1 BONGA ASSET

1.1 Well Reservoir Facility Management [WRFM] 1


2

1.2 Manage Threats & Opportunities [MTO] 1

1.3 PTME [PMTE] 1

1.4 5 Yearly As-Built 1


2

2 BBIP
2.1 1

2.2 2

3 PHASE-3 TEAM
3.1 1
2
3
4

4 DELTA-AFRIC ENGINEERING
1
2
3
4
5
6
7
8
9

5 BONGA NORTH / LE
5.1 1
2
3
ONGOING ACTIVITIES / PROJECT

Optimization of BOT
Optimization of PW Train 1& 2

Root Cause Analysis on VRU-1

Process Surveillance

Hull
Topside

Training (Oil System)


Water Flood
Fuel Gas

As-Built
Instrument Air & Power
Produced Water

Slot Doubler
LP Separator Retrofit
Heat Exchanger Replacement
Oil Foamer Chemical

Collection Sump
H2S Scavenger Injection Reinstatement
Sewage System
Water Flood Improvement Project
DRA
Train 2
Hose Changeout
Convert Temporary to Permanent
Online Corrosion

FEED
Scope
Heat Exchanger Replacement
LOOK AHEAD TARGET DATE

Q3
Q3

??

Continuous

Q3

Q3

??
??

Design Review / HAZOP ??


Slow Mode ??
Slow Mode
Trial completed, re-trial with a new injection pump,
??
process engineering

Kick-off Meeting, Scope, CTR ??


Chemical Injection Requirement, Hydraulics ??
Support DED, Datasheets. ??
Slow Mode ??
Slow Mode ??
Commissioning ??
Process ??
Kick-off Meeting, Scope, CTR
Kick-off Meeting, Scope, CTR

Design Review / HAZOP ??


Slow Mode ??
Action Close ou
ACTION BY

Godwin
Godwin

Uche

Uche

Peter

Godwin / Ozioma

Godwin
Godwin

Uche

Godwin
Godwin

Uche

Peter
Peter
Uche (PE) / Peter (PM)
Uche (PE) / Peter (PM)

Godwin
Godwin