PTTES SERVICES

ALARP, Risk
Document no.EE2015007

As Low As Reasonably Practicable (ALARP)


As it is generally known that plant operation is undertaken with risks. Risk is the possibility that harm (illness,
injury or death) might occur when plant personnel or equipment expose to a hazard. Theoretically, all
foreseeable risks must be identified and managed through a structured process. Because risk cannot be
completely eliminated, it is however possible to be minimized to a level that is As Low As Reasonably
Practicable (ALARP).

ALARP principle is basically represented by the In practice, the management of risk, such that a
above risk triangle with high risk ( indicated by red risk is ALARP must be demonstrated. Therefore,
color) on the top and low risk (green color) at the it is always important to determine the correct
bottom. And medium risk is located somewhere in technique to assess whether it is ALARP or not to
the middle. When a risk is reduced by mitigations implement risk reduction measure. The technique
or measures, the degree of risk is decreased from required varies according to the associated
high to low. Risks above the Upper Tolerability Limit hazard, risk, risk reduction measure being
is intolerable which risk reduction is a must. considered.
Between the Upper and the Lower Tolerability Limit,
Appropriate technique used to ensure that
the risk is only tolerable if it is ALARP, which means
operation risks are properly managed to ALARP
that all reasonably practicable risk reduction
can be :
measures have to be identified and implemented.
Lastly, below the Lower Tolerability Limit, risk is  Engineering Judgement
broadly tolerable or accpetable.  Qualitative Risk Assessment
 Semi–Quantitative Risk Assessment
ALARP is a point at which a risk is reduced so low
 Quantitative Risk Assessment
that further risk reduction measure is not required.
This demonstrates by the risk reduction cost PTTES can assist customer to embed ALARP
(money, time or effort) is grossly disproportionate technique into risk management process.
to the risk reduction gained. Or another word,
ALARP is simply a balancing of risk reduction and
the cost of achieving it.

For more information please contact


Ekachai Kongboonsod at ekachai.k@pttes.com

xxxxxxxxxxxxxxxx
Technical Center of Excellence in AEC in 2020
 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
xxxxxxxx.