CRIS makes no warranty of any kind with regard to this manual including but not limited to the implied
warranties of xxxxxxxxxxxx.
Copyright Notices
© 2010 by CRIS All rights reserved
No Part of this document may be reproduced or transmitted in any form or by any means electronic, mechanical,
photocopying, recording, or otherwise, without prior written permission of CRIS.
Edition
Printing History
Printing date and Edition number of the manual will change when a new edition is printed. Minor changes or
updates can be made at the printing without change of edition or printing date.
For latest updates related to CRIS documents, contact CRIS sales representative..
Contents
Organization ................................................................................................................................................................xiv
Support ........................................................................................................................................................................xiv
Introduction to TMS..................................................................................................................................15
Terminologies .............................................................................................................................................................. 15
GUI Icons..................................................................................................................................................................... 16
Jurisdiction Details....................................................................................................................................................... 19
TMS Components........................................................................................................................................................ 20
TMS Users................................................................................................................................................................... 20
Station.......................................................................................................................................................................... 21
Steps to add new Station ......................................................................................................................................... 22
Sections ....................................................................................................................................................................... 22
Steps to add new Section details............................................................................................................................. 22
Training........................................................................................................................................................................ 24
Steps to add Training detail ..................................................................................................................................... 24
GMT............................................................................................................................................................................. 26
Steps to add new GMT details................................................................................................................................. 26
Gradient ....................................................................................................................................................................... 28
Steps to add new Gradient details........................................................................................................................... 29
Steps to delete existing Gradient details ................................................................................................................. 30
USFD Team................................................................................................................................................................. 37
Steps to add new USFD Team ................................................................................................................................ 37
Steps to edit existing USFD Team........................................................................................................................... 38
Steps to delete existing USFD Team....................................................................................................................... 38
EQKM Entry................................................................................................................................................................. 40
Steps to add new EQKM Entry ................................................................................................................................ 40
Scrap ........................................................................................................................................................................... 48
Lot Formation............................................................................................................................................................... 48
Steps to enter Lot Formation details........................................................................................................................ 48
Steps to edit existing Lot Formation details ............................................................................................................. 49
TMS Administartion..................................................................................................................................53
Route ........................................................................................................................................................................... 54
Steps to add new Route details ............................................................................................................................... 54
Line .............................................................................................................................................................................. 54
Steps to add new Line ............................................................................................................................................. 55
Supplier........................................................................................................................................................................ 55
Steps to add new Supplier details ........................................................................................................................... 56
Steps to edit existing Supplier details ...................................................................................................................... 57
Station.......................................................................................................................................................................... 57
Steps to add new Station ......................................................................................................................................... 58
Edit Parameter............................................................................................................................................................. 59
Steps to edit existing Inspection Parameter details................................................................................................. 60
Gaps of SEJ................................................................................................................................................................. 60
Steps to add new Gaps of SEJ for LWR.................................................................................................................. 61
Machine ....................................................................................................................................................................... 62
Steps to add new Machine details ........................................................................................................................... 62
Steps to delete Machine details ............................................................................................................................... 63
Pixing Drawing............................................................................................................................................................. 64
Steps to add Point & Crossing details ..................................................................................................................... 64
Steps to delete Point & Crossing details.................................................................................................................. 64
Page vi of 190
Designation.................................................................................................................................................................. 65
Steps to add new Designation details...................................................................................................................... 65
Steps to edit existing Designation details ................................................................................................................ 66
Steps to delete Designation details ......................................................................................................................... 66
Group/Subgroup .......................................................................................................................................................... 66
Steps to add new Group/Subgroup details .............................................................................................................. 67
Steps to edit existing Group/Subgroup details......................................................................................................... 67
Steps to delete Group/Subgroup details.................................................................................................................. 67
Supplier........................................................................................................................................................................ 69
Steps to add new Supplier details: .......................................................................................................................... 69
Steps to edit existing Supplier details ...................................................................................................................... 70
Training........................................................................................................................................................................ 71
Steps to add new Training details............................................................................................................................ 71
Assets .......................................................................................................................................................72
Rails............................................................................................................................................................................. 72
Steps to add new Rail details .................................................................................................................................. 73
Steps to delete existing Rail details ......................................................................................................................... 73
Steps to edit existing Rail details ............................................................................................................................. 74
Weld............................................................................................................................................................................. 77
Steps to enter Weld details ...................................................................................................................................... 77
Steps to remove existing Weld details..................................................................................................................... 78
Sleeper ........................................................................................................................................................................ 79
Steps to add new Sleeper details ............................................................................................................................ 79
Steps to delete existing Sleeper details................................................................................................................... 80
Steps to edit existing Sleeper details....................................................................................................................... 81
Fastening ..................................................................................................................................................................... 81
Steps to add new Fastening details......................................................................................................................... 82
Steps to delete existing Fastening details ............................................................................................................... 83
Steps to edit existing Fastening details ................................................................................................................... 83
SEJ .............................................................................................................................................................................. 84
Steps to add new SEJ details .................................................................................................................................. 84
Steps to edit existing SEJ details............................................................................................................................. 85
LWR............................................................................................................................................................................. 87
Steps to add new LWR details................................................................................................................................. 87
Steps to edit existing LWR details ........................................................................................................................... 88
Curve ........................................................................................................................................................................... 92
Steps to add new Curve details ............................................................................................................................... 92
Steps to edit existing Curve details.......................................................................................................................... 94
Ballast .......................................................................................................................................................................... 96
Steps to add new Ballast details.............................................................................................................................. 96
Steps to delete existing Ballast details .................................................................................................................... 97
Steps to edit existing Ballast details ........................................................................................................................ 98
Formation..................................................................................................................................................................... 99
Steps to add new Formation details ........................................................................................................................ 99
Steps to delete existing Formation details ............................................................................................................. 100
Inspection ...............................................................................................................................................115
Work 142
Compliance................................................................................................................................................................ 143
Steps for generating Job Card Compliance........................................................................................................... 143
Miscellaneous.........................................................................................................................................150
ODC........................................................................................................................................................................... 154
Steps to add new ODC details............................................................................................................................... 155
Steps to delete existing ODC details ..................................................................................................................... 155
Circulars..................................................................................................................................................................... 156
Steps to upload Circular......................................................................................................................................... 156
Page x of 190
Employee List ............................................................................................................................................................ 160
Steps to add new Employee detail ........................................................................................................................ 160
Steps to edit existing Employee details ................................................................................................................. 161
Steps to delete existing Employee details ............................................................................................................. 162
Training...................................................................................................................................................................... 163
Steps to add new Training details.......................................................................................................................... 163
Query.......................................................................................................................................................170
Report......................................................................................................................................................171
Compliance................................................................................................................................................................ 186
Steps for generating Compliance report ................................................................................................................ 186
Chapter 2. TMS: Getting Started This chapter deals with overview of the application.
