Sie sind auf Seite 1von 2

[Insert LDC Logo and Letterhead Here]

Letter of Equivalency
Confirmation of Verification Evidence Report (COVER)

Date:

[Insert name of LDC] acknowledges and agrees to ensure that the embedded generation
facility connection of [Insert H1 CIA Project Reference] to [Insert name of LDC]’s
distribution system does not and will not materially adversely affect the safety,
reliability and efficiency of either Hydro One Networks Inc.’s distribution or
transmission systems and meets the technical requirements specified in Appendix F.2 of
the Distribution System Code, in accordance with section 6.2.25 of the Distribution System
Code.

Furthermore, [Insert name of LDC] verifies and confirms to Hydro One that:

(a) the connection of embedded generation facility [Insert H1 CIA Project Reference] to
Insert name of LDC]’s distribution system has been properly commissioned by the
[Insert name of LDC] in accordance with Appendix F.1 of the Distribution
System Code and the requirements specified within the Connection Impact
Assessment performed by Hydro One (the “CIA”); and

(b) the Existing feeder protections are suitable within the stated terms of the CIA.

Please reference the project data below for your operational schedules.

Generator/ Site
HONI Project ID
Does this project have a Capacity
Allocation Notification Agreement Yes No
(CANA)?
Does this project fall under a Threshold Yes No
Allocation Agreement?
LDC Project ID (if applicable)
Name of Facility (Generator)
OPA Contract Number (if applicable)
Legal Address

LDC Operating Designation


Proposed Energization Date
3-Phase or Phase (Red, White or Blue)
Fuel Type (Wind, Solar, Bio, Hydro)
Capacity (MW)
Voltage Level at PCC
Supplying Transformer Station
Name
Bus
Supply Feeder(s) Designation(s)
Supply Point Switch between H1 & LDC
Municipal Station Information*
Name
Bus
Feeder(s) Designation(s)

*If appropriate for connection

Instructions: The letter is to be provided on LDC letterhead (insert above) by a LDC


employee or agent acting on behalf of the LDC. The equivalency letter needs to be signed
by a Professional Engineer registered in the Province of Ontario or an LDC Officer.

 Please file with the Distribution Generation Connections group at


DxGenerationConnections@HydroOne.com along with a copy to the applicable

Letter of Equivalency | v2.7 – June 22, 2016 | Pg 1


control authority Outage Planner identified in your Connection Agreement
Operating Schedule A/D. Unless otherwise specified for “M” designated feeders,
this will be the Network Operating Division, for “F” designated feeders, this will
be the appropriate Provincial Lines Zone Scheduler. Please check your Schedule
for the appropriate contact numbers and email addresses.

 If telemetry (i.e. monitoring) and/or teleprotection is required between Hydro One


Networks Inc. and the embedded generation facility, the LDC shall complete and
submit a Teleprotection Verification Report (TVR).

 The LDC shall complete and submit a Single Line Diagram (SLD).

Signature

Name (Please Print)

Title

Professional Engineers Ontario ID


(if applicable)

Letter of Equivalency | v2.7 – June 22, 2016 | Pg 2

Das könnte Ihnen auch gefallen