SN Stages %
1 Structure 30.00
1.1. Sub-structure, Foundations
First Floor
• Columns and Slope Roof 6.00
• FF Roof Slab 7.00
2 Masonry & Plastering 15.00
2.1. Masonry Works
• GF Masonry Works up to Roof including Lintel and Sunshades 2.00
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2.00
• FF 1.00
5 Painting Works 10.00
• GF 3.00
• FF 3.00
• GF 2.00
• FF 2.00
• Marking, Wall Chasing, Pipe Works for Water & Waste Line incl Pressure
Testing
1.00
• Pipe Works for Water Line, Waste Line & Rain Water down take lines
0.50
• Gully Traps & Chambers with connections complete (Pumps & Valves),
Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25
3BHK 4BHK 4BHK 4BHK 4BHK 4BHK 4BHK 4BHK 3BHK 3BHK 3BHK 3BHK 3BHK 3BHK 3BHK
Description of work 36A 50 54 56 60 65 66 68 70 72 72a 73 74 77 78 83 91 113 115 117 119 120 121 123 124 126A 128 130 126 131 142 169 171A 171 174 177 178 187 194 226 231 234A 245
Structure
1 30
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column
up to Plinth, Plinth Beam 6 6 4 4 4 4 4 6 5 4 4 6 6 6 5 5 5 6 5 5 5 6 5 5 6 6 5 6 6 5 6 5 4 5 5 5 5 5 4 3 4 5 4 5
1.2. Super-structure - RCC frame
Ground Floor
• GF
3
• FF
3
2.3. Plastering in External Elevation in all floors
5 5
Flooring, Dado & Skirting
3 20
3.1. Flooring & Skirting
• GF-Foyer, Living, Dining, Kitchen,
Bedroom 4
• FF-All Bedrooms, lobby & Balconies
4
• Clay tiling at all Open terraces
2
• Car Park & All round villa flagging
concrete and other finishing Works 2
3.2. All Dadoo, Granite & Flooring
• GF Toilet, Dining & Kitchen Granite Works
with Sink 3
• FF All Toilets
3
3.3. Staircase & Landings, etc.,
2
Joinery & MS Railing Works
4 14
4.1. Door frames & Shutters
• GF
3
• FF
3
4.2. Window frames & Shutters
• GF
3
• FF
3
MS Railing Works for Windows, Staircase,
4.3.
Balcony & Terrace
• GF
1
• FF
1
Painting Works
5 10
5.1. Painting of Internal Walls & Ceilings
• GF
3
• FF
3
5.2. Painting for External Elevation
• GF
2
• FF
2
Water proofing Works in all floors
6 4
6.1. Toilet Water Proofing
2
6.2. Terrace, balcony water Proofing
2
Plumbing & Sanitary Works in all floors
7 4
7.1. Internal Plumbing and Sanitary Works
• Marking, Wall Chasing, Pipe Works for
Water & Waste Line incl Pressure testing
1
• Fixing CP & Sanitary fittings
2
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line &
Rain Water down take lines 1
• Gully Traps & Chambers with connections
complete (Pumps & Valves), Supply & Fixing
0
Syntex Tank & Connections (Pumps & Valves)
• Testing, Commissioning and Handing Over
0
Miscellaneous Works in all floors
8 3
Expansion Joint Treatment Works & Flagging
8.1.
Concrete 1
8.2. MS Staircase to terrace & Fencing for site
2
TOTAL
100 39 4 4 4 4 4 9 5 4 4 6 6 6 5 5 5 6 5 5 5 6 5 5 9 6 5 6 9 5 9 5 4 5 5 5 5 5 4 3 4 5 4 5
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRES
AUTHORISED SIGNATORY
HRIRAM SHRESHTA" VILLAS AT COIMBATORE
2.15
Cumulative bill
1,635,812
-
1,551,380
446,609
1,281,063
2,620,891
752,184
1,328,075
2,961,725
1,162,558
679,016
1,234,575
843,626
102,881
787,042
396,093
17,783,530
###
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTORS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : THIRD RUNNING BILL
BILLING PERIOD 11.01.15 to 07.02.15
Total Block-4 ( 27A to 37 ) - 11 Nos x 1475 sft x Rs. 1395/ sft Rs 22,633,875
Block 4
Claim. ( 36A ) -
1 Nos x 1475 sft x Rs. 1395/ sft Rs 2,057,625
Percentage of work
Value of work completed
Payment completed
S.No Description of work
modality Upto Upto previous
current bill Current bill Cumulative bill
previous Bill bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing,
Column up to Plinth, Plinth Beam 6%
1
1.1.
1.2.
S.No
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
S.No
3.3.
4
4.1.
4.2.
4.3.
S.No
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
S.No
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCT
NAME OF THE OWNER
NAME OF THE CONTRACTOR : M/S.
