Government of West Bengal


Public Works Department
'NABANNA' (8thfloor), 325, Sarat Chatterjee Road, Howrah-711 102
Tel.No.033-2214-5444, Fax No.2214-5825 & E-mail: secpwd(tl~wb.gov.in

No. 167/ SPW / 2019 Dated, Kolkata, 7thJune, 2019

From : Arnab Roy,


Principal Secretary to the Government of West Bengal

To The Addl, Chief Secretary / Principal Secretary / Secretary to the Government of


West Bengal,
_______________ Deptt (All)

Sub: Vetting of estimates by PWD.


Sir I Madam,
As you might be aware Public Works Department had circulated a guidelines and
procedures to be followed to get estimates vetted by PWD vide No.338/SPW/2014 dated
November, 18,2014 (copy enclosed).
PWD had also issued a memorandum on levy of vetting fee for checking of plans,
estimates, tender papers etc. vide No.78-W(C)/1M-26/15 dated March, 3, 2015 (copy
enclosed).
I am now enclosing a checklist for submission of required documents for vetting
estimates of building works. It is requested that this checklist may kindly be followed while
submitting estimates for vetting in order to expedite the vetting and ensure that requisite
documents are submitted along with the estimates. You are requested to pass instructions to
organizations under you to comply with the check list while submitting estimates of vetting.
Thanking you,
Yours faithfully,

W
(Amab Roy)
ProSecy. to the Govt. of West Bengal
Enclo: As stated.
, '/."
.r
:,

Checklist for submission of reguired documents for vetting of Estimates of Building works by
P.W.D. Goyt. of West Bengal.

1. Site plan certified by the Concerned Engineer/Architect


(with Registration No.) on the body of the drawing with
Signature of Authority of applying organization is submitted
D
2. Architectural drawings such as plan, Elevation etc. certified by
the concerned Engineer/Architect (with Registration No.) on the
body of the drawings with signature of the authority of applying
D
organisation are submitted.

3. Structural Drawings including foundation certified by the


concerned Engineer of the applying organisation are submitted. D
4. Detailed calculation of quantity of items both in hard copy
as well as in soft copy (excel File format) is submitted.
The hard copy is signed by the concerned Engineer of the
D
applying organisation.

5. A Report stating the necessity of the scheme / Project


authenticated by the concerned authority of the applying
organisation is submitted.
D
6. For Non schedule item of works (the item of works not
available in P.W.DBuilding schedule of rates/CPWD /DSR)
minimum three number supporting Quotations in original D
with clear specifications of the items authenticated of the
applying organisation are submitted.

7. Copy of soil Investigation Report is submitted (in case of


Construction of a New Building.) D
8. Estimate contained the reference page no. and item no. of the P.W.D
/CPWD/DSR Schedule of Rates for each of the item considered in it. D
9. Estimates are submitted in triplicate for each scheme.
D
10. A ticked checklist is attached with the estimate.
Government of West Bengal
Public Works Department
Nabanna

Date:- November 18, 2014


No. 338/SPVV/2014

MEMORANDUM

Sub: Guidelines and procedure to be followed to get estimates vetted by FWD

It has been observed that estimates received by Planning & Monitoring Circle
of PWD from different Government Departments for vetting could not be processed
and released in time due to lack of proper information and supportive documents. It
normally takes a lot of time to correct the deficiencies in the estimates even after
taking up the matter with the concerned Department.

2. To avoid such delays and expedite the process of vetting of estimates by


PWD, it is decided that all the Departments should follow the following guidelines
to ensure timelines:

(i) As per Finance Department, Audit Branch's Notification No. 5400-F(y) dt.
25/06/2012 "Estimated cost shall be based on PWD's Schedule of Rates for
the scheduled items of work and market rate as approved by the Head of
Engineering wing of the Agency / Organisation for the non-scheduled
items of work."

(ii) No deviation in the specification should be made in case of scheduled


items.

(ill) that for any item of work where rate is not available in the
It is decided
PWD's Schedule, CPWD's Schedule or Delhi Schedule of Rates may be
adopted.

(iv) If any non-scheduled item is included in the estimate, proper supporting


papers alongwith rate analysis should be given.

(v) Analysis of rates of non-scheduled item may be done after taking


quotation only. For specialized work, if it is not possible to obtain a
number of quotations, single quotation may be given to justify the rates.

(vi) Derivation of lump-sum rates should be given with proper justification


and supporting authenticated documents.

1
. _. 1- ~
------- -

3. All the Departments sending estimates to PWD for vetting are requested to
comply with the above guidelines to ensure timely vetting.

By order of the Governor


Sd/-
Principal Secretary
to the Govt. of West Bengal
Public Works Department

Date:- November 18, 2014


No. 338/1(6)/SPW /2014
Copy forwarded for information and necessary action to:-
1) Additional.Chief Secretary /Principal Secretary/Secretary
Departments(All)

2) Conunissioner, Presidency /Jalpaigur,i/Burdwan Division

3) District Magistratesl.All)

4) Engineer-in-ChiefjChief Engineers(All), PWD

5) Joint Secretary(Works)/Joint Secretary(Roads)/Joint Secretary(personnel)/Joint


Secretary(Administration) .
v-- ;r
6) Zonal Chief Engineers(All)/Superintending Engineers/Executive Engineer~ of
all wings of FWD , U~ J>l"v- t'tJo,..__

k~(~
Principal Secretary
Public Works Department
/t
i
!
:.

Government of vVest BengaJ


Public 'v\!orks Department
V/arks Branch
Nabanna

NO.7 q - 'vV(C)/ lI'vI-26(15 Date: March 3,2015

MEMORANDUM

Levy of vetting fee for checking of plans, estimates, tender papers, etc.