Support
We value your interaction. You can always mail/ call for support.
Contact No.
No ###############
Email ID
Introduction to TMS
This chapter explains the following topics:
• Overview of the System
• Features and Benefits
• System Requirement
• Terminologies
• Graphical User Interface
• Process Flow of TMS
System Requirements
Reporting framework should be compatible with following browsers:
• IE 6 & above.
Terminologies
Terminology Description
GUI Icons
Icon Name
Search
Calendar
Page 16 of 190
TMS: Getting Started
Change Password
At any point in the application user can change password, using the Change Password
link provided at the top right hand corner of the TMS screen. Refer to Figure: 2.
Page 18 of 190
Figure 3: User Profile
2. Click Edit button. This displays the details of the user. Refer to Figure: 4.
3. Edit the desired changes.
4. Click Save button.
Figure 4
Jurisdiction Details
At any point in the application user can view the Jurisdiction details using the
Jurisdiction link provided at the top right hand corner of the TMS screen. Refer to Figure:
2.
TMS Components
TMS application can be divided into 8 main modules which includes;
• Master
• Assets
• Inspection
• Planning
• Work
• Miscellaneous
• Query
• Report
TMS Users
TMS Users include:
Comment [N4]: Need info
• General User
Comment [N5]: Need Info
Page 20 of 190
Administartion Division
This chapter explains the following topics:
• Station
• Sections
• Loop Line
• GMT
• Critical Locations
• Gradient
• Speed Restriction
• Short/Long Kilometers
• USFD Team
• USFD Machine
• EQKM Entry
• TRC Extraction
• TRC Bifurcation
• OMS Extraction
• OMS Bifurcation
• Lot Formation
• Scrap Scale
• Scrap Delivery
Station
The purpose of this option is to add new Station details.
Figure 5
Steps to add new Station
1. Click Station from the menu bar under Masters. This displays the Station Master
screen. Refer to Figure: 5.
2. Select the Division from the drop-down list.
3. Click GO button. This displays the existing Station details. Refer to Figure: 6.
Figure 6
Sections
The purpose of this option is to add new Sections details.
Figure 7
Page 22 of 190
Figure 8
3. Click Route Search icon and select the route from the list.
4. Click Section Search icon and select the route from the list.
5. Enter Short name
6. Enter Full name.
7. Enter From and To kilometer as per user’s jurisdiction.
8. Click Add Row button. Refer to Figure: 8.
9. Enter Station Code Search icon and then select the Station from the list.
10. Enter Centre Line.
11. Enter Station limits.
12. Click Save button.
Employee List
The purpose of this option is to add agency employee list.
Figure 9
Training
The purpose of this option is to add Training detail
Figure 11
Page 24 of 190
Loop Line
The purpose of this option is to add Loop Line details.
Figure 13
2. Click Search icon. This displays the list of stations. Refer to Figure: 14.
Figure 14
• Goods/Passenger
Goods Passenger Line:
Line Select goods/passenger line from the drop-down list.
• PF/Non
PF Non PF Line:
Line Select PF/non PF line from the drop-down list.
7. Click Save button.
GMT
The purpose of this option is to add new GMT details.
Figure 16
Page 26 of 190
Figure 17
Critical Locations
The purpose of this option is to add new and delete existing Critical Location details.
Figure 18
2. Click Search icon. This displays the list of Sections. Refer to Figure: 19.
Figure 19
• Reason:
Reason Enter reason
7. Click Save button.
2. Click Search icon. This displays the list of sections. Refer to Figure: 19.
3. Select Section from the list.
4. Click GO button. Refer to Figure: 20.
Gradient
The purpose of this option is to add new and delete existing Gradient details.
Page 28 of 190
Figure 21
2. Click Search icon. This displays the list of sections. Refer to Figure: 19.
3. Select Section from the list
4. Click GO button.
5. Click Add Row button. Refer to Figure: 22.
6. Enter the following details.
Figure 22
• Line:
Line Select UP, DN, SL line from the drop-down list.
• Location:
Location Enter From and To kilometer.
• Grade:
Grade Enter grade value.
• Direction
Direction:
ction Select rise, level, fall direct option from the drop-down list.
7. Click Save button.
Steps to delete existing Gradient details
1. Click Gradient from the menu bar under Masters. This displays the Gradient
screen. Refer to Figure: 21.
2. Click Search icon. This displays the list of Sections details. Refer to Figure: 25.
Page 30 of 190
Figure 25
5. Click Add New Permanent Speed Restriction button. Refer to Figure: 27.
6. Enter the following details:
Figure 27
• Line:
Line Select UP, DN, SL line from the drop-down list.
• Location:
Location Enter From and To kilometer.
• Speed: Enter speed
• Reason: Enter reason
• ETA Time: Enter ETA time.
• Date of Imposition: Click Calendar icon and popup will open and then
select imposition date.
7. Click Save button and then new Speed Restriction will show in the existing list.
8. Click Clear button.
2. Click Search icon. This displays list of sections details. Refer to Figure: 25.
3. Select Section from the list.
4. Click GO button. This display the existing Permanent Speed Restriction list. Refer
to Figure: 28.
Figure 28
5. Click Edit button. This displays the Edit Parameter Speed Restriction popup.
Refer to Figure: 29.
Page 32 of 190
Figure 29
2. Click Search icon. This displays the list of sections. Refer to Figure: 25.
3. Select Section from the list.
4. Click GO button.
Figure 30
5. Click Edit button. This displays the Edit Parameter Speed Restriction popup.
Refer to Figure: 30.
Figure 31
6. Click Remove button and detail will be removed from the list. Refer to Figure: 31.
Speed Restriction
The purpose of this option is to add new, edit and delete existing Speed Restriction
details.
