EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
NOTE: See " General Notes" for instruction on use of this checklist.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A Y/N RE-INSP DATE
No.
A Documentation:
Test and Inspection Plan (SATIPs) and Inspection Checklists for Paint
Application as listed below have been verified to be complete and
GI-2.710
A5 accepted. Y
Para. 4.1.1.2
a) ______________________
b) ______________________
SAES-L-150,
A6 All Sections of the mainline/pipeline has been hydrotested and accepted. Y
Para. 5.2
All non-conformance reports and worksheets have been resolved to the GI-2.710
A7 Y
satisfaction of Inspection Department. Para. 4.1.1.4
All log book entries have been resolved to the satisfaction of Inspection GI-2.710
A8 Y/N
Department. Para. 4.1.1.4
Page 1 of 7
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Re-Instatement/Punchlisting of Under Ground Pipeline SAIC-L-2133 25-May-05 PIPE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A Y/N RE-INSP DATE
No.
Thermal Relief Valves were verified and the corresponding Form 3099A SAES-J-600,
B3 Y
signed. Sec. 10
Pipeline thermal relief valves for liquid service are installed in locations SAES-J-600,
B4 Y
as shown in the P&ID/IFC drawings and Form 3099A signed. Para. 8.9
Delete if
P&ID #
B5 Pressure gages installed are of the same range as shown in the P&ID. Y covered by
____________
Instrumentation
Delete if
Pressure gages are installed with block and bleed valves. (The bleed SAES-J-200,
B6 Y covered by
valve shall be plugged.) Para. 6.1 & 6.4
Instrumentation
Thermowells are provided with chained plug and plug installed where Delete if
SAES-J-400,
B7 temperature indicators are not provided. (Std.Dwg. N covered by
Para. 5.2.5
AB-36019) Instrumentation
Flow direction of Control valves and globe valves follow the process flow P&ID #
B8 Y
direction. ____________
P&ID #
B9 Flow direction of check valves follow the process flow direction. Y
____________
Buried pipe section at road/camel crossings were inspected and Project Quality
B14 Y
accepted per SAIC-L-2119 and SAIC-L-2120. Plan
SAES-L-410,
B15 Vent/drain valves are plugged or blinded. Y
Para. 17.1
Page 2 of 7
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Re-Instatement/Punchlisting of Under Ground Pipeline SAIC-L-2133 25-May-05 PIPE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A Y/N RE-INSP DATE
No.
Verify the completion of bolted flange joints in accordance with (SAEP- SAES-L-450,
B19 Y
351) Assembly of Bolted Flanged Joints. Para. 9.4
B21 Cathodic Protection are installed-to be referred to Electrical Discipline. Scope of Work Y
Flange bolting are complete and gasket were verified per SAES-L-450,
B22 Y
SATIP-L-2014. Para. 9.4
Confirm that construction waste materials have been removed from the SAES-L-450,
B23 N
right-of-way Para. 19.9
C Valve Station:
P& ID #
C1 By-pass lines installed on Mainline valves Y
___________
Scope of Work &
C2 Mainline Valve actuators installed. Y
P&ID________
SAES-B-054,
C3 Access provided on actuators of valves. Y
Para. 4.2
SAES-L-410,
C4 Vent/drain valves are plugged or blinded. Y
Para. 17.1
P&ID#
C5 Measuring and recording instruments were installed per P&ID. Y
___________
SAES-M-001,
C6 Structural welds are complete conforming to seal welding requirement. N
Para. 7.1.9.3
Painting and Valve Station identification are complete, ie: OSPAS valve
C7 Scope of Work Y
number identification.
C8 Fencing and grading are complete-(to be referred to Civil Discipline). Scope of Work Y/N
Page 3 of 7
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Re-Instatement/Punchlisting of Under Ground Pipeline SAIC-L-2133 25-May-05 PIPE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A Y/N RE-INSP DATE
No.
