DPTO. : AREQUIPA
DISTRITO : YARABAMBA
P.BASE Adel VAL-1 VAL-2 VAL-3 VAL-4 VAL-5 VAL-6 VAL-7
indices
nov-17 may-18 jun-18 jul-18 ago-18 sep-18 oct-18 nov-18 dic-18
UNIF
47 580.90 582.52 582.52 582.52 582.52 582.52 582.52 582.52 582.52
4 592.26 589.61 588.70 588.70 588.70 588.70 588.70 588.70 588.70
5 605.77 608.03 609.06 609.06 609.06 609.06 609.06 609.06 609.06
17 860.76 859.84 859.00 859.00 859.00 859.00 859.00 859.00 859.00
21 431.73 431.73 431.73 431.73 431.73 431.73 431.73 431.73 431.73
3 464.75 513.58 508.81 508.81 508.81 508.81 508.81 508.81 508.81
30 465.87 478.04 479.58 479.58 479.58 479.58 479.58 479.58 479.58
65 233.92 250.41 250.53 250.53 250.53 250.53 250.53 250.53 250.53
51 311.33 347.86 349.06 349.06 349.06 349.06 349.06 349.06 349.06
43 643.05 646.54 652.81 652.81 652.81 652.81 652.81 652.81 652.81
48 363.07 368.95 368.82 368.82 368.82 368.82 368.82 368.82 368.82
49 292.27 298.68 298.83 298.83 298.83 298.83 298.83 298.83 298.83
39 441.61 445.61 447.10 447.10 447.10 447.10 447.10 447.10 447.10
2 3 4 5 6 7 8 9 10
VALORIZACION N° 06
ENTIDAD MUNICIPALIDAD DISTRITAL Y VILLA DE YARABAMBA
“MEJORAMIENTO DEL AREA DE RECREACION UBICADO EN EL LOTE 7
NOMBRE DE LA OBRA MZ. B DEL ASENTAMIENTO HUMANO SANTA CECILIA, DISTRITO DE
YARABAMBA, PROVINCIA AREQUIPA –AREQUIPA”
AMPLIACION DE PLAZO Nº 1
SUSPENSIÓN Y REINICIO DE PLAZO Nª 1 3 DÍAS
PRESUPUESTO ADICIONAL S/.374,631.04
METRADO
CÓDIGO DESCRIPCIÓN UND. METRADO
ACTUAL
TOTAL
01 OBRAS PROVISIONALES -
1.05 ENERGIA ELECTRICA PROVISIONAL mes 6.00 1.00
1.06 SUMINISTRO DE AGUA PARA LA CONSTRUCCION mes 6.00 1.00
2 OBRAS PRELIMINARES
2.01 TRAZO Y REPLANTEO m2 2,561.81 150.71
2.02 DEMOLICION CISTERNA m3 6.18 6.18
2.06 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA PESADA vje 4.00 1.00
2.07 TRANSPORTE DE MATERIALES A PIE DE OBRA vje 20.00 2.00
3 SEGURIDAD Y SALUD
3.03 EQUIPOS DE PROTECCION COLECTIVA und 1.00 0.16
3.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 0.16
4 LOSA DEPORTIVA Y GRADERIAS
4.02 CONCRETO SIMPLE
04.02.07 PISO DE CONCRETO F´C=175 KG/CM2 E=4" FROTACHADO m2 79.96 79.96
04.02.09 GRADERIAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 121.50 45.00
04.02.10 GRADERIAS: CONCRETO F´C=140KG/CM2+30% P.G. m3 118.01 51.52
4.03 CONCRETO ARMADO -
04.03.13 SOLERA:ACERO FY=4200 KG7CM2 kg 770.04 183.57
4.05 REVOQUES, ENLUCIDOS Y MOLDURAS -
04.05.03 TARRAJEO PULIDO EN GRADAS Y ESCALERA m2 228.78 228.78
04.05.04 TARRAJEO DE MUROS EXTERIORES m2 1,342.49 354.00
