30
4.66 1.50 2.34 1.00
WF WF WF 1.00

F2/C1 F2/C1 F2/C1


USE : 3-12MMØ CONC.
1.76 MATT BARS W/
WF WF F2/C1
WF 10MMØ TIES @
WF
WF 0.50M.O.C.
WF 4.00
F1/C1 WF WF 0.25 1.00
2.38 WF WF
F1/C1 F1/C1
F1/C1
WF
WF WF
6 X 6 - 16 MM DSB
2.44
1.42 WF 0.5
0.80
WF

F1/C1
WF 4.00
WF 5.00
FOOTING DETAIL (F2) USE : 0.10M THK. CHB W/
2.44 WF
WF
F1/C1
0 0.2 0.4 0.6 0.8 1 SCALE 1:20 10MMØ VERT. BARS SPACED @
F1/C1 0.50 0.80M.O.C. & 10MMØ HOR. BARS
@ EVERY 3 - LAYERS
WF WF
RESPECTIVELY
F1/C1 F1/C1
0.80
F1/C1 F1/C1
0.50
2.44 2.86 3.20

USE : 100MM CONCRETE SLAB ON FILL W/


10MMØ BARS @ 0.60M.O.C. EACH WAY
0.25
PLAN
FOUNDATION PLAN 0.25
9 MMØ COLUMN TIE
2.00

BARS SPACED AT
0 1 2 3 4 5 SCALE 1:100 0.15 MTS. ON CENTER
NGL
1.00 4 - 12 MM DSB
VERT. BARS

COLUMN DETAIL (C1) 0.40


USE : 0.10M THK. CHB W/
10MMØ VERT. BARS SPACED @
0.80M.O.C. & 10MMØ HOR. BARS
1.00
0 0.2 0.4 0.6 0.8 1 SCALE 1:20 @ EVERY 3 - LAYERS RESPECTIVELY
0.20
0.20 USE : 3-12MMØ CONC. MATT BARS W/
10MMØ TIES @ 0.50M.O.C.
0.10 HARD CORE

6 X 6 - 16 MM DSB
0.30

0.20
SECTION
FOOTING DETAIL (F1) WALL FOOTING DETAIL (WF)
0 0.2 0.4 0.6 0.8 1 SCALE 1:20 0 0.2 0.4 0.6 0.8 1 SCALE 1:20
DATE SUBJECT PREPARED BY : PROJECT TITLE: APPROVED BY: DRAWN BY: SASHEEN T. DELA CRUZ SHEET CONTENT SHEET NO.

A
DATE: SEPTEMBER 2, 2016

OCT 14, 2016 CE405: BUILDING DESIGN SASHEEN DELA CRUZ DEOCAMPO RESIDENCE SHEILA MAE B. DEOCAMPO CHECKED BY: ENGR. JEROME MONGCAL
VICINITY MAP, SITE
DEVELOPMENT PLAN &
LOCATION: LOT 39, BLOCK 12, PSD -06-038463 PERSPECTIVE

BSCE - 4 TERRANOVA SUBD., BACOLOD CITY, NEGROS OCC. PROJECT OWNER DATE: SEPTEMBER 2, 2016 6 6