Workshop #2

Commercial Establishment :

A Commercial establishment was to be built with an area of 297


sqm from a commercial space with supply voltage of 230 V
Single Phase. Given the schedule of Loads, provide an Electrical
Design Analysis Documents for Voltage Drop

Electrical Design Analysis Workshop www.fractalknowledge.com, : bersalazarjr@gmail.com


WORKSHOP # 2
Commercial Establishment :
Electrical Design Analysis Workshop www.bersalazar.com , email: bersalazarjr@gmail.com
WORKSHOP # 2
Commercial Establishment : LOAD SCHEDULE

Electrical Design Analysis Workshop www.bersalazar.com , email: bersalazarjr@gmail.com


EXAMPLE # 2
Commercial Establishment : LOAD SCHEDULE
Electrical Design Analysis Workshop www.bersalazar.com , email: bersalazarjr@gmail.com
Date : ________________________________
Project: ________________________________
Owner :
Location:
________________________________
________________________________ WORKSHOP #2
Vd =2 x I x L x R
TABLE FOR MDP TO LOAD
Voltage Drop

Cond Length R X Ohms/ Load Per Main to


FROM TO Voltage
Size mm2
(m) (Ω/305) (Ω/305) km Current Branch load

Source MDP 125 mm2 25 0.1753 230 155 1.358575


MDP PBB 22 mm2 15 1.053 230 54.8 1.731132 3.089707
1 PPB CO1 3.5 mm2 13 6.73 230 4.7 0.822406 2.180981
2 PPB CO2 3.5 mm2 15 6.73 230 2.35 0.474465 1.83304
3 PPB CO3 3.5 mm2 21 6.73 230 3.91 1.1052006 2.4637756
4 PPB L1 3.5 mm2 25 230 4.35
5 PPB L2 3.5 mm2 56 230 4.35
6 PPB CCTV 3.5 mm2 25 230 4.35
7 PPB Horizontal Signage 3.5 mm2 21 230 4.35
8 PPB Flag Signage 3.5 mm2 21 230 4.35
9 PPB ACCU - 1HP 3.5 mm2 20 230 4.35
10 PPB ACCU - 1.5TR 8.0 mm2 20 230 14
11 PPB ACCU - 1.5TR 8.0 mm2 20 230 14

Electrical Design Analysis Workshop www.bersalazar.com , email: bersalazarjr@gmail.com

Finding(s):
1. ALL Feeders & Branches PASSED the test of 5% Voltage Drop for operational efficiency requirement of PEC 2017 Article 2.10.2.1 FPN No. 4 page 42 an
Article 2.15.1.2 FPN No. 2 page 51.

Analysis & Recommendation(s)


1. The above loadings and circuits passed the VD Analysis at the time and date it was conducted as appeared in this document.
2. Operational Monitoring is always encourage, and do conduct Voltage Drop Calculation should there be change in the load, this is for the Safety of t
Operations.
Finding(s):
1. ALL Feeders & Branches PASSED the test of 5% Voltage Drop for operational efficiency requirement of PEC 2017 Article 2.10.2.1 FPN No. 4 page 42 an
Article 2.15.1.2 FPN No. 2 page 51.

Analysis & Recommendation(s)


1. The above loadings and circuits passed the VD Analysis at the time and date it was conducted as appeared in this document.
2. Operational Monitoring is always encourage, and do conduct Voltage Drop Calculation should there be change in the load, this is for the Safety of t
Operations.

Note(s): Above Spare CB was assume to carry 50% of load , with the maximum length of 10meters, if there shall be load to connect on those spare abo
computation shall be conducted.
x I x Lx R
oltage Drop

%VD Remarks

0.59% Acceptable
1.34% Acceptable
0.95% Acceptable
0.80% Acceptable
1.07% Acceptable

lazarjr@gmail.com

.1 FPN No. 4 page 42 and PEC 2017

t.
his is for the Safety of the Electrical
.1 FPN No. 4 page 42 and PEC 2017

t.
his is for the Safety of the Electrical

nect on those spare above 50%, a new


LET'S CHECK OUR ANSWERS TYPE 1 in the YELLOW BOX to show the ANSWER
0
TABLE FOR MDP TO LOAD Vd =2 x I x L x R
Voltage Drop

Cond Length R X Ohms/ Load Per Main to


FROM TO Voltage
Size mm 2
(m) (Ω/305) (Ω/305) km Current Branch load

Source MDP 125 mm2 25 0.1753 230 155 1.358575


MDP PBB 22 mm2 15 1.053 230 54.8 1.731132 3.089707
1 PPB CO1 3.5 mm2 13 6.73 230 4.7 0.822406 2.180981
2 PPB CO2 3.5 mm2 15 6.73 230 2.35 0.474465 1.83304
3 PPB CO3 3.5 mm2 21 6.73 230 3.91 1.1052006 2.4637756
4 PPB L1 3.5 mm2 25 230 4.35
5 PPB L2 3.5 mm2 56 230 4.35
6 PPB CCTV 3.5 mm2 25 230 4.35
7 PPB Horizontal Signage 3.5 mm2 21 230 4.35
8 PPB Flag Signage 3.5 mm2 21 230 4.35
9 PPB ACCU - 1HP 3.5 mm2 20 230 4.35
10 PPB ACCU - 1.5TR 8.0 mm2 20 230 14
11 PPB ACCU - 1.5TR 8.0 mm2 28 230 14