Figure 32
Page 34 of 190
Figure 33
5. Click Add New Permanent Speed Restriction button. This displays the Add New
Permanent Speed Restriction popup. Refer to Figure: 34.
Figure 34
• Date of Imposition: Click Calendar icon and popup will open and then
select imposition date.
1. Click Search
Search icon. This displays list of sections details.
2. Select Section from the list.
3. Click GO button.
4. Click Edit button. This display the Edit Permanent Speed Restriction Popup.
Refer to Figure: 35.
Figure 35
Short/Long Kilometers
The purpose of this option is to add new Short/long Kilometers.
Figure 36
USFD Team
The purpose of this option is to add new, edit and delete existing USFD detail.
Figure 38
• Date of entry: Click Calendar icon and popup will open and then select
date.
Page 38 of 190
1. Click USFD Team from the menu bar under Masters. This displays the USFD
Team Master screen. Refer to Figure: 38.
2. Select USFD team name from the drop-down list.
3. Click GO button.
Figure 41
USFD Machine
The purpose of this option is to add new and edit existing USFD detail.
Figure 42
Note If you want to make new machine number, click Add M/c No.
No and then enter machine
• Date of commission: Click Calendar icon and popup will open and then
select commission date.
Note Future date will not accept in date of commission.
• Machine type:
type: Select digital or analog machine type from the drop-down list.
• Remarks: Enter remarks.
• Yearly target: Enter yearly target.
3. Click Save button.
EQKM Entry
The purpose of this option is to add new EQKM detail.
Figure 44
Page 40 of 190
1. Click EQ km Entry from the menu bar under Masters. This displays the
Equivalent KM Master screen. Refer to Figure: 44.
2. Select Division from the drop-down list.
3. Click GO button.
4. Click Add Row button. Refer to Figure: 45.
Figure 45
5. Select SEJ, Weld, Loop Line or Bridges from the drop-down list.
6. Enter value in equivalent to IKM text box.
7. Enter remarks.
8. Click Save button.
TRC Extraction
The purpose of this option is to enter TRC Extraction.
Figure 46
TRC Bifurcation
The purpose of this option is to enter TRC Bifurcation.
Figure 47
OMS Extraction
Comment [N6]: What is purpose
The purpose of this option is to
Figure 49
Page 42 of 190
Steps to enter OMS Extraction
1. Click OMS Extraction from the menu bar under Master. This displays the OMS
Extraction screen. Refer to Figure: 49.
2. Click Extraction for PC-B
PC Based OMS button. Refer to Figure: 50.
Figure 50
• Route: Click Search icon and route popup will open and then select the
route from the list.
• Line: Select line according to route from the drop-down list.
• Run No.: Enter run number.
• Run Date: Click Calendar icon and popup will open and then select run
date.
Page 44 of 190
Figure 53
2. Click Search icon and OMS run detail popup will open. Refer To Figure: 54.
Figure 54
2. Click Search icon and OMS run detail Popup will open.
3. Select the route from the drop-down list.
4. Select Section from drop-down list.
5. Select UP, DN, SL line from drop-down list.
6. Click Search button and then detail will be shown.
7. Select the desired Run number.
8. Click GO button and then detail will be shown.
Page 46 of 190
Figure 56
OMS Bifurcation
The purpose of this option is to enter OMS Bifurcation.
Figure 57
4. Click Search icon and route popup will open and then select the route from
the list. Refer to Figure: 58.
Figure 58
Scrap
This facilitates the scrap disposal Stock holder wise with the details of Lot formation, Sale
and Delivery. This is a standalone feature and is not linked to the store and day to day
transaction of the SE/P-Way.
Lot Formation
The purpose of this option is to add new, edit and delete existing Lot Formation details.
Figure 60
Page 48 of 190
Figure 61
• Date of Offer for Auction (to Store Dept): Click Calendar icon and popup
will open and then select auction date.
2. Click Search icon. This displays the assets detail popup. Refer to Figure: 62.
Figure 62
Scrap Sale
The purpose of this option is to add new Scrap Scale details.
Page 50 of 190
Figure 65
Scrap Delivery
The purpose of this option is to add new Scrap Delivery.
Figure 66
• Issue Date:
Date Click Calendar icon and popup will open and then select issue
date.
Page 52 of 190
TMS Administartion
This chapter explains the following topics:
• Route
• Line
• Supplier
• Station
• Master Code
• Edit Parameter
• Gaps of SEJ
• Machine Type
• Machine
• Pixing Drawing
• Designation
• Group/Subgroup
Route
The purpose of this option is to add new Route details.
Figure 67
Line
The purpose of this option is to add new Line details.
Page 54 of 190
Figure 69
Supplier
The purpose of this option is to add new and edit existing details.
Figure 71
Station
The purpose of this option is to add new Station details.
Figure 74
Master code
The purpose of this option is to add new and delete existing Master Code details.
Figure 76
Edit Parameter
The purpose of this option is to edit existing Edit Parameter.
Figure 79
Steps to edit existing Inspection Parameter details
1. Click Edit Parameter from the menu bar under Masters. This displays the Edit
Inspection Parameter screen. Refer to Figure: 79.
2. Select Feature type from the drop-down list.
3. Click GO button. This displays the existing Parameter details. Refer to Figure: 80.
Figure 80
4. Click Edit button corresponding to the Parameter. This displays the Edit
Parameter popup. Refer to Figure: 81.
Figure 81
Gaps of SEJ
The purpose of this option is to add new Gaps of SEJ.
Figure 82
Page 60 of 190
Steps to add new Gaps of SEJ for LWR
1. Click Gaps of SEJ from the menu bar under Master. This displays the Gaps of
SEJ for LWR screen. Refer to Figure: 82
2. Select the following details:
• Temperature Zone
• Gauge
• Initial Gap at laying
• Rail selection
• Sleeper type
• Sleeper Density
3. Click Add Row button. Refer to Figure: 83.
Figure 83
Machine Type
The purpose of this option is to add new Machine Type details.
Figure 84
Machine
The purpose of this option is to add new and delete existing Machine details.
Figure 86
5. Select Type
6. Select Railway
7. Enter Machine Number.
8. Click Save button.
Page 64 of 190
Figure 91
Designation
The purpose of this option is to add new, edit and delete existing Designation details.