4.08 INSTALACIONES ELECTRICAS -
04.08.01 TABLERO DE DISTRIBUCION GAB. METALICO P/DISTRIBUCION DE 6 CIRCUITOS und 2.00 1.00
04.08.02 TUBERIA CONDUIT RIGIDA DE 25 mm, CABLE NH80 2X4MM2 + 1X2.5MM2 (T) m 143.00 143.00
4.09 ESTRUCTURA METALICA -
04.09.02 PUERTA METALICA DE 2.40x3.00 m.DOS HOJAS und 4.00 2.00
04.10.04 CAJA DE INSPECCION PARA DRENAJE und 7.00 7.00
04.10.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. DM=2 km m3 33.46 33.46
5 PARQUES Y PLAZAS -
5.01 MOVIMIENTO DE TIERRAS -
05.01.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3 107.30 42.92
05.01.08 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 326.55 114.76
05.01.10 ACARREO MANUAL DE TIERRA DE CHACRA m3 156.61 62.00
5.02 OBRAS DE CONCRETO SIMPLE -
05.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 106.89 96.20
05.02.02 SARDINELES - ENCOFRADO Y DESENCOFRADO (H=0.25m) m2 205.10 123.06
05.02.03 SARDINELES - CONCRETO FC=175 KG/CM2 C/MEZCLADORA INC. CURADO m3 2.40 2.40
05.02.04 GRADAS: CONCRETO F´C= 140 kg/cm2 m3 2.82 2.82
05.02.05 GRADAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 8.35 8.35
5.03 OBRAS DE CONCRETO ARMADO -
05.03.01 MURO DE CONTENCION:ENCOFRADO Y DESENCOFRADO NORMAL m2 929.06 109.87
05.03.02 MURO DE CONTENCION:ACERO FY=4200 KG7CM2 kg 8,338.26 917.61
05.03.03 MURO DE CONTENCION:CONCRETO F'C=210 KG/CM2 m3 122.45 14.15
5.04 REVOQUES, ENLUCIDOS Y MOLDURAS -
05.04.01 TARRAJEO DE MUROS EXTERIORES m2 478.30 95.64
05.04.02 TARRAJEO PULIDO EN GRADAS Y ESCALERA m2 23.71 16.60
5.06 PISOS Y VEREDAS -
05.06.04 PISO DE LAJA E=2" MEZCLA=3CM m2 65.09 35.00
5.07 AREAS VERDES -
05.07.01 PREPARACION Y/O TRATAMIENTO DEL TERRENO PARA EL SEMBRADO DE GRASS m2 783.05 469.83
VALORIZACION N° 06
DESCRIPCION DE ACTIVIDADES
“MEJORAMIENTO DEL AREA DE RECREACION UBICADO EN EL LOTE 7 MZ. B DEL ASENTAMIENTO HUMANO SANTA CECILIA, DISTRITO DE
YARABAMBA, PROVINCIA AREQUIPA –AREQUIPA”
METRADO
CÓDIGO DESCRIPCIÓN UND. METRADO
ACTUAL
TOTAL
5.08 INSTALACIONES ELECTRICAS -
05.08.06 EXCAVACION DE ZANJAS PARA REDES ELECTRICAS a= 0.40, h=0.50 APROX. m 335.00 169.00
05.08.07 CAMA DE APOYO PARA TUBO HASTA 10" CON MATERIAL DE PRESTAMO m 335.00 170.00
05.08.08 RELLENO DE ZANJA C/ M.PROPIO, APISONADO MANUAL m 335.00 170.00
05.08.09 TUBERIA PVC SAP ELECTRICIDAD DE Ø 2" (50 mm) , CABLE NYY 2X10MM2 m 80.00 10.00
05.08.10 TUBERIA PVC SAP ELECTRICIDAD DE Ø 2" (50 mm) , CABLE NYY 2X6MM2 m 345.00 345.00
