PATROL INSPECTION REPORT

Issued Date :
Inspection No. :
Report date :

Inspection Content :
Inspection Area :
Inspected date & time :
Inspected by :
Report made by :

No INSPECTION DESCRIPTION
1 Programme :

2 Construction Status :

3 Personnel :

4 Equipment :

5 Safety Status & PPE :

6 Weather Condition :

7 Problem Encountered :
& Action Taken
8 Recommendations :

9 Remaks :

General Comments/ Remarks :


PATROL INSPECTION REPORT

13th February 2019

13th February 2019

Slope protection, drainage system, sheet pile Content


DK74+020 point 113 v Inspection Description
13 February 2019; 12.30 am NCR
Jamaludin, Arif Quality report
Jamaludin v Photograph

INSPECTION DESCRIPTION
Inspection of Slope protection, drainage system, sheet pile

No activities, installation sheet pile

Not issued

Not issued

Not issued

Cloudy

1. Reinforcement installation on the slope must be done well so that undesirable things happen. This process needed to m
properly
2. Around the slope, must be shotcreted
3. Drainage must be made to drain water on the surface
4. Needed to install early warning system such as inclinometer
5. Monitoring periodically needed to ensure the stability of slope or tunnel entrance

ments/ Remarks : Chief Engineer


Form

B1

n. This process needed to monitored


ATTACHMENT PHOTOS
Attchment for NCR No :
Name of Inspector : Jamaludin, arif

No. Inspection Photos

1 Progress:
Installing sheet pile on the plan of tunnel
2 inlet with depth around 8-9m

2 Progress:
Cracks in shotcrete on the slope face

3 Progress:
Cracks in shotcrete on the slope face.
Cracks are getting wider than a week ago

4 Progress:
Cracks in shotcrete on the slope face.
Cracks are getting wider than a week ago
Prepared by: : Jamaludin, arif
Date: :Feb 13, 2019 General Comments/Remarks :
Form
PHOTOS
S
Location DK74+020 point 113
Date and time :Feb 13, 2019

Description

No. of Segment :
sheet pile on the plan of tunnel Mileage : DK74+020 point 113
th depth around 8-9m
Type of Construction : Tunnel
Contractor : CREC
Work's Name : Installing Sheet Pile
Borderline N:
E :
S :
W:
No. of Segment :
shotcrete on the slope face Mileage : DK74+020 point 113
Type of Construction : Tunnel
Contractor : CREC
Work's Name : Slope Reinforcement
Borderline N:
E :
S :
W:
No. of Segment :
shotcrete on the slope face. Mileage : DK74+020 point 113
e getting wider than a week ago
Type of Construction : Tunnel
Contractor : CREC
Work's Name : Slope Reinforcement
Borderline N:
E :
S :
W:
No. of Segment :
shotcrete on the slope face. Mileage : DK74+020 point 113
e getting wider than a week ago
Type of Construction : Tunnel
Contractor : CREC
Work's Name : Slope Reinforcement
Borderline N:
E :
S :
W:

Comments/Remarks :