Figure 92
Group/Subgroup
The purpose of this option is to add new, edit and delete existing Group/Subgroup details.
Figure 96
Page 66 of 190
Steps to add new Group/Subgroup details
1. Click Group/Subgroup
Group Subgroup from the menu bar under Master. This displays the Main
Group/ Sub Group screen. Refer to Figure: 96.
2. Click Add New button.
Figure 97
Page 68 of 190
Administartion RDSO
This chapter explains the following topics:
• Supplier
• Employee List
• Training
Supplier
Employee List
Page 70 of 190
Steps to add new Employee List details
1. Click Employee List from the menu bar under Master. This displays the Employee
List (Agency) screen. Refer to Figure: 101.
2. Select Agency name from the drop-down list.
3. Click GO button.
Figure 101
Training
Rails
The purpose of this option is to add new, edit and delete existing rail details.
Figure 103
Page 72 of 190
Steps to add new Rail details
1. Click Rails option from the menu bar under Assets. This displays the Rail details
screen. Refer To Figure: 103.
2. Select Section name from the list.
3. Select UP, DN, SL line from the drop-down list.
4. Select left/right rail.
5. Enter From & To kilometer range (optional).
6. Click GO button. This displays the data as per user's jurisdiction.
7. Click Add Row button Refer to Figure: 104.
Figure 104
• Rail selection: Select 75 LBS, 90 LBS, 52 KG, 60 KG from the drop-down list.
• Grade of Steel: 720, 880, 1080 HH, 1080 CR from the drop-down list.
• Year of rolling: Enter month and year of rolling and it will not accept future
date.
Note Year of rolling should be less than year of laying.
• Supplier: Select Sail, Tisko, Sydney supplier from the drop-down list.
• Year of laying: Enter month and year of laying and it will not accept future
date.
• GMT Carried at Laying: Enter GMT carried at laying.
9. Click Save button.
Rail Joints
The purpose of this option is to add new, delete and edit Rail Joints.
• Joint Type: Select LWR, CWR, SWR, FP, SR from the joint type drop-down list
• Weld type: Select FBW, ATSKV, SKV from the weld type drop-down list.
9. Click Save button.
Page 76 of 190
Figure 110
Weld
The purpose of this option is to add new and delete existing Weld details.
Figure 111
2. Click Section/Station
Section Station radio button.
3. Select Line/Loop Line from the drop-down list.
4. Select Left/Right rail.
5. Enter KM and TP from.
6. Select Weld type, by default it always shows thermit weld type.
7. Click GO button. Refer to Figure: 112.
Figure 112
10. Enter the following details, if you select other Weld type:-
• Serial Number
• Meter Point
• TP
• Weld Type
• Plant
• Panel Number
• Dimensional Tolerances on Joint
11. Click Save button.
Note • Date of welding should be less than or equal to date of finish grinding.
• Date of welding should be greater than date of manufacturing.
Page 78 of 190
2. Click Section/Station
Section Station radio button.
3. Select Line/Loop Line from the drop-down list.
4. Select left/right rail.
5. Enter KM and TP from.
6. Select Weld type, by default it's shows thermit weld.
7. Click GO button. Refer to Figure: 113.
Figure 113
Sleeper
The purpose of this option is to add new, edit and delete existing details.
Figure 114
• Sleeper Type: Select PSC 52 KG, PSC 60 KG, Wooden, ST from the sleeper
type drop-down list
• Sleeper density: Select 1310, 1540, 1660, 1818, 1283, 2566 sleeper density
from the drop-down list.
• Supplier: Select KGB sleeper plant, RSD raipur supplier from the drop-down
list.
• Laying date: Click Calendar icon and popup will open and then select
laying date.
Page 80 of 190
Figure 116
Fastening
The purpose of this option is to add new and delete existing Fastening details.
Figure 118
• Type: Select GPN, 3706, 3740, 3742, 3702, 3703 from the drop-down list.
• Drawing No.: Select 3740, 3702, 3738, 3741, 3742,
• Year of insertion: Click Calendar icon and popup will open and then select
insertion date.
Page 82 of 190
Steps to delete existing Fastening details
1. Click Fastening from the menu bar under Assets. This displays the Fastening
screen. Refer to Figure: 118.
2. Select Section name from the list.
3. Select UP, DN, SL line from the drop-down list.
Figure
120
4. Enter From & To kilometer range (optional).
5. Click GO button, it will show data as per user's jurisdiction.
SEJ
The purpose of this option is to add new and edit existing SEJ details.
Figure 122
4. Click Section/Station
Section radio button.
5. Select Line/Loop Line from the drop-down list.
• Installation Date:
Date Click Calendar icon and popup will open and then select
installation date.
Page 84 of 190
Figure 123
• Passenger Running Line: Click check box for passenger running line, leave
2. Click Search icon and SEJ detail popup will open. Refer to Figure: 124.
Figure 124
3. Click Section/Station
Section Station radio button.
4. Select Line/Loop Line from the drop-down list.
5. Click Search button. This displays the list of Sections.
Note Icon:
Icon Unconfirmed assets, user can modify its details.
Icon:
Icon Confirmed assets, user can not modify its details.
Page 86 of 190
LWR
The purpose of this option is to add new and edit existing LWR detail.
Figure 126
4. Click Section/Station
Section Station radio button.
5. Select Line/Loop Line from the drop-down list.
• SEJ From:
From Enter From SEJ
• Gap to be measured for:
for Select tongue or stock rail from the drop-down list.
• SEJ To: Enter To SEJ
• Gap to be measured for:
for Select tongue or stock rail from the drop-down list.
• Rail Selection:
Selection Select 60 KG, 52 KG, 90 LBS rail selection from the drop-down
list.
• Sleeper Type:
Type Select PSC, Wooden, ST sleeper type from the drop-down list.
• Sleeper Density:
Density: Select 1310, 1540, 1660 sleeper density from the drop-down
list.
• Mean Annual Temperature:
Temperature: Enter annual temperature of the area.
• Range of Temperature:
Temperature: Enter minimum and maximum temperature range.
• Type of weld:
weld: Select weld type from the drop-down list.
• Laying Date:
Date: Click Calendar icon and popup will open and then select
laying date.