05.08.11 TUBERIA PVC SAP ELECTRICIDAD DE Ø 1" (25 mm) , CABLE NYY 1X2.5MM2 m 175.00 100.00
05.08.12 BUZON DE INSPECCÓN DE ENERGIA 500x500x750 mm und 14.00 6.00
05.08.13 CAJA DE PASE DE 150X150X75MM und 1.00 1.00
5.09 INSTALACIONES SANITARIAS -AGUA -
05.09.01 EXCAVACION DE ZANJAS PARA TUBERIA Ancho Aprox.= 0.40m, h</=0.60 m. en TR m 164.30 129.30
“MEJORAMIENTO DEL AREA DE RECREACION UBICADO EN EL LOTE 7 MZ. B DEL ASENTAMIENTO HUMANO SANTA CECILIA, DISTRITO
OBRA DE YARABAMBA, PROVINCIA AREQUIPA –AREQUIPA”
RESUMEN DE LA VALORIZACIONES
CONTRATISTA : CONSORCIO SANTA CECILIA V
SUPERVISOR : ING. MANUEL FABRICIO BEGAZO GUZMAN -- C.I.P. N° 74012
AL 30 DE NOVIEMBRE 2018 RESIDENTE : ING. GINO ALDO MUÑOZ PONCE -- C.I.P. N° 39405
CONTRATO : N° 022-2018-MDVY
LICIT. PUBLICA : N° 03-2018-MDVY (1era Convocatoria)
FECHA DE INICIO 6/1/2018
MONTO VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION ACUMULADO % SALDO POR
DESCRIPCION
CONTRATADO 1 2 3 4 5 6 VALORIZADO ACUMULADO VALORIZAR
VALORIZACION CONTRACTUAL
FORMULA POLINOMICA: GENERAL 2,900,261.34 208,485.06 315,919.99 417,900.39 323,419.92 635,961.56 #N/A #N/A #N/A #N/A
TOTAL CONTRACTUAL (V) 2,900,261.34 208,485.06 315,919.99 417,900.39 323,419.92 635,961.56 #N/A #N/A #N/A
% DE AVANCE DE OBRA A LA FECHA 7.19% 10.89% 14.41% 11.15% 21.93% #N/A #N/A #N/A #N/A
REAJUSTES (S)
FORMULA POLINOMICA: GENERAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO
OBRA “MEJORAMIENTO DEL AREA DE RECREACION UBICADO EN EL LOTE 7 MZ. B DEL ASENTAMIENTO HUMANO SANTA CECILIA, DISTRITO
DE YARABAMBA, PROVINCIA AREQUIPA –AREQUIPA”
CLIENTE MUNICIPALIDAD DISTRITAL Y VILLA DE YARABAMBA
DPTO. : AREQUIPA DISTRITO : YARABAMBA
CONTRATISTA : CONSORCIO SANTA CECILIA V RESIDENTE : ING. GINO ALDO MUÑOZ PONCE -- C.I.P. N° 39405
FECHA : 30 DE NOVIEMBRE 2018 SUPERVISOR : ING. MANUEL FABRICIO BEGAZO GUZMAN -- C.I.P. N° 74012
1 2 3 4 5 6 7
Ítem Descripción Parcial Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18
30 31 31 30 31 27 1
1.- AVANCE PROGRAMADO ACELERADO 3,422,308.37 246,012.37 372,785.59 493,122.46 748,523.36 937,635.79 601,109.23 23,119.57
2.- AVANCE PROGRAMADO ACUMULADO 3,422,308.37 246,012.37 618,797.96 1,111,920.42 1,860,443.78 2,798,079.57 3,399,188.80 3,422,308.37
3.- % AVANCE PROGRAMADO 100.00% 7.19% 10.89% 14.41% 21.87% 27.40% 17.56% 0.68%
4.- % AVANCE PROGRAMADO ACUMULADO 100.00% 7.19% 18.08% 32.49% 54.36% 81.76% 99.32% 100.00%
5.- AVANCE REAL #N/A 246,012.37 372,785.59 493,122.46 381,635.51 750,434.64 #N/A