Electrical Design Analysis Workshop www.bersalazar.com , email: bersalazarjr@gmail.com


e ANSWER

x I x Lx R
oltage Drop

%VD Remarks

0.59% Acceptable
1.34% Acceptable
0.95% Acceptable
0.80% Acceptable
1.07% Acceptable
Failed
Failed
Failed
Failed
Failed
Failed
Failed
Failed

lazarjr@gmail.com
Date : ________________________________
Project: ________________________________
Owner :
Location:
________________________________
________________________________ WORKSHOP#2
Vd =2 x I x L x R Voltage Drop

Cond Size Length R X Load Per Main to


FROM TO Ohms/km Voltage
mm2 (m) (Ω/305) (Ω/305) Current Branch load

Source MDP 125 mm2 25 0.1753 230 155 1.36


MDP PPA 30 mm2 10 0.661 230 103 1.36 2.72
PPA CO1 3.5 mm2 29 6.73 230 6.26 2.44 3.80
PPA CO2 3.5 mm2 28 6.73 230 6.26 2.36 3.72
PPA CO3 3.5 mm2 25 6.73 230 6.26 2.11 3.47
PPA CO4 3.5 mm2 21 230 6.26
PPA CO5 3.5 mm2 19 230 3.91
PPA CO6 3.5 mm2 37 230 6.26
PPA DATA CAB 3.5 mm2 20 230 4.35
PPA FACP 3.5 mm2 20 230 4.35
PPA LO1 3.5 mm2 25 230 4.35
PPA LO2 3.5 mm2 40 230 4.35
PPA LO3 3.5 mm2 45 230 4.35
PPA ACCU - 2TR 8.0 mm2 20 2.653 230 14.00 1.49 2.84
PPA ACCU - 2TR 8.0 mm2 25 230 14.00
PPA ACCU - 1 TR 8.0 mm2 30 230 5.10
PPA ACCU - 1HP 5.5 mm2 10 4.226 230 4.35 0.37 1.73
PPA ACCU - 1HP 5.5 mm2 16 230 4.35
PPA ACCU - 3TR 8.0 mm2 20 230 24.00

Electrical Design Analysis Workshop www.fractalknowledge.com , email: bersalazarjr@gm


Finding(s):
1. ALL Feeders & Branches PASSED the test of 5% Voltage Drop for operational efficiency requirement of PEC 2017 Article 2.10.2.1 FPN No. 4 page 4
2017 Article 2.15.1.2 FPN No. 2 page 51.

Analysis & Recommendation(s)


1. The above loadings and circuits passed the VD Analysis at the time and date it was conducted as appeared in this document.
2. Operational Monitoring is always encourage, and do conduct Voltage Drop Calculation should there be change in the load, this is in consideratio
of the Electrical System Operations.
Note(s): Above Spare CB was assume to carry 50% of load , with the maximum length of 10meters, if there shall be load to connect on those spare
new computation shall be conducted.
Voltage Drop

%VD Remarks

0.59% Acceptable
1.18% Acceptable
1.65% Acceptable
1.62% Acceptable
1.51% Acceptable

1.24% Acceptable

0.75% Acceptable

www.fractalknowledge.com , email: bersalazarjr@gmail.com


perational efficiency requirement of PEC 2017 Article 2.10.2.1 FPN No. 4 page 42 and PEC

time and date it was conducted as appeared in this document.


oltage Drop Calculation should there be change in the load, this is in consideration of Safety

e maximum length of 10meters, if there shall be load to connect on those spare above 50%, a
LET'S CHECK OUR ANSWERS TYPE 1 in the YELLOW BOX to show the ANSWER
0
TABLE FOR MDP TO LOAD Vd =2 x I x L x R
Voltage Drop

Cond Size Length R X Load Per Main to


FROM TO Ohms/km Voltage
mm 2
(m) (Ω/305) (Ω/305) Current Branch load

Source MDP 125 mm2 25 0.1753 230 155 1.36


MDP PPA 30 mm2 10 0.661 230 103 1.36 2.72
PPA CO1 3.5 mm2 29 6.73 230 6.26 2.44 3.80
PPA CO2 3.5 mm2 28 6.73 230 6.26 2.36 3.72
PPA CO3 3.5 mm2 25 6.73 230 6.26 2.11 3.47
PPA CO4 3.5 mm2 21 230 6.26
PPA CO5 3.5 mm2 19 230 3.91
PPA CO6 3.5 mm2 37 230 6.26
PPA DATA CAB 3.5 mm2 20 230 4.35
PPA FACP 3.5 mm2 20 230 4.35
PPA LO1 3.5 mm2 25 230 4.35
PPA LO2 3.5 mm2 40 230 4.35
PPA LO3 3.5 mm2 45 230 4.35
PPA ACCU - 2TR 8.0 mm2 20 2.653 230 14.00 1.49 2.84
PPA ACCU - 2TR 8.0 mm2 25 230 14.00
PPA ACCU - 1 TR 8.0 mm2 30 230 5.10
PPA ACCU - 1HP 5.5 mm2 10 4.226 230 4.35 0.37 1.73
PPA ACCU - 1HP 5.5 mm2 16 230 4.35
PPA ACCU - 3TR 8.0 mm2 20 230 24.00

Electrical Design Analysis Workshop www.fractalknowledge.com , email: bersalazarjr@gmail.c


2 x I x Lx R
oltage Drop

%VD Remarks

0.59% Acceptable
1.18% Acceptable
1.65% Acceptable
1.62% Acceptable
1.51% Acceptable
Failed
Failed
Failed
Failed
Failed
Failed
Failed
Failed
1.24% Acceptable
Failed
Failed
0.75% Acceptable
Failed
Failed

om , email: bersalazarjr@gmail.com