BILL NO : THIRD RUNNING BILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth,
Plinth Beam
Painting Works
Painting of Internal Walls & Ceilings
• GF
• FF
Painting for External Elevation
• GF
• FF
Water proofing Works in all floors
Toilet Water Proofing
Terrace, balcony water Proofing
Plumbing & Sanitary Works in all floors
Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste
Line incl Pressure testing
• Fixing CP & Sanitary fittings
External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water
•down
Gully
takeTraps
lines & Chambers with connections complete
(Pumps & Valves), Supply & Fixing Syntex Tank &
Connections (Pumps & Valves)
• Testing, Commissioning and Handing Over
Miscellaneous Works in all floors
Expansion Joint Treatment Works & Flagging Concrete
MS Staircase to terrace & Fencing for site
Description of work
TOTAL
repared by
CCPL Er
CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIM
NER : M/S. SHRIPROP CONSTRUCTORS PVT LTD
CTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LT
NNING BILL
11.01.15 to 07.02.15
VILLA 36A (3 BHK) - 1475 sft x Rs. 1395/
Percentage of work
Value of wor
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
30%
6%
2.00% 41,153
1.00% 20,576
1.00% 20,576
1.00% 20,576
1.00% 20,576
-
-
-
4% 4.00% 82,305
Percentage of work
Value of wor
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
7% 7.00% 144,034
-
6% 6.00% 123,458
7% 7.00% 144,034
15% -
-
2% 2.00% 41,153
2% 2.00% 41,153
-
3% 3.00% 61,729
3% 3.00% 61,729
5% 5.00% 102,881
20% -
-
4% 4.00% -
4% 4.00% -
2% 1.00% 1.00% 20,576
2% -
-
3% 3.00% -
3% 3.00% -
Percentage of work
Value of wor
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 2.00% -
14% -
-
3% 1.00% 20,576
3% 1.00% 20,576
-
3% -
3% -
-
1% 1.00% 20,576
1% 1.00% 20,576
Percentage of work
Value of wor
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
10% -
-
3% 1.00% 20,576
3% 1.00% 20,576
-
2% 0.25% 5,144
2% 0.25% 5,144
4% -
2% 2.00% 41,153
2% 2.00% 41,153
4% -
-
1% 1.00% 20,576
2% 2.00% -
-
0.50% 0.50% -
0.25% 0.25% -
0.25% 0.25% -
3% -
1% -
2% 2.00% -
Percentage of work
Value of wor
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
-
100% 57.50% 22.00% 1,183,134
Checked by
SCCPL Er
ESHTA" VILLAS AT COIMBATORE
TRUCTORS PVT LTD
ON CORPORATION PVT.LTD
- 41,153
- 20,576
- 20,576
- 20,576
- 20,576
- -
- -
- -
- 82,305
Value of work completed
- 144,034
- -
- 123,458
- 144,034
- -
- -
- 41,153
- 41,153
- -
- 61,729
- 61,729
- 102,881
- -
- -
82,305 82,305
82,305 82,305
20,576 41,153
- -
- -
61,729 61,729
61,729 61,729
Value of work completed
41,153 41,153
- -
- -
- 20,576
- 20,576
- -
- -
- -
- -
- 20,576
- 20,576
Value of work completed
- -
- -
- 20,576
- 20,576
- -
- 5,144
- 5,144
- -
- 41,153
- 41,153
- -
- -
- 20,576
41,153 41,153
- -
10,288 10,288
5,144 5,144
5,144 5,144
- -
- -
41,153 41,153
Value of work completed
- -
452,678 1,635,812
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTORS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : THIRD RUNNING BILL
BILLING PERIOD 11.01.15 to 07.02.15
Total Block-6 ( 49 to 59 ) - 11 Nos x 1685 sft x Rs. 1395/ sft Rs 25,856,325
Block 6
( 49 ,
Claim. 50,51,52,54,54A,56,57,58,59 )
11 Nos x 1685 sft x Rs. 1395/ sft Rs 25,856,325
-
Percentage of work
Value of work completed
Payment completed
S.No Description of work
modality Upto Upto previous
current bill Current bill Cumulative bill
previous Bill bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing,
Column up to Plinth, Plinth Beam 6%
Structure
1 30%
1.1. Sub-structure, Foundations
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
2% - - -
• Car Park & All round villa flagging concrete and other finishing Works
2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing and Sanitary Works
- - -
• Marking, Wall Chasing, Pipe Works for Water & Waste Line incl Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
- - -
• Pipe Works for Water Line, Waste Line & Rain Water down take lines
0.50% - - -
• Gully Traps & Chambers with connections complete (Pumps & Valves), Supply &
Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 2% 3.0% 47,012 70,517 117,529
Percentage of work
Value of work completed
completed
S.No Description of work Payment modality Upto
current Upto previous
previous Current bill Cumulative bill
bill bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth
Beam 6%
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRU
NAME OF THE OWNER
NAME OF THE CONTRACTOR : M
BILL NO : THIRD RUNNING BILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth
Beam
Marking & Earthwork
PCC for footing
RCC for footing
Column upto plinthbeam
RCC for plinth beam
TOTAL
epared by
CPL Er
NSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBA
R : M/S. SHRIPROP CONSTRUCTORS PVT LTD
R : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL
11.01.15 to 07.02.15
VILLA 51 (4 BHK) - 1685 sft x Rs. 1395/
Percentage of work
Upto Value of wo
Payment modality completed
current Upto previous
previous
bill bill
Bill
30%
6%
2% 0% 47,012
1% -
1% -
1.0% -
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 2% 3.0% 47,012
Checked by
SCCPL Er
S AT COIMBATORE
LTD
ON PVT.LTD
- 47,012
23,506 23,506
23,506 23,506
23,506 23,506
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
70,517 117,529
Verified by
SCPL Er
S.No
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCT
NAME OF THE OWNER :
NAME OF THE CONTRACTOR : M/S. S
BILL NO : THIRD RUNNING BILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Be
TOTAL
Prepared by
SCCPL Er
ION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
M/S. SHRIPROP CONSTRUCTORS PVT LTD
SENTHIL CONSTRUCTION CORPORATION PVT.LTD
11.01.15 to 07.02.15
VILLA 52 (4 BHK) - 1685 sft x Rs. 1395/ sft
Percentage of work
Value of work completed
completed
Payment Upto Upto
modality current Current
previous previous
bill bill
Bill bill
30%
6%
0% 2% - 47,012
1% - 23,506
0% - -
- -
- -
- -
- -
- -
4% - -
7% - -
- -
6% - -
7% - -
15% - -
- -
2% - -
2% - -
- -
3% - -
3% - -
5% - -
20% - -
- -
4% - -
4% - -
2% - -
2% - -
- -
3% - -
3% - -
2% - -
14% - -
- -
3% - -
3% - -
- -
3% - -
3% - -
- -
