Pure water treatment system includes raw water storage tank,raw water pump,sand filter,active
carbon filter,sodium filter,micro filter,ro system,uv sterilizer,ozone generator,ozone mixing
tower,pure water storage tank,SS 304 pipes,fittings,valves.
The raw water pump the water from raw water storage tank into the filters and ro system.The uv
sterilizer is for water sterilization and the ozone generator and mixer tower is to make the water
fresh and shelfife time.The pure water storage tank is for pure water storage tank for beverage
processing system.
Bottle blow molding system is including fully automatic blow molding machine,preform automatic
loader,high pressure air compressor system,low pressure air complressor system,Air storage
tank,Air dryer & filter,chiller,moulds for bottles.
The worker put the preforms onto the preform loader,the machine will feed the preforms
automatically and heat & blow to bottles.The air compressorsys supplys the air system to the blow
molding machine.The air dryer & filter is for compressor air dryer and filter.And the chiller is for
cooling the bottle mould.
Bottle Filling Packing System includes Air conveyor system,Air conveyor joint part,bottle water
washing filling and capping machine with cap loader,light check,bottle dryer,automatic sleeve
labeling machine with steam shrink tunnel,steam generator,ink jet printer,automatic shrink
packing machine with tunnel,conveyor system with motor.
After the blow molding machine makes the bottles,the air conveyor will send the empty bottles into
the filling machine.The bottle washing filling and capping machine will wash the bottles,fill the
bottles water and cap the bottles.then the bottle dryer will dry the bottle for labelling.Then the
labeling machine will insert the pvc label onto the bottle and shrink the label onto the bottle.The
ink jet printer will print the production date and batch no onto the bottle.The shrink packing
machine will pack the bottles in 3X4 & 4x6 package.Then the workers carry the package into final
product store.
Filter, RO filter
Fittings, Valves. Electricity Control Box,
,Flowmeter,Pressure Gauge Size:
4000X2100X2200MM Weight: 800KG
208 550 6 Cavity 1 3500 3500 Capacity: 6 Cavity Bottle Size: 550ML Main
ML Bottle Cavity Plate: Steel S136 Harden To HRC 48
Mould Degree Bottle Neck Plate:Japan Import Steel
DC53 Harden To HRC 62 degree Back
Plate: Steel 50# Clamp Holder: Aluminium
6061 Trmming Cylinder:STNC
Subtotal: 89700
$
310 2.2KW 500 Motor Capacity: 2.2KW 8-10 Meters Per Set
Conveyor
Motor
76700
Subtotal: $
Injection Machine
Components Brand、Origin
PLC controller SIEMENS,GERMANY
Touch screen SIEMENS,GERMANY
Cylinder SMC, Japan
Filter TPC, Korea
Magnet valve TPC, Korea
Photoelectric switch OMRON,Japan
Contactor Schneider,France
Seal Pipe fixed
10
Emergency stop switch Schneider France
BUYER’S SCOPE
SUPPLY BY
REQUIRMENTS OF BIHAI
THE BUYER
Hard surface area for site set up YES
Secure storage area adjacent to installation area YES
Night security guard for the storage area YES
Site office with desks, chairs, telephone , WiFi,lighting and air
YES
condition
Telephone, fax machine and relative cost YES
Working area adjacent to installation site for workshop
YES
container
plant & machinery must be made available to GUOLE and full scope of works
agreed, prior to commencement of installation
⑦Additional journeys to and from project site or waiting time due to delays caused by
the Client or others employed by the client will be paid and invoiced separately.⑧All
delivered material has to be stored by GUOLE in the storage area provided by the
client and goods made available for checking by the client if they require.
4.3. Limit of Supply
4.3.1 GUOLE responsible for providing the processing equipment design project.Equipment is in
place,
installation, debugging and commissioning, shall be the responsibility of the GUOLE company, but
is limited to within the scope of supply.
4.3.2 GUOLE delivers and installs only the equipment and interconnecting piping and cabling to the
equipment listed in GUOLE proposal and satisfies the basic function of the system. Other
material or equipment not specified is not GUOLE‘s responsibility and not GUOLE’s scope.
4.3.3 The buyer is responsible for introducing the utility system location designated by GUOLE, and
will provide the MCC ark of electricity led to the GUOLE company. With compressed air, water
and steam pipelines, equipment provided by the GUOLE company.GUOLE company provide
pipeline will follow the layout. Pre-treatment area within the production workshop all the utilities
facilities by the GUOLE company. If no clear room boundaries, near by the process the estimated
boundaries.
4.3.4 GUOLE will label the flow direction and power cable by various colors for all process
and utility pipes.
4.4 Exclusion
4.4.1 Civil, building and structural works.
4.4.2 Maintenance equipment by buyer
4.4.3 Fire protection equipment, small power and lighting.
4.4.4 Specialist hygienic internal chemical cleaning.
4.4.5 Removal/disposal of redundant plant and equipment unless otherwise specified.
4.4.6 Pipework, valves, cabling and automation outside the boundary limits of this project.
4.4.7 Costs associated with the requirements of external inspection agencies, unless otherwise
specified.
4.4.8 MCC main power incoming cables, including cable tray
GUOLE is responsible for commissioning, test of the pretreatment system for this project in the
contract, but limited within the scope of supply only.