Flange bolting are complete and gasket were verified per SAES-L-450,
D1 Y
SATIP-L-2014. Para. 9.4
SAES-H-002,
D2 Painting and paint touch-up were complete. N
Para. 5.1.1
SAES-L-410,
D3 Vent/drain valves are plugged or blinded. Y
Para. 17.1
P&ID #
D4 In- line instruments are installed and connected per P&ID. Y
____________
SAES-L-150,
D5 Jump-Over piping has completed and passed hydrostatic pressure test. Y
Para. 5.2
Pipe supports are in direct contact with the pipe. Shims installed where SAES-L-450,
D6 Y
required. Para. 10.3.1
SAES-M-001,
D7 Structural welds are complete conforming to seal welding requirement. Y
Para. 7.1.9.3
IFC Drawings
D8 Guides are installed in conformance with the IFC drawings. Y
__________
E Pipeline Anchor
SAES-M-001,
E1 Structural welding, seal weld requirements Y
Para. 7.1.9.3
Anchor supports at the start and end of the pipeline is complete with G.I.-2.710-6,
E2 Y
respect welding and coating requirements per Scope of Work. Checklist # 4(m)
GI-2.710
F2 The location and degree of all horizontal bends; Y
Para. 4.1.1.2
GI-2.710
F3 The location and degree of all horizontal bends Y
Para. 4.1.1.2
GI-2.710
F4 The location and degree of all preformed sagbends and overbends Y
Para. 4.1.1.2
GI-2.710
F5 The location of all vents and drains Y
Para. 4.1.1.2
The identification, station, elevation, and size of all pipes which cross the GI-2.710
F6 Y
pipeline and of any other buried steel installations within 30 m. Para. 4.1.1.2
Page 4 of 7
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Re-Instatement/Punchlisting of Under Ground Pipeline SAIC-L-2133 25-May-05 PIPE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A Y/N RE-INSP DATE
No.
GI-2.710
F9 Safety Instruction Sheets per SAES-L-125. Y
Para. 4.1.1.2
General Notes:
1. Any Item marked as "Fail" requires to be identified with the specific description and location of the descripancy/violation and shall be
listed in the Re-Instatement Punchlist Form (SATR-A-2011).
2. Column "Y/N" is used to pre-determine each respective item as required for start-up (Y), or not required for start-up (N). Final
designation of "Y/N" items will be at the Mechanical Completion Punchlisting by Saudi Aramco Inspection.
3. This Checklist along with the Re-Instatement Punchlist Form (SATR-A-2011), with or with out cleared items, shall be submitted to Saudi
Aramco on or before the requested time for Mechanical Completion Punchlisting.
4. Where blank lines are provided, please indicate the applicable requirements or actual data/information required for verification.
Page 5 of 7
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Re-Instatement/Punchlisting of Under Ground Pipeline SAIC-L-2133 25-May-05 PIPE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A Y/N RE-INSP DATE
No.
REMARKS:
REFERENCE DOCUMENTS:
1. G.I.-2.710, Mechanical Completion and Performance Acceptance of Facilities, (07/13/2002)
2. SAES-H-002, Internal and External Coatings for Steel Pipelines and Piping, (31 March, 2004)
3. SAES-B-064, Onshore and Nearshore Pipeline Safety, (30 January, 2002)
4. SAES-J-400, Temperature, (31 May, 2004)
5. SAES-J-600, Pressure Relief Devices, (31 March, 2003)
6. SAES-L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003)
7. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, 30 September, 2003
8. SAES-L-410, Design of Pipelines, 28 April, 2004
9. SAES-M-001, Structural Design Criteria for Non-Building Structures, (30 June, 2004)
10. SAES-W-012, Welding Requirements for Pipelines, (31 December, 2002)
11. SAES-X-400, Cathodic Protection of Buried Pipelines, (29 October, 2003)
12. Project Quality Plan
13. Scope of Work
14. IFC Drawings: P&ID#__________________ Plan Drawings:___________________
ATTACHMENTS:
1. ASSEMBLY FOR RING JOINT FLANGES
ASSEMBLY FOR RAISED FACE FLANGES
STD. DWG. AA-036865, SHT 1, REV. 19
Page 6 of 7
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Re-Instatement/Punchlisting of Under Ground Pipeline SAIC-L-2133 25-May-05 PIPE-
Page 7 of 7