1% - -
1% - -
10% - -
- -
3% - -
3% - -
- -
2% - -
2% - -
4% - -
2% - -
2% - -
4% - -
- -
1% - -
2% - -
- -
0.50% - -
0.25% - -
0.25% - -
3% - -
1% - -
2% - -
- -
100% 0% 3% - 70,517
Checked by
SCCPL Er
TORE
Rs 2,350,575
work completed
Cumulative
bill
47,012
23,506
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
70,517
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTORS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : THIRD RUNNING BILL
Percentage of work
Value of work completed
completed
Payment Upto Upto Cumulative
S.No Description of work current Current bill
modality previous previous
bill bill
Bill bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2% 47,012 - 47,012
PCC for footing 1% 23,506 - 23,506
RCC for footing 1% 23,506 - 23,506
Column upto plinthbeam 1% 23,506 - 23,506
RCC for plinth beam 1% 23,506 - 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 3% - 70,517 70,517
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. •Internal Plumbing
Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 6% 3% 141,035 70,517 211,552
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto Cumulative
previous Current bill
bill previous bill bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto Cumulative
previous Current bill
bill previous bill bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Upto Value of work completed
S.No Description of work Payment modality completed
current Upto Cumulative
previous Current bill
bill previous bill bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth
Beam 6%
Marking & Earthwork 2% 47,012 - 47,012
PCC for footing 1% 23,506 - 23,506
RCC for footing 1% 23,506 - 23,506
Column upto plinthbeam 1% 23,506 - 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
• GF Roof and Portico Roof Slab including Staircase Second 4% - - -
Flight 7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
• GF Masonry Works up to Roof including Lintel and - - -
Sunshades
• FF Masonry Works up to Roof including Lintel, Lofts and 2% - - -
Sunshades 2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other 2% - - -
finishing Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste - - -
Line incl Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down - - -
•takeGully
lines Traps & Chambers with connections complete 0.50% - - -
(Pumps & Valves), Supply & Fixing Syntex Tank &
0.25% - - -
Connections (Pumps & Valves)
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 5% 0.00% 117,529 - 117,529
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth
Beam
Marking & Earthwork
PCC for footing
RCC for footing
Column upto plinthbeam
RCC for plinth beam
TOTAL
epared by
CPL Er
ESHTA" VILLAS AT COIMBATORE
PORATION PVT.LTD
11.01.15 to 07.02.15
VILLA 57 (4 BHK) - 1685 sft x Rs. 1395/ sf
Percentage of work
Upto Value of work
Payment modality completed
current Upto
previous
bill previous bill
Bill
30%
6%
2% 47,012
1% 23,506
1% 23,506
1% 23,506
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 5% 0.00% 117,529
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,350,575
- 47,012
- 23,506
- 23,506
- 23,506
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 117,529
Verified by
SCPL Er
S.No
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
TOTAL
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
VILLA 58 (4 BHK) - 1685 sft x Rs. 1395/ sft
Percentage of work
Payment Upto Value of work complet
completed
current Upto
modality previous
bill previous bill
Bill
30%
6%
2% 47,012
1% 23,506
1% 23,506
1% 23,506
1% -
-
-
-
4% 3% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 5% 4% 117,529
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,350,575
- 47,012
- 23,506
- 23,506
- 23,506
23,506 23,506
- -
- -
- -
70,517 70,517
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
94,023 211,552
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2% 47,012 - 47,012
PCC for footing 1% 23,506 - 23,506
RCC for footing 1% 23,506 - 23,506
Column upto plinthbeam 1% 23,506 - 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 3% - 70,517 70,517
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% 3% - 70,517 70,517
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 5% 7% 117,529 164,540 282,069
Block-7
Claim. ( 60,65 ) -
2 Nos x 1685 sft x Rs. 1395/ sft Rs 4,701,150
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality Upto previous
previous current bill Current bill Cumulative bill
bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column
up to Plinth, Plinth Beam 6%
- - -
TOTAL
100% 7.50% 2.00% 352,586 94,023 446,609
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Structure
1
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up
to Plinth, Plinth Beam
Ground Floor
• Columns & Staircase First Flight
• GF Roof and Portico Roof Slab including
Staircase Second Flight
First Floor
• Columns and Slope Roof
• FF Roof Slab
• FF All Toilets
• GF
• FF
• GF
• FF
MS Railing Works for Windows, Staircase,
4.3.
Balcony & Terrace
• GF
• FF
Painting Works
5
5.1. Painting of Internal Walls & Ceilings
• GF
• FF
5.2. Painting for External Elevation
S.No Description of work
• GF
• FF
TOTAL
Prepared by
SCCPL Er
OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
ONSTRUCTORS PVT LTD
NSTRUCTION CORPORATION PVT.LTD
BILL
11.01.15 to 07.02.15
Total Block-8 ( 66 to 72 ) - 6 Nos x 1685 sft x Rs. 1395
Block-8 (66,67,68,69,70,72 )
Claim. -
6 Nos x 1685 sft x Rs. 139
Percentage of work
Value of work
Payment completed
modality Upto previous Upto previous
current bill
Bill bill
30%
6%
0.00% 0.00% -
0.00% 0.00% -
4% 1.00% 0.50% 141,035
0.00% 0.00% -
6% 0.00% 0.67% -
7% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
Percentage of work
Value of work
Payment completed
modality Upto previous Upto previous
current bill
Bill bill
5% 0.00% 0.00% -
0.00% 0.00% -
4% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
2% 0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
1% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
Percentage of work
Value of work
Payment completed
modality Upto previous Upto previous
current bill
Bill bill
