Sie sind auf Seite 1von 14

FOR APPROVAL

H 30-May-19 S.I.YOON D.G.KANG K.J.LIM REVISED FOLLOWING THE OWNER’S COMMENTS


G 18-Mar-19 S.I.YOON D.G.KANG K.J.LIM FOR APPROVAL
F 07-Mar-19 S.I.YOON D.G.KANG K.J.LIM FOR APPROVAL
E 25-Feb-19 S.I.YOON D.G.KANG K.J.LIM FOR APPROVAL
D 12-Feb-19 S.I.YOON D.G.KANG K.J.LIM FOR APPROVAL
C 25-Jan-19 S.I.YOON D.G.KANG K.J.LIM FOR APPROVAL
B 24-Jan-19 S.I.YOON D.G.KANG K.J.LIM FOR APPROVAL
A 08-Jan-19 S.I.YOON D.G.KANG K.J.LIM FOR APPROVAL
Rev Date Prepared Checked Approved Details of Revision
Owner

Owner’s Engineer

Contractor

DOOSAN HEAVY INDUSTRIES VIETNAM

Sub-Supplier

Project

NGHI SON 2 BOT THERMAL POWER PLANT PROJECT


(2 x 600MW)
Title

INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM


(REINFORCED CONCRETE CYLINDER PIPE)

Document No. Rev. Page-No.


NS2-DH01-P0ZEN-130004
H 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004

RECORD OF REVISION
Rev. Date Page Affected Description of Revision

A 08.01.2018 First Issue

B 24.01.2018 Second Issue

C 25.01.2018 Third Issue

D 12.02.2018 Fourth Issue

E 25.02.2018 Fifth Issue

F 07.03.2019 Sixth Issue

G 18.03.2019 Seventh Issue

H 30.05.2019 Eighth Issue

R e v. H 1 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004

CONTENTS

1. PURPOSE

2. OVERVIEW

3. REFERENCES

4. ATTCHMENT

R e v. H 2 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004

1. PURPOSE

The purpose of this document to see the approval from contractor about
Inspection and Test plan for main Cooling water system Nghi Son 2 BOT
Thermal Power Plant Project.

2. OVERVIEW
 Project: Nghi Son 2 BOT Thermal Power Plant Project
(2 X 600MV)
 Employ: NS2PC.
 Contractor: DOOSAN HEAVY INDUSTRIES VIETNAM

3. REFERENCE
 NS2-YR01-P0ZEN-070001 'Painting Procedure
 NS2-YR01-P0ZEN-130001 Welding Approval Request of Welding
Procedure Specification
 NS2-XB02-P0UPZ-164405 CW Supply & Discharge Pipe Line Layout
Drawing
 NS2-XB02-P0UPZ-164408 CW Supply & Discharge Pipe Line
Manufacturer Drawing
 NS2-DE00-P0ZEN-130001 Material Approval Request of Welding Rod

R e v. H 3 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004

4. ATTACHMENT
1. Inspection and Test plan for main Cooling Water System.

2. Inspection Report CW(RCCP) Visual Record

3. Inspection Report CW(RCCP) Location Checking

4. Fit-up Inspection Report

5. Inspection Report CW(RCCP) Welding Visual

6. Liquid Penetrant Examination Report

7. Paint Inspection Report

8. Hand Over For Backfilling

9. Hydrostatic Test Report

R e v. H 4 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
1. Inspection and Test plan for main Cooling Water System

R e v. H 5 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
2. Inspection Report CW(RCCP) Visual Record

R e v. H 6 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
3. Inspection Report CW(RCCP) Location Checking

R e v. H 7 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004

4. Fit-up Inspection Report

R e v. H 8 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
5. Inspection Report CW(RCCP) Welding Visual

R e v. H 9 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
6. Liquid Penetrant Examination Report

R e v. H 10 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
7. Paint Inspection Report

R e v. H 11 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
8. Hand Over For Backfilling

R e v. H 12 | 13
INSPECTION AND TEST PLAN FOR MAIN COOLING WATER SYSTEM NS2-DH01-P0ZEN-130004
9. Hydrostatic Test Report

R e v. H 13 | 13