It has been observed that various Government departments are coming


up with proposal for waiving of vetting fee for checking of plans, estimates,
tender papers etc. framed by agencies other than FWD.

As per the extant orders of the Department no vetting fee is payable for
projects executed by State Government departments, irrespective of executing
agency involved. Vetting charges are also not payable in case of schemes to be
implemented under l\-fPLADS.

In all other cases where the vetting relates to schemes of State


Government Undertakings/ autonornous bodies and private institutions, etc.
either directly or through their respective departments, vetting charges are
applicable @ 0.5% of the estimated cost as prescribed vide letter no. 3361-WBdt.
28/7/1977 of P\t\1D(copy enclosed).

All concerned should take necessary action accordingly.


'Y(,
1/- j ...
~....
_.~. ~
--::I' .~.~\"L c. I , ......_.
=r \ :..";~ . '_J •• '
(Indevar Pandey)
Principal Secretary
Public Works Department
!

Date: March 3, 2m 5
No. -/:? /1(8) _W(C)/1tvl-26/l5
com forw<uded for inforrnatiOll. ,\lid. necessarv action to:-
(1) Additional Chief Secretary /Principal Secretary jSecretcny

_------.---- Department
Divisional COl1,rnissioner(All)
(2)
District Magistrate(All)
(3) The Principal Accountant General(A&E), \Ve~t Bengal
(4)
Finance(Budget) Departnient
(5)
Finance Department, Grollp-T
(6)
(7) PS to MIC, PWD
(8)
Sr. PS to Principal Secretary, PW Department )~~;1(
J oin't Secretary
Public Works Department

No.7 e /2(6) _W(C)/1M-26/15 Date: March 3,2015


Co w forwarded for information and necessar action to:-
(1) The Financial Advisor, PvV Department
(2) Chief Engineer(All), PW Dte.jPW(Roads)/Social Sector, PWD
(3) Joint Secretary, PvVD(All)
(4) Superintending Engineer(All), PW Dte.jPW(Roads)/Social Sector,

PvVD
(5) Executive Engineer(All), PW Dte.jPW(Roads)/Social Sector, PWD
(6) The Executive Engineer, rr Division, PWD . ... .He is requested to upload the

Memorandurn. in PWD vvebsite. \ ~,I


]oin('Secietat:
Public "'Torks Departmell
Date: March 3,201
No. ,YJ /3(1) _W(C)/1l\1-26/1S
COPy forwarded for information to:-
(1)PS to Chief Secretary for kind inionnation. of Chief Secretary

JOint\~
Public 'Narks Departme
COpy of Illlleu,!~. ,J?,~U~Wqd:t.L..2Ll..(.J..z.
from !flc DCf.U(y
Secr.'18ry_1I P. W. D. to lha ChIef Englneor, P. W. ('
We:;1 BC'noal'1f1d copy to thin off/co and other!

Sub: lovy of va!iing foe 10r chocking plan. est/mate'


fondor r'lj:lIUS ale, of tho Stale GovernrnenJ
llncJerl., <.InC)and priVate In~lIll1l1ons.

Tho UrJdersignO\'. Is airocled by oreier 01 Ule GOvernor It; say


lhal tho Governor Is pleased 10 aCCOrd sanction 10 Ihe levy c.~Ih,
yeU(ng 100 @ 112% iO:IC-/lalt porcent) of the estimated cost by thp
PUblic wo,', O."It. for <"'lokfng of Pf.n,. ""m.f
etc, appertaining tOrro~' lr·W;tlon Works !'alerred 10Iho p.W. Depl!. b)
... "nde, "'''''"

ditfOfGnl st.~o G~rrlm.n fC/Ildertaklngs ~d


\,i\lalO ~!u.uOr]S oltha~
diroctly 0; !h~ ~Pe'CI'te adminlslmtlVo[5(iPffs.
The
' GOllcrnor !s I "
I:~erploased to direct Iflat SUch velL'lIn tee
shaH be deposllod hi ,;advanco wHh Public Works Dept!. tJ}. the
·pon~~r!uM" the '""","pq.,le nea. Indic"a. ~ Ina 'Uc" ,-..,,'
P.. ·."Pn< InOtd<tlfo :'n."",
Ih. RW,O. '10 I.k. up Ino Cho',kfn,
plans, ~s(/matos. tel'lC1ar/PC!pt;lfs etc. In rho event 01ultimate eX~.)'Jlion
ollh' ,"hOm. by Ih. P·",.Oepll. Ih. "'Itin. f•• ""'ody
be adjusted Boalnsl II(oSCrlbed dopaTlmenfal char~es @ ~2't,or,
'.4",,,, ""',
lovlabl,o
COdo on
VOl. 1."depoSit l"j(ks·ln,lor~. of rule 189(1) of lila F~~"".),

. Tho V'lf/n, feo.. !'i"!~'~~


,,~~~~
l~ij!!"~~~:i1~btlc "0'",. (
III ReCovery or Cerlltt~ Pharaes~1nthe:'~!8ta,'l3Ol:fge( ,f
Tho El1p!neer Offb1rll C9nce(nod in~y p/~llse be advis')d
lake approp'r/.lte acUor aCCOrdlhgly as arid When necessary.
(0
1
The A.G.. WOllt I:engal Is being infornled.
This, has Iho Conwrronco 01 Iho Finance DOPlt, vide thei, No.
Gr.?up F ~39y• dL .~~._7.,~~:,_,

~ I' ~.
"I I
." ~" ( Sd/. ,
,I Deputy SecretarY_lip. "1-: D.

[ 170 J ,

I
.

,
,

.,
".:
'c'

~tr
(~~:

,~

'"
J
~t'
" ~

;1
,;

------~~----------------_ ---_ _--_. _-_


.._ ..•... _ .. __ .. __ .._ .
'~