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
-
100% 6.67% 2.42% 940,230
Checked by
SCCPL Er
x 1685 sft x Rs. 1395/ sft Rs 14,103,450
- 282,069
- 141,035
- 141,035
23,506 141,035
- 47,012
- -
Value of work completed
- -
- -
70,517 211,552
152,787 223,305
- -
94,023 94,023
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
340,833 1,281,063
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
• FF
Painting for External Elevation
• GF
• FF
Water proofing Works in all floors
Toilet Water Proofing
Terrace, balcony water Proofing
TOTAL
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
Percentage of work
Value of work comple
completed
Payment
modality Upto
current Upto
previous
bill previous bill
Bill
30%
6%
2% 47,012
1% 23,506
1% 23,506
1% 23,506
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 5.00% 0.00% 117,529
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,350,575
- 47,012
- 23,506
- 23,506
- 23,506
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 117,529
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
TOTAL
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
Percentage of work
Value of work compl
completed
Payment
modality Upto
current Upto previous
previous
bill bill
Bill
30%
6%
2% 47,012
1% 23,506
1% 23,506
1% -
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 4.00% 1.00% 94,023
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,350,575
- 47,012
- 23,506
- 23,506
23,506 23,506
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
23,506 117,529
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Block-9
Claim. (72A,73,74,75,77,78,79,81,81A, 11 Nos x 1685 sft x Rs. 1395/ sft Rs 25,856,325
82,83) -
Percentage of work
Value of work completed
completed
Payment
S.No Description of work
modality Upto Upto previous
current bill Current bill Cumulative bill
previous Bill bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam 6%
Ground Floor
0.00% 0.00% - - -
• Columns & Staircase First Flight
4% 1.64% 0.00% 423,104 - 423,104
• GF Roof and Portico Roof Slab including Staircase
Second Flight 7% 0.61% 1.16% 158,664 299,698 458,362
First Floor
0.00% 0.00% - - -
• Columns and Slope Roof
6% 0.00% 1.09% - 282,069 282,069
• FF Roof Slab
7% 0.00% 0.00% - - -
Masonry & Plastering
2 15% 0.00% 0.00% - - -
2.1. Masonry Works
0.00% 0.00% - - -
• GF Masonry Works up to Roof including Lintel and
Sunshades 2% 0.00% 0.27% - 70,517 70,517
• GF
1% 0.00% 0.00% - - -
• FF
1% 0.00% 0.00% - - -
Painting Works
5 10% 0.00% 0.00% - - -
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
TOTAL
epared by
CCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
VILLA 75 (4 BHK) - 1685 sft x Rs. 1395/ sft
Percentage of work
Payment Upto Value of work comple
completed
current Upto
modality previous
bill previous bill
Bill
30%
6%
2.00% 47,012
1.00% 23,506
0.00% -
-
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 3.00% 0.00% 70,517
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,350,575
- 47,012
- 23,506
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 70,517
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed Upto
modality previous current bill Current bill Cumulative bill
previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2% 47,012 - 47,012
PCC for footing 1% 23,506 - 23,506
RCC for footing 1% 23,506 - 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 4% 1% 94,023 23,506 117,529
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed Upto
modality previous current bill Current bill Cumulative bill
previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2.00% - 47,012 47,012
PCC for footing 1.00% - 23,506 23,506
RCC for footing 1.00% - 23,506 23,506
Column upto plinthbeam 1.00% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed Upto
modality previous current bill Current bill Cumulative bill
previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2% - 47,012 47,012
PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed Upto
modality previous current bill Current bill Cumulative bill
previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2% 47,012 - 47,012
PCC for footing 1% 23,506 - 23,506
RCC for footing 1% 23,506 - 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 4% 1% 94,023 23,506 117,529
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
S.No
1
1.1.
S.No
1.2.
2
2.1.
S.No
2.2.
2.3.
3.1.
3.2.
S.No
3.3.
4.1.
4.2.
4.3.
S.No
5.1.
5.2.
6
6.1.
6.2.
7
S.No
7.1.
7.2.
8.1.
S.No
8.2.
Prepared by
SCCPL Er
AME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLA
AME OF THE OWNER : M/S. SHRIPROP CONSTRUCTORS PVT LTD
AME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PV
LL NO : THIRD RUNNING BILL
LLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
Ground Floor
• Columns & Staircase First Flight
• GF Roof and Portico Roof Slab including Staircase
Second Flight
First Floor
• Columns and Slope Roof
• FF Roof Slab
Masonry Works
• GF Masonry Works up to Roof including Lintel and
Sunshades
• FF Masonry Works up to Roof including Lintel,
Lofts and Sunshades
Description of work
• FF All Toilets
• GF
• FF
Window frames & Shutters
• GF
• FF
• GF
Description of work
• FF
Painting Works
• GF
• FF
• GF
• FF
TOTAL
epared by
CCPL Er
RAM SHRESHTA" VILLAS AT COIMBATORE
CTORS PVT LTD
ON CORPORATION PVT.LTD
11.01.15 to 07.02.15
Block-10
Total (91,84,85,86,87,88,90,90A,92 ) 9 Nos x 1685 sft x Rs. 1395/
-
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
30%
6%
0.00% 0.00% -
4% 0.60% 0.00% 70,517
0.00% 0.00% -
6% 0.00% 0.80% -
7% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
5% 0.00% 0.00% -
0.00% 0.00% -
4% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
3% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
1% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
1% 0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 0.00% 0.00% -
-
100% 2.15% 4.25% 252,687
Checked by
SCCPL Er
5 sft x Rs. 1395/ sft Rs 21,155,175
188,046 235,058
94,023 117,529
23,506 47,012
- 23,506
Value of work completed
- 23,506
- -
- -
- -
- 70,517
99,899 141,035
- -
94,023 94,023
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
499,497 752,184