5.1 Dry Testing
5.1.1 Dry testing of the Works can commence only when the following activities have
been completed:
①installation of process pipework
②site wiring work
③compressed air mains tested and charged
④electrical power is available to the control panels, pumps and equipment
5.1.2During this phase, the following work is carried out
①all motor drives checked
②rotation of all pumps checked for direction
③The above work will be carried out by GUOLE personnel. Local maintainer and
operator staff, provided by the Buyer, will be seconded as a working member of our
Commissioning Team, working alongside and under the guidance of our personnel.
This will enable the maintenance staff to become familiar with the plant and
conversant with fault finding procedures, etc. The Buyer has to name one person in
charge who is responsible for dealing serious problems named by the responsible
GUOLE project engineer.
④When the testing of the process pipework is completed, testing of all the new
product and CIP routes covered by this proposal will be checked to ensure that they
function correctly.
⑤This work will be carried out by our personnel, but again with the assistance of the
Buyer’s electrical maintenance staff as required.
5.2 Water Testing
5.2.1 Water testing of the Works can commence only when the full services are
available, i.e. steam,
water, etc.
5.2.2 On completion of dry testing the works are wet tested. During this period, process
and CIP routes
are checked for leaks and proven their correct operation using water as process
liquid. This work will be carried out by our personnel, but with the assistance of the
Buyer’s electrical / mechanical maintenance staff. Absolutely necessary is that the
Buyer’s operators for the plant will be in this team from this time on.
①The pipework is cleaned by water flushes.
②Automation programs are tested with water for their correct function.
③CIP is started and all routings should be cleaned by running automatic programs
before start of product tests.
5.3 Product Test
5.3.1 After the wet testing the product tests will start. For the final adjustment of times, flow-rates and
modulating valves. It is necessary to make some tests with juice.
5.3.2 Note
The commissioning is based upon a single visit by GUOLE commissioning engineers. If for any
reasons beyond GUOLE control, repeated visits are required, there will be additional to the
contract.
5.4 Handing Over
During the test GUOLE will make some further optimisations. If this period takes
longer time, because GUOLE does not have access to the plant as the Buyer is
operating the plant, GUOLE reserve the right to charge extra costs for the
commissioning team. Now the handing-over starts. During a period of some weeks
one part of the plant after the other will be handed over to the operators, who can
operate this parts of the plant by themselves.
5.5 Acceptance
5.5.1 Only after the signing of the commissioning certificate, the plant can be put into commercial
production. Also the warrantee period will be started after this signing. Then the buyer will have
four weeks for each part to check the performance off the plant.
5.5.2 Within one week after the issue of the commissioning certificate, the the Buyer and GUOLE will
sign the Acceptance Certificate with the final punch-list and schedule as an attachment.
5.5.3 The acceptance will be according to
GUOLE Soft.
GUOLE Project Engineer
GUOLE
Manager Automation
Manager GUOLE Hrd.
Engineer
GUOLE
Commercial
Project Manager GUOLE GUOLE Design
Processing Engineer
Engineer
6.1.3 Drawings
On completion of the contract, two prints of the process line diagrams will be issued
incorporating all amendments agreed during installation. A revised lay out drawing will
be prepared before installation.
6.1.4 Process Engineering
The programmes for the plant control are designed according to the long lasting
experience of BIHAI. For all programmes a description is made. The pictures for the
control are designed with the software engineer according to the PID scheme.
The engineering price mentioned in our price table is valid for the all components and
engineering works mentioned in this quotation. It is based on a detailed specification.
Changes in execution of this specification will lead to changes in the timetable. If the
engineering period is prolonged due to circumstances GUOLE is not responsible for,
there will be additional costs for engineering.
6.2Documentation
All the documents delivered should be according to the contract.
6.2.1Document delivery after signed contract
①The client must hand over Layout of the whole plant, Building/civil layout of new/existing building
(on disc preferable), Available pressure/ flow rate for utilities and product, Inter phase signals to
BIHAI in one week after contract signing.
②GUOLE must hand over all necessary information as the civil work requirement to new
preprocess workshop, including special foundation, height of the roof, position of the hole to
transfer the equipment in, drainage position, civil requirement for communication cable, to the
client latest in 2 weeks after layout signing by Client.
6.2.2 Document delivery after detail design
①P&D (English/Chinese) is delivery in four weeks after the contract
②Layout (English/Chinese) is delivery in four weeks after the contract.
③Pipe direction of dimension of tanks and platform in scope of the buyer (English/Chinese) is
delivery in 4 weeks after signing P&ID + Layout
④Utility requirements (English/Chinese) is delivery in one month after signing P&ID + Layout
6.2.3 Document delivery together with the unit equipment or before the installation
①Preliminary component operation manual and maintenance manual, arrive with the equipment
②Mechanical installation drawing, delivered before mechanical installation
③Electrical installation drawing, delivered before electrical installation
④GUOLE standard Electrical design drawings & installation schedules
pH Value 9-10
Total hardness 10°dH
Compressed air
Working pressure min.6 bar, max.10 bar
Particle < 0.01 um
Oil content <0.01 ppm
Pressure dew point -20 °C
8.1.3 Training should be throughout in commission, and should ensure the operator of the
dairy can operate it in-dependently.
8.1.4 The buyer can also provide the special requirement to GUOLE if want some respective training.
8.1.5 We advise that the maintenance staff assist our engineers, during commissioning, to gain further
experience of the system.