6.- AVANCE REAL ACUMULADO 246,012.37 618,797.96 1,111,920.42 1,493,555.93 2,243,990.57 #N/A #N/A
7.- AVANCE REAL % #N/A 7.19% 10.89% 14.41% 11.15% 21.93% #N/A 0.00%
8.- AVANCE REAL ACUMULADO % 7.19% 18.08% 32.49% 43.64% 65.57% #N/A #N/A
9.- ESTADO ACTUAL DE LA OBRA ATRAZADA ATRAZADA ATRAZADA ATRAZADA ATRAZADA #N/A #N/A
0.00% 0.00% 0.00% -10.72% -16.19% #N/A #N/A
VALORIZACION N° 06
CONTROL GRAFICO DE VALORIZACIONES (CURVAS S)
OBRA
“MEJORAMIENTO DEL AREA DE RECREACION UBICADO EN EL LOTE 7 MZ. B DEL ASENTAMIENTO
HUMANO SANTA CECILIA, DISTRITO DE YARABAMBA, PROVINCIA AREQUIPA –AREQUIPA”
ENTIDAD MUNICIPALIDAD DISTRITAL Y VILLA DE YARABAMBA
CONTRATISTA : CONSORCIO SANTA CECILIA V
SUPERVISIÓN : ING. MANUEL FABRICIO BEGAZO GUZMAN -- C.I.P. N° 74012
RESIDENTE DE OBRA : ING. GINO ALDO MUÑOZ PONCE -- C.I.P. N° 39405
LICITAC. PUBLICA : N° 03-2018-MDVY (1era Convocatoria)
99.32%
100.00%
82.32%
80.00%
66.02%
60.00% 54.73%
43.94%
40.00% 32.71%
32.71%
18.20%
20.00% 18.20%
7.24%
0.00% 7.24%
0.00% 0.00%
OBRA #VALUE!
01 OBRAS PROVISIONALES
1.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60X2.40m und 1.00 1.00
1.02 CASETA DE GUARDIANIA, ALMACEN Y OFICINA DE RESIDENTE m2 72.00 72.00
###
1.03 VESTIDORES, COMEDORES Y SS.HH. PARA PERSONAL OBRERO m2 50.00 50.00
1.04 CERCO PROVISIONAL CON MALLA ARPILLERA m 267.53 267.53
1.05 ENERGIA ELECTRICA PROVISIONAL mes 6.00 6.00
1.06 SUMINISTRO DE AGUA PARA LA CONSTRUCCION mes 6.00 6.00
###
2 OBRAS PRELIMINARES
2.01 TRAZO Y REPLANTEO m2 2,561.81 2,561.81
2.02 DEMOLICION CISTERNA m3 6.18 6.18
2.03 DEMOLICION DE PISOS Y ESTRUCTURA EXISTENTE m2 120.09 120.09
2.04 DEMOLICION DE GRADERIAS Y SOLERA DE CERCO m3 112.06 112.06
2.05 DESMONTAJE DE CERCO METALICO Y ESTRUCTURA METALICA MALLA RASCHELL glb 1.00 1.00
2.06 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA PESADA vje 4.00 4.00
2.07 TRANSPORTE DE MATERIALES A PIE DE OBRA vje 20.00 20.00
2.08 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. DM=2 km m3 161.77 161.77
3 SEGURIDAD Y SALUD
3.01 ELABORACION E IMPLEMENTACION DEL PLAN DE SEGURIDAD glb 1.00 1.00
3.02 EQUIPOS DE PROTECCION INDIVIDUAL und 40.00 40.00
3.03 EQUIPOS DE PROTECCION COLECTIVA und 1.00 1.00
3.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 1.00
3.05 PROGRAMACION DE MONITOREO AMBIENTAL und 1.00 1.00
4 LOSA DEPORTIVA Y GRADERIAS
4.01 MOVIMIENTO DE TIERRAS
04.01.01 CORTE DE TERRENO EN ROCA FISURADA m3 170.29 170.29
04.01.02 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 931.40 931.40
