ANNUAL EQUIPMENTS / MACHINERIES PREVENTIVE MAINTENANCE SCHEDULE

JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER
NO. NAMES OF EQUIPMENTS 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
AIRCONDITIONING SYSTEM (Admin Office)
PASSENGER ELEVATOR 1
PASSENGER ELEVATOR 2
PASSENGER ELEVATOR 3
SERVICE ELEVATOR
MECHANICAL

DIESEL GENERATOR SET, ELVSAD, MCCBs, ATS and others


WATER DISTRIBUTION SYSTEM
TRANSFER PUMP GF PUMP ROOM
KEF (KITCHEN EXHAUST FAN)
TEF (TOILET EXHAUST FAN)
SMEF(SMOKE EXHAUST FAN)
G/F PODIUM PARKING FANS AND BLOWERS, SF AND EF
2/F PODIUM 1 PARKING FANS AND BLOWERS, SF AND EF
3/F PODIUM 2PARKING FANS AND BLOWERS, SF AND EF
4/F PODIUM 3 PARKING FANS AND BLOWERS, SF AND EF
MCB2 AND LVS 1
BUSDUCT SYSTEM (GF TO 42 FLOORS)
ELECTRICAL

TELEPHONE PROVISION
CCTV SYSTEM G/F - 42F
CCTV SYSTEM PE1, PE2, PE3,SE
CATV SYSTEM
TRAFFIC MANAGEMENT SYSTEM
SEISMIC ACCELEROGRAPH SYSTEM
SEWAGE EJECTOR PUMP
CISTERN TANK
PLUMBING

FIRE TANK
OVERHEAD TANK
ELEVATOR PIT PUMP
SUMP PUMPS W/ CONTROLLERS
SUMP PUMPS W/ CONTROLLERS
FIRE PRO & SAFETY

FDAS G/F TO 42/F


JOCKEY PUMP AND CONTROLLER
FIRE PUMP AND CONTROLLER HIGH
FIRE PROTECTION AND PIPING WORKS
FIREMANS TELEPHONE SYSTEM
PZF (PRESSURIZATION FAN)
ADMIN OFFICE, MAIN LOBBY, HALLWAY AND MAILBOX ROOM
COMMON TOILET
SECURITY ROOM
CONTROL ROOM
MACHINE ROOM
TELCO ROOM
MAJOR FACILITIES

MDF ROOM
EE ROOM G/F TO 42
GENSET ROOM
SEWAGE PUMP ROOM STP
G/F PARKING
2/F PODIUM 1 PARKING
3/F PODIUM 2 PARKING
4/F PODIUM 3 PARKING
POOL PUMP ROOM
FIRE EXIT 1
FIRE EXIT 2
ROOF DECK AND UPPER ROOF DECK
HALLWAYS AND LOBBIES
AMENITIES

ARCADE AREA AND SIDEWALK


& OTHER

FUNCTION ROOM AND CHANGING ROOM ( MALE AND FEMALE)


SWIMMING POOL, PLAYGROUND AREA AND LANDSCAPE

LEGEND
Prepared by:
________________________ Testing Monthly Contractors Job Pumps and Fans Monthly
Billy Dumlao Checking and read supply voltage and ampere load Preventive Maintenance Get parameters of the motors
Building Engineer Dusting off of contacts, check for arcing on contacts Cleaning of the pumps and motor pump parts
Check and retighten mounting bolts, loose screws and springs Yearly Cleaning of pits and tanks Check for high temp. including noise & vibration
Noted by: Schedule during holiday vacation: Greasing, lubrication of moving parts
________________________ Inspection Check belt tension and wear
Ms. Dang Cabarles Cleaning ACU @ Ground floor lobby Monthly Test run for 5 minutes
Building Manager Repair Air filter cleaning Inspection and retightening of screws and bolts
Leak Check ( Water and Freon ) Checking of all electrical components
Vibration Unusual sound and temperature check Check packing seal , oil level of bearings and alignment.
Cleaning of starter and relays contacts Application of contact cleaner to contact surfaces.

Generator set weekly


Check the battery terminals for corrosion
Check all hoses for loose connections
Check engine fuel , oil and coolant level
Monitoring of parameters
No load test for 5 minutes