• Anchord or not:
not: Select yes/ no from the drop-down list, whether it's anchord or
not.
• Reason for destressing:
destressing: Select destressing reason from the drop-down list.
• Installation:
Installation: Enter installation temperature.
• Min.
Min. Ambient:
Ambient: Enter minimum ambient
• Max.
Max. Ambient:
Ambient: Enter maximum ambient temperature
• Min.
Min. Rail:
Rail: Enter minimum rail temperature
• Max.
Max. Rail:
Rail: Enter maximum rail temperature
• Min.
Min. Variation:
Variation: Enter minimum variation temperature
• Max.
Max. Variation:
Variation: Enter maximum variation temperature
• Stress-
Stress-Free:
Free: Enter Stress free temperature
• Prevailing:
Prevailing: Enter prevailing temperature
• Destressing
Destressing Date:
Date: Click Calendar icon and popup will open and then
select distressing date.
• Destressing:
Destressing: Enter destressing temperature.
6. Enter distance between Ref. mark & mark on Rail at different location.
7. Click Save button.
3. Click Section/Station
Section Station radio button.
4. Select Line/Loop Line from the drop-down list.
5. Click Search button and this display the lists of sections.
Note Icon:
Icon Unconfirmed assets, user can modify its details.
Icon:
Icon Confirmed assets, user can not modify its details.
6. Select section.
Page 88 of 190
7. Click GO button and then LWR details will show.
8. Edit the desired changes. Refer to Figure: 128.
Figure 128
• Layout:
Layout Select conventional- PRC, wooden ST/ CS and fan shaped layout from
the drop-down list.
• Angle:
Angle Select 1/8.5, 1/12, 1/16, 1/10 angle from the drop-down list.
• Drawing No.:
No Select drawing number from the drop-down list.
• Radius of Turn-
Turn-out: Enter turn out radius.
• Laid on: Select straight/curve laid from the drop-down list.
• Super Elevation: Enter super elevation value.
• Direction: Select left/right hand direction from the drop-down list
• Traffic Direction: Select facing, trailing, Single line, middle line traffic
direction from the drop-down list.
• Joint Type: Select fish plated/ welded joint type from the list.
• Flexure: Select symmetrical spilt, similar, contrary flexure from the drop-
Page 90 of 190
down list.
• Track Circuted: Select yes/no option from the drop-down list.
• Motor Operated: Select yes/no option from the drop-down list.
• Passenger Running Line: Click check box for passenger running line, leave
Note Select replacement date if any above has been replaced and it will not accept future date.
• Radius of Turn-
Turn-in Curve: Enter radius of turn-in curve.
• Super Elevation of Turn-
Turn-in Curve: Enter super elevation of turn-in curve
• Speed
Speed over Points & Crossing: Enter speed over points & crossing.
6. Click Save button.
3. Click Section/Station
Section Station radio button.
4. Select Line/Loop Line from the drop-down list.
5. Click Search button and this displays the list of sections.
Note Icon:
Icon Unconfirmed assets, user can modify its details.
Icon:
Icon Confirmed assets, user can not modify its details.
6. Select Section from the list.
7. Click GO button. This displays the Point & Crossing details. Refer to Figure: 131.
8. Edit the desired changes.
Figure 131
Curve
The purpose of this option is to add new and edit existing Curve details.
Figure 132
Page 92 of 190
4. Click Section/Station radio button.
5. Select Line/Loop Line from the drop-down list.
6. Enter from kilometer and it will be automatically shown in kilometer/meter of
first segment.
7. Select direction to define whether Kilometers are in increasing or decreasing order
for the curve.
Figure 133
• Type: Select transition type and then enter below mentioned details:-
• To:
To If Direction is 'Increasing' then, for each segment From kilometer/meter
should be less than To kilometer/meter and, if Direction is 'Decreasing' then,
for each segment From kilometer/meter should be greater than To
kilometer/meter.
• Speed Potential: Enter Speed Potential
• Start Station: Enter start station
• End Station: Enter end station and it should be greater than start station.
8. Click Show Versine button.
• Design versine: Enter design versine
• Design super elevation: Enter design super elevation.
• Type: Select circular type and then enter the following details:-
• Location: Enter From and To kilometer.
Note After entering degree, radius of curve and design versine will be automatically shown.
3. Click Section/Station
Section Station radio button.
4. Select Line/Loop Line from the drop-down list.
5. Click Search button. This displays the list of sections.
Note Icon:
Icon Unconfirmed assets, user can modify its details.
Icon:
Icon Confirmed assets, user can not modify its details.
Buffer Rail
The purpose of this option is to add new and edit existing Buffer Rail details.
Figure 134
Page 94 of 190
Figure 135
Delete button will be enable only for SE/SSE users in mentioned below cases:-
a. No curve inspection has been done in past.
Ballast
The purpose of this option add new, delete and edit existing Ballast details.
2. Click Search icon. This displays the list of sections based on user's Jurisdiction.
3. Select Section name from the list.
4. Select UP, DN, SL line from the drop-down list.
Figure 137
Page 96 of 190
5. Enter From & To kilometer range (optional).
6. Click GO button, it will show data as per user's jurisdiction.
7. Click Add Row button. Refer to Figure: 137.
8. Enter the following details.
• Location:
Location Enter From and To kilometer.
• Sub Ballast Type: Select A/B sub ballast type from the drop-down list.
• Sub Ballast Depth: Enter sub ballast depth value.
• Ballast Type: Select M/C crushed, hand broken, murrum, earth packed ballast
type from the drop-down list.
• Total cushion: Enter total cushion value
• Clean cushion: Enter clean cushion value
• Deep Screening Date: Click Calendar icon and popup will open and then
select deep screening date.
Note Future date will not accept in deep screening date.
2. Click Search icon. This displays the list of sections based on user's Jurisdiction.
3. Select Section name from the list.
4. Select UP, DN, SL line from the drop-down list.
5. Enter From & To kilometer range (optional).
6. Click GO button. Refer to Figure: 138
Figure 138
2. Click Search icon. This displays the list of sections based on user's Jurisdiction.
3. Select Section name from the list.
4. Select UP, DN, SL line from the drop-down list.
5. Enter From & To kilometer range (optional).
6. Click GO button, it will show data as per user's jurisdiction. Refer to Figure: 139.
Figure 139
Page 98 of 190
Formation
The purpose of this option is to add new and delete existing Formation details.