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Structure
1
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
Marking & Earthwork
PCC for footing
RCC for footing
Column upto plinthbeam
RCC for plinth beam
TOTAL
Prepared by
SCCPL Er
HRIRAM SHRESHTA" VILLAS AT COIMBATORE
TRUCTORS PVT LTD
UCTION CORPORATION PVT.LTD
Percentage of work
Payment Value of work com
Upto completed Upto previous
modality current bill
previous Bill bill
30%
6%
2.00% 0.00% 188,046
1.00% 0.00% 94,023
1.00% 0.00% 94,023
1.00% 0.00% 94,023
1.00% 0.00% 94,023
0.00% 0.00% -
0.00% 0.00% -
0.00% 0.00% -
Percentage of work
Payment Value of work com
Upto completed Upto previous
modality current bill
previous Bill bill
4% 3.00% 0.00% 282,069
7% 1.56% 2.19% 146,911
0.00% 0.00% -
6% 0.00% 1.00% -
7% 0.00% 0.00% -
15% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.38% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
5% 0.00% 0.00% -
20% 0.00% 0.00% -
0.00% 0.00% -
4% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
Percentage of work
Payment Value of work com
Upto completed Upto previous
modality current bill
previous Bill bill
3% 0.00% 0.00% -
3% 0.00% 0.00% -
2% 0.00% 0.00% -
14% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
1% 0.00% 0.00% -
10% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
Percentage of work
Payment Value of work com
Upto completed Upto previous
modality current bill
previous Bill bill
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
0.50% 0.00% 0.00% -
0.25% 0.00% 0.00% -
0.25% 0.00% 0.00% -
3% 0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
-
100% 10.56% 3.56% 993,118
Checked by
SCCPL Er
1685 sft x Rs. 1395/ sf Rs 21,155,175
1685 sft x Rs. 1395/ sf Rs 9,402,300
- 188,046
- 94,023
- 94,023
- 94,023
- 94,023
- -
- -
- -
Value of work completed
Current bill Cumulative bill
- 282,069
205,675 352,586
- -
94,023 94,023
- -
- -
- -
35,259 35,259
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
Current bill Cumulative bill
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
Current bill Cumulative bill
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
334,957 1,328,075
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Structure
1
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
Ground Floor
• Columns & Staircase First Flight
• GF Roof and Portico Roof Slab including Staircase
Second Flight
First Floor
• Columns and Slope Roof
• FF Roof Slab
• GF
• FF
• GF
• FF
TOTAL
S.No Description of work
Prepared by
SCCPL Er
RAM SHRESHTA" VILLAS AT COIMBATORE
UCTORS PVT LTD
TION CORPORATION PVT.LTD
11.01.15 to 07.02.15
Block-14
Total (120,121,123,124,126A,127,1 11 Nos x 1685 sft x Rs. 1395/ s
28,130,122,126,129 ) -
Block-14
Claim. (120,121,123,124,126,126A,1 9 Nos x 1685 sft x Rs. 1395/ sf
27,128,130)
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
30%
6%
-
4% 3.00% 0.00% 634,655
7% 1.19% 2.47% 252,687
0.00% 0.00% -
6% 0.00% 0.89% -
7% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.44% -
2% 0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
5% 0.00% 0.00% -
0.00% 0.00% -
4% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
2% 0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
1% 0.00% 0.00% -
10% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
3% 0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
-
100% 10.19% 3.81% 2,156,653
Percentage of work
Value of work c
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
Checked by
SCCPL Er
1685 sft x Rs. 1395/ s Rs 25,856,325
- 423,104
- 211,552
- 211,552
Value of work completed
- 211,552
- 211,552
- -
- -
- -
- 634,655
523,003 775,690
- -
188,046 188,046
- -
- -
- -
94,023 94,023
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
805,072 2,961,725
Value of work completed
Verified by
SCPL Er
Value of work completed
1,386,839.25
1,574,885.25
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
TOTAL
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
VILLA 127 (4 BHK) - 1685 sft x Rs. 1395/ sft
Percentage of work
Payment Upto Value of work comple
completed
current Upto
modality previous
bill previous bill
Bill
30%
6%
2.00% 47,012
1.00% 23,506
1.00% 23,506
1.00% 23,506
1.00% 23,506
-
-
-
4% 3.00% 70,517
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 9% 0% 211,552
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,350,575
- 47,012
- 23,506
- 23,506
- 23,506
- 23,506
- -
- -
- -
- 70,517
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 211,552
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Block-15
Claim. (131,132,133,135,135A,136, 10Nos x 1475 sft x Rs. 1395/ sft Rs 20,576,250
137,138,140,141)
Percentage of work
Value of work completed
completed
Payment
S.No Description of work
modality Upto Upto previous
current bill Current bill Cumulative bill
previous Bill bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam 6%
• GF
1% 0.00% 0.00% - - -
• FF
1% 0.00% 0.00% - - -
Painting Works
5 10% 0.00% 0.00% - - -
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VI
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Be
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
VILLA 133 (3 BHK) - 1475 sft x Rs. 1395/ sft
Percentage of work
Payment Upto Value of work comp
completed
current Upto
modality previous
bill previous bill
Bill
30%
6%
2.00% 41,153
1.00% -
1.00% -
1.00% -
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 2% 3% 41,153
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,057,625
- 41,153
20,576 20,576
20,576 20,576
20,576 20,576
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
61,729 102,881
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2.00% 41,153 - 41,153
PCC for footing 1.00% - 20,576 20,576
RCC for footing 1.00% - 20,576 20,576
Column upto plinthbeam 1.00% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 2% 3% 41,153 61,729 102,881
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VI
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Be
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
VILLA 140 (3 BHK) - 1475 sft x Rs. 1395/ sft
Percentage of work
Payment Upto Value of work comp
completed