04.01.03 EXCAVACION DE ZANJA PARA ZAPATAS m3 191.83 191.83
04.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 52.55 52.55
04.01.05 CONFORMACION DE BASE GRANULAR PARA GRASS SINTETICO C/EQUIPO LIVIANO E=0.20M m2 504.00 504.00
04.01.06 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. DM=2 km m3 386.96 386.96
4.02 CONCRETO SIMPLE
04.02.01 SOLADO PARA ZAPATAS F´C=100KG/CM2 e=4" m2 70.78 70.78
04.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 34.78 34.78
04.02.03 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMAL m 16.56 16.56
04.02.04 SOBRECIMIENTO: CONCRETO f´c=140 kg/cm2 1:10+25% P.M. m3 2.48 2.48
04.02.05 EMPEDRADO DE LOZA m2 79.96 79.96
04.02.06 ENCOFRADO Y DESENCOFRADO DE PISOS EXTERIORES m2 3.97 3.97
04.02.07 PISO DE CONCRETO F´C=175 KG/CM2 E=4" FROTACHADO m2 79.96 79.96
04.02.08 JUNTA ASFALTICA m 49.12 49.12
04.02.09 GRADERIAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 121.50 121.50
04.02.10 GRADERIAS: CONCRETO F´C=140KG/CM2+30% P.G. m3 118.01 118.01
04.02.11 ANCLAJES: CONCRETO F´C=175KG/CM2+30% P.G. m3 19.80 19.80
04.02.12 SARDINELES - ENCOFRADO Y DESENCOFRADO (H=0.25m) m2 92.60 92.60
04.02.13 SARDINELES - CONCRETO FC=175 KG/CM2 C/MEZCLADORA INC. CURADO m3 3.47 3.47
4.03 CONCRETO ARMADO
04.03.01 ZAPATAS: ACERO fy=4,200 kg/cm2 GRADO 60 kg 943.70 943.70
04.03.02 ZAPATAS: CONCRETO F'C=210 kg/cm2 m3 27.67 27.67
04.03.03 COLUMNAS. ENCOFRADO Y DESENCOFRADO NORMAL m2 640.91 640.91
04.03.04 COLUMNAS: ACERO fy=4,200 kg/cm2 GRADO 60 kg 13,061.45 13,061.45
04.03.05 COLUMNAS: CONCRETO F´C=210 kg/cm2 m3 64.66 64.66
04.03.06 VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 619.41 619.41
Item DESCRIPCION Und. Metrado Total Mes Actual
04.08.04 TUBERIA PVC SAP ELECTRICIDAD DE Ø 3//4" (20 mm) , CABLE NH80 2X2.5MM2 m 139.00 139.00
04.08.05 TUBERIA PVC SAP ELECTRICIDAD DE Ø 3//4" (20 mm) , CABLE GTP 2X#18AWG (SONIDO) m 85.00 85.00
04.08.06 SALIDA DE PARED CON CABLE NH80 2.5MM2(14)+DUCTO PVC SAP 19MM (3/4") pto 30.00 30.00
04.08.07 SALIDA DE PARED CON CABLE GTP 2X#18 AWG +DUCTO PVC SAP 19MM (3/4") pto 4.00 4.00
04.08.08 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE + L.T. A PRUEBA DE AGUA pto 7.00 7.00
04.08.09 CAJA DE PASE DE 150X150X75MM und 24.00 24.00
04.08.10 FLUORESCENTE RECTO ISPE 2X40 W INCLUYE EQUIPO Y PANTALLA und 11.00 11.00
04.08.11 REFLECTORES LED 200W, 50,000 HORAS LIVE und 16.00 16.00
04.08.12 LUMINARIA DE EMERGENCIA und 20.00 20.00