Figure 140
• Sub-
Sub-Grade Soil: Select Stable, Sandy Non Cohessive, Yellow Slit, Black Cotton
from the drop-down list.
• Sub-
Sub-Soil (Base-
(Base-Oil): Select sub-soil from the list.
• Bank/Cutting: Select cutting/ bank from the drop-down list.
• Year of construction: Enter construction year and it will not accept future
year.
• Height of Bank/ Depth of cutting: Enter height of bank/ depth of cutting value.
• C Value: Enter C value
• Value: Enter value
• Cess Width: Select cess width from drop-down list.
• Side Slope of Bank/ Cutting: Enter side slope of bank/ cutting value.
• Existence of Borrow Pit: Enter existence of borrow pit
• Distance of Borrow Pit from toe of the bank: Select less or more than H+3
option from the list.
• Formation Width: Select single, double or multiple line embankment and
single, double or multiple formation width from the drop-down list.
• Type of Blanket Material: Select blanket material type from the drop-down
list.
• Thickness of Blanket: Select 30, 45, 60cm blanket thickness from the drop-
down list.
8. Click Save button.
Protection Work
The purpose of this option is to add new and delete existing Protection Work details.
• Toe Wall: Select left, right or both side toe wall option from the drop-down list.
• Gabbion: Select left, right or both side gabbion options from the drop-down
list.
• Sub Bank Provision: Select left, right or both side sub bank provision from the
drop-down list.
• Wall Retaining Provision: Select left, right or both side wall retaining
provision from the drop-down list.
• Side Slope Stone/Boulder Pitching: Select side slope stone/boulder pitching
from the drop-down list.
• Shot Creting: Select shot creting from the drop-down list.
• Grouting: Select grouting from the drop-down list.
• Rock Bolting: Select rock bolting from the drop-down list.
• Micro Piles: Select micro piles from the drop-down list.
• Soil Nailing: Select soil nailing from drop down list.
• Remarks: Enter remarks.
8. Click Save button.
Drainage System
The purpose of this option is to add new and delete existing Drainage System details.
Figure 144
Weak Formation
The purpose of this option is to add new and edit existing Weak Formation details.
Figure 148
• Slip of Side Slope: Click check box for slip of side slope.
• Slip Page of Slide Slope: Click check box for slip page of slide slope.
• Deep Rain Cuts: Click check box for deep rain cuts.
• Mud Pumping Failure: Click check box for mud pumping failure.
• Cracks on Formation Top: Click check box for cracks on formation top.
8. Click Save button.
• Laying of geo-
geo-grid: Click check box for laying of geo-grid.
Level Crossing
The purpose of this option is to add new and delete existing Level Crossing details.
Figure 151
Note
To delete existing Accident tab detail, select the desired check box.
Note Future date will not accept in overhauling and painting date.
Note If you click yes radio button, then follow mentioned steps.
16. Click Station icon and popup will open and then select station name.
17. Enter number of loop lines.
18. Click Add Row button.
19. Select line from the drop-down list.
20. Click Calendar icon and popup will open and then select overhauling date.
21. Click Calendar icon and popup will open and then select painting date.
22. Click Save button.
Land Boundary
The purpose of this option is to add new and delete existing Land Boundary.
Figure 153
Glued Joint
The purpose of this option is to add new Glued Joint details.
Figure 155
4. Click Section/Station
Section Station radio button.
5. Select Line/Loop Line from the drop-down list.
6. Click Calendar icon and popup will open and then select laying date.
4. Click Section/Station
Section Station radio button.
5. Select Line/Loop Line from the drop-down list.
6. Enter From and To kilometer.
7. Click Search button and select the Asset name from the list.
Figure 158
Sand Hump
The purpose of this option is to add new and edit existing Sand Hump details.
Figure 159
6. Click GO button.
Figure 163
LWR Inspection
The purpose of this option is to add new LWR/CWR inspection details.
3. Click Section
Section/Station
ction Station radio button.
4. Select Line/Loop Line from the drop-down list.
5. Click Search button. This displays the list of sections.
6. Select Section.
Figure 165
7. Click GO button
8. Enter the following details.
• Track structure details:
details: Structure details will be automatically shown.
Figure 166
SEJ From
• Name/Location: It will be automatically shown.
• Measurement Time: Enter measurement time
• Rail Temp: Enter rail temperature
• Permissible Range: It will be automatically shown.
Note If left/right red tongue rail value entered outside the permissible range, then it will show in
red color and Destressing required will be automatically set to be "Yes".
9. Click SEJ Inspection button and SEJ inspection popup will open.
Figure 167
10. Enter value of centre to centre spacing between two central sleepers.
11. Enter others details (Optional).
12. Click Save button.
13. Enter reference marks and pillars of LWR/CWR
14. Click Save button.
3. Click Section/Station
Section Station radio button.
Curve Inspection
Comment [N7]: What’s purpose?
The purpose of this option
3. Click Section/Station
Section Station radio button.
4. Select Line/Loop Line from the drop-down list.
5. Click Search button and this list of sections.
Figure 173
6. Click GO button.
7. Edit the desired changes.
Figure 174
2. Click Search icon. This displays the list of sections based on user's Jurisdiction.
6. Click GO button.
7. Enter details in Level Crossing tab.
Figure 177
8. Enter details in Track tab.
Figure 178
Trolley Inspection
4. Click Search icon. This displays the list of sections based on user's Jurisdiction.
Figure 179
7. Click GO button.
• Inspection Date:
Date Click Calendar icon and popup will open and then select
inspection date.
Rail Inspection
The purpose of this option is to add new Rail Inspection details.
Figure 186
Steps to add new Rail Inspection details
1. Click Rail from the menu bar under Inspection. This displays the Rail Inspection
screen.
2. Select Section name from the list.
3. Select UP, DN, SL line from the drop-down list.
4. Click GO button.
Figure 187
• Inspection Date:
Date Click Calendar icon and pop will open and then select
inspection date.
• Scabbing:
Scabbing Click scrabbing check box
• Wheel burns:
burns Click wheel burns check box
• Shelling:
Shelling Click shelling check box
11. Click Save button.
Ballast Inspection
The purpose of this option is to add new inspection details.