current Upto
modality previous
bill previous bill
Bill
30%
6%
2.00% -
1.00% -
-
-
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 0% 3% -
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,057,625
41,153 41,153
20,576 20,576
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
61,729 61,729
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 1.00% 1.00% 20,576 20,576 41,153
PCC for footing 1.00% - 20,576 20,576
RCC for footing 1.00% - 20,576 20,576
Column upto plinthbeam 1.00% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 1% 4% 20,576 82,305 102,881
Structure
1
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
Ground Floor
• GF
• FF
• GF
• FF
S.No Description of work
• GF
• FF
Painting Works
5
• GF
• FF
5.2. Painting for External Elevation
• GF
• FF
TOTAL
Prepared by
SCCPL Er
HRIRAM SHRESHTA" VILLAS AT COIMBATORE
TRUCTORS PVT LTD
UCTION CORPORATION PVT.LTD
11.01.15 to 07.02.15
Block-16
Total (142,144,144A,145,146,14 9 Nos x 1475 sft x Rs. 1395/ sft
7,148,149,150 ) -
Block-16
Claim. (142,144,145,147,149)
5 Nos x 1475 sft x Rs. 1395/ sft
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
30%
6%
0.00% 0.00% -
0.00% 0.00% -
6% 0.00% 0.80% -
7% 0.00% 0.00% -
0.00% 0.00% -
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
5% 0.00% 0.00% -
0.00% 0.00% -
4% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
1% 0.00% 0.00% -
1% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 0.00% 0.00% -
4% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
1% 0.00% 0.00% -
2% 0.00% 0.00% -
-
100% 2.10% 4.50% 216,051
Checked by
SCCPL Er
1475 sft x Rs. 1395/ sft Rs 18,518,625
164,610 205,763
82,305 102,881
Value of work completed
41,153 61,729
- 20,576
- 20,576
- -
- -
- -
- 61,729
92,593 123,458
- -
82,305 82,305
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
462,966 679,016
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Structure
1
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
• FF
2.3. Plastering in External Elevation in all floors
Flooring, Dado & Skirting
3
3.1. Flooring & Skirting
• GF-Foyer, Living, Dining, Kitchen, Bedroom
• FF-All Bedrooms, lobby & Balconies
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and
other finishing Works
3.2. All Dadoo, Granite & Flooring
• GF Toilet, Dining & Kitchen Granite Works with
Sink
• FF All Toilets
3.3. Staircase & Landings, etc.,
Joinery & MS Railing Works
4
4.1. Door frames & Shutters
• GF
• FF
S.No Description of work
TOTAL
Prepared by
S.No Description of work
SCCPL Er
IRAM SHRESHTA" VILLAS AT COIMBATORE
UCTORS PVT LTD
TION CORPORATION PVT.LTD
11.01.15 to 07.02.15
Block-19
Total (169,171,171A,174,177,172, 9 Nos x 1475 sft x Rs. 1395/ sft
173,175,176 ) -
Block-19
Claim. (169,171,171A,174,176,177 6 Nos x 1475 sft x Rs. 1395/ sf
)
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
30%
6%
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 8.50% 1.50% 1,049,389
Checked by
Percentage of work
Value of work com
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
SCCPL Er
475 sft x Rs. 1395/ sft Rs 18,518,625
41,153 246,915
20,576 123,458
Value of work completed
20,576 123,458
- 102,881
- 102,881
- -
- -
- -
- 318,932
51,441 164,610
- -
- -
- -
- -
- -
51,441 51,441
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Value of work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
185,186 1,234,575
Verified by
Value of work completed
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto Cumulative
previous Current bill
bill previous bill bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto Cumulative
previous Current bill
bill previous bill bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Block-20
Claim. (178,180,181,182,184,186,187 7 Nos x 1475 sft x Rs. 1395/ sft Rs 14,403,375
)
Percentage of work
Value of work completed
completed
Payment
S.No Description of work
modality Upto Upto previous
current bill Current bill Cumulative bill
previous Bill bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam 6%
Marking & Earthwork 0.86% 1.00% 123,458 144,034 267,491
PCC for footing 0.43% 0.43% 61,729 61,729 123,458
RCC for footing 0.43% 0.43% 61,729 61,729 123,458
Column upto plinthbeam 0.43% 0.43% 61,729 61,729 123,458
RCC for plinth beam 0.29% 0.00% 41,153 - 41,153
0.00% 0.00% - - -
1.2. Super-structure - RCC frame
0.00% 0.00% - - -
Ground Floor
0.00% 0.00% - - -
• Columns & Staircase First Flight
• GF Roof and Portico Roof Slab including 4% 0.86% 0.00% 123,458 - 123,458
Staircase Second Flight 7% 0.14% 0.00% 20,576 - 20,576
First Floor
0.00% 0.00% - - -
• Columns and Slope Roof
6% 0.00% 0.00% - - -
• FF Roof Slab
7% 0.00% 0.00% - - -
Masonry & Plastering
2 15% 0.00% 0.00% - - -
2.1. Masonry Works
• GF Masonry Works up to Roof including Lintel 0.00% 0.00% - - -
and
• FFSunshades
Masonry Works up to Roof including Lintel, 2% 0.00% 0.14% - 20,576 20,576
Lofts and Sunshades 2% 0.00% 0.00% - - -
2.2. Plastering of ceiling and walls
0.00% 0.00% - - -
• GF
3% 0.00% 0.00% - - -
• FF
3% 0.00% 0.00% - - -
2.3. Plastering in External Elevation in all floors
5% 0.00% 0.00% - - -
Flooring, Dado & Skirting
3 20% 0.00% 0.00% - - -
3.1. Flooring & Skirting
0.00% 0.00% - - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% 0.00% 0.00% - - -
• FF-All Bedrooms, lobby & Balconies
4% 0.00% 0.00% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete 2% 0.00% 0.00% - - -
and other finishing Works 2% 0.00% 0.00% - - -
3.2. All Dadoo, Granite & Flooring
• GF Toilet, Dining & Kitchen Granite Works 0.00% 0.00% - - -
with Sink 3% 0.00% 0.00% - - -
• FF All Toilets
3% 0.00% 0.00% - - -
3.3. Staircase & Landings, etc.,
2% 0.00% 0.00% - - -
Joinery & MS Railing Works
4 14% 0.00% 0.00% - - -
4.1. Door frames & Shutters
0.00% 0.00% - - -
• GF
3% 0.00% 0.00% - - -
• FF
3% 0.00% 0.00% - - -
4.2. Window frames & Shutters
0.00% 0.00% - - -
• GF
3% 0.00% 0.00% - - -
• FF
3% 0.00% 0.00% - - -
Percentage of work
Value of work completed
completed
Payment
S.No Description of work
modality Upto Upto previous
current bill Current bill Cumulative bill
previous Bill bill
MS Railing Works for Windows, Staircase,
4.3.
