Commercial Establishment :
Finding(s):
1. ALL Feeders & Branches PASSED the test of 5% Voltage Drop for operational efficiency requirement of PEC 2017 Article 2.10.2.1 FPN No. 4 page 42 an
Article 2.15.1.2 FPN No. 2 page 51.
Note(s): Above Spare CB was assume to carry 50% of load , with the maximum length of 10meters, if there shall be load to connect on those spare abo
computation shall be conducted.
x I x Lx R
oltage Drop
%VD Remarks
0.59% Acceptable
1.34% Acceptable
0.95% Acceptable
0.80% Acceptable
1.07% Acceptable
lazarjr@gmail.com
t.
his is for the Safety of the Electrical
.1 FPN No. 4 page 42 and PEC 2017
t.
his is for the Safety of the Electrical
x I x Lx R
oltage Drop
%VD Remarks
0.59% Acceptable
1.34% Acceptable
0.95% Acceptable
0.80% Acceptable
1.07% Acceptable
Failed
Failed
Failed
Failed
Failed
Failed
Failed
Failed
lazarjr@gmail.com
Date : ________________________________
Project: ________________________________
Owner :
Location:
________________________________
________________________________ WORKSHOP#2
Vd =2 x I x L x R Voltage Drop
%VD Remarks
0.59% Acceptable
1.18% Acceptable
1.65% Acceptable
1.62% Acceptable
1.51% Acceptable
1.24% Acceptable
0.75% Acceptable
e maximum length of 10meters, if there shall be load to connect on those spare above 50%, a
LET'S CHECK OUR ANSWERS TYPE 1 in the YELLOW BOX to show the ANSWER
0
TABLE FOR MDP TO LOAD Vd =2 x I x L x R
Voltage Drop
%VD Remarks
0.59% Acceptable
1.18% Acceptable
1.65% Acceptable
1.62% Acceptable
1.51% Acceptable
Failed
Failed
Failed
Failed
Failed
Failed
Failed
Failed
1.24% Acceptable
Failed
Failed
0.75% Acceptable
Failed
Failed