Table of Contents
5.1 Assumptions.......................................................................................................................... 4
ii | P a g e
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
Renovations are currently being conducted at the Lodge School in Society St. John by the
contractors Innotech Services Ltd. The clients of this project are the Ministry of Education
Implementation and Project Unit. As part of our fulfillment of the MSc in Building and
Construction Management, we have been contracted by Innotech Services Ltd to assist with the
project management of mainly two of the processes. These are: the Schedule Management and
the Risk Management plans. The implementation of these plans will also be required during the
This Project Charter outlines the purpose, objectives, and scope of the project. The purpose of a
1. to provide an understanding of the project, the reason it is being conducted and its
justification
3. to establish the project manager/assistants role and authority level of the project
1|Page
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
The main focus of the project will be centred on: (1) To develop CPM/PDM baseline schedule
for construction of building (I) which will be used to perform optimizations, updates, and track
progress and output reports. (2) Develop a risk management strategy that will be utilised during
the construction of building (I) that encompass risk identification, assessment, quantifying,
tracking and mitigation strategies. These risks will be updated throughout the construction of the
buildings.
At the end of the project the following will be submitted to the client:
project schedules.
2. A completed project risk management plan including the risk management methodology,
risk register, risk response plan, risk response tracking and risk communication plan.
4. Lessons learned during the execution of this project are anticipated to make a meaningful
2|Page
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
In an effort to improve the schedule management and risk management processes of the Innotech
Services Ltd it was recommended that assistance be given to them during the Renovations to the
Lodge School Project. For the successful project management of these key project areas we will
Time management plan document including baseline and optimized Microsoft Project
Schedules. In addition status updated will be done and specific intervals of the project.
Various reports highlighting the company’s performance during the execution of this
Risk management plan document including risk register, risk assessment matrix, risk
response plans, risk actions and risk assignments. In order to properly conduct risk inputs
such as the communications management plan and procurement management plan will so
be documented. Risk updates will also be performed and risk register updated.
Lesson learnt document highlighting the key aspects of this project that was realized
Recommendation will also be provided on areas of schedule and risks where Innotech
Services Ltd could possibly improve their success on future projects of similar nature.
Managing a construction project of this nature normally requires the utilization of the all the
project management tools and processes. However, we will not seek to look at the quality
3|Page
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
Milestone Date
5.1 Assumptions
In an effort to produce a CPM/PDM baseline schedule and a risk management strategy the
4|Page
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
3. The team having full cooperation from the management and staff of Innotech Services
Ltd
5.2 Constraints
There are some constraints that have been identified in the execution of this project, namely:
1. Force majeure
2. The unavailability of resources in a timely manner (financials etc.).
3. Limited availability to the management and staff of Innotech Services Ltd given their
busy schedule
5|Page
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
The key stakeholders that can have an effect on the outcome of this undertaking have been
identified as:
6|Page
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
Roles Responsibilities
7|Page
Practicum
THE LODGE SCHOOL RENOVATIONS PROJECT Project –
COEM 6900
_________________________ __________
Dr. P. Glidden Date
Coordinator of the MSc. Building & Construction Management Program
Sponsor Approval
__________________________ __________
Mr. Andrew Adams Date
Construction Manager at Innotech Services Ltd
8|Page