Balcony & Terrace 0.00% 0.00% - - -
• GF
1% 0.00% 0.00% - - -
• FF
1% 0.00% 0.00% - - -
Painting Works
5 10% 0.00% 0.00% - - -
5.1. Painting of Internal Walls & Ceilings
0.00% 0.00% - - -
• GF
3% 0.00% 0.00% - - -
• FF
3% 0.00% 0.00% - - -
5.2. Painting for External Elevation
0.00% 0.00% - - -
• GF
2% 0.00% 0.00% - - -
• FF
2% 0.00% 0.00% - - -
Water proofing Works in all floors
6 4% 0.00% 0.00% - - -
6.1. Toilet Water Proofing
2% 0.00% 0.00% - - -
6.2. Terrace, balcony water Proofing
2% 0.00% 0.00% - - -
Plumbing & Sanitary Works in all floors
7 4% 0.00% 0.00% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water 0.00% 0.00% - - -
& Waste Line incl Pressure testing
1% 0.00% 0.00% - - -
• Fixing CP & Sanitary fittings
2% 0.00% 0.00% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain 0.00% 0.00% - - -
•Water
Gully Traps
down take& lines
Chambers with connections 0.50% 0.00% 0.00% - - -
complete (Pumps & Valves), Supply & Fixing
0.25% 0.00% 0.00% - - -
•Syntex TankCommissioning
Testing, & Connections and
(Pumps & Valves)
Handing Over
0.25% 0.00% 0.00% - - -
Miscellaneous Works in all floors
8 Expansion Joint Treatment Works & Flagging 3% 0.00% 0.00% - - -
8.1.
Concrete 1% 0.00% 0.00% - - -
8.2. MS Staircase to terrace & Fencing for site
2% 0.00% 0.00% - - -
- - -
TOTAL
100% 3.43% 2.43% 493,830 349,796 843,626
1,386,839.25
(543,213.00)
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
TOTAL
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
VILLA 180 (3 BHK) - 1475 sft x Rs. 1395/ sft
Percentage of work
Payment Upto Value of work comple
completed
current Upto
modality previous
bill previous bill
Bill
30%
6%
2.00% 41,153
1.00% 20,576
1.00% 20,576
1.00% 20,576
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 5% 0% 102,881
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,057,625
- 41,153
- 20,576
- 20,576
- 20,576
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 102,881
Verified by
SCPL Er
S.No
1
1.1.
1.2.
2
2.1.
2.2.
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILL
BILLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
TOTAL
Prepared by
SCCPL Er
LLAS AT COIMBATORE
PVT.LTD
11.01.15 to 07.02.15
VILLA 181 (3 BHK) - 1475 sft x Rs. 1395/ sft
Percentage of work
Payment Upto Value of work complet
completed
current Upto
modality previous
bill previous bill
Bill
30%
6%
2.00% -
1.00% -
1.00% -
1.00% -
-
-
-
-
4% -
7% -
-
6% -
7% -
15% -
-
2% -
2% -
-
3% -
3% -
5% -
20% -
-
4% -
4% -
2% -
2% -
-
3% -
3% -
2% -
14% -
-
3% -
3% -
-
3% -
3% -
-
1% -
1% -
10% -
-
3% -
3% -
-
2% -
2% -
4% -
2% -
2% -
4% -
-
1% -
2% -
-
0.50% -
0.25% -
0.25% -
3% -
1% -
2% -
-
100% 0% 5% -
Checked by
SCCPL Er
sft x Rs. 1395/ sft Rs 2,057,625
41,153 41,153
20,576 20,576
20,576 20,576
20,576 20,576
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
102,881 102,881
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2.00% - 41,153 41,153
PCC for footing 1.00% - 20,576 20,576
RCC for footing 1.00% - 20,576 20,576
Column upto plinthbeam 1.00% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 1.00% - 20,576 20,576
PCC for footing - - -
RCC for footing - - -
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 1% - 20,576 20,576
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 2.00% - 41,153 41,153
PCC for footing 1.00% - 20,576 20,576
RCC for footing 1.00% - 20,576 20,576
Column upto plinthbeam 1.00% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Claim. Block-21 (194) 1 Nos x 1475 sft x Rs. 1395/ sft Rs 2,057,625
Percentage of work
Value of work completed
completed
Payment
S.No Description of work
modality Upto Upto previous
current bill Current bill Cumulative bill
previous Bill bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam 6%
1,386,839.25
(1,283,958.00)
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
S.No
1
1.1.
S.No
1.2.
S.No
2
2.1.
2.2.
2.3.
3
3.1.
S.No
3.2.
3.3.
4
4.1.
4.2.
S.No
4.3.
5
5.1.
5.2.
6
S.No
6.1.
6.2.
7
7.1.
7.2.
8
8.1.
S.No
8.2.
Prepared by
SCCPL Er
AME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLA
AME OF THE OWNER : M/S. SHRIPROP CONSTRUCTORS PVT LTD
AME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PV
LL NO : THIRD RUNNING BILL
LLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
Ground Floor
• FF Roof Slab
Description of work
Masonry Works
• GF Masonry Works up to Roof including Lintel
and Sunshades
• FF Masonry Works up to Roof including Lintel,
Lofts and Sunshades
Plastering of ceiling and walls
• GF
• FF
• GF
• FF
• GF
Description of work
• FF
MS Railing Works for Windows, Staircase, Balcony &
Terrace
• GF
• FF
Painting Works
• GF
• FF
• GF
• FF
TOTAL
epared by
CCPL Er
RAM SHRESHTA" VILLAS AT COIMBATORE
UCTORS PVT LTD
TION CORPORATION PVT.LTD
11.01.15 to 07.02.15
Block-25
Total (231,226,227,228,229,234A, 9 Nos x 1475 sft x Rs. 1395/ sft
230,232,234 ) -
Block-25
Claim. (226,228,229,230,231,234A)
6 Nos x 1475 sft x Rs. 1395/ sft
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
30%
6%
0.00% 0.00% -
0.00% 0.00% -
0.00% 0.00% -
7% 0.00% 0.50% -
0.00% 0.00% -
6% 0.00% 0.00% -
7% 0.00% 0.00% -
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
2% 0.00% 0.38% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
5% 0.00% 0.00% -
0.00% 0.00% -
4% 0.00% 0.00% -
4% 0.00% 0.00% -
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
3% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
1% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
1% 0.00% 0.00% -
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
2% 0.00% 0.00% -
Checked by
SCCPL Er
1475 sft x Rs. 1395/ sft Rs 18,518,625
work completed
123,458 246,915
work completed
61,729 123,458
- 61,729
- 61,729
- 61,729
- -
- -
- -
61,729 123,458
61,729 61,729
- -
- -
- -
work completed
- -
- -
46,297 46,297
- -
- -
- -
- -
- -
- -
- -
- -
- -
work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
work completed
- -
- -
354,940 787,042
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
S.No
1
1.1.
