Zero-Touch Energy Audit

Building a “Site-Visit Free” Energy Audit


System using GIS

Swami
Senior Consultant @ Red Planet Consulting
swami@redplanetconsulting.com
+91-9884183818
What is Energy Audit?
M3 33 kV Consumer
Meter
Outgoing
Meter
33 kV
M1
Substation
33 kV Consumer
M2 Meter

11 kV Consumer M6
M7 Meter Incoming
M4 Meter
LT
Consumer M8 M5
Meters Outgoing
33/11 kV
M9 Meter Substation
Transformer
Loss = M1 – (M2 + M3 + M4)
33 kV Consumer
M3 Meter
Outgoing
Meter
33 kV
M1
Substation
33 kV Consumer
M2 Meter

M1 Incoming
M4 Meter
33/11 kV
Substation
M2 M3 M4
M5

M6 M7 M8 M9

Loss= M5 – (M6 + M7 + M8 + M9)

11 kV Consumer M6
M7 Meter

LT
M5
33/11 kV
Consumer M8
Meters Outgoing
Substation
Meter
M9
Transformer
Loss = M1 – (M2 + M3 + M4)
M3

33 kV
M1
Substation

M2

M6
M7
M4

M8 M5 33/11 kV
Substation
M9
Transformer

Loss= M5 – (M6 + M7 + M8 + M9)


GIS @ NPCL
Project Objectives
• Resurrection of Existing GIS System.

• Make GIS integrall part of Business Process by integrating it with


SAP.

• Integration of Planned Scada OMS/DMS with GIS

• Provide GIS Access across the organization (Web Application)

• Field Force Automation for Field Crews.


GIS @ NPCL
EO
FME WEB

Electric Field Force


Mapframe
Office Automation
Data Import

Smallworld
Business CIMXML
Integrator

SAP SCADA
Evolution of Energy Audit
Make Data your Highest Goal & Build your
Applications around it.
Stage I : Field Survey QC
Team MMI
Stage II : Back-office QC

Stage III : Pre-Import QC


Team RPC
Stage IV : Post-Import QC

Stage V : Connectivity QC
Team NPCL
Stage VI : Field Verification
QC

Stage VII : Quality Routines System Driven


Loss = M1 – (M2 + M3 + M4)
M3

33 kV
M1
Substation

M2

M6
M7
M4

M8 M5 33/11 kV
Substation
M9
Transformer

Loss= M5 – (M6 + M7 + M8 + M9)


Substation O/G
Meter

33 kV Consumer Substation I/C 33 kV Consumer


Meter Meter Meter

Substation PT
Meter

Substation O/G
Meter

Distribution Txr Distribution Txr


Meter Meter

LT Meter LT Meter

LT Meter LT Meter

LT Meter LT Meter
Substation O/G
Meter

33 kV Consumer Substation I/C 33 kV Consumer


Meter Meter Meter

Substation PT
Meter

Substation O/G Substation O/G


Meter Meter

Boundary Meter Boundary Meter Boundary Meter Boundary Meter

Distribution Txr Distribution Txr Distribution Txr Distribution Txr


Meter Meter Meter Meter

LT Meter LT Meter LT Meter LT Meter

LT Meter LT Meter LT Meter LT Meter

LT Meter LT Meter LT Meter LT Meter


Substation Substation
M1 M2

M3 M4

M1 M2 M5
M6

M3 M5 M4
M7
Transformer

M6 M7
Substation Substation
M1 M2

M3 M4

M1 M2 M5
M7

M3 M5 M4
M8
Transformer

M6 M7
Ease of Diagnosis by introducing
additional Layers.
Substation
Meter

DT Meter

Consumer
Meter
Substation
Meter

Boundary
Meter

Division
Meter

DT Meter

Consumer
Meter
Post-GIS

Substation Level
Pre-GIS Feeder Level
Substation Level DT Level
Feeder Level Division Level
DT Level Boundary Level
Nodal Level
Switching Level
GOING FORWARD @ NPCL
$

• Integration with OMS system

• Accountability of Temporary Network Switching


Swami
swami@redplanetconsulting.com
+91-9884183818