Figure 188
• Inspection Date:
Date Click Calendar icon and pop will open and then select
inspection date.
Fastening Inspection
The purpose of this option is to add new Fastening Inspection details.
Figure 190
• Condition of rubber pad: Select rubber pad condition from the drop-down list.
10. Click Liner tab.
11. Click Add Row button.
• Location: Enter From and To kilometer.
• Condition of liners: Select liners condition from the drop-down list.
12. Click Save button.
Sleeper Inspection
The purpose of this option is to add new Sleeper Inspection details.
Figure 192
• Inspection Date:
Date Click Calendar icon and popup will open and then select
inspection date.
5. Click Add Row button
6. Enter the following details.
• Location: Enter From and To kilometer.
Weld Fracture
The purpose of this option is to add new Weld Fracture details.
Figure 194
2. Click Section/Station
Section Station radio button.
3. Select Line/Loop Line from the drop-down list.
Figure 195
2. Click Search button and this displays the list of sections based on user's
Jurisdiction
Figure 198
• Fracture Date:
Date Click Calendar icon and popup will open and then select
Fracture date.
• Chainage:
Chainage Enter the chainage kilometer.
• Weld Date: Click Calendar icon and popup will open and then select Weld
date.
8. Select the Fracture Position from the drop-down list.
9. Select Classification of Failure from the drop-down list.
10. Select Detected By from the drop-down list.
11. Select Straight/Curve option from the drop-down.
12. Enter remarks (If Any).
13. Click Save button.
Click Show Track Detail hyperlink, to view the Track detail.
Glued Joint
The purpose of this option is to add new Glued Joint Inspection details.
Figure 201
2. Click Search button and this displays list of sections based on user's
Jurisdiction.
Figure 202
4. Click Section/Station
Section Station radio button.
5. Select Line/Loop Line.
6. Enter From and To kilometer.
7. Click Search button and select the Asset name from the list.
8. Click GO button
Figure 203
2. Click Section/Station
Section Station radio button.
3. Select Line/Loop Line from the drop-down list.
4. Enter Kilometer.
Figure 205
5. Click GO button.
Figure 206
• Inspection Date:
Date Click Calendar icon and popup will open and then select
inspection date.
• From TP:
TP Enter From TP
• To TP:
TP Enter To TP
• Sleeper Number:
Number Enter the Sleeper number
• TOE Load of ERC (kg):
• Remarks:
Remarks Enter the remarks. (If Any).
6. Click Save button.
Sand Hump
The purpose of this option is to add new Sand Hump details.
Figure 207
2. Click Search icon. This displays the list of sections based on user's Jurisdiction.
Figure 208
6. Click GO button.
Land Boundary
The purpose of this option is to add new Land Boundary details.
Figure 211
2. Click Search icon. This displays the list of sections based on user's Jurisdiction.
Figure 212
USFD Inspection
The purpose of this option is to add new USFD Inspection details.
Figure 214
3. Click Section/Station
Section Station radio button.
4. Select Line/Loop Line from the drop-down list.
5. Select rail, weld and SEJ test type from the drop-down list.
6. Select left/right rail.
Figure 215
7. Click GO button.
• Location:
Location Enter From and To kilometer.
• M/C Name:
Name Select machine name from the drop down list.
• KM Tested:
Tested Enter tested kilometer.
5. Click GO button.
Compliance
The purpose of this option is to generate Job Card Compliance.
Figure 220
3. Click GO button
4. Enter the following details.
• New Value:
Value Select new value from the drop-down list.
• Work Date:
Date Click Calendar icon and popup will open and then select date of
working.
• Man Days
Days: Enter man days.
Figure 222
General Compliance
The general compliance facilitates the recording of the compliance of the general nature of
the inspection of higher officials.
Asset Change
This facilitates the entering of the details of the asset change. This will update the master
record of the assets with their new details.
2. Click Search icon. This displays the list of sections based on user's Jurisdiction.
Figure 225
Gang Work
This facilitates the entering the details of the daily work done by the gangs.
Figure 228
Machine
This facilitates the entering the details of the daily work done by the machines.
Figure 230
Steps for entering Machine Progress
1. Click Machine from the menu bar under Work. This displays the Machine
Progress screen. Refer to Figure: 230.
2. Select Machine number from the drop-down list.
3. Click Calendar icon and popup will open and then select date.
4. Click GO button.
Note Select future date and five days back date from today's date
4. Click GO button.
Message Centre
The user can communicate with any of the fellow users individually as well as in groups.
He can also pose any complaint to the CRIS/Admin as well as Dir/TMS/Railway Board.
Inbox:
Inbox Inbox screen is loaded by default where users can view the messages received with
Date, Sender’s name and Designation and Message Content.
Click message body,
body the user can view the complete message in a separate pop up window.
This message window shows sender’s and receiver’s name and the complete message. Also
a “Message Chain” link is shown to read the previous conversations regarding that
message. Click reply button, the user can type maximum 1000 words and send it to the
sender. Click close button, the message window will be closed.
Figure 234
Compose:
Compose Click Compose button, the compose screen is loaded. The user can select the
message type (Message, Suggestions/Feedback) type the message and select the name of
receivers from the list available. Click send button, the message will be sent to the
selected receivers.
Figure 235
Delete:
Delete Click check box and then click delete button, message will be deleted from the
inbox.
Figure 236
Sent Items:
Items Click sent Items button, a new screen is loaded which shows all the messages
sent by the user till date with. Here also, user can read delete the messages from sent
items list.
Figure 237
2. Click Search icon. This displays the list of sections. Refer to Figure: 239.
Figure 239
• Line:
Line Select UP, DN, SL line from the drop-down list.
• Location:
Location Enter From and To kilometer.
• Target Date of Removal/ Relaxation: Click Calendar icon and popup will
open and then select target date.
7. Click Save button and then new speed restriction will show.
8. Click Clear button.
ODC
This facilitates the entry of Over Dimensional Consignment details of the section.
Figure 242
2. Click Section/Station
Section Station radio button.
3. Select Line/Loop Line from the drop-down list.
Figure 243
2. Click Section/Station
Section Station radio button.