S.No
1.2.
2
2.1.
2.2.
S.No
2.3.
3
3.1.
3.2.
3.3.
4
4.1.
S.No
4.2.
4.3.
5
5.1.
5.2.
6
6.1.
6.2.
S.No
7
7.1.
7.2.
8
8.1.
8.2.
Prepared by
SCCPL Er
AME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLA
AME OF THE OWNER : M/S. SHRIPROP CONSTRUCTORS PVT LTD
AME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PV
LL NO : THIRD RUNNING BILL
LLING PERIOD
Description of work
Structure
Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
Marking & Earthwork
PCC for footing
RCC for footing
Description of work
• FF
Plastering in External Elevation in all floors
Flooring, Dado & Skirting
Flooring & Skirting
• GF-Foyer, Living, Dining, Kitchen, Bedroom
• FF-All Bedrooms, lobby & Balconies
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and
other finishing Works
All Dadoo, Granite & Flooring
• GF Toilet, Dining & Kitchen Granite Works with
Sink
• FF All Toilets
Staircase & Landings, etc.,
Joinery & MS Railing Works
Door frames & Shutters
• GF
• FF
Description of work
TOTAL
epared by
CCPL Er
RAM SHRESHTA" VILLAS AT COIMBATORE
UCTORS PVT LTD
TION CORPORATION PVT.LTD
11.01.15 to 07.02.15
Block-26
Total (235,245,236,237,238,239, 11 Nos x 1475 sft x Rs. 1395/ sft
240,241,243,234A,244) -
Block-26
Claim. (235,237,239,245)
4 Nos x 1475 sft x Rs. 1395/ sft
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
30%
6%
0.75% 1.00% 61,729
0.25% 0.50% 20,576
0.25% 0.25% 20,576
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
3% 0.00% 0.00% -
5% 0.00% 0.00% -
20% 0.00% 0.00% -
0.00% 0.00% -
4% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
2% 0.00% 0.00% -
14% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
1% 0.00% 0.00% -
10% 0.00% 0.00% -
0.00% 0.00% -
3% 0.00% 0.00% -
3% 0.00% 0.00% -
0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
4% 0.00% 0.00% -
2% 0.00% 0.00% -
2% 0.00% 0.00% -
Percentage of work
Value of work completed
completed
Payment
modality Upto Upto previous
current bill
previous Bill bill
4% 0.00% 0.00% -
0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
0.00% 0.00% -
0.50% 0.00% 0.00% -
0.25% 0.00% 0.00% -
0.25% 0.00% 0.00% -
3% 0.00% 0.00% -
1% 0.00% 0.00% -
2% 0.00% 0.00% -
-
100% 2.63% 2.19% 216,051
216051
Checked by
SCCPL Er
1475 sft x Rs. 1395/ sft Rs 22,633,875
work completed
82,305 144,034
41,153 61,729
20,576 41,153
work completed
- 20,576
- 20,576
- -
- -
- -
- 61,729 1.17
25,720 36,008
- -
- -
- -
- -
- -
10,288 10,288
- -
- -
- -
work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
work completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
180,042 396,093
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam
6%
Marking & Earthwork 1% 20,576 - 20,576
PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 1% 2.00% 20,576 41,153 61,729
Percentage of work
Payment Upto Value of work completed
S.No Description of work completed
current Upto
modality previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam 6%
Marking & Earthwork 0% 2% - 41,153 41,153
PCC for footing 1% - 20,576 20,576
RCC for footing - - -
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
• GF Roof and Portico Roof Slab including Staircase 4% - - -
Second Flight 7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
• GF Masonry Works up to Roof including Lintel and - - -
Sunshades
• FF Masonry Works up to Roof including Lintel, Lofts 2% - - -
and Sunshades 2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and 2% - - -
other finishing Works 2% - - -
3.2. All Dadoo, Granite & Flooring
• GF Toilet, Dining & Kitchen Granite Works with - - -
Sink 3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
MS Railing Works for Windows, Staircase, Balcony & 3% - - -
4.3.
Terrace - - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal
• Marking,Plumbing and Sanitary
Wall Chasing, PipeWorks
Works for Water & - - -
Waste Line incl Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain - - -
•Water
Gully
downTraps
take& lines
Chambers with connections 0.50% - - -
complete (Pumps & Valves), Supply & Fixing Syntex
0.25% - - -
•Tank & Connections
Testing, (Pumpsand
Commissioning & Valves)
Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 3% - 61,729 61,729
BILLING PERIOD
Structure
1
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to
Plinth, Plinth Beam
TOTAL
Prepared by
SCCPL Er
SHRESHTA" VILLAS AT COIMBATORE
S PVT LTD
CORPORATION PVT.LTD
11.01.15 to 07.02.15
Percentage of work
Value of work completed
completed
Payment
modality Upto
current Upto
previous Current bill
bill previous bill
Bill
30%
6%
2% - 41,153
- -
- -
- -
- -
- -
- -
- -
4% - -
7% - -
- -
6% - -
7% - -
15% - -
- -
2% - -
2% - -
- -
3% - -
3% - -
5% - -
20% - -
- -
4% - -
4% - -
2% - -
2% - -
- -
3% - -
3% - -
2% - -
14% - -
- -
3% - -
3% - -
- -
3% - -
3% - -
- -
1% - -
1% - -
10% - -
- -
3% - -
3% - -
- -
2% - -
2% - -
4% - -
2% - -
2% - -
4% - -
- -
1% - -
2% - -
- -
0.50% - -
0.25% - -
0.25% - -
3% - -
1% - -
2% - -
- -
100% 0% 2% - 41,153
Checked by
SCCPL Er
Rs 2,057,625
ompleted
Cumulative bill
41,153
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
41,153
Verified by
SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
SIVAKUMAR
1 9 4BHK Villa-72a 2350575 - - - - - - 1.5