORM
No. WO :
Customer : Contact Person :
Location : Telephone :
Engineer : Engineer Time Arrival :

I. DETAIL DESCRIPTION AT TIME FAILURE

II. VISUAL STATUS / LED DISPLAY


Fiber Optic WLAN UTP/STP Hotspot
Connector : Connector : Connector : Connector :
Switch : Switch : Switch : PoE :
DSP : DSP : DSP :
Converter : Radio :
PoE :

NIC1 Router : NIC3 Router : Electrical Status : volt


NIC2 Router : NIC4 Router : Electrical Grounding : ohm

III. CONFIGURATION STATUS


Router OS : Routing : Signal Strenght :
IP Address : Firewall : TX/RX (AVG) :
IP Gateway : QoS :

IV. LINK TEST


Ping Test IP Address Losses Min (ms) Max (ms) Avg (ms)
Gateway (100x)
Yahoo (100x)
Bandwith Test URL : IIX : | kbps : http://www.sijiwae.net/speedtest/
International : | kbps : http://www.speakeasy.net/speedtest/
Intranet : | kbps : http://support.unpad.ac.id/BWMeter/
V. EQUIPMENT REPLACEMENT
EQUIPMENT Note OLD S/N Note NEW S/N Note REMARK

VI. PROBLEM SUMMARY


1. CAUSED OF FAILURE 2. ACTION TAKEN REMARK

Time Problem Solved :


Engineer Signature Customer Signature
Development Center of Information and System Technology for Education and Management
Jl.Dipati Ukur No. 35 Bandung Telpon.022-70820020

DCISTEM - INSTALLATION REPORT

Customer : Telephone :
Router Location : Date :
Contact Person : No. WO :

I. EQUIPMENT
Equipment Type Merk Serial Number Qty Remarks
Antenna
AP CPE
Router
Switch
Arrester
Electric Terminal
Stecker
Connector
Surge Arrester
POE & Adapter
Others
Equipment Type Merk Length Qty Remarks
UTP
STP
Fiber Optic
Jumper
Elcectric Cable
Patch Core
Others

II. CONNECTION STATUS Ready Pending Failure


System Identity : Connection to Gateway :
IP Address : Connection to DNS :
:
Wireless Mode : Signal Strenght (AVG) :
IP Address : TX/RX Rate (AVG) :
Radio Name : Frequency :

III. INSTALLATION SUMMARY

Form instalasi ini sekaligus berlaku sebagai SURAT TUGAS & BERITA ACARA INSTALASI yang digunakan sebagaimana mestinya

Engineer Signature Customer Signature

F-2 Installation Form


Development Center of Information and System Technology for Education and Management
Jl.Dipati Ukur No. 35 Bandung Telpon.022-70820020

F-2 Installation Form


PRE INSTALLATION CHECK LIST

Customer : Telephone :
Location : Date :
Engineer Time Arrival : Engineer :
Contact Person : No. WO :

Dcistem Service : Backbone : Lan : Hotspot : Other :

I. PLACE DESCRIPTION
Indoor Unit Location : Distance RO to Ring Backbone :
Outdoor Unit Location : Distance RO to ODU :
Visual LOS : Distance ODU to BTS :
Obstacle : Coordinate :
Bearing : :

II. AC POWER SOURCE


PLN Genset UPS
Volt Meter Reading : Line to Neutral : Volt
Ground to Line : Volt
Ground to Neutral : Volt

Earth Resistance : Lightning Arrester No Arrester

III. EQUIPMENT
CPU Eth Card Keyboard Monitor Switch
STP UTP RJ-45 AP CPE POE
Adapter Stecker Antenna Klem PVC
Fiber Optic Converter Patch Core Tower Jumper
AP Hotspot Box Mounting Arrester UPS
Electric Terminal Electric Cable Wiring Duct
Data Cable Approximately : Meters FO/STP/UTP
Electric Cable Approximately : Meters

IV. SURVEY SUMMARY

Form survey ini sekaligus berlaku sebagai SURAT TUGAS & BERITA ACARA SURVEY yang digunakan sebagaimana mestinya

Engineer Signature Customer Signature

Das könnte Ihnen auch gefallen