3. Select Line/ Loop Line from the drop-down list.
4. Select left/right rail.
5. Enter KM and TP from.
6. Click GO button.
Note File extension should be txt, png, jpeg, doc, xls, pdf, bmp.
Publications
This facilitates the searching of the various Engineering Publications.
Inspection Notes
This provides the inspection notes of the high officials.
Figure 248
Steps to upload Inspection Note
1. Click Inspection Notes from the menu bar under Miscellaneous. This displays the
High Official Inspection Notes screen. Refer to Figure: 248.
• Inspection Date:
Date Click Calendar icon and popup will open and then select
inspection date.
• Inspecting Authority:
Authority Enter inspecting authority name.
• Subject:
Subject Enter subject.
• Title:
Title Enter publication title.
• Keyword:
Keyword Enter publication keyword.
Note File extension should be txt, png, jpeg, doc, xls, pdf, bmp.
Figure 249
Morning Position
This gives the position of gang work and the speed restriction in the particular user’s
section.
Figure 250
Gang Usage
The purpose of this option is to generate Gang Usage Summary.
Figure 252
Steps for generating Gang Summary
1. Click Gang Usage from the menu bar under Report. This displays the Daily Gang
Usage screen. Refer to Figure: 252.
2. Click Calendar icon and popup will open and then select From and To date.
3. Click User level and this displays the Gang Usage report.
Figure 253
Employee List
The purpose of this option is to add new, edit and delete existing Employee List.
Figure 254
3. Click GO button.
Figure 257
3. Click GO button.
Figure 259
PME
This consists of the details of the Periodical Medical Examination of Trackman, Gateman,
Keyman, Mate, artisan staff and JE.
Figure 260
3. Click GO button
4. Enter the following details in current PME.
Figure 262
• Date: Click Calendar icon and popup will open and then select PME date.
• Hospital: Enter hospital name.
• Certificate
Certificate No.: Enter Certificate number.
• Due Date: Click Calendar icon and popup will open and then select due
date.
5. Click Save button.
Training
This consists of the details of the training course attended by Trackman, Gateman,
Keyman, Mate, artisans staff and JE.
Figure 263
• Date: Click Calendar icon and popup will open and then select training date.
• Valid Upto:
Upto Click Calendar icon and popup will open and then select valid upto
training date.
Note Valid upto training date should be greater than training date.
5. Click GO button
Figure 267
4. Click GO button.
Figure 270
Temperature Register
The purpose of this option is to add new Temperature Register details.
Figure 271
Click GO button.
Figure 273
2. Click Section/Station
Section Station radio button.
3. Select Line/ Loop Line from the drop-down list.
Figure 274
4. Enter Kilometer.
5. Click GO button and this displays the report.
Gate Duty
The purpose of this option is to add new Gate Duty details.
Figure 275
Site Particular
The purpose of this option is to view Site Particular details.
Track Network
This gives the details of the Route/Section, Line, Station, Loop line, Short/Long Km for a
particular division, railway and route.
Steps for generating Report
1. Click Track Network from the menu bar under Report. This displays the Track
Network screen.
2. Select the following details:
• Railway
• Division
• Route
Figure 282
Asset Register
This gives the details of the various assets. Basically it is the report of all the asset
masters.
Inspection Register
This provides the soft copy of the inspection register. It can be generated section wise,
station wise as well as individual user wise. The register can be generated for various
features like: LWR, Curve, Pts & Xing, Level Xing, Push Trolley and Foot Plate.
The inspection registers are generated in pdf format and can be stored in user’s computer
for offline viewing.
Figure 285
• Feature Type:
Type Select LWR, curve, foot trolley from the drop down list.
• Location:
Location Enter From and To kilometer.
• From date:
date Click Calendar icon and pop will open and then select date.
• To date:
date Click Calendar icon and pop will open and then select To date.
1. Click Generate Report button.
• Feature Type: Select LWR, curve, point & crossing from the drop-down list.
• Station: Select AF, AGA, IDH, JAB station from the drop-down list.
• Loop Line: Select loop line-1, 2, 3 from the drop-down list.
• From date: Click Calendar icon and pop will open and then select date.
• To date: Click Calendar icon and pop will open and then select To date.
4. Click Generate Report button.
• Feature Type: Select LWR, curve, point & crossing from the drop-down list.
• Asset Name: Click Search icon and assets detail popup will open.
Figure 288
3. Click Section/Station
Section Station radio button.
4. Select Line/ Loop Line from the drop-down list.
5. Click Search button and this displays the list of sections detail.
Note Icon:
Icon Unconfirmed assets, user can modify its details.
Icon:
Icon Confirmed assets, user can not modify its details.
6. Select Section.
• From date:
date Click Calendar icon and pop will open and then select date.
• To date:
date Click Calendar icon and pop will open and then select To date.
7. Click Generate Report button.
Weld Fracture
Weld Fracture report can be generated section wise, station wise.
Steps for generating Weld Fracture report
1. Select Division from the drop-down list.
Figure 289
4. Click Section/Station
Section Station radio button.
5. Select Line/Loop Line from the drop-down list.
6. Select left/right line from the drop down list.
7. Enter From kilometer
8. Enter From TP.
Figure 290
Track Diagram
Track diagram can be generated route wise for a maximum of 8 kms at a time.
TRC
Various TRC reports can be generated for different parameters.
View some reports:-
• KM wise result
• SD Values
• Index Summary
• KM wise Comparison
Figure 292
OMS
Various OMS reports can be generated.
Figure 293
USFD
Various USFD reports can be generated.
Gang Work
The gang work report for a particular period can be generated.
Miscellaneous Register
Miscellaneous registers can be printed. It contains various features like ODC, Gradient,
Critical location, Speed restriction.
View some reports:-
• Gradient report
• Critical location report
• Speed restriction report
Figure 296
2. Click Calendar icon and popup will open and then select From and To date.
3. Click User level and this displays the Gang Usage report.
Figure 300
USFD Progress
User Analysis
Special Incident
4. Click GO button.
5. Click Add Row button. Refer to Figure: 310
Figure 310
• Location:
Location Enter From and To kilometer.
Compliance
User Performance
Inspection Analysis
Steps for generating Inspection Analysis report
1. Click Inspection Analysis from the menu bar under Report. This displays the
Inspection Analysis screen.
Figure 315