04.08.13 EQUIPO DE SONIDO und 1.00 1.00
04.08.14 POZO DE TIERRA und 2.00 2.00
4.09 ESTRUCTURA METALICA
04.09.01 ARCO METALICO DE FULBITO und 2.00 2.00
04.09.02 PUERTA METALICA DE 2.40x3.00 m.DOS HOJAS und 4.00 4.00
04.09.03 COLUMNAS METALICAS CON TUBO DE ACERO DE 3", C-1 m 181.80 181.80
04.09.04 VIGA METALICA PRINCIPAL CON TUBO DE ACERO DE 2 1/2", V-1 m 202.14 202.14
04.09.05 TENSOR CON TUBO DE 1" m 323.20 323.20
04.09.06 PERGOLA CON TUBO CUADRADO m2 145.04 145.04
04.09.07 PROTECTORES METALICOS PARA PUERTAS Y VENTANAS m2 185.43 185.43
04.10 GRASS SINTETICO
04.10.01 SUMINISTRO E INSTALACION DE GRAS SINTETICO m2 504.00 504.00
04.10.02 EXCAVACION DE ZANJA PARA DREN m3 26.77 26.77
04.10.03 DRENAJE PLUVIAL m 90.00 90.00
04.10.04 CAJA DE INSPECCION PARA DRENAJE und 7.00 7.00
04.10.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. DM=2 km m3 33.46 33.46
4.11 VIDRIOS CRISTALES Y SIMILARES
04.11.01 CRISTAL TEMPLADO INCOLORO DE 8MM m2 101.87 101.87
04.11.02 CRISTAL TEMPLADO INCOLORO DE 12MM m2 21.96 21.96
4.12 EQUIPAMIENTO Y MOBILIARIO
04.12.01 KIT DE EQUIPAMIENTO DEPORTIVO und 2.00 2.00
5 PARQUES Y PLAZAS
5.01 MOVIMIENTO DE TIERRAS
05.01.01 CORTE DE TERRENO EN ROCA FISURADA m3 283.82 283.82
05.01.02 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 569.16 569.16
05.01.03 CONFORMACION DE SUB BASE GRANULAR C/EQUIPO LIVIANO E=0.20M m2 596.85 596.85
05.01.04 EXCAVACION Y PERFILADO DE ZANJAS PARA SARDINELES EN TERRENO NORMAL m 229.30 229.30
05.01.05 EXCAVACION DE ZANJA PARA CIMENTACION EN ROCA FISURADA m3 495.17 495.17
05.01.06 ACARREO DE MATERIAL EXCEDENTE DE FORMA MANUAL 20m<D>50m m3 671.15 671.15
05.01.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3 107.30 107.30
05.01.08 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 326.55 326.55
05.01.09 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. DM=2 km m3 785.79 785.79
CALCULO DE LOS COEFICIENTES DE REAJUSTE "K"
VALORIZACION N° 06
AL 30 DE NOVIEMBRE 2018
OBRA
“MEJORAMIENTO DEL AREA DE RECREACION UBICADO EN EL LOTE 7 MZ. B DEL ASENTAMIENTO HUMANO SANTA CECILIA, DISTRITO DE YARABAMBA, PROVINCIA AREQUIPA –AREQUIPA”
POLINOMICA GENERAL
K= 0.255*(Mr / Mo) + 0.061*(BAAr / BAAo) + 0.074*(CAr / CAo) + 0.094*(DTr / DTo) + 0.155*(PMr / PMo) + 0.070*(MMr / MMo) + 0.291*(Ir / Io)
FP GENERAL 2,900,261.34
D = V * A * ( Kr / Ka - 1 ) / C
SUB TOTAL 3,399,188.80 95,055.70 #N/A #N/A #N/A #N/A 0.00 #N/A
REINT. ACUM. ANTERIOR 0.00
REINT